Table of Contents Index By Project Number ............................................................................................................................................ 4 MCDOT Mission & Vision ............................................................................................................................................ 6 Message From The Director ........................................................................................................................................ 7 Maricopa County Supervisory Districts ....................................................................................................................... 9 Introduction .................................................................................................................................................................. 10 TIP Financial Tables ..................................................................................................................................................... 11 MCDOT Management Team ........................................................................................................................................ 13 Transportation Advisory Board .................................................................................................................................... 16 Completed Projects T397 T446 T415 T288 T416 T409 T423 T418 T290 T398 T188 T292 T315 T386 T431 T396 T365 T098 17th Avenue Dust Mitigation and Dirt Road Paving Project: Low Volume Road Program: Maddock Road to West Joy Ranch Road .................................................................................................................... 18 147th Avenue Roadway Rehabilitation Project: R.H. Johnson Boulevard to Heritage Drive ....................................... 19 Asphalt Rubber Arterial Overlay Project FY 2013 ........................................................................................................ 20 Bell Road West DMS Project Dynamic Sign Installation Project: SR 303L to 75th Avenue ......................................... 21 Desert Sage Subdivision Roadway Rehabilitation Project ........................................................................................... 22 Dust Mitigation and Dirt Road Paving Projects: Low Volume Road Program .............................................................. 23 Dust Mitigation and Dirt Road Paving Projects: Low Volume Road Program .............................................................. 24 Highway Operations Building Reconstruction and Remodel Project ........................................................................... 25 McKellips Road/McDowell Road Intelligent Transportation System (ITS) Project ....................................................... 26 Oakmont Drive at 107th Avenue Traffic Signal Installation Project .............................................................................. 27 Old US 80 Bridge at the Gila River (Gillespie Dam Bridge) Erosion Control Project .................................................... 28 Olive Avenue ITS Project: Litchfield Road to SR 101L ................................................................................................. 29 Southern Avenue and Meridian Road Intersection and Drainage Improvement Project ............................................. 30 Southern Avenue Roadway Improvement Project: Crismon Road to Signal Butte Road ........................................... 31 Sun City West HAWK Pedestrian Crossing Signal Installation and Roadway Rehabilitation Project: Granite Valley Drive: Meeker Boulevard to White Rock Drive ..................................................................................... 32 Sun City West Pedestrian Signals ................................................................................................................................ 33 Traffic Calming ............................................................................................................................................................. 34 Williams Field Road Roadway Widening and Drainage Improvement Project: Gilbert Road to the Eastern Canal ........ 35 Ongoing Projects T383 T428 T439 T435 T391 T447 T373 T387 T248 T437 75th Avenue Bridge at the Salt River Scoping Study: Southern Avenue to Broadway Road ...................................... 36 79th Place Drainage and Roadway Improvement Project: South of Apache Trail ....................................................... 37 Alma School Road at Michigan Avenue Traffic Signal Installation and Traffic Safety Improvement Project ................ 38 Asphalt Rubber Arterial Overlay Project FY 2014......................................................................................................... 39 Avondale Boulevard at MC 85 Traffic Signal Installation and Safety Improvement Project ......................................... 41 Bell Road Adaptive Signals Study ............................................................................................................................... 42 Broadway Road at Watson Road Signal Installation Project ....................................................................................... 43 Buckeye Yard Maintenance Facility Replacement Project ........................................................................................... 44 Deer Valley Road/Williams Drive Extension and Traffic Improvement Project: El Mirage Road to 109th Avenue........ 45 Del Webb Boulevard at Hutton Drive Traffic Signal Installation and Traffic Safety Improvement Project .................... 46 Page 2 Table of Contents Index By Project Number ............................................................................................................................................ 4 MCDOT Mission & Vision ............................................................................................................................................ 6 Message From The Director ........................................................................................................................................ 7 Maricopa County Supervisory Districts ....................................................................................................................... 9 Introduction .................................................................................................................................................................. 10 TIP Financial Tables ..................................................................................................................................................... 11 MCDOT Management Team ........................................................................................................................................ 13 Transportation Advisory Board .................................................................................................................................... 16 Completed Projects T397 T446 T415 T288 T416 T409 T423 T418 T290 T398 T188 T292 T315 T386 T431 T396 T365 T098 17th Avenue Dust Mitigation and Dirt Road Paving Project: Low Volume Road Program: Maddock Road to West Joy Ranch Road .................................................................................................................... 18 147th Avenue Roadway Rehabilitation Project: R.H. Johnson Boulevard to Heritage Drive ....................................... 19 Asphalt Rubber Arterial Overlay Project FY 2013 ........................................................................................................ 20 Bell Road West DMS Project Dynamic Sign Installation Project: SR 303L to 75th Avenue ......................................... 21 Desert Sage Subdivision Roadway Rehabilitation Project ........................................................................................... 22 Dust Mitigation and Dirt Road Paving Projects: Low Volume Road Program .............................................................. 23 Dust Mitigation and Dirt Road Paving Projects: Low Volume Road Program .............................................................. 24 Highway Operations Building Reconstruction and Remodel Project ........................................................................... 25 McKellips Road/McDowell Road Intelligent Transportation System (ITS) Project ....................................................... 26 Oakmont Drive at 107th Avenue Traffic Signal Installation Project .............................................................................. 27 Old US 80 Bridge at the Gila River (Gillespie Dam Bridge) Erosion Control Project .................................................... 28 Olive Avenue ITS Project: Litchfield Road to SR 101L ................................................................................................. 29 Southern Avenue and Meridian Road Intersection and Drainage Improvement Project ............................................. 30 Southern Avenue Roadway Improvement Project: Crismon Road to Signal Butte Road ........................................... 31 Sun City West HAWK Pedestrian Crossing Signal Installation and Roadway Rehabilitation Project: Granite Valley Drive: Meeker Boulevard to White Rock Drive ..................................................................................... 32 Sun City West Pedestrian Signals ................................................................................................................................ 33 Traffic Calming ............................................................................................................................................................. 34 Williams Field Road Roadway Widening and Drainage Improvement Project: Gilbert Road to the Eastern Canal ........ 35 Ongoing Projects T383 T428 T439 T435 T391 T447 T373 T387 T248 T437 75th Avenue Bridge at the Salt River Scoping Study: Southern Avenue to Broadway Road ...................................... 36 79th Place Drainage and Roadway Improvement Project: South of Apache Trail ....................................................... 37 Alma School Road at Michigan Avenue Traffic Signal Installation and Traffic Safety Improvement Project ................ 38 Asphalt Rubber Arterial Overlay Project FY 2014......................................................................................................... 39 Avondale Boulevard at MC 85 Traffic Signal Installation and Safety Improvement Project ......................................... 41 Bell Road Adaptive Signals Study ............................................................................................................................... 42 Broadway Road at Watson Road Signal Installation Project ....................................................................................... 43 Buckeye Yard Maintenance Facility Replacement Project ........................................................................................... 44 Deer Valley Road/Williams Drive Extension and Traffic Improvement Project: El Mirage Road to 109th Avenue........ 45 Del Webb Boulevard at Hutton Drive Traffic Signal Installation and Traffic Safety Improvement Project .................... 46 Page 2 Table of Contents Ongoing Projects (cont.) T410 T411 T433 T424 T412 T434 T389 T344 T367 T341 T332 T339 T441 T345 T425 T352 T342 T442 T420 T304 T338 T445 T347 T427 T372 T369 T195 T443 T404 T305 T448 T251 T375 T406 T429 T438 T333 T365 T426 T419 Dust Mitigation and Dirt Road Paving Projects: Low Volume Road Program.............................................................. 47 Dust Mitigation and Dirt Road Paving Projects: Low Volume Road Program.............................................................. 48 Dust Mitigation and Dirt Road Paving Projects: Low Volume Road Program Dove Valley Area.................................. 49 Dynamite Road at 52nd Street Traffic Signal Installation and Traffic Safety Improvement Project ............................. 50 Eagle Eye Road at Tiger Wash Roadway Improvement Study..................................................................................... 51 East Mesa Subdivisions Pavement Rehabilitation Project............................................................................................ 52 E-IntelliDrive Study, Phase III (SMARTDrive Testbed) .................................................................................................. 53 El Mirage Road Roadway Widening and Traffic Safety Improvement Project: Northern Avenue to Cactus Road......... 54 El Mirage Road Roadway Widening and Traffic Safety Improvement Project: Northern Avenue to Peoria Avenue........ 55 El Mirage Road Roadway Widening and Traffic Safety Improvement Project: Picerne Road to Bell Road .................... 56 Fort McDowell Road Drainage Improvement Project SR 87 (Beeline Highway) to Ba Hon Nah Road........................ 57 Gilbert Road at the Salt River Bridge Installation......................................................................................................... 58 Gilbert Road Improvements IGA: Hunt Highway to Queen Creek Road ..................................................................... 59 MC 85 and 83rd Avenue Intersection Widening, Traffic Signal and Traffic Safety Improvement Project..................... 60 MC 85 at Jackrabbit Road Traffic Signal Replacement and Traffic Safety Improvement Project................................ 61 MC 85 ITS Project: Litchfield Road to 83rd Avenue..................................................................................................... 62 ............................................................................ 63 McKellips Road Improvement Study: SR 101L to Alma School Road McQueen Road Improvements IGA: Riggs Road to Ocotillo Road.............................................................................. 64 Meridian Road and Empire Boulevard Intersection and Signal Improvement Project.................................................. 65 Miller Road at the BWCDD Canal: Bridge Replacement Project ................................................................................ 66 Miller Road Improvement Project: I-10 to One Mile North.............................................................................................67 New River Road Sight Distance Improvement Study: Maricopa Trail Crossing at Linda Lane.................................... 68 Northern Parkway Program: Dysart Road to 111th Avenue/ Agua Fria Freeway Project ........................................... 69 Northern Parkway Program: Dysart Road Overpass Project ...................................................................................... 70 Northern Parkway Program: Northern Avenue/SR 101L Overpass Project.................................................................. 71 Northern Parkway Program: Reems Road/Litchfield Road Overpass Project.............................................................. 72 Northern Parkway Program: Sarival Road to Dysart Road Project............................................................................... 73 Ocotillo Road Improvements IGA: Arizona Avenue to McQueen Road ...................................................................... 74 Olive Avenue Roadway Improvement Study: El Mirage Road to White Tank Mountain Park....................................... 75 Power Road Roadway Widening, Drainage and Traffic Safety Improvement Project: Pecos Road to SR 202L (San Tan Freeway)................................................................................................................. 76 R.H. Johnson Boulevard ITS Communications Study................................................................................................... 77 Riggs Road Widening, Traffic and Drainage Improvement Project: Ellsworth Road to Signal Butte Road ................. 78 Riggs Road Widening, Traffic and Drainage Improvement Project: Hawes Road to Ellsworth Road .......................... 79 Riggs Road Widening, Traffic and Drainage Improvement Project: Power Road to Hawes Road .............................. 80 Riggs Road Widening, Traffic and Drainage Improvement Study: Recker Road to Power Road ................................ 81 Roadway Flooded Warning Signs Installation Project ................................................................................................. 82 Sossaman Road and Elliot Road Traffic Signal Installation and Traffic Safety Improvement Project............................ 83 Traffic Calming.............................................................................................................................................................. 84 University Drive at Signal Butte Road/Crismon Road Traffic Signal Replacement and Traffic Safety Improvement Project .................................................................................................................................................... 85 West Valley Dynamic Message Sign Installation Project ............................................................................................. 86 Page 3 Index by Project Number Completed Projects T098 T188 T288 T290 T292 T315 T365 T386 T396 T397 T398 T409 T415 T416 T418 T423 T431 T446 Williams Field Road Roadway Widening and Drainage Improvement Project: Gilbert Road to the Eastern Canal ..... 35 Old US 80 Bridge at the Gila River (Gillespie Dam Bridge) Erosion Control Project .................................................... 28 Bell Road West DMS Project Dynamic Sign Installation Project: SR 303L to 75th Avenue ........................................ 21 McKellips Road/McDowell Road Intelligent Transportation System (ITS) Project ...................................................... 26 Olive Avenue ITS Project: Litchfield Road to SR 101L ................................................................................................. 29 Southern Avenue and Meridian Road Intersection and Drainage Improvement Project ............................................. 30 Traffic Calming .............................................................................................................................................................34 Southern Avenue Roadway Improvement Project: Crismon Road to Signal Butte Road ........................................... 31 Sun City West Pedestrian Signals ................................................................................................................................ 33 17th Avenue Dust Mitigation and Dirt Road Paving Project: Low Volume Road Program: Maddock Road to West Joy Ranch Road.................................................................................................................... 18 Oakmont Drive at 107th Avenue Traffic Signal Installation Project .............................................................................. 27 Dust Mitigation and Dirt Road Paving Projects: Low Volume Road Program ............................................................. 