CMAQ DETAILED PROJECT LISTING REPORT (FY 2009) CMAQ CO NOx PM10 Net Benefit (kg/day) (kg/day) (kg/day) (kg/day) STATE PROJECT ID Trip Reduction Program 385.81 4643.87 326.91 323.76 5680.35 PMG09 02P 999A(042) MAG09-617 Phoenix Yes Yes Regional Rideshare Program 269.04 3238.34 227.97 225.77 3961.12 PMG09 02P 999A(042) MAG09-615 Phoenix Yes Yes MAG/Valley Metro Telework Outreach and Ozone Education Program 249.82 3007.03 211.68 209.64 3678.17 PMG09 02P 999A(042) MAG09-612 Phoenix Yes Yes 3.11 907.78 37.45 10926.69 2.64 769.20 2.61 761.78 45.81 13365.45 PMG09 02P 999A(042) MAG08-610 Phoenix Yes Yes 1561.00 1561.00 PMG09 03P 999A(043) MAG09-614 Phoenix No No 149.28 149.28 SS66601C LPK0200 LPK08-801 Phoenix No No 92.57 92.57 SS84203D SRI0201 SRP09-802 Phoenix No No 36.77 36.77 SS84103D BKY0203 BKY09-802 Phoenix No No 20.10 1859.72 23.65 1863.27 SS70101C MMA0209 MMA09-610 Phoenix No No Arizona AZ20090018 $939,998 Shared Ride Arizona AZ20090020 $700,092 Shared Ride Arizona AZ20090021 $317,967 Shared Ride Arizona AZ20090019 $138,176 $2,096,233 Shared Ride Shared Ride Arizona AZ20090022 $1,612,968 I/M and Other TCMs Arizona AZ20090017 $702,000 I/M and Other TCMs Maricopa Association of Governments: PM-10 Certified Street Regional program for the purchase of PM-10 Certified Sweeper Program Street Sweepers Litchfield Park: Pave Unpaved Alleys Various Locations Pave unpaved alleys at various locations Arizona AZ20090037 $316,377 I/M and Other TCMs Salt River Pima - Maricopa Indian Community: Design Pave Dirt Roads Arizona AZ20090002 $56,000 I/M and Other TCMs Arizona AZ20090025 $1,440,000 $4,127,345 I/M and Other TCMs I/M and Other TCMs Arizona AZ20090030 $566,550 Arizona AZ20090006 $1,000,000 Arizona AZ20090031 $296,548 Arizona AZ20090040 $1,000,000 Arizona AZ20090026 $852,459 Arizona AZ20090012 $300,000 Arizona AZ20090027 $1,000,000 Arizona AZ20090038 $1,822,800 Arizona AZ20090024 $294,908 Arizona AZ20090035 $400,000 Arizona AZ20090011 $150,000 Arizona Arizona AZ20090028 AZ20090033 $2,220,000 $2,520,000 Arizona AZ20090029 $1,370,000 Arizona AZ20090004 $282,700 Arizona AZ20090010 $150,000 Arizona AZ20090005 $450,000 Arizona AZ20090034 $1,256,000 $15,931,965 PROJECT TITLE Maricopa Association of Governments: Trip Reduction Program Maricopa Association of Governments: Regional Rideshare Program Maricopa Association of Governments: Telework & Ozone Outreach Program Maricopa Association of Governments: Travel Reduction Program Capitol Rideshare Program Design pave dirt roads within the Salt River Pima Maricopa Indian Community Buckeye: Design Pave Dirt Shoulders Design Pave Dirt Shoulders at Various Locations Pave shoulders to include a bicycle lane on Rio Verde Dr from Forest Rd to 136th St alignment Maricopa County: Pave shoulders Traffic Flow Improvements Mesa: Upgrade TMC Equipment Chandler: Upgrade Traffic Traffic Flow Improvements Management Center equipment Peoria: Install connections from existing traffic signals to central Traffic Flow Improvements system Surprise: Construct fiber optic Traffic Flow Improvements interconnection of traffic signals Maricopa County: Establish arterial Traffic Flow Improvements incident response teams Upgrade TCM equipment and purchase central components field