CMAQ DETAILED PROJECT LISTING REPORT (FY 2005) STATE CMAQ PROJECT PROJECT ID AMOUNT PROJECT TYPE PROJECT TITLE PROJECT DESCRIPTION Arizona Arizona Arizona AZ20050029 AZ20050030 Arizona AZ20050026 $3,969,389 I/M and Other TCMs MAG: Regionwide Arizona Arizona Arizona AZ20050008 AZ20050006 AZ20050028 $1,647,600 I/M and Other TCMs $474,208 I/M and Other TCMs $3,901 I/M and Other TCMs Arizona AZ20050022 $1,372,290 Pedestrian/Bicycle Arizona AZ20050010 $943,000 Pedestrian/Bicycle Maricopa County: Various locations Mesa: Various locations MAG: Regionwide Scottsdale: Pima Rd. from Via Linda to Inner Circle Tempe: Rio Salado Parkway from Mill Ave. to Priest Dr. Arizona AZ20050012 $714,123 Pedestrian/Bicycle Arizona AZ20050014 $707,250 Pedestrian/Bicycle Arizona AZ20050020 $571,142 Pedestrian/Bicycle Arizona AZ20050015 $311,190 Pedestrian/Bicycle Arizona AZ20050023 $282,900 Pedestrian/Bicycle Arizona AZ20050017 $200,000 Pedestrian/Bicycle Arizona Arizona Arizona AZ20050025 AZ20050027 AZ20050031 $150,000 Pedestrian/Bicycle $2,270 Pedestrian/Bicycle $604,516 Shared Ride Arizona AZ20050032 Arizona AZ20050001 Arizona AZ20050011 Arizona AZ20050005 Arizona AZ20050024 Arizona AZ20050002 Arizona AZ20050021 Traffic Flow $3,740,440 Improvements Traffic Flow $1,270,000 Improvements Traffic Flow $775,000 Improvements Traffic Flow $750,000 Improvements Arizona AZ20050004 Traffic Flow $675,997 Improvements ADOT: US 60 at 83rd Ave. and Peoria Ave. Chandler: Consolidated Canal bank from Ryan Rd. to Riggs Rd. (Phase 3) Construct multi-use path Peoria: New River Trail from Northern Ave. to Peoria Ave. Construct multi-use path Gilbert: Western - Powerline Trail Design multi-use path and from Cooper Rd. to Lindsay Rd. pedestrian amenities Tempe: Mill Ave. from Broadway Rd to Southern Ave. Widen sidewalks and ramps Litchfield Park: Litchfield Rd. and Wigwam Blvd. Design multi-use underpass Bicycle Safety Education MAG/Valley Metro: Regionwide Program MAG: Regionwide Pedestrian Assistance MAG: Regionwide Regional Rideshare Program Telework and Ozone Outreach MAG/Valley Metro: Regionwide Program ADOT: US 60 at Stapley and Val Widen structures for dual left turn Vista traffic interchanges lanes Construct dual left turn lanes in ADOT: Interstate-17 at Cactus Rd. both directions Widen for dual left turn lanes in Chandler: Alma School Rd. and all directions and add north and Warner Rd. intersection southbound auxiliary lanes Mesa: Broadway Rd. from Center Install SMART corridor traffic St. to Recker Rd. control system Maricopa County: Bell Rd. from Real-Time Traffic Coordination Grand Ave. to Loop 101 (Phase I) and Messaging System Upgrade traffic signal timing Phoenix: Various locations equipment Purchase equipment and services for ITS traffic control Avondale: Various locations system Arizona AZ20050013 Traffic Flow $397,978 Improvements Chandler: Arizona Ave. from Elliot Rd. to Chandler Blvd. $952,871 Demand Management $143,713 Demand Management $300,000 Shared Ride Traffic Flow $5,872,000 Improvements Traffic Flow $3,767,694 Improvements Arizona AZ20050019 Arizona AZ20050018 Arizona AZ20050003 Traffic Flow $366,695 Improvements Traffic Flow $278,185 Improvements Traffic Flow $196,000 Improvements Arizona AZ20050007 Traffic Flow $188,600 Improvements Arizona AZ20050016 Arizona AZ20050009 Traffic Flow $181,999 Improvements Traffic Flow $143,000 Improvements MAG: Regionwide MAG: Regionwide Mesa: Various locations Mesa: Various locations Chandler: 56th St. and Chandler Blvd. intersection Trip Reduction Program Travel Reduction Program PM-10 Certified Street Sweeper Program Pave dirt roads Pave dirt roads Air Quality Public Involvement Design and construct multi-use path and overpass Construct multi-use path