TABLE OF CONTENTS Page/ s INTRODUCTION 2 2009 HIGHLIGHTS AND LOANS 3 FINANCIAL CONDITION OF HELP FUND 4 - 11 HELP PROJECT LOCATION MAP 12 - 13 ¡ INTRODUCTION The Highway Expansion and Extension Loan Program (HELP) provides the state and its communities with an innovative financing mechanism to accelerate the funding of transportation projects. This mechanism is referred to as a State Infrastructure Bank (SIB) and was initially authorized by Congress in 1995. A SIB operates like a bank by providing loans or credit enhancement for eligible projects. HELP, Arizona’s SIB, was established in 1998, and is operated under the authority of the State Transportation Board. A seven member HELP Advisory Committee accepts loan applications, reviews and evaluates requests for financial assistance, and makes recommendations to the State Transportation Board on loan and financial assistance requests. The current members of the State Transportation Board are: Delbert Householder, Chair Robert Montoya, Vice Chair Felipe Andres Zubia William Feldmeier Barbara Ann Lundstrom Victor Flores Stephen Christy Thatcher Flagstaff Avondale Prescott Nogales Phoenix Tucson The current members of the HELP Advisory Committee are: John Halikowski, Chair Gary Bourne Jim Glock Robert Jackson ADOT Sun City Tucson Casa Grande There are currently three vacant positions on the HELP Advisory Committee (one each appointed by the Governor, Senate President and House Speaker). 2 2009 HIGHLIGHTS HELP continues to be among the most active State Infrastructure Banks in the nation. The Federal Highway Administration (FHWA) collects loan activity data from the states and periodically publishes this information. As of the September 30, 2006 SIB loan activity report (the latest data available from FHWA), HELP ranked: • • • fourth in total number of approved loans (60); third in total amount of approved loans ($657million); and second in loan amounts disbursed to recipients ($512 million). As a result of the repayment of all outstanding Board Funding Obligations in April 2009, no new HELP loans were approved in 2009. During the year, four of the previously outstanding loans were paid in full, and loan principal repayments totaling $39 million were received. 3 FINANCIAL CONDITION OF THE HELP FUND Arizona Department of Transportation Highway Expansion and Extension Loan Program Fund Statement of Net Assets For the fiscal years ended June 30, 2009 and 2008 (Unaudited) 2009 2008 $ 50,220,090 $ 77,630,108 481,944 8,390,822 59,092,856 669,877 47,732,252 126,032,237 15,660,000 15,660,000 74,752,856 20,273,156 20,273,156 146,305,393 Liabilities Current Liabilities: Accrued payroll and other accrued expenses Board Funding Obligations Compensated absences Advance fromother ADOT funds Due to Arizona counties and cities Total current liabilities 6,951 12,329 30,590 49,870 6,170 50,000,000 13,821 20,000,000 70,019,991 Non-current liabilities: Accrued interest payable Total non-current liabilities Total liabilities 49,870 2,170,356 2,170,356 72,190,347 74,702,986 $ 74,702,986 74,115,046 $ 74,115,046 Assets Current assets: Restricted cash on deposit with the State Treasurer Receivables: Accrued interest Loans Total current assets Non-current assets: Receivables: Loans Total non-current assets Total assets Net assets Restricted for loans and other financial assistance Total net assets 4 FINANCIAL CONDITION OF THE HELP FUND Arizona Department of Transportation Highway Expansion and