Capital Improvement Program FY 2018-2027 peoriaaz.gov City of Peoria FY 2018 – FY2027 Capital Improvement Program 2 City of Peoria FY 2018 – FY 2027 Capital Improvement Program City of Peoria Capital Improvement Program FY 2018 - 2027 City Council, Core Values, Principal Officials .................................................................... 12-14 Introduction .................................................................................................................................17 Financing the CIP ........................................................................................................................25 Drainage ...................................................................................................................................... 35 81st Ave - Varney Pk Drainage Solution EN00482 38 85th Ave Storm Drain; Peoria Av to Grand Av EN00182 39 87th Ave Storm Drain; Hatcher Rd to Monroe St EN00257 40 Beardsley Rd Channel Improvements PW00112 41 Desert Harbor/91st Av; Drainage Channel Impr EN00531 42 Lake Pleasant Basin Access ramp EN00523 43 Mountain View Rd Drainage; 91st Ave to 89th Av EN00130 44 Neighborhood Drainage Program EN00458 45 New River & Jomax Road Concrete Box Culvert EN00354 46 New River Trail - BLM EN00371 47 Peoria Storm Drain Master Plan - Land Preservation EN00524 48 Pinnacle Peak Drainage; 87th Ave to 99th Av EN00455 49 Pinnacle Peak Rd & 67th Ave Channel to New River EN00119 50 Union Hills Channel EN00137 52 Williams Rd Channel Improvements- 79th Av to NR EN00543 53 Economic Development ............................................................................................................. 55 Arrowhead Equities (Huntington Univ. Building) ED00023 58 Commercial Abatement ED00025 59 Denaro Medical Plaza ED00021 60 GE Avionics (Aviage Systems) ED00015 61 Huntington University ED00018 62 Maxwell Technologies ED00008 63 Modern Round ED00022 64 P83 Entertainment District Improvements ED00002 65 P83 Innovation Center Project Parking Structure ED00020 66 Washington Street Redevelopment ED00024 67 3 City of Peoria FY 2018 – FY 2027 Capital Improvement Program City of Peoria Capital Improvement Program FY 2018 - 2027 Operational Facilities ................................................................................................................ 69 Arts Distribution FY2018 AT02018 74 Asphalt Repair and Replacement-MOC Building Equipment Renovation and Replacement Building Fixture and Finish Renovation Chargeback Distribution FY2018 City Hall Roof Replacement City Parks Parking Lots - Asphalt Replacement Citywide Security Program Community Works Program Council Chambers A/V Equipment Replacement Fire Department Building Needs Fleet Heavy Duty Vehicle Lift Historic Buildings Equipment and Finish Renovation Impact Fee Study MOC Fuel Island MOC Site Lighting Improvements Network Infrastructure Replacement - Beardsley WRF Network Infrastructure Replacement - Butler WRF Network Infrastructure Replacement - City Hall Network Infrastructure Replacement - Greenway WTF Network Infrastructure Replacement - Jomax WTF Network Infrastructure Replacement - Microwave WAN Network Infrastructure Replacement – MOC Network Infrastructure Replacement - Quintero WTF Network Infrastructure Replacement - Remote Access Network Infrastructure Replacement-Municipal Court Parking Lot Maintenance for City Buildings Peoria Center for Performing Arts Peoria Transit Center Pyramid Peak Radio Site 4 PW01199 PW00050 PW00060 CB02018 PW00150 PW00995 PW00506 COP0001 PW00510 PW00090 PW13010 PW10300 CD00007 PW00305 PW00402 IT00011 IT00013 IT00027 IT00010 IT00012 IT00026 IT00014 IT00017 IT00032 IT00020 PW11150 PW00080 PW00325 IT00035 76 77 78 79 80 81 82 83 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 City of Peoria FY 2018 – FY 2027 Capital Improvement Program City of Peoria Capital Improvement Program FY 2018 - 2027 Operational Facilities (Continued) ............................................................................................... Radio Subscriber Replacements IT00018 106 Renovate Main Library PW00509 107 Transit Park and Ride Lot PW00335 108 Vistancia Radio Site IT00034 109 Parks............................................................................................................................................. 111 75th Avenue and Deer Valley Trailhead CS00173 120 83rd Avenue and Village Parkway Trailhead CS00156 121 99th Ave and Olive Trailhead CS00088 122 Camino a Lago Park#2 (The Meadows) CS00086 123 Community Services ADA Compliance CS00177 124 Community Services Master Plan CS00067 125 Country Meadows Park Improvements CS00203 126 New River Trail - Williams Rd to Happy Valley Rd CS00128 127 Northern Community Park CS00059 128 Palo Verde Ruin - Interpretive Plan CS00178 130 Park and Recreation Facility Refurbishment CS00185 131 Sonoran Mountain Ranch Park Improvements CS00204 132 Sonoran Preservation Program (Open Space) CS00089 133 Sports Complex Asphalt Remediation CS00179 134 Trailhead at Vistancia CS00159 135 Varney Park Improvements CS00201 136 Veterans Memorial Improvements CS00187 137 Public Safety ...............................................................................................................................139 800 MHz Mobile and Portable Radios FD00018 142 Fire Station #8 FD00008 143 Fire Station No. 3 Apparatus Bay Expansion FD13400 144 Jomax Fire Station #7 Emergency Traffic Signal FD13101 145 Pinnacle Peak Public Safety Facility Expansion PD00021 146 Self Contained Breathing Apparatus FD00017 147 5 City of Peoria FY 2018 – FY 2027 Capital Improvement Program City of Peoria Capital Improvement Program FY 2018 - 2027 Streets and Traffic Control .......................................................................................................149 103rd Av; Northern Ave to Olive Ave -Full Street EN00422 155 67th Av; Olive Av to Redfield Rd Landscape Enhance EN00593 156 67th Ave Widening; Pinnacle Peak to Happy Valley EN00100 157 75th Av; Grand Av to Tbird Rd Landscape Enhancemnt EN00592 159 75th Ave & Cactus Rd Intersection Improvements EN00088 160 75th Ave & Peoria Ave Intersection Improvements EN00081 161 83rd Ave Bus Shelters EN00582 162 83rd Av Sidewalks & Bike Lanes; HVR to Jomax EN00546 163 87th Ave & Peoria Ave Intersection Alignment PW00109 164 89th Ave; Golden Ln to Olive Av EN00472 165 91st Av; Mtn Vw Rd to Grand Av Landscape Enhancemn EN00594 166 91st Ave; Deer Valley Rd to Pinnacle Pk Rd EN00505 167 99th Ave Reconstruction; Butler Dr to Olive Av EN00421 168 ADA Accessibility PW00025 169 Arterial Road Pavement Preservation & Restoration PW00992 170 Bell Rd and 83rd Av Right Turn Lane EN00562 171 Bridge Maintenance and Management Program EN00243 172 Bus Stop Improvements PW11190 173 Cactus Rd & 69th Av Sidewalk, North Side EN00550 174 Chip Seal Dirt Roads PW00163 175 Deer Valley Rd & 87th Av Intesection Improvements EN00590 176 Deer Valley Rd; 109th Ave to Lake Pleasant Pkwy EN00395 177 Dirt Shoulders, Dust Abatement PM-10 Program PW01001 178 Guardrail Program EN00555 179 Happy Valley Pkwy Widening; LPP to Agua Fria EN00463 180 Jomax Rd Improvements; 73rd Av to 75th Av EN00591 181 Jomax Rd; L303 to Vistancia Blvd EN00585 182 Lake Pleasant Parkway Pavement Maintenance PW13005 183 Lake Pleasant Parkway Sidewalk EN00480 184 Lake Pleasant Pkwy & Dixileta Dr Intersection Mods EN00588 185 Lone Mountain ROW Acquistion EN00479 186 6 City of Peoria FY 2018 – FY 2027 Capital Improvement Program City of Peoria Capital Improvement Program FY 2018 - 2027 Streets and Traffic Control (Continued) ....................................................................................... Major Street Repairs PW00027 187 Monroe St; 83rd Av to 85th Av Roadway Improvements EN00549 188 Northern Parkway EN00142 189 Paradise Lane Widening; Skunk Creek Bridge to 75th EN00373 190 Peoria Auto District EN00556 191 Peoria Homes Alley Improvements EN00580 192 Pinnacle Peak Road; 91st Ave-Lake Pleasant Pkwy EN00015 193 Residential Roads Rehabilitation and Preservation PW13000 194 Resurvey Benchmarks PW00137 195 Rural-Standard Roads Program PW01003 196 Sidewalks Annual Program PW00046 197 Street Light Infill and Replacement Program PW11160 198 Street Maintenance Program PW00138 199 Sunrise Mtn HS Traffic Solutions EN00589 200 Technical Pavement Condition Survey & Support PW00512 201 Thunderbird Road Corridor Improvements EN00086 202 Traffic Signal Renovation and Replacement PW00993 203 Utility Undergrounding Program EN00563 204 Vistancia Blvd & Happy Valley Rd Intersection Mods EN00586 205 Traffic Management Center Equipment Replacement EN00433 206 Traffic Signal Interconnect Project (TSIP) PW00133 207 Traffic Signal Program EN00170 208 Traffic Signal System Software Replacement EN00430 209 Wastewater .................................................................................................................................211 101st Ave and Northern Lift Station Pretreatment UT00398 214 Agua Fria Lift Station-Wastewater Campus Land UT00284 215 Beardsley Plant Equipment Upgrade and Expansion UT00314 216 Beardsley WRF Solids Pipeline Rehabilitation UT00308 217 Butler IPS Equipment Upgrade/Replacement UT00422 218 Butler Recharge Wells (ASR) UT00309 219 7 City of Peoria FY 2018 – FY 2027 Capital Improvement Program City of Peoria Capital Improvement Program FY 2018 - 2027 Wastewater (Continued) ................................................................................................................. Butler WRF Aeration System Upgrades UT00420 221 Butler WRF Headworks Rehabilitation UT00100 222 Butler WRF Plant Equipment Upgrade and Replacement UT00333 223 Dixileta 21 inch Sewer Extension UT00404 224 El Mirage Road Sewer Infrastructure Upsizing UT00432 225 Jomax WRF Expansion UT00388 226 Jomax WRF Operational Improvement/Upgrade/Replace UT00323 228 Lift Station Reconditioning UT00116 229 Manhole Rehabilitation UT00307 230 Miscellaneous Local Wastewater Line Improvements UT00191 231 Reclaimed Water Booster Land Purchase at IPS UT00329 232 SROG Line Assessment& Repair UT00321 233 Trunk Sewer Line Inspection UT00322 234 Trunk Sewer Rehabilitation UT00296 235 Wastewater System Additional R & M Expense UT00436 236 West Agua Fria Wastewater Lines UT00171 237 Water...........................................................................................................................................239 103rd Ave 12" Waterline