Design and construct at-grade pedestrian crossing including pedestrian refuges Install fibre optic communication system (Phase 2) Purchase communications equipment install cameras and provide wireless network access Purchase and install radio communications system Construct right turns on three approaches PM2.5 PM10 VOC CO NOx (kg/day) (kg/day) (kg/day) (kg/day) (kg/day) 477 4 4755 43 394 4 STATE FMIS TIP PROJECT ID PROJECT ID PROJECT ID 348 3 H671501X H671501X 999A042 999A042 MAG05-145 MAG05-124 4526 H671601X 999A043 MAG05-130R SS56401C SS56501C H671501X MMA0043 MES0028 999A042 MMA04-212S MES03-124R QA QA QA 394 409 QA 1 14 1 1 SS49901C SCT0012 SCT04-116R 1 4 1 1 SS54001C TMP0024 TMP02-006 1 3 1 1 H590001C 060B001 PEO04-104 1 5 1 1 SS50001C CHN0018 CHN02-012 1 3 1 1 SS51003D PEO0003 PEO02-005CR 2 19 1 1 SS61003D GIL0018 GLB09-601D 1 6 1 1 SS56701C TMP0025 TMP06-253 1 6 1 1 SS60703D LPK0004 LPK05-101D 33 QA 333 332 QA 3316 27 QA 275 24 QA 243 H671501X H671501X H671501X 999A042 999A042 999A042 MAG09-611A MAG03-115 MAG05-128 251 2500 207 183 H671501X 999A042 MAG05-127 1 1 1 H601501C 060C010 DOT04-259AC 1 4 1 1 H644001C 017A026 DOT04-112R 3 9 1 1 SS53401C CHN0020 CHN00-722R 6 43 6 SS54301C MES0025 MES03-121RC 7 37 7 SS55501C MMA0041 MMA04-114 27 115 26 SS59901C PHX0054 PHX05-501 2 10 2 SS59001C AVN0005 AVN07-301R 2 17 2 SS52701C CHN0019 CHN03-108R 150 630 140 SS59601C MES0029 MES09-606R 100 420 93 SS59701C MES0030 MES05-501 1 1 1 SS53901C CHN0021 CHN04-217 QA Maricopa County: Bell Rd. from SR Design Intelligent Transportation 303 to Grand Ave. (Phase II) Systems improvements Design traffic management center (Phase A) and purchase Gilbert: Citywide video wall 5 26 5 SS59503D MMA0046 MMA07-301D1 64 482 69 SS60801C GIL0017 GLB06-203A Peoria: 91st Ave. and Olive Ave. 1 1 1 SS60303D PEO0009 PEO06-202D Design intersection project Table 3 - FY2005 Project Types and Emissions Benefits Calculations Fiscal Year = '2005' and Status Selection Criteria = 'All' and State = 'Arizona' Proposal Category Number of Proposals Funded Proposals with Emissions Benefits Percent with Benefits Reported Demand Management 2 2 100 % I/M and Other TCMs 4 3 75 % 10 9 90 % 2 2 100 % Traffic Flow Improvements 14 14 100 % Total 32 30 94 % Pedestrian/Bicycle Shared Ride Page 1 of 1 FIGURE 1 - CMAQ OBLIGATIONS FOR FY 2005 Fiscal Year = '2005' and Status Selection Criteria = 'All' and State = 'Arizona' CMAQ Obligations by Type of Project Shared R ide D em and Managem ent Pedestrian/Bicy cle Traf f ic F low Im prov em ents I/M and Other TC Ms Total: 2.8% 3.4% 16.4% 58.2% 19.1% 100.0% Figure - 2 : Type of Proposals Funded by Category in FY 2005 14 14 19M Fiscal Year = '2005' and Status Selection Criteria = 'All' and State = 'Arizona' 20M 18M 12 10 16M 8 10M 6M 8M 6M 4M 4 5M 6 2 I/M D an em a g an em d en t /B an str i de Pe Project Category M ic yc le id R ar ed Sh Tr a pr ffic ov Fl em ow en ts e 2 an TC d O M th er s 2 0M 1M 4 2M 0M Millions of Dollars 14M 12M Im Number of Proposals 10 Table 5 - Air Quality Analysis by Project Type (VOC, Kg/Day) For FY 2005 Fiscal Year = '2005' and Status Selection Criteria = 'All' and State = 'Arizona' Type of Project Number 1 Minimum Median2 Maximum 14 0 4 150 Shared Ride 2 251 292 333 Pedestrian/Bicycle 9 0 1 33 Demand Management 2 4 241 477 Traffic Flow Improvement Total . . . . . . 27 Notes: 1 The number of projects submitted with VOC emissions analysis. 