Extension Loan Program Fund Statement of Activities For the fiscal years ended June 30, 2009 and 2008 (Unaudited) 2009 Operating revenues: Interest on loans receivables Total operating revenues Operating expenses: Salaries and related benefits Supplies Professional and outside services Travel Interest on Board Funding Obligations Other Total operating expenses Operating loss Non-operating revenues: Interest on investments Investment expense Distributions to other state agencies Total non-operating revenues Changes in net assets Total net assets - July 1 Total net assets - June 30 $ 1,127,759 1,127,759 141,207 197 32,000 1,877,425 461 2,051,290 <923,531> 2008 $ 1,755,395 1,755,395 146,321 2,477 24,759 254 3,795,890 1,439 3,971,140 <2,215,745> 1,572,256 4,705,331 <58,785> <80,251> <2,000> <2,000> 4,623,080 1,511,471 587,940 2,407,335 71,707,711 74,115,046 $ 74,702,986 $ 74,115,046 5 HIGHWAY EXPANSION AND EXTENSION LOAN PROGRAM (HELP) LOAN STATUS AS OF SEPTEMBER 2009 STATEWIDE LOANS PROJECT SPONSOR PURPOSE OF LOAN PROJECT LOCATION LOAN APPROVAL INTEREST RATE* MAXIMUM LOAN FINAL MATURITY DRAWS TO DATE OUTSTANDING LOAN BALANCE ADOT Reconstruction SR260, Show Low to Pinetop 02/18/2000 2.93% $5,664,000 Feb-02 $4,666,837 Paid in full 02/25/2002 TOWN OF CHINO VALLEY Construction Center Street 03/17/2000 4.50% $300,000 Jan-05 $300,000 Paid in full 01/11/2005 ADOT Design, Right of Way Various projects state wide 05/19/2000 3.46% $5,707,000 Mar-04 $5,165,861 Paid in full 03/16/2004 CITY OF SIERRA VISTA Construction Buffalo Soldier Trail 7th St. to SR 90 07/21/2000 4.00% $1,970,000 Jun-03 $1,970,000 Paid in full 06/13/2003 LA PAZ COUNTY Reconstruction Salome Road Centennial Wash 12/18/2000 2.93% $2,000,000 Jan-04 $1,448,568 Paid in full 05/31/2002 ADOT Reconstruction SR 260, Pinetop to Hon-Dah 01/19/2001 2.93% $8,400,000 May-03 $6,038,856 Paid in full 05/20/2003 SANTA CRUZ COUNTY Reconstruction South River Road 01/19/2001 3.11% $1,150,000 Jan-07 $643,827 Paid in full 09/27/2005 ADOT Design Naha 'Ta' Dziil Rd Sanders TI 03/16/2001 3.32% $1,000,000 Jan-05 $1,000,000 Paid in full 01/20/2005 CITY OF YUMA Reconstruction Ave. A, 40th Street to Desert Avenue 04/20/2001 1.65% $1,000,000 Dec-06 $1,000,000 Paid in full 12/05/2006 TOWN OF TAYLOR Reconstruction Paper Mill Road 05/18/2001 3.42% $1,000,000 Jun-05 $1,000,000 Paid in full 06/02/2005 ADOT Reconstruction SR 260, Christopher Creek 05/18/2001 2.85% $41,900,000 Jul-05 $37,678,400 Paid in full 06/22/2005 TOWN OF PAYSON Reconstruction McLane Road 06/15/2001 3.56% $1,100,000 Jul-06 $1,100,000 Paid in full 06/30/2006 CITY OF YUMA Reconstruction I-8, Giss Parkway Redondo Drive TI 06/15/2001 1.77% $2,000,000 Jul-06 $2,000,000 Paid in full 07/05/2006 LOAN STATUS AS OF SEPTEMBER 2009 STATEWIDE LOANS PROJECT SPONSOR PURPOSE OF LOAN PROJECT LOCATION LOAN APPROVAL INTEREST RATE* MAXIMUM LOAN FINAL MATURITY DRAWS TO DATE OUTSTANDING LOAN BALANCE ADOT Design, Right of Way SR89A, Glassford Hill Section 09/21/2001 1.76% $3,216,000 Sep-03 $2,031,264 Paid in full 09/17/2003 TOWN OF MIAMI Reconstruction Rose Road & Sullivan Street 01/18/2002 2.20% $80,000 Jun-05 $80,000 Paid in full 06/02/2005 ADOT Construction SR 89A, Glassford Hill Section 03/15/2002 1.35% $13,855,000 Oct-04 $13,855,000 Paid in full 10/19/2004 ADOT Construction Avenue 3E Traffic Interchange 03/15/2002 0.86% $9,900,000 Aug-04 $9,900,000 Paid in full 8/19/2004 YAVAPAI COUNTY Construction SR 89A, Glassford Hill Section 03/15/2002 1.83% $4,500,000 