cameras and VMS Upgrade retrofit and integrate TMC equipment at Buffalo St and Colorado St Connect existing traffic signals with a hybrid wireless fiber system to the central system Construct fiber optic interconnection of traffic signals on Greenway Rd from US 60 to Cotton Ln Establish REACT arterial incident response teams in Glendale Peoria and Scottsdale Develop an ITS Strategic Plan document in line with Traffic Flow Improvements Glendale: Develop ITS Strategic Plan regional ITS planning efforts Maricopa County: Construct ITS Traffic Flow Improvements improvements Scottsdale: Construct smart corridor Traffic Flow Improvements traffic control system Maricopa Association of Governments: Traffic Signal Traffic Flow Improvements Optimization Project Construct ITS improvements on Bell Rd from Loop 303 Estrella Freeway to Loop 101 Agua Fria Freeway Construct smart corridor traffic control system on Scottsdale Rd from Loop 101 Pima Freeway to Indian School Rd Traffic Signal Optimization Project Upgrade the Downtown Traffic Management System software video switches wall and the TMC projector system Design for fiber optic cable conduit and CCTV at various Glendale: Design for fiber optic cable locations on Cactus Rd Thunderbird Rd and Greenway Traffic Flow Improvements conduit and Closed Circuit Television Rd. Expand fiber optic network and link 11 traffic signals to Traffic Flow Improvements Mesa: Expand fiber optic network the TMC Traffic Flow Improvements Peoria: Construct intersection Construct intersection at 91st Ave and Olive Ave Install real-time adaptive signal system in the Traffic Flow Improvements Mesa: Install signal system Superstition Springs Mall Area Install Chandler Fire/Police Department signal system integration and variable message signs at various Chandler: Install integrated signal locations Traffic Flow Improvements system Design for installation of fiber optic cable conduit and DMS at 59th Ave from Northern Ave to Bethany Home Glendale: Design of fiber optic cable Rd; Glendale Ave from 51st Ave to 67th Ave; and Peoria Traffic Flow Improvements conduit and Dynamic Message Signs Ave from 47th Ave to 67th Ave Chandler: Install fiber optic cable for Install fiber optic cable traffic signal interconnection on Traffic Flow Improvements traffic signal interconnection Chandler Blvd from Delaware St to Gilbert Rd Design and construction of intersection improvements at Traffic Flow Improvements Phoenix: Intersection improvements 7th St and McDowell Rd Traffic Flow Improvements Phoenix: Downtown Traffic Traffic Flow Improvements Management System Is this an Is this a outreach TCM in an activity? approved VOC (kg/day) AMOUNT PROJECT TYPE NONATTAINMENT/ MAINTENANCE PROJECT DESCRIPTION STATE CMAQ PROJECT ID FMIS PROJECT TIP PROJECT ID ID 0.21 0.21 3.25 3.25 0.09 0.09 146.37 621.90 160.73 929.00 SS73501C MES0208 MES09-607 Phoenix No Yes 42.86 211.77 49.17 303.80 SS84001C CHN0213 CHN10-613 Phoenix No Yes 8.13 39.63 9.04 56.80 SS72101C PEO0203 PEO13-904 Phoenix No Yes 7.08 28.57 7.69 43.34 SS67601C SUR0204 SUR10-614 Phoenix No Yes 31.22 (8.97) 15.40 37.65 SS68701C MMA0206 MMA09-810 Phoenix No Yes 21.79 (5.33) 10.06 26.52 SS85303D GLN0229 GLN09-815 Phoenix No Yes 11.95 (2.63) 5.64 