October 2023 Monthly Financial Report PREPARED BY Financial Accounting & Reporting Division October 31, 2023 To the Mayor and City Council: This is the City's Financial Report for October, the fourth month of fiscal year 2023-24. This financial report summarizes revenues and expenditures by major categories. The report consists of three sections: Expenditures by Program General Fund Presents a five-year history, including current year budget and actual, and variance and trend analysis for general fund expenditures. Citywide Presents a five-year history, including current year budget and actual, and variance and trend analysis for citywide expenditures. Revenues by Source Presents a current year budget-to-actual analysis as well as a three-year variance and trend analysis for various revenue sources. Financial Schedules General Fund Summary Presents comparisons of year-to-date balances to the fiscal year budget and to the actual results for the prior year for the general fund. Citywide Summary Presents the City's summarized comparisons of the year-to-date balances to the fiscal year budget and to the actual results for the prior year. Citywide Detail Presents, in detail, the results of the City's operations for the current month and for the fiscal year-to-date. Included are breakdowns of the City's revenues, operating budget expenditures, capital budget expenditures and bonds authorized and sold. Respectfully submitted, Kathleen Gitkin Chief Financial Officer Cynthia Bisdorf Acting Deputy Finance Director February 1, 2024 INDEPENDENT AUDITOR REPORT To the Chief Financial Officer, We have assessed the Finance Department’s (Finance) October 2023 Monthly Financial Report (MFR) in accordance with the agreed-upon procedures engagement between Finance and the City Auditor Department (Audit). Finance prepares a monthly, written report to the City Council detailing expenditures, revenues, and the City’s financial condition. Finance is responsible for compiling an accurate and complete MFR. Finance and Audit entered into an agreed-upon procedures engagement for the assessment of the MFR on September 7, 2023. The agreed-upon procedures include the following: • Mathematically check calculations presented within the MFR. • Confirm stated financial data presented within the MFR to historical data supplied by Finance. This agreed-upon procedures engagement was conducted in accordance with the attestation standards established by the American Institute of Certified Public Accountants (AICPA). Because the agreed-upon procedures listed above do not constitute an examination or a review, we will not express an opinion on the MFR as a whole. Had we performed additional procedures; other matters may have come to our attention which would have been reported. The sufficiency of the procedures is solely the responsibility of parties specified in the agreed-upon procedures engagement agreement. Based on the agreed-upon procedures, we verified that the presented financial data was mathematically accurate and tied to historical data presented in the MFR. Sincerely, Aaron Cook Deputy City Auditor City of Phoenix Monthly Financial Report October 2023 Table of Contents Page Performance Status General Fund Total Expenditures 1 Expected General Government 1 Expected Criminal Justice 1 Monitor and Consider Taking Action Public Safety 2 Monitor and Consider Taking Action Transportation 2 Better than Expected Community Development 2 Monitor and Consider Taking Action Expenditures by Programs General Fund Expenditures Community Enrichment 3 Better than Expected Environmental Services 3 Monitor and Consider Taking Action Citywide Total Operating Expenditures 4 Better than Expected General Government 4 Better than Expected Criminal Justice 4 Expected Public Safety 5 Monitor and Consider Taking Action Transportation 5 Better than Expected Community Development 5 Better than Expected Community Enrichment 6 Monitor and Consider Taking Action Environmental Services 6 Monitor and Consider Taking Action General Obligation Debt Service 6 Better than Expected Citywide Expenditures Capital Expenditures CIP-General Government 7 CIP-Aviation 7 CIP-Phoenix Convention Center 8 CIP-Solid Waste Disposal 8 CIP-Wastewater 9 CIP-Water System 9 Page Performance Status General Fund Total Operating Revenue 10 Better than Expected Property Tax 11 Expected Local Sales Tax 12 Better than Expected Revenues by Source State Sales Tax 13 Better than Expected Vehicle License Tax 14 Monitor and Consider Taking Action Governmental Funds 15 Expected Aviation 16 Better than Expected Water System 17 Monitor and Consider Taking Action Wastewater 18 Monitor and Consider Taking Action Financial Schedules Page General Fund Revenue 19 General Fund Expenditures 20 Citywide Operating Revenue 21 Citywide Operating Expenditures 22 Citywide Operating Revenue by Source 23 Citywide Operating Expenditures by Program 26 Capital Expenditures and Encumbrances 28 Bonds Authorized and Sold 29 Notes: Performance Status Better than Expected - Positive variance of greater than 1% actual vs budget. Expected - Actual vs budget variance within 1% positive or negative. Monitor and Consider Taking Action - Negative variance greater than 1% actual vs budget. Corrective Action Taken - Negative variance greater than 1% actual vs budget, however the City has taken action to address the negative variance. General Fund Expenditures Expenditures from the City's General Fund for core functions such as Police, Fire, Parks, Streets and Social Services as well as administrative functions such as Mayor and Council, City Manager, Finance, and Human Resources. This does not include any expenditures from dedicated revenue streams such as grants, bonds, specifically dedicated taxes, and enterprise revenues. General Fund Year-To-Date Expenditures (In Thousands of Dollars) Refer to detailed financial schedules pages 19 thru 29 Total General Fund Expenditures Fiscal Year 19-20 20-21 21-22 22-23 23-24 October YTD Expenditures 466,266 466,370 548,182 559,433 671,210 Total General Fund Annual Expenditures * 1,282,831 1,371,152 1,470,251 1,623,808 1,955,421 % of Annual Expenditures 36.3% 34.0% 37.3% 34.5% 34.3% * For prior years -- total actual expenditures; for current year -- total approved budget net of adjustment for contingencies. $2,500,000 October YTD Expenditures $2,000,000 $1,500,000 $1,000,000 Annual Expenditures * $500,000 $0 19-20 Expected 20-21 21-22 22-23 23-24 In order to have a better comparison to prior year actuals, contingencies and vacancy savings will only be included in the annual budget to the extent that they have been spent. The general fund provides for core City functions that are not provided by dedicated revenue streams. It does not include services provided by dedicated taxes, grants, bond proceeds or enterprise fund revenues. Fiscal year 2023-24 budgeted general fund expenditures are 20.4% higher than the fiscal year 2022-23 actuals. Fiscal year 2023-24 actual general fund expenditures through October are 20.0% higher than the same period in fiscal year 2022-23. The increase is due to higher personal services (i.e., salaries, benefits, etc.), vehicle purchases, and insurance premiums in fiscal year 2023-24. General fund expenditures increased 10.4% in fiscal year 2022-23 over fiscal year 2021-22. This followed an increase of 7.2% from 2021-22 over 2020-21 and an increase of 6.9% from 2020-21 over 2019-20 fiscal results. General Government Fiscal Year 19-20 20-21 21-22 22-23 23-24 General Government October YTD Expenditures 53,882 52,812 61,716 66,271 80,940 Annual % of Annual Expenditures * Expenditures 43.8% 123,100 34.2% 154,211 38.1% 161,907 34.7% 190,945 34.5% 234,477 * For prior years -- total actual expenditures; for current year -- total approved budget net of adjustment for contingencies. $250,000 October YTD Expenditures $200,000 $150,000 $100,000 Annual Expenditures * $50,000 $0 19-20 Expected 20-21 21-22 22-23 23-24 General government expenditures include costs for administrative and internal service functions such as the Mayor and City Council, City Manager’s Office, City Auditor, Finance, Budget and Research, and Human Resources. Fiscal year 2023-24 budgeted general fund expenditures are 22.8% higher than the fiscal year 2022-23 actuals. Fiscal year 2023-24 actual general fund expenditures through October are 22.1% higher than the same period in fiscal year 2022-23. The largest driver accounting for increase year-over-year is Human Resource's $4.2 million charge for the Firefighters Cancer Reimbursement Fund Assessment. The largest driver accounting for the year-over-year increase in budget is $10 million in Information Technology. General fund expenditures increased 17.9% in fiscal year 2022-23 over fiscal year 2021-22. This followed an increase of 5.0% from 2021-22 over 2020-21 and an increase of 25.3% from 2020-21 over 2019-20 fiscal results. Criminal Justice Fiscal Year 19-20 20-21 21-22 22-23 23-24 Criminal Justice October YTD Expenditures Annual Expenditures * 12,084 12,126 13,123 14,103 15,478 35,033 36,162 40,008 42,361 45,265 % of Annual Expenditures 34.5% 33.5% 32.8% 33.3% 34.2% * For prior years -- total actual expenditures; for current year -- total approved budget net of adjustment for contingencies. $50,000 October YTD Expenditures $40,000 $30,000 Annual Expenditures * $20,000 $10,000 $0 19-20 Monitor and Consider Taking Action 20-21 21-22 22-23 23-24 Criminal Justice expenditures include costs for Municipal Courts and Public Defenders. Fiscal year 2023-24 budgeted general fund expenditures are 6.9% higher than the fiscal year 2022-23 actuals. Fiscal year 2023-24 actual general fund expenditures through October are 9.7% higher than the same period in fiscal year 2022-23. General fund criminal justice expenditures increased 5.9% in fiscal year 2022-23 over fiscal year 2021-22. This followed an increase of 10.6% from 2021-22 over 2020-21 and an increase of 3.2% from 2020-21 over 2019-20 fiscal results. 