Jun-05 $4,500,000 Paid in full 06/06/2005 ADOT Right of Way US 60/SR 79 Traffic Interchange 03/15/2002 1.56% $4,000,000 Oct-04 $2,691,459 Paid in full 10/19/2004 ADOT Design SR 95, Parker to Lakeside 03/15/2002 1.14% $500,000 May-05 $500,000 Paid in full 05/19/2005 GILA COUNTY Reconstruction Fossil Creek Road 04/19/2002 1.43% $1,237,500 Mar-09 $1,237,500 Paid in fill 03/19/2009 GILA COUNTY Reconstruction Six Shooter Canyon Road 04/19/2002 1.81% $600,000 Jun-08 $600,000 Paid in full 06/13/2008 GILA COUNTY Construction Six Shooter Road and Bridge 04/19/2002 3.12% $487,500 Dec-08 $487,500 Paid in full 12/05/2008 ADOT Construction SR 260, Cottonwood to Camp Verde 05/17/2002 1.99% $5,000,000 Jun-06 $5,000,000 Paid in full 06/19/2006 YAVAPAI COUNTY Construction Fain Road Realignment 06/21/2002 2.25% $4,500,000 Jun-06 $4,500,000 Paid in full 05/31/2006 CITY OF LAKE HAVASU CITY Reconstruction SR 95, North City Limits 06/21/2002 1.18% $789,508 Feb-05 $789,508 Paid in full 02/01/2005 LOAN STATUS AS OF SEPTEMBER 2009 STATEWIDE LOANS PROJECT SPONSOR PURPOSE OF LOAN PROJECT LOCATION LOAN APPROVAL INTEREST RATE* MAXIMUM LOAN FINAL DRAWS TO MATURITY DATE ADOT Design Fort Grant Road Traffic Interchange 06/21/2002 1.35% $650,000 Nov-06 $650,000 Paid in full 04/26/2006 CITY OF SAFFORD Construction 20th Avenue 08/16/2002 2.42% $2,000,000 Oct-07 $2,000,000 Paid in full 10/02/2007 TOWN OF THATCHER Construction 20th Avenue 08/16/2002 1.56% $2,000,000 Oct-07 $2,000,000 Paid in full 10/03/2007 CITY OF KINGMAN Construction North Bank Street 09/23/2005 3.11% $2,000,000 Nov-11 $2,000,000 $1,100,000 CITY OF ELOY Reconstruction Sunshine Boulevard 11/16/2007 1.49% $3,200,000 Mar-14 $3,200,000 $3,200,000 PINAL COUNTY Reconstruction Thornton Road 12/21/2007 2.35% $2,000,000 May-12 $2,000,000 $1,500,000 CITY OF TOMBSTONE Construction Yellow Jacket Way 11/18/2005 To be Determined $150,000 Nov-10 - - MOHAVE COUNTY Design and Construction Highway 91, Beaver Dam Wash Bridge 04/21/2006 To be Determined $8,700,000 Jun-10 - - CITY OF BISBEE Reconstruction Arizona Street 09/21/2007 To be Determined $2,400,000 Oct-10 - - TOWN OF PAYSON Reconstruction Bonita Street, Phase II 03/21/2008 To be Determined $1,200,000 May-13 - - TOWN OF MAMMOTH Reconstruction Main Street 12/14/2001 - $334,800 - Withdrawn OUTSTANDING LOAN BALANCE - LOAN STATUS AS OF SEPTEMBER 2009 MAG LOANS PROJECT SPONSOR CITY OF CHANDLER CITY OF MESA ADOT PURPOSE OF PROJECT LOAN LOCATION New Construction Price Freeway: Warner Urban Freeway to Frye System New Construction Red Mountain Freeway: Urban Freeway Country Club to Gilbert System Purchase of Right Various: As stipulated of Way for Urban in Senate Bill 1201 Freeway System LOAN APPROVAL INTEREST RATE* MAXIMUM LOAN FINAL DRAWS TO MATURITY DATE OUTSTANDING LOAN BALANCE 03/20/1998 3.59% $26,000,000 Jul-02 $26,000,000 Paid in full 11/30/2001 03/20/1998 4.41% $24,000,000 Mar-03 $24,000,000 Paid in full 03/21/2003 11/15/1999 3.92% $100,000,000 Jun-01 $90,324,109 Paid in full 06/28/2001 ADOT/ CITY OF PHOENIX Construction SR 51 Completion Union Hills - L101 11/17/2000 2.48% $22,500,000 Jun-05 $22,500,000 Paid in full 02/17/2005 ADOT Right of Way, Construction Regional Freeway System 09/21/2001 3.30% $50,000,000 Dec-08 $50,000,000 Paid in full 04/17/2008 ADOT Right of Way, Construction Regional Freeway System 11/21/2003 1.44% $80,500,000 Jun-09 $80,500,000 Paid in full 06/15/2009 CITY OF GOODYEAR Design I-10 Widening 04/21/2006 3.13% $7,369,000 