Northern to Olive UT00392 243 75 Ave 16-inch Waterline, Cactus and Peoria UT00143 244 75th Ave 16" Waterline Cholla St to Thunderbird Rd UT00400 245 75th Avenue and Grand PRV Upgrade UT00408 246 85th Avenue Reclaimed Waterline-Mtn View to Grand UT00310 247 ADOT Well-Sports Complex Well Connection UT00327 249 Agua Fria Booster/PRV UT00245 250 Butler Well Site Rehabilitation UT00410 251 Central Arizona Project Curtailment Study UT00434 252 Condition Assessment of Remote Sites UT00256 253 Desert Harbor-Arrowhead Shores Well Mixing UT00312 254 El Mirage Road Waterline Upsizing UT00430 255 Fire Hydrant Infill and Replacement UT00204 256 8 City of Peoria FY 2018 – FY 2027 Capital Improvement Program City of Peoria Capital Improvement Program FY 2018 - 2027 Water (Continued) ........................................................................................................................... Greenway Plant Equipment Upgrade/Replacement UT00316 257 Greenway WTP 8 MGD Expansion UT00311 258 Hillcrest 8 inch Waterline UT00426 259 Integrated Utility Master Plan UT00271 260 Jomax In-Line Booster Station Upgrades UT00285 261 Lake Plsnt Pkwy 24-inch Waterline; Loop 303- LPWTP UT00269 262 Lone Mtn Pkwy 36-inch Waterline; LPP to L303 UT00233 263 Miscellaneous Local Waterline Improvements UT00203 264 New River Utility Company Acquisition UT00390 265 Northern Community Park Well UT00424 266 Patterson Well-W209, W210 Well Mixing UT00328 267 Pyramid Peak Water Treatment Plant - Upgrades UT00037 268 Pyramid Peak Water Treatment Plant Expansion UT00334 269 Quintero Plant Equipment Upgrade/Replacement UT00418 270 SCADA Equipment Replacement UT00266 271 Technology and Security Master Plan UT00304 272 Terramar Booster Pump Station Rehabilitation UT00412 273 Thunderbird Rd 16" Watermain Replacement UT00416 274 Utility Billing System UT00160 275 Ventana Well, Booster Rehabilitation UT00394 276 W108 Bailey Well Site Improvements UT00414 277 Water & Wastewater Rate Study UT00298 278 Water Facility Reconditioning UT00206 279 Water Line Assessment and Replacement UT00335 280 Water Meter Replacement Program UT00326 281 Water System Additional R & M Expense UT00438 282 Water/Wastewater Hydraulic Model Update UT00428 283 Water/Wastewater/Expansion Fee Update UT00070 284 Wellhead Water Quality Mitigation UT00272 285 Wells - New Construction UT00117 286 West Agua Fria Water Lines UT00170 287 9 City of Peoria FY 2018 – FY 2027 Capital Improvement Program City of Peoria Capital Improvement Program FY 2018 - 2027 Water (Continued) ........................................................................................................................... Western Area CAP Pump Station UT00274 288 Westland Rd. Reservoir and Booster Station UT00336 289 White Mountain Apache Tribe Water Rights Purchase UT00234 290 Zone 1/2 PRV Upgrades (91st and Cactus) UT00261 291 Zone 5E/6E PRV Station UT00286 292 Appendix A Account Number Detail ......................................................................................294 Appendix B Project Listing by Number .................................................................................342 Appendix C Total CIP by Source ............................................................................................348 10 City of Peoria FY 2018 – FY2027 Capital Improvement Program 11 City of Peoria Council Districts Lake Pleasant Mayor Cathy Carlat Vice Mayor Jon Edwards Willow District Mesquite Carefree Hwy 67th Ave. Councilmember Vicki Hunt Acacia District Pinnacle Peak Rd. Willow Councilmember Bill Patena Ironwood District Ironwood Bell Rd. Councilmember Carlo Leone Pine District Peoria Ave. 115th Ave. Councilmember Michael Finn Palo Verde District 12 Pine Palo Verde Acacia Northern Ave. 67th Ave. Councilmember Bridget Binsbacher Mesquite District City of Peoria Core Values P “The City of Peoria team members share a commitment to provide quality service for our community.” Professional E Demonstrates professional skills and knowledge needed to perform the job; keeps informed of developments in the professional field and applies this knowledge to the job; encourages and supports the development of subordinate personnel. Ethical O Maintains the highest standards of personal integrity, truthfulness, honesty, and fairness in carrying out public duties; avoids any improprieties; trustworthy, maintains confidentiality; never uses City position or power for personal gain. Open R Communicates effectively orally and in writing; involves appropriate individuals and keeps others informed; acts as a team member; participates and supports committees/boards/commissions/task forces; approachable; receptive to new ideas; supports diversity and treats others with respect; actively listens. Responsive I Consistently emphasizes and supports customer service; takes responsibility to respond to all customers in a prompt, efficient, friendly, and patient manner; represents the City in an exemplary manner with civic groups/organizations and the public. Innovative A Demonstrates original thinking, ingenuity, and creativity by introducing new ideas or courses of action; supports innovative problem-solving by identifying and implementing better methods and procedures; takes responsible risks; demonstrates initiative and “follows through” on development and completion of assignments. Accountable Accepts responsibility; committed to providing quality service to our community; plans, organizes, controls and delegates appropriately; work produced is consistent and completed within required timeframes; implements or recommends appropriate solutions to problems; acknowledges mistakes; manages human and financial resources appropriately. 13 City of Peoria Principal Officials of the City Fiscal Year 2018 Cathy Carlat Mayor Jon Edwards Bridget Binsbacher Vicki Hunt Carlo Leone Vice Mayor Michael Finn Councilmember Councilmember Councilmember Bill Patena Councilmember Councilmember Carl Swenson City Manager Susan J. Daluddung Jeff Tyne Julie Ayers Deputy City Manager Deputy City Manager George Anagnost Thomas Adkins John Imig Municipal Judge Governmental Affairs Director Information Technology Director Steve Burg Bobby Ruiz Jennifer Stein City Attorney Fire Chief Director of Communications Deputy City Manager John Sefton Roy Minter Stuart Kent Community Services Director Police Chief Public Works-Utilities Director Andrew Granger Rhonda Geriminsky Scott Whyte Development and Engineering Director City Clerk Economic Development Services Director Laura Krause Brent Mattingly Katie Gregory Human Resources Director Finance Director Management and Budget Director Chris Jacques Planning and Community Development Director 14 City of Peoria FY 2018 – FY2027 Capital Improvement Program 15 City of Peoria FY 2018 – FY2027 Capital Improvement Program 16 City of Peoria FY 2018 – FY2027 Capital Improvement Program Introduction Each year, the City of Peoria invests significant time and resources to design, construct and maintain the infrastructure and facilities needed to deliver municipal services to residents and businesses. Because of the high costs associated with building and maintaining capital assets, the city must carefully balance the need for such assets with our requirements to sustain a strong financial position. This is accomplished through the Capital Improvement Program (CIP) – a 10year plan for addressing present and future infrastructure needs. Coordinating the timing of different projects in the same area is particularly important, since it helps us to minimize service disruptions. The Community Center in Old Town Peoria was recently remodeled and expanded. New event seating at the Sports Complex Capital projects are non-routine expenditures that generally cost more than $100,000 and have a useful life of five years or more. Capital projects include design and construction, as well as the acquisition of land and the purchase of fixed assets. A fixed asset is any single item or single cohesive system that has a life expectancy of at least one year and a value of at least $5,000. All land is capitalized as a fixed asset, regardless of cost. Peoria’s CIP is a 10-year balanced plan that addresses projects that are needed, or will be needed, across a broad spectrum of areas. It is balanced because we have identified funding sources based on reliable revenues to support both the capital costs and the operating costs for each project in the 10-year program. Each year, a great deal of effort is put into updating this plan to ensure not only that critical needs are being met, but also that the cost, scope and timing of all projects are coordinated throughout. The first year of the program is the only year that is appropriated by the City Council. This becomes the capital budget, which is an important piece of the city’s overall annual budget. The Fiscal Year 2018 capital budget includes not only newly funded projects, but also any project costs carried over from the previous year. The last nine years of the CIP are for planning purposes; future funding is not guaranteed and the plan is subject to change. The CIP is a dynamic plan that can change significantly from year to year. At the discretion 17 City of Peoria FY 2018 – FY2027 Capital Improvement Program  The Capital Improvement Program shall provide an estimate of each project’s costs, anticipated sources of revenue for financing the project, and an estimate of each project on city revenues and operating budgets (8.02). of the City Council, new projects can even be added to the capital budget after it has been adopted. The 10-year Capital Improvement Program totals $660,251,970. For FY 2018 alone, budgeted capital projects total $212,187,537. This document provides detailed information about each project in the CIP, including scope, schedule, project costs, funding sources and future operating costs. It is intended to be a communication device, informing stakeholders of the city’s plans for capital investment.  The city will match programs and activities identified in the Capital Improvement Program with associated funding sources (8.03). The architects’ vision for the Northern Community Park  Efforts will be made to allocate sufficient funds in the multi-year capital plan and operating budgets for condition assessment, preventative and major maintenance, and repair and replacement of critical infrastructure assets (8.04). Deer Valley Road Improvements Financial Policies The City of Peoria Principles of Sound Financial Mangement establish guidelines for the city’s overall fiscal planning and management, including the Capital Improvement Program. This document is available in its entirety on the city’s website (Peoriaaz.gov) under the Finance and Budget Department. Several of the policies relate directly to the CIP, most notably Policy 8 – Capital Improvement Program. Following are some excerpts from this policy.  