2006 ANNUAL CMAQ REPORT PROJECT TYPE TIP ID PROJECT AMOUNT PROJECT TITLE PROJECT DESCRIPTION EMISSION REDUCTIONS PM10 VOC CO NOx (kg/day) (kg/day) (kg/day) (kg/day) Shared Ride TMP05-204T $2,253,629 Tempe: Construct regional park-and-ride Construct regional park-and-ride at Loop 101 and Apache Blvd CHN05-501T MAG06-209 $2,220,300 $910,000 Chandler: Design regional park-and-ride Design regional park-and-ride near Loop 202 and Arizona Avenue MAG: Trip Reduction Program Trip Reduction Program MES05-205T MAG06-210 $695,565 $660,000 RPT05-125T $623,700 MAG06-211 MAG06-205 $300,000 $135,000 $7,798,194 Mesa: Acquire right-of-way for regional park-and-ride at Loop 202 and Power Rd MAG: Regional Rideshare Program Valley Metro: Purchase 22 vanpool vehicles to expand fleet MAG/Valley Metro: Telework & Ozone Outreach Program MAG: Travel Reduction Program TOTAL SHARED RIDE 1 8 1 1 3 447 33 4651 2 349 3 357 4 312 43 3243 3 244 3 249 5 51 4 4 579 4 6023 41 452 3 462 3 Construct multiuse underpass 2 21 1 1 Construct multiuse path Regional Pedestrian Planning 1 QA 12 QA 1 QA 1 QA 1 2 1 1 Acquire right-of-way for regional park-and-ride Regional Rideshare Program Purchase vanpool vehicles Telework & Ozone Outreach Program Travel Reduction Program Pedestrian /Bicycle PHX06-223 $2,240,000 MES05-127C $1,658,000 $51,414 AVN08-624D $50,000 $3,999,414 Phoenix: Construct underpass at 51st Ave. and Arizona Canal Diversion Channel Mesa: Construct South Canal multiuse path between McKellips Rd and McDowell Rd MAG: Regional Pedestrian Planning Avondale: Pedestrian improvements on McDowell Rd. - Agua Fria River to 119th Ave TOTAL PEDESTRIAN/BICYCLE Design pedestrian improvements 2006 ANNUAL CMAQ REPORT PROJECT TYPE TIP ID PROJECT AMOUNT PROJECT TITLE PROJECT DESCRIPTION EMISSION REDUCTIONS PM10 VOC CO NOx (kg/day) (kg/day) (kg/day) (kg/day) Traffic Flow Improvements DOT06-6C65C $1,890,000 $1,869,373 DOT07-347R $1,410,000 PHX06-225C $845,600 GLN01-001C $665,000 DOT05-237A $664,607 TMP06-630 $100,294 CHN06-214 $94,300 $7,539,174 ADOT: Install fiber-optic cable on Loop 101 between I-10 and I-17 MAG: Traffic Signal Optimization Program ADOT: Construct interchange improvements at I-10 and 43rd Ave and 51st Ave Phoenix: Install wireless communications in areas citywide Glendale: Install signal system on Bell Rd. from 51st Ave. to 83rd Ave. ADOT: Construct traffic interchange improvements at Interstate-10 and Ray Rd. Tempe: Install connections between ADOT FMS and 22 traffic interchanges Install fiber-optic cable Regional Community Network Implementation and Coordinate Regional Smart Corridor 438 1269 70 QA QA QA 1 1 1 62 173 45 7 -13 4 Construct traffic interchange improvements 1 2 1 Install ITS connections 49 99 37 1 3 1 102 1036 81 Purchase buses 1 4 1 Purchase buses 1 4 1 Design transit center Purchase trolley 1 0 11 3 Construct traffic interchange improvements Install wireless communications Install computerized signal system Chandler: Design fire and police Design signal system integration department signal system integration and variable message signs TOTAL TRAFFIC FLOW IMPROVEMENTS Transit VMR06-477TR $11,763,536 RPT05-501T $2,040,000 PHX05-131T $1,810,560 SCT05-501T SCT05-502T $550,000 $300,000 $16,464,096 METRO: Construct fixed guideway Central Phoenix - East Valley Valley Metro: Purchase 6 standard buses to replace older buses Phoenix: Purchase 6 standard buses to replace older buses Scottsdale: Design Arizona State University - Scottsdale Transit Center Scottsdale: Purchase 1 trolley TOTAL TRANSIT Construct fixed guideway and intermodal transfer facility 2 1 82 1 1 2006 ANNUAL CMAQ REPORT PROJECT TYPE TIP ID PROJECT AMOUNT PROJECT DESCRIPTION PROJECT TITLE EMISSION REDUCTIONS PM10 VOC CO NOx (kg/day) (kg/day) (kg/day) (kg/day) I/M and Other TCMs MAG06-208 MAG: PM-10 Certified Street Sweeper Program MAG: Regional Videoconferencing System and Hub Site Support & Administration MAG: Regional System Planning TOTAL I/M AND OTHER TCMS $1,867,091 $201,772 $117,903 $2,186,766 PROJECT AMOUNT $7,798,194 $3,999,414 $7,539,174 $16,464,096 $2,186,766 $37,987,644 PROJECT TYPE PM-10 Certified Street Sweeper Program Regional Videoconferencing System Regional System Planning CMAQ OBLIGATIONS SHARED RIDE PEDESTRIAN/BICYCLE TRAFFIC FLOW IMPROVEMENTS TRANSIT I/M AND OTHER TCMS TOTAL CMAQ FUNDING FY2006 21% 11% 20% 43% 6% FY2006 CMAQ OBLIGATIONS 6% 21% SHARED RIDE PEDESTRIAN/BICYCLE 11% 43% TRAFFIC FLOW IMPROVEMENTS TRANSIT 20% I/M AND OTHER TCMS 3974 2 QA 1 QA 1 QA 1 QA