Jun-10 $6,783,965 $3,474,182 MARICOPA COUNTY Design, Right of Way, Construction MC 85, 107th Ave. to 75th Ave. 03/21/2008 To be Determined $25,700,000 Jul-13 - CITY OF PHOENIX Design, Right of Way, Construction Dixileta Drive TI 11/18/2005 - $11,900,000 - Withdrawn - CITY OF PEORIA Design, Construction SR 101 - Union Hills Drive TI 05/16/2008 - $9,910,000 - Withdrawn - - LOAN STATUS AS OF SEPTEMBER 2009 PAG LOANS PROJECT SPONSOR PURPOSE OF LOAN PROJECT LOCATION LOAN APPROVAL INTEREST RATE* MAXIMUM LOAN FINAL MATURITY DRAWS TO DATE OUTSTANDING LOAN BALANCE CITY OF TUCSON Street Improvements 6th Avenue, 19th Street to I-10 03/17/2000 4.50% $2,000,000 Jan-05 $2,000,000 Paid in full 05/01/2001 ADOT Design, Right of Way Various projects in Pima County 05/19/2000 1.77% $5,285,000 Jun-05 $5,285,000 Paid in full 06/22/2005 CITY OF TUCSON Street Improvements 6th Avenue, Ajo Way to Rodeo Wash 06/15/2001 2.91% $4,500,000 Jan-06 $4,500,000 Paid in full 01/03/2006 ADOT Construction I-10 / I-19 Interchange 09/21/2001 2.11% $62,500,000 Jan-06 $62,500,000 Paid in full 04/18/2005 PIMA COUNTY Street Improvements Ajo Way, Country Club to Alvernon 12/14/2001 3.23% $3,700,000 Jul-07 $3,700,000 Paid in full 01/17/2007 PIMA COUNTY Street Improvements Shannon Road, Ina Rd to Magee Rd 12/14/2001 3.23% $1,400,000 Jul-07 $1,400,000 Paid in full 01/17/2007 ADOT Design I-10 Mainline, Grant to Congress 03/15/2002 0.86% $5,500,000 Jun-06 $4,098,869 Paid in full 06/20/2006 TOWN OF ORO VALLEY Construction Tangerine Road Widening 08/16/2002 1.19% $1,716,000 Jul-05 $1,716,000 Paid in full 08/01/2005 TOWN OF ORO VALLEY Construction La Canada Drive Extension 02/20/2004 2.52% $5,000,000 Feb-08 $5,000,000 Paid in full 03/07/2008 TOWN OF MARANA Construction Thornydale Road 11/19/2004 2.51% $7,000,000 Mar-10 $7,000,000 $900,000 PIMA COUNTY Construction Alvernon Way, River Rd. to Ft. Lowell 05/20/2005 3.06% $4,836,000 Jun-09 $4,836,000 Paid in full 06/01/2009 CITY OF TUCSON Construction Mountain Avenue, Roger Rd. to Ft. Lowell 03/16/2007 1.97% $14,000,000 May-11 $13,400,000 $5,900,000 TOWN OF ORO VALLEY Construction La Canada Drive Widening 07/20/2007 3.20% $8,000,000 Aug-12 $8,000,000 $8,000,000 LOAN STATUS AS OF SEPTEMBER 2009 PAG LOANS PROJECT SPONSOR PURPOSE OF LOAN PROJECT LOCATION LOAN APPROVAL INTEREST RATE* MAXIMUM LOAN FINAL MATURITY DRAWS TO DATE OUTSTANDING LOAN BALANCE ADOT Construction I-10, Pinal Air Park to Marana TI 11/19/2004 - $18,500,000 - Withdrawn - CITY OF TUCSON Construction Harrison Road 08/20/2004 - $12,293,000 - Withdrawn - TOWN OF SAHUARITA Construction La Canada Phase II 09/23/2005 - $3,900,000 - Withdrawn - HELP Projects Map and Table Map Table 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 Project Name SR260 Showlow to Pinetop Center Street Carr Canyon Rd. - Hunter Canyon Rd. Van’s Trading Post - East of SR264 Lake Havasu Blvd - Old London Bridge Rd. US60 - SR79 TI Glassford Hill Ave 3E SR280 TI Buffalo Soldier Trail Salome Rd. Centennial Wash SR260, Pinetop - Hon-dah South River Rd. Naha Ta Dziil Rd / Sanders TI. Ave. A 40th st to Desert Ave Paper Mill Rd. SR260, Christopher Creek McLane Rd. I-18 - Giss Parkway - Redondo Dr. TI SR89A, Glassford Hill Section Rose Rd. to Sullivan Street SR89A, Glassford Hill Section Avenue 3E TI. SR89A, Glassford Hill Section US60 - SR79 TI SR95 Parker to Lakeside Fossil Creek Rd. Six Shooter Canyon Rd. SR260 Cottonwood to Camp Verde Fain Rd. Realignment SR95, North City Limits Fort Grant Rd. TI 20th Avenue 20th Avenue Six Shooter Rd. and Bridge North Bank Street Highway 91, Beaver Dam Wash Bridge Yellow Jacket Way Arizona Street, Cole Ave to Hazard Street Sunshine Boulevard Bonita Street, Phase II Thornton Road Project Description Reconstruction Construction Design Design Design Design Design Design Construction Reconstruction Reconstruction Reconstruction Design Reconstruction Reconstruction Reconstruction Reconstruction Reconstruction Design Reconstruction Reconstruction Reconstruction Reconstruction Reconstruction Reconstruction Reconstruction Reconstruction Construction Construction Construction Construction Construction Construction Construction Construction Construction Construction Reconstruction Reconstruction Reconstruction Reconstruction Loan Amount $5,664,000 $300,000 $457,000 $500,000 $1,850,000 $600,000 $1,500,000 $800,000 $1,970,000 $2,000,000 $8,400,000 $1,150,000 $1,000,000 $1,000,000 $1,000,000 $41,900,000 $1,100,000 $2,000,000 $3,216,000 $80,000 $13,855,000 $9,900,000 $4,500,000 $4,000,000 $500,000 $1,237,500 $600,000 $5,000,000 $4,500,000 $789,508 $650,000 $2,000,000 $2,000,000 $487,500 $2,000,000 $8,700,000 $150,000 $2,400,000 $3,200,000 $1,200,000 $2,000,000 City / Location Showlow Chino Valley Cochise Cty Coconino Cty Mohave Cty Pinal Cty Prescott Valley Yuma Sierra Vista La Paz Cty Pinetop Santa Cruz Cty Apache Cty City of Yuma Town of Taylor Gila Cty Payson Yuma Prescott Valley Miami Prescott Valley Yuma Prescott Valley Pinal Cty Parker Gila Cty Gila Cty Yavapai Cty Yavapai Cty Mohave Cty Cochise Cty Safford Thatcher Gila Cty Kingman Mohave Cty Tombstone City of Bisbee City of Eloy Town of Payson Pinal Cty 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 6th Avenue Project I-10 - I-19 TI I-10 Mainline Prince Rd. I-10 - I-19 TI 6th Avenue Project Phase II JCT I-10 / I-19 Phase 1&2 Ajo Way - Country Club Rd -Alvernon Way Shannon Road: Ina Rd - Magee Rd. I-10 Mainline Grant - Congress Tangerine Rd. La Canada Dr. Extension - Tangerine Rd. Thornydale Rd. Reconstruction Alvernon Way - River Rd. - Lowell Rd. Mountain Ave, Roger Rd., Ft. Lowell Rd. La Canada Drive Widening Street improvements Design Design Design Street improvements Construction Street Improvements Street Improvements Design Construction Construction Reconstruction Construction Reconstruction Construction $2,000,000 $3,285,000 $1,000,000 $1,000,000 $4,500,000 $62,500,000 $3,700,000 $1,400,000 $5,500,000 $1,716,000 $5,000,000 $7,000,000 $4,836,000 $14,000,000 $8,000,000 Tucson Pima Cty Pima Cty Pima Cty Tucson Tucson Pima Cty Pima Cty Pima Cty Oro Valley Oro Valley Town of Marana Pima Cty Tucson Oro Valley 1 Red Mountain Country Club - Gilbert Construction 2 Price Freeway - Warner - Frye Construction Above two loans are not included in totals 3 Various: as stipulated / MAG Right of way 4 SR51 Completion Union Hills - L101 Construction 5 Regional Freeway System / MAG ROW Construction 6 Regional Freeway System / MAG ROW Construction 7 I-10 Widening Design Design, RWY, Const 8 MC 85, 107th Ave. to 75th Ave. 13 $24,000,000 Mesa $26,000,000 Chandler $100,000,000 $22,500,000 $50,000,000 $80,500,000 $7,369,000 $25,700,000 Maricopa Cty Phoenix Maricopa Cty Maricopa Cty City of Goodyear Maricopa Cty Prepared By: Arizona Department of Transportation Financial Management Services Highway Expansion and Extension Loan Program Section 206 S. 17th Avenue, Suite 200 B Phoenix, AZ 85007-3213 Phone (602) 712-7441 * Fax (602) 712-6672