The city’s objective is to incorporate “Pay-AsYou-Go” funding (using available cash resources) in the annual Capital Improvement Program. This will supplement funding from other sources such as IGAs, bonds, impact fees and grants (8.05).  When current revenues or resources are available for capital improvement projects, consideration will be given first to those capital assets with the shortest useful life and/or to those capital assets whose nature makes them comparatively more difficult to finance with bonds or lease financing (8.06).  The city manager will annually submit a financially-balanced, multi-year Capital Improvement Program for review by the City Council (8.01). 18 City of Peoria FY 2018 – FY2027 Capital Improvement Program  The first year of the adopted capital plan will the capital budget for that fiscal year (8.07). FY 2018‐2027 CIP BY FUNDING SOURCE  Periodic status reports will be presented to City Council to share project progress and identify significant issues associated with a project (8.08).  Within 90 days of the completion of a capital project, any remaining appropriated funds for the project will revert to the fund balance of the funding source (8.09).  The Capital Improvement Program will be updated annually as a multi-departmental effort (8.10). Funding Source 10-Year Total Pct. of Total G.O. Bonds $105,842,009 16% Impact Fees $ 92,647,344 14% Operating $213,079,426 32% Outside Sources $ 24,299,368 4% Revenue Bonds $130,696,540 20% RTP-ALCP $ 20,349,433 3% Transportation Sales Tax $ 72,787,850 11% Total $659,701,970 100% CIP Development Process Capital improvement planning has proven to be a year-round process, with city departments continually re-evaluating and prioritizing their capital needs. However, the process is most involved from October through April. It is during this period that city staff identifies and prioritizes projects, estimates project costs, determines available resources and, ultimately, submits a recommended program to the City Council. The Budget Division coordinates the annual update of the 10-year CIP as part of the annual budget process. Division staff also forecast revenues for the various funds used to finance capital projects, and set the financial parameters for the development of the CIP. Capital projects originate in the operating departments, where subject matter experts identify needs based on master planning documents and other technical criteria. Once project requests have been submitted and the financial parameters established, a preliminary plan is prepared for the review of the CIP Management Committee. This committee is made up of the deputy city managers and directors of city departments that have a Wayfinding signage in the P83 Entertainment District 19 City of Peoria FY 2018 – FY2027 Capital Improvement Program The following is an overview of the CIP process: significant stake in the delivery of capital projects (including Finance and Budget). The CIP Management Committee is responsible for evaluating project requests in light of available resources and developing a financially balanced plan that addresses City Council goals and priorities. This group also ensures that projects are properly scoped and that the timing of projects is coordinated. Once complete, the city manager forwards the recommended Capital Improvement Program to the City Council for approval. September – October. Operating departments identify projects, define project scopes, prepare cost estimates, and prioritize projects based on direction received from the city manager and City Council. Department directors review project requests before final submittal. November – December. Capital project requests are submitted to the Budget Division. Division staff use revenue forecasts and financial models to prepare a preliminary CIP. January – March. The CIP Management Committee meets to review the proposed plan, making adjustments as needed. Budget finalizes the recommended CIP for the consideration of the City Council. The City Council receives the CIP and offers its recommendations during study sessions. April. The City Council approves the Capital Improvement Program at one of its regular meetings, usually on the same day as the adoption of the Tentative Budget. The new scoreboard is a great addition at the Peoria Sports Complex. The San Diego Padres’ newly renovated clubhouse 20 City of Peoria FY 2018 – FY2027 Capital Improvement Program Programming Projects in the CIP Specific projects in these broad categories spring from long-range plans, City Council goals and priorities, and staff recommendations. Longrange planning is critical to ensuring a sustainable future for the City of Peoria. Planning efforts such as those encompassed by the city’s General Plan and the various master plans (for parks, trails, streets, water, wastewater, etc.) provide helpful guidance to departments in identifying and prioritizing capital projects. Specific sections of the General Plan, such as the Circulation Element, tie directly with the CIP, as do each of the master plans. As such, the CIP is one of the mechanisms by which long-range plans become reality. Capital improvements are the “bricks and mortar” from which the City of Peoria delivers services to residents and businesses within its borders. FY 2018‐2027 CIP BY PROJECT TYPE Project Type 10‐Year Total Pct. of Total Drainage $37,596,326 6% Economic Development $30,499,940 5% Operational Facilities $32,375,348 5% Parks $62,131,656 9% Public Safety $16,157,074 2% $178,276,470 27% $92,924,243 14% Water $209,740,913 32% Total $659,701,970 100% Streets & Traffic Control Wastewater The goals and priorities of the City Council are another key source of capital projects. Many of the projects in the CIP, particularly those that benefit a specific neighborhood or area, come directly from the communication of concerned citizens with their elected representatives. The City Council’s Policy Goals provide near-term direction to city staff. The six broad policy goals for fiscal year 2018 are: (1) Community Building, (2) Enhance Current Services, (3) Preserve Natural Environment, (4) Total Planning, (5) Economic Development, and (6) Leadership and Image. By preventing the deterioration of existing infrastructure and by adding new infrastructure in response to growth, capital improvements help to ensure that the city can continue to provide the level of service our customers have come to expect. Many different types of projects make up the Capital Improvement Program, including the following: Below are some of the notable projects planned for the next three years:  Office buildings, police and fire stations, court facilities, libraries, and recreation centers. A project to mitigate the impact of storm water on Union Hills Drive, particularly at the intersection with 107th Avenue. Improvements will include channel improvements, box culverts, storm drains, laterals, and catch basins.  Parks, trails, open space, right-of-way landscaping, and sports facilities.  Roads, bridges, sidewalks, street lights, traffic signals, and sound walls. A similar need has been identified and addressed for the Beardsley Channel between 99th and 111th Avenue. This requires improved channelization as well as local storm drain connections with storm drains, catch basins scuppers and swales. Landscape and landscape irrigation will be installed.  Storm drains, channels, retention basins, and drywells.  Water and wastewater treatment plants, pipes, storage facilities, and pump stations.  Information technology infrastructure major software applications. and 21 City of Peoria FY 2018 – FY2027 Capital Improvement Program ongoing and construction programmed in fiscal years 2018 thru 2021. The Neighborhood Drainage Program is initiated to identify areas with minor drainage issues and provide for the investigation, evaluation and where appropriate, implementation of drainage solutions. Landscaping improvements in the P83 Entertainment District Peoria’s next generation workforce volunteers at a Community Works project. Revitalization of Peoria’s P83 Entertainment District consistent with the Peoria Sports Complex Area Urban Design Plan approved by the City Council in July 2010. Funding is for final design and construction of the final phase of P83 Improvements including way finding signage, monument signage, bridge aesthetics, lighting, and landscaping on 83rd Avenue, Arrowhead Fountain Center, and Paradise Lane from 83rd to 75th. The various phases of the project will include paving, concrete, landscaping, lighting, signage, aesthetics, utility relocations, right-of-way acquisition, public involvement, and drainage. Continuation of the successful Community Works Program, which provides funding for projects that have a local benefit or that may arise during the fiscal year but are not identified in the capital budget. Country Meadows Park Improvements. This project entails the addition of one or more new park amenities that will be determined through a public input process. A design professional will be chosen to assist the City in facilitating public meeting(s) and preparing visuals of amenity alternatives. Artist rendering of improvements to Pinnacle Peak Public Safety Facility Additional space for the Police Department’s north command on the campus of the Pinnacle Peak Public Safety Facility. The building will be home to police employees providing services to the northern reaches of the city. The Trailhead at Vistancia will construct a trailhead near White Peak Mountain to provide access to mountain hiking trails. Amenities will include parking, restroom, picnic shelters, benches, drinking fountain, bike racks, signage, shade and landscaping. Development of a third community park is underway in the northern portion of the City with site selection and preliminary design work 22 City of Peoria FY 2018 – FY2027 Capital Improvement Program Inspection and rehabilitation of trunk sewer lines around the city to ensure continuous and