14.96 SS59503D MMA0046 MMA09-607 Phoenix No Yes 9.58 (2.09) 4.45 11.94 SS57701C SCT0015 SCT04-119C Phoenix No Yes 9.20 (2.03) 4.34 11.51 PMG09 02P 999A(042) MAG09-801 Phoenix Yes Yes 5.26 (1.16) 2.48 6.58 SS83701C PHX0243 PHX07-317 Phoenix No Yes 3.02 (0.65) 1.37 3.74 SS84703D GLN0223 GLN09-812 Phoenix No Yes 4.30 0.46 (2.59) 1.91 1.73 0.21 3.44 2.58 SS63501C SS60301C MES0202 PEO0009 MES08-807 PEO06-202C Phoenix Phoenix No No Yes Yes 2.59 (1.57) 1.04 2.06 SS56301C MES0027 MES04-125C Phoenix No Yes 0.84 (0.19) 0.40 1.05 SS62501C CHN0200 CHN06-214 Phoenix No Yes 7.60 (9.14) 2.53 0.99 SS84503D GLN0221 GLN09-810 Phoenix No Yes 0.67 (0.15) 0.31 0.83 SS72601C CHN0210 CHN09-802 Phoenix No Yes 0.10 313.02 0.41 867.69 0.04 276.63 0.55 1457.34 SS64701C PHX0209 PHX07-316 Phoenix No Yes 0.00 0.00 0.00 CMAQ DETAILED PROJECT LISTING REPORT (FY 2009) STATE CMAQ PROJECT ID CMAQ AMOUNT PROJECT TYPE PROJECT TITLE Maricopa Association of Governments: Valley Metro Bicycle Education Project CO NOx PM10 Net Benefit (kg/day) (kg/day) (kg/day) (kg/day) STATE PROJECT ID 13.45 161.92 11.40 11.29 198.06 PMG09 02P 999A(042) MAG09-611B Phoenix Yes Yes 1.48 22.95 0.63 3.47 28.53 SL67102D GLN0220 GLN09-813 Phoenix No Yes 1.68 24.20 0.66 0.30 26.84 SS65501C SCT0202 SCT09-611 Phoenix No Yes 0.87 12.62 0.35 0.16 14.00 SL61902D GLN0203 GLN09-818 Phoenix No Yes 0.75 10.75 0.30 0.13 11.93 SS84603D GLN0222 GLN09-811 Phoenix No Yes 0.12 1.09 0.03 0.01 1.25 SS64001C TMP0203 TMP08-602 Phoenix No Yes 0.09 0.83 0.02 0.01 0.95 SS65801C AVN0201 AVN11-706FIN Phoenix No Yes 0.09 0.79 0.02 0.01 0.91 SS70701C CHN0204 CHN11-710 Phoenix No Yes 0.03 18.56 0.31 235.46 0.01 13.42 0.00 15.38 0.35 282.82 SS65701C PEO0201 PEO08-602 Phoenix No Yes 5.63 69.37 4.70 4.71 84.41 FTA FTA GLN09-816T Phoenix No Yes 5.63 69.37 4.70 4.71 84.41 FTA FTA GLN09-817T Phoenix No Yes 5.65 71.15 2.42 4.49 83.71 FTA FTA GDY08-801T Phoenix No Yes 2.83 (31.59) 34.11 10.93 2.40 26.68 2.38 32.42 41.72 38.44 FTA FTA FTA FTA VMR09-825T PHX09-836T Phoenix Phoenix No No Yes Yes 2.31 28.54 1.93 1.94 34.72 FTA FTA CHN08-802T Phoenix No Yes 0.47 5.68 0.40 0.40 6.95 FTA FTA VMR09-806T Phoenix No Yes 0.47 5.68 0.40 0.40 6.95 FTA FTA VMR09-826T Phoenix No Yes 0.47 (8.13) 5.68 300.51 0.40 44.03 0.40 51.85 6.95 388.26 FTA FTA VMR09-827T Phoenix No Yes Arizona AZ20090009 $100,000 Pedestrian/Bicycle Arizona AZ20090039 $7,745,320 Pedestrian/Bicycle Arizona AZ20090008 $250,000 Pedestrian/Bicycle Glendale: Design multi-use path Bicycle Education Program Design project to widen roadway for a bike lane on 67th Ave to 69th Ave and pave multi-use path in Discovery Park from 79th Ave to 83rd Ave Upgrade sidewalks and add bicycle lanes on Scottsdale Rd from Roosevelt St to Earll Dr Design a 1.5 mile multi-use path along the Grand Canal from Loop 101 to New River Arizona AZ20090013 $450,000 Pedestrian/Bicycle Arizona AZ20090041 $2,550,000 Pedestrian/Bicycle Glendale: Design multi-use path Tempe: Construct pedestrian improvements Design multi-use path and underpass with landscaping lighting parking and pedestrian facilities at New River (east bank) from Northern Ave to Bethany Home Rd Construct pedestrian improvements on College Ave from Superstition Freeway (US 60) to Apache Blvd Arizona AZ20090001 $129,804 Pedestrian/Bicycle Avondale: Design and construct sidewalk Arizona AZ20090003 $540,000 Pedestrian/Bicycle Chandler: Install pedestrian actuated crossing signals Design and construct sidewalk and landscaping on Buckeye Rd from Avondale Blvd to 117th Ave alignment Install three pedestrian actuated crossing signals on Western Canal bike path at Dobson Rd Alma School Rd and Arizona Ave. Peoria: Design and construct pedestrian improvements Design and construct at-grade pedestrian improvements at 84th Ave from Peoria Ave to Monroe St AZ20090023 $24,000 Pedestrian/Bicycle Arizona AZ20090032 $1,164,057 $12,953,181 Pedestrian/Bicycle Pedestrian/Bicycle Arizona AZ20090014 $162,836 Transit Arizona AZ20090015 $473,060 Transit Arizona AZ20090016 $438,000 Transit Arizona Arizona AZ20090043 AZ20090036 $300,000 $11,406,416 Transit Transit Arizona AZ20090007 $1,086,000 Transit Arizona AZ20090042 $1,856,002 Transit Arizona AZ20090044 $300,000 Transit Arizona AZ20090045 $1,000,000 $17,022,314 Transit Transit APPORTIONED OBLIGATED AMOUNT $50,000,000 AMOUNT $52,131,038 $2,096,233 OBLIGATED % 104% Shared Ride Glendale: Pre-design for regional park- Pre-design and environmental documentation activities and-ride for a regional park-and-ride near Loop 101 and Bell Rd Glendale: Pre-design for regional park- Pre-design and environmental documentation activities and-ride for a regional park-and-ride near Loop 101 and Bell Rd Purchase five buses for new neighborhood circulator Goodyear: Purchase five buses services Valley Metro Rail: Expand light rail service Expand METRO light rail hours of service Phoenix: Purchase 29 buses Purchase 29 buses for regional fixed route service Chandler: Construct regional park-and-Repayment for the construction of a regional park-andride ride near Loop 202 and Arizona Avenue Valley Metro Rail: Preliminary Engineering/FEIS for Fixed Guideway Preliminary Engineering/FEIS for Fixed Guideway Corridor Corridor along Main Street in downtown Mesa Valley Metro Rail: Ticket vending Acquire additional METRO ticket vending machines/fare machines/fare validation systems validation systems at stations Valley Metro Rail: Alternatives Alternatives Analysis for Light Rail Transit along Analysis for Light Rail Transit Interstate-10 and Loop 101 Total Emission Benifits by Category (kg/day) Cost per Emissions (kg) Reduced by Category Net Benefit (kg/day) 17357.14 13365.45 Cost per kg/day Reduced $156.840 1863.27 $2,215.108 1457.34 282.82 388.26 $10,932.222 $45,800.088 $43,842.564 $45,800.09 Shared Ride FMIS PROJECT TIP PROJECT ID ID CMAQ Funding Allocated by Category $156.84 4% $43,842.56 $4,127,345 $15,931,965 $12,953,181 $17,022,314 I/M and Other TCMs Traffic Flow Improvements Pedestrian/Bicycle Transit Is this an Is this a outreach TCM in an activity? approved VOC (kg/day) Glendale: Design bike lane and multiuse path Scottsdale: Upgrade sidewalks and add bicycle lanes Arizona NONATTAINMENT/ MAINTENANCE PROJECT DESCRIPTION I/M and Other TCMs 2% $2,215.11 8% 32% 2% Traffic Flow Improvements Shared Ride Pedestrian/Bicycle I/M and Other Transit $10,932.22 $2,215.11 $156.84 $10,932.22 $45,800.09 TCMs $43,842.56 Traffic Flow Improvements Pedestrian/Bicycle Transit 8% 11% 31% 25% 77%