2 The median, rather than the mean, is a better representation of average effectiveness because the mean is unduly influenced by relatively few projects with large emissions reductions. The median is the point above or below which 50 percent of all observations lie when ranked highest to lowest. Emissions reductions are provided without comment as to their accuracy. FIGURE 3 - Expected VOC Emission Reductions (FY 2005) Fiscal Year = '2005' and Status Selection Criteria = 'All' and State = 'Arizona' 9 8 8 6 5 4 2 2 1 1 1 10 1 -1 00 0 5 -6 61 5 -3 31 26 -3 0 0 -1 6 1 - 1 5 0 < Number of Projects 10 Kg per Day NOTE: Emissions reductions are provided without comment to their accuracy Table 6 - Air Quality Analysis by Project Type (CO, Kg/Day) For FY 2005 Fiscal Year = '2005' and Status Selection Criteria = 'All' and State = 'Arizona' Type of Project Number 1 Minimum Median2 Maximum 14 1 21 630 Shared Ride 2 2,500 2,908 3,316 Pedestrian/Bicycle 9 3 6 332 Demand Management 2 43 2,399 4,755 Traffic Flow Improvement Total . . . . . . 27 Notes: 1 The number of projects submitted with CO emissions analysis. 2 The median, rather than the mean, is a better representation of average effectiveness because the mean is unduly influenced by relatively few projects with large emissions reductions. The median is the point above or below which 50 percent of all observations lie when ranked highest to lowest. Emissions reductions are provided without comment as to their accuracy. FIGURE 4 - Expected CO Emission Reductions (FY 2005) Fiscal Year = '2005' and Status Selection Criteria = 'All' and State = 'Arizona' 7 7 5 5 4 4 3 3 2 2 1 1 2 1 1 1 00 10 > -1 00 0 5 -4 10 1 41 0 36 -4 0 26 -3 0 -2 16 11 -1 5 0 -1 6 1 - 1 5 0 < Number of Projects 6 Kg per Day NOTE: Emissions reductions are provided without comment to their accuracy Table 7 - Air Quality Analysis by Project Type (NOx, Kg/Day) For FY 2005 Fiscal Year = '2005' and Status Selection Criteria = 'All' and State = 'Arizona' Type of Project Number 1 Minimum Median2 Maximum 14 0 4 140 Shared Ride 2 207 241 275 Pedestrian/Bicycle 9 0 0 27 Demand Management 2 4 199 394 Traffic Flow Improvement Total . . . . . . 27 Notes: 1 The number of projects submitted with NOx emissions analysis. 2 The median, rather than the mean, is a better representation of average effectiveness because the mean is unduly influenced by relatively few projects with large emissions reductions. The median is the point above or below which 50 percent of all observations lie when ranked highest to lowest. Emissions reductions are provided without comment as to their accuracy. FIGURE 5 - Expected NOx Emission Reductions (FY 2005) Fiscal Year = '2005' and Status Selection Criteria = 'All' and State = 'Arizona' 12 12 8 6 5 4 4 2 2 2 1 1 10 1 -1 00 0 5 -9 91 0 -7 66 26 -3 0 0 -1 6 1 - 1 5 0 < Number of Projects 10 Kg per Day NOTE: Emissions reductions are provided without comment to their accuracy Table 8 - Air Quality Analysis by Project Type (PM10, Kg/Day) For FY 2005 Fiscal Year = '2005' and Status Selection Criteria = 'All' and State = 'Arizona' Type of Project Number 1 Minimum Median2 Maximum Traffic Flow Improvement 2 0 0 0 Shared Ride 2 183 213 243 I/M and Other TCMs 3 394 409 4,526 Pedestrian/Bicycle 9 0 0 24 Demand Management 2 3 176 348 Total . . . . . . 18 Notes: 1 The number of projects submitted with PM 10 emissions analysis. 2 The median, rather than the mean, is a better representation of average effectiveness because the mean is unduly influenced by relatively few projects with large emissions reductions. The median is the point above or below which 50 percent of all observations lie when ranked highest to lowest. Emissions reductions are provided without comment as to their accuracy. FIGURE 6 - Expected PM-10 Emission Reductions (FY 2005) Fiscal Year = '2005' and Status Selection Criteria = 'All' and State = 'Arizona' 10 8 6 5 4 2 1 1 1 00 10 > 10 1 -1 00 0 5 -2 21 1 - 1 5 0 < Number of Projects 10 Kg per Day NOTE: Emissions reductions are provided without comment to their accuracy