reliable service. Widening of the intersections along 75th Avenue at Peoria Avenue and Cactus Road. From a safety and congestion relief standpoint, these are the highest priority intersections in Peoria. The city received federal Highway Safety Improvement Program funding for both intersections. The City will Rehabilitate And Upgrade Well Production Sites to address reliability and water quality issues as these facilities age. This City will also upgrade sites with new technologies as appropriate, allowing the system to continue to operate reliably providing redundancy, and ensuring water quality. Inspection and rehabilitation of trunk sewer lines around the city to ensure continuous and reliable service. The Regional Transportation Plan supports a Transit Center to serve the anticipated convergence of three bus lines thru Peoria; the Grand Avenue Limited, the 83rd Avenue Line and the Peoria Line, along with a Park and Ride facility that may be directly linked to the transit center. New River Trail - Northern Avenue to Olive Avenue Replacement and/or upgrades to critical Communication and Information Technology Infrastructure are all addressed in this plan. Reconstruction of the west half-street improvements on 103rd Avenue between Northern and Olive Avenues. These improvements will provide additional traffic capacity and pedestrian facilities, improve drainage, repair failing roadway sections, and secure the old City of Glendale Landfill. Widening Happy Valley Parkway over the Agua Fria from Lake Pleasant Parkway to the west end of the bridge over the Agua Fria River. This will include the widening of the bridge, striping and signage, street lighting, ADA ramps, landscape and irrigation. The City plans to partner with the City of Glendale to expand Peoria’s treatment capacity at the Pyramid Peak Water Treatment Plant by an additional 13 million gallons per day. Additional treatment capacity at the plant and the additional facilities to support the delivery of additional capacity will provide service to planned growth areas in the northern areas of Peoria. Development in the north and northwest portions of the city will require that additional treatment capacity be added at both the Beardsley and Jomax Wastewater Reclamation Facilities (WRFs). The City will complete the multi-year Water Meter Replacement Program to replace aging customer water meters that have reached the end of their useful lives. As part of the transmission system’s maintenance, the City will replace and/or rehabilitate waterlines that have been identified as being at risk of failure. The City will expand its Groundwater Recharge Well infrastructure near the Butler WRF to allow additional storage of treated effluent. Underground storage allows the City to increase future groundwater supplies that may be needed in times of shortage. 23 City of Peoria FY 2018 – FY2027 Capital Improvement Program Impacts on the Operating Budget from a new recreation center help to offset the increased operating costs. The net operating costs are included not only in the project request, but also in the long-range forecasts of the respective funds, to ensure that we properly account for operating budget impacts of all capital projects. The Capital Improvement Program has direct and sometimes significant impacts on Peoria’s operating budget. Upon their completion, most capital projects require ongoing costs for operation and maintenance. New buildings require electricity, water and sewer service, and maintenance and repair. New roads require regular sweeping as well as periodic crack filling and sealing, patching, milling, minor resurfacing, and replacement of stripes and markings. New parks and landscaped rights of way (such as medians and streets shoulders) require irrigation, fertilizing, mowing, and trimming. Some projects, such as a recreation center, require additional employees. Departments submitting capital projects estimate the operations and maintenance costs of each project based on cost guidelines that are updated each year. The departments also consider any additional revenues or savings the city can reasonably expect to recognize upon completion of the project. For example, membership fees A beautiful rainbow appears over Centennial Plaza, nestled in the center of the City Hall Complex. OPERATING IMPACTS BY PROJECT TYPE Project Type FY2018 FY2019 FY2020 Operational Facilities $ 2,000 $ 0 $ 37,300 $ 0 $ 37,300 $ 0 $ 67,300 $ 0 $ 70,800 $ 0 Parks $ 45,000 $1,671,287 $1,770,925 $1,826,939 $1,849,789 Public Safety $128,074 $ 128,074 $ 153,434 $ 178,434 $ 178,434 Streets & Traffic Control $ 58,387 $ 120,387 $ 343,787 $ 364,867 $ 367,067 Water & Wastewater $ $ $ $ $ Total $233,461 Drainage 0 33,312 $1,990,360 24 53,412 $2,358,858 FY2021 53,412 $2,490,952 FY2022 53,412 $2,519,502 City of Peoria FY 2018 – FY2027 Capital Improvement Program Financing the CIP debt is backed by all the revenues and resources of the city. Peoria only issues debt for projects when it truly makes sense to do so. This is determined by a number of different criteria, including the following: The Capital Improvement Program for fiscal years 2018-2027 is a $660 million investment in 207 different capital projects over the next 10 years. The program represents a significant investment of city resources in infrastructure, facilities, and recreational assets, and is designed to address the highest priority needs of the community. It is both financially feasible and can be accomplished within the suggested time frame.  The useful life of the project will not exceed the term of the bond (usually 20 years).  Pay-as-you-go financing is either not available or not sufficient to fund the project. (Pay-asyou-go financing refers to cash-based sources such as operating revenues and impact fees.)  The project will benefit future residents of Peoria, so the use of pay-as-you-go financing will unfairly burden current residents. The 10-year plan relies on several major revenue sources to finance capital projects. The use of these funding sources is governed not only by federal and state law, but also by the city’s own Principals of Sound Financial Management. Funding for many of the projects in the CIP comes from more than one source. For example, a single roadway project might be funded with general obligation bonds, impact fees, transportation sales tax, and federal transportation funds. In Peoria, G.O. bonds are backed by the city’s property tax collections. Beginning in 1980, state law mandated the separation of city property taxes into two components: the primary tax levy and the secondary levy. The primary levy may be imposed for any governmental purpose, but has strict limitations on how much can be levied. The secondary levy may only be used to retire the principal and interest on G.O. bonds issued by the city. As a result, it is the secondary levy that is used to finance many of Peoria’s capital projects. The amount of revenue available for allocation to projects in the CIP each year is based on financial projections by staff in the Budget Division. To develop these projections, staff vigilantly monitors and analyzes retail sales figures, construction (development) activity, residential and commercial property values, water and wastewater usage, state revenues, interest rates, and local and national economic trends. Much of the work involved in the development of the CIP involves matching identified project needs (and the associated costs) with available funding sources. The major sources used to pay for capital projects in the CIP are discussed below. General Obligation Bonds General obligation bonds helped pay for Pioneer Community Park, which opened for play in fall 2013. General Obligation (G.O.) Bonds are a common method used to raise revenues for large-scale municipal projects. G.O. bonds are backed by the full faith and credit of the city, meaning that the 25 City of Peoria FY 2018 – FY2027 Capital Improvement Program assessed valuation of taxable property in the city (11.07f).  Reserve funds, when required, will be provided to adequately meet debt service requirements in subsequent years (11.07g).  Interest earnings on bond fund balances will only be used to pay debt service on the bonds unless otherwise committed for other uses or purposes of the project (11.07h).  The term of any bond will not exceed the useful life of the capital project/facility or equipment for which borrowing is intended (11.07i). The water splash ground is a popular amenity at the Camino a Lago Park. Debt Policies. The Principles of Sound Financial Management include policies governing the use of property-tax supported bonds: Assessed Valuation. As mentioned above, it is the secondary levy that is used to pay the principal and interest on general obligation bonds. The secondary assessed value of a property is calculated by multiplying that property’s full cash value, as determined by the county assessor, by an assessment ratio (varies by property class). Thus, Peoria’s secondary assessed valuation is the sum of the secondary assessed valuation of all properties within the incorporated area of Peoria. The city’s secondary property tax levy, then, is the secondary assessed valuation multiplied by the secondary property tax rate, which is $1.25 per $100 of assessed valuation. For FY 2018, Peoria’s secondary assessed valuation is $1.34 billion and the secondary levy is $16.8 million.  Tax supported bonds are bonds for which funds used to make annual debt service expenditures are derived from ad valorum (property) tax revenue of the city (11.07a).  The target for the maturity of general obligation bonds will typically be between 20 and 30 years. The target for the “average weighted maturities” for general obligation bonds of the city will be 12.5 years (11.07b).  Generally, the city will structure general obligation bond issues to create level debt service payments over the life of the issue (11.07c).  Debt supported by the city’s general fund will not exceed 10 percent of the annual general fund revenues (11.07d). The secondary property tax is unlimited in that a city may levy the amount necessary to meet its debt service obligations. However, Arizona voters in November 2012 approved Proposition 117, which caps the growth of the secondary assessed valuation to 5 percent over the previous year’s amount. This means that the city would have to raise its secondary property tax rate if the growth in assessed valuation were insufficient to meets its debt service obligations using the existing rate. Fortunately, despite this new limit on the secondary assessed valuation, the city is still in a position to meets its needs with the existing rate for the foreseeable future.  