1 General Fund Year-To-Date Expenditures (In Thousands of Dollars) Refer to detailed financial schedules pages 19 thru 29 Public Safety Fiscal Year 19-20 20-21 21-22 22-23 23-24 Public Safety October YTD Expenditures Annual Expenditures * 305,142 317,148 330,301 369,261 447,763 893,403 925,920 992,648 1,082,562 1,222,556 % of Annual Expenditures 34.2% 34.3% 33.3% 34.1% 36.6% $1,500,000 October YTD Expenditures $1,200,000 $900,000 $600,000 Annual Expenditures * $300,000 * For prior years -- total actual expenditures; for current year -- total approved budget net of adjustment for contingencies. $0 19-20 Monitor and Consider Taking Action 20-21 21-22 22-23 23-24 Public Safety expenditures include costs for police and fire services. The anticipated increases are due to vehicle purchases and higher personal service expenditures for public safety employees in both the Police and Fire Departments, which includes City pension contributions. Fiscal year 2023-24 budgeted general fund public safety expenditures are 12.9% higher than the fiscal year 2022-23 actuals. Fiscal year 2023-24 actual general fund public safety expenditures through October are 21.3% higher than the same period in fiscal year 2022-23. General fund public safety expenditures increased 9.1% in fiscal year 2022-23 over fiscal year 2021-22. This followed an increase of 7.2% from 2021-22 over 2020-21 and an increase of 3.6% from 2020-21 over 2019-20 fiscal results. Transportation Fiscal Year 19-20 20-21 21-22 22-23 23-24 Transportation October YTD Expenditures Annual Expenditures * 7,985 7,045 8,094 9,923 6,363 19,748 22,144 23,166 24,827 25,473 % of Annual Expenditures 40.4% 31.8% 34.9% 40.0% 25.0% * For prior years -- total actual expenditures; for current year -- total approved budget net of adjustment for contingencies. $30,000 $25,000 October YTD Expenditures $20,000 $15,000 $10,000 Annual Expenditures * $5,000 $0 19-20 Better than Expected 20-21 21-22 22-23 23-24 Transportation expenditures include costs for public transit and street maintenance and repair. Prior to fiscal year 2018-19 Street Transportation Department charged expenses to the general fund and subsequently transferred some of those expenses to the Arizona Highway User Revenue fund (AHUR). Beginning in fiscal year 2018-19 Street Transportation is charging most expenses to AHUR while transferring a portion of those to the general fund. Fiscal year 2023-24 budgeted general fund transportation expenditures are 2.6% higher than the fiscal year 2022-23 actuals. Fiscal year 2023-24 actual general fund transportation expenditures through October are 35.9% lower than the same period in fiscal year 2022-23 due to the senior services shuttle program being discontinued. General fund transportation expenditures increased 7.2% in fiscal year 2022-23 over fiscal year 2021-22. This followed an increase of 4.6% from 2021-22 over 2020-21 and an increase of 12.1% from 2020-21 over 2019-20 fiscal results. Community Development Fiscal Year 19-20 20-21 21-22 22-23 23-24 Community Development October YTD Expenditures Annual Expenditures * 8,161 7,898 9,013 9,950 13,062 22,542 24,114 28,225 32,420 39,424 % of Annual Expenditures 36.2% 32.8% 31.9% 30.7% 33.1% $50,000 October YTD Expenditures $40,000 $30,000 $20,000 Annual Expenditures * $10,000 * For prior years -- total actual expenditures; for current year -- total approved budget net of adjustment for contingencies. $0 19-20 Monitor and Consider Taking Action 20-21 21-22 22-23 23-24 Community Development expenditures include costs for economic development and neighborhood services. The fiscal year 2023-24 budgeted general fund community development expenditures are 21.6% higher than the fiscal year 2022-23 actuals. Fiscal year 2023-24 actual general fund community development expenditures through October are 31.3% higher than the same period in fiscal year 2022-23. General fund community development expenditures increased 14.9% in fiscal year 2022-23 over fiscal year 2021-22. This followed an increase of 17.0% from 2021-22 over 2020-21 and an increase of 7.0% from 2020-21 over 2019-20 fiscal results. 2 General Fund Year-To-Date Expenditures (In Thousands of Dollars) Refer to detailed financial schedules pages 19 thru 29 Community Enrichment Community Enrichment % of Annual Expenditures 42.7% 38.3% 37.9% 39.4% 38.0% $250,000 * For prior years -- total actual expenditures; for current year -- total approved budget net of adjustment for contingencies. $0 Fiscal Year 19-20 20-21 21-22 22-23 23-24 October YTD Expenditures Annual Expenditures * 66,388 60,808 65,880 75,137 86,749 155,417 158,589 173,631 190,780 228,167 October YTD Expenditures $200,000 $150,000 $100,000 Annual Expenditures * $50,000 19-20 20-21 21-22 22-23 23-24 Better than Expected Community enrichment expenditures include costs for parks, recreational activities, senior centers and community centers. Fiscal year 2023-24 budgeted general fund community enrichment expenditures are 19.6% higher than the fiscal year 2022-23 actuals. Fiscal year 2023-24 actual general fund community enrichment expenditures through October are 15.5% higher than the same period in fiscal year 2022-23. The anticipated increase is due to higher contractual services related to parking management services and staffing fiscal year 2023-24. General fund community enrichment expenditures increased 9.9% in fiscal year 2022-23 over fiscal year 2021-22. This followed an increase of 9.5% from 2021-22 over 2020-21 and an increase of 2.0% from 2020-21 over 2019-20 fiscal results. Environmental Services Fiscal Year 19-20 20-21 21-22 22-23 23-24 Environmental Services October YTD Expenditures Annual Expenditures * 9,774 6,691 10,830 9,573 13,384 19,180 20,905 26,508 28,329 38,527 % of Annual Expenditures 51.0% 32.0% 40.9% 33.8% 34.7% $40,000 October YTD Expenditures $30,000 $20,000 Annual Expenditures * $10,000 * For prior years -- total actual expenditures; for current year -- total approved budget net of adjustment for contingencies. $0 19-20 Monitor and Consider Taking Action 20-21 21-22 22-23 23-24 Environmental service expenditures include costs for maintaining and operating City facilities. Because environmental service expenditures are highly dependent on interdepartmental charges, they tend to be very volatile. Fiscal year 2023-24 budgeted general fund environmental services expenditures are 36.0% higher than the fiscal year 2022-23 actuals. Fiscal year 2023-24 actual general fund environmental service expenditures through October are 39.8% higher than the same period in fiscal year 2022-23. The largest factors increasing annual budget is additional personal services and commodities. General fund environmental expenditures increased 6.9% in fiscal year 2022-23 over fiscal year 2021-22. This followed an increase of 26.8% from 2021-22 over 2020-21 and an increase of 9.0% from 2020-21 over 2019-20 fiscal results. 3 Citywide Expenditures All expenditures of the City including those for enterprise functions and those related to dedicated revenue streams. Expenditures are reported in total and by program. Citywide Year-To-Date Expenditures (In Thousands of Dollars) Refer to detailed financial schedules pages 19 thru 29 Total Citywide Operating Fiscal Year 19-20 20-21 21-22 22-23 23-24 October YTD Expenditures 1,450,722 1,418,499 1,785,763 1,818,503 1,948,957 Total Citywide Annual Expenditures * 3,814,963 4,163,122 4,488,949 4,737,610 6,602,682 % of Annual Expenditures 38.0% 34.1% 39.8% 38.4% 29.5% * For prior years -- total actual expenditures; for current year -- total approved budget net of adjustments for contingencies and use of the early redemption fund. $8,000,000 October YTD Expenditures $6,000,000 $4,000,000 Annual Expenditures * $2,000,000 $0 19-20 Better than Expected 20-21 21-22 22-23 23-24 In order to have a better comparison to prior year actuals, contingencies and vacancy savings will only be included in the annual budget to the extent that they have been spent. Fiscal year 2023-24 budget includes program budgeted ARPA amounts. Without contingencies and vacancy savings, and including programs budgeted for ARPA the budget for fiscal year 2023-24 anticipates an increase of 39.4% over fiscal year 2022-23 actuals in total operating expenditures. Actual expenditures through October are 7.2% higher than the same period in the prior fiscal year. General Government Fiscal Year 19-20 20-21 21-22 22-23 23-24 General Government October YTD Expenditures 59,527 73,614 66,219 93,816 91,552 Annual Expenditures * 157,200 207,451 238,925 246,244 287,719 % of Annual Expenditures 37.9% 35.5% 27.7% 38.1% 31.8% $400,000 October YTD Expenditures $300,000 $200,000 Annual Expenditures * $100,000 * For prior years -- total actual expenditures; for current year -- total approved budget. $0 19-20 Better than Expected 20-21 21-22 22-23 23-24 General government expenditures include costs for administrative and internal service functions such as the Mayor and City Council, City Manager's Office, City Auditor, Finance, Budget and Research, and Human Resources. Budget for fiscal year 2023-24 anticipates an increase of 16.8% over fiscal year 2022-23 actuals in total operating expenditures. Actual expenditures through October are 2.4% lower than the same period in the prior fiscal year. Criminal Justice Fiscal Year 19-20 20-21 21-22 22-23 23-24 Criminal Justice October YTD Expenditures 15,346 14,938 15,464 16,449 18,228 Annual Expenditures * 44,425 44,147 47,054 49,422 54,280 % of Annual Expenditures 34.5% 33.8% 32.9% 33.3% 33.6% $80,000 October YTD Expenditures $60,000 $40,000 Annual Expenditures * $20,000 * For prior years -- total actual expenditures; for current year -- total approved budget. $0 19-20 Expected 20-21 21-22 22-23 23-24 Criminal Justice expenditures include costs of the Municipal Court and the Public Defender’s Office. Citywide criminal justice budget for fiscal year 2023-24 anticipates an increase of 9.8% over fiscal year 2022-23 actuals in total operating expenditures. Actual expenditures through October are 10.8% higher than the same period in the prior fiscal year. 4 Citywide Year-To-Date