23 Asphalt Rubber Arterial Overlay Project FY 2013 ........................................................................................................ 20 Desert Sage Subdivision Roadway Rehabilitation Project ........................................................................................... 22 Highway Operations Building Reconstruction and Remodel Project ........................................................................... 25 Dust Mitigation and Dirt Road Paving Projects: Low Volume Road Program ............................................................24 Sun City West HAWK Pedestrian Crossing Signal Installation and Roadway Rehabilitation Project: Granite Valley Drive: Meeker Boulevard to White Rock Drive ..................................................................................... 32 147th Avenue Roadway Rehabilitation Project: R.H. Johnson Boulevard to Heritage Drive ...................................... 19 Ongoing Projects T195 T248 T251 T304 T305 T332 T333 T338 T339 T341 T342 T344 T345 T347 T352 Northern Parkway Program: Sarival Road to Dysart Road Project ............................................................................. 73 Deer Valley Road/Williams Drive Extension and Traffic Improvement Project: El Mirage Road to 109th Avenue........ 45 Riggs Road Widening, Traffic and Drainage Improvement Project: Ellsworth Road to Signal Butte Road ................. 78 Miller Road at the BWCDD Canal: Bridge Replacement Project ................................................................................. 66 Power Road Roadway Widening, Drainage and Traffic Safety Improvement Project: Pecos Road to SR 202L (San Tan Freeway) ................................................................................................................. 76 Fort McDowell Road Drainage Improvement Project SR 87 (Beeline Highway) to Ba Hon Nah Road ........................ 57 Sossaman Road and Elliot Road Traffic Signal Installation and Traffic Safety Improvement Project............................ 83 Miller Road Improvement Project: I-10 to One Mile North ........................................................................................... 67 Gilbert Road at the Salt River Bridge Installation ......................................................................................................... 58 El Mirage Road Roadway Widening and Traffic Safety Improvement Project: Picerne Road to Bell Road.................. 56 McKellips Road Improvement Study: SR 101L to Alma School Road........................................................................... 63 El Mirage Road Roadway Widening and Traffic Safety Improvement Project: Northern Avenue to Cactus Road ......... 54 MC 85 and 83rd Avenue Intersection Widening, Traffic Signal and Traffic Safety Improvement Project ..................... 60 Northern Parkway Program: Dysart Road to 111th Avenue/ Agua Fria Freeway Project............................................ 69 MC 85 ITS Project: Litchfield Road to 83rd Avenue ..................................................................................................... 62 Page 4 Index by Project Number Ongoing Projects (cont.) T365 T367 T369 T372 T373 T375 T383 T387 T389 T391 T404 T406 T410 T411 T412 T419 T420 T424 T425 T426 T427 T428 T429 T433 T434 T435 T437 T438 T439 T441 T442 T443 T445 T447 T448 Traffic Calming .............................................................................................................................................................. 84 El Mirage Road Roadway Widening and Traffic Safety Improvement Project: Northern Avenue to Peoria Avenue..... 55 Northern Parkway Program: Reems Road/Litchfield Road Overpass Project.............................................................. 72 Northern Parkway Program: Northern Avenue/SR 101L Overpass Project ................................................................. 71 Broadway Road at Watson Road Signal Installation Project ........................................................................................ 43 Riggs Road Roadway Widening and Drainage Improvement Project: Hawes Road to Ellsworth Road....................... 79 75th Avenue Bridge at the Salt River Scoping Study: Southern Avenue to Broadway Road....................................... 36 Buckeye Yard Maintenance Facility Replacement Project ........................................................................................... 44 E-IntelliDrive Study, Phase III (SMARTDrive Testbed) ................................................................................................... 53 Avondale Boulevard at MC 85 Traffic Signal Installation and Safety Improvement Project ......................................... 41 Olive Avenue Roadway Improvement Study: El Mirage Road to White Tank Mountain Park ...................................... 75 Riggs Road Widening, Traffic and Drainage Improvement Project: Power Road to Hawes Road ............................... 80 Dust Mitigation and Dirt Road Paving Projects: Low Volume Road Program ............................................................. 47 Dust Mitigation and Dirt Road Paving Projects: Low Volume Road Program ............................................................. 48 Eagle Eye Road at Tiger Wash Roadway Improvement Study .......................................................................................... 51 West Valley Dynamic Message Sign Installation Project .............................................................................................. 86 Meridian Road and Empire Boulevard Intersection and Signal Improvement Project ................................................. 65 Dynamite Road at 52nd Street Traffic Signal Installation and Traffic Safety Improvement Project .............................. 50 MC 85 at Jackrabbit Road Traffic Signal Replacement and Traffic Safety Improvement Project ................................ 61 University Drive at Signal Butte Road/Crismon Road Traffic Signal Replacement and Traffic Safety Improvement Project .................................................................................................................................................... 85 Northern Parkway Program: Dysart Road Overpass Project ....................................................................................... 70 79th Place Drainage and Roadway Improvement Project: South of Apache Trail ....................................................... 37 Riggs Road Widening, Traffic and Drainage Improvement Study: Recker Road to Power Road ............................... 81 Dust Mitigation and Dirt Road Paving Projects: Low Volume Road Program Dove Valley Area ................................. 49 East Mesa Subdivisions Pavement Rehabilitation Project ........................................................................................... 52 Asphalt Rubber Arterial Overlay Project FY 2014 ........................................................................................................ 39 Del Webb Boulevard at Hutton Drive Traffic Signal Installation and Traffic Safety Improvement Project .................... 46 Roadway Flooded Warning Signs Installation Project .................................................................................................. 82 Alma School Road at Michigan Avenue Traffic Signal Installation and Traffic Safety Improvement Project ................ 38 Gilbert Road Improvements IGA: Hunt Highway to Queen Creek Road ...................................................................... 59 McQueen Road Improvements IGA: Riggs Road to Ocotillo Road .............................................................................. 64 Ocotillo Road Improvements IGA: Arizona Avenue to McQueen Road........................................................................ 74 New River Road Sight Distance Improvement Study: Maricopa Trail Crossing at Linda Lane .................................... 68 Bell Road Adaptive Signals Study ................................................................................................................................ 42 R.H. Johnson Boulevard ITS Communications Study .................................................................................................. 77 Page 5 Maricopa County Department of Transportation (MCDOT) MCDOT MISSION: To provide transportation infrastructure and related services to the people within Maricopa County so they can live, work, conduct business and travel in a safe and clean environment. MCDOT VISION: MCDOT performs in a collaborative, innovative, efficient and effective manner to deliver safe, cost-effective infrastructure that is responsive to our customers. Page 6 Message from the Director JOHN B. HAUSKINS, P.E., PWLF County Engineer Director, Maricopa County Department of Transportation FY 2012-2013 was another successful year for MCDOT. Our multi-disciplined employee team continues to provide excellent customer service and produce quality transportation infrastructure projects. This year’s Transportation Improvement Program (TIP) covers a variety of projects, from long range transportation planning efforts, to dirt road paving aimed at improving Maricopa County’s air quality, to extensive pavement preservation projects, to the design and construction of major arterial roadways and bridges, to the implementation of the multi-jurisdictional Northern Parkway Program. The 2013-2014 TIP exemplifies MCDOT’s emerging role as a regional transportation partner and leader. MCDOT’s efforts produce recognizable results: • 88% of MCDOT’s 2,087 miles of paved roadways are rated “Very Good to Excellent“ • 98% of MCDOT’s 421 bridges & structures are rated “Good to Excellent” Industry Awards: • Build AZ Award: Riggs Road at Sonoqui Wash Roadway and Channelization Project • ITS Arizona: MCDOT SMARTDrive Program • Arizona Quality Alliance: Showcase in Excellence Award 2012, MCDOT Pavement Management Program • Arizona Transportation Partnering Excellence Award: Historic Gillespie Dam Bridge Rehabilitation Project • Marvin M. Black National Partnering Excellence Award and APWA National and Arizona 2013 Project of the Year: Old US 80 Bridge Rehabilitation Project 2013 Annual Community Satisfaction survey: • 86% of public customers polled rate their overall satisfaction with MCDOT “Satisfied to Very Satisfied” MCDOT’s FY 2014 TIP projects include the research and implementation of several ITS projects for traffic safety and management including the MCDOT SMARTDrive Program for the model deployment of vehicle-to-vehicle and vehicle-to-infrastructure communication technologies, the ongoing design and construction of the Northern Parkway and the unique Riggs Road design project and its excavation of the Pozos de Sonoqui archaeological site. Throughout a variety of transportation projects, MCDOT continues to provide quality for our community. Internally, MCDOT completed its fifth year of Scoreboards, a results-driven program to measure our success and project delivery. The outcomes have improved performance and enhanced clarity in expectations for everyone in the organization. Page 7 As we move into 2014 and future years, our newly developed Project Rating System will help clarify and prioritize projects within the TIP and the MCDOT Project Development Manual will serve to streamline the delivery of these important projects. In addition, our Transportation Planning Division is working with a team of acknowledged industry and economy experts to develop a comprehensive economic benefit evaluation tool for MCDOT that will be used to assess transportation alternatives and the entire Transportation Improvement Program’s benefit to the taxpaying customers of Maricopa County. MCDOT’s efforts will also serve to benefit our partner agencies throughout the MAG (Maricopa Association of Governments) region. MCDOT will continue to be a strong regional transportation leader and continue to improve and excel as an organization by focusing on: • Effective, Efficient & Prudent Budget Management • Definitive Operational Asset Management • Formation of Top-notch Project Teams • Cultivation of Mutually Beneficial Partnerships • Involvement in the Professional Community Finally, to demonstrate our commitment to transparent government, MCDOT has recently presented proposed Citizen Scoreboards to the Maricopa County Board of Supervisors and is working to get these important facts posted on the MCDOT website to provide for public scrutiny of MCDOT’s performance on an ongoing basis. MCDOT is at your service. Maricopa County Supervisor Districts District 1 - Denny Barney District 2 - Steve Chucri District 3 - Andrew Kunasek District 4 - Clint L. Hickman District 5 - Mary Rose Wilcox Page 9 Introduction Purpose of the TIP The Transportation Improvement Program (TIP) is a five-year “road map” that provides direction and guidance for Maricopa County to carefully plan for and manage its transportation capital and infrastructure assets. The TIP identifies capital projects and anticipated funding sources to assist in the planning and scheduling of finances for projects as well as the manpower required to plan, design, and construct programmed projects. Structure of the TIP The TIP contains projects such as major transportation studies, construction of new roadways and bridges, installation of ITS traffic managements systems, roadway widening and capacity enhancements, improvements to existing bridges, structures, and intersections, and the maintenance and reconstruction of existing roadways. The TIP is composed of the following sections: • • • • Projects that are not route-specific but are necessary to support the roadway system (environmental and archeological analysis, planning projects etc.) Projected revenues and expenditures for the five-year program period Completed projects from the previous fiscal year Ongoing and potential projects programmed for the next five years Compiling the TIP The selection of TIP projects, their prioritization, approval, and implementation are based on Maricopa County Department of Transportation’s (MCDOT) commitment to providing a quality transportation system for all County residents. Throughout the year, MCDOT staff reviews, ranks, and prioritizes new and continuing projects to be recommended to the MCDOT Management Team and Transportation Advisory Board (TAB). TAB then reviews the list of rated and ranked projects and makes recommendations to the Board of Supervisors for final approval. All selected TIP projects are compiled by recommendations in the County’s Comprehensive Plan, the Transportation System Plan and the County’s Strategic Plan. TIP Contacts The MCDOT web site includes the current TIP and several past Transportation Improvement Programs. It also has the latest traffic count data, city limit maps, and numerous other MCDOT studies and documents that can be downloaded. • Maricopa County Department of Transportation TIP Program Coordinator Planning Division 2901 W Durango Street Phoenix, AZ 85009 602-506-4608 Website: www.mcdot.maricopa.gov Page 10 TIP System Expenditure Projects 2014-2018 TIP System Projects are projects that are not route specific but are needed to support the roadway system. Examples are environmental analysis, archeological analysis, planning projects, etc. Proj# Project Name Activity T001 TIP Program Management Design T001 TIP Program Management MCDOT Labor T002 Project Reserve Account Project Reserves T003 TAB Special Projects MCDOT Labor T003 TAB Special Projects Special Projects T004 Warranted Traffic Improvements Construction T004 Warranted Traffic Improvements Design T005 Planning Studies (Candidate Assessment Reports & Corridor Studies) MCDOT Labor T005 Planning Studies (Candidate Assessment Reports & Corridor Studies) Preliminary Engineering T006 Unallocated Force Account MCDOT Labor T008 Property Management on Prior Year TIP Right-of-Way T011 Right-of-Way In-Fill on Road Inventory System MCDOT Labor T011 Right-of-Way In-Fill on Road Inventory System Right-of-Way T012 General Civil Engineering Design T012 General Civil Engineering Scoping Study Proj# FY14 FY15 FY16 FY17 FY18 TOTAL T001 $50,000 $50,000 $50,000 $50,000 $50,000 $250,000 T001 450,000 450,000 450,000 450,000 450,000 2,250,000 T002 5,000,000 15,000,000 30,000,000 20,000,000 70,000,000 T003 10,000 10,000 10,000 10,000 10,000 50,000 T003 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 7,500,000 1,000,000 4,000,000 4,000,000 4,000,000 13,000,000 T004 T004 500,000 500,000 1,000,000 1,000,000 1,000,000 4,000,000 T005 200,000 200,000 200,000 200,000 200,000 1,000,000 T005 1,400,000 1,400,000 1,400,000 1,400,000 1,400,000 7,000,000 T006 233,500 1,056,500 1,948,230 2,058,230 2,103,230 7,399,690 T008 50,000 50,000 50,000 50,000 50,000 250,000 T011 100,000 100,000 100,000 100,000 100,000 500,000 800,000 800,000 1,600,000 T011 T012 100,000 100,000 100,000 100,000 100,000 500,000 T012 1,200,000 2,000,000 3,000,000 3,000,000 3,000,000 12,200,000 $10,793,500 $8,416,500 $28,808,230 $44,718,230 $34,763,230 $127,499,690 Totals Page 11 MCDOT Projected Five Year Revenue & Expenditures Fiscal Years 2014-2018 FY2013-14 CASH BALANCE FROM PRIOR FISCAL YEAR $16,742,736 FY2014-15 - FY2015-16 - FY2016-17 - FY2017-18 - REVENUE HURF, VLT, FEES, OTHER SOURCES $94,967,838 $104,112,634 $107,296,135 78,811,462 82,345,386 TOTAL REVENUE $161,082,598 $164,998,706 $174,941,254 $182,924,096 $189,641,521 TOTAL FUNDS AVAILABLE $177,825,334 $164,998,706 $174,941,254 $182,924,096 $189,641,521 TIP GRANTS, INTERGOV CHARGES & TRANSFER 66,114,760 $98,415,042 $101,288,419 66,583,664 73,652,835 EXPENDITURES TIP EXPENDITURES CONSTRUCTION PHASE $48,037,530 $33,944,000 $28,634,000 $30,356,000 $43,461,000 DEVELOPMENT PHASE 24,342,000 15,105,000 12,585,000 8,925,000 5,830,000 SYSTEM SUPPORT 1,093,500 1,916,500 2,808,230 3,718,230 3,863,230 PROJECT PROGRAMMING 8,615,981 7,600,000 22,700,000 37,700,000 27,700,000 TOTAL TIP EXPENDITURES $82,089,011 $58,565,500 $66,727,230 $80,699,230 $80,854,230 OPERATING EXPENDITURES 58,872,678 58,236,556 58,236,556 58,236,556 58,236,556 TOTAL EXPENDITURES NET BALANCE $140,961,689 $37,499,767 Revenue & Expenditures 2013 REVENUE REVISED ACTUAL $94,881,237 $97,340,423 54,977,725 45,130,722 $149,858,962 $142,471,145 $24,763,554 $23,873,524 28,550,297 24,352,905 4,705,280 4,955,688 $58,019,131 $52,626,376 TIP EXPENDITURES $103,932,010 $73,444,452 TOTAL TIP EXPENDITURES $103,932,010 $73,444,452 TOTAL EXPENDITURES $161,951,141 $126,070,828 HURF, VLT, FEES & OTHER SOURCES TIP GRANTS, INTERGOV CHARGES & TRANSFER TOTAL REVENUE OPERATING EXPENDITURES SALARIES & BENEFITS MATERIALS, SUPPLIES & SERVICES EQUIPMENT & MACHINERY TOTAL OPERATING EXPENDITURES TIP EXPENDITURES Page 12 Meet the MCDOT Management Team JOHN B. HAUSKINS, P.E., PWLF County Engineer, Transportation Director John Hauskins is a native Arizonan, born in Phoenix. He has been a Registered Engineer in the State of Arizona for over 40 years. He has experience in the development community and private sector as a consultant. John worked for the Arizona Department of Transportation for 30 years prior to assuming his current position as Director of the Maricopa County Department of Transportation in 2007. During his diverse career, John has held increasingly responsible positions ranging from Project Design Engineer, to Research Engineer, to ADOT District Engineer, to his current leadership role as County Engineer for one of the largest counties in the United States. John’s decades of experience in the transportation field gives him a diverse yet uniquely comprehensive perspective and knowledge of regional transportation-related issues. JACK M. LORBEER Planning Division Manager Jack Lorbeer has over 25 years of transportation planning experience in city, state and metropolitan planning agencies. Prior to assuming the role of Planning Division Manager at MCDOT in 2012, he was the Planning Manager for the Regional Transportation Commission in Reno, Nevada. Jack was also an Associate Traffic Engineer for the City of San Diego, California, a Project Manager for the San Diego Association of Governments, and a Transportation Planner with the Arizona Department of Transportation. He is a member of the Institute of Transportation Engineers and the American Planning Association. Jack earned a Bachelor of Science in Transportation Planning from Arizona State University and a Master of Science in Transportation Planning from California State University at Dominguez Hills. EDMUND C. WILLIAMS, P.E. Engineering Division Manager, Superintendent of Streets Ed Williams has over 19 years of civil engineering experience. Before joining MCDOT as the Engineering Division Manager in 2012, he worked as a design engineer and project manager on commercial developments and tribal projects for J&K Engineering in Prescott, Arizona. He has also worked at Parsons Transportation Group in Denver, Colorado as well as a number of small local firms in Boulder, Colorado and Prescott, Arizona. Ed earned a Bachelor of Science in Civil Engineering from the Georgia Institute of Technology. He is a member of the American Society of Civil Engineers, Engineers Without Borders and the American Public Works Association. Page 13 JEFFREY A. KRAMER, P.E., PWLF, CPM, CCM Roadway Operations Division Manager Jeff Kramer has over 26 years of transportation engineering and operations experience in the public and private sector. Before becoming the Roadway Operations Division Manager at MCDOT in 2012, he was the Transportation and Infrastructure Market Lead for the southwest region of ARCADIS. Prior to that, he was an Assistant Public Works Director for the City of Chandler, as well as the Transportation Department Director and Deputy City Engineer for the City of Mesa. Jeff earned a Bachelor of Science in Civil Engineering degree from the University of Arizona, and is currently pursuing an MBA in construction management at Chandler University. He is a Public Works Leadership Fellow in the American Public Works Association, a member of the Construction Management Association of America, the American Society for Public Administration, and the American Academy of Certified Public Managers, which awarded him the 2012 Henning Award naming him the National Public Manager of the year. NICOLAAS P. SWART, P.E. Traffic Management Division Manager Nicolaas Swart has been the Traffic Management Division Manager since 2006. He oversees all aspects of Traffic Engineering and Intelligent Transportation Systems (ITS). He comes to MCDOT with a strong international engineering background. Before joining MCDOT he worked for Associated Engineering (B.C.) Ltd. in Canada and Ninham Shand, Inc. in South Africa. Nicolaas earned his Bachelor of Science in Civil Engineering and his post-graduate degree in Transportation Engineering from the University of Pretoria in South Africa. He is a member of the State Board of Technical Registration of Arizona, the Association of Professional Engineers and Geoscientists of British Columbia, the Intelligent Transportation Society of Arizona and the Institute of Transportation Engineers. He also serves as the Program Manager for AZTech, a partnership of local agencies integrating transportation systems across jurisdictional boundaries through traffic management and ITS solutions. MARK MODIN, CPA Financial Services Division Manager Mark Modin has worked with MCDOT since 1982. As Financial Services Division Manager, he oversees all departmental budgets, Facilities, Article 3 and 5 Procurement, Customer Service and Custodian of Records. Before joining MCDOT, he worked in auditing for the State of Wisconsin Department of Health Services as well as in Financial Services for the Maricopa County Schools Department. Mark earned his Bachelor of Arts in Business Administration with a major in Accounting from Washington State University. He is a member of the Association of Governmental Accountants and holds an Arizona Certified Public Accountant license. Page 14 MIKE WILSON SR/WA Real Estate Division Manager Mike Wilson joined MCDOT in 1997 as the Real Estate Division’s Property Management Supervisor and became the Division Manager in 2002. As Division Manager, he is on both MCDOT and the Maricopa County Flood Control District’s management teams. Prior to joining MCDOT, he worked for the Arizona State Land Department, holding several supervisory positions in the Range, Environment, Trespass Mitigation and Right of Way sections. He has also worked in farming, ranching and commercial cattle feeding management throughout Iowa and Nebraska. Mike earned his Bachelor of Science in Business Administration (Agri-business) from Iowa State University. He holds an Arizona Real Estate License and a Senior Right of Way Associate Designation from the International Right of Way Association. ROSEANN OSBORN-PEREZ Information Technology Division Manager Roseann Osborn-Perez has worked with the County since 1982. She started her career as a Management Information Systems (MIS) Specialist, working her way up to become the Information Technology (IT) Division Manager. Positions she has held include MIS Supervisor, an Assistant Project Manager and Application/Program Manager with the Maricopa County Health Services Department. As IT Division Manager, she is responsible for evaluating and bringing technology to MCDOT business processes to help departments be more efficient. Roseann earned her Bachelor of Science in Business Administration specializing in Management Information Systems with a minor in Computer Science from Glassboro State College in New Jersey. Page 15 Maricopa County Transportation Advisory Board The Maricopa County Transportation Advisory Board (TAB) consists of five members appointed by the Board of Supervisors, one from each of Maricopa County’s supervisorial districts, with each TAB member appointed by the elected Supervisor representing that district. One of the TAB's fundamental responsibilities is to review and recommend the Maricopa County Department of Transportation (MCDOT) Five-Year Transportation Improvement Program (TIP). This program contains all projects planned by MCDOT during the upcoming five years. Another important function of the TAB is to assist in developing and maintaining public understanding and support of MCDOT programs through active communication. TAB members bring the constituent voice to MCDOT transportation decisions. The board meets every other month, and Maricopa County residents are encouraged to attend. MARC ERPENBECK Chairman, Supervisory District 1 Marc Erpenbeck currently serves as the Transportation Advisory Board Chairman. He was appointed in 2010 by former District 1 Supervisor Fulton Brock. Erpenbeck is a partner at the Law Offices of Snell and Wilmer. His practice is concentrated in both transactional and litigation matters in environmental, construction and real estate law. Before practicing law, he was a civil engineer with the Harza Engineering Company in Chicago, Illinois. He earned a Bachelor of Science in Civil Engineering from the University of Illinois at Champaign-Urbana and a Juris Doctorate from Arizona State University. He currently also serves on the Arizona Theatre Company Board of Trustees and with the Volunteer Lawyer Program. JEFF MARTIN Vice Chairman, Supervisory District 2 Jeff Martin serves as the Transportation Advisory Board Vice-Chairman. He was appointed to the Transportation Advisory Board by former District 2 Supervisor Don Stapley in 2009. Jeff is the President and CEO of Jeff Martin Consulting. He specializes in advancing regional transit infrastructure and accelerating regional freeway improvement as well as lending his expertise to other regional transit issues. Before developing his consulting firm, Martin gained valuable experience with the City of Mesa, holding positions as Assistant Development Services Manager, Transportation Director and Assistant to the City Manager. He also served as the Senior Staff Associate for the League of Arizona Cities and Towns. Martin earned a Bachelor of Arts in Criminal Justice and a Masters of Public Administration from Arizona State University. Page 16 WES GULLETT Supervisory District 3 Wes Gullett was appointed to the Transportation Advisory Board in 2012 by District 3 Supervisor Andy Kunasek. Wes Gullett is a founding partner in the firm FirstStrategic, Communications & Public Affairs. He works primarily on strategic planning projects and representing businesses engaged in public policy efforts. Gullett has worked in the consulting world for the past 12 years. He has extensive experience in government including serving as Chief of Staff for Arizona Governor Fife Symington from July 1993 to April 1996. In addition, he served as Administrative Assistant to U.S. Senator John McCain. He also served as Senator McCain's 1992 Campaign Manager and as Deputy Campaign Manager during Senator McCain’s 2000 campaign for the Republican Presidential Nomination. Gullett is a native of Ottumwa, Iowa and attended the University of Iowa. MERLYN CARLSON Supervisory District 4 Merlyn Carlson was appointed to the Transportation Advisory Board in 2012 by former District 4 Supervisor Max Wilson. Carlson formerly served as Deputy Undersecretary for the USDA’s Natural Resources Conservation Service (NRCS) where he oversaw the nation’s natural resources in partnership with NRCS and other government and non-government entities. Carlson also served as director of the Nebraska Department of Agriculture (NDA) and is a past president of the National Cattlemen’s Beef Association. In addition, he was the chairman of the U.S. Meat Export Federation and was president of the Mid-American International Agri-Trade Council. LAURA PASTOR Supervisory District 5 Laura Pastor was appointed to the Transportation Advisory Board in 2008 by District 5 Supervisor Mary Rose Wilcox. Pastor is the Director of the Achieving a College Education Program (ACE) at South Mountain Community College, a program helping students transition from high school to community college and then on to earning bachelor’s degrees at four-year universities. She oversees all fiscal and administrative management of the program including coordinating partnership and outreach initiatives. Pastor earned her Bachelor of Arts in Education from Arizona State University and a Masters of Public Administration from Baruch College School of Public Affairs, City University of New York. Page 17 Completed Construction Projects FY 2013 Project Manager: Eric Mayer Phone: (602) 506-8367 Project Number T397 email:EricMayer@mail.maricopa.gov 17th Avenue Dust Mitigation and Dirt Road Paving Project Low Volume Road Program Maddock Road To West Joy Ranch Road This roadway paving project performed grading activities and placed a 2.5-inch layer of asphaltic concrete pavement on top of roadway base material on 17th Avenue between Maddock Road and Joy Ranch Road. The Maricopa County Department of Transportation (MCDOT) Low Volume Road (LVR) Program is paving and improving dirt roads in the MCDOT Roadway System in compliance with federal EPA mandates and Maricopa County’s air quality plan. Total FY 2008-2013* BOS District: 3 $353,319 *Includes: Construction, Construction Management, Design, Design Support During Construction, Environmental Study/Clearances, MCDOT Labor/Construction, MCDOT Labor/Design, Right-of-Way Acquisition, Utility Relocation/Accomodation Page 18 Completed Construction Projects FY 2013 Project Manager: Eric Mayer Phone: (602) 506-8367 Project Number T446 email: EricMayer@mail.maricopa.gov 147th Avenue Roadway Rehabilitation Project R.H. Johnson Boulevard to Heritage Drive This roadway improvement project performed roadway maintenance and rehabilitation activities on 147th Avenue between R.H. Johnson Boulevard and Heritage Drive. Work included the milling (grinding) and reconstruction of the top layer of pavement followed by the installation of a “roadway quieting” surface treatment using a rubberized asphalt overlay paving process. R $284, 680 I TA D GE 147 TH 15 1 ST Total FY 2008-2013* BOS District: 4 H ER DR AV E Project LV D T A ST R H J O HN SO N B LV D R D U S B *Includes: Construction, Construction Management, Design, Design Support During Construction, Environmental Study/Clearances, MCDOT Labor/Construction, MCDOT Labor/Design, Right-of-Way Acquisition, Utility Relocation/Accomodation Page 19 Completed Construction Projects FY 2013 Project Manager: Eric Mayer Phone: (602) 506-8367 Project Number T415 email:EricMayer@maricopa.gov Asphalt Rubber Arterial Overlay Project FY 2013 This project consisted of milling and resurfacing the existing pavement surfaces with Asphalt-Rubber Overlay (asphalt milling and overlaying with Asphalt Rubber Concrete Pavement). Additionally, pavement safety edges were constructed on roadway segments where required. The project also included the installation of pavement markings, vehicle loop detector sensors, and other miscellaneous work. • • • • • • • • • • • • • 107th Avenue: MC 85 to Van Buren Street Avondale Boulevard: Broadway Road to Lower Buckeye Road Broadway Road: Rainbow Road to Dean Road Cotton Lane: Camelback Road to Bethany Home Road Cotton Lane: Bethany Home Road to Glendale Avenue Cotton Lane: Glendale Avenue to Northern Avenue Cotton Lane: Northern Avenue to Olive Avenue Cotton Lane: Olive Avenue to Peoria Avenue Glendale Avenue: Citrus Road to Cotton Lane Jackrabbit Trail: Southern Avenue to Broadway Road McDowell Road: 462 feet east of 196th Avenue to Jackrabbit Trail McDowell Road: Jackrabbit Trail to 191st Avenue Olive Avenue: White Tank Mountain Road to Beardsley Road Total FY 2008-2013* BOS Districts: 4 and 5 $2,902,376 *Includes: Construction, Construction Management, Design, Design Support During Construction, Environmental Study/Clearances, MCDOT Labor/Construction, MCDOT Labor/Design, Right-of-Way Acquisition, Utility Relocation/Accomodation Page 20 Completed Construction Projects FY 2013 Project Manager: Faisal Saleem Phone: (602) 506-1241 Project Number T288 email:FaisalSaleem@mail.maricopa.gov Bell Road West DMS Project Dynamic Message Sign Installation Project SR 303L to 75th Avenue This project included the design and installation of four new Dynamic Message Signs (DMS) and associated structures, shaft foundations, surface trenching, the installation of fiber optic cable and CCTV (closed circuit television) cameras for real-time traffic management. The new DMS provides real time traveler information along the Bell Road corridor and also alerts drivers of potential traffic incidents or congestion impacting traffic flow in the area. New DMS locations: • Eastbound Bell Road, 1,350 feet east of Happy Trails Way (City of Surprise) • Westbound Bell Road, 80 feet west of 115th Avenue (City of Surprise) • Eastbound Bell Road, 750 feet east of 114th Avenue (Maricopa County) • Westbound Bell Road, 400 feet west of 70th Avenue (City of Glendale) • Westbound Bell Road, 600 feet east of 55th Avenue (City of Glendale) Total FY 2008-2013* BOS District: 4 $803,928 *Includes: Construction, Construction Management, Design, Design Support During Construction, Environmental Study/Clearances, MCDOT Labor/Construction, MCDOT Labor/Design, Right-of-Way Acquisition, Utility Relocation/Accomodation Page 21 Completed Construction Projects FY 2013 Project Manager: Eric Mayer Phone: (602) 506-8367 Project Number T416 email:EricMayer@mail.maricopa.gov Desert Sage Subdivision Roadway Rehabilitation Project This neighborhood roadway improvement project consisted of concrete valley gutter construction, concrete apron construction, concrete curb repair and replacement to facilitate drainage, full depth milling, cement treatment of the base material, construction of rubberized asphalt concrete pavement, installation of pavement markings and vehicle loop detector sensors, and other miscellaneous work items on the following Desert Sage subdivision streets: • • • • • • • • • • • • 79th Place: Broadway Road to Apache Trail 80th Street: Broadway Road to Apache Trail 81st Street: Broadway Road to Apache Trail 82nd Street: Broadway Road to 1st Avenue 82nd Way: Broadway Road to 1st Avenue 83rd Place: Broadway Road to Apache Trail 1st Avenue: 79th Place to 82nd Way 2nd Avenue: 79th Place to 82nd Way 3rd Avenue: 79th Place to 82nd Way 4th Avenue: 79th Place to 82nd Way 5th Avenue: 79th Place to 82nd Way 6th Avenue: 79th Place to 82nd Way Total FY 2008-2013* BOS District: 1 $2,149,987 *Includes: Construction, Construction Management, Design, Design Support During Construction, Environmental Study/Clearances, MCDOT Labor/Construction, MCDOT Labor/Design, Right-of-Way Acquisition, Utility Relocation/Accomodation Page 22 Completed Construction Projects FY 2013 Project Manager: Eric Mayer Phone: (602) 506-8367 Project Number T409 email:EricMayer@mail.maricopa.gov Dust Mitigation and Dirt Road Paving Projects Low Volume Road Program This roadway paving project performed grading activities and placed a 2.5-inch layer of asphaltic concrete pavement on top of roadway base material on the following dirt roadways: • • • • • • • • • • • 7th Avenue: Saddle Mountain Road to approximately 685 feet north of Saddle Mountain Road 16th Street: From beginning of maintenance road to Cavalry Road 22nd Street: Cavalry Road to north end of the road Perdiz Drive: End of the cul-de-sac to New River Road Sabrosa Drive: New River Road to 6th Street 191st Avenue: Jomax Road to Roadrunner Road 203rd Avenue: Jomax Road to Morning Star Lane 207th Avenue (Mitchell Road): Bradley Road to Radford Road Jomax Road: 207th Avenue to 203rd Avenue Roadrunner Road: 193rd Avenue to 191st Avenue Watkins Street: Airport Road to 203rd Avenue The Maricopa County Department of Transportation (MCDOT) Low Volume Road (LVR) Program is paving and improving dirt roads in the MCDOT Roadway System in compliance with federal EPA mandates and Maricopa County’s air quality plan. Total FY 2008-2013* BOS Districts: 3 and 4 $1,747,777 *Includes: Construction, Construction Management, Design, Design Support During Construction, Environmental Study/Clearances, MCDOT Labor/Construction, MCDOT Labor/Design, Right-of-Way Acquisition, Utility Relocation/Accomodation Page 23 Completed Construction Projects FY 2013 Project Manager: Eric Mayer Phone: (602) 506-8367 Project Number T423 email:EricMayer@mail.maricopa.gov Dust Mitigation and Dirt Road Paving Projects Low Volume Road Program TY LN Total FY 2008-2013* BOS District: 5 S IVANHO E ST MO NT ERE Y ST G ALV ES TO N S Project CH OP PO PHOENIX T 43RD AVE The Maricopa County Department of Transportation (MCDOT) Low Volume Road (LVR) Program is paving and improving dirt roads in the MCDOT Roadway System in compliance with federal EPA mandates and Maricopa County’s air quality plan. This dirt road paving project was paid in part by Gila River Indian Community gaming revenue funds through the State Shared Revenue Program. U • SAN DY R D D • N E L • AT K • RAY RD KO M • 45th Avenue: from Dusty Lane to Sandy Road Choppo Road: from Dusty Lane to 43rd Avenue Dusty Lane: from Galveston Street to Choppo Road Galveston Street: from Dusty Lane to 43rd Avenue Ivanhoe Street: from 45th Avenue to end of roadway Monterey Street: from 45th Avenue to end of roadway 45TH AVE • 44TH AVE This paving project included the design and construction of 1.5 miles of low volume roadways in the Vee Quiva area located in a small County area between the Gila River Indian Community and the City of Phoenix (51st Avenue and Dusty Lane). The work consisted of the construction of a 2-inch thick asphalt concrete pavement layer, application of an acrylic copolymer topical dust palliative, new signs, and other miscellaneous work items on the following roadways: RD $645,500 *Includes: Construction, Construction Management, Design, Design Support During Construction, Environmental Study/Clearances, MCDOT Labor/Construction, MCDOT Labor/Design, Right-of-Way Acquisition, Utility Relocation/Accomodation Page 24 Completed Construction Projects FY 2013 Project Manager: Cynthia Robinson Phone: (602) 506-8796 Project Number T418 email: CynthiaRobinson@mail.maricopa.gov Highway Operations Building Reconstruction and Remodel Project This building expansion and renovation project consisted of the following: • • • • • Highway Operations Building Features 5,397 square foot building addition, which includes new office space for inspectors, training room with A/V equipment, crew room, break room and conference room. Exterior improvements included additional covered parking, replacement of the vehicle gate and the addition of a pedestrian gate for access to the CDL lot. Refresh of the existing space (11,000 square feet) included new ceiling grid and tile, paint, flooring replacement, remodel of existing restrooms to include new plumbing fixtures, tile, paint and lighting. New Traffic Management Center Features Remodel of approximately 1,900 square feet of office space to accommodate the new Traffic Management Center. New facility includes three offices, open work area with video wall and a server room. Total FY 2008-2013* BOS District: 5 $1,979,741.60 *Includes: Construction, Construction Management, Design, Design Support During Construction, Environmental Study/Clearances, MCDOT Labor/Construction, MCDOT Labor/Design, Right-of-Way Acquisition, Utility Relocation/Accomodation Page 25 Completed Construction Projects FY 2013 Project Manager: Faisal Saleem Phone: (602) 506-1241 Project Number T290 email:FaisalSaleem@mail.maricopa.gov McKellips Road/McDowell Road Intelligent Transportation System (ITS) Project This Intelligent Transportation System (ITS) project made improvements to the existing traffic signal equipment located at the following locations: • • • • • 92nd Street and McDowell Road Longmore Road and McDowell Road 92nd Street and McKellips Road Alma School Road and McKellips Road Alma School Road and McDowell Road Improvements included utilizing existing conduits, installing new conduits, new geotextile inner ducts, fiber optic pull boxes, fiber optic cables, splice enclosures, electronic equipment and related items on McDowell Road from SR 101L to Alma School Road. New wireless radio equipment and electronic equipment such as Ethernet switches and accessories were also installed at additional locations which included the intersections of McKellips Road and 92nd Street and McKellips Road and Alma School Road. $495,433 L EV I EW B E L L E V IE W S T ST DO B SO N R D 92ND ST BEL ROO SEVELT ST 9 2N D ST er Salt Riv M CK ELL IPS AL MA SCH O OL RD MCD O WEL L RD PALM LN LO N G MO R E RD PA LM LN LO N GMO R E R D 92ND ST Total FY 2008-2013* BOS District: 2 RD *Includes: Construction, Construction Management, Design, Design Support During Construction, Environmental Study/Clearances, MCDOT Labor/Construction, MCDOT Labor/Design, Right-of-Way Acquisition, Utility Relocation/Accomodation Page 26 Completed Construction Projects FY 2013 Project Manager: Randy Dunsey Phone: (602) 506-2166 Project Number T398 email:DunseyR@mail.maricopa.gov Oakmont Drive at 107th Avenue Traffic Signal Installation Project This traffic improvement project installed a new traffic signal at the intersection of 107th Avenue and Oakmont Drive. Work consisted of installing traffic signal equipment, pole foundations, poles, mast arms and signal heads. Additional traffic safety improvements include the installation of new dedicated turn lanes, center median modifications, curb and gutter, ADA-compliant sidewalk ramps, emergency preemption equipment for fire trucks and pole-mounted traffic detection devices for “real time” traffic management. Total FY 2008-2013* BOS District: 4 $618,275 *Includes: Construction, Construction Management, Design, Design Support During Construction, Environmental Study/Clearances, MCDOT Labor/Construction, MCDOT Labor/Design, Right-of-Way Acquisition, Utility Relocation/Accomodation Page 27 Completed Construction Projects FY 2013 Project Manager: Nariman Zadeh Phone: (602) 506-8623 Project Number T188 email:NarimanZadeham@mail.maricopa.gov Old US 80 Bridge at the Gila River (Gillespie Dam Bridge) Erosion Control Project This project consisted of erosion control improvements at the west abutment at the Old US 80 Bridge crossing of the Gila River. Construction activity included the installation of grouted riprap along the north embankment, hand-placed angular riprap along the north and south embankments and grading activities. Total FY 2008-2013* BOS District: 5 $7,474,562 *Includes: Construction, Construction Management, Design, Design Support During Construction, Environmental Study/Clearances, MCDOT Labor/Construction, MCDOT Labor/Design, Right-of-Way Acquisition, Utility Relocation/Accomodation Page 28 Completed Construction Projects FY 2013 Project Manager: Faisal Saleem Phone: (602) 506-1241 Project Number T292 email:FaisalSaleem@mail.maricopa.gov Olive Avenue ITS Project Litchfield Road to SR101L This Intelligent Transportation System (ITS) project included the installation of fiber optic cable on a five mile stretch of Olive Avenue between Litchfield Road and SR 101L for future deployment of traffic management communication technologies. The new fiber conduit will interconnect Olive Avenue traffic signals and provide the first leg of a state-of-the-art "real-time" computerized traffic control and communication system along the corridor. The Olive Avenue ITS corridor connects to the previously deployed Bell Road ITS and 99th Avenue ITS corridor installation and serves interconnected traffic management centers at MCDOT and the cities of Surprise, Peoria and Glendale. Total FY 2008-2013* BOS District: 4 $1,008,884 *Includes: Construction, Construction Management, Design, Design Support During Construction, Environmental Study/Clearances, MCDOT Labor/Construction, MCDOT Labor/Design, Right-of-Way Acquisition, Utility Relocation/Accomodation Page 29 Completed Construction Projects FY 2013 Project Manager: Dave Hopper Phone: (602) 506-2882 Project Number T315 email:DaveHopper@mail.maricopa.gov Southern Avenue and Meridian Road Intersection and Drainage Improvement Project This intersection improvement project constructed intersection and drainage improvements at Southern Avenue and Meridian Road. Improvements included installation of a traffic signal, sidewalk ramps, curb, gutter, street lighting and left-turn lanes in all four directions. Additional improvements included a three-barrel box culvert drainage structure through the existing low water crossing to provide an all-weather crossing and concrete channel lining in the vicinity of the new culvert crossing. The project reduced congestion and improved traffic flow. This project was constructed in partnership with the City of Apache Junction. Total FY 2008-2013* BOS District: 2 $2,290,810 *Includes: Construction, Construction Management, Design, Design Support During Construction, Environmental Study/Clearances, MCDOT Labor/Construction, MCDOT Labor/Design, Right-of-Way Acquisition, Utility Relocation/Accomodation Page 30 Completed Construction Projects FY 2013 Project Manager: Nariman Zadeh Phone: (602) 506-8623 Project Number T386 email:NarimanZadeham@mail.maricopa.gov Southern Avenue Roadway Improvement Project Crismon Road to Signal Butte Road The project widened 0.13 miles of Southern Avenue between Crismon Road and Cheshire Road. Work included installation of one additional westbound travel lane, curb, gutter and sidewalk to match existing improvements. The project also included signing, striping and street lighting. This project was constructed in partnership with the City of Mesa. Total FY 2008-2013* BOS District: 1 $308,721 *Includes: Construction, Construction Management, Design, Design Support During Construction, Environmental Study/Clearances, MCDOT Labor/Construction, MCDOT Labor/Design, Right-of-Way Acquisition, Utility Relocation/Accomodation Page 31 Completed Construction Projects FY 2013 Project Manager: Jim Sargent Phone: (602) 506-8678 Project Number T431 email:JamesSargent@mail.maricopa.gov Sun City West HAWK Pedestrian Crossing Signal Installation and Roadway Rehabilitation Project Granite Valley Drive: Meeker Boulevard to White Rock Drive This traffic and pedestrian safety improvement project installed a traffic signal at Granite Valley Drive and Dachtler Drive and a signalized pedestrian crosswalk at Granite Valley Drive and Mantor Lane in the vicinity of the Banner Del Webb Medical Center campus. The new pedestrian crossing includes a HAWK (High-Intensity Activated Crosswalk) beacon. Roadway maintenance activities were performed on Granite Valley Drive between Meeker Boulevard and White Rock Drive as part of this project. Work included removal of the existing top layer of pavement and the installation of a “roadway quieting” rubber asphalt overlay. N W Y DR H LN ITE WH CK RO A A VD TZ ST BL R U $151,753 ST AN AN R GR ITE M Project TO O Total FY 2008-2013* BOS District: 4 U RD U M W R EY D LL H Y A VA S D R DA SURPRISE ME EK C ER L HT ER DR B LVD *Includes: Construction, Construction Management, Design, Design Support During Construction, Environmental Study/Clearances, MCDOT Labor/Construction, MCDOT Labor/Design, Right-of-Way Acquisition, Utility Relocation/Accomodation Page 32 Completed Construction Projects FY 2013 Project Manager: Randy Dunsey Phone: (602) 506-2166 Project Number T396 email: DunseyR@mail.maricopa.gov Sun City West Pedestrian Signals This pedestrian safety improvement project installed HAWK (High-Intensity Activated Crosswalk) beacons at 138th Avenue and R.H. Johnson and 138th Avenue and Camino Del Sol. The HAWK beacon resembles a traffic signal light but is pedestrian-activated to provide a protected crossing. Traffic is only stopped, when necessary, to allow pedestrians to safely cross the roadway. Additional improvements included new crosswalks, ADA-compliant sidewalk ramps, signs and striping. Total FY 2008-2013* BOS District: 4 $588,666 *Includes: Construction, Construction Management, Design, Design Support During Construction, Environmental Study/Clearances, MCDOT Labor/Construction, MCDOT Labor/Design, Right-of-Way Acquisition, Utility Relocation/Accomodation Page 33 Completed Construction Projects FY 2013 Project Manager: Bill Grimes Phone: (602) 506-6604 Project Number T365 email: BillGrimes@mail.maricopa.gov Traffic Calming This project installed speed humps and speed cushions, signage and striping in order to provide for traffic safety at two locations: • • Banff Lane: 83rd Avenue to 79th Avenue (District 4) Fairview Street: Greenfield Road to Higley Road (District 1) Total FY 2008-2013* BOS Districts:1 and 4 $321,354 *Includes: Construction, Construction Management, Design, Design Support During Construction, Environmental Study/Clearances, MCDOT Labor/Construction, MCDOT Labor/Design, Right-of-Way Acquisition, Utility Relocation/Accomodation Page 34 Completed Construction Projects FY 2013 Project Manager: Nariman Zadeh Phone: (602) 506-8623 Project Number T098 email:NarimanZadeham@mail.maricopa.gov Williams Field Road Roadway Widening and Drainage Improvement Project Gilbert Road to the Eastern Canal This roadway improvement project, widened the roadway and constructed drainage improvements along a 1.5 mile segment of Williams Field Road between Gilbert Road and the Eastern Canal. This project addressed roadway drainage and traffic safety, and increased roadway capacity by widening Williams Field Road to a continuous six-lane roadway (three travel lanes in each direction) throughout the project limits. Additional improvements included the installation of new curb, gutter, sidewalk, street lighting, landscaping, retention basins, storm drains, the widening of the Eastern Canal Bridge and intersection improvements at Lindsay Road. The project also included the installation of an equestrian path along the north side of Williams Field Road from approximately 700 feet east of Gilbert Road to Lindsay Road. The project was constructed in partnership with the Town of Gilbert. Total FY 2008-2013* BOS District: 1 $6,358,923 *Includes: Construction, Construction Management, Design, Design Support During Construction, Environmental Study/Clearances, MCDOT Labor/Construction, MCDOT Labor/Design, Right-of-Way Acquisition, Utility Relocation/Accomodation Page 35 FY 2014 - 2018 Project Listing Project Manager: Tricia Brown Project Number T383 Phone: (602) 506-0896 email: TriciaBrown@mail.maricopa.gov 75th Avenue Bridge at the Salt River Scoping Study Southern Avenue to Broadway Road This scoping study is to determine the type and cost for a future bridge crossing of the Salt River on 75th Avenue between Southern Avenue and Broadway Road. Approved by the Board of Supervisors on May 31, 2013. Activity FY 2014-2018 Construction 3,000,000 Design $500,000 Environmental Study/Clearances MCDOT Labor/Constructiom MCDOT Labor/Design Right-of-Way Acquisition Utility Relocation/Accomodation Totals FY 2015 FY 2016 FY 2017 FY 2018 21,000,000 Construction Management Design Support During Construction FY 2014 $500,000 200,000 1,5000,000 1,500,000 140,000 40,000 40,000 2,5000,000 300,000 $540,000 $540,000 BOS District: 5 Page 36 FY 2014 - 2018 Project Listing Project Manager: Bill Hahn Project Number T428 Phone: (602) 506-4611 email:BillHahn@mail.maricopa.gov 79th Place Drainage and Roadway Improvement Project South of Apache Trail 79th Place provides access to the Desert Sage subdivision. It floods during storm events closing the road. The purpose of this project is to replace the existing low flow crossing with a box culvert so the residents have all weather access to the subdivision. Approved by the Board of Supervisors on May 31, 2013. Activity FY 2014-2018 FY 2014 FY 2015 FY 2016 $325,000 $325,000 8,000,000 13,000,000 50,000 50,000 1,200,000 1,800,000 100,000 100,000 70,000 70,000 Construction Construction Management Design 225,000 Design Support During Construction 200,000 Environmental Study/Clearances MCDOT Labor/Constructiom MCDOT Labor/Design Right-of-Way Acquisition Utility Relocation/Accomodation Totals FY 2017 FY 2018 1,5000,000 25,000 25,000 125,000 125,000 2,5000,000 2,5000,000 300,000 300,000 $400,000 $400,000 $9,370,000 $14,970,000 BOS District: 2 Page 37 FY 2014 - 2018 Project Listing Project Manager: Randy Dunsey Project Number T439 Phone: (602) 506-2166 email: DunseyR@mail.maricopa.gov Alma School Road at Michigan Avenue Traffic Signal Installation and Traffic Safety Improvement Project This project will install traffic signals, signage and ADA-compliant ramps, adjust the length of the turn lanes, and make drainage, safety and traffic improvements to reduce congestion. Approved by the Board of Supervisors on May 31, 2013. Activity FY 2014-2018 FY 2014 FY 2015 FY 2016 $400,000 $200,000 $200,000 13,000,000 60,000 30,000 30,000 1,800,000 125,000 125,000 Construction Construction Management Design Design Support During Construction Environmental Study/Clearances FY 2018 100,000 5,000 5,000 MCDOT Labor/Constructiom 40,000 20,000 MCDOT Labor/Design 20,000 20,000 Right-of-Way Acquisition 20,000 20,000 Utility Relocation/Accomodation 10,000 10,000 $680,000 $430,000 Totals FY 2017 20,000 70,000 $250,000 $14,970,000 BOS District: 1 Page 38 FY 2014 - 2018 Project Listing Project Manager: Eric Mayer Phone: (602) 506-8367 Project Number T435 email: EricMayer@mail.maricopa.gov Asphalt Rubber Arterial Overlay Project FY 2014 This project consists of milling and resurfacing the existing pavement surfaces with asphalt rubber overlay (asphalt milling and overlaying with asphalt rubber concrete pavement). Additionally, pavement safety edges will be constructed on roadway segments where required. The project also includes the installation of pavement markings, vehicle loop detector sensors, and other miscellaneous work. • • • • • • • • • • • • • Forest Road: from Mustang Way to Rio Verde Drive 91st Avenue (Northbound Lanes Only): from MC 85 to 1,320 feet north of MC 85 195th Avenue (Jackrabbit Trail): from Thomas Road to Camelback Road McDowell Road: from Perryville Road to Citrus Road Olive Avenue: from Citrus Road to Sarival Avenue Van Buren Street: from Perryville Road to Citrus Road Lehi Road: from 2,137 feet north of McDowell Road to Thomas Road Val Vista Drive: from 33 feet north of Chandler Heights Road to Ocotillo Road Val Vista Drive: from 80 feet north of Southern Canal Service Road to Thomas Road Old US 80: from 5,953 feet north of Watermelon Road to 11,233 feet north of Watermelon Road Old US 80: from 76 feet north of Mile Post 5 to 3,506 feet north of Mile Post 5 Old US 80: from 20,915 feet north of Watermelon Road to Cactus Rose Road Old US 80: from Arlington School Road to Salome Highway Approved by the Board of Supervisors May 31, 2013. (cont. next page) Page 39 FY 2014 - 2018 Project Listing Project Manager: Eric Mayer Activity Project Number T435 Phone: (602) 506-8367 email: EricMayer@mail.maricopa.gov FY 2014-2018 FY 2014 FY 2015 FY 2016 $7,000,000 $7,000,000 1,500,000 13,000,000 10,000 1,800,000 100,000 100,000 70,000 70,000 Construction Construction Management FY 2017 FY 2018 Design Design Support During Construction Environmental Study/Clearances MCDOT Labor/Constructiom MCDOT Labor/Design Right-of-Way Acquisition Utility Relocation/Accomodation Totals $7,000,000 $7,000,000 $1,510,000 $14,970,000 BOS District: 1, 2, 4 and 5 Page 40 FY 2014 - 2018 Project Listing Project Manager: Randy Dunsey Project Number T391 Phone: (602) 506-2166 email: DunseyR@mail.maricopa.gov Avondale Boulevard at MC 85 Traffic Signal Installation and Safety Improvement Project Requested by the City of Avondale, this project will install traffic signals, make other improvements and railroad safety improvements at this intersection to improve safety, reduce congestion, and improve traffic flow. Approved by the Board of Supervisors on May 31, 2013. Activity FY 2014-2018 FY 2014 FY 2015 FY 2016 $1,544,000 $1,544,000 13,000,000 Construction Management 250,000 250,000 1,800,000 Design 120,000 100,000 100,000 10,000 70,000 Construction $5,000 $5,000 MCDOT Labor/Constructiom $10,000 MCDOT Labor/Design $10,000 $10,000 Right-of-Way Acquisition $50,000 $50,000 Utility Relocation/Accomodation $20,000 $20,000 $2,009,000 $205,000 Totals FY 2018 $120,000 Design Support During Construction Environmental Study/Clearances FY 2017 $1,804,000 $14,970,000 BOS District: 5 Federal Funds: Yes Intergovernmental Agreement (Cost Share) Project Partners or Partnership: City of Avondale, Arizona Department of Transportation Page 41 FY 2014 - 2018 Project Listing Project Manager: Faisal Saleem Phone: (602) 506-1241 Project Number T447 email: FaisalSaleem@mail.maricopa.gov Bell Road Adaptive Signals Study This study will determine the cost to install signal timing system to enable signal timing to systematically respond to the varying traffic conditions along Bell Road between Cotton Lane and 114th Avenue; 99th Avenue and 73rd Avenue; 35th Avenue and 19th Avenue as well as along Frank Lloyd Wright Boulevard between Scottsdale Road and Thompson Peak Parkway so that commuters will have a faster and safer commute. Budget total includes scoping labor and scoping study. Approved by the Board of Supervisors on May 31, 2013. Activity FY 2015 FY 2016 21,000,000 8,000,000 13,000,000 Construction Management 3,000,000 1,200,000 1,800,000 Design $100,000 100,000 100,000 70,000 70,000 FY 2014-2018 Construction FY 2014 10,000 10,000 MCDOT Labor/Constructiom MCDOT Labor/Design FY 2018 $100,000 Design Support During Construction Environmental Study/Clearances FY 2017 10,000 10,000 Utility Relocation/Accomodation 15,000 15,000 Additional Expenditures (IGA, Scoping, etc.) 28,000 28,000 $163,000 $163,000 Right-of-Way Acquisition Totals $9,370,000 $14,970,000 BOS District: 4 Federal Funds: Yes Page 42 FY 2014 - 2018 Project Listing Project Manager: James Sargent Phone: (602) 506-8678 Project Number T373 email: JamesSargent@mail.maricopa.gov Broadway Road at Watson Road Signal Installation Project This project will upgrade the existing traffic signals to improve safety, reduce congestion, and improve traffic flow. The Town of Buckeye is the lead agency. Budget total includes IGA payment. Approved by the Board of Supervisors on May 31, 2013. Activity FY 2014-2018 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 Construction Construction Management Design Design Support During Construction Environmental Study/Clearances MCDOT Labor/Constructiom MCDOT Labor/Design Right-of-Way Acquisition Utility Relocation/Accomodation Additional Expenditures (IGA, Scoping, etc.) $125,000 $125,000 Totals $125,000 $125,000 BOS District: 4 Intergovernmental Agreement (Cost Share) Project Partners or Partnership: Town of Buckeye Page 43 FY 2014 - 2018 Project Listing Project Manager: Cynthia Robinson Project Number T387 Phone: (602) 506-8796 email: CynthiaRobinson@mail.maricopa.gov Buckeye Yard Maintenance Facility Replacement Project This project is to design and build a new maintenance facility to replace the current facility which is at the end of its useful life. The current building is not connected into the Town of Buckeye’s sewer system or water supply. Water for the building is currently being supplied by its own well. The new building will be connected to the Town of Buckeye’s sewer and water systems. Approved by the Board of Supervisors on May 31, 2013. Activity FY 2014-2018 FY 2014 FY 2015 FY 2016 $4,050,000 $2,550,000 $1,500,000 13,000,000 30,000 20,000 10,000 1,800,000 100,000 100,000 70,000 70,000 Construction Construction Management Design 225,000 Design Support During Construction 200,000 Environmental Study/Clearances 225,000 1,5000,000 MCDOT Labor/Constructiom 200,000 25,000 1,5000,000 125,000 25,000 2,5000,000 125,000 300,000 $4,080,000 $2,570,000 MCDOT Labor/Design Right-of-Way Acquisition Utility Relocation/Accomodation Totals FY 2017 FY 2018 $1,510,000 $14,970,000 BOS District: 4 Intergovernmental Agreement (Cost Share) Project Partners or Partnership: Town of Buckeye Page 44 FY 2014 - 2018 Project Listing Project Manager: Tricia Brown Project Number T248 Phone: (602) 506-0896 email: TriciaBrown@mail.maricopa.gov Deer Valley Road/Williams Drive Extension and Traffic Improvement Project El Mirage Road to 109th Avenue This project will widen existing Williams Drive between El Mirage Road and 117th Avenue and construct a five-lane southeasterly extension of the roadway from Williams Drive and 117th Avenue, across the Agua Fria River, to the Deer Valley Road alignment on the east side of the river channel and continuation eastward for approximately one-quarter mile to tie into existing Deer Valley Road improvements at 109th Avenue. The project includes the construction of a new five-lane all-weather bridged crossing of the Agua Fria River channel and a crossing at approximately 111th Avenue over the future Agua Fria Truck Road Reliever (AFTRR) planned by the City of Peoria to avoid an at-grade connection and shared access between the two roadways. d Approved by the Board of Supervisors on May 31, 2013. Activity FY 2014-2018 Construction Construction Management Design Design Support During Construction Environmental Study/Clearances MCDOT Labor/Constructiom MCDOT Labor/Design Right-of-Way Acquisition Utility Relocation/Accomodation Totals FY 2014 FY 2015 FY 2016 800,000 1,090,000 189,000 100,000 89,000 1,000,000 1,000,000 140,000 70,000 1,890,000 $75,000 50,000 50,000 3,200,000 1,600,000 1,600,000 600,000 200,000 400,000 $26,044,000 FY 2018 $8,000,000 $10,900,000 $18,900,000 75,000 FY 2017 70,000 $1,925,000 $11,970,000 $12,149,000 BOS District: 4 Intergovernmental Agreement (Cost Share) Project Partners or Partnership: City of Peoria Page 45 FY 2014 - 2018 Project Listing Project Manager: Randy Dunsey Project Number T437 Phone: (602) 506-2166 email: DunseyR@mail.maricopa.gov Del Webb Boulevard at Hutton Drive Traffic Signal Installation and Traffic Safety Improvement Project This project will install a traffic signals to the median nose and median curb along Del Webb Boulevard, ADA-compliant sidewalk ramps and make other improvements to improve safety, reduce congestion and improve traffic flow. Approved by the Board of Supervisors on May 31, 2013. Activity FY 2014-2018 FY 2014 FY 2015 FY 2016 $500,000 $250,000 $250,000 13,000,000 70,000 35,000 35,000 1,800,000 150,000 150,000 Construction Construction Management Design Design Support During Construction Environmental Study/Clearances FY 2018 100,000 5,000 5,000 MCDOT Labor/Constructiom MCDOT Labor/Design FY 2017 70,000 20,000 20,000 $20,000 20,000 $765,000 $480,000 Right-of-Way Acquisition Utility Relocation/Accomodation Totals $285,000 $14,970,000 BOS District: 4 Page 46 FY 2014 - 2018 Project Listing Project Manager: Eric Mayer Project Number T410 Phone: (602) 506-8367 email: EricMayer@mail.maricopa.gov Dust Mitigation and Dirt Road Paving Projects Low Volume Road Program The Maricopa County Department of Transportation (MCDOT) Low Volume Road (LVR) Program is paving and improving dirt roads in the MCDOT Roadway System in compliance with federal EPA mandates and Maricopa County’s air quality plan. • • • • • 105th Street: Jenson Street to McKellips Road (0.5 mile) McKellips Road: 103rd Street to 105th Street (0.5 mile) 93rd Street: McLellan Road north to End of Maintenance (0.25 mile) 90th Place: Adobe Road north to End of Maintenance (0.25 mile) 91st Way: Adobe Road north to End of Maintenance (0.25 mile) Approved by the Board of Supervisors on May 31, 2013. Activity FY 2014-2018 FY 2014 FY 2015 FY 2016 $2,000,000 $2,000,000 8,000,000 13,000,000 1,200,000 1,800,000 Construction Construction Management FY 2017 FY 2018 Design Design Support During Construction 10,000 10,000 100,000 100,000 25,000 25,000 70,000 70,000 $2,035,000 $2,035,000 Environmental Study/Clearances MCDOT Labor/Constructiom MCDOT Labor/Design Right-of-Way Acquisition Utility Relocation/Accomodation Totals $9,370,000 $14,970,000 BOS District: All Page 47 FY 2014 - 2018 Project Listing Project Manager: Eric Mayer Project Number T411 Phone: (602) 506-8367 email: EricMayer@mail.maricopa.gov Dust Mitigation and Dirt Road Paving Projects Low Volume Road Program The Maricopa County Department of Transportation (MCDOT) Low Volume Road (LVR) Program is paving and improving dirt roads in the MCDOT Roadway System in compliance with federal EPA mandates and Maricopa County’s air quality plan. • • • • • • • • • • • 168th Avenue: from Dixileta Drive to Dove Wing Way 199th Avenue: from Happy Valley Road to Frontier Drive 205th Avenue: from Bradley Road to Gordon Way 205th Avenue: from Janice Road to Skinner Drive 206th Avenue: from Begin Road to Radford Road 227th Avenue: from Montgomery Road to Lone Mountain Road 227th Avenue: from Lone Mountain Road to Dove Valley Road Dove Valley Road: from 231st Avenue to 227th Avenue Frontier Drive: from 199th Avenue to 195th Avenue Frontier Drive: from Begin Road to Reems Road Galvin Street: from Begin Road to 211th Avenue • • • • • • • • • • Gordon Way: from 205th Avenue to Bradley Road Janice Road (Peak View Road): from Begin Road to 205th Avenue Janice Road (Peak View Road): from 205th Avenue to 203rd Avenue Lone Mountain Road: from Crozier Road to 215th Avenue Norwich Drive: from 193rd Avenue to 191st Avenue Patrick Lane: from 89th Avenue to 87th Avenue Planada Lane: from 87th Avenue to 83rd Avenue Radford Road: from 207th Avenue (Mitchell Road) to 206th Avenue Radford Road: from 206th Avenue to 205th Avenue Skinner Drive: from Begin Road to 205th Avenue Approved by the Board of Supervisors on May 31, 2013. Activity FY 2014-2018 Construction FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 $2,500,000 $2,500,000 Construction Management Design Design Support During Construction Environmental Study/Clearances 50,000 MCDOT Labor/Constructiom 25,000 $50,000 25,000 MCDOT Labor/Design 120,000 120,000 Right-of-Way Acquisition 100,000 100,000 Utility Relocation/Accomodation 100,000 100,000 $2,895,000 $370,000 Totals $2,525,000 BOS District: All Page 48 FY 2014 - 2018 Project Listing Project Manager: Ben Markert Project Number T433 Phone: (602) 506-8651 email: BenMarkert@mail.maricopa.gov Dust Mitigation and Dirt Road Paving Projects Low Volume Road Program Dove Valley Area The project includes scoping and final design with environmental documentation, right-of-way acquisition, utility relocations, and construction for the following road segments: • • • • • • 167th Avenue: Dixeleta Drive to Windstone Trail 168th Avenue: Dixeleta Drive to Dove Wing Way Dove Valley Road: 171st Avenue to 163rd Avenue White Wing Road: 171st Avenue to 163rd Avenue Montgomery Road: 171st Avenue to 163rd Avenue 163rd Avenue: Beginning of Maintenance to Dove Valley Road The Maricopa County Department of Transportation (MCDOT) Low Volume Road (LVR) Program is paving and improving dirt roads in the MCDOT Roadway System in compliance with federal EPA mandates and Maricopa County’s air quality plan. Approved by the Board of Supervisors on May 31, 2013. Activity FY 2014-2018 FY 2014 FY 2015 FY 2016 4,050,000 2,550,000 1,500,000 13,000,000 30,000 20,000 10,000 1,800,000 100,000 100,000 70,000 70,000 Construction Construction Management Design 225,000 Design Support During Construction 200,000 Environmental Study/Clearances 225,000 1,5000,000 MCDOT Labor/Constructiom 200,000 25,000 1,5000,000 125,000 25,000 2,5000,000 125,000 300,000 Additional Expenditures (IGA, Scoping, etc.) $140,000 $140,000 Totals $140,000 MCDOT Labor/Design Right-of-Way Acquisition Utility Relocation/Accomodation $140,000 FY 2017 FY 2018 $1,510,000 $14,970,000 BOS District: 4 Page 49 FY 2014 - 2018 Project Listing Project Manager: Randy Dunsey Project Number T424 Phone: (602) 506-2166 email: DunseyR@mail.maricopa.gov Dynamite Road at 52nd Street Traffic Signal Installation and Traffic Safety Improvement Project This project will install traffic signals and make other improvements to improve safety, reduce congestion, and improve traffic flow. Approved by the Board of Supervisors on May 31, 2013. Activity FY 2014-2018 FY 2014 FY 2015 FY 2016 $670,000 $335,000 $335,000 13,000,000 90,000 45,000 45,000 1,800,000 Construction Construction Management FY 2017 FY 2018 Design Design Support During Construction 100,000 Environmental Study/Clearances MCDOT Labor/Constructiom 40,000 20,000 $800,000 $400,000 20,000 70,000 MCDOT Labor/Design Right-of-Way Acquisition Utility Relocation/Accomodation Totals $400,000 $14,970,000 BOS District: 3 Page 50 FY 2014 - 2018 Project Listing Project Manager: Tricia Brown Phone: (602) 506-0896 Project Number T412 email: TriciaBrown@mail.maricopa.gov Eagle Eye Road at Tiger Wash Roadway Improvement Study This scoping study will review options for all-weather crossings, increasing safety and roadway improvements. The study includes the evaluation of a bridge crossing at the wash. Budget total includes scoping labor and scoping study. Approved by the Board of Supervisors on May 31, 2013. Activity FY 2014-2018 FY 2014 FY 2015 FY 2016 2,000,000 2,000,000 8,000,000 13,000,000 1,200,000 1,800,000 Construction Construction Management FY 2017 FY 2018 Design Design Support During Construction 10,000 10,000 100,000 100,000 25,000 25,000 70,000 70,000 Additional Expenditures (IGA, Scoping, etc.) $120,000 $120,000 Totals $120,000 $120,000 Environmental Study/Clearances MCDOT Labor/Constructiom MCDOT Labor/Design Right-of-Way Acquisition Utility Relocation/Accomodation $9,370,000 $14,970,000 BOS District: 4 Page 51 FY 2014 - 2018 Project Listing Project Manager: Tricia Brown Phone: (602) 506-0896 Project Number T434 email: TriciaBrown@mail.maricopa.gov East Mesa Subdivisions Pavement Rehabilitation Project This project will remove existing pavement and replace with new pavement and gutter as needed. Approved by the Board of Supervisors on May 31, 2013. Activity FY 2014-2018 FY 2014 FY 2015 $1,000,000 $1,000,000 2,500,000 50,000 50,000 50,000 50,000 25,000 $1,100,000 $1,100,000 $2,525,000 Construction Construction Management FY 2016 FY 2017 FY 2018 Design Design Support During Construction Environmental Study/Clearances MCDOT Labor/Constructiom MCDOT Labor/Design Right-of-Way Acquisition Utility Relocation/Accomodation Totals BOS District: 2 Page 52 FY 2014 - 2018 Project Listing Project Manager: Faisal Saleem Project Number T389 Phone: (602) 506-1241 email: FaisalSaleem@mail.maricopa.gov E-IntelliDrive Study Phase III (SMARTDrive Testbed) D M C LUB PK W U N TA IN ma ad De ash nW DR Project ME RI DIA N D R DES ERT H IL LS D R Activity FY 2014-2018 FY 2014 Construction Construction Management Design $50,000 FY 2015 FY 2016 1,500,000 13,000,000 10,000 1,800,000 100,000 100,000 70,000 70,000 FY 2017 19TH AVE Y MO R ED M EM O R I A L DAI SY EM Y PEA K E FR TH W G AV IL A N AN O M WY HE ANT D Approved by the Board of Supervisors on May 31, 2013. R The purpose of this study is to test Emergency and Transit Vehicle Priority System and also an advanced Pedestrian Crossing System along the Daisy Mountain Drive SMARTDrive testbed corridor in Anthem, Arizona. FY 2018 $50,000 Design Support During Construction Environmental Study/Clearances MCDOT Labor/Constructiom MCDOT Labor/Design 10,000 10,000 $60,000 $60,000 Right-of-Way Acquisition Utility Relocation/Accomodation Totals $1,510,000 $14,970,000 BOS District: 3 Federal Funds: Yes Page 53 FY 2014 - 2018 Project Listing Project Manager: Tricia Brown Phone: (602) 506-0896 Project Number T344 email: TriciaBrown@mail.maricopa.gov El Mirage Road Roadway Widening and Traffic Safety Improvement Project Northern Avenue to Cactus Road This project includes the widening of existing El Mirage Road (from just north of Northern Avenue to the Gateway Park entrance at Cinnabar Avenue just south of Peoria Avenue) to a seven-lane roadway (three travel lanes in each direction with a combination raised center median and flush center/left-turn lane). Additional improvements include the installation of curb, gutter, sidewalk, bike lanes, underground storm drain system, roadside retention basins, utility relocations and intersection improvements at Olive Avenue and Mountain View. d Approved by the Board of Supervisors on May 31, 2013. Activity FY 2014-2018 FY 2014 FY 2015 Construction FY 2016 FY 2017 FY 2018 10,900,000 Construction Management 1,090,000 Design Design Support During Construction 89,000 Environmental Study/Clearances MCDOT Labor/Constructiom MCDOT Labor/Design 70,000 $40,000 $20,000 $20,000 $40,000 $20,000 $20,000 $12,149,000 Right-of-Way Acquisition Utility Relocation/Accomodation Totals BOS District: 4 Federal Funds: Applied for funds Intergovernmental Agreement (Cost Share) Project Partners or Partnership: City of El Mirage Page 54 FY 2014 - 2018 Project Listing Project Manager: Tricia Brown Project Number T367 Phone: (602) 506-0896 email: TriciaBrown@mail.maricopa.gov El Mirage Road Roadway Widening and Traffic Safety Improvement Project Northern Avenue to Peoria Avenue This project includes the widening of existing El Mirage Road to a seven-lane roadway (three travel lanes in each direction with a continuous center left-turn lane) between Cinnabar Avenue south of Peoria Avenue and Cactus Road. Additional improvements include the installation of curb, gutter, sidewalk, bike lanes, underground storm drain system, roadside retention basins, utility relocations and intersection improvements at Peoria Avenue and Cactus Road. Approved by the Board of Supervisors on May 31, 2013. Activity FY 2014-2018 FY 2014 FY 2015 FY 2016 $6,000,000 $1,000,000 $5,000,000 13,000,000 Construction Construction Management FY 2017 FY 2018 1,800,000 Design 60,000 40,000 20,000 Design Support During Construction 90,000 60,000 30,000 100,000 Environmental Study/Clearances MCDOT Labor/Constructiom 70,000 MCDOT Labor/Design $30,000 30,000 Right-of-Way Acquisition 100,000 100,000 1,000,000 1,000,000 $7,280,000 $2,230,000 Utility Relocation/Accomodation Totals $5,050,000 $14,970,000 BOS District: 4 Intergovernmental Agreement (Cost Share) Project Partners or Partnership: City of El Mirage Page 55 FY 2014 - 2018 Project Listing Project Manager: Tricia Brown Phone: (602) 506-0896 Project Number T341 email: TriciaBrown@mail.maricopa.gov El Mirage Road Roadway Widening and Traffic Safety Improvement Project Picerne Road to Bell Road In partnership with the City of Surprise, the project will install new traffic signals, street lighting, curb/gutter and sidewalk, raised medians, three through travel lanes and dual left-turn lanes in all four directions, right-turn-only lanes for west and eastbound travel and a “free-flow” right-turn lane on westbound Bell Road for northbound travel onto El Mirage Road. The project also includes the widening of El Mirage Road between Bola Drive and Bell Road and drainage improvements on El Mirage Road from the Lizard Acres Wash crossing northward to just south of Bell Road. Approved by the Board of Supervisors on May 31, 2013. Activity FY 2014-2018 FY 2014 FY 2015 FY 2016 $2,250,000 $2,250,000 335,000 13,000,000 250,000 250,000 45,000 1,800,000 40,000 40,000 30,000 30,000 $2,570,000 $2,570,000 Construction Construction Management FY 2017 FY 2018 Design Design Support During Construction 100,000 Environmental Study/Clearances MCDOT Labor/Constructiom 20,000 70,000 MCDOT Labor/Design Right-of-Way Acquisition Utility Relocation/Accomodation Totals $400,000 $14,970,000 BOS District: 4 Intergovernmental Agreement (Cost Share) Project Partners or Partnership: City of Surprise Page 56 FY 2014 - 2018 Project Listing Project Manager: Bill Hahn Project Number T332 Phone: (602) 506-4611 email:BillHahn@mail.maricopa.gov Fort McDowell Road Drainage Improvement Project SR 87 (Beeline Highway) to Ba Hon Nah Road This project will construct roadway drainage improvements along Fort McDowell Road (Indian Route 1) between SR 87 (Beeline Highway) and Ba Hon Nah Road at the following four locations within the Fort McDowell Yavapai Nation: Fountain Hills Ba Hon Nah Rd N Fort McDowell Recreation Center Area 4 d aR Rd R ula Su am rqu ah Yavapai Rd Ha Area 1 - Fort McDowell Road approximately 3,200 feet north of SR 87 Area 2 - Fort McDowell Road and Mohave Road intersection Area 3 - Fort McDowell Road approximately 650 feet north of the Harquahula Road Area 4 - Fort McDowell Road at the Fort McDowell Recreation Center The purpose of this project is to improve drainage in these areas by preventing flows from storm events overtopping the roadway. Construction activities include grading, installation of storm drain pipe, channel excavation, and relocation of fiber optic conduit, cable, pull boxes, sewer service lines and water lines as necessary to facilitate drainage improvements. Mo hav eR d Area 2 Fort McDowell Rd Area 3 Area 1 Approved by the Board of Supervisors on May 31, 2013. Activity 87 FY 2014-2018 FY 2014 FY 2015 $600,000 $600,000 2,500,000 60,000 60,000 25,000 $660,000 $660,000 $2,525,000 Construction FY 2016 FY 2017 FY 2018 Construction Management Design Design Support During Construction Environmental Study/Clearances MCDOT Labor/Constructiom MCDOT Labor/Design Right-of-Way Acquisition Utility Relocation/Accomodation Totals BOS District: 2 Page 57 FY 2014 - 2018 Project Listing Project Manager: Nariman Zadeh Phone: (602) 506-8623 Project Number T339 email: NarimanZadeham@mail.maricopa.gov Gilbert Road at the Salt River Bridge Installation In coordination with the Salt River Pima-Maricopa Indian Community (SRPMIC), this project will design and construct a new six-lane all-weather crossing of Gilbert Road at the Salt River between Thomas Road and SR 87 that will carry both south and northbound traffic and replace both the existing bridge and the interim low-flow crossing with a single bridge structure and approach roadway. Design plans include the building of a new, longer bridge and roadway that will span the Salt River between both roads. Approved by the Board of Supervisors on May 31, 2013. Activity FY 2014-2018 FY 2014 FY 2015 Construction FY 2016 FY 2017 FY 2018 10,900,000 Construction Management 1,090,000 Design Design Support During Construction 89,000 Environmental Study/Clearances MCDOT Labor/Constructiom MCDOT Labor/Design 70,000 $5,000 $5,000 $5,000 $5,000 20,000 Right-of-Way Acquisition Utility Relocation/Accomodation Totals $20,000 $12,149,000 BOS District: 1 and 2 Federal Funds: Yes Intergovernmental Agreement (Cost Share) Project Partners or Partnership: MAG/Regional Transportation Plan, Salt River Pima - Maricopa Indian Community Page 58 FY 2014 - 2018 Project Listing Project Manager: Clem Ligocki Phone: (602) 506-8672 Project Number T441 email: ClemLigocki@mail.maricopa.gov Gilbert Road Improvements IGA Hunt Highway to Queen Creek Road The purpose of this project is to improve Gilbert Road from Queen Creek Road to Hunt Highway to City of Chandler standards. Improvements include widening to six lanes, adding bike lanes, curb and gutter, sidewalks, street lighting, new traffic signals and landscaping. The City of Chandler is the lead on this project. Budget total includes IGA Payment. Approved by the Board of Supervisors on May 31, 2013. FY 2014-2018 FY 2014 FY 2015 FY 2016 2,250,000 2,250,000 335,000 13,000,000 250,000 250,000 45,000 1,800,000 40,000 40,000 30,000 30,000 Additional Expenditures (IGA, Scoping, etc.) $1,037,000 $2,570,000 Activity Construction Construction Management FY 2017 FY 2018 Design Design Support During Construction 100,000 Environmental Study/Clearances MCDOT Labor/Constructiom 20,000 70,000 MCDOT Labor/Design Right-of-Way Acquisition Utility Relocation/Accomodation Totals $400,000 $14,970,000 $1,037,000 $1,037,000 $1,037,000 BOS District: 1 Intergovernmental Agreement (Cost Share) Project Partners or Partnership: City of Chandler Page 59 FY 2014 - 2018 Project Listing Project Manager: Ben Markert Project Number T345 Phone: (602) 506-8651 email: BenMarkert@mail.maricopa.gov MC 85 and 83rd Avenue Intersection Widening, Traffic Signal and Traffic Safety Improvement Project The project will widen MC 85 to five lanes, including bike lanes and a two-way left-turn lane, and will expand the intersections of MC 85 at 107th Avenue, 99th Avenue, 91st Avenue, 83rd Avenue, and 75th Avenue. Curb and gutter and sidewalk will be installed, and street lighting will be provided. The project involves extensive utility relocations. Raised medians will be constructed at each major intersection. Cross-streets will be widened approximately a quarter-mile north and south of MC 85. The Union Pacific Railroad crossing will be improved at 107th Avenue. Approved by the Board of Supervisors on May 31, 2013. Activity FY 2015 FY 2016 FY 2017 $13,600,000 $3,000,000 $7,000,000 $3,600,000 1,400,000 300,000 700,000 400,000 200,000 60,000 140,000 125,000 50,000 75,000 FY 2014-2018 Construction Construction Management FY 2014 FY 2018 Design Design Support During Construction Environmental Study/Clearances MCDOT Labor/Constructiom MCDOT Labor/Design 5,000,000 Right-of-Way Acquisition 5,000,000 Utility Relocation/Accomodation 3,000,000 Totals 23,325,000 $5,000,000 3,000,000 5,000,000 6,410,000 7,915,000 4,000,000 BOS District: 5 Intergovernmental Agreement (Cost Share) Project Partners or Partnership: City of Phoenix, City of Tolleson Page 60 FY 2014 - 2018 Project Listing Project Manager: James Sargent Phone: (602) 506-8678 Project Number T425 email: JamesSargent@mail.maricopa.gov MC 85 at Jackrabbit Road Traffic Signal Traffic Signal Replacement and Traffic Safety Improvement Project This project will replace existing traffic signals and make other improvements to improve safety, reduce congestion, and improve traffic flow. Approved by the Board of Supervisors on May 31, 2013. Activity FY 2014-2018 FY 2014 FY 2015 FY 2016 $350,000 $350,000 5,000,000 13,000,000 52,000 52,000 Construction Construction Management FY 2017 FY 2018 1,800,000 Design 20,000 Design Support During Construction 30,000 100,000 Environmental Study/Clearances MCDOT Labor/Constructiom 20,000 20,000 70,000 $422,000 $422,000 $5,050,000 $14,970,000 MCDOT Labor/Design Right-of-Way Acquisition Utility Relocation/Accomodation Totals BOS District: 4 Page 61 FY 2014 - 2018 Project Listing Project Manager: Randy Dunsey Project Number T352 Phone: (602) 506-2166 email: DunseyR@mail.maricopa.gov MC 85 ITS Project Litchfield Road to 83rd Avenue The purpose of this Intelligent Transportation System (ITS) project is to install fiber optic cable and wireless connections along MC 85 between Litchfield Road and 83rd Avenue to improve traffic control. Federal funding is available for the project in 2014. Approved by the Board of Supervisors on May 31, 2013. Activity FY 2014-2018 Construction FY 2014 FY 2015 $1,250,000 $1,250,000 Construction Management 150,000 150,000 Design 150,000 Design Support During Construction Environmental Study/Clearances FY 2018 10,000 5,000 MCDOT Labor/Constructiom 20,000 MCDOT Labor/Design 20,000 20,000 Right-of-Way Acquisition 10,000 10,000 Utility Relocation/Accomodation 20,000 20,000 $1,635,000 $205,000 Totals FY 2017 150,000 10,000 5,000 FY 2016 20,000 $1,430,000 BOS District: 5 Federal Funds: Yes Page 62 FY 2014 - 2018 Project Listing Project Manager: Nariman Zadeh Phone: (602) 506-8623 Project Number T342 email: NarimanZadeham@mail.maricopa.gov McKellips Road Improvement Study SR 101L to Alma School Road This scoping study will determine the type and cost of roadway improvements needed to address present and future travel demand, i.e. travel lanes, turning lanes, paved shoulders, drainage improvements and alignment improvements. This project is being conducted in cooperation with the Salt River Pima-Maricopa Indian Community (SRPMIC). Approved by the Board of Supervisors on May 31, 2013. Activity FY 2014-2018 FY 2014 FY 2015 Construction FY 2016 FY 2017 FY 2018 10,900,000 Construction Management 1,090,000 Design Design Support During Construction 89,000 Environmental Study/Clearances MCDOT Labor/Constructiom MCDOT Labor/Design 70,000 5,000 5,000 Additional Expenditures (IGA, Scoping, etc.) $340,000 $340,000 Totals $340,000 $340,000 20,000 Right-of-Way Acquisition Utility Relocation/Accomodation $20,000 $12,149,000 BOS District: 2 Federal Funds: Yes Intergovernmental Agreement (Cost Share) Project Partners or Partnership: Salt River Pima-Maricopa Indian Community (SRPMIC) Page 63 FY 2014 - 2018 Project Listing Project Manager: Clem Ligocki Project Number T442 Phone: (602) 506-8672 email: ClemLigocki@mail.maricopa.gov McQueen Road Improvements IGA Riggs Road to Ocotillo Road The purpose of this project is to improve McQueen Road from Ocotillo Road to Riggs Road to City of Chandler standards. Improvements include additional traffic lanes, bike lanes, curb and gutter, sidewalks, street lighting, new traffic signals and landscaping. The City of Chandler is the lead on this project. Budget total includes IGA Payment. Approved by the Board of Supervisors on May 31, 2013. Activity FY 2014-2018 FY 2014 FY 2015 FY 2016 2,250,000 2,250,000 335,000 13,000,000 250,000 250,000 45,000 1,800,000 40,000 40,000 30,000 30,000 Additional Expenditures (IGA, Scoping, etc.) $309,000 $2,570,000 Totals $309,000 Construction Construction Management FY 2017 FY 2018 Design Design Support During Construction 100,000 Environmental Study/Clearances MCDOT Labor/Constructiom 20,000 70,000 MCDOT Labor/Design Right-of-Way Acquisition Utility Relocation/Accomodation $400,000 $14,970,000 $309,000 $309,000 BOS District: 1 Federal Funds: Intergovernmental Agreement (Cost Share) Project Partners or Partnership: City of Chandler Page 64 FY 2014 - 2018 Project Listing Project Manager: Nariman Zadeh Phone: (602) 506-8623 Project Number T420 email: NarimanZadeham@mail.maricopa.gov Meridian Road and Empire Boulevard Intersection and Signal Improvement Project This intersection improvement project will improve the overall safety of the intersection and address future traffic demand. Improvements include upgrading the existing span-wire traffic signals to new pole-mounted traffic signals, restriping to provide left-turn lanes in all four directions, new pavement, gutter and curbing at the north and west legs of the intersection to match existing lane configurations and improvements at the south and east legs of the intersection. Approved by the Board of Supervisors on May 31, 2013. Activity FY 2014-2018 FY 2014 FY 2015 FY 2016 $1,370,000 5,0$$$1,370,000 13,000,000 Construction Management 205,000 205,000 1,800,000 Design 150,000 10,000 10,000 100,000 MCDOT Labor/Constructiom 30,000 30,000 70,000 MCDOT Labor/Design 30,000 30,000 Right-of-Way Acquisition 170,000 170,000 Utility Relocation/Accomodation 300,000 300,000 $2,265,000 $650,000 Construction Design Support During Construction FY 2017 FY 2018 $150,000 Environmental Study/Clearances Totals $1,615,000 $14,970,000 BOS District: 1 Page 65 FY 2014 - 2018 Project Listing Project Manager: Bill Hahn Project Number T304 Phone: (602) 506-4611 email:BillHahn@mail.maricopa.gov Miller Road at the BWCDD Canal Bridge Replacement Project The bridge replacement project consists of replacing the Miller Road Bridge deck and adjusting the road and bridge design to accommodate the future ultimate five-lane roadway. Additionally, the Buckeye Water Conservation and Drainage District (BWCDD) lateral pipeline and turnout structures will be relocated and a new concrete canal lining will be installed as part of the construction effort. Approved by the Board of Supervisors on May 31, 2013. Activity FY 2014-2018 FY 2014 FY 2015 $1,100,000 $1,100,000 250,000 120,000 120,000 Construction Construction Management FY 2016 FY 2017 FY 2018 Design Design Support During Construction 10,000 Environmental Study/Clearances MCDOT Labor/Constructiom 30,000 30,000 20,000 $1,250,000 $1,250,000 $1,430,000 MCDOT Labor/Design Right-of-Way Acquisition Utility Relocation/Accomodation Totals BOS District: 4 Intergovernmental Agreement (Cost Share) Project Partners or Partnership: Town of Buckeye Page 66 FY 2014 - 2018 Project Listing Project Manager: Bill Hahn Project Number T338 Phone: (602) 506-4611 email:BillHahn@mail.maricopa.gov Miller Road Improvement Project I-10 to One Mile North This roadway improvement project will pave and improve the existing dirt road segment of Miller Road between I-10 and one mile north. The project will include utility relocation, drainage improvements, paving and striping for a center turn lane. Budget total includes scoping labor and scoping study.d Approved by the Board of Supervisors on May 31, 2013. Activity FY 2014-2018 Construction Construction Management Design Design Support During Construction Environmental Study/Clearances MCDOT Labor/Constructiom MCDOT Labor/Design Right-of-Way Acquisition FY 2014 FY 2015 FY 2016 18,900,000 8,000,000 10,900,000 1,890,000 800,000 1,090,000 189,000 100,000 89,000 1,000,000 1,000,000 140,000 70,000 75,000 FY 2017 FY 2018 75,000 50,000 50,000 3,200,000 1,600,000 70,000 1,600,000 Utility Relocation/Accomodation Additional Expenditures (IGA, Scoping, etc.) $365,000 Totals $365,000 $365,000 $11,970,000 $12,149,000 $365,000 BOS BOS District: 4 Page 67 FY 2014 - 2018 Project Listing Project Manager: Mazen Muradvich Phone: (602) 506-8689 Project Number T445 email: MazenMuradvich@mail.maricopa.gov New River Road Sight Distance Improvement Study Maricopa Trail Crossing at Linda Lane The Maricopa County Trail System crosses New River Road just south of Linda Lane. Due to limited sight distance to observe on-coming traffic hikers are in danger when crossing the road. This scoping study will determine the type and cost of roadway improvements needed, so hikers will be able to cross safely and the travelers will have a safer route to travel. Approved by the Board of Supervisors on May 31, 2013. Activity FY 2014-2018 Construction Construction Management FY 2014 FY 2015 FY 2016 FY 2017 3,000,000 3,000,000 7,000,000 3,600,000 300,000 300,000 700,000 400,000 60,000 60,000 140,000 50,000 75,000 FY 2018 Design Design Support During Construction Environmental Study/Clearances MCDOT Labor/Constructiom MCDOT Labor/Design Right-of-Way Acquisition $40,000 $$40,000 20,000 20,000 Utility Relocation/Accomodation Totals 3,000,000 $60,000 $60,000 6,410,000 7,915,000 4,000,000 BOS District: 3 Page 68 FY 2014 - 2018 Project Listing Project Manager: Ben Markert Phone: (602) 506-8651 Project Number T347 email: BenMarkert@mail.maricopa.gov Northern Parkway Program Dysart Road to 111th Avenue/Agua Fria River Freeway Project This project will provide a capacity enhancement to the Northern Parkway on the current Northern Avenue alignment between Dysart Road and 111th Avenue. The project includes constructing a bridge over the Agua Fria River. This project is part of the 20-year multi–phased Northern Parkway Program in partnership with the Maricopa Association of Governments and the cities of El Mirage, Glendale and Peoria. Approved by the Board of Supervisors on May 31, 2013. Activity FY 2014-2018 FY 2014 FY 2015 FY 2016 $11,820,000 5,0$1,370,000 13,000,000 Construction Management 1,840,000 205,000 1,800,000 Design 1,026,000 10,000 100,000 30,000 70,000 Construction FY 2017 FY 2018 $820,000 $11,000,000 140,000 1,700,000 $960,000 $12,700,000 $1,026,000 Design Support During Construction Environmental Study/Clearances MCDOT Labor/Constructiom MCDOT Labor/Design Right-of-Way Acquisition Utility Relocation/Accomodation Totals 50,000 50,000 4,180,000 4,180,000 140,000 140,000 $19,056,000 $5,396,000 $5,050,000 $14,970,000 BOS District: 4 Federal Funds: Yes Intergovernmental Agreement (Cost Share) Project Partners or Partnership: Maricopa Association of Governments, City of El Mirage, City of Glendale, City of Peoria Page 69 FY 2014 - 2018 Project Listing Project Manager: Ben Markert Project Number T427 Phone: (602) 506-8651 email: BenMarkert@mail.maricopa.gov Northern Parkway Program Dysart Road Overpass Project This project will construct a Northern Parkway bridge over Dysart Road. The Northern Parkway is a 12-mile long corridor converting Northern Avenue from its current condition into an access-controlled parkway containing three through travel lanes in each direction. The parkway will include grade-separated interchanges at the major crossroads and will connect to US 60 and SR 303L with directional/freeway style ramps. This project is part of the 20-year multi–phased Northern Parkway Program in partnership with the Maricopa Association of Governments and the cities of El Mirage, Glendale and Peoria. Approved by the Board of Supervisors on May 31, 2013. Activity FY 2014-2018 Construction Construction Management FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 $10,000,000 $19,581,000 $29,581,000 2,785,000 $500,000 $2,285,000 20,000 Design Design Support During Construction Environmental Study/Clearances MCDOT Labor/Constructiom MCDOT Labor/Design 60,000 5,000 20,000 $32,426,000 340,000 $520,000 20,000 Right-of-Way Acquisition Utility Relocation/Accomodation Totals $2,305,000 $10,020,000 $19,581,000 BOS District: 4 Federal Funds: Yes Intergovernmental Agreement (Cost Share) Project Partners or Partnership: Maricopa Association of Governments, City of El