Secondary property tax rates will be determined each year as part of the budgetary process (pursuant to state law) to pay the necessary debt service payments of general obligation bonds currently outstanding or expected to be issued within the fiscal year (11.07e).  In accordance with requirements of the State of Arizona Constitution, total bonded debt will not exceed the 20 percent limitation and 6 percent limitation of the total secondary 26 City of Peoria FY 2018 – FY2027 Capital Improvement Program Assessed valuation is highly susceptible to swings in the real estate market. The severe economic recession that began in 2008 decimated commercial and residential property values in the Phoenix metropolitan area, leading to dramatic declines in assessed valuation for cities like Peoria. Secondary assessed valuation peaked at almost $2 billion in FY 2009, but fell 47 percent by FY 2014 to $1.05 billion—a loss of nearly half the city’s assessed valuation over a five-year period. The black cloud over the Valley’s housing market has finally lifted, and Peoria homeowners have seen the value of their properties increasing again over the last couple of years. As a result, city forecasts show a 8 percent increase in secondary assessed valuation for FY 2017. The chart below shows historic and projected secondary assessed valuation. A welcoming rest station along the New River Trail indebtedness (outstanding principal) to 20 percent or 6 percent of its secondary assessed valuation, depending on the type of project involved. Projects in the 20 percent category include water, sewer, drainage, artificial lighting, open space preserves, parks, playgrounds and recreational facilities, public safety and emergency services facilities, and streets and transportation. Projects in the 6 percent category include economic development, historic preservation and cultural facilities, general government facilities, and libraries. HISTORIC AND PROJECTED ASSESSED VALUATION Dollars (in Millions) 3,000 2,500 2,000 1,500 1,000 500 The table on the next page shows the city’s estimated constitutional debt limitation as of July 1, 2017. Available borrowing capacity has decreased significantly since the onset of the Great Recession. Moreover, the city sold $29 million in new bonds in June 2010, $14.7 million in June 2012 and an additional $30.3 million in December 2015. Available capacity in the 20 percent category is now $93.9 million, compared to $200 million in FY 2010, while available capacity in the 6 percent category is now $69.9 million, compared to $108 million in FY 2010. FY04 FY06 FY08 FY10 FY12 FY14 FY16 FY18 FY20 FY22 FY24 FY26 0 This loss of secondary assessed valuation means the city cannot support the level of G.O.-bonded projects once programmed in the CIP, as property tax revenues would not be sufficient to pay the debt service. Indeed, G.O. bonds account for $105 million, or 16 percent, of the $660 million FY 2018-2027 CIP—compared to $319 million, or 32 percent, of the $1 billion FY 2009-2018 CIP. To look at it another way, the G.O.-bond supported portion of the CIP has decreased by 67 percent since FY 2009. Forecasts show available capacity in both categories increasing in FY 2018, and rising steadily thereafter. This can be attributed to the aforementioned increases in assessed valuation beginning in FY 2018 combined with the fact that the city does not plan to issue large amounts General Obligation Debt Limitations. The Arizona Constitution limits a city’s bonded 27 City of Peoria FY 2018 – FY2027 Capital Improvement Program of general obligation debt over the next four years. The city is anticipating a large debt issue in FY 2018 to finance a community park in northern Peoria, and this will certainly affect constitutional capacity in the years that follow. An inviting trail takes a shady turn under El Mirage Road in Northern Peoria. 28 City of Peoria FY 2018 – FY2027 Capital Improvement Program one category may be used to pay for projects in that same category, but may not be used to pay for projects in another category. The city takes very seriously its responsibility to properly apply voter authorization, and has systems in place to track the use of voter authorization. Voter Authorization. Regardless of whether or not the city has available revenues or constitutional capacity to issue and pay for new bonds, the city must have authorization from the voters through a citywide bond referendum in order to issue G.O. bonds for capital projects. Peoria voters have authorized the use of bonds for various capital needs in bond elections held in 1985, March 1990, September 1994, September 1996, September 2000, May 2005, and November 2008. In the most recent bond election, held November 4, 2008, voters authorized the use of $378 million in bonds in three categories: Streets, Bridges, Traffic Control and Transportation, and Drainage ($277 million); Public Safety, Technology, and Municipal Operations ($60 million); and Parks, Recreation, and Trails ($41 million). Property Tax Rate. This 10-year plan was developed under the assumption that the existing secondary property tax rate of $1.25 per $100 of assessed valuation will not change. The last time the secondary property tax rate changed was in FY 2008 when it increased to $1.25 from $1.20. Prior to that time, the rate held steady at $1.30 from FY 1999 to FY 2006. Schedule 8 in the Annual Program Budget for FY 2018 shows the original issue amount, outstanding principal amount, and debt service requirements for the city’s general obligation bonds. Bond sale proceeds must be used for the purposes specified in the bond election publicity pamphlet and ballot. Unspent bond proceeds in CONSTITUTIONAL DEBT LIMITATION As of June 30, 2017 20% Bonds 6% Bonds $1,340,187,710 Secondary Assessed Valuation Secondary Assessed Valuation $1,340,187,710 Allowable 20% Debt Capacity $268,037,542 Allowable 6% Debt Capacity $80,411,263 Less 20% Bonds Outstanding ($163,903,780) Less 6% Bonds Outstanding $5,053,265) Unused 6% Debt Capacity $75,357,998 Unused 20% Debt Capacity $104,133,762 PLANNED BOND USES VERSUS PROJECTED CONSTITUTIONAL CAPACITY (All Dollars in Thousands) Fiscal Year Available Before Use 20% 6% Projected Constitutional Capacity Remaining Projected Usage Total 20% 6% Total 20% 6% 2018 $112,692 $75,597 $188,289 $39,749 $4,311 $44,060 $72,943 $71,285 2019 $91,706 $81,225 $172,931 $7,701 $269 $7,969 $84,005 $76,645 2020 $104,081 $87,248 $191,329 $14,468 $81 $14,549 $89,613 $82,587 2021 $111,095 $93,693 $204,787 $7,727 $3,182 $10,909 $103,367 $85,850 2022 $126,352 $100,588 $226,940 $3,538 $657 $4,195 $122,814 $92,089 29 City of Peoria FY 2018 – FY2027 Capital Improvement Program Revenue Bonds Municipal Development Authority Bonds The city uses revenue bonds to support major capital improvements in its water and wastewater systems. Revenue bonds are secured by water and wastewater utility rate revenues rather than the full faith and credit of the city. As such, revenue bonds typically carry a slightly higher interest rate than general obligation bonds. Like G.O. bonds, revenue bond-funded projects can only be undertaken if they have voter authorization from a citywide bond referendum. For certain projects, the city uses bonds issued by the non-profit Peoria Municipal Development Authority to pay for capital improvements. MDA bonds are secured by the city’s excise tax and other undesignated revenues. The use of property taxes for this purpose is specifically prohibited. MDA bonds typically carry a higher interest rate than general obligation bonds, but they are advantageous in that they are not subject to constitutional debt limits or coverage ratios and they do not require voter approval. There are no legal or statutory limits on the amount of revenue bonds that may be issued. However, there are other constraints that limit the amount of revenue bonds that city can sell. For example, the issue will be required to have a debt coverage ratio of at least 1.25, which means that the projected net revenues from the project must be at least 125 percent of the highest maximum debt service requirement on outstanding bonds plus the debt service on new bonds to be issued. In addition, each of the outstanding bond issues must have a debt service reserve requirement sufficient to cover at least one year of debt service. The newly renovated Seattle Mariners’ clubhouse is being financed with MDA bonds. Under this method of financing, the city acquires the desired facilities from the non-profit corporation by means of a lease-purchase contract. The MDA issues its own bonds to obtain the funds necessary for the construction of the facilities. The facilities financed with the MDA bonds are then leased to the city for leaserental payments that mirror the semi-annual interest and principal payments on the bonds. Included under revenue bonds, though technically not “bonds” at all, are loan agreements with the Water Infrastructure Finance Authority of Arizona, or WIFA. WIFA is a program created by the State of Arizona, pursuant to federal regulations regarding water pollution and safe drinking water law, to provide financing to local communities for water and wastewater projects. Like revenue bonds, these loan agreements are backed by water and wastewater utility rate revenues. The city has entered into loan agreements with WIFA to finance the construction and/or expansion of the Greenway Water Treatment Plant, Beardsley Water Reclamation Facility, and Butler Water Reclamation Facility, and recently the purchase of the New River Water Company. The Peoria Municipal Development Authority has issued bonds three times in recent years for high-profile projects around the city. Most recently, in July 2012, the Peoria MDA issued $35.5 million in MDA bonds to finance clubhouse and stadium improvements at the Peoria Sports Complex and in March 2006, the MDA issued $6.7 million in bonds to finance the construction of the Peoria Center for the Performing Arts. These bonds are being repaid with the city’s half-cent sales tax revenues and, 30 City of Peoria FY 2018 – FY2027 Capital Improvement Program Operating Fund Revenues in the