Expenditures (In Thousands of Dollars) Refer to detailed financial schedules pages 19 thru 29 Public Safety Public Safety % of Annual Expenditures 33.7% 34.3% 33.5% 34.9% 35.9% $2,000,000 * For prior years -- total actual expenditures; for current year -- total approved budget. $0 Fiscal Year 19-20 20-21 21-22 22-23 23-24 October YTD Expenditures 374,072 384,672 411,464 472,338 556,009 Annual Expenditures * 1,110,457 1,122,901 1,228,901 1,354,421 1,547,732 October YTD Expenditures $1,600,000 $1,200,000 $800,000 Annual Expenditures * $400,000 19-20 20-21 21-22 22-23 23-24 Monitor and Consider Taking Action Public Safety expenditures include costs of Police, Fire and Emergency Management. Citywide public safety budget for fiscal year 2023-24 anticipates an increase of 14.3% over fiscal year 2022-23 actuals in total operating expenditures. Actual expenditures through October are 17.7% higher than the same period in the prior fiscal year. Transportation Fiscal Year 19-20 20-21 21-22 22-23 23-24 Transportation October YTD Expenditures 425,627 359,205 460,730 438,721 416,772 Annual Expenditures * 774,492 786,597 797,084 792,941 914,442 % of Annual Expenditures 55.0% 45.7% 57.8% 55.3% 45.6% $1,000,000 October YTD Expenditures $800,000 $600,000 $400,000 Annual Expenditures * $200,000 * For prior years -- total actual expenditures; for current year -- total approved budget. $0 19-20 Better than Expected 20-21 21-22 22-23 23-24 Transportation expenditures include costs for street lighting, maintenance and repair, Aviation and Public Transit. Citywide transportation budget for fiscal year 2023-24 anticipates an increase of 15.3% over fiscal year 2022-23 actuals in total operating expenditures. Actual expenditures through October are 5.0% lower than the same period in the prior fiscal year. Fiscal year 2021-22 financial results included a $70 million pension paydown. Community Development Fiscal Year 19-20 20-21 21-22 22-23 23-24 October YTD Expenditures 70,090 85,193 74,042 83,547 105,535 Community Development Annual Expenditures * 229,793 245,310 227,960 270,479 416,139 % of Annual Expenditures 30.5% 34.7% 32.5% 30.9% 25.4% $500,000 October YTD Expenditures $400,000 $300,000 $200,000 Annual Expenditures * $100,000 * For prior years -- total actual expenditures; for current year -- total approved budget. $0 19-20 Better than Expected 20-21 21-22 22-23 23-24 Community Development expenditures include costs for Neighborhood Services, Housing, Planning and Economic Development. Citywide community development budget for fiscal year 2023-24 anticipates an increase of 53.9% over fiscal year 2022-23 actuals in total operating expenditures. Actual expenditures through October are 26.3% higher than the same period in the prior fiscal year. 5 Citywide Year-To-Date Expenditures (In Thousands of Dollars) Refer to detailed financial schedules pages 19 thru 29 Community Enrichment Community Enrichment % of Annual Expenditures 41.7% 36.8% 36.3% 39.4% 43.1% $600,000 * For prior years -- total actual expenditures; for current year -- total approved budget. $0 Fiscal Year 19-20 20-21 21-22 22-23 23-24 October YTD Expenditures 132,077 143,799 152,774 177,354 206,148 Annual Expenditures * 316,680 390,805 420,501 450,218 478,854 October YTD Expenditures $450,000 $300,000 Annual Expenditures * $150,000 19-20 20-21 21-22 22-23 23-24 Monitor and Consider Taking Action Community Enrichment expenditures include costs for Parks, Libraries, the Convention Center, Senior Centers and Community Centers. Citywide community enrichment budget for fiscal year 2023-24 anticipates an increase of 6.4% over fiscal year 2022-23 actuals in total operating expenditures. Actual expenditures through October are 16.2% higher than the same period in the prior fiscal year. Environmental Services % of Annual Expenditures 35.5% 34.7% 38.3% 34.4% 35.5% $1,000,000 * For prior years -- total actual expenditures; for current year -- total approved budget. $0 Fiscal Year 19-20 20-21 21-22 22-23 23-24 October YTD Expenditures 245,568 254,943 288,056 285,805 326,341 Environmental Services Annual Expenditures * 692,524 734,733 752,386 830,101 918,863 October YTD Expenditures $750,000 $500,000 Annual Expenditures * $250,000 19-20 20-21 21-22 22-23 23-24 Monitor and Consider Taking Action Environmental Services expenditures include costs for Water, Wastewater and Solid Waste services as well as the care and maintenance of City facilities. Citywide environmental services budget for fiscal year 2023-24 anticipates an increase of 10.7% over fiscal year 2022-23 actuals in total operating expenditures. Actual expenditures through October are 14.2% higher than the same period in the prior fiscal year. Citywide Debt Service Expenditures Fiscal Year 19-20 20-21 21-22 22-23 23-24 October YTD Expenditures 43,513 44,213 43,807 120,380 45,333 Annual Expenditures * 130,839 131,938 131,081 207,854 136,900 General Obligation Debt Service % of Annual Expenditures 33.3% 33.5% 33.4% 57.9% 33.1% $240,000 October YTD Expenditures $180,000 $120,000 Annual Expenditures * $60,000 * For prior years -- total actual expenditures; for current year -- total approved budget net of credit for early redemption fund resources $0 19-20 20-21 21-22 22-23 23-24 Better than Expected General obligation debt service expenditures budget for fiscal year 2023-24 has a decrease of 34.1% over fiscal year 2022-23 actuals in total operating expenditures. Actual debt service expenditures through October 2023 are 62.3% lower than the same period in the prior fiscal year. Increases in fiscal year 2022-23 include a $75 million partial defeasance of General Obligation Refunding Bonds, Series 2014, and a $60 million pay-off of the Excise Tax Revenue Obligations Loan that was used to purchase the 100 W. Washington Street Building. 6 Capital Expenditures Expenditures for capital projects. These expenditures may come from designated capital funds such as bond proceeds or grants, or they may come from operating funds and be reported in both the operating and capital sections. Because of the long-term view used in capital budgeting and the volatility of capital spending, no performance status is provided unless capital spending exceeds the capital budget. Capital Expenditures (In Thousands of Dollars) Refer to detailed financial schedules pages 19 thru 29 19-20 General Government $ 500,745 20-21 21-22 22-23 23-24 (Budget) 23-24 (YTD) $ 684,798 $ 525,852 $ 494,744 $ 2,119,807 $ Discussion: 165,609 General Government Major projects budgeted for in fiscal year 2019-20 included $131 million for pavement maintenance, $100 million on Light Rail, $57 million for Talking Stick Arena Renovations, $47 million on parks preserve development, community centers, and development, $45 million bus and vehicle purchases, and $18 million for major streets. 23-24 (YTD) 23-24 (Budget) 22-23 Major projects budgeted for in fiscal year 2020-21 included $115 million on the South Central Light Rail, $96 million for Talking Stick Arena renovations, $69 million on Northwest Light Rail extension, and $32 million to replace fare collection system. 21-22 20-21 Major projects budgeted for in fiscal year 2021-22 included $117 million on South Central Light Rail extension, $70 million on Northwest Light Rail extension, $29 million to design and constructing roadway and drainage near the 303 and Carefree Highway, $11 million replacement of Police Air Fleet, and $10 million street improvement near Pinnacle Peak and 35th to 45th Ave. 19-20 $0 $500 $1,000 $1,500 $2,000 $2,500 Major projects budgeted for in fiscal year 2022-23 included $248 million for Light Rail extension, construction, right-of-way and acquisition of property, $63 million for debt service/principal and interest for Aviation and Convention Center, $60 million to construct and complete major street projects, $53 million to purchase standard buses, design first corridor Bus Rapid Transit, and add an operational garage, $22 million on funds for construction cost of affordable housing, $21 million to improve three Pedestrian Hybrid Beacons, $18 million to procure and implement a Time and Labor System, and $2 million to acquire parcels along the Capitol and I-10 corridor. Additionally, there is $100 million in contingency budget for undetermined capital expenditures. Major projects budgeted for in fiscal year 2023-24 include $264 million for Light Rail extension, construction, right-of-way and acquisition of property, $116 million to purchase standard buses, design first and second corridors Bus Rapid Transit, $75 million to acquire parcels along the Capitol and I-10 corridor, $65 million for new parks construction, $101 million for major streets and bridges projects, $41 million on funds for construction cost of affordable housing, and $20 million to procure and implement a Time and Labor System. Additionally, there is $100 million in contingency budget for undetermined capital expenditures. 20-21 21-22 22-23 23-24 (Budget) 23-24 (YTD) $ 172,418 $ 115,395 $ 134,479 $ 1,192,245 $ 19-20 Aviation $ 254,523 70,407 Discussion: Aviation Major projects budgeted for in fiscal year 2019-20 included $90 million for PHX Terminal 4 South concourse and gates, $47 million for Runway, Apron and Taxiway Improvements, and $10 million for PHX Sky Train. 