2007 ANNUAL CMAQ REPORT PROJECT TYPE TIP ID PROJECT AMOUNT PROJECT TITLE PROJECT DESCRIPTION EMISSION REDUCTIONS PM10 VOC CO NOx (kg/day) (kg/day) (kg/day) (kg/day) Shared Ride MAG07-311 $919,329 MAG: Trip Reduction Program Trip Reduction Program 403 4882 327 367 MAG07-309 $598,681 3404 228 256 $300,000 Regional Rideshare Program Telework and Ozone Outreach Program 281 MAG07-303 MAG: Regional Rideshare Program MAG: Telework and Ozone Outreach Program 521 6322 424 475 MAG07-302 $135,000 $1,953,010 MAG: Travel Reduction Program TOTAL SHARED RIDE Travel Reduction Program 3 1208 42 14650 3 982 3 1101 1 15 1 1 1 19 1 1 1 3 1 1 1 5 1 1 1 14 19 22 170 234 1 11 16 1 13 18 Pedestrian /Bicycle GLN08-604 GLN12-802 $3,557,383 GLB09-601C $614,405 Gilbert: Multiuse path MMA06-206 $494,870 Maricopa County: Bicycle lane PVY06-201C $400,000 Paradise Valley: Pedestrian path GLN07-310 MAG07-308 $269,306 $30,000 $5,365,964 Glendale: Bicycle lane MAG: Regional Bicycle Planning TOTAL PEDESTRIAN/BICYCLE Glendale: Multi-use overpass Design and construct multi-use overpass on 63rd Ave at Loop 101 Construct Western-Powerline Trail multiuse path from Cooper Rd to Gilbert Rd (phase III) Design and construct bicycle lane on McDowell Mountain Rd from Fountain Hills city limits to Forest Rd Construct pedestrian path on south side of Lincoln Dr from 32nd St to Invergordon Rd Design and construct bicycle lane on 63rd Ave from Olive Ave to Grand Ave Regional Bicycle Planning 2007 ANNUAL CMAQ REPORT PROJECT TYPE TIP ID PROJECT AMOUNT PROJECT TITLE PROJECT DESCRIPTION EMISSION REDUCTIONS PM10 VOC CO NOx (kg/day) (kg/day) (kg/day) (kg/day) Traffic Flow Improvements DOT06-218 $1,680,000 SCT04-113R $1,424,844 MMA06-207 $1,350,000 GLN00-703 $917,500 GDY04-204C $902,440 GLN08-606C $686,825 GDY07-303 TMP07-302 $640,000 $540,000 GLB06-203B $368,401 GLN11-703 $356,018 TMP07-315 $320,000 $9,186,028 Design and construct Freeway Management System on Loop 101 between Guadalupe Rd and ADOT: Freeway Management System Loop 202 Construct left turn lanes on Scottsdale: Left turn lanes Hayden Rd at Via de Ventura Maricopa County: Aztech smart Construct Aztech smart corridors corridors Phase 3 (design-build) Construct 59th Ave for turn lane and sidewalk from Olive St to Glendale: Turn lane Mountain View Rd Install conduit and fiber cable on Litchfield Rd from Wigwam Blvd Goodyear: Conduit and fiber cable to Maricopa County Route 85 Install fiber optic cable and video Glendale: Fiber optic cable detection cameras Purchase and install equipment Goodyear: Traffic Operations Center for Traffic Operations Center Tempe: Traffic signal controllers Upgrade traffic signal controllers Design traffic management center (phase B) and purchase Gilbert: Traffic management center equipment Purchase and install dynamic message signs and reversible lane control sign bridges with Glendale: Dynamic message signs message signs Tempe: Emergency vehicle preemption Upgrade emergency vehicle systems preemption systems TOTAL TRAFFIC FLOW IMPROVEMENTS 3 14 4 2 6 1 2 -1 2 1 2 1 3 -1 1 9 47 10 9 24 45 -8 10 11 49 171 53 1 6 1 24 127 -8 273 11 105 1 1 2007 ANNUAL CMAQ REPORT PROJECT TYPE TIP ID PROJECT AMOUNT PROJECT TITLE PROJECT DESCRIPTION EMISSION REDUCTIONS PM10 VOC CO NOx (kg/day) (kg/day) (kg/day) (kg/day) Transit VMR07-703T RPT07-325 PHX07-308TR RPT07-326T PHX04-213TRX Valley Metro Rail: Central Phoenix $11,554,441 East Valley Light Rail Transit $400,000 Phoenix: Purchase bus $337,500 Valley Metro: Purchase Vanpool Vans $245,811 Phoenix: Regional park-and-ride $12,537,752 TOTAL TRANSIT Construct Central Phoenix-East Valley Light Rail Transit and repayment for construction of five Intermodal Transfer Facilities Purchase one standard bus Purchase 15 vanpool vans Repayment of advance design Interstate-17 and Happy Valley Rd regional park-and-ride 142 1 1772 1 118 1 144 1 3 37 2 3 4 150 54 1864 4 125 4 152 I/M and Other TCMs MAG07-307 $1,947,109 PEO03-101 $845,000 CHN03-107R $162,000 $2,954,109 MAG: PM-10 Certified Street Sweeper Purchase PM-10 Certified Street Program Sweepers Pave dirt road on Carefree Highway from Lake Pleasant Rd Peoria: Pave dirt road to Beardsley Canal Pave dirt road on Ryan Rd from Chandler: Pave dirt road Arizona Ave to McQueen Rd TOTAL I/M AND OTHER TCMS 1085 214 73 1372 PROJECT AMOUNT $1,953,010 $5,365,964 $9,186,028 $12,537,752 $2,954,109 $31,996,863 PROJECT TYPE CMAQ OBLIGATIONS SHARED RIDE PEDESTRIAN/BICYCLE TRAFFIC FLOW IMPROVEMENTS TRANSIT I/M AND OTHER TCMS TOTAL CMAQ FUNDING FY2007 6% 17% 29% 39% 9% FY2007 CMAQ OBLIGATIONS I/M OTHER TCMS SHARED RIDE $2,954,109 $1,953,010 PED/BICYCLE $5,365,964 TRANSIT $12,537,752 TRAFFIC FLOW $9,186,028 POLLUTANT VOC CO NOx PM10 TOTAL TOTAL CMAQ EMISSIONS REDUCTIONS KG/DAY 1504 17021 1228 2644 22397 CMAQ 2007 REDUCTIONS APPORTIONMENT 7% 76% 5% 12%