case of the theater, with the 1 percent charge to capital projects for public art. In February 2008, the MDA issued $47 million for the construction of the missing segment of Happy Valley Road from 91st Avenue to Terramar Boulevard and for the widening of 83rd Avenue from Williams Road to Calle Lejos. These bonds are being repaid with the city’s transportation sales tax revenues. Where possible, the city uses available cash, or “Pay-As-You-Go” funding, to pay for capital projects. Pay-As-You-Go funding comes from several operating funds, including the general fund, the water and wastewater utility funds, and the streets fund. Each year, the city identifies one-time, non-recurring revenues from these funds that can be used to support capital needs. The amount available in these funds for capital projects is limited, however, because of the uncertainty of available revenues and the need to support ongoing operations. The city’s half-cent sales tax fund also can be used to support capital projects, provided that such projects are consistent with the City Council policy governing the use of revenues from this tax. A variety of economic development projects have been supported by this revenue source over the years. The expansion of the Pinnacle Peak Public Safety Facility is being financed with development impact fees. Development Impact Fees A development impact fee is a charge on new development to pay for the construction or expansion of off-site capital improvements that are necessitated by and benefit the new development. Impact fees, which are collected when building permits are issued for a given project, cannot be used for operations, maintenance, or repair of existing facilities. The City of Peoria assesses impact fees for transportation, neighborhood parks, community parks, libraries, law enforcement, fire protection, water expansion, wastewater expansion and water resources. Grant and Intergovernmental Revenues Peoria’s grants coordinator and intergovernmental affairs staff work with city departments and outside agencies to aggressively pursue grants and other outside funding sources to help support capital projects. The city frequently shares the costs of capital projects with neighboring cities, the Flood Control District of Maricopa County, the Maricopa County Department of Transportation, the Arizona Department of Transportation, and other agencies. The Development and Engineering, Public Works-Utilities, and Governmental Affairs departments work closely with the Maricopa Association of Governments, the Water and Infrastructure Financing Authority of Arizona, and other agencies to secure passthrough federal funds, low-interest loans, and other favorable funding sources for capital projects. Impact fees are an important source of revenue for the capital program, and help to ensure that residential and commercial growth in Peoria helps pay for a portion of the Capital Improvement required to support new growth in the City. Impact fee revenues are subject to fluctuations in economic and market forces. As such, staff regularly updates forecasts of impact fee revenues and the associated fund balance models to reflect the most current economic and development information. 31 City of Peoria FY 2018 – FY2027 Capital Improvement Program water measuring devices. In addition, Peoria received $10 million in reduced-interest WIFA loans and $1.4 million in principal forgiveness from the 2009 federal stimulus program. These loans paid for several projects in the CIP, including trunk sewer repairs on Northern Avenue, new water lines at several locations, and upgrades to several well sites and the Beardsley Water Reclamation Facility. Over the last few years, Peoria has been very successful in securing or advancing outside funding for transportation projects. Nearly $70 million in federal stimulus dollars awarded to either the city or to ADOT was put to work all around the city on projects such as the Beardsley Road Extension, the widening of Loop 101 traffic interchanges at Union Hills Drive and Olive Avenue, the Grand Avenue widening, and pavement preservation projects in various locations. Federal Congestion Mitigation and Air Quality (CMAQ) money paid for almost 100 percent of the construction costs for the 84th Avenue streetscape and the 91st and Olive intersection improvements. Most recently, the city was awarded $13.7 million in federal Highway Safety Improvement Program funding for two intersection improvement programs along 75th Avenue at Peoria Avenue and Cactus Road. Transportation Sales Tax In 2004, the City Council appointed a 23member Citizen Transportation Committee to evaluate Peoria’s future transportation requirements and consider the various alternatives for funding these improvements. Based on its review, the committee put forward a recommendation to the City Council to increase the city sales tax by three-tenths of a percent to pay for transportation needs. The City Council referred this recommendation to the voters, who, on September 13, 2005, approved Proposition 300 increasing the city sales tax for transportation purposes. Transportation sales tax revenues are deposited into a separate fund from which expenditures are made for various transportation purposes. Consistent with the Citizen Transportation Committee’s original recommendation, the city earmarks in its forecasts each year $1 million for pavement maintenance, $1.6 million for transit operations, and $500,000 for operational support. Any unspent monies in these three areas are allocated to street capital projects, along with the balance of revenues collected. The transportation sales tax fund also pays the debt service on the MDA bonds issued for the construction of Happy Valley Road and the widening of 83rd Avenue widening from Williams to Calle Lejos, which is approximately $4 million per year. Federal dollars paid for much of the Beardsley Road Connector project, which provides enhanced freeway access for residents living in the northern reaches of Peoria. The city also has received significant outside dollars for water and wastewater projects. The United States Department of the Interior awarded $1.8 million in federal stimulus-funded Challenge Grants to Peoria for water resources sustainability enhancements. These enhancements included the construction of an additional recharge basin to bank reclaimed water from the city’s water reclamation facility, conversion of a well system from potable to non-potable water, and installation of a reclaimed water pipeline and Major projects completed to date using primarily transportation sales tax revenues include Happy Valley Road, the 83rd Avenue widening from Williams Road to Calle Lejos Road, and the 75th Avenue and Thunderbird Road intersection 32 City of Peoria FY 2018 – FY2027 Capital Improvement Program adopted by the Maricopa Association of Governments (MAG) Regional Council November 25, 2003. The RTP provides a blueprint for future transportation investments in the region through FY 2026, including freeways and other routes on the state highway system, major arterial streets and intersection improvements, and public transit systems. improvements. Other completed projects that have been funded at least partially with this source include the Traffic Management Center, ITS Workstations at the Peoria Sports Complex, 84th Avenue Streetscape, intersection improvements along 75th Avenue at Peoria Avenue and Cactus Road; and 87th Avenue half-street improvements from Olive Avenue to Hatcher Road. This fund also supports a number of ongoing programs, including the Traffic Signal Program, Traffic Signal Interconnect Program, and Bridge Maintenance Program. Over the next three years, the transportation sales tax will help pay for several key projects, including the acquisition of the right of way (ROW) along Lone Mountain Parkway between Lake Pleasant Parkway and the Agua Fria; the widening of Happy Valley Parkway between Lake Pleasant Parkway and the Agua Fria River; the west halfstreet improvements to 103rd Avenue between Northern and Olive Avenues; and extension of Jomax Rd from the L303 to Vistancia Blvd. Peoria has one project in the arterial component of the RTP, known as the Arterial Life Cycle Program, or ALCP; Happy Valley Road: Lake Pleasant Parkway to the Agua Fria. Regional revenues have been allocated to each of these projects, and the city is required to match these revenues with a contribution of no less than 30 percent of the total project costs. The source of the regional revenues programmed in the ALCP for all of Peoria’s projects except for the Beardsley Connector is the half-cent county transportation sales tax. The Beardsley Connector received federal surface transportation program funds rather than the county sales tax. To receive disbursements of county transportation sales tax through the ALCP, a city must first expend its own sources on an eligible project and then request reimbursement up to 70 percent of those expenditures. To date, Peoria has received $74.75 million in ALCP reimbursements for the following projects: Lake Pleasant Parkway ($32.02 million), Happy Valley Road ($20.63 million), 75th Avenue and Thunderbird Road Intersection Improvements ($1.89 million), Beardsley Rd from the Loop 101 to 83rd Ave & Lake Pleasant Parkway ($6.13 million), the Loop 101 Beardsley Road to Union Hills Drive ($10.85 million) and 83rd Avenue from Butler Drive to Mountain View Road ($3.23 million). Since most of these projects were constructed in advance of the scheduled reimbursements, the city has allocated these reimbursement dollars toward other capital projects that would have used the same sources for which the original projects were reimbursed. The city was reimbursed almost $21 million for its Happy Valley Road project through Maricopa County’s Arterial Life Cycle Program. County Transportation Sales Tax (Prop. 400 Reimbursements) On November 2, 2004, Maricopa County voters approved Proposition 400, which authorized a 20-year continuation of the half-cent sales tax for transportation projects. By state law, use of the revenues from this sales tax must be consistent with the Regional Transportation Plan (RTP) 33 City of Peoria FY 2018 – FY2027 Capital Improvement Program 34 City of Peoria FY 2018 – FY2027 Capital Improvement Program Drainage Storm water flows through the City of Peoria typically from the northeast to the southwest. As development occurs, the