Maricopa County Department of Transportation Transportation Improvement Program Fiscal Years 2015-2019 Introduction Purpose of the TIP The Maricopa County Department of Transportation (MCDOT) annual Transportation Improvement Program (TIP) contains planned roadway system improvements for the County. These improvements include new or improved roadways, bridges, drainage structures, intersection improvements, Intelligent Transportation Systems and more. The TIP allows MCDOT to plan for five years of future projects through the development process (planning, scoping, design and construction). Projects identified in the first year of the TIP are part of the annual adopted County budget. The County does not adopt a multi-year budget and the TIP allows for public documentation of projects planned for years two through five. The County’s annual budget is adopted by the Board of Supervisors (BOS) in May for each fiscal year beginning July 1st and ending July 30th. Developing the TIP The TIP is developed annually. The process begins by analyzing previously budgeted/ scheduled TIP projects based upon project cost, commitment of financial partners (i.e. cities and towns) and available funding. New projects are developed from requests by cities/towns, State, and the public. These projects are then reviewed and the highest rated projects are then recommended for inclusion in the new TIP. Accessing the TIP Past and current MCDOT TIP information is available on the MCDOT website at mcdot.maricopa.gov/technical/tip/tip.htm. A hard copy may also be obtained through the public records request process at mcdot.maricopa.gov/forms/records-request.htm. Table of Contents by Project Number (Alphabetical Listing on p.7) Introduction..........................................................................................................................................2 TIP System Expenditure Projects 2015-2019................................................................6 Project Listing FY 2015-2019 T195 T248 T251 T333 T338 T339 T342 T344 T345 T347 T348 T352 T365 T367 T369 T372 T375 T387 T389 T391 T404 T406 T411 T420 T427 T429 T432 T433 T434 T437 T439 T440 T441 T442 T443 T444 T445 T447 T459 T460 T462 T466 Northern Parkway Program Phase I Landscaping Project................................................................................... 7 Deer Valley Road: 117th Avenue to 109th Avenue Roadway Improvement Project............................................ 8 Riggs Road: Ellsworth Road to Meridian Road Roadway Widening Project...................................................... 9 Elliot Road at Sossaman Road Intersection Improvement Project.....................................................................10 Miller Road: I-10 to Army National Guard Facility Roadway Improvement Project...........................................11 Gilbert Road Bridge at the Salt River................................................................................................................12 McKellips Road: SR 101 to Alma School Road Roadway Improvement Study.................................................13 El Mirage Road: Northern Avenue to Cactus Road Roadway Widening and Safety Improvement Project.......14 MC 85: 107th Avenue to 75th Avenue Safety Improvement Project....................................................................15 Northern Parkway Program Dysart Road to 111th Avenue/Agua Fria River Crossing.........................................16 Bush Highway: Southern Mesa City Limits north to Water Users Circle Asphalt Rubber Overlay.................17 MC 85: Litchfield Road to 83rd Avenue Intelligent Transportation System (ITS)................................................18 Traffic Calming County Wide...............................................................................................................................19 El Mirage Road: Northern Avenue to Peoria Avenue Roadway Widening Project........................................... 20 Northern Parkway Program Reems Road/Litchfield Road Overpass Project.................................................... 21 Northern Parkway Program Northern Avenue at Loop 101................................................................................ 22 Riggs Road: Hawes Road to Ellsworth Road Roadway Widening Project....................................................... 23 MCDOT Highway Operations (Buckeye Yard) Facility Improvements............................................................... 24 E-IntelliDrive Safety – Phase III North Maricopa County................................................................................... 25 Avondale Boulevard at MC 85 Traffic Signal and Safety Improvement Project.................................................. 26 Olive Avenue: Citrus Road to El Mirage Road Roadway Improvement Study.................................................. 27 Riggs Road: Power Road to Hawes Road Roadway Widening Project............................................................. 28 Low Volume Road Program Dust Mitigation and Dirt Road Paving: County Wide............................................. 29 Empire Boulevard and Meridian Road Intersection Improvement Project......................................................... 30 Northern Parkway Program Dysart Road Overpass Project.............................................................................. 31 Riggs Road: Recker Road to Power Road Roadway Widening Project............................................................ 32 McDowell Road: 76th Street to Usery Pass Road Safety Improvement Project............................................... 33 Low Volume Road Program Dust Mitigation and Dirt Road Paving: Dove Valley............................................... 34 East Mesa Subdivisions Pavement Rehabilitation Project................................................................................. 35 Del Webb Boulevard at Hutton Drive Traffic Signal Installation and Traffic Safety Improvement....................... 36 Alma School Road at Michigan Avenue Traffic Signal Installation and Traffic Safety Improvements................ 37 Cotton Lane Haul Road Repair.......................................................................................................................... 38 Gilbert Road: Queen Creek Road to Hunt Highway Roadway Improvement Project....................................... 39 McQueen Road: Riggs Road to Ocotillo Road Roadway Improvement Project............................................... 40 Ocotillo Road: Arizona Avenue to McQueen Road Roadway Improvement Project......................................... 41 Aguila Road: Western Area Power Administration Towers Safety Improvement Project................................. 42 New River Road at Linda Lane Safety Improvement Project............................................................................. 43 Bell Road Adaptive Signals Study.................................................................................................................... 44 Anthem Box Culverts: Scour Protection North Central Maricopa County....................................................... 45 University Drive and Meridian Road Traffic Signal Installation.......................................................................... 46 Germann Road at Sossaman Road Intersection Improvement Study............................................................... 47 Fiber Optics Installation.................................................................................................................................... 48 Table of Contents T467 T468 T469 T470 T471 T472 T473 T474 T475 T476 T477 T478 T479 T481 Fiber Optics Installation.................................................................................................................................... 49 Meridian Road: Southern Avenue to Brown Road Asphalt Rubber Overlay.................................................... 50 16th Street: Carefree Highway to Joy Ranch Road Asphalt Rubber Overlay................................................... 51 Asphalt Rubber Overlay Southeast Area Arterials............................................................................................. 52 Asphalt Rubber Overlay Portions of a Two-Mile Section of Germann Road...................................................... 53 Asphalt Rubber Overlay SR303L and Northern Avenue Area........................................................................... 54 Local Road Rehabilitation County Wide............................................................................................................ 55 Asphalt Rubber Overlay Northwest Area Arterials............................................................................................. 56 Asphalt Rubber Overlay Southeast Area Arterials............................................................................................. 57 Asphalt Rubber Overlay Southwest Area Arterials............................................................................................ 58 Pavement Preservation Project County Wide................................................................................................... 59 Asphalt Rubber Overlay Southeast Area Arterials............................................................................................. 60 Gavilan Peak Parkway at Venture Drive Pedestrian Crosswalk Beacon........................................................... 61 Happy Valley Parkway at 115th Ave Traffic Scoping Study................................................................................. 62 Completed Projects FY 2014 T195 T304 T332 T341 T393 T419 T425 T426 T435 T437 T439 T449 Northern Parkway Program Sarival Road to Dysart Road................................................................................. 63 Miller Road Bridge Bridge Improvement Rehabilitation Project......................................................................... 64 Fort McDowell Road: SR87 to Ba Hon Nah Road Drainage Improvement Project........................................... 65 El Mirage Road: Picerne Drive to Bell Road Roadway Improvement Project................................................... 66 Sun City Roadway Rehabilitation Project 99th Avenue: Tarrytown Avenue to Coggins Drive.......................... 67 Dynamic Message Sign Installation Project West Valley................................................................................. 68 MC 85 at Jackrabbit Road Intersection Improvement Project............................................................................. 69 University Drive at Signal Butte/Crismon Road Intersection Improvement Project......................................... 70 Asphalt Rubber Overlay Southwest Area Arterials............................................................................................ 71 Del Webb Boulevard at Hutton Drive Intersection Improvement Project........................................................... 