Mirage, City of Glendale, City of Peoria Page 70 FY 2014 - 2018 Project Listing Project Manager: Ben Markert Project Number T372 Phone: (602) 506-8651 email: BenMarkert@mail.maricopa.gov Northern Parkway Program Northern Avenue/SR 101L Overpass Project This project will construct an overpass along the Northern Parkway over SR 101L. The Northern Parkway is a 12-mile long corridor converting Northern Avenue from its current condition into an access controlled-parkway containing three travel lanes in each direction. The parkway will include grade-separated interchanges at the major crossroads and will connect to US 60 and SR 303L with directional/ freeway style ramps. This project is part of the 20-year multi–phased Northern Parkway Program in partnership with the Maricopa Association of Governments and the cities of El Mirage, Glendale and Peoria. Approved by the Board of Supervisors on May 31, 2013. Activity FY 2014-2018 Construction FY 2014 FY 2015 FY 2016 $7,200,000 FY 2017 FY 2018 $7,200,000 Construction Management Design 730,000 $150,000 $580,000 Design Support During Construction Environmental Study/Clearances MCDOT Labor/Constructiom 100,000 MCDOT Labor/Design 200,000 Right-of-Way Acquisition Utility Relocation/Accomodation Totals 100,000 100,000 3,350,000 3,350,000 900,000 900,000 $12,480,000 $100,000 $150,000 $1,580,000 $3,450,000 $7,300,000 BOS District: 4 Federal Funds: Yes Intergovernmental Agreement (Cost Share) Project Partners or Partnership: Maricopa Association of Governments, City of El Mirage, City of Glendale, City of Peoria Page 71 FY 2014 - 2018 Project Listing Project Manager: Ben Markert Project Number T369 Phone: (602) 506-8651 email: BenMarkert@mail.maricopa.gov Northern Parkway Program Reems Road/Litchfield Road Overpass Project This project will construct two grade separated Northern Parkway overpasses over Reems Road and Litchfield Road. The Northern Parkway is a 12-mile long corridor converting Northern Avenue from its current condition into an access-controlled parkway containing three through travel lanes in each direction. The parkway will include grade-separated interchanges at the major crossroads and will connect to US 60 and SR 303L with directional/freeway style ramps. This project is part of the 20-year multi–phased Northern Parkway Program in partnership with the Maricopa Association of Governments and the cities of El Mirage, Glendale and Peoria. Approved by the Board of Supervisors on May 31, 2013. Activity FY 2014 FY 2015 FY 2016 FY 2017 $8,446,500 $7,446,500 $1,000,000 7,000,000 3,600,000 1,762,000 100,000 700,000 400,000 FY 2014-2018 Construction Construction Management 1,862,000 FY 2018 Design Design Support During Construction 140,000 Environmental Study/Clearances MCDOT Labor/Constructiom 50,000 50,000 75,000 MCDOT Labor/Design Right-of-Way Acquisition Utility Relocation/Accomodation Totals $10,358,500 $9,258,500 $1,100,000 7,915,000 4,000,000 BOS District: 4 Federal Funds: Yes Intergovernmental Agreement (Cost Share) Project Partners or Partnership: Maricopa Association of Governments, City of El Mirage, City of Glendale, City of Peoria Page 72 FY 2014 - 2018 Project Listing Project Manager: Ben Markert Project Number T195 Phone: (602) 506-8651 email: BenMarkert@mail.maricopa.gov Northern Parkway Program Sarival Road to Dysart Road Project This initial phase of the Northern Parkway Program, extending between Sarival Avenue and Dysart Road, will construct an interim four-lane roadway consisting of the eastbound and westbound auxiliary lanes and the two outside travel lanes to achieve the interim roadway configuration of two travel lanes in each direction of the ultimate six-lane Northern Parkway. A center concrete barrier and an additional inside lane in each direction will be added in the future to form the ultimate six-lane configuration. Connecting ramps for future grade-separated intersections (over-passes); bridge structures at the BNSF spur/143rd Avenue and Sarival Avenue crossings; new curb, gutter and street lighting at on/off ramps and intersecting cross streets; and the installation of new traffic signals at Sarival Avenue, Reems Road and Litchfield Road will also be constructed as part of this current project. This project is part of the 20-year multi–phased Northern Parkway Program in partnership with the Maricopa Association of Governments and the cities of El Mirage, Glendale and Peoria. Approved by the Board of Supervisors on May 31, 2013. Activity FY 2014-2018 FY 2014 FY 2015 FY 2016 $4,000,000 $4,000,000 335,000 13,000,000 670,000 670,000 1,850,000 850,000 Construction Construction Management Design FY 2017 FY 2018 1,800,000 $1,000,000 Design Support During Construction 100,000 Environmental Study/Clearances MCDOT Labor/Constructiom MCDOT Labor/Design Right-of-Way Acquisition 25,000 25,000 70,000 150,000 75,000 75,000 3,500,000 1,000,000 500,000 $1,000,000 $1,000,000 3,600,000 3,6000,000 $1,575,000 $1,000,000 $1,000,000 Utility Relocation/Accomodation Construction Landscaping Totals BOS District: 4 Federal Funds: Yes $13,795,000 $10,220,000 250,000 20,000 Intergovernmental Agreement (Cost Share) Project Partners or Partnership: Maricopa Association of Governments, 40,000 City of El Mirage, City of Glendale, City of Peoria, Flood Control District of Maricopa County Page 73 30,000 $400,000 FY 2014 - 2018 Project Listing Project Manager: Clem Ligocki Phone: (602) 506-8672 Project Number T443 email: ClemLigocki@mail.maricopa.gov Ocotillo Road Improvements IGA Arizona Avenue to McQueen Road The purpose of this project is to improve Ocotillo Road from Arizona Avenue to Riggs Road to City of Chandler standards. Improvements include widening to four lanes, adding curb and gutter, sidewalks, street lighting, new traffic signals and landscaping. The City of Chandler is the lead on this project. Budget total includes IGA Payment. Approved by the Board of Supervisors on May 31, 2013. Activity FY 2014-2018 Construction Construction Management FY 2014 FY 2015 FY 2016 29,581,000 2,785,000 500,000 2,285,000 FY 2017 FY 2018 10,000,000 19,581,000 Design Design Support During Construction Environmental Study/Clearances MCDOT Labor/Constructiom MCDOT Labor/Design 60,000 5,000 20,000 20,000 Additional Expenditures (IGA, Scoping, etc.) $1,120,000 340,000 $520,000 $2,305,000 20,000 Right-of-Way Acquisition Utility Relocation/Accomodation Totals $1,120,000 $1,120,000 $19,581,000 $1,120,000 BOS District: 1 Intergovernmental Agreement (Cost Share) Project Partners or Partnership: City of Chandler Page 74 FY 2014 - 2018 Project Listing Project Manager: Tricia Brown Project Number T404 Phone: (602) 506-0896 email: TriciaBrown@mail.maricopa.gov Olive Avenue Roadway Improvement Study El Mirage Road to White Tank Mountain Park This scoping study will determine the type and cost of roadway improvements needed, i.e. travel lanes, turning lanes, paved shoulders, drainage improvements and alignment improvements. Approved by the Board of Supervisors on May 31, 2013. Activity FY 2014-2018 FY 2014 Construction FY 2015 FY 2016 335,000 13,000,000 FY 2018 1,800,000 Construction Management Design FY 2017 $500,000 $500,000 1,000,000 Design Support During Construction 100,000 Environmental Study/Clearances MCDOT Labor/Constructiom MCDOT Labor/Design 70,000 50,000 50,000 Right-of-Way Acquisition 75,000 500,00 1,000,000 1,000,000 Utility Relocation/Accomodation Totals $550,000 $550,000 $1,575,000 $14,970,000 BOS District: 4 20,000 $400,000 Page 75 FY 2014 - 2018 Project Listing Project Manager: Nariman Zadeh Phone: (602) 506-8623 Project Number T305 email: NarimanZadeham@mail.maricopa.gov Power Road Roadway Widening, Drainage and Traffic Safety Improvement Project Pecos Road to SR 202L (San Tan Freeway) The purpose of this project is to improve Power Road from Pecos Road to SR 202L (San Tan Freeway). Improvements will include widening the roadway to a six-lane urban principal arterial roadway with raised landscaped medians, dual left-turn lanes at major intersections, bike lanes, curb and gutter, driveways, bus stops and pullouts, landscaped areas, signage and street lighting. The City of Mesa will lead the project. Gilbert and Mesa will annex any remaining unincorporated portions of Power Road within the limits of the project and will be responsible for the operation and maintenance of the project located within each of their respective jurisdictions. Budget total incudes IGA Payment. Approved by the Board of Supervisors on May 31, 2013. Activity FY 2014-2018 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 11,820,000 5,01,370,000 13,000,000 820,000 11,000,000 Construction Management 1,840,000 205,000 1,800,000 140,000 1,700,000 Design 1,026,000 10,000 100,000 30,000 70,000 Construction 1,026,000 Design Support During Construction Environmental Study/Clearances MCDOT Labor/Constructiom MCDOT Labor/Design 50,000 50,000 Right-of-Way Acquisition 4,180,000 4,180,000 Utility Relocation/Accomodation 1,000,000 1,000,000 Additional Expenditures (IGA, Scoping, etc.) $2,065,030 $2,065,030 Totals $2,065,030 $2,065,030 $1,615,000 $14,970,000 BOS Districts: 1 and 2 Intergovernmental Agreement (Cost Share) Project Partners or Partnership: City of Mesa, Town of Gilbert Page 76 FY 2014 - 2018 Project Listing Project Manager: Faisal Saleem Project Number T448 Phone: (602) 506-1241 email: FaisalSaleem@mail.maricopa.gov R.H. Johnson Boulevard ITS Communications Study The purpose of this Intelligent Transportation System (ITS) study is to determine the cost to install fiber optic cable and wireless connections along R.H. Johnson Boulevard between Bell Road and Grand Avenue so that commuters will experience less delays and safer commute. H 12 R FY 2014-2018 FY 2014 FY 2015 $70,000 $70,000 580,000 10,000 10,000 100,000 FY 2016 DY SA R T R D PAR K BE LL R D LI T C HF I EL D RD PL S VI EW M EE EL M I R A G E R D L 8T EK IN O SO D SUN D L DE A VE OL D E L MIR A G E R D D ME AM C RI S LV BL LV ST VD ER B W B E B N E D SO VI LV S T A RD U D LV U N TAIN L L EY D R B R H JO H N R Activity V 1 3 5TH AVE MO WI LL I A MS D R A AV E Budget total includes scoping labor and scoping study. Approved by the Board of Supervisors on May 31, 2013. D EE R 151ST SURPRISE FY 2017 Project EL MIRAGE FY 2018 Construction Construction Management Design Design Support During Construction Environmental Study/Clearances MCDOT Labor/Constructiom MCDOT Labor/Design Right-of-Way Acquisition Utility Relocation/Accomodation Additional Expenditures (IGA, Scoping, etc.) Totals 900,000 23,000 23,000 $103,000 103,000 $1,580,000 BOS District: 4 Page 77 FY 2014 - 2018 Project Listing Project Manager: Nariman Zadeh Project Number T251 Phone: (602) 506-8623 email: NarimanZadeham@mail.maricopa.gov Riggs Road Widening Traffic and Drainage Improvement Project Ellsworth Road to Signal Butte Road The Riggs Road, Ellsworth Road to Signal Butte Road transportation improvement project will construct a new six-lane divided roadway with a center raised median and curb and gutter. The western connection will tie into a recently completed Ellsworth intersection at Riggs Road. The eastern limit will terminate at Signal Butte Road. The new 140 foot right-of-way will also contain a new storm drain system, irrigation crossings and relocated utilities. Private irrigation shall be relocated to outside the right-of-way limits. The primary purpose of this project is to provide an eastward extension of this important east/west corridor to enhance the regional transportation network system. Approved by the Board of Supervisors on May 31, 2013. Activity Construction FY 2014-2018 FY 2014 FY 2015 FY 2016 29,581,000$$$5,000,000 500,000 Construction Management Design FY 2017 FY 2018 10,000,000 $5,000,000 2,285,000 500,000 500,000 MCDOT Labor/Constructiom 50,000 50,000 MCDOT Labor/Design 75,000 Design Support During Construction Environmental Study/Clearances Right-of-Way Acquisition 5,000 20,000 20,000 $75,000 2,000,000 2,000,000 Utility Relocation/Accomodation Totals $7,625,000 340,000 $520,000 $2,305,000 $2,075,000 $5,550,000 BOS District: 1 Federal Funds: Yes Intergovernmental Agreement (Cost Share) Project Partners or Partnership: Town of Queen Creek Page 78 FY 2014 - 2018 Project Listing Project Manager: Nariman Zadeh Project Number T375 Phone: (602) 506-8623 email: NarimanZadeham@mail.maricopa.gov Riggs Road Widening Traffic and Drainage Improvement Project Hawes Road to Ellsworth Road This project will widen Riggs Road to a five-lane roadway from Hawes Road to Ellsworth Road and improve drainage. An IGA between Maricopa County and the Town of Queen Creek allows for MCDOT to design and construct the project. Upon completion of the project, MCDOT will maintain the bridge and the roadway for the next five years. After five years, the Town of Queen Creek will annex the bridge and roadway and will assume the maintenance. Approved by the Board of Supervisors on May 31, 2013. Activity FY 2014-2018 FY 2014 FY 2015 FY 2016 FY 2017 $3,425,000 $3,425,000 1,000,000 7,000,000 3,600,000 345,000 345,000 100,000 700,000 400,000 40,000 40,000 140,000 50,000 50,000 75,000 $3,860,000 $3,860,000 Construction Construction Management FY 2018 Design Design Support During Construction Environmental Study/Clearances MCDOT Labor/Constructiom MCDOT Labor/Design Right-of-Way Acquisition Utility Relocation/Accomodation Totals $1,100,000 7,915,000 4,000,000 BOS District: 1 Intergovernmental Agreement (Cost Share) Project Partners or Partnership: Town of Queen Creek Page 79 FY 2014 - 2018 Project Listing Project Manager: Nariman Zadeh Project Number T406 Phone: (602) 506-8623 email: NarimanZadeham@mail.maricopa.gov Riggs Road Widening Traffic and Drainage Improvement Project Power Road to Hawes Road Riggs Road is expected to be a regional route once the segment from Ellsworth Road to Meridian Road is opened. This project includes the widening of Riggs Road to between a five-lane “interim” and seven-lane ultimate section, including the addition of left-turn lanes in each direction and dedicated right turns at the Riggs Road/Power Road and Riggs Road/Sossaman Road intersections. The project also includes the modification/ relocation of the current traffic signals at the Riggs Road intersections with Power Road and Sossaman Road; minor on-site and off-site roadway drainage improvements; the extension of the channel along the 198th Street alignment between Riggs Road and the Sonoqui Wash (approximately 2,500 feet in length); and relocation of SRP 12kV facilities, Queen Creek Irrigation District irrigation facilities and other utilities and obstructions within the roadway clear zone. Approved by the Board of Supervisors on May 31, 2013. FY 2015 FY 2016 $4,000,000 $1,500,000 $2,500,000 Construction Management 600,000 200,000 400,000 Design 400,000 $400,000 Environmental Study/Clearances 25,000 25,000 MCDOT Labor/Constructiom 80,000 40,000 40,000 MCDOT Labor/Design 25,000 25,000 Right-of-Way Acquisition 700,000 200,000 Utility Relocation/Accomodation 500,000 Activity FY 2014-2018 Construction FY 2014 FY 2017 FY 2018 Design Support During Construction Totals $6,330,000 500,000 1,000,000 500,000 $650,000 $2,740,000 $2,940,000 BOS District: 1 Intergovernmental Agreement (Cost Share) Project Partners or Partnership: Town of Queen Creek Page 80 FY 2014 - 2018 Project Listing Project Manager: Nariman Zadeh Project Number T429 Phone: (602) 506-8623 email: NarimanZadeham@mail.maricopa.gov Riggs Road Widening Traffic and Drainage Improvement Study Recker Road to Power Road Riggs Road is expected to be a regional route once the segment from Ellsworth Road to Meridian Road is opened. In anticipation, this scoping study will determine the type and cost of roadway improvements necessary, i.e. travel lanes, turning lanes, paved shoulders, drainage improvements and alignment improvements. Budget total includes scoping labor and scoping study. GILBERT SE VIL LE Approved by the Board of Supervisors on May 31, 2013. V BL QUEEN CREEK D Project PO W ER RD REC KER RD RIG G S R D SAN TAN BLVD Activity FY 2014-2018 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 11,820,000 5,01,370,000 13,000,000 820,000 11,000,000 Construction Management 1,840,000 205,000 1,800,000 140,000 1,700,000 Design 1,026,000 10,000 100,000 30,000 70,000 Construction 1,026,000 Design Support During Construction Environmental Study/Clearances MCDOT Labor/Constructiom MCDOT Labor/Design 50,000 50,000 Right-of-Way Acquisition 4,180,000 4,180,000 Utility Relocation/Accomodation 1,000,000 1,000,000 Additional Expenditures (IGA, Scoping, etc.) $200,000 $200,000 Totals $200,000 $200,000 $1,615,000 $14,970,000 BOS District: 1 Page 81 FY 2014 - 2018 Project Listing Project Manager: Steve Poole Project Number T438 Phone: (602) 506-8660 email: StevePoole@mail.maricopa.gov Roadway Flooded Warning Signs Installation Project This project will install automatic warning signs at strategic low flow crossings to warn motorists not to cross when flooded to improve safety. Approved by the Board of Supervisors on May 31, 2013. FY 2014-2018 FY 2014 FY 2015 $500,000 $250,000 $250,000 70,000 35,000 35,000 150,000 150,000 5,000 5,000 MCDOT Labor/Constructiom 40,000 20,000 MCDOT Labor/Design 20,000 20,000 20,000 20,000 $805,000 $500,000 Activity Construction Construction Management Design FY 2016 FY 2017 FY 2018 Design Support During Construction Environmental Study/Clearances 20,000 Right-of-Way Acquisition Utility Relocation/Accomodation Totals $305,000 BOS District: All Intergovernmental Agreement (Cost Share) Project Partners or Partnership: Flood Control District of Maricopa County Page 82 FY 2014 - 2018 Project Listing Project Manager: Randy Dunsey Project Number T333 Phone: (602) 506-2166 email: DunseyR@mail.maricopa.gov Sossaman Road and Elliot Road Traffic Signal Installation and Traffic Safety Improvement Project This project will widen the intersection to include left-turn lanes on all approaches; install a traffic signal and street lighting; install ADA-compliant sidewalk ramps; install new pavement marking and signing; and extend an existing box culvert. Approved by the Board of Supervisors on May 31, 2013. Activity FY 2014-2018 FY 2014 FY 2015 FY 2016 FY 2017 $1,600,000 $800,000 $800,000 7,000,000 3,600,000 240,000 120,000 120,000 700,000 400,000 Construction Construction Management FY 2018 Design Design Support During Construction 140,000 Environmental Study/Clearances MCDOT Labor/Constructiom 40,000 20,000 20,000 75,000 $1,880,000 $940,000 $940,000 7,915,000 MCDOT Labor/Design Right-of-Way Acquisition Utility Relocation/Accomodation Totals 4,000,000 BOS District: 2 Page 83 FY 2014 - 2018 Project Listing Project Manager: James Sargent Phone: (602) 506-8678 Project Number T365 email: JamesSargent@mail.maricopa.gov Traffic Calming This project will install speed humps or other traffic calming features to reduce speeding and cut-through traffic on qualifying local roads. Approved by the Board of Supervisors on May 31, 2013. Activity FY 2014-2018 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 $480,000 $80,000 $100,000 $100,000 $100,000 $100,000 MCDOT Labor/Constructiom 90,000 10,000 20,000 20,000 20,000 20,000 MCDOT Labor/Design 10,000 10,000 80,000 80,000 80,000 80,000 $200,000 $200,000 $200,000 $200,000 Construction Construction Management Design Design Support During Construction Environmental Study/Clearances Right-of-Way Acquisition Utility Relocation/Accomodation Additional Expenditures (IGA, Scoping, etc.) Totals 320,000 $900,000 $100,000 BOS District: All Page 84 FY 2014 - 2018 Project Listing Project Manager: James Sargent Phone: (602) 506-8678 Project Number T426 email: JamesSargent@mail.maricopa.gov University Drive at Signal Butte Road/Crismon Road Traffic Signal Replacement and Traffic Safety Improvement Project This project will replace existing traffic signals and make other improvements to improve safety, reduce congestion, and improve traffic flow at the two intersections. Approved by the Board of Supervisors on May 31, 2013. Activity FY 2014-2018 FY 2014 FY 2015 FY 2016 $495,000 $495,000 1,500,000 2,500,000 75,000 75,000 200,000 400,000 20,000 20,000 40,000 40,000 Construction Construction Management FY 2017 FY 2018 Design Design Support During Construction Environmental Study/Clearances MCDOT Labor/Constructiom MCDOT Labor/Design Right-of-Way Acquisition 500,000 Utility Relocation/Accomodation 500,000 Totals $590,000 $590,000 $2,740,000 1,000,000 $2,940,000 BOS District: 2 Page 85 FY 2014 - 2018 Project Listing Project Manager: Faisal Saleem Project Number T419 Phone: (602) 506-1241 email: FaisalSaleem@mail.maricopa.gov West Valley Dynamic Message Sign Installation Project SA RIVAL AVE CO TTO N L N DY SA R T R D CEN TR AL AVE GOODYEAR YU MA R D EST R ELL A PK WY Approved by the Board of Supervisors on May 31, 2013. Project LI T C HF I EL D R D VA N BU REN ST BU LLA R D AVE The purpose of this project is to install five Dynamic Message Signs (DMS), including the design and installation of the new DMS and associated structures, shaft foundations, surface trenching, the installation of fiber optic cable and CCTV (Closed Circuit Television) cameras along McDowell Road and MC 85 to provide commuters MCD O WEL L RD real time traffic information so they will experience less delays and safer commute. LO W ER B UCKE YE RD AVONDALE Project Activity FY 2014-2018 Construction Construction Management $821,000 123,000 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 $821,000 5,01,370,000 13,000,000 820,000 11,000,000 205,000 1,800,000 140,000 1,700,000 10,000 100,000 30,000 70,000 123,000 Design Design Support During Construction Environmental Study/Clearances MCDOT Labor/Constructiom 20,000 20,000 $964,000 $964,000 MCDOT Labor/Design Right-of-Way Acquisition Utility Relocation/Accomodation Totals $1,615,000 $14,970,000 BOS Districts: 4 and 5 Federal Funds: Yes Intergovernmental Agreement (Cost Share) Project Partners or Partnership: City of Goodyear Page 86 Table of Contents Ongoing Projects (cont.) T410 T411 T433 T424 T412 T434 T389 T344 T367 T341 T332 T339 T441 T345 T425 T352 T342 T442 T420 T304 T338 T445 T347 T427 T372 T369 T195 T443 T404 T305 T448 T251 T375 T406 T429 T438 T333 T365 T426 T419 Dust Mitigation and Dirt Road Paving Projects: Low Volume Road Program.............................................................. 47 Dust Mitigation and Dirt Road Paving Projects: Low Volume Road Program.............................................................. 48 Dust Mitigation and Dirt Road Paving Projects: Low Volume Road Program Dove Valley Area.................................. 49 Dynamite Road at 52nd Street Traffic Signal Installation and Traffic Safety Improvement Project ............................. 50 Eagle Eye Road at Tiger Wash Roadway Improvement Study..................................................................................... 51 East Mesa Subdivisions Pavement Rehabilitation Project............................................................................................ 52 E-IntelliDrive Study, Phase III (SMARTDrive Testbed) .................................................................................................. 53 El Mirage Road Roadway Widening and Traffic Safety Improvement Project: Northern Avenue to Cactus Road......... 54 El Mirage Road Roadway Widening and Traffic Safety Improvement Project: Northern Avenue to Peoria Avenue........ 55 El Mirage Road Roadway Widening and Traffic Safety Improvement Project: Picerne Road to Bell Road .................... 56 Fort McDowell Road Drainage Improvement Project SR 87 (Beeline Highway) to Ba Hon Nah Road........................ 57 Gilbert Road at the Salt River Bridge Installation......................................................................................................... 58 Gilbert Road Improvements IGA: Hunt Highway to Queen Creek Road ..................................................................... 59 MC 85 and 83rd Avenue Intersection Widening, Traffic Signal and Traffic Safety Improvement Project..................... 60 MC 85 at Jackrabbit Road Traffic Signal Replacement and Traffic Safety Improvement Project................................ 61 MC 85 ITS Project: Litchfield Road to 83rd Avenue..................................................................................................... 62 ............................................................................ 63 McKellips Road Improvement Study: SR 101L to Alma School Road McQueen Road Improvements IGA: Riggs Road to Ocotillo Road.............................................................................. 64 Meridian Road and Empire Boulevard Intersection and Signal Improvement Project.................................................. 65 Miller Road at the BWCDD Canal: Bridge Replacement Project ................................................................................ 66 Miller Road Improvement Project: I-10 to One Mile North.............................................................................................67 New River Road Sight Distance Improvement Study: Maricopa Trail Crossing at Linda Lane.................................... 68 Northern Parkway Program: Dysart Road to 111th Avenue/ Agua Fria Freeway Project ........................................... 69 Northern Parkway Program: Dysart Road Overpass Project ...................................................................................... 70 Northern Parkway Program: Northern Avenue/SR 101L Overpass Project.................................................................. 71 Northern Parkway Program: Reems Road/Litchfield Road Overpass Project.............................................................. 72 Northern Parkway Program: Sarival Road to Dysart Road Project............................................................................... 73 Ocotillo Road Improvements IGA: Arizona Avenue to McQueen Road ...................................................................... 74 Olive Avenue Roadway Improvement Study: El Mirage Road to White Tank Mountain Park....................................... 75 Power Road Roadway Widening, Drainage and Traffic Safety Improvement Project: Pecos Road to SR 202L (San Tan Freeway)................................................................................................................. 76 R.H. Johnson Boulevard ITS Communications Study................................................................................................... 77 Riggs Road Widening, Traffic and Drainage Improvement Project: Ellsworth Road to Signal Butte Road ................. 78 Riggs Road Widening, Traffic and Drainage Improvement Project: Hawes Road to Ellsworth Road .......................... 79 Riggs Road Widening, Traffic and Drainage Improvement Project: Power Road to Hawes Road .............................. 80 Riggs Road Widening, Traffic and Drainage Improvement Study: Recker Road to Power Road ................................ 81 Roadway Flooded Warning Signs Installation Project ................................................................................................. 82 Sossaman Road and Elliot Road Traffic Signal Installation and Traffic Safety Improvement Project............................ 83 Traffic Calming.............................................................................................................................................................. 84 University Drive at Signal Butte Road/Crismon Road Traffic Signal Replacement and Traffic Safety Improvement Project .................................................................................................................................................... 85 West Valley Dynamic Message Sign Installation Project ............................................................................................. 86 Page 3 Index by Project Number Completed Projects T098 T188 T288 T290 T292 T315 T365 T386 T396 T397 T398 T409 T415 T416 T418 T423 T431 T446 Williams Field Road Roadway Widening and Drainage Improvement Project: Gilbert Road to the Eastern Canal ..... 35 Old US 80 Bridge at the Gila River (Gillespie Dam Bridge) Erosion Control Project .................................................... 28 Bell Road West DMS Project Dynamic Sign Installation Project: SR 303L to 75th Avenue ........................................ 21 McKellips Road/McDowell Road Intelligent Transportation System (ITS) Project ...................................................... 26 Olive Avenue ITS Project: Litchfield Road to SR 101L ................................................................................................. 29 Southern Avenue and Meridian Road Intersection and Drainage Improvement Project ............................................. 30 Traffic Calming .............................................................................................................................................................34 Southern Avenue Roadway Improvement Project: Crismon Road to Signal Butte Road ........................................... 31 Sun City West Pedestrian Signals ................................................................................................................................ 33 17th Avenue Dust Mitigation and Dirt Road Paving Project: Low Volume Road Program: Maddock Road to West Joy Ranch Road.................................................................................................................... 18 Oakmont Drive at 107th Avenue Traffic Signal Installation Project .............................................................................. 27 Dust Mitigation and Dirt Road Paving Projects: Low Volume Road Program ............................................................. 23 Asphalt Rubber Arterial Overlay Project FY 2013 ........................................................................................................ 20 Desert Sage Subdivision Roadway Rehabilitation Project ........................................................................................... 22 Highway Operations Building Reconstruction and Remodel Project ........................................................................... 25 Dust Mitigation and Dirt Road Paving Projects: Low Volume Road Program ............................................................24 Sun City West HAWK Pedestrian Crossing Signal Installation and Roadway Rehabilitation Project: Granite Valley Drive: Meeker Boulevard to White Rock Drive ..................................................................................... 32 147th Avenue Roadway Rehabilitation Project: R.H. Johnson Boulevard to Heritage Drive ...................................... 19 Ongoing Projects T195 T248 T251 T304 T305 T332 T333 T338 T339 T341 T342 T344 T345 T347 T352 Northern Parkway Program: Sarival Road to Dysart Road Project ............................................................................. 73 Deer Valley Road/Williams Drive Extension and Traffic Improvement Project: El Mirage Road to 109th Avenue........ 45 Riggs Road Widening, Traffic and Drainage Improvement Project: Ellsworth Road to Signal Butte Road ................. 78 Miller Road at the BWCDD Canal: Bridge Replacement Project ................................................................................. 66 Power Road Roadway Widening, Drainage and Traffic Safety Improvement Project: Pecos Road to SR 202L (San Tan Freeway) ................................................................................................................. 76 Fort McDowell Road Drainage Improvement Project SR 87 (Beeline Highway) to Ba Hon Nah Road ........................ 57 Sossaman Road and Elliot Road Traffic Signal Installation and Traffic Safety Improvement Project............................ 83 Miller Road Improvement Project: I-10 to One Mile North ........................................................................................... 67 Gilbert Road at the Salt River Bridge Installation ......................................................................................................... 58 El Mirage Road Roadway Widening and Traffic Safety Improvement Project: Picerne Road to Bell Road.................. 56 McKellips Road Improvement Study: SR 101L to Alma School Road........................................................................... 63 El Mirage Road Roadway Widening and Traffic Safety Improvement Project: Northern Avenue to Cactus Road ......... 54 MC 85 and 83rd Avenue Intersection Widening, Traffic Signal and Traffic Safety Improvement Project ..................... 60 Northern Parkway Program: Dysart Road to 111th Avenue/ Agua Fria Freeway Project............................................ 69 MC 85 ITS Project: Litchfield Road to 83rd Avenue ..................................................................................................... 62 Page 4 Index by Project Number Ongoing Projects (cont.) T365 T367 T369 T372 T373 T375 T383 T387 T389 T391 T404 T406 T410 T411 T412 T419 T420 T424 T425 T426 T427 T428 T429 T433 T434 T435 T437 T438 T439 T441 T442 T443 T445 T447 T448 Traffic Calming .............................................................................................................................................................. 84 El Mirage Road Roadway Widening and Traffic Safety Improvement Project: Northern Avenue to Peoria Avenue..... 55 Northern Parkway Program: Reems Road/Litchfield Road Overpass Project.............................................................. 72 Northern Parkway Program: Northern Avenue/SR 101L Overpass Project ................................................................. 71 Broadway Road at Watson Road Signal Installation Project ........................................................................................ 43 Riggs Road Roadway Widening and Drainage Improvement Project: Hawes Road to Ellsworth Road....................... 79 75th Avenue Bridge at the Salt River Scoping Study: Southern Avenue to Broadway Road....................................... 36 Buckeye Yard Maintenance Facility Replacement Project ........................................................................................... 44 E-IntelliDrive Study, Phase III (SMARTDrive Testbed) ................................................................................................... 53 Avondale Boulevard at MC 85 Traffic Signal Installation and Safety Improvement Project ......................................... 41 Olive Avenue Roadway Improvement Study: El Mirage Road to White Tank Mountain Park ...................................... 75 Riggs Road Widening, Traffic and Drainage Improvement Project: Power Road to Hawes Road ............................... 80 Dust Mitigation and Dirt Road Paving Projects: Low Volume Road Program ............................................................. 47 Dust Mitigation and Dirt Road Paving Projects: Low Volume Road Program ............................................................. 48 Eagle Eye Road at Tiger Wash Roadway Improvement Study .......................................................................................... 51 West Valley Dynamic Message Sign Installation Project .............................................................................................. 86 Meridian Road and Empire Boulevard Intersection and Signal Improvement Project ................................................. 65 Dynamite Road at 52nd Street Traffic Signal Installation and Traffic Safety Improvement Project .............................. 50 MC 85 at Jackrabbit Road Traffic Signal Replacement and Traffic Safety Improvement Project ................................ 61 University Drive at Signal Butte Road/Crismon Road Traffic Signal Replacement and Traffic Safety Improvement Project .................................................................................................................................................... 85 Northern Parkway Program: Dysart Road Overpass Project ....................................................................................... 70 79th Place Drainage and Roadway Improvement Project: South of Apache Trail ....................................................... 37 Riggs Road Widening, Traffic and Drainage Improvement Study: Recker Road to Power Road ............................... 81 Dust Mitigation and Dirt Road Paving Projects: Low Volume Road Program Dove Valley Area ................................. 49 East Mesa Subdivisions Pavement Rehabilitation Project ........................................................................................... 52 Asphalt Rubber Arterial Overlay Project FY 2014 ........................................................................................................ 39 Del Webb Boulevard at Hutton Drive Traffic Signal Installation and Traffic Safety Improvement Project .................... 46 Roadway Flooded Warning Signs Installation Project .................................................................................................. 82 Alma School Road at Michigan Avenue Traffic Signal Installation and Traffic Safety Improvement Project ................ 38 Gilbert Road Improvements IGA: Hunt Highway to Queen Creek Road ...................................................................... 59 McQueen Road Improvements IGA: Riggs Road to Ocotillo Road .............................................................................. 64 Ocotillo Road Improvements IGA: Arizona Avenue to McQueen Road........................................................................ 74 New River Road Sight Distance Improvement Study: Maricopa Trail Crossing at Linda Lane .................................... 68 Bell Road Adaptive Signals Study ................................................................................................................................ 42 R.H. Johnson Boulevard ITS Communications Study .................................................................................................. 77 Page 5