additional impervious surface area impacts the effective drainage of these flows, driving the need for drainage infrastructure. The city partners with the development community to ensure that onsite drainage issues are addressed during the development process. The city’s Capital Improvement Program addresses regional drainage issues through the drainage projects contained herein. provided by such outside sources as the Flood Control District of Maricopa County. The city has partnered with the Flood Control District on several large projects in recent years, including the drainage improvements along Pinnacle Peak Road and Rose Garden Lane and at 83rd Avenue and Pinnacle Peak Road. Drainage projects in the 10-year program include a project to mitigate the impact of storm water on Union Hills Drive, particularly at the intersection with 107th Avenue, and continuation of funding for the Neighborhood Drainage program to identify areas with minor drainage issues and provide for the investigation, evaluation and, where appropriate, implementation of drainage solutions. Drainage projects in the Capital Improvement Program are typically funded from General Obligation Bonds, with additional funding Drainage Total $37,596,326 $14,000,000 $12,000,000 $10,000,000 $8,000,000 $6,000,000 $4,000,000 $2,000,000 $0 FY18 FY19 FY20 FY21 FY22 35 FY23 FY24 FY25 FY26 FY27 FY 2018-2027 Capital Improvement Program Drainage Drainage Summary by Project Project Name Pg# FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 23-27 81st Ave / Varney Park Drainage Solution 38 85th Ave Storm Drain; Peoria Av to Grand Av $244,932 $0 $0 $0 $0 $0 $244,932 39 $0 $0 $0 $0 $0 $1,410,120 $1,410,120 87th Ave Storm Drain; Hatcher Rd to Monroe St 40 $0 $0 $0 $0 $407,721 $2,085,394 $2,493,115 Beardsley Rd Channel Improvements 41 $2,508,377 $0 $0 $0 $0 $0 $2,508,377 Desert Harbor/91st Ave Channel Improvements 42 $49,500 $0 $0 $635,932 $0 $0 $685,432 Lake Pleasant Basin Access Ramp 43 $0 $0 $0 $510,495 $0 $0 $510,495 Mountain View Rd Drainage; 91st Av to 89th Av 44 $0 $0 $0 $0 $173,500 $1,109,550 $1,283,050 Neighborhood Drainage Program 45 $600,000 $0 $0 $0 $0 $0 $600,000 New River & Jomax Rd Concrete Box Culvert 46 $17,000 $0 $0 $88,000 $435,000 $2,814,350 $3,354,350 New River Trail - BLM 47 $175,529 $0 $0 $0 $0 $0 $175,529 Peoria Storm Drain Master Plan - Land Preservation 48 $697,115 $0 $601,500 $0 $0 $601,500 $1,900,115 Pinnacle Peak Drainage; 87th Ave to 91st Ave 49 $320,000 $0 $1,512,800 $0 $0 $0 $1,832,800 Pinnacle Peak Rd & 67th Av Channel to New River 50 $3,496,476 $2,355,630 $10,660,437 $0 $0 $0 $16,512,543 Union Hills Channel 52 $1,075,730 $505,000 $505,000 $1,145,792 $0 $0 $3,231,522 Williams Road Channel Improvements 53 $0 $0 $0 $139,946 $714,000 $0 $853,946 $9,184,659 $2,860,630 $13,279,737 $2,520,165 $1,730,221 $8,020,914 $37,596,326 Total - Drainage 36 Total FY 2018-2027 Capital Improvement Program Drainage Drainage Summary by Funding Source Fund Number and Name FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 23-27 1000 - General $0 $0 $0 $0 $0 $0 $0 4240 - GO Bonds 2010 $0 $0 $0 $0 $0 $0 $0 4251 - GO Bonds 2015 $5,580,869 $0 $0 $0 $0 $0 $5,580,869 4252 - Proposed GO Bonds $3,603,790 $2,860,630 $6,209,737 $2,520,165 $1,730,221 $8,020,914 $24,945,457 4550 - CIP Capital Projects Fund $0 $0 $0 $0 $0 $0 $0 4810 - Outside Sources $0 $0 $7,070,000 $0 $0 $0 $7,070,000 $9,184,659 $2,860,630 $13,279,737 $2,520,165 $1,730,221 $8,020,914 $37,596,326 Total - Drainage 37 Total FY 2018-2027 Capital Improvement Program Drainage 81st Ave / Varney Park Drainage Solution Project Number: EN00482 Project Location: 81st Av; Cherry Ln to Roosevelt Dr Description: This project provides for the coordination with adjacent property owners, public involvement, design, ROW acquisition, utility coordination, utility relocation, materials testing, construction and construction administration for the construction of the drainage facilities on 81st Av between Roosevelt St and Cherry Hills Dr and within the Varney Park required to intercept and collect storm run-off and to make upgrades to the park. The improvements will include: construction of a large retention basin on the Varney Park, a spillway to allow the run-off to flow from 81st Ave to the park basin, park improvements including turf replacement, landscape repairs/restoration, pressurized irrigation systems, decomposed granite areas, and hardscape improvements. This project may also require processing of utility company (APS, Cox, Qwest, SRP. EPNG, SWG, etc) design and construction agreements, development and intergovernmental agreements. 38 Justification: The City of Peoria Storm Drain Master Plan recommends various alternatives to collect the storm run-off from the area bounded by 75th Ave and 81st Av, Cholla St and Cactus Rd. Staff has recommended a hybrid alternative which collects the run-off from 81st Av and directs it onto the Varney Park. An area of the Varney Park will be depressed and converted into a stormwater management basin. Discharges accumulate along 81st Av. between Cactus Road and Kirby Street and overwhelm the capacity of the 81st Av. roadway. The excessive flows overtop the roadway and escape along the west side of 81st Av. thru Varney Park and thru private properties until the flows reach Cholla Street. There are residences in the vicinity that are constructed below the street grades thus threatened by flooding once the area roadways overtop. This concept was developed by employing critical input from one particular resident routinely threatened by flooding. The Community Services Dept requested that the scope of the project be revised to include upgrades to the park. Category Funding Source CO-Constructi GO Bonds 2015 CO-Constructi Proposed GO Bonds Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $194,932 $50,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $194,932 $50,000 $244,932 $0 $0 $0 $0 $0 $0 $0 $0 $0 $244,932 FY 2018-2027 Capital Improvement Program Drainage 85th Ave Storm Drain; Peoria Av to Grand Av Project Number: EN00182 Project Location: 85th Av from Peoria Av to Grand Av Description: This project is for public involvement, design, land acquisition, utility coordination, utility relocation, materials testing, construction and construction administration for a storm drainage project to capture the drainage along 85th Avenue north of Peoria Avenue. This project will reduce the impact of the storm water reaching and overwhelming the 85th Avenue and Peoria Avenue intersection. In addition, the storm drain will be extended north of the BNSFRR and help drain the ponding area north of the tracks. The improvements will consist of storm drains, laterals and catch basins, which are an extension of the overall drainage system. There is a catch basin connected to the Salt River Project irrigation system that will also be reconfigured to connect to this proposed storm drain. Processing of utility agreements (APS, Cox, CenturyLink, SRP, EPNG, SWG, etc) and intergovernmental agreements may also be required. Justification: The Glendale-Peoria Area Drainage Master Plan is a regional storm drainage plan. Each element proposed in an ADMP is essential to the proper function of the storm drainage system. Recommendations from that plan are made to meet the intentions for the storm drainage system, in an orderly manner. This project is identified as an element of the ADMP. Additionally, there is an interconnection of a lone storm drain catch basin with Salt River Project irrigation facilities that needs to be converted to a storm drain. 39 Category AT-Arts CB-Chargeba DS-Design LA-Land Acq Funding Source Proposed GO Bonds Proposed GO Bonds Proposed GO Bonds Proposed GO Bonds Total Budget Total Operating Impacts FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,120 $32,000 $212,000 $0 $0 $16,000 $0 $100,000 $0 $48,000 $0 $1,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $2,120 $96,000 $212,000 $1,100,000 $0 $0 $0 $0 $0 $246,120 $116,000 $1,048,000 $0 $0 $1,410,120 $0 $0 $0 $0 $0 $0 $0 $0 $300 $300 $600 FY 2018-2027 Capital Improvement Program Drainage 87th Ave Storm Drain; Hatcher Rd to Monroe St Project Number: EN00257 Project Location: 87th Av from Hatcher Rd to Monroe St & Mtn View Rd from 87th Av to 85th Av Description: This project provides for the coordination with adjacent property owners, public involvement, design, right-of-way acquisition, utility coordination, utility relocation and extensions, materials testing, construction, and construction administration for the storm drain on 87th Avenue from Hatcher Road to Monroe Street and along Mountain View Road from 87th Avenue to 85th Avenue. The improvements will consist of storm drains, laterals and catch basins, which are an extension of the overall drainage system and mill and overlay of the existing pavement from curb to curb throughout the project limits. Processing of utility agreements (APS, Cox, CenturyLink, SRP, EPNG, SWG, etc) and intergovernmental agreements may also be required. Justification: The City approved a rezoning in the downtown area of Peoria, where on-lot storm water storage was waived for developments and redevelopments in the heart of Old Town Peoria. An update to the Drainage Master Plan was performed, which recommended additional storm drainage improvements needed to account for the shortage of storm water storage resulting from the anticipated change in land use. This storm drain was the result of the recommendation of the Downtown Area Drainage Master Plan. 40 Funding Source Category AT-Arts CB-Chargeba CO-Constructi DS-Design Proposed GO Bonds Proposed GO Bonds Proposed GO Bonds Proposed GO Bonds Total Budget Total Operating Impacts FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $4,037 $0 $0 $403,684 $20,042 $61,200 $2,004,152 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $24,079 $61,200 $2,004,152 $403,684 $0 $0 $0 $0 $407,721 $2,085,394 $0 $0 $0 $0 $2,493,115 $0 $0 $5,700 $5,700 $5,700 $0 $0 $0 $0 $5,700 $22,800 FY 2018-2027 Capital Improvement Program Drainage Beardsley Rd Channel Improvements Project Number: PW00112 Project Location: Beardsley Rd drainage ditch from Lake Pleasant Rd to 107th Av Lining Description: As part of the design phase multiple alternatives were evaluated and a consensus was reached with the adjacent property owners to pipe and backfill the Beardsley Channel from 99th Av to 111th Av, desert landscape the backfilled channel