72 Alma School Road at Michigan Avenue Intersection Improvement Project...................................................... 73 339th Avenue at Interstate 10 Pavement Rehabilitation Project..........................................................................74 Index (A-Z) T469 T444 T439 T459 T474 T471 T470 T475 T478 T476 T472 T391 T447 T348 T440 T248 T437 T434 T389 T367 T344 T333 T420 T466 T467 T479 T462 T339 T441 T481 T473 T411 T433 T352 T345 T387 T432 T342 T442 T468 T338 T445 T427 T347 T372 T195 T369 16th Street: Carefree Highway to Joy Ranch Road Asphalt Rubber Overlay................................................... 51 Aguila Road: Western Area Power Administration Towers Safety Improvement Project................................. 42 Alma School Road at Michigan Avenue Traffic Signal Installation and Traffic Safety Improvements................ 37 Anthem Box Culverts: Scour Protection North Central Maricopa County....................................................... 45 Asphalt Rubber Overlay Northwest Area Arterials............................................................................................. 56 Asphalt Rubber Overlay Portions of a Two-Mile Section of Germann Road...................................................... 53 Asphalt Rubber Overlay Southeast Area Arterials............................................................................................. 52 Asphalt Rubber Overlay Southeast Area Arterials............................................................................................. 57 Asphalt Rubber Overlay Southeast Area Arterials............................................................................................. 60 Asphalt Rubber Overlay Southwest Area Arterials............................................................................................ 58 Asphalt Rubber Overlay SR303L and Northern Avenue Area........................................................................... 54 Avondale Boulevard at MC 85 Traffic Signal and Safety Improvement Project.................................................. 26 Bell Road Adaptive Signals Study.................................................................................................................... 44 Bush Highway: Southern Mesa City Limits north to Water Users Circle Asphalt Rubber Overlay.................17 Cotton Lane Haul Road Repair.......................................................................................................................... 38 Deer Valley Road: 117th Avenue to 109th Avenue Roadway Improvement Project............................................ 8 Del Webb Boulevard at Hutton Drive Traffic Signal Installation and Traffic Safety Improvement....................... 36 East Mesa Subdivisions Pavement Rehabilitation Project................................................................................. 35 E-IntelliDrive Safety – Phase III North Maricopa County................................................................................... 25 El Mirage Road: Northern Avenue to Peoria Avenue Roadway Widening/Safety Improvement Project........... 20 El Mirage Road: Northern Avenue to Cactus Road Roadway Widening/Safety Improvement Project..............14 Elliot Road at Sossaman Road Intersection Improvement Project.....................................................................10 Empire Boulevard and Meridian Road Intersection Improvement Project......................................................... 30 Fiber Optics Installation.................................................................................................................................... 48 Fiber Optics Installation.................................................................................................................................... 49 Gavilan Peak Parkway at Venture Drive Pedestrian Crosswalk Beacon........................................................... 61 Germann Road at Sossaman Road Intersection Improvement Study............................................................... 47 Gilbert Road Bridge at the Salt River................................................................................................................12 Gilbert Road: Queen Creek Road to Hunt Highway Roadway Improvement Project....................................... 39 Happy Valley Parkway at 115th Ave Traffic Scoping Study................................................................................. 62 Local Road Rehabilitation County Wide............................................................................................................ 55 Low Volume Road Program Dust Mitigation and Dirt Road Paving: County Wide............................................. 29 Low Volume Road Program Dust Mitigation and Dirt Road Paving: Dove Valley............................................... 34 MC 85: Litchfield Road to 83rd Avenue Intelligent Transportation System (ITS)................................................18 MC 85: 107th Avenue to 75th Avenue Safety Improvement Project....................................................................15 MCDOT Highway Operations (Buckeye Yard) Facility Improvements............................................................... 24 McDowell Road: 76th Street to Usery Pass Road Safety Improvement Project............................................... 33 McKellips Road: SR 101 to Alma School Road Roadway Improvement Study.................................................13 McQueen Road: Riggs Road to Ocotillo Road Roadway Improvement Project............................................... 40 Meridian Road: Southern Avenue to Brown Road Asphalt Rubber Overlay.................................................... 50 Miller Road: I-10 to Army National Guard Facility Roadway Improvement Project...........................................11 New River Road at Linda Lane Safety Improvement Project............................................................................. 43 Northern Parkway Program Dysart Road Overpass Project.............................................................................. 31 Northern Parkway Program Dysart Road to 111th Avenue/Agua Fria River Crossing.........................................16 Northern Parkway Program Northern Avenue at Loop 101................................................................................ 22 Northern Parkway Program Phase I Landscaping Project................................................................................... 7 Northern Parkway Program Reems Road/Litchfield Road Overpass Project.................................................... 21 Index (A-Z) T443 T404 T477 T251 T375 T406 T429 T365 T460 Ocotillo Road: Arizona Avenue to McQueen Road Roadway Improvement Project......................................... 41 Olive Avenue: Citrus Road to El Mirage Road Roadway Improvement Study.................................................. 27 Pavement Preservation Project County Wide................................................................................................... 59 Riggs Road: Ellsworth Road to Meridian Road Roadway Widening Project...................................................... 9 Riggs Road: Hawes Road to Ellsworth Road Roadway Widening Project....................................................... 23 Riggs Road: Power Road to Hawes Road Roadway Widening Project............................................................. 28 Riggs Road: Recker Road to Power Road Roadway Widening Project............................................................ 32 Traffic Calming County Wide...............................................................................................................................19 University Drive and Meridian Road Traffic Signal Installation.......................................................................... 46 Completed Projects FY 2014 T449 T439 T435 T437 T419 T341 T332 T425 T304 T195 T393 T426 339th Avenue at Interstate 10 Pavement Rehabilitation Project..........................................................................74 Alma School Road at Michigan Avenue Intersection Improvement Project...................................................... 73 Asphalt Rubber Overlay Southwest Area Arterials............................................................................................ 71 Del Webb Boulevard at Hutton Drive Intersection Improvement Project........................................................... 72 Dynamic Message Sign Installation Project West Valley................................................................................. 68 El Mirage Road: Picerne Drive to Bell Road Roadway Improvement Project................................................... 66 Fort McDowell Road: SR87 to Ba Hon Nah Road Drainage Improvement Project........................................... 65 MC 85 at Jackrabbit Road Intersection Improvement Project............................................................................. 69 Miller Road Bridge Bridge Improvement Rehabilitation Project.......................................................................... 64 Northern Parkway Program: Sarival Road to Dysart Road................................................................................ 63 Sun City Roadway Rehabilitation Project 99th Avenue: Tarrytown Avenue to Coggins Drive.......................... 67 University Drive at Signal Butte/Crismon Road Intersection Improvement Project......................................... 70 TIP FY 2015-2019 | 5 TIP System Expenditure Projects 2015-2019 TIP System Projects includes those projects that are not route specific but are needed to support the entire roadway system. Examples are environmental analysis, archeological analysis, planning projects, etc. Proj# Project Name FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 T001 TIP Program Management 450,000 450,000 450,000 450,000 450,000 T002 Project Reserve Account 8,000,000 - - - - T003 TAB Special Projects 1,510,000 1,510,000 1,510,000 1,510,000 1,510,000 T004 Warranted Traffic Improvements 1,240,000 3,000,000 4,000,000 5,000,000 5,000,000 T005 Planning Studies (CARS & Corridor Studies) 1,600,000 1,600,000 1,600,000 1,600,000 1,600,000 T006 Unallocated Force Account 581,000 1,280,230 1,856,230 1,913,230 2,053,230 T008 Property Management on prior year TIP Projects 50,000 50,000 50,000 50,000 50,000 T011 R.O.W. In-fill on Road Inventory System T012 General Civil Engineering Totals 6 | TIP FY 2015-2019 100,000 100,000 900,000 1,000,000 1,000,000 1,336,000 600,000 1,100,000 3,100,000 3,100,000 14,867,000 8,590,230 11,466,230 14,623,230 14,763,230 FY 2015 - 2019 Project Listing Project Manager: Ben Markert Project Number T195 Phone: (602) 506-8651 email: BenMarkert@mail.maricopa.gov Northern Parkway Program Activity Olive Ave Dysart Rd Reems Rd SURPRISE Northern Pkwy EL MIRAGE Northern Ave GLENDALE FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 - - - - - - 1,000,000 1,000,000 - - - - - - - - - - 2,500,000 500,000 1,000,000 1,000,000 - - - - - - - - Construction 22,317,000 1,681,000 55,000 - 20,581,000 - Totals 25,817,000 3,181,000 1,055,000 1,000,000 20,581,000 - Scoping Study Design Environmental Right-of-way Utilities FY 2015-2019 Sarival Ave The first phase of the 12.5 mile Northern Parkway Program from Sarival Avenue to Dysart Road has been completed and landscaping of the right-ofway to prevent erosion and dust is in progress. The landscaping consists of drought-resistant trees, shrubs, accents and decomposed granite for ground covering plus an irrigation system. Once installed, the contractor will maintain the plants and irrigation system for one year to insure the plants are established. A total of $3,256,000 is budgeted in FY 2015 to complete landscaping and corridor rightof-way acquisition to protect the future alignment. The Northern Parkway project is a 20-year multiphased project in partnership with the Maricopa Association of Governments (MAG), the Cities of El Mirage, Glendale, Peoria and the Flood Control District of Maricopa County. Litchfield Rd Phase I Landscaping Project BOS District/s: 4 Federal Funding: Yes Intergovernmental Agreement (Cost Share) Project Partners or Partnership: Maricopa Association of Governments, City of El Mirage, City of Glendale, City of Peoria, Flood Control District of Maricopa County TIP FY 2015-2019 | 7 FY 2015 - 2019 Project Listing Project Manager: Tricia Brown Project Number T248 Phone: (602) 506-0896 email: TriciaBrown@mail.maricopa.gov Deer Valley Road: 117th Avenue to 109th Avenue 109th Ave 117th Ave The project will extend Deer Valley Road across the Agua Fria River from 109th Avenue to El Mirage Road. It will connect Williams Drive at 117th Avenue to Deer Valley Road at 109th Avenue. The project will construct two bridges, and two miles of a fivelane roadway. Construction is planned to begin in the summer of 2016. Williams Dr 107th Ave Roadway Improvement Project Activity Ag u ia Fr PEORIA Beardsley Rd FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 - - - - - - 50,000 50,000 - - - - Environmental 1,000,000 1,000,000 - - - - Right-of-way 4,500,000 4,500,000 - - - - 400,000 400,000 - - - - Construction 21,030,000 5,600,000 15,430,000 - - - Totals 26,980,000 11,550,000 15,430,000 - - - Scoping Study Design Utilities FY 2015-2019 a El Mirage Rd Ri ve r Deer Valley Rd BOS District/s: 4 Federal Funding: Yes Intergovernmental Agreement (Cost Share) Project Partners or Partnership: City of Peoria 8 | TIP FY 2015-2019 FY 2015 - 2019 Project Listing Project Manager: Nariman Zadeh Project Number T251 Phone: (602) 506-8623 email: NarimanZadeh@mail.maricopa.gov Riggs Road: Ellsworth Road to Meridian Road Roadway Widening Project Riggs Road is a major east/west arterial that currently ends at Ellsworth Road. This project will construct Riggs Road from Ellsworth Road to Meridian Road. A total of $200,000 is budgeted in fiscal year 2015 to complete design, cultural resource data recovery and archeological investigation along with the interim roadway design due to the existence of the Pozos de Sonoqui archeological site. Construction of this project is contingent upon funding partnership with Town of Queen Creek and is tentatively planned for FY 2019. QUEEN CREEK ou se Rd Cloud Rd Empire Blvd Meridian Rd Signal Butte Rd Ellsworth Rd Riggs Rd FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 - - - - - - 50,000 50,000 - - - - 150,000 150,000 - - - - 2,000,000 - - - 2,000,000 - - - - - - - Construction 5,550,000 - - - - 5,550,000 Totals 7,750,000 200,000 - - 2,000,000 5,550,000 Scoping Study Design Environmental Right-of-way Utilities FY 2015-2019 nh Que e n Creek ¯ Activity Ri tte BOS District/s: 4 Federal Funding: Yes Intergovernmental Agreement (Cost Share) Project Partners or Partnership: Town of Queen Creek TIP FY 2015-2019 | 9 FY 2015 - 2019 Project Listing Project Manager: Randy Dunsey Project Number T333 Phone: (602) 506-2166 email: DunseyR@mail.maricopa.gov Elliot Road at Sossaman Road Intersection Improvement Project Activity MESA Elliot Rd FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 Scoping Study - - - - - - Design - - - - - - Environmental - - - - - - Right-of-way - - - - - - Utilities - - - - - - Construction 940,000 940,000 - - - - Totals 940,000 940,000 - - - - BOS District/s: 2 10 | TIP FY 2015-2019 FY 2015-2019 Sossaman Rd A traffic signal warrant study determined that a signalized intersection was needed to improve safety and improve traffic flow. This project will install traffic signals and make other improvements to improve safety, reduce congestion and improve traffic flow so the traveling public will have a safer commute. A total of $940,000 is budgeted in FY 2015 to complete construction. FY 2015 - 2019 Project Listing Project Manager: Bill Hahn Project Number T338 Phone: (602) 506-4611 email: BillHahn@mail.maricopa.gov Miller Road: I-10 to Army National Guard Facility Roadway Improvement Project A total of $25,000 is budgeted in FY 2015 to complete the scoping study for a project that will pave Miller Rd from I-10 to the Army National Guard Facility to improve safety. Construction is not currently planned and is dependent on National Guard participation, the total project cost and availability of funds. BUCKEYE Miller Rd Ton o Activity pah Salome Hwy Yuma Rd FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 25,000 25,000 - - - - Design - - - - - - Environmental - - - - - - Right-of-way - - - - - - Utilities - - - - - - Construction - - - - - - 25,000 25,000 - - - - Scoping Study Totals FY 2015-2019 Van Buren St BOS District/s: 4 TIP FY 2015-2019 | 11 FY 2015 - 2019 Project Listing Project Manager: Nariman Zadeh Project Number T339 Phone: (602) 506-8623 email: NarimanZadeh@mail.maricopa.gov Gilbert Road Bridge at the Salt River A new six-lane bridge will replace the existing twolane bridge with raised roadway approaches to provide an all-weather crossing. The first step is to form the financial partnership with the Salt River Indian Community and the City of Mesa to secure Maricopa Association of Governments funding from the Regional Transportation Plan. A total of $4,000,000 is budgeted in FY 2019 to begin design contingent on partnership negotiations. Construction is contingent on successful financial partnership formation. Gilbert Rd Salt River Thomas Rd MESA Activity FY 2015-2019 FY 2015 Scoping Study FY 2016 FY 2017 FY 2018 FY 2019 - - - - Design - - - - - 4,000,000 Environmental - - - - - - Right-of-way - - - - - - Utilities - - - - - - Construction - - - - - - - - - 4,000,000 Totals BOS District/s: 1 and 2 Federal Funding: Yes Intergovernmental Agreement (Cost Share) Project Partners or Partnership: MAG/Regional Transportation Plan, Salt River Pima - Maricopa Indian Community (SRPMIC) 12 | TIP FY 2015-2019 FY 2015 - 2019 Project Listing Project Manager: Nariman Zadeh Project Number T342 Phone: (602) 506-8623 email: NarimanZadeh@mail.maricopa.gov McKellips Road: SR 101 to Alma School Road Roadway Improvement Study This scoping study will determine the type and cost of roadway improvements needed, i.e. travel lanes, turning lanes, paved shoulders, drainage improvements and alignment improvements providing travelers with a safer travel route. Construction is tentatively planned for FY 2022 consistent with Maricopa Association of Governments funding and is dependent on the total project cost, acquiring funding partners and availability of funds. Alma School Rd 92nd St Dobson Rd McDowell Rd iver Salt R McKellips Rd MESA Activity FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 320,000 320,000 - - - - 1,050,000 - - - - 1,050,000 Environmental - - - - - - Right-of-way - - - - - - Utilities - - - - - - Construction - - - - - - 1,370,000 320,000 - - - 1,050,000 Scoping Study Design Totals FY 2015-2019 BOS District/s: 2 Federal Funding: Yes Intergovernmental Agreement (Cost Share) Project Partners or Partnership: Salt River Pima-Maricopa Indian Community (SRPMIC) TIP FY 2015-2019 | 13 FY 2015 - 2019 Project Listing Project Manager: Tricia Brown Project Number T344 Phone: (602) 506-0896 email: TriciaBrown@mail.maricopa.gov El Mirage Road: Northern Avenue to Cactus Road Roadway Widening and Safety Improvement Project Fria Rive r Cactus Rd YOUNGTOWN Olive Ave El Mirage Rd Dysart Rd Peoria Ave Agua EL MIRAGE 111th Ave SURPRISE The purpose of this project is to design the widening of El Mirage Road from Northern Avenue to Cactus Road. Improvements include the intersection at Cactus Road from two to four lanes with a dual left-turn center lane. Construction is planned for FY 2015 as part of T367 El Mirage Road widening from Northern Avenue to Peoria Avenue. This project is one of five phased improvements being planned in partnership with the City of El Mirage and the Maricopa Association of Governments (MAG) along El Mirage Road from Northern Avenue to Bell Road. PEORIA Northern Ave Activity FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 Scoping Study FY 2015-2019 - - - - - - Design - 20,000 - - - - Environmental - - - - - - Right-of-way - - - - - - Utilities - - - - - - Construction - - - - - - Totals - 20,000 - - - - BOS District/s: 4 Federal Funding: No Intergovernmental Agreement (Cost Share) Project Partners or Partnership: City of El Mirage, Maricopa Association of Governments (MAG) 14 | TIP FY 2015-2019 FY 2015 - 2019 Project Listing Project Manager: Wade Ansell Project Number T345 Phone: (602) 506-4662 email: WadeAnsell@mail.maricopa.gov MC 85: 107th Avenue to 75th Avenue Safety Improvement Project This project will provide a consistent roadway design from 107th Avenue to 75th Avenue by adding a dual center turn lane, where missing, and improving 75th, 83rd, 91st and 107th Avenue intersections. This project will also include overlaying the roadway so the traveling public will have a safer commute. AVONDALE Van Buren St R oosevelt TOLLESON Lower Buckeye Rd 75th Ave 83rd Ave 91st Ave 99th Ave 107th Ave MC 85 Can al PHOENIX Broadway Rd Activity FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 - - - - - - 350,000 450,000 - - - - - - - - - - Right-of-way 1,605,000 1,605,000 - - - - Utilities 1,250,000 500,000 500,000 - 250,000 - Construction 5,760,000 - 2,880,000 - 2,880,000 - Totals 8,965,000 2,555,000 3,380,000 - 3,130,000 - Scoping Study Design Environmental FY 2015-2019 BOS District/s: 5 TIP FY 2015-2019 | 15 FY 2015 - 2019 Project Listing Project Manager: Ben Markert Project Number T347 Phone: (602) 506-8651 email: BenMarkert@mail.maricopa.gov Northern Parkway Program Dysart Road to 111th Avenue/Agua Fria River Crossing This project will acquire the right-of-way needed for the ultimate parkway layout and then construct an interim four lane parkway with additional lanes at major intersections by constructing the eventual east bound two-lane frontage road south of the existing Northern Avenue. Northern Avenue will become the ultimate west bound frontage road. These two future frontage roads will serve as the interim four-lane parkway separated by the right-of-way for the future six-lane parkway. A new bridge at the Agua Fria River is included in this project. Olive Ave EL MIRAGE R iv e r Dysart Rd El Mirage Rd Agua F ri a Northern Ave GLENDALE Glendale Ave Activity FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 - - - - - - 497,000 497,000 - - - - Environmental - - - - - - Right-of-way - - - - - - Utilities - - - - - - Construction 33,034,670 - 15,964,060 17,070,610 - - Totals 33,531,670 497,000 15,964,060 17,070,610 - - Scoping Study Design FY 2015-2019 111th Ave PEORIA BOS District/s: 4 Federal Funding: Yes Intergovernmental Agreement (Cost Share) Project Partners or Partnership: Maricopa Association of Governments, City of El Mirage, City of Glendale, City of Peoria 16 | TIP FY 2015-2019 FY 2015 - 2019 Project Listing Project Manager: Bill Hahn Project Number T348 Phone: (602) 506-4611 email: billhahn@mail.maricopa.gov Bush Highway: Southern Mesa City Limits North to Water Users Circle Asphalt Rubber Overlay This 15.4-mile long project will overlay the existing Bush Highway pavement and make other safety improvements. In addition, this project will include paving of approximately 500 feet of Usery Pass Road and Goldfield Road. Other improvements include replacing an existing fence with a concrete barrier, upgrading existing guardrails and replacing the existing drainage pipe with two 24-inch pipes to reduce roadway flooding. The project is planned to be completed in phases due to limitations on construction from existing nesting bald eagles and heavy summer traffic. Activity Scoping Study Design Environmental Right-of-way FY 2015-2019 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 - - - - - - 800,000 800,000 - - - - - - - - - - - - - - - - 25,000 - 25,000 - - - Construction 8,910,000 - 2,925,000 2,925,000 3,060,000 - Totals 9,745,000 800,000 2,950,000 2,925,000 3,060,000 - Utilities BOS District/s: 2 TIP FY 2015-2019 | 17 FY 2015 - 2019 Project Listing Project Manager: Randy Dunsey Project Number T352 Phone: (602) 506-2166 email: DunseyR@mail.maricopa.gov MC 85: Litchfield Road to 83rd Avenue Intelligent Transportation System (ITS) Project The purpose of this Intelligent Transportation System (ITS) project is to install fiber optic cable and wireless connections along MC 85 between Litchfield Road and 83rd Avenue to improve traffic control. AVONDALE GOODYEAR Litchfield Rd Van Buren St MC 85 TOLLESON Activity 83rd Ave 91st Ave 99th Ave 107th Ave FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 Scoping Study - - - - - - Design - - - - - - Environmental - - - - - - Right-of-way - - - - - - Utilities - - - - - - Construction 1,880,000 1,880,000 - - - - Totals 1,880,000 1,880,000 - - - - BOS District/s: 5 Federal Funding: Yes 18 | TIP FY 2015-2019 FY 2015-2019 PHOENIX Avondale Blvd Dysart Rd El Mirage Rd Lower Buckeye Rd FY 2015 - 2019 Project Listing Project Manager: Angel Cobb Project Number T365 Phone: (602) 506-4263 email: angelcobb@mail.maricopa.gov Traffic Calming County Wide Traffic calming devices slow traffic through the neighborhood to make it safer for the residents. This project will install speed humps and other traffic calming solutions to improve safety. Locations have yet to be selected. Activity FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 400,000 80,000 80,000 80,000 80,000 80,000 Design - - - - - - Environmental - - - - - - Right-of-way - - - - - - Utilities - - - - - - 600,000 120,000 120,000 120,000 120,000 120,000 1,000,000 200,000 200,000 200,000 200,000 200,000 Scoping Study Construction Totals FY 2015-2019 BOS District/s: All TIP FY 2015-2019 | 19 FY 2015 - 2019 Project Listing Project Manager: Wade Ansell Project Number T367 Phone: (602) 506-4662 email: WadeAnsell@mail.maricopa.gov El Mirage Road: Northern Avenue to Peoria Avenue Roadway Widening The purpose of this project is to design the widening of El Mirage Road from Cactus Road to 1500 feet south of Peoria Avenue, right-of-way acquisition and construction from Northern Avenue to 1500 feet south of Peoria Avenue from two to four lanes with a dual left-turn lane. This project is one of five planned phased improvements being planned in partnership with the City of El Mirage and the Maricopa Association of Governments (MAG) along El Mirage Road from Northern Avenue to Bell Road. r Ri ve Dysart Rd El Mirage Rd Peoria Ave Olive Ave Agua ia Fr Northern Ave Activity FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 - - - - - - 20,000 20,000 - - - - Environmental - - - - - - Right-of-way - - - - - - Utilities - - - - - - Construction 5,530,000 5,530,000 - - - - Totals 5,550,000 5,550,000 - - - - Scoping Study Design FY 2015-2019 BOS District/s: 4 Intergovernmental Agreement (Cost Share) Project Partners or Partnership: City of El Mirage 20 | TIP FY 2015-2019 FY 2015 - 2019 Project Listing Project Manager: Ben Markert Project Number T369 Phone: (602) 506-8651 email: BenMarkert@mail.maricopa.gov Northern Parkway Program Reems Rd This project will construct grade separated Northern Parkway overpasses over Reems Road and Litchfield Road. Northern Avenue will be ultimately built to a six-lane arterial with the construction of 12.5 miles of roadway known as Northern Parkway. This project is part of a 20-year multi-phased Northern Parkway Program in partnership with the Maricopa Association of Governments and the cities of El Mirage, Glendale and Peoria. Litchfield Rd Reems Road/Litchfield Road Overpass Project Olive Ave Northern Pkwy Northern Ave GLENDALE Activity FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 Scoping Study FY 2015-2019 - - - - - - Design - - - - - - Environmental - - - - - - Right-of-way - - - - - - Utilities - - - - - - Construction 11,125,000 11,125,000 - - - - Totals 11,125,000 11,125,000 - - - - BOS District/s: 4 Federal Funding: Yes Intergovernmental Agreement (Cost Share) Project Partners or Partnership: Maricopa Association of Governments, City of El Mirage, City of Glendale, City of Peoria TIP FY 2015-2019 | 21 FY 2015 - 2019 Project Listing Project Manager: Ben Markert Project Number T372 Phone: (602) 506-8651 email: BenMarkert@mail.maricopa.gov Northern Parkway Program Northern Avenue at Loop 101 PEORIA 99th Ave This project will initially widen Northern Avenue to four lanes with additional lanes at major intersections. This is one of four projects in the second phase of the 20-year multi-phased project in partnership with the Maricopa Association of Governments and the Cities of El Mirage, Glendale, Peoria, and the Flood Control District of Maricopa County. New River Northern Ave GLENDALE Activity Scoping Study Design Environmental Right-of-way Utilities Construction Totals FY 2015-2019 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 - - - - - - 680,000 680,000 - - - - - - - - - - 3,350,000 - 3,450,000 - - - 900,000 900,000 - - - - 7,300,000 - - 7,300,000 - - 12,230,000 1,580,000 3,450,000 7,300,000 - - BOS District/s: 4 Federal Funding: Yes Intergovernmental Agreement (Cost Share) Project Partners or Partnership: Maricopa Association of Governments, City of El Mirage, City of Glendale, City of Peoria 22 | TIP FY 2015-2019 FY 2015 - 2019 Project Listing Project Manager: Nariman Zadeh Project Number T375 Phone: (602) 506-8623 email: NarimanZadeh@mail.maricopa.gov Riggs Road: Hawes Road to Ellsworth Road Roadway Widening Project This segment of Riggs Road will be expanded to have two travel lanes in each direction, a dual center turning lane, paved shoulders, drainage improvements and alignment improvements. Cloud Rd QUEEN CREEK Activity San Tan Blvd FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 Scoping Study - - - - - - Design - - - - - - Environmental - - - - - - Right-of-way FY 2015-2019 Ellsworth Rd Hawes Rd Riggs Rd - - - - - - Utilities 1,860,000 - - - 1,860,000 - Construction 3,860,000 - - - 3,860,000 - Totals 5,720,000 - - - 5,720,000 - BOS District/s: 1 Intergovernmental Agreement (Cost Share) Project Partners or Partnership: Town of Queen Creek TIP FY 2015-2019 | 23 FY 2015 - 2019 Project Listing Project Number T387 MCDOT Highway Operations (Buckeye Yard) Facility Improvements The Buckeye Yard building needed extensive repairs and the decision was made to construct a new building at the same site. The new building will be connected to the Town of Buckeye’s water and sewer systems. Total cost is estimated to be $5.3 million with $510,000 budgeted in FY 2015 to complete construction. Activity Buc k eye Canal MC 85 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 Scoping Study - - - - - - Design - - - - - - Environmental - - - - - - Right-of-way - - - - - - Utilities - - - - - - Construction 510,000 510,000 - - - - Totals 510,000 510,000 - - - - 24 | TIP FY 2015-2019 FY 2015-2019 BUCKEYE FY 2015 - 2019 Project Listing Project Manager: Faisal Saleem Project Number T389 Phone: (602) 506-1241 email: FaisalSaleem@mail.maricopa.gov E-IntelliDrive Safety – Phase III North Maricopa County Gavilan Pe ak Pkwy The purpose of this study is to test the Emergency and Transit Vehicle Priority System and also an advanced Pedestrian Crossing System along the Daisy Mountain Drive SMARTDrive testbed corridor in Anthem, Arizona. A n t h em W Me y an adm De W ash morial Dr ou n Dr Desert Hills Dr 27th Ave D a is yM n tai Activity FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 - - - - - - 50,000 50,000 - - - - Environmental - - - - - - Right-of-way - - - - - - Utilities - - - - - - Construction - - - - - - 50,000 50,000 - - - - Scoping Study Design Totals FY 2015-2019 BOS District/s: 3 Federal Funding: Yes Intergovernmental Agreement (Cost Share) Project Partners or Partnership: Federal Highway Administration, University of Arizona, University of Virginia TIP FY 2015-2019 | 25 FY 2015 - 2019 Project Listing Project Manager: Randy Dunsey Project Number T391 Phone: (602) 506-2166 email: DunseyR@mail.maricopa.gov Avondale Boulevard at MC 85 Traffic Signal and Safety Improvement Project This project will upgrade the existing traffic signal, make other improvements and railroad safety improvements at this intersection. The project will improve safety, reduce congestion and improve traffic flow. Construction is planned for FY 2016. AVONDALE Avondale Blvd MC 85 Activity FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 Scoping Study - - - - - - Design - - - - - - Environmental - - - - - - 50,000 50,000 - - - - - - - - - - Construction 1,804,000 - 1,804,000 - - - Totals 1,854,000 50,000 1,804,000 - - - Right-of-way Utilities FY 2015-2019 BOS District/s: 4 Federal Funding: Yes Intergovernmental Agreement (Cost Share) Project Partners or Partnership: City of Avondale 26 | TIP FY 2015-2019 FY 2015 - 2019 Project Listing Project Manager: Tricia Brown Project Number T404 Phone: (602) 506-0896 email: TriciaBrown@mail.maricopa.gov Olive Avenue: Citrus Road to El Mirage Road Roadway Improvement Study Reems Rd Citrus Rd Beardsley C ana l White Tanks Park Litchfield Rd SURPRISE Peoria Ave EL MIRAGE Olive Ave El Mirage Rd This scoping study will determine the type and cost of roadway improvements needed, i.e. travel lanes, turning lanes, paved shoulders, drainage improvements and alignment improvements. Construction is not currently planned and is dependent on the total project cost, acquiring funding partners and availability of funds. Northern Ave GLENDALE al an Camelback Rd Airli n e C GOODYEAR Activity FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 60,000 60,000 - - - - Design - - - - - - Environmental - - - - - - Right-of-way - - - - - - Utilities - - - - - - Construction - - - - - - 60,000 60,000 - - - - Scoping Study Totals FY 2015-2019 BOS District/s: 4 TIP FY 2015-2019 | 27 FY 2015 - 2019 Project Listing Project Manager: Nariman Zadeh Project Number T406 Phone: (602) 506-8623 email: NarimanZadeh@mail.maricopa.gov Riggs Road: Power Road to Hawes Road Roadway Widening Project Riggs Road is a major east-west arterial that currently ends at Ellsworth Road. This segment of Riggs Road will be expanded to have three travel lanes in each direction, a dual center turning lane, paved shoulders, signal improvements, drainage improvements and alignment improvements. Total cost is estimated to be $17.2 million. $1,555,000 is budgeted in FY 2015 to complete design and begin right-of-way acquisition. Construction is tentatively planned for FY 2017. Hawes Rd QUEEN CREEK Sossaman Rd Power Rd Chandler Heights Rd Riggs Rd San Tan Blvd Hunt Hwy Activity FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 - - - - - - Design 555,000 555,000 - - - - Environmental 905,000 - 450,000 455,000 - - Right-of-way 2,150,000 1,000,000 1,150,000 - - - Utilities 2,200,000 - 2,200,000 - - - Construction 10,005,000 - - 10,005,000 - - Totals 15,840,000 1,555,000 - - Scoping Study FY 2015-2019 3,800,000 10,460,000 BOS District/s: 1 Federal Funding: Yes Intergovernmental Agreement (Cost Share) Project Partners or Partnership: Town of Queen Creek 28 | TIP FY 2015-2019 FY 2015 - 2019 Project Listing Project Manager: Eric Mayer Project Number T411 Phone: (602) 506-8367 email: EricMayer@mail.maricopa.gov Low Volume Road Program Dust Mitigation and Dirt Road Paving: County Wide The MCDOT’s Low Volume Road (LVR) Program is paving and improving dirt roads in the MCDOT Roadway System in compliance with federal EPA mandates and Maricopa County’s Air Quality Plan. • 168th Avenue: Dixileta Drive to Dove Wing Way • Gordon Way: 205th Avenue to Bradley Road • 199th Avenue: Happy Valley Road to Frontier Drive • Janice Road (Peak View Road): Begin Road to 205th Avenue • 205th Avenue: Bradley Road to Gordon Way • Janice Road (Peak View Road): 205th Avenue to 203rd Avenue • 205th Avenue: Janice Road to Skinner Drive • 206th Avenue: Begin Road to Radford Road • Lone Mountain Road: Crozier Road to 215th Avenue • 227th Avenue: Montgomery Road to Lone Mountain Road • Norwich Drive: 193rd Avenue to 191st Avenue • 227th Avenue: Lone Mountain Road to Dove Valley Road • Patrick Lane: 89th Avenue to 87th Avenue • Dove Valley Road: 231st Avenue to 227th Avenue • Frontier Drive: 199th Avenue to 195th Avenue • Radford Road: 207th Avenue (Mitchell Road) to 206th Avenue • Frontier Drive: Begin Road to Reems Road • Radford Road: 206th Avenue to 205th Avenue • Galvin Street: Begin Road to 211th Avenue • Skinner Drive: Begin Road to 205th Avenue Activity • Planada Lane: 87th Avenue to 83rd Avenue FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 - - - - - - 160,000 160,000 - - - - Environmental 25,000 25,000 - - - - Right-of-way 50,000 50,000 - - - - Utilities 50,000 50,000 - - - - Construction 2,525,000 2,525,000 - - - - Totals 2,810,000 2,810,000 - - - - Scoping Study Design FY 2015-2019 BOS District/s: 4 Federal Funding: Yes TIP FY 2015-2019 | 29 FY 2015 - 2019 Project Listing Project Manager: Randy Dunsey Project Number T420 Phone: (602) 506-2166 email: DunseyR@mail.maricopa.gov Empire Boulevard and Meridian Road Mews Rd tte Ri nh ou se This intersection is at the southeast corner of the County with three legs of the intersection in Pinal County. The northwest corner is in Maricopa County. Pinal County has previously improved their three legs of the intersection. The County will improve the final leg of the intersection, install new traffic signals and move private irrigation to make room for the additional traffic lanes being constructed. Meridian Rd Intersection Improvement Project Rd Empire Blvd PINAL COUNTY Activity FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 Scoping Study - - - - - - Design - - - - - - Environmental - - - - - - Right-of-way - - - - - - Utilities - - - - - - Construction 865,000 865,000 - - - - Totals 865,000 865,000 - - - - BOS District/s: 1 30 | TIP FY 2015-2019 FY 2015-2019 FY 2015 - 2019 Project Listing Project Manager: Ben Markert Project Number T427 Phone: (602) 506-8651 email: BenMarkert@mail.maricopa.gov Northern Parkway Program Northern Avenue will be widened initially to four lanes with additional lanes at major intersections. Construction of the overpass is tentatively planned for FY 2017 with the design scheduled to start in FY 2016. The estimated cost of the project is $11.8 million. The overpass will be constructed to the ultimate six-lane width with wide shoulders to accommodate future expansion but striped to have two travel lanes in each direction consistent with initial construction of the other portions of the 20-year multi-phased project. The Dysart Road overpass is one of four projects in the second phase of the 20-year, multi-phased project in partnership with the Maricopa Association of Governments and the Cities of El Mirage, Glendale, Peoria, and the Flood Control District of Maricopa County. Activity Northern Ave GLENDALE FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 - - - - - - 859,000 - 859,000 - - - Environmental - - - - - - Right-of-way - - - - - - Utilities - - - - - - Construction 10,918,000 - - 10,918,000 - - Totals 11,777,000 - 859,000 10,918,000 - - Scoping Study Design FY 2015-2019 EL MIRAGE Dysart Rd Dysart Road Overpass Project BOS District/s: 4 Federal Funding: Yes Intergovernmental Agreement (Cost Share) Project Partners or Partnership: Maricopa Association of Governments, City of El Mirage, City of Glendale, City of Peoria TIP FY 2015-2019 | 31 FY 2015 - 2019 Project Listing Project Manager: Nariman Zadeh Project Number T429 Phone: (602) 506-8623 email: NarimanZadeh@mail.maricopa.gov Riggs Road: Recker Road to Power Road Riggs Road is a major east/west arterial that currently ends at Ellsworth Road. This project will construct Riggs Road from Recker Road to Power Road to have two travel lanes in each direction, a dual center turning lane, paved shoulders, drainage improvements and alignment improvements. Total cost is estimated to be $7.3 million. Bl vd Power Rd GILBERT S e v i ll e QUEEN CREEK Roadway Widening Project Recker Rd Riggs Rd San Tan Blvd Activity FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 - - - - - - Design 200,000 200,000 - - - - Environmental 375,000 100,000 275,000 - - - Scoping Study Right-of-way FY 2015-2019 975,000 100,000 875,000 - - - Utilities 1,100,000 - 1,100,000 - - - Construction 4,095,000 - - 3,445,000 650,000 - Totals 6,770,000 400,000 2,250,000 3,445,000 650,000 - BOS District/s: 1 32 | TIP FY 2015-2019 FY 2015 - 2019 Project Listing Project Manager: Bill Hahn Project Number T432 Phone: (602) 506-4611 email: billhahn@mail.maricopa.gov McDowell Road: 76th Street to Usery Pass Road Safety Improvement Project This project will add bike lanes to McDowell Road from 76th Street to Usery Pass Road to improve safety for both cyclists and motorists. re st ss R d d Ri c ge y Pa User 76th St Hawes Rd McDowell Rd MESA McKellips Rd Activity FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 - - - - - - 30,000 30,000 - - - - - - - - - - Right-of-way 40,000 40,000 - - - - Utilities 20,000 20,000 - - - - Construction 687,000 687,000 - - - - Totals 777,000 777,000 - - - - Scoping Study Design Environmental FY 2015-2019 BOS District/s: 2 Federal Funding: Yes TIP FY 2015-2019 | 33 FY 2015 - 2019 Project Listing Project Manager: Ben Markert Project Number T433 Phone: (602) 506-8651 email: BenMarkert@mail.maricopa.gov Low Volume Road Program Dust Mitigation and Dirt Road Paving: Dove Valley This is a dust mitigation project in the Dove Valley area providing travelers with a healthier route to travel. The project includes: • 167th Avenue: Dixileta Drive to Windstone Trail • 168th Avenue: Dixileta Drive to Windstone Trail • Montgomery Road and White Wing Road: 171st Avenue to 163rd Avenue The estimated project cost is $2,020,000 out of which $320,000 budgeted in FY 2015 to complete design, right-of-way acquisition and utility relocation prior to construction. Construction is planned for FY 2016. The MCDOT’s Low Volume Road (LVR) Program is paving and improving dirt roads in the MCDOT Roadway System in compliance with federal EPA mandates and Maricopa County’s Air Quality Plan. Activity FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 - - - - - - 20,000 20,000 - - - - - - - - - - 300,000 300,000 - - - - - - - - - - Construction 1,700,000 - 1,700,000 - - - Totals 2,020,000 320,000 1,700,000 - - - Scoping Study Design Environmental Right-of-way Utilities BOS District/s: 4 Federal Funding: Yes 34 | TIP FY 2015-2019 FY 2015-2019 FY 2015 - 2019 Project Listing Project Manager: Eric Mayer Project Number T434 Phone: (602) 506-8367 email: EricMayer@mail.maricopa.gov East Mesa Subdivisions Pavement Rehabilitation Project This project will remove existing pavement and replace with new pavement and valley gutters as needed in subdivisions in the vicinity of Loop 202 and Broadway Road. Construction is planned for FY 2015. Activity FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 Scoping Study FY 2015-2019 - - - - - - Design - - - - - - Environmental - - - - - - Right-of-way - - - - - - Utilities - - - - - - Construction 6,150,000 6,150,000 - - - - Totals 6,150,000 6,150,000 - - - - BOS District/s: 2 TIP FY 2015-2019 | 35 FY 2015 - 2019 Project Listing Project Manager: Randy Dunsey Project Number T437 Phone: (602) 506-2166 email: DunseyR@mail.maricopa.gov Del Webb Boulevard at Hutton Drive Traffic Signal Installation and Traffic Safety Improvement This project will construct a new traffic signal at the intersection and reconstruct the existing sidewalk ramps to conform with the Americans with Disabilities Act (ADA). A traffic signal warrant study determined that a signalized intersection was needed to improve safety and improve traffic flow. Bell Rd Hutto n Dr De l We bb Blv d Activity FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 Scoping Study - - - - - - Design - - - - - - Environmental - - - - - - Right-of-way - - - - - - Utilities - - - - - - Construction 413,000 413,000 - - - - Totals 413,000 413,000 - - - - BOS District/s: 4 36 | TIP FY 2015-2019 FY 2015-2019 FY 2015 - 2019 Project Listing Project Manager: Randy Dunsey Project Number T439 Phone: (602) 506-2166 email: DunseyR@mail.maricopa.gov Alma School Road at Michigan Avenue E J Ro b s o This project will install a new traffic signal at the intersection, extend the north and south bound turn lanes and reconstruct the existing sidewalk ramps per the Americans with Disabilities Act (ADA). A traffic signal warrant study determined that a signalized intersection was needed to improve safety and traffic flow. Alma School Rd Traffic Signal Installation and Traffic Safety Improvements Riggs Rd n Michigan Blv d Ho wa rd Dr Activity FY 2015-2019 Av e San Tan Blvd FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 Scoping Study - - - - - - Design - - - - - - Environmental - - - - - - Right-of-way - - - - - - Utilities - - - - - - Construction 139,000 139,000 - - - - Totals 139,000 139,000 - - - - BOS District/s: 1 TIP FY 2015-2019 | 37 FY 2015 - 2019 Project Listing Project Number T440 Cotton Lane Haul Road Repair As part of the construction to widen Loop 303 the Arizona Department of Transportation (ADOT) contractor is using a portion of Cotton Lane to haul materials. Upon completion of the construction an assessment will be made to determine if any repairs to the roadway are needed. Activity FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 Scoping Study - - - - - - Design - - - - - - Environmental - - - - - - Right-of-way - - - - - - Utilities - - - - - - Construction 325,000 - - - - 325,000 Totals 325,000 - - - - 325,000 38 | TIP FY 2015-2019 FY 2015-2019 FY 2015 - 2019 Project Listing Project Manager: Clem Ligocki Project Number T441 Phone: (602) 506-8672 email: ClemLigocki@mail.maricopa.gov Gilbert Road: Queen Creek Road to Hunt Highway GILBERT Lindsay Rd Gilbert Rd East ern Ca nal Queen Creek Rd Cooper Rd The City of Chandler is the lead agency on this project. Improvements include widening to six lanes, adding bike lanes, curb/gutter, sidewalks, street lighting, new traffic signals and landscaping. Cana C o nso li l E ast d a ted Br a nch Roadway Improvement Project Ocotillo Rd Chandler Heights Rd Riggs Rd CHANDLER Hunt Hwy Activity FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 Scoping Study FY 2015-2019 - - - - - - Design - - - - - - Environmental - - - - - - Right-of-way - - - - - - Utilities - - - - - - Construction 1,037,000 - - 1,037,000 - - Totals 1,037,000 - - 1,037,000 - - BOS District/s: 1 Intergovernmental Agreement (Cost Share) Project Partners or Partnership: City of Chandler TIP FY 2015-2019 | 39 FY 2015 - 2019 Project Listing Project Manager: Clem Ligocki Project Number T442 Phone: (602) 506-8672 email: ClemLigocki@mail.maricopa.gov McQueen Road: Riggs Road to Ocotillo Road Roadway Improvement Project The City of Chandler is the lead agency on this project. Improvements include widening to city standards, adding bike lanes, curb/gutter, sidewalks, street lighting, new traffic signals and landscaping. Cooper Rd Chandler Heights Rd d ated ra n ch CHANDLER McQueen Rd Ocotillo Rd E i ol ns t B o s C a Ca na l Riggs Rd Activity FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 Scoping Study FY 2015-2019 - - - - - - Design - - - - - - Environmental - - - - - - Right-of-way - - - - - - Utilities - - - - - - Construction 309,000 - - 309,000 - - Totals 309,000 - - 309,000 - - BOS District/s: 1 Intergovernmental Agreement (Cost Share) Project Partners or Partnership: City of Chandler 40 | TIP FY 2015-2019 FY 2015 - 2019 Project Listing Project Manager: Clem Ligocki Project Number T443 Phone: (602) 506-8672 email: ClemLigocki@mail.maricopa.gov Ocotillo Road: Arizona Avenue to McQueen Road Roadway Improvement Project The City of Chandler is the lead agency in charge of administering this project via an intergovernmental agreement with MCDOT. Improvements include widening to city standards, adding bike lanes, curb/ gutter, sidewalks, street lighting, new traffic signals and landscaping. C Cana on l E so as l id at t Br ed a nc h Appleby Rd Activity FY 2015-2019 McQueen Rd Arizona Ave Ocotillo Rd CHANDLER FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 Scoping Study - - - - - - Design - - - - - - Environmental - - - - - - Right-of-way - - - - - - Utilities - - - - - - Construction 1,120,000 - - 1,120,000 - - Totals 1,120,000 - - 1,120,000 - - BOS District/s: 1 Intergovernmental Agreement (Cost Share) Project Partners or Partnership: City of Chandler TIP FY 2015-2019 | 41 FY 2015 - 2019 Project Listing Project Manager: Randy Dunsey Project Number T444 Phone: (602) 506-2166 email: DunseyR@mail.maricopa.gov Aguila Road: Western Area Power Administration Towers Safety Improvement Project This project will realign Aguila Road around three Western Area Power Administration Towers to provide a 50-foot clear zone around the towers. The project will require purchasing land from the Arizona State Land Department. A total of $12,000 is budgeted in FY 2015. Activity Scoping Study Design Environmental Right-of-way FY 2015-2019 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 - - - - - - 2,000 2,000 - - - - - - - - - - 10,000 10,000 - - - - Utilities - - - - - - Construction - - - - - - 12,000 12,000 - - - - Totals BOS District/s: 4 42 | TIP FY 2015-2019 FY 2015 - 2019 Project Listing Project Manager: Mazen Muradvich Project Number T445 Phone: (602) 506-8689 email: MazenMuradvich@mail.maricopa.gov New River Road at Linda Lane Safety Improvement Project The Maricopa County Trail System crosses New River Road just south of Linda Lane. Due to the limited sight distance for on-coming traffic, hikers are Honda Bow Rd in danger when crossing the road. This project will acquire right-of-way and make other improvements to allow hikers to see on-coming traffic for a greater Cr e r e ek Ro dg distance to allow for a safer road crossing. Linda Ln Ne wR ive r Rd REGIONAL TRAIL Activity FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 Scoping Study - - - - - - Design - - - - - - Environmental - - - - - - 90,000 90,000 - - - - - - - - - - Construction 235,000 - 235,000 - - - Totals 325,000 90,000 235,000 - - - Right-of-way Utilities FY 2015-2019 BOS District/s: 3 TIP FY 2015-2019 | 43 FY 2015 - 2019 Project Listing Project Manager: Faisal Saleem Project Number T447 Phone: (602) 506-1241 email: FaisalSaleem@mail.maricopa.gov Bell Road Adaptive Signals Study The purpose of this project is to install a signal timing system at 52 intersections along Bell Road between Cotton Lane and 114th Avenue; 99th Ave and 73rd Ave; 35th Ave and 19th Ave as well as along Frank Lloyd Wright Boulevard between Scottsdale Road and Thompson Peak Parkway so that commuters will have a faster and safer commute. The system will systematically respond to the varying traffic conditions to facilitate traffic demands. Construction is planned for FY 2016. PEORIA SCOTTSDALE SURPRISE Scottsdale Rd Central Ave El Mirage Rd Bell Rd PHOENIX Activity FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 - - - - - - 190,000 190,000 - - - - 25,000 25,000 - - - - Right-of-way - - - - - - Utilities - - - - - - Construction 2,600,000 - 2,600,000 - - - Totals 2,815,000 215,000 2,600,000 - - - Scoping Study Design Environmental BOS District/s: 4 Federal Funding: Yes 44 | TIP FY 2015-2019 FY 2015-2019 FY 2015 - 2019 Project Listing Project Number T459 Anthem Box Culverts Scour Protection North Central Maricopa County Intense summer storms in 2012 resulted in soil erosion (scour in engineering terms) downstream of seven box culverts in the Anthem area. A review of the existing hydrology and hydraulics of the culverts indicates that improved scour protection is needed. Activity FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 Scoping Study - - - - - - Design - - - - - - 50,000 50,000 - - - - Right-of-way - - - - - - Utilities - - - - - - Construction 240,000 240,000 - - - - Totals 290,000 290,000 - - - - Environmental FY 2015-2019 BOS District/s: 3 TIP FY 2015-2019 | 45 FY 2015 - 2019 Project Listing Project Manager: Randy Dunsey Project Number T460 Phone: (602) 506-2166 email: DunseyR@mail.maricopa.gov University Drive and Meridian Road Traffic Signal Installation This project will replace the obsolete existing traffic signal at the intersection. The existing traffic signal is obsolete and needs to be upgraded to current County standards. Activity FY 2015-2019 FY 2015 Scoping Study FY 2016 FY 2017 FY 2018 FY 2019 - - - - Design - - - - - - Environmental - - - - - - Right-of-way - - - - - - Utilities - - - - - - Construction 400,000 400,000 - - - - Totals 400,000 400,000 - - - - BOS District/s: 2 Intergovernmental Agreement (Cost Share) Project Partners or Partnership: City of Chandler 46 | TIP FY 2015-2019 FY 2015 - 2019 Project Listing Project Manager: Tricia Brown Project Number T462 Phone: (602) 506-0896 email: triciabrown@mail.maricopa.gov Germann Road at Sossaman Road The Town of Queen Creek is in partnership with the City of Mesa and the County to study the Germann Road/Sossaman Road intersection to investigate the feasibility of an at-grade railroad crossing. The County will contribute up to $50,000 to the study and provide staff participation to the study team. A total of $37,500 is budgeted in FY 2015 for the study. So uth er nP ac if ic R Sossaman Rd Intersection Improvement Study R MESA Germann Rd QUEEN CREEK Rittenhouse Rd Activity FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 37,500 37,500 - - - - Design - - - - - - Environmental - - - - - - Right-of-way - - - - - - Utilities - - - - - - - - - - - - - - Scoping Study FY 2015-2019 Construction Totals 37,500 37,500 BOS District/s: 1 and 2 Intergovernmental Agreement (Cost Share) Project Partners or Partnership: Town of Queen Creek and City of Mesa TIP FY 2015-2019 | 47 FY 2015 - 2019 Project Listing Project Manager: Randy Dunsey Project Number T466 Phone: (602) 506-2166 email: DunseyR@mail.maricopa.gov Fiber Optics Installation • Indian School Road: W/O SR101L to 99th Avenue • McDowell Road at SR101L • Daisy Mountain Road: Daisy Mountain Road to north terminus of the ADOT Freeway Management System on Interstate 17 This project will install fiber optic cable along Indian School Road, McDowell Road and Daisy Mountain Road. Along Indian School Road the fiber optic cable will connect MCDOT traffic signals to ADOT traffic signals at 99th Avenue and SR101L. The McDowell Road fiber optic cable will integrate the MCDOT traffic signal and the ADOT traffic signal at McDowell Road and SR101L. The Daisy Mountain Road fiber optic cable will connect all MCDOT traffic signals along Daisy Mountain Road to the north terminus of the ADOT Freeway Management System on Interstate 17. These projects will coordinate signal timings, monitor traffic flow and adjust signals to minimize commuter delays. A total of $5,000 is budgeted in FY 2015 to apply for Federal Funds. Construction is tentatively scheduled for FY 2017. Activity FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 - - - - - - 5,000 5,000 - - - - Environmental - - - - - - Right-of-way - - - - - - Utilities - - - - - - Construction 480,000 - - 480,000 - - Totals 485,000 5,000 - 480,000 - - Scoping Study Design BOS District/s: 2, 3 & 4 Federal Funding: Pending 48 | TIP FY 2015-2019 FY 2015-2019 FY 2015 - 2019 Project Listing Project Manager: Randy Dunsey Project Number T467 Phone: (602) 506-2166 email: DunseyR@mail.maricopa.gov Fiber Optics Installation Riggs Road: Sun Lakes Boulevard to Arizona Avenue Alma School Road: Chandler Heights Road to Riggs Road This project will install fiber optic cable along Riggs Road from Sun Lakes Boulevard to Arizona Avenue to interconnect the traffic signals. The project along Alma School Road from Chandler Heights Road to Riggs Road will integrate with the Regional Community Network System and the MCDOT Traffic Management Center. These projects will coordinate signal timings, monitor traffic flow and adjust signals to minimize commuter delays. A total of $5,000 is budgeted in FY 2015 to apply for federal funds. Construction is tentatively scheduled for FY 2017. Activity FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 - - - - - - 5,000 5,000 - - - - Environmental - - - - - - Right-of-way - - - - - - Utilities - - - - - - Construction 800,000 - - 800,000 - - Totals 805,000 5,000 - 800,000 - - Scoping Study Design FY 2015-2019 BOS District/s: 1 Federal Funding: Pending TIP FY 2015-2019 | 49 Maricopa County Department of Transportation Operations Division Maintenance Plan 2015 Operations AR Overlay Program Meridian Road TT468 FY 2015 - 2019 Project Listing Project Manager: James Newberry Project Number T468 M c D ow e l l B lv d U sery Pa ss R d M c D ow e l l R d Phone: (602) 506-4109 email: JamesNewberry@mail.maricopa.gov Meridian Road: Southern Avenue to Brown Road M c K e ll ip s Rd M c K e ll ip s Bl v d Ir o n w o o d D r M e r id ia n R d M o u n ta in R d Cr i s m o n R d El ls w o r th R d This project will overlay Meridian Road n Rd Br owwith rubberized asphalt. Si gna l B ut t e R d Asphalt Rubber Overlay Un iv e r s it y D r APACHE JUNCTION SR 88 Su pe r s t it i on B lv d Los t D ut c hm a n Apa c he Tr Br oa dw a y R d Ha we s Rd Br oa dw a y Av e MESA So ut he r n Av e PINAL COUNTY M Document Path: X:\tjw\Assignments\Adair_MCDOT\Overlay\MeridianRoad_TT468.mxd 2901 West Durango Street, Phoenix, Arizona 85009, (602) 506-8600 Activity FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 - - - - - - 44,000 44,000 - - - - Environmental - - - - - - Right-of-way - - - - - - Utilities - - - - - - Construction 611,000 611,000 - - - - Totals 655,000 655,000 - - - - Scoping Study Design FY 2015-2019 BOS District/s: 2 Intergovernmental Agreement (Cost Share) Project Partners or Partnership: City of Apache Junction 50 | TIP FY 2015-2019 FY 2015 - 2019 Project Listing Project Manager: James Newberry Project Number T469 Phone: (602) 506-4109 email: JamesNewberry@mail.maricopa.gov 16th Street: Carefree Highway to Joy Ranch Road Asphalt Rubber Overlay Maricopa County Department of Transportation Operations Division J N 24t h Pl W N 26t h St r Wy N 27t h St N 24th St N 26t h Pl E C arr iage D r N 29t h St N 28t h St E Maddock R d N 23rd St N 22nd St N 25t h St N 20t h St N 21s t St N 18t h St i N 27t h Pl N 18t h Pl N 17t h S t E B re N 16th St iv N 14th St N 12t h S t N 7th St E Cloud Rd Ol e E D o lo r e s R d p e r Wy as E y Dr E P rimr ose Pat h J asp e W C lo u d R d ez E Av E C ar l ise R d E Joy R an c h R d N 19t h St N 4t h S t E J o y R a n c h Rd Overlay 1 inch = 1,700 feet ne This project will overlay 16th Street between Carefree Highway and Joy Ranch Road with rubberized asphalt. The need for this improvement was identified by the Pavement Management System. N 16t h St N 1st St Maintenance Plan FY 2015 Operations AR Overlay Program TT469 N 7th St E 11th St N 11th St N 9t h St E Galvi n S t N 10t h St N C entr al Ave W Galv in S t N 3rd St W Le is u r e Ln E Carefree Hwy PHOENIX Maricopa County Public Works, GIS Division, January 9, 2014 Document Path: X:\tjw\Assignments\Adair_MCDOT\Overlay\Northeast_Overlay_TT469.mxd www.mcdot.maricopa.gov 2901 West Durango Street, Phoenix, Arizona 85009, (602) 506-8600 Activity FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 Scoping Study FY 2015-2019 - - - - - - Design - - - - - - Environmental - - - - - - Right-of-way - - - - - - Utilities - - - - - - Construction 390,000 390,000 - - - - Totals 390,000 390,000 - - - - BOS District/s: 3 TIP FY 2015-2019 | 51 FY 2015 - 2019 Project Listing Project Manager: James Newberry Project Number T470 Phone: (602) 506-4109 email: JamesNewberry@mail.maricopa.gov Asphalt Rubber Overlay Southeast Area Arterials Hawes Road: Empire Boulevard to Riggs Road Recker Road: Chandler Heights Road to Brooks Farm Road San Tan Boulevard: Recker Road to Ellsworth Road This project will overlay Hawes Road from Empire Boulevard to Riggs Road, Recker Road from Chandler Heights Road to Brooks Farm Road and San Tan Boulevard from Recker Road to Ellsworth Road with rubberized asphalt. The need for this improvement was identified by the Pavement Management System. Activity FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 Scoping Study - - - - - - Design - - - - - - Environmental - - - - - - Right-of-way - - - - - - Utilities - - - - - - Construction 1,000,000 1,000,000 - - - - Totals 1,000,000 1,000,000 - - - - BOS District/s: 1 52 | TIP FY 2015-2019 FY 2015-2019 FY 2015 - 2019 Project Listing Project Manager: James Newberry Project Number T471 Phone: (602) 506-4109 email: JamesNewberry@mail.maricopa.gov Asphalt Rubber Overlay Portions of a Two-Mile Section of Germann Road This project will overlay portions of Germann Road with rubberized asphalt so travelers will have a safer route to travel. Activity FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 Scoping Study FY 2015-2019 - - - - - - Design - - - - - - Environmental - - - - - - Right-of-way - - - - - - Utilities - - - - - - Construction 425,000 - 425,000 - - - Totals 425,000 - 425,000 - - - BOS District/s: 2 TIP FY 2015-2019 | 53 FY 2015 - 2019 Project Listing Project Manager: James Newberry Project Number T472 Phone: (602) 506-4109 email: JamesNewberry@mail.maricopa.gov Asphalt Rubber Overlay SR303L and Northern Avenue Area This project will overlay the following road segments with rubberized asphalt so travelers will have a safer route to travel: • Citrus Road: Northern Avenue to Butler Drive • Cotton Lane: Camelback Road to Peoria Avenue • Sarival Road: Camelback Road to Northern Parkway • Reems Road: Glendale Road to Peoria Avenue • Glendale Road: Cotton Lane to Reems Road • Northern Avenue: Cotton Lane to Reems Road and from to 147th Avenue to the junction with Northern Parkway • Olive Avenue: Cotton Lane to Sarival Road • Reems Road to 147th Avenue • Peoria Avenue: Sarival Road to Reems Road Activity FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 Scoping Study - - - - - - Design - - - - - - Environmental - - - - - - Right-of-way - - - - - - Utilities - - - - - - Construction 4,085,000 4,085,000 - - - - Totals 4,085,000 4,085,000 - - - - BOS District/s: 4 54 | TIP FY 2015-2019 FY 2015-2019 FY 2015 - 2019 Project Listing Project Manager: James Newberry Project Number T473 Phone: (602) 506-4109 email: JamesNewberry@mail.maricopa.gov Local Road Rehabilitation County Wide This project will improve local roads to be determined by from the MCDOT Pavement Management System ratings so travelers have a safer route to travel. Activity FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 Scoping Study FY 2015-2019 - - - - - - Design - - - - - - Environmental - - - - - - Right-of-way - - - - - - Utilities - - - - - - Construction 7,910,000 - 7,910,000 - - - Totals 7,910,000 - 7,910,000 - - - BOS District/s: All TIP FY 2015-2019 | 55 FY 2015 - 2019 Project Listing Project Manager: James Newberry Project Number T474 Phone: (602) 506-4109 email: JamesNewberry@mail.maricopa.gov Asphalt Rubber Overlay Northwest Area Arterials This project will improve various arterial roads identified by the MCDOT Pavement Management System so travelers have a safer route to travel. Activity FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 Scoping Study - - - - - - Design - - - - - - Environmental - - - - - - Right-of-way - - - - - - Utilities - - - - - - Construction 1,460,000 - 1,460,000 - - - Totals 1,460,000 - 1,460,000 - - - BOS District/s: 4 56 | TIP FY 2015-2019 FY 2015-2019 FY 2015 - 2019 Project Listing Project Manager: James Newberry Project Number T475 Phone: (602) 506-4109 email: JamesNewberry@mail.maricopa.gov Asphalt Rubber Overlay Southeast Area Arterials This project will improve various arterial roads in the Southeast area identified by the MCDOT Pavement Management System so travelers have a safer route to travel. Activity FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 Scoping Study FY 2015-2019 - - - - - - Design - - - - - - Environmental - - - - - - Right-of-way - - - - - - Utilities - - - - - - Construction 2,075,000 - 2,075,000 - - - Totals 2,075,000 - 2,075,000 - - - BOS District/s: 1 & 2 TIP FY 2015-2019 | 57 FY 2015 - 2019 Project Listing Project Manager: James Newberry Project Number T476 Phone: (602) 506-4109 email: JamesNewberry@mail.maricopa.gov Asphalt Rubber Overlay Southwest Area Arterials This project will improve various arterial roads in the Southwest area identified by the MCDOT Pavement Management System so travelers have a safer route to travel. Activity FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 Scoping Study - - - - - - Design - - - - - - Environmental - - - - - - Right-of-way - - - - - - Utilities - - - - - - Construction 605,000 - 605,000 - - - Totals 605,000 - 605,000 - - - BOS District/s: 5 58 | TIP FY 2015-2019 FY 2015-2019 FY 2015 - 2019 Project Listing Project Manager: James Newberry Project Number T477 Phone: (602) 506-4109 email: JamesNewberry@mail.maricopa.gov Pavement Preservation Project County Wide This project will improve various arterial and local roads throughout the County identified by the MCDOT Pavement Management System so travelers have safer routes to travel. A total of $3,630,000 is budgeted in FY 2017 for construction Activity FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 Scoping Study FY 2015-2019 - - - - - - Design - - - - - - Environmental - - - - - - Right-of-way - - - - - - Utilities - - - - - - Construction 15,430,000 - - 3,630,000 5,800,000 6,000,000 Totals 15,430,000 - - 3,630,000 5,800,000 6,000,000 BOS District/s: All TIP FY 2015-2019 | 59 FY 2015 - 2019 Project Listing Project Manager: James Newberry Project Number T478 Phone: (602) 506-4109 email: JamesNewberry@mail.maricopa.gov Asphalt Rubber Overlay Southeast Area Arterials This project will improve various arterial roads in the Southeast area identified by the MCDOT Pavement Management System so travelers have safer routes to travel. Activity FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 Scoping Study - - - - - - Design - - - - - - Environmental - - - - - - Right-of-way - - - - - - Utilities - - - - - - Construction 1,170,000 - - 1,170,000 - - Totals 1,170,000 - - 1,170,000 - - BOS District/s: 1 & 2 60 | TIP FY 2015-2019 FY 2015-2019 FY 2015 - 2019 Project Listing Project Manager: Randy Dunsey Project Number T479 Phone: (602) 506-2166 email: DunseyR@mail.maricopa.gov Gavilan Peak Parkway at Venture Drive Pedestrian Crosswalk Beacon An This project will install a Pedestrian Crosswalk Beacon at the intersection. There is heavy pedestrian traffic crossing Gavilan Peak Parkway going to and from the Anthem Community Park. A traffic signal warrant study determined that a pedestrian signal was needed to improve safety at this crossing. the m W y ee do m a n P eak Wy Pkwy Venture Dr Gavil Fr Activity FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 - - - - - - 20,000 20,000 - - - - Environmental - - - - - - Right-of-way - - - - - - Utilities - - - - - - Construction 200,000 200,000 - - - - Totals 220,000 220,000 - - - - Scoping Study Design FY 2015-2019 BOS District/s: 3 TIP FY 2015-2019 | 61 FY 2015 - 2019 Project Listing Project Number T481 Happy Valley Parkway at 115th Ave Traffic Scoping Study The purpose of the scoping study is to determine the best way to handle the increased traffic turning left from Happy Valley Parkway onto Lake Pleasant Parkway. Activity FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 45,000 45,000 - - - - Design - - - - - - Environmental - - - - - - Right-of-way - - - - - - Utilities - - - - - - Construction - - - - - - 45,000 45,000 - - - - Scoping Study Totals 62 | TIP FY 2015-2019 FY 2015-2019 Completed Construction Projects FY 2014 Project Number T195 Northern Parkway Program Sarival Road to Dysart Road This initial phase (phase one) of the Northern Parkway Program, extending between Sarival Avenue and Dysart Road, constructed an interim four-lane roadway consisting of the eastbound and westbound auxiliary lanes and the two outside travel lanes to achieve the interim roadway configuration of two travel lanes in each direction of the ultimate six-lane Northern Parkway. A center concrete barrier and an additional inside lane in each direction will be added in the future to form the ultimate six-lane configuration. Phase one of the Northern Parkway Program also included connecting ramps for future gradeseparated intersections (over-passes); bridge structures at the BNSF spur/143rd Avenue and Sarival Avenue crossings; new curb, gutter and street lighting at on/off ramps and intersecting cross streets; and the installation of new traffic signals at Sarival Avenue, Reems Road and Litchfield Road. In addition, segments of the White Tanks Area Drainage Master Plan improvements were constructed in partnership with the Flood Control District of Maricopa County. This project is funded in part by voter-approved Prop 400 – MAG (Maricopa Association of Governments) Regional Transportation Plan. Total Cost: $77.3 Million TIP FY 2015-2019 | 63 Completed Construction Projects FY 2014 Project Number T304 Miller Road Bridge Bridge Improvement Rehabilitation Project MCDOT, in partnership with the City of Buckeye and the Buckeye Water Conservation and Drainage District (BWCDD), rehabilitated the Miller Road Bridge crossing of the BWCDD Canal located just north of Narramore Avenue. New improvements included the replacement of the Miller Road Bridge deck, the construction of new roadway approaches on Miller Road and the installation of new concrete canal lining, along with the relocation of the BWCDD Lateral 21 pipe line and turnout structures. The new bridge has been designed to accommodate the installation of additional travel lanes when future roadway widening is warranted. Total Cost: $2.2 Million 64 | TIP FY 2015-2019 Completed Construction Projects FY 2014 Project Number T332 Fort McDowell Road SR 87 (Beeline Highway) to Ba Hon Nah Road Drainage Improvement Project • • • • Area 1 - Fort McDowell Road approximately 3,200 feet north of SR 87 Area 2 - Fort McDowell Road and Mohave Road intersection Area 3 - Fort McDowell Road approximately 650 feet north of the Harquahala Road Area 4 - Fort McDowell Road at the Fort McDowell Recreation Center The Fort McDowell Road Drainage Improvement Project improved drainage in these areas by preventing storm event flows from flooding the roadway. The project included grading, installation of storm drain pipe, channel excavation, relocation of fiber optic conduit, cable, pull boxes, sewer service lines and water lines. Total Cost: $783,000 TIP FY 2015-2019 | 65 Completed Construction Projects FY 2014 Project Number T341 El Mirage Road: Picerne Drive to Bell Road Roadway Improvement Project MCDOT, in partnership with the City of Surprise, installed new traffic signals, street lighting, curb/gutter and sidewalk at the intersection of El Mirage Road and Bell Road. Additional improvements included the installation of raised medians, three through travel lanes and dual left-turn lanes in all four directions, right-turn-only lanes for west, south and eastbound travel and a “free-flow” right-turn lane on westbound Bell Road for northbound travel onto El Mirage Road. The project also included the widening of El Mirage Road between Bola Drive and Bell Road and drainage improvements on El Mirage Road from the Lizard Acres Wash crossing northward to just south of Bell Road. Total Cost: $5.8 Million 66 | TIP FY 2015-2019 Completed Construction Projects FY 2014 Project Number T393 Sun City Roadway Rehabilitation Project 99th Avenue: Tarrytown Avenue to Coggins Drive MCDOT performed roadway maintenance and rehabilitation activities on 99th Avenue between Tarrytown Avenue and Coggins Drive. The work included milling (grinding) the asphalt pavement followed by the installation of a “roadway quieting” surface treatment using a “rubberized” asphalt overlay paving process which used recycled pulverized tires from landfill sites throughout the southwest. Total Cost: $9.6 Million TIP FY 2015-2019 | 67 Completed Construction Projects FY 2014 Project Number T419 Dynamic Message Sign Installation Project West Valley • McDowell Road west of Pebble Creek Parkway/Estrella Parkway • McDowell Road east of Bullard Avenue • MC 85 west and east of Estrella Parkway MCDOT, in partnership with the City of Goodyear, installed four new overhead roadway Dynamic Message Signs (DMS) connecting to the existing traffic signal, Intelligent Transportation System (ITS) equipment and communication links at the locations listed above. Work included the installation of DMS and associated structures, shaft foundations, surface trenching, fiber optic cable and closed circuit television (CCTV) cameras for real-time traffic management. The new DMS provides drivers with real time travel information along the McDowell Road and MC 85 corridors and also alerts motorists to potential traffic incidents or congestion impacting traffic flow in the area. Total Cost: $940,000 68 | TIP FY 2015-2019 Completed Construction Projects FY 2014 Project Number T425 MC 85 at Jackrabbit Road Intersection Improvement Project The MC 85 at Jackrabbit Road intersection improvement project replaced and upgraded the existing antiquated traffic signal poles and foundations to improve safety, reduce congestion, reduce maintenance costs and improve traffic flow at the intersection. Total Cost: $540,000 TIP FY 2015-2019 | 69 Completed Construction Projects FY 2014 Project Number T426 University Drive at Signal Butte/Crismon Road Intersection Improvement Project The University Drive intersection improvement project installed new traffic signal poles and foundations to improve safety and traffic flow and reduce congestion and maintenance costs. Additional improvements included ADA-compliant sidewalk ramps, and new roadway signing and striping. Total Cost: $613,000 70 | TIP FY 2015-2019 Completed Construction Projects FY 2014 Project Number T435 Asphalt Rubber Overlay Southwest Area Arterials This project consisted of milling (grinding) and resurfacing by the installation of a roadway quieting surface treatment using a rubberized asphalt overlay paving process which used recycled pulverized tires from landfill sites throughout the southwest. Additionally, pavement safety edges were constructed on roadway segments where required. The project also included the installation of pavement markings, vehicle loop detector sensors and other miscellaneous work. • Forest Road: Mustang Way to Rio Verde Drive • 91st Avenue (northbound lanes only): MC 85 to 1,320 feet north of MC 85 • 195th Avenue (Jackrabbit Trail): Thomas Road to Camelback Road • McDowell Road: Perryville Road to Citrus Road • Olive Avenue: Citrus Road to Sarival Avenue • Van Buren Street: Perryville Road to Citrus Road • Lehi Road: 2,137 feet north of McDowell Road to Thomas Road • Val Vista Drive: 33 feet north of Chandler Heights Road to Ocotillo Road • Val Vista Drive: 80 feet north of the Southern Canal Service Road to Thomas Road • Old US 80: - 5,953 feet north of Watermelon Road to 11,233 feet north of Watermelon Road - 76 feet north of Mile Post 5 to 3,506 feet north of Mile Post 5 - 20,915 feet north of Watermelon Road to Cactus Rose Road - Arlington School Road to Salome Highway Total Cost: $6.4 Million TIP FY 2015-2019 | 71 Completed Construction Projects FY 2014 Project Number T437 Del Webb Boulevard at Hutton Drive Intersection Improvement Project The Del Webb Boulevard and Hutton Drive intersection improvement project installed new traffic signal equipment, pole foundations, poles, mast arms and signal heads to improve safety, reduce congestion, reduce maintenance costs, and improve traffic flow. Additional improvements included installation of emergency preemption equipment for fire trucks, polemounted traffic detection devices for traffic management, new ADA-compliant sidewalk ramps and intersection pavement reconstruction. Total Cost: $610,000 72 | TIP FY 2015-2019 Completed Construction Projects FY 2014 Project Number T439 Alma School Road at Michigan Avenue Intersection Improvement Project The Alma School Road at Michigan Avenue intersection improvement project installed new traffic signal equipment, pole foundations, poles, mast arms and signal heads to improve safety, reduce congestion, reduce maintenance costs, and improve traffic flow. Additional improvements included installation of emergency preemption equipment for fire trucks, polemounted traffic detection devices for traffic management, new ADA-compliant sidewalk ramps and intersection pavement reconstruction. Total Cost: $535,000 TIP FY 2015-2019 | 73 Completed Construction Projects FY 2014 Project Number T449 339th Avenue at Interstate 10 (I-10) Pavement Rehabilitation Project MCDOT performed roadway maintenance and rehabilitation activities on 339th Avenue just south of Interstate 10. The work included milling (grinding) the asphalt pavement, as well as removing and reconstructing certain pavement sections. The project also included utility adjustments and installation of pavement markings. Total Cost: $247,000 74 | TIP FY 2015-2019 Maricopa County Department of Transportation