23-24 (YTD) 23-24 (Budget) 22-23 Major projects budgeted for in fiscal year 2020-21 included $51 million on Terminal 4 concourse, $24 million Terminal 4 Apron Concrete construction, $19 million garage demolition, and $13 million on the 24th St parking lot. 21-22 20-21 19-20 $0 $500 $1,000 $1,500 Major events budgeted for in fiscal year 2021-22 included $58 million in Aviation Bonds, $13 million in New Crossfield Taxiway, $6 million on Terminal 4 South 1 Concourse, and $5 million on Phoenix Sky Train. Major projects budgeted for in fiscal year 2022-23 included $11 million for a New Crossfield Taxiway, $34 million to modernize vertical and horizontal transportation equipment at Sky Harbor, $24 million to reconstruct the West Air Cargo Apron, $21 million to replace and relocate the police hangar at Phoenix Deer Valley Airport, $13 million to relocate Taxiway at Phoenix Deer Valley Airports, $12 million to replace Terminal 4 fire alarm/voice evacuation system, and $11 million to facilitate the acquisition of land on the North side of Phoenix Sky Harbor Airport. Additionally, the City budgets $176 million in contingencies for the Airport Development Plan. Major projects budgeted for in fiscal year 2023-24 include $315 million for Concourse Construction at Phoenix Sky Harbor Airport, $185 million for the new Crossfield Taxiway, $43 million to relocate the American Airlines baggage sorting facility, $41 million to modify West Air Cargo Building in support of new Crossfield Taxiway, and $23 million to reconstruct the West Air Cargo Apron. Additionally, the City budgets $377 million in contingencies for the Airport Development Plan. 7 Capital Expenditures (In Thousands of Dollars) Refer to detailed financial schedules pages 19 thru 29 19-20 Phoenix Convention Center $ 52,148 20-21 21-22 22-23 $ 31,640 $ 84,751 $ 112,717 23-24 (Budget) 23-24 (YTD) $ $ Discussion: 45,697 5,284 Phoenix Convention Center Beginning in fiscal year 2012-13, Phoenix Convention Center began making debt service payments on the State funded portion of the 2005 Convention Center bonds. The payments from the State are accumulated in a capital fund and the subsequent debt service payments are then made from the capital fund within the capital budget. The debt service payments totaled $24 million for fiscal year 202021. Major projects budgeted for in fiscal year 2021-22 included $47 million for the purchase of 100 West Washington Street. 23-24 (YTD) 23-24 (Budget) 22-23 21-22 Major projects budgeted for in fiscal year 2022-23 included $150 million to design and construct the second phase of building and garage renovations at 100 West Washington Street. 20-21 19-20 Major projects budgeted for in fiscal year 2023-24 include $34 million to design and construct the second phase of building and garage renovations at 100 West Washington Street. 19-20 Solid Waste $ 20-21 5,490 $ 8,796 $0 21-22 22-23 $ 28,986 $ 22,723 $50 23-24 (Budget) 23-24 (YTD) $ $ 38,135 $100 $150 11,480 Discussion: Solid Waste Major projects budgeted for in fiscal year 2019-20 Solid Waste included $3 million for transfer stations, $1 million at State Route 85, and $1 million for Skunk Creek as monitoring and maintenance. 23-24 (YTD) 23-24 (Budget) Major projects budgeted for in fiscal year 2020-21 Solid Waste included $4.5 million on Excavate and line Cell 2 at the State Route 85 Landfill, $1.2 million Dixileta payment replacement at self-haul area, and $1.1 million at the 27th Ave trommel machine. 22-23 21-22 Major projects budgeted for in fiscal year 2021-22 Solid Waste included $24 million on replacing and upgrading aging equipment at 27th Ave and North Gateway Transfer Stations Material Recovery Facilities. 20-21 19-20 $0 $15 $30 Major projects budgeted for in fiscal year 2022-23 included $10 million at transfer stations, $8.5 million at State Route 85 for excavating and lining along with methane gas extraction systems, and $3 million to purchase replacement vehicles. Additionally, the City budgeted $2.5 million in contingency funding for unexpected expenditures. $45 Major projects budgeted for in fiscal year 2023-24 include $9 million to excavate and line Cell 2 at the State Route 85 Landfill, $7 million to replace or upgrade aging equipment at the 27th Ave Material Recovery Facilities, and $3 million to purchase and install upgraded recycling equipment at the North Gateway Material Recovery Facility. Additionally, the City budgets $10 million for unexpected expenditures. 8 Capital Expenditures (In Thousands of Dollars) Refer to detailed financial schedules pages 19 thru 29 19-20 Wastewater $123,141 20-21 21-22 22-23 $ 77,339 $ 182,710 $147,620 23-24 (Budget) 23-24 (YTD) $ $ 381,046 Discussion: 42,982 Wastewater Major projects budgeted for in fiscal year 2019-20 included $42.0 million on sewer replacement and construction, $27.7 million on 91st Ave Waste Water Treatment Plant, $14.4 million at 23rd Ave, $13.1 million at Cave Creek, and $13.1 million on lift stations. 23-24 (YTD) 23-24 (Budget) Major projects budgeted for in fiscal year 2020-21 included $12.4 million on 91st Ave plant equipment, $10.1 million for 23rd Ave Grit Basin Replacement, $6.9 million Citywide to rehabilitate small diameter sewers, and $4.7 million for 23rd Ave equipment replacement. 22-23 21-22 Major projects budgeted for in fiscal year 2021-22 included $49.8 million on Lift Stations, $33.2 million on Dixileta Dobbins North Gravity Sewer, $22.7 million primarily rehabbing at 91st Ave, $16.3 million at 23rd Ave including designing and constructing a new grit basin, $6.6 million rehabbing small diameter sewers Citywide, $5.9 million rehabbing Cave Creek Reclamation Plant, $3 million 32nd Street sanity sewer between Cortez Street and Cactus Road, and $3.0 million for Sewer Relocation due to Light Rail. 20-21 19-20 $0 $100 $200 $300 $400 $500 Thousands Major projects budgeted for in fiscal year 2022-23 included $20 million on growth-related wastewater infrastructure in Desert View area, $17 million to replace and rehabilitate equipment used in solids thickening, $17 million to rehabilitate Plant 2 equipment at 91st Ave, $12 million to rehabilitate or replace large diameter sewers, $11 million 23rd Ave Grit Basin Replacement, $9 million to rehabilitate small sewers citywide, $5 million for rehabilitate or replacing PVC-lined concrete sanitary interceptors, and $4 million for Dixileta Dobbins North Gravity Sewer. In addition, the City has budgeted $165 million for contingencies. Major projects budgeted for in fiscal year 2023-24 include $50 million to rehabilitate equipment at Cave Creek, $29 million to replace and rehabilitate Plant 2 equipment at 91st Ave, $23 million to rehabilitate or replace PVC-lined concrete sanitary interceptors, $19 million to replace and rehabilitate equipment used in solids thickening, $16 million to rehabilitate small diameter sewers Citywide, $15 million to construct a new force main, $12 million for large growth-related infrastructure in the Desert View Impact fee area, and $11 million for the Northwest Wastewater Gravity Sewer. Additionally, the City has budgeted $66 million for contingencies. 19-20 Water System $ 252,146 20-21 21-22 22-23 $ 434,000 $ 205,485 $152,431 23-24 (Budget) 23-24 (YTD) $ $ 630,908 25,261 Discussion: Water System Major projects budgeted for in fiscal year 2019-20 included $84.3 million on water main replacement and construction, $55.9 million on Water Treatment Plants, and $38.9 million on wells. 23-24 (YTD) 23-24 (Budget) Major projects budgeted for in fiscal year 2020-21 included $153 million on water main from 24th Street treatment plant to 32nd St and Bell Road, $110 million on water boosters, and $20 million on transmission main rehabilitation. 22-23 21-22 20-21 19-20 $0 $200 $400 $600 $800 Major projects budgeted for in fiscal year 2021-22 included $47 million on Dixileta Dobbins to install water infrastructure, $21 million on relocating waterlines along the Light Rail, $15 million to provide power redundancy at 24th Street Water Treatment Plant, $12 million to repair and replace leaking water services from main to meter, and $9 million in underground aquifer water storage. Major projects budgeted for in fiscal year 2022-23 included $104 million for water engineering and construction labor, $51 million for the Southern/Northern Water Growth Projects for growth-related water infrastructure, $22 million at DVWTP to relocate existing chemical storage and related chemical feed pumping systems to upgrade and replace aging facilities, $17 million on underground Aquifer Water Storage, $12 million on Booster Pump Stations, $12 million Remote Facilities Rehab and Replacement, $11 million for 24th Street WTP rehabilitation, and $9 million to Acquire Additional Water Resources. Additionally, the City budgeted $105 million for Water contingencies. Major projects budgeted for in fiscal year 2023-24 include $85 million on booster pump stations, $25 million to install and upgrade water mains, $42 million for Deer Valley plant rehabilitation, $32 million for 24th Street treatment plant rehabilitation, $30 million for infrastructure construction in the Southern development impact fee area, $17 million for groundwater wells construction, $17 million on plant power redundancy at 24 th Street, $15 million for concrete reservoir rehabilitation, $15 million for construction improvements, and $12 million for aquifer storage recovery wells. Additionally, the City budgets $105 million for Water contingencies. 9 Revenues Sources of funds for the operations of the City including local taxes, state shared taxes, user fees and charges, and grants. General Fund Total Operating Revenue (In Thousands of Dollars) Refer to detailed financial schedules on pages 19 thru 29 General Fund Revenues $2,000,000 $1,600,000 October YTD Revenues $1,200,000 $800,000 Annual Revenues* $400,000 $0 19-20 Fiscal Year 19-20 20-21 21-22 22-23 23-24 October YTD Revenues 365,435 478,763 436,564 522,896 595,385 20-21 21-22 22-23 23-24 Annual % of Annual Revenues* Revenues 1,307,357 28.0% 1,491,537 32.1% 1,508,526 28.9% 1,695,886 30.8% 1,833,837 32.5% * For prior years - total actual revenues, for current year - total approved budget Year to Date Performance Status Better than Expected Fiscal year 2023-24 general fund operating revenues are budgeted to increase 8.1% over prior year actuals. Actual revenues through October are 13.9% higher than the same period in the prior fiscal year. Specific revenue sources are discussed on the following pages. 10 Property Tax Revenue (In Thousands of Dollars) Refer to detailed financial schedules on pages 19 thru 29 Property Taxes Primary & Secondary 360,000 320,000 280,000 131,092 126,148 240,000 119,973 115,069 107,555 Secondary 200,000 Primary 160,000 120,000 80,000 206,935 201,050 192,215 182,043 170,209 11,401 40,000 17,860 19-20 Fiscal Year 19-20 20-21 21-22 22-23 23-24 YTD 23-24 Budget Total 277,764 297,112 312,188 327,198 29,261 338,027 July (1,141) (1,619) (1,490) (1,541) (1,819) (1,678) 20-21 Aug 1,081 1,541 1,141 1,275 1,291 1,428 Sept 647 1,288 1,040 1,357 1,182 1,330 21-22 Oct 11,579 21,550 24,048 29,752 28,607 27,197 Nov 106,458 89,520 101,285 98,119 104,287 22-23 Dec 23,612 38,512 33,534 39,943 40,422 Jan 14,875 15,608 18,086 16,279 18,038 23-24 YTD Feb 7,447 6,612 6,889 7,687 7,648 Mar 8,185 9,456 8,972 10,370 10,395 Apr 12,116 15,171 15,063 15,618 16,550 23-24 Budget May 66,043 76,862 71,096 77,294 81,304 June 26,862 22,611 32,524 31,045 31,106 Primary Secondary 170,209 107,555 182,043 115,069 192,215 119,973 201,050 126,148 17,860 11,401 206,935 131,092 Note: Monthly budget amount for 23-24 is the average % of last 3 fiscal years of the total actual amount. Year to Date Performance Status Expected Because property taxes are primarily collected in November, December, May and June, a monthly breakdown of the revenues is not particularly useful, therefore the chart for property tax revenues is presented with an annual perspective. Total property tax revenues are budgeted to increase 3.3% in fiscal year 2023-24 over fiscal year 2022-23 actuals. 11 Local Sales Tax Revenue (In Thousands of Dollars) Refer to detailed financial schedules on pages 19 thru 29 Local Sales Tax Budget vs Actual 90,000 80,000 70,000 60,000 19-20 Actuals 20-21 Actuals 50,000 21-22 Actuals 40,000 22-23 Actuals 23-24 Actuals 30,000 23-24 Budget 20,000 10,000 July Fiscal Year 19-20 20-21 21-22 22-23 23-24 23-24 Budget Aug July 33,070 41,583 44,048 43,479 65,562 46,969 Sept Aug 36,653 59,937 61,805 67,368 40,693 65,383 Oct Sept 56,465 33,935 41,516 46,739 61,764 51,740 Nov Dec Jan Feb Mar Apr May June Oct 31,089 45,467 50,734 81,273 77,291 60,402 YTD thru October 157,277 180,922 198,103 238,859 245,310 224,494 Nov 40,325 52,188 60,971 35,837 54,829 Dec 51,643 39,837 53,633 59,276 59,193 Jan 39,512 42,051 70,197 70,667 64,417 Feb 33,570 32,672 42,535 54,420 47,264 Mar 61,093 63,749 44,740 52,376 64,281 Apr 29,662 40,758 54,758 43,371 48,814 May 35,239 40,197 72,938 85,884 67,844 June 50,222 67,088 61,286 56,272 68,020 Year to Date Performance Status Better than Expected Local Sales Tax for fiscal year 2023-24 are budgeted to increase 0.3% over fiscal year 2022-23 actual results. Year-to-date Local Sales Tax through October are 9.3% higher than budget expectations. City of Phoenix revenue is budgeted on an annual basis. Fiscal year 2023-24 monthly budget amounts are based on an allocation of the annual budget. Monthly budget amounts are calculated based on an allocation of fiscal year 2019-20 through fiscal year 2022-23 actual revenue. Through October fiscal year 2023-24 Local Sales Tax revenues increased 2.7% compared to the same period in prior year. For the fiscal year 2022-23 Local Sales Tax for the full year increased 5.7% over fiscal year 2021-22. Fiscal year 2021-22 increased 17.8% over 2020-21 full year results. 12 State Sales Tax Revenue (In Thousands of Dollars) Refer to detailed financial schedules on pages 19 thru 29 State Sales Tax Budget vs Actual 35,000 30,000 25,000 19-20 Actuals 20-21 Actuals 20,000 21-22 Actuals 22-23 Actuals 15,000 23-24 Actuals 23-24 Budget 10,000 5,000 July Fiscal Year 19-20 20-21 21-22 22-23 23-24 23-24 Budget Aug July 20,116 22,912 26,539 28,422 31,080 28,837 Sept Aug 14,944 14,482 18,124 15,064 17,702 18,427 Oct Sept 11,479 13,123 16,285 22,937 21,440 18,783 Nov Oct 14,226 18,038 18,259 18,918 17,613 20,436 Dec Jan Feb Mar Apr May June YTD thru October 60,765 68,555 79,207 85,341 87,835 86,483 Nov 16,443 13,095 15,097 17,357 18,244 Dec 12,120 19,640 23,860 22,501 22,990 Jan 17,440 19,033 22,364 20,469 23,339 Feb 17,707 10,831 12,163 19,205 17,630 Mar 12,285 15,878 18,738 22,501 20,424 Apr 18,557 23,414 25,105 23,090 26,535 May 11,288 17,998 15,952 15,244 17,799 June 5,321 12,848 17,415 16,105 15,212 Year to Date Performance Status Better than Expected State Sales Tax for fiscal year 2023-24 are budgeted to increase 2.8% over fiscal year 2022-23 actual results. Year-to-date State Sales Tax through October are 1.6% higher than budget expectations. City of Phoenix revenue is budgeted on an annual basis. Fiscal year 2023-24 monthly budget amounts are based on an allocation of the annual budget. Monthly budget amounts are calculated based on an allocation of fiscal year 2019-20 through fiscal year 2022-23 actual revenue. Through October fiscal year 2023-24 State Sales Tax revenues increased 2.9% compared to the same period in prior year. For the fiscal year 2022-23 State Sales Tax for the full year increased 5.2% over fiscal year 2021-22. Fiscal year 2021-22 increased 14.2% over 2020-21 full year results. 13 Vehicle License Tax Revenue (In Thousands of Dollars) Refer to detailed financial schedules on pages 19 thru 29 Vehicle License Tax Budget vs Actual 14,000 12,000 19-20 Actuals 10,000 20-21 Actuals 21-22 Actuals 8,000 22-23 Actuals 6,000 23-24 Actuals 23-24 Budget 4,000 2,000 July Fiscal Year 19-20 20-21 21-22 22-23 23-24 23-24 Budget Aug July 10,791 10,098 10,453 10,826 10,796 11,665 Sept Aug 5,619 7,692 5,328 5,739 5,974 6,744 Oct Nov Dec Jan Feb Mar Apr May Sept 5,207 6,207 6,363 6,274 6,936 6,653 Oct 6,146 7,328 6,970 6,676 6,283 7,502 YTD thru October 27,763 31,325 29,114 29,515 29,989 32,564 Nov 5,408 4,608 4,862 5,183 5,549 Dec 5,891 6,529 6,537 6,555 7,057 Jan 6,514 7,328 7,285 6,684 7,693 Feb 6,528 5,568 5,828 6,276 6,694 Mar 5,960 6,411 6,418 7,297 7,216 June Apr 5,110 7,162 8,075 7,252 7,635 May 4,699 6,472 6,061 7,241 6,770 June 2,611 4,365 4,515 4,590 4,448 Year to Date Performance Status Monitor and Consider Taking Action Vehicle License Tax for fiscal year 2023-24 are budgeted to increase 6.2% over fiscal year 2022-23 actual results. Year-to-date Vehicle License Tax through October are 7.9% lower than budget expectations. City of Phoenix revenue is budgeted on an annual basis. Fiscal year 2023-24 monthly budget amounts are based on an allocation of the annual budget. Monthly budget amounts are calculated based on an allocation of fiscal year 2019-20 through fiscal year 2022-23 actual revenue. Through October fiscal year 2023-24 Vehicle License Tax revenues increased 1.6% compared to the same period in prior year. For the fiscal year 2022-23 Vehicle License Tax for the full year increased 2.4% over fiscal year 2021-22. Fiscal year 2021-22 decreased 1.3% over 2020-21 full year results. 14 Governmental Funds Revenue (In Thousands of Dollars) Refer to detailed financial schedules on pages 19 thru 29 Governmental Funds Revenues Budget vs Actual 600,000 500,000 19-20 Actuals 20-21 Actuals 21-22 Actuals 400,000 22-23 Actuals 23-24 Actuals 300,000 23-24 Budget 200,000 100,000 - Fiscal Year 19-20 20-21 21-22 22-23 23-24 23-24 Budget July Aug Sept Oct Nov Dec July 100,481 68,761 123,174 79,979 154,502 114,645 Aug 187,393 217,048 225,569 274,628 239,106 288,476 Sept 194,506 260,275 185,901 211,185 274,616 272,566 Oct 175,883 215,731 231,638 288,507 297,125 291,960 YTD thru October 658,263 761,815 766,282 854,299 965,349 967,647 Jan Nov 269,127 298,362 324,875 300,162 381,199 Feb Dec 226,582 236,818 253,979 275,549 318,233 Mar Jan 209,806 216,626 267,406 263,160 306,678 Apr May June Feb 187,061 178,738 199,258 246,172 260,842 Mar 217,521 272,444 230,537 255,008 312,903 Apr 180,484 316,241 255,574 243,521 321,256 May 226,625 277,929 320,064 419,779 399,467 June 378,887 362,173 540,197 497,001 581,656 Year to Date Performance Status Expected Governmental Funds are those funds supported primarily through taxes, bonds and grants and include the general fund as well as funds with dedicated tax revenue streams. They do not include the enterprise funds. Governmental Funds for fiscal year 2023-24 are budgeted to increase 14.8% over fiscal year 2022-23 actual results. Year-to-date Governmental Funds revenues through October are 0.2% lower than budget expectations. City of Phoenix revenue is budgeted on an annual basis. Fiscal year 2023-24 monthly budget amounts are based on an allocation of the annual budget. Monthly budget amounts are calculated based on an allocation of fiscal year 2019-20 through fiscal year 2022-23 actual revenue. Through October fiscal year 2023-24 Governmental Funds revenues increased 13.0% compared to the same period in prior year. For the fiscal year 2022-23 Governmental Funds for the full year increased 6.2% over fiscal year 2021-22. Fiscal year 2021-22 increased 8.1% over 2020-21 full year results. 15 Aviation Revenue (In Thousands of Dollars) Refer to detailed financial schedules on pages 19 thru 29 Aviation Operating Revenues Budget vs Actual 160,000 120,000 19-20 Actuals 20-21 Actuals 21-22 Actuals 80,000 22-23 Actuals 23-24 Actuals 23-24 Budget 40,000 July Fiscal Year 19-20 20-21 21-22 22-23 23-24 23-24 Budget Aug July 30,489 25,387 36,735 12,023 43,541 29,090 Sept Aug 32,307 2,666 33,945 37,402 46,444 29,559 Oct Nov Dec Jan Feb Mar Apr May June Sept 32,953 27,193 28,302 34,042 42,615 34,054 Oct 32,056 21,045 31,904 41,419 49,373 35,148 YTD thru October 127,805 76,291 130,886 124,886 181,973 127,851 Nov 33,532 23,880 36,031 66,192 44,381 Dec 36,787 31,636 35,025 25,237 35,777 Jan 34,297 18,059 57,391 46,228 43,364 Feb 34,215 61,877 33,583 57,291 51,980 Mar 34,228 25,487 38,417 45,866 40,034 Apr 27,255 31,454 40,080 48,930 41,069 May 23,524 30,668 46,367 46,926 41,004 June 10,702 91,844 155,860 112,245 103,048 Year to Date Performance Status Better than Expected Aviation Operating revenue for fiscal year 2023-24 are budgeted to decrease 7.9% over fiscal year 2022-23 actual results. Year-to-date Aviation Operating revenues through October are 42.3% higher than budget expectations. City of Phoenix revenue is budgeted on an annual basis. Fiscal year 2023-24 monthly budget amounts are based on an allocation of the annual budget. Monthly budget amounts are calculated based on an allocation of fiscal year 2019-20 through fiscal year 2022-23 actual revenue. Through October fiscal year 2023-24 Aviation Operating revenues increased 45.7% compared to the same period in prior year. For the fiscal year 2022-23 Aviation Operating revenues for the full year increased 0.0% over fiscal year 2021-22. Fiscal year 2021-22 increased 46.6% over 2020-21 full year results. 16 Water System Revenue (In Thousands of Dollars) Refer to detailed financial schedules on pages 19 thru 29 Water System Operating Revenues Budget vs Actual 90,000 80,000 70,000 60,000 19-20 Actuals 50,000 20-21 Actuals 21-22 Actuals 40,000 22-23 Actuals 30,000 23-24 Actuals 20,000 23-24 Budget 10,000 July Fiscal Year 19-20 20-21 21-22 22-23 23-24 23-24 Budget Aug July 52,660 57,819 58,256 60,867 79,474 74,381 Sept Oct Nov Dec Aug 51,596 53,509 42,379 49,237 60,009 63,729 Sept 47,319 52,454 47,181 53,259 59,303 64,861 Oct 40,300 47,335 39,257 44,825 53,644 55,629 YTD thru October 191,875 211,117 187,073 208,188 252,430 258,600 Jan Feb Mar Apr May June Nov 38,339 42,280 41,784 40,352 52,726 Dec 26,405 33,139 37,523 33,550 42,314 Jan 25,330 28,579 28,902 28,416 36,033 Feb 25,643 25,188 28,035 26,868 34,253 Mar 24,861 28,415 31,242 30,349 37,212 Apr 29,080 37,714 40,702 35,722 46,397 May 40,442 42,556 45,193 41,526 54,981 June 52,141 43,174 51,821 52,443 64,655 Year to Date Performance Status Monitor and Consider Taking Action Water System Operating revenues for fiscal year 2023-24 are budgeted to increase 26.1% over fiscal year 2022-23 actual results. Year-to-date Water System Operating revenues through October are 2.4% lower than budget expectations. City of Phoenix revenue is budgeted on an annual basis. Fiscal year 2023-24 monthly budget amounts are based on an allocation of the annual budget. Monthly budget amounts are calculated based on an allocation of fiscal year 2019-20 through fiscal year 2022-23 actual revenue. Through October fiscal year 2023-24 Water System Operating revenues increased 21.3% compared to the same period in prior year. For the fiscal year 2022-23 Water System Operating revenues for the full year increased 1.0% over fiscal year 2021-22. Fiscal year 2021-22 increased 0.0% over 2020-21 full year results. 17 Wastewater Revenue (In Thousands of Dollars) Refer to detailed financial schedules on pages 19 thru 29 Wastewater Operating Revenues Budget vs Actual 35,000 30,000 25,000 19-20 Actuals 20,000 20-21 Actuals 15,000 21-22 Actuals 22-23 Actuals 10,000 23-24 Actuals 23-24 Budget 5,000 July Fiscal Year 19-20 20-21 21-22 22-23 23-24 23-24 Budget Aug July 18,374 21,205 22,011 18,108 18,448 21,965 Sept Aug 24,593 22,791 21,971 22,936 22,257 25,436 Oct Nov Dec Jan Feb Mar Apr May June Sept 21,373 21,844 26,947 19,029 26,911 24,582 Oct 20,975 22,234 18,312 22,401 22,957 23,129 YTD thru October 85,315 88,074 89,241 82,474 90,573 95,112 Nov 21,142 18,577 21,720 25,044 23,835 Dec 20,888 24,461 24,380 19,691 24,644 Jan 22,063 18,430 22,218 26,128 24,484 Feb 20,973 24,355 21,916 25,503 25,561 Mar 21,613 21,754 23,023 22,405 24,472 Apr 18,428 21,584 24,091 21,595 23,618 May 23,948 20,085 22,296 23,607 24,786 June 18,289 17,424 17,973 28,591 22,676 Year to Date Performance Status Monitor and Consider Taking Action Wastewater Operating revenues for fiscal year 2023-24 are budgeted to increase 5.1% over fiscal year 2022-23 actual results. Year-to-date Wastewater Operating revenues through October are 4.8% lower than budget expectations. City of Phoenix revenue is budgeted on an annual basis. Fiscal year 2023-24 monthly budget amounts are based on an allocation of the annual budget. Monthly budget amounts are calculated based on an allocation of fiscal year 2019-20 through fiscal year 2022-23 actual revenue. Through October fiscal year 2023-24 Wastewater Operating revenues increased 9.8% compared to the same period in prior year. For the fiscal year 2022-23 Wastewater Operating revenues for the full year increased 3.1% over fiscal year 2021-22. Fiscal year 2021-22 increased 4.8% over 2020-21 full year results. 18 General Funds Summary Presents comparisons of year-to-date balances to the fiscal year budget and to the actual results for the prior year for the general fund. General Fund Revenue As of OCTOBER 31 (dollars in thousands) Budget Estimate 2023-2024 Actual Year-to-Date 2023-2024 2022-2023 Revenues Local Taxes Sales Taxes Privilege License Fees State Shared Taxes State Sales Tax State Income Tax Vehicle License Tax Primary Property Tax Licenses and Permits Cable Communications Municipal Court Fines and Forfeitures Court Default Fee Police Library Parks and Recreation Engineering & Architectural Services Planning & Development Street Transportation Fire Emergency Transportation Service Hazardous Materials Inspection Fee Other Interest Other Fees and Service Charges Total Revenues $ $ 699,157 3,005 245,310 $ 527 238,859 412 248,655 435,656 85,627 206,935 3,070 8,000 87,835 145,251 29,989 17,860 881 (136) 85,341 102,728 29,515 18,896 880 (123) 7,987 778 14,511 438 6,372 1,811 6,946 2,860 255 4,997 200 2,594 461 7,104 2,612 255 2,914 161 2,361 620 5,125 51,332 1,700 18,066 14,540 19,250 25,784 255 7,413 9,595 6,349 16,144 423 7,123 3,570 5,081 1,833,837 19 $ $ 595,385 $ 522,896 General Fund Expenditures As of OCTOBER 31 (dollars in thousands) Budget Estimate 2023-2024 Actual Year-to-Date 2023-2024 2022-2023 Expenditures and Encumbrances General Government Mayor City Council City Manager Information Technology Services Public Information Equal Opportunity Law City Auditor City Clerk Human Resources Budget and Research Finance Others Total General Government $ 2,700 6,854 11,109 92,038 4,778 3,486 34,148 3,682 9,744 30,340 4,563 29,093 1,944 234,477 $ 881 $ 2,176 4,182 31,125 1,969 1,176 10,666 1,299 2,793 12,050 1,620 9,322 1,682 80,940 780 1,590 2,724 25,747 1,024 866 9,322 917 1,909 10,535 1,935 7,356 1,565 66,271 Criminal Justice Municipal Court Public Defender Total Criminal Justice 38,970 6,295 45,265 13,752 1,725 15,478 12,573 1,529 14,103 Public Safety Police Fire Others Total Public Safety 741,278 481,278 1,222,556 268,430 179,333 447,763 221,814 147,447 369,261 Transportation Street Transportation Public Transit Total Transportation 25,473 25,473 6,363 6,363 8,032 1,890 9,923 Community Development Economic Development Neighborhood Services Department Planning and Development Others Total Community Development 9,771 20,578 7,072 2,003 39,424 3,040 7,031 1,863 1,129 13,062 2,292 5,763 1,300 594 9,950 Community Enrichment Parks and Recreation Library Human Services Others Total Community Enrichment 128,060 49,928 40,944 9,235 228,167 50,209 17,847 13,459 5,234 86,749 41,787 19,115 9,656 4,579 75,137 Environmental Services Public Works Environmental Programs Others Total Environmental Services 36,023 1,789 715 38,527 12,449 568 368 13,384 8,903 371 299 9,573 Capital Improvement 121,532 7,472 5,216 Vacancy Savings (28,000) - - Contingencies 101,247 Total Expenditures and Encumbrances $ 20 2,028,668 $ - - 671,210 $ 559,433 Citywide Summary Presents the City's summarized comparisons of the year-to-date balances to the fiscal year budget and to the actual results for the prior year. Citywide Operating Revenue As of OCTOBER 31 (dollars in thousands) Source General Funds Local Taxes: Sales Taxes Privilege License Fees State Shared Taxes: State Sales Tax State Income Tax Vehicle License Tax Primary Property Tax Licenses and Permits Cable Communications Municipal Court Police Library Fees Parks and Recreation Planning & Development Street Transportation Fire Interest Other Fees and Service Charges Budget Estimate 2023-2024 $ 699,157 3,005 Total General Funds Special Revenue and Debt Service Funds Neighborhood Protection Public Safety Enhancement & Expansion Parks and Preserves Golf Courses Transit 2000 & 2050 Court Awards Planning and Development Capital Construction Sports Facilities Highway User Revenue Regional Transit Revenues Community Reinvestment Other Restricted Fees Grants G.O. Bond/Secondary Property Tax Total Special Revenue and Debt Service Funds Enterprise Funds Aviation Convention Center Water System Wastewater Solid Waste Total Enterprise Funds Total Operating Revenues $ 245,310 $ 527 238,859 412 248,655 435,656 85,627 206,935 3,070 8,000 8,764 14,511 438 6,372 1,811 6,946 71,098 14,540 19,250 87,835 145,251 29,989 17,860 881 (136) 3,115 4,997 200 2,594 461 7,104 33,451 9,595 6,349 85,341 102,728 29,515 18,896 880 (123) 2,867 2,914 161 2,361 620 5,125 23,690 3,570 5,081 1,833,837 595,385 522,896 53,788 136,966 56,273 10,130 402,264 4,673 84,311 6,157 32,452 158,475 82,429 11,905 51,070 790,214 134,938 16,722 36,550 18,174 2,638 129,233 (3,130) 35,325 2,752 7,895 51,770 22,520 969 1,333 35,812 11,401 16,501 44,402 16,957 2,273 123,426 (660) 45,360 2,174 7,363 49,432 12,409 1,004 (3,826) 2,637 11,951 2,016,044 369,964 331,403 528,508 112,998 627,172 289,188 197,194 181,973 34,718 252,430 90,573 70,505 124,886 32,485 208,188 82,474 68,332 1,755,060 630,198 516,366 5,604,941 21 Actual Year-to-Date 2023-2024 2022-2023 $ $ 1,595,548 $ 1,370,664 Citywide Operating Expenditures As of OCTOBER 31 (dollars in thousands) Source General Government General Funds Other Funds Total General Government Actual Year-to-Date 2023-2024 2022-2023 Budget 2023-2024 80,940 $ 10,612 91,552 66,271 27,545 93,816 45,265 9,015 54,280 15,478 2,750 18,228 14,103 2,346 16,449 Public Safety General Funds Other Funds Total Public Safety 1,222,556 325,176 1,547,732 447,763 108,246 556,009 369,261 103,077 472,338 Transportation General Funds Other Funds Total Transportation 25,473 888,969 914,442 6,363 410,409 416,772 9,923 428,798 438,721 Community Development General Funds Other Funds Total Community Development 39,424 376,715 416,139 13,062 92,473 105,535 9,950 73,597 83,547 Community Enrichment General Funds Other Funds Total Community Enrichment 228,167 250,687 478,854 86,749 119,399 206,148 75,137 102,217 177,354 Environmental Services General Funds Other Funds Total Environmental Services 38,527 880,336 918,863 13,384 312,957 326,341 9,573 276,232 285,805 Debt Service General Funds Other Funds Total Debt Service 136,900 136,900 45,333 45,333 120,380 120,380 121,532 1,650,390 1,771,922 7,472 175,566 183,038 5,216 124,878 130,094 Non-Departmental Grants General Funds Other Funds Total Non-Departmental Grants 75,832 75,832 - - Vacancy Savings General Funds Other Funds Total Vacancy Savings (28,000) (28,000) - - Contingencies General Funds Other Funds Total Contingencies 101,247 75,500 176,747 - - 2,028,668 4,722,762 6,751,429 671,211 1,277,745 1,948,956 $ $ Criminal Justice General Funds Other Funds Total Criminal Justice Capital Improvement General Funds Other Funds Total Capital Improvement Total Operating General Funds Other Funds Total Operating Budget $ 234,477 53,242 287,719 22 $ $ 559,434 1,259,070 1,818,505 Citywide Detail Presents, in detail, the results of the City's operations for the current month and for the fiscal year-to-date. Included are breakdowns of the City's revenues, operating budget expenditures, capital budget expenditures and bonds authorized and sold. Citywide Operating Revenue by Source For the Month Ended OCTOBER 31 2023 2022 Budget Estimate 2023-2024 Source Actual Year-to-Date 2023-2024 2022-2023 General Funds $ 77,290,944 123,116 77,414,060 $ 81,272,843 100,185 Local Taxes: Sales Taxes Privilege License Fees $ 699,157,051 3,005,450 $ 245,310,417 526,746 $ 238,859,186 412,240 81,373,028 Total Local Taxes 702,162,501 245,837,163 239,271,426 17,612,868 36,312,872 6,282,969 18,917,845 25,681,939 6,676,319 State Shared Taxes: State Sales Tax State Income Tax Vehicle License Tax 248,655,000 435,656,000 85,627,000 87,835,358 145,251,488 29,989,424 85,341,211 102,727,757 29,515,162 60,208,709 51,276,103 769,938,000 263,076,270 217,584,130 17,462,362 18,226,629 Primary Property Tax 206,935,000 17,860,003 18,895,587 130,183 196,660 Licenses and Permits 3,070,000 881,142 880,443 - - Cable Communications 8,000,000 (135,857) (122,815) 748,033 58,585 606,753 60,189 Municipal Court: Fines and Forfeitures Court Default Fee 7,986,764 777,600 2,859,633 255,477 2,612,489 254,686 806,618 666,942 8,764,364 3,115,110 2,867,175 1,355,780 599,246 Police 14,511,088 4,997,453 2,913,744 109,743 21,200 Library Fees 438,376 199,556 161,450 781,207 541,173 Parks and Recreation 6,371,912 2,594,356 2,360,557 Total State Shared Taxes Total Municipal Court 88,126 167,562 Planning and Development 1,810,900 460,548 620,010 499,683 334,790 Street Transportation 6,946,062 7,104,000 5,124,668 5,012,715 64,125 2,892,109 3,396,016 64,125 2,652,879 Fire: Emergency Transportation Service Hazardous Materials Inspection Fee Other 51,332,000 1,700,000 18,066,317 25,783,620 255,150 7,412,569 16,144,139 422,925 7,122,610 7,968,949 6,113,020 71,098,317 33,451,339 23,689,674 2,319,883 1,079,379 Interest 14,539,712 9,595,438 3,570,074 1,205,059 1,022,390 Other Fees and Service Charges 170,350,362 161,618,122 Total Fire Total General Funds 19,250,440 6,348,525 5,080,559 1,833,836,672 595,385,046 522,896,682 Special Revenue and Debt Service Funds 3,653,745 260,981 1,304,908 61,215 3,785,701 270,407 1,352,036 34,505 Neighborhood Protection: Police Neighborhood Protection Police Blockwatch Fire Neighborhood Protection Interest/Other 37,394,341 2,671,453 13,356,262 365,618 11,522,864 823,061 4,115,308 260,879 11,442,085 817,292 4,086,459 155,316 5,280,849 5,442,649 Total Neighborhood Protection 53,787,674 16,722,112 16,501,152 8,642,686 2,266,373 90,198 12,274,967 4,383,153 38,925 103,978,215 32,710,001 278,000 28,320,192 7,799,400 430,402 33,320,497 10,931,109 150,139 10,999,257 16,697,045 136,966,216 36,549,994 44,401,745 5,662,780 5,596,655 56,272,960 18,173,532 16,957,341 Public Safety Enhancement & Expansion: Police Fire Interest/Other Total Public Safety Enhancement & Expansion Parks and Preserves 23 Citywide Operating Revenue by Source For the Month Ended OCTOBER 31 2023 2022 $ 498,541 220,754 15,525 16,105 $ Budget Estimate 2023-2024 Source 297,874 148,910 6,637 28,473 Golf Courses: Fees Coffee Shops Concessions Interest Other $ 6,566,050 3,022,550 45,000 496,615 Actual Year-to-Date 2023-2024 2022-2023 $ 1,530,958 896,504 62,127 148,030 $ 1,253,683 845,066 22,982 151,150 750,925 481,894 Total Golf Courses 10,130,215 2,637,619 2,272,881 35,643,484 4,533,929 36,712,064 3,906,715 Transit 2000 & 2050: Sales Taxes Interest/Other 364,772,821 37,490,765 112,423,741 16,809,712 111,248,780 12,177,568 40,177,413 40,618,779 402,263,586 129,233,453 123,426,348 Court Awards 4,672,692 (3,129,682) (660,123) Planning and Development 84,311,300 35,325,440 45,359,965 Capital Construction 6,157,424 2,751,549 2,173,745 Sports Facilities: Sales Taxes Interest/Other 28,487,629 3,964,315 6,844,724 1,049,873 7,035,096 327,528 586,833 - Total Transit 2000 & 2050 5,770,832 7,910,355 824,798 663,189 2,185,142 271,006 2,228,540 97,441 2,456,148 2,325,981 Total Sports Facilities 32,451,944 7,894,597 7,362,624 12,730,172 532,494 71,752 12,724,003 203,370 2,050 Highway User Revenue: Highway User Revenue Interest Other 157,955,000 500,000 20,000 49,770,489 1,879,963 119,105 48,745,766 653,079 33,347 13,334,418 12,929,423 158,475,000 51,769,557 49,432,192 - - Total Highway User Revenue Local Transportation Assistance - - - 4,003,310 3,935,362 Regional Transit Revenues 82,428,550 22,520,297 12,408,895 259,186 14,329 Community Reinvestment 11,905,291 969,290 1,004,419 1,074,765 (1,222,103) Other Restricted Fees 51,069,507 1,332,800 (3,825,697) 404,603 12,299,148 1,553,479 405,194 7,686,882 1,176,973 Grants: Public Housing: Rentals Grants Other 5,139,519 180,635,763 60,510,644 1,622,315 53,354,697 13,477,977 1,522,982 39,054,981 (344,460) 14,257,230 9,269,049 246,285,926 68,454,989 40,233,503 3,392,403 5,219,134 20,298 1,559,232 4,053,238 3,182,666 15,783 3,449,911 69,661,897 136,907,541 58,578,515 278,779,742 9,530,572 (36,685,860) (3,989,000) (1,498,718) 4,732,257 (34,642,851) (6,025,884) (1,660,497) 10,191,067 10,701,598 Total Other 543,927,695 (32,643,006) (37,596,975) 24,448,297 19,970,647 Total Grants 790,213,621 35,811,983 2,636,528 11,145,572 - 11,525,102 - 131,092,075 3,846,046 11,401,258 130 11,946,962 4,067 11,145,572 11,525,102 Total G.O. Bond/Secondary Property Tax 134,938,121 11,401,388 11,951,029 126,775,383 126,889,307 Total Special Revenue and Debt Service Funds 2,016,044,101 369,963,929 331,403,044 Total Public Housing Other: Human Resources Federal Transit Administration Community Development Other G.O. Bond/Secondary Property Tax Secondary Property Tax Interest 24 Citywide Operating Revenue by Source For the Month Ended OCTOBER 31 2023 2022 Budget Estimate 2023-2024 Source Actual Year-to-Date 2023-2024 2022-2023 Enterprise Funds AVIATION: $ 11,107,142 $ 35,050,117 1,801,092 244,385 278,733 325,035 565,757 8,234,329 30,700,022 563,364 1,051,034 342,720 277,032 249,984 49,372,261 41,418,485 Sky Harbor: Airlines Concessions Interest Other Phoenix-Goodyear Phoenix-Deer Valley Phoenix-Customer Facility Charge $ Total Aviation 132,626,916 374,531,216 8,130,000 3,270,252 2,984,888 3,584,906 3,380,000 $ 44,083,423 125,657,653 6,551,194 1,104,696 1,123,936 1,289,996 2,161,770 $ 33,841,713 112,804,139 1,730,426 (26,562,501) 1,130,636 1,131,004 810,553 528,508,178 181,972,668 124,885,970 86,163,389 25,634,387 1,200,000 24,710,708 8,361,597 1,645,273 25,112,479 6,980,409 392,205 112,997,776 34,717,578 32,485,093 567,565,219 5,000,000 9,382,054 10,703,646 6,200,000 7,213,000 21,108,100 215,707,499 1,019,285 4,363,624 3,614,484 2,188,740 4,086,663 21,449,854 191,677,644 1,000,746 3,867,909 3,235,158 2,083,080 1,668,507 4,654,970 627,172,019 252,430,149 208,188,014 CONVENTION CENTER: 8,301,922 2,659,901 452,005 8,609,299 2,210,808 130,249 11,413,828 10,950,356 Excise Taxes Operating Revenue Interest Total Convention Center WATER SYSTEM: 50,404,776 252,593 534,556 199,187 558,600 1,103,374 590,788 41,697,595 221,199 462,878 950,299 419,520 522,547 550,546 53,643,874 44,824,584 Water Sales Water Service Fees Distribution Intergovernmental Development Fees Interest Other Total Water System WASTEWATER: 19,085,210 (111,062) 535,740 1,054,045 2,393,478 17,351,345 1,753,552 399,960 471,696 2,424,810 Sewer Service Charges Multi-City Development Fees Interest Other 232,083,321 16,357,249 6,200,000 9,367,000 25,180,224 72,169,249 5,671,903 2,110,920 4,047,829 6,573,048 66,365,413 5,660,230 1,949,100 1,601,218 6,898,470 22,957,411 22,401,363 Total Wastewater 289,187,794 90,572,949 82,474,431 178,603,138 13,906,117 450,000 4,235,040 60,708,219 5,373,062 636,016 3,787,665 58,797,751 4,951,715 276,037 4,306,554 197,194,295 70,504,962 68,332,057 1,755,060,062 630,198,306 516,365,565 SOLID WASTE: $ 15,191,141 1,403,066 159,512 747,512 14,730,442 1,211,786 82,969 877,934 17,501,231 16,903,131 154,888,605 136,497,919 452,014,350 $ 425,005,348 Collection Fees Landfill Fees Interest Other Total Solid Waste Total Enterprise Funds Total Operating Revenues $ 25 5,604,940,835 $ 1,595,547,281 $ 1,370,665,291 Citywide Operating Expenditures by Program For the Month Ended OCTOBER 31 2023 2022 Program Budget Estimate 2023-2024 2023-2024 Year-to-Date Operating Expenditures & Encumbrances Capital Operations and Debt Actual Year-to-Date 2023-2024 2022-2023 General Government $ 207,479 $ 527,025 1,022,057 4,966,935 209,580 237,216 268,733 2,542,886 270,319 483,700 1,540,552 237,678 9,452 376,753 2,835,692 (316,120) 221,379 398,809 915,345 6,829,600 297,121 220,997 276,277 2,315,455 193,718 513,042 (6,088,060) 265,413 9,746 548,575 2,541,015 (256,920) 15,419,935 9,201,512 $ Mayor City Council City Manager Information Technology Services Government Relations Public Information Equal Opportunity Law City Auditor City Clerk Human Resources Retirement Systems Phoenix Employment Relations Board Budget and Research Finance Regional Wireless Cooperative Total General Government 2,700,000 6,854,261 17,288,658 105,471,392 1,580,787 4,803,103 4,066,660 35,832,717 3,682,271 9,744,371 38,268,397 852,015 129,248 4,562,718 45,001,681 6,881,164 $ 881,266 2,176,019 4,514,904 35,610,549 785,319 1,974,672 1,362,025 11,277,429 1,299,271 2,792,876 12,727,814 1,099,213 50,164 1,619,894 13,936,646 (556,132) $ 780,130 1,590,165 2,971,617 29,684,833 640,482 1,108,111 1,037,389 9,924,308 916,866 1,909,334 29,154,382 1,001,169 45,785 1,935,121 11,050,734 65,467 $ 881,266 2,176,019 4,514,904 31,420,516 785,319 1,974,672 1,362,025 11,277,429 1,299,271 2,792,876 12,513,654 1,099,213 50,164 1,619,894 10,007,084 (556,132) $ 4,190,033 214,160 3,929,562 - 287,719,443 91,551,931 93,815,894 83,218,176 8,333,755 47,984,830 6,295,331 16,502,572 1,725,449 14,919,371 1,529,205 14,397,398 1,725,449 2,105,174 - 54,280,161 18,228,022 16,448,576 16,122,848 2,105,174 980,679,674 567,051,944 - 347,401,194 208,608,111 - 296,728,231 175,609,906 289 346,721,972 207,930,524 - 679,222 677,587 - 1,547,731,618 556,009,304 472,338,425 554,652,495 1,356,809 Criminal Justice 3,747,001 489,881 3,251,467 443,941 4,236,883 3,695,408 Municipal Court Public Defender Total Criminal Justice Public Safety 73,661,154 41,986,925 - 62,116,251 33,794,203 - 115,648,079 95,910,454 Police Fire Other Total Public Safety Transportation 8,388,424 725,112 33,408,483 7,158,432 9,689,920 744,428 31,564,597 5,704,472 Street Transportation Street Lighting Aviation Public Transit 126,809,355 10,266,365 442,525,728 334,840,200 40,132,485 4,036,344 137,385,643 235,217,941 45,179,289 4,067,954 136,862,785 252,610,728 36,484,625 4,036,344 104,405,283 235,217,941 3,647,860 32,980,360 - 49,680,451 47,703,417 Total Transportation 914,441,648 416,772,412 438,720,756 380,144,192 36,628,220 Community Development 6,820,422 12,904,502 2,184,531 6,134,665 6,319,923 9,422,266 3,942,788 2,383,552 Planning and Development Housing Economic Development Neighborhood Services Department 96,602,351 199,791,557 28,666,019 91,078,576 30,322,584 50,985,065 8,466,677 15,760,500 27,195,680 38,170,997 8,103,344 10,076,950 30,322,584 50,794,696 6,515,876 15,760,500 190,369 1,950,801 - 28,044,120 22,068,529 Total Community Development 416,138,503 105,534,826 83,546,970 103,393,657 2,141,170 150,922,077 52,713,101 76,642,732 12,759,875 172,977,937 6,219,799 6,618,485 57,629,408 18,285,104 35,223,740 4,253,412 83,473,453 4,360,135 2,923,106 47,781,699 19,882,966 32,995,711 4,375,970 65,262,343 4,397,067 2,658,317 57,417,547 18,285,104 29,397,540 83,432,221 4,360,135 2,923,106 211,861 5,826,200 4,253,412 41,233 - 478,854,006 206,148,358 177,354,074 195,815,652 10,332,705 Community Enrichment 11,245,875 3,357,020 3,777,047 1,063,173 11,640,792 111,517 395,986 8,917,889 2,772,271 4,553,260 1,093,813 14,747,646 516,009 1,378,450 31,591,411 33,979,336 Parks and Recreation Library Convention Center Sports and Cultural Facilities Human Services Public Parking Facilities Other Total Community Enrichment 26 Citywide Operating Expenditures by Program For the Month Ended OCTOBER 31 2023 2022 Budget Estimate 2023-2024 Program 2023-2024 Year-to-Date Operating Expenditures & Encumbrances Capital Operations and Debt Actual Year-to-Date 2023-2024 2022-2023 Environmental Services $ 38,652,355 $ 20,313,442 14,287,458 1,510,447 525,293 81,969 28,762,306 19,826,750 13,851,828 2,674,556 333,697 70,768 75,370,964 65,519,904 Water System Wastewater Solid Waste Management Public Works Environmental Programs Manager's Office of Sustainability $ Total Environmental Services 457,619,596 224,901,618 182,579,989 47,591,219 5,070,133 1,100,374 $ 165,478,744 79,043,196 63,566,665 16,093,386 1,694,822 463,779 $ 141,605,320 70,230,053 58,238,632 13,840,057 1,570,322 320,446 $ 113,503,740 51,038,974 60,573,332 12,454,712 1,694,822 463,779 $ 51,975,004 28,004,223 2,993,333 3,638,674 - 918,862,929 326,340,592 285,804,830 239,729,358 86,611,234 12,670,339 23,155,869 100,500 14,829,694 626,325 3,029,663 558,750 12,892,226 6,768,002 377,425 17,184,992 12,573,822 1,087,431 900,036 600,000 17,778,600 11,412,282 33,000 321,419 4,223,446 7,718,623 33,500 4,943,231 208,775 1,009,888 186,250 4,297,408 2,256,000 125,808 5,728,330 4,191,274 362,477 200,000 5,926,200 3,804,094 11,000 107,143 36,649,294 5,691,611 711,783 3,592,668 403,042 1,428,488 110,583 5,909,092 5,766,172 81,725 16,670,372 8,109,788 362,477 1,772,413 200,000 25,135,644 7,648,255 29,667 107,143 4,223,446 7,718,623 33,500 4,943,231 208,775 1,009,888 186,250 4,297,408 2,256,000 125,808 5,728,330 4,191,274 362,477 200,000 5,926,200 3,804,094 11,000 107,143 - General Obligation Debt Service 1,055,862 1,929,656 8,375 1,235,808 52,194 252,472 46,563 1,074,352 564,000 31,452 1,432,083 1,047,818 90,619 50,000 1,481,550 951,024 2,750 26,786 1,968,573 1,422,903 177,946 656,917 52,010 183,372 27,646 558,523 586,543 20,431 1,528,843 1,071,197 90,619 2,000 50,000 1,606,411 994,564 2,417 26,786 11,333,362 11,027,701 Total Debt Service 136,900,375 45,333,448 120,380,216 45,333,448 - 39,545,467 20,367,162 Capital Improvement 1,771,921,923 183,038,369 130,093,516 183,038,369 - - - Non-Departmental Grants 75,831,589 - - - - - - Vacancy Savings (28,000,000) - - - - - Contingencies $ 370,870,671 $ 309,473,423 Cultural Facilities Downtown Development Economic Development Environmental Services Fire Protection Freeway Mitigation Historic/Neighborhood Preservation Human Services Information Systems Libraries Maintenance Service Centers Mountain Preserves/Parks Municipal Administration Buildings Police Protection Public Housing Renovation Sanitary Sewers Secondary Property Tax Solid Waste Enterprise Bonds Storm Sewer Improvements Street Improvements Street Light Refinancing Water System 176,747,000 $ - 6,751,429,195 $ 27 1,948,957,262 $ 1,818,503,258 $ 1,801,448,196 $ 147,509,067 Capital Expenditures and Encumbrances 2023-2024 Program General Government Arts and Cultural Facilities Economic Development Facilities Management Finance Fire Protection Housing Human Services Information Technology Libraries Neighborhood Services Non-Departmental Capital Parks and Mountain Preserves Planning & Historic Preservation Police Protection Public Art Program Public Transit Regional Wireless Cooperative Street Transportation & Drainage General Government Subtotal Enterprise Aviation Phoenix Convention Center Solid Waste Disposal Wastewater Water System Enterprise Subtotal Total Capital Budget Program 2022-2023 Actual Yearto-Date Actual Yearto-Date Budget From Operating Funds Budget Actual 2023-2024 Year-to-Date Capital Amounts From Capital Funds Budget Actual Unencumbered Budget $ 2,797,246 $ 18,088,263 53,901,968 1,030,894 52,713,739 122,276,471 7,762,972 52,359,900 9,228,892 10,588,009 668,406,841 156,600,628 26,563,000 17,759,000 7,634,150 516,206,676 6,001,000 389,887,281 51,245 $ 6,895,376 4,088,916 2,819,670 10,328,431 5,943,553 6,196,634 270,649 62,330 26,989,645 12,385,881 24,215,542 8,357,398 1,659,623 18,740,092 36,603,891 10,205,519 5,133,354 795,597 3,889,291 381,182 99,035 143,521 27,290,374 11,923,892 750,128 12,453,597 559,701 16,736,152 30,587,614 $ 1,696,965 $ 18,088,263 32,875,714 20,044,385 109,111,590 7,162,972 44,222,725 3,933,792 10,588,009 37,000,000 129,877,565 26,563,000 2,588,233 515,949,670 226,228,532 49,889 6,895,376 3,826,410 1,723,499 7,146,904 5,943,553 6,196,634 270,649 62,330 8,178,689 24,215,542 148,457 18,738,398 28,913,461 $ 1,100,281 $ 21,026,254 1,030,894 32,669,354 13,164,881 600,000 8,137,175 5,295,100 631,406,841 26,723,063 17,759,000 5,045,917 257,006 6,001,000 163,658,749 1,356 262,506 1,096,171 3,181,527 26,989,645 4,207,192 8,357,398 1,511,167 1,693 7,690,431 $ 2,746,001 11,192,887 49,813,052 1,030,894 49,894,069 111,948,040 1,819,419 46,163,266 8,958,243 10,525,679 641,417,196 144,214,747 2,347,458 9,401,602 5,974,527 497,466,584 6,001,000 353,283,390 $ 2,119,806,930 $ 165,608,877 $ 120,948,959 $ 1,185,931,415 $ 112,309,791 $ 933,875,515 $ 53,299,087 $ 1,954,198,053 $ $ 1,192,244,623 45,697,400 38,134,630 381,045,887 630,908,072 2,288,030,612 $ 4,407,837,542 $ $ 70,407,257 5,283,524 11,480,132 42,981,973 25,261,254 155,414,141 $ 321,023,018 $ $ 10,218,866 136,006,072 12,662,566 40,851,857 35,997,876 235,737,236 $ $ 356,686,195 $ 1,771,921,923 28 $ 232,286,116 8,927,400 14,373,212 134,949,019 195,454,761 585,990,508 $ 22,795,536 3,711,208 1,103,145 26,412,310 16,706,378 70,728,578 $ 183,038,369 $ $ $ 959,958,507 36,770,000 23,761,418 246,096,868 435,453,311 1,702,040,104 $ 2,635,915,619 $ $ 47,611,721 1,572,316 10,376,986 16,569,664 8,554,876 84,685,563 $ $ 1,121,837,366 40,413,876 26,654,498 338,063,914 605,646,818 2,132,616,471 $ 137,984,649 $ 4,086,814,524 Bonds Authorized and Sold As of OCTOBER 31 (dollars in thousands) Authorized Sold Available 1988 Authorizations General Obligation Bonds Freeway Mitigation, Neighborhood Stabilization, and Slum and Blight Elimination Bonds Fully Issued $ Total General Obligation Bonds Revenue Bonds Bonds Fully Issued Total 1988 Authorizations 29,285 884,175 $ 28,285 884,175 $ 1,000 - 913,460 912,460 1,000 143,890 143,890 - 1,057,350 1,056,350 1,000 66,300 125,300 24,800 61,500 12,000 33,000 91,500 74,000 77,000 78,800 66,000 43,700 64,600 124,685 24,170 60,700 11,205 32,100 89,275 71,645 72,575 77,685 65,950 43,700 1,700 615 630 800 795 900 2,225 2,355 4,425 1,115 50 - 753,900 738,290 15,610 81,000 11,100 198,700 12,800 104,622 74,705 29,178 115,500 107,295 78,200 65,400 63,385 8,510 190,610 8,345 85,510 61,200 21,100 102,290 81,900 58,135 61,770 17,615 2,590 8,090 4,455 19,112 13,505 8,078 13,210 25,395 20,065 3,630 878,500 742,755 135,745 2001 Authorization General Obligation Bonds Education, Youth and Family Cultural Facilities Computer Technology Environmental Cleanup Fire Protection Historic Preservation Library Facilities Street Improvements Neighborhood Protection and Senior Centers Parks, Open Space, and Recreational Facilities Police Protection Storm Sewer and Flood Protection Bonds Fully Issued Total 2001 Authorizations 2006 Authorization General Obligation Bonds Affordable Housing and Neighborhood Revitalization Computer Technology Education and Health Science Facilities Environmental Cleanup Family, Senior, and Youth Cultural Facilities Fire Protection Library Facilities and Improvements Parks, Open Space, and Recreational Facilities Police Protection Street Improvements Storm Sewer and Flood Protection Total 2006 Authorizations Total Bond Program $ 29 2,689,750 $ 2,537,395 $ 152,355