and construct a concrete sidewalk. Local storm drain connections will be made with storm drains, catch basins scuppers and swales. Landscape and landscape irrigation will be installed. The City will continue efforts for cost participation from the Flood Control District of Maricopa County identified through a previous request for their participation in their respective Capital Improvement Program. Justification: The primary purpose of this project is to reduce maintenance, provide maintenance access, improve aesthetics, provide pedestrian access, and provide 100-year design storm capacity and enhance safety along Beardsley Rd. 41 Category Funding Source CO-Constructi GO Bonds 2015 CO-Constructi Proposed GO Bonds Total Budget Total Operating Impacts FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $1,500,000 $1,008,377 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,500,000 $1,008,377 $2,508,377 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,508,377 $2,000 $2,000 $2,000 $2,000 $2,000 $2,000 $2,000 $2,000 $2,000 $2,000 $20,000 FY 2018-2027 Capital Improvement Program Drainage Desert Harbor/91st Ave Channel Improvements Project Number: EN00531 Project Location: 91st Av alignment; Thunderbird Rd to New River Description: This project provides for the coordination with adjacent property owners, public involvement, design, utility coordination, utility relocation, materials testing, construction and construction administration for designing and constructing a lining and maintenance access for the 91st Avenue Channel between Thunderbird Road and New River. The improvements will include clearing and grubbing, removing overgrown trees and vegetation from the channel, reshaping of the channel, concrete channel lining, rip-rap inlet and outlet, pipe railing, a maintenance road and an access ramp. This project may also require processing of utility company (APS, Cox, Qwest, SRP. EPNG, SWG, etc) design and construction agreements, development and intergovernmental agreements. Justification: The Flood Control District obtained the easement for the existing drainage channel, but it is the City's responsibility to maintain the channel. This has proven to be a challenge because of the mature trees and vegetation. Erosion of the banks is ongoing, caused by run-off from the adjacent vacant property. With development of the properties on both sides of the channel, access has become difficult. Construction of a new point of access will allow the City to get maintenance equipment into the channel. Lining of the channel will abate the growth of vegetation and ease the effort and costs of maintenance. 42 Category AT-Arts CB-Chargeba CO-Constructi DS-Design Funding Source Proposed GO Bonds Proposed GO Bonds Proposed GO Bonds Proposed GO Bonds Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $0 $49,500 $0 $0 $0 $0 $0 $0 $0 $0 $0 $6,153 $14,521 $550,258 $65,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $6,153 $14,521 $599,758 $65,000 $49,500 $0 $0 $635,932 $0 $0 $0 $0 $0 $0 $685,432 FY 2018-2027 Capital Improvement Program Drainage Lake Pleasant Basin Access Ramp Project Number: EN00523 Project Location: NWC 87th Ave & LPP Description: This project provides for the project coordination, public involvement, pre-design studies, design, construction, materials testing, construction administration, utility coordination, utility relocation, clearing and grubbing, and all related site work for constructing a maintenance access ramp for the channel along 87th Avenue north of Lake Pleasant Parkway. Install new 15-foot wide access ramp appurtenances to connect the channel and a driveway to 87th Avenue. Removal and restoration of landscaping as necessary, etc. This project includes construction of a concrete sidewalk near the restroom building of Deer Village Park in order to facilitate vehicular access to the Lake Pleasant Basin ramp located in the northwest corner of the basin. This project may also include processing of utility company (APS, Cox, Qwest/Century link, SRP, etc) design and construction agreements, development and intergovernmental agreements. 43 Justification: When the Lake Pleasant basin was modified to create a channel along 87th Avenue it was expected that the channel would be self-scouring and not require routine maintenance. A sediment build-up was expected with smaller flow events; however, in larger events the material would be scoured and carried away. The problem is that there is a chronic issue with overwatering of upstream amenities, specifically the elementary school's turfed channel, which creates a nuisance with standing and stagnating water. The water, in turn, promotes weed growth in the sediment that accumulates in the channel. The weed growth tends to lock in the material so that it is not carried away in larger flow events. The justification for the added sidewalk access around the restroom building of Deer Village Park is to provide convenient access to sidewalks within the park that lead to the Lake Pleasant Basin access ramp. Category AT-Arts Funding Source FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total Proposed GO Bonds $0 $0 $0 $4,995 $0 $0 $0 $0 $0 $0 $4,995 CB-Chargeba Proposed GO Bonds CO-Constructi Proposed GO Bonds DS-Design Proposed GO Bonds $0 $0 $0 $0 $0 $0 $0 $0 $0 $6,000 $450,000 $49,500 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $6,000 $450,000 $49,500 $0 $0 $0 $510,495 $0 $0 $0 $0 $0 $0 $510,495 Total Budget FY 2018-2027 Capital Improvement Program Drainage Mountain View Rd Drainage; 91st Av to 89th Av Project Number: EN00130 Project Location: Mtn View Rd from 91st Av to 89th Av Description: This project provides for the coordination with adjacent property owners, public involvement, design, right-of-way acquisition, utility coordination, utility relocation and extensions, materials testing, construction and construction administration for a storm drainage project to capture the drainage along Mountain View Road, east of 91st Avenue, to reduce the impact of the storm water reaching and overwhelming the 91st Avenue and Mountain View Road intersection. The improvements will consist of storm drains, laterals and catch basins, which are an extension of the overall drainage system, and the mill and overlay of the existing roadway from curb to curb throughout the project limits. Processing of utility agreements (APS, Cox, CenturyLink, SRP, EPNG, SWG, etc) and intergovernmental agreements may also be required. Justification: The Glendale-Peoria Area Drainage Master Plan (ADMP) is a regional storm drainage plan. Each element proposed in an ADMP is essential to the proper function of the storm drainage system. Recommendations from that plan are made to meet the intentions for the storm drainage system in an orderly manner. This project is identified as an element of the ADMP. 44 Funding Source Category AT-Arts CB-Chargeba CO-Constructi DS-Design Proposed GO Bonds Proposed GO Bonds Proposed GO Bonds Proposed GO Bonds Total Budget Total Operating Impacts FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,500 $22,000 $0 $150,000 $10,550 $44,000 $1,055,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $12,050 $66,000 $1,055,000 $150,000 $0 $0 $0 $0 $173,500 $1,109,550 $0 $0 $0 $0 $1,283,050 $3,500 $3,500 $3,500 $3,500 $3,500 $0 $0 $0 $0 $3,500 $21,000 FY 2018-2027 Capital Improvement Program Drainage Neighborhood Drainage Program Project Number: EN00458 Project Location: Citywide Description: This program will identify areas with minor drainage issues and provide for the investigation and evaluation of drainage solutions, coordination with adjacent property owners, public involvement, design, right-of-way acquisition, utility coordination, utility relocation and extensions, as determined, materials testing, construction and construction administration. The improvements may include, but are not limited to, installing drywells, connecting pipes and inlets to the adjacent storm drain systems, re-grading to improve the function of the storm water system or modifying connector pipes and inlets, and restoring landscape and irrigation systems, as needed. Processing of utility agreements (APS, Cox, CenturyLink, SRP, EPNG, SWG, etc) and intergovernmental agreements may also be required. Justification: This new program will address drainage issues throughout the storm drainage system. The success of the drywell program is apparent, since there have recently been new drainage issue candidate areas, which staff will assemble into combined or separate project tasks. The intent of the former drywell program will continue through this redefined program, with a more flexible approach to varied solutions, where specifically a drywell would not be necessary or appropriate. 45 Category Funding Source CO-Constructi GO Bonds 2015 CO-Constructi Proposed GO Bonds Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $50,000 $550,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $50,000 $550,000 $600,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $600,000 FY 2018-2027 Capital Improvement Program Drainage New River & Jomax Rd Concrete Box Culvert Project Number: EN00354 Project Location: New River and Jomax Rd Description: The project is for the hydrologic study, design, coordination with adjacent property owners, public involvement, right-of-way acquisition, utility coordination, utility relocation and extensions, materials testing, construction and construction administration for an additional box culvert crossing for New River at Jomax Road. The roadway will be resurfaced in the immediate vicinity of the area disturbed for constructing the crossing. Earthwork, to direct drainage into the crossing, will be necessary both up and down stream of the crossing. The landscaping, sidewalks and streetlights will be restored. Permits for work in the Floodplain, 404 and off-site will be applied for and obtained. FEMA floodplain approvals and map changes will also be necessary. Processing of utility agreements (APS, Cox, CenturyLink, SRP, EPNG, SWG, etc) for design and construction, and intergovernmental agreements may also be required. 46 Justification: The existing box culvert crossing for New River at Jomax Road was designed and constructed by developers at no cost to the City, in accordance with the City's past and present criteria. The City's criteria for roadway and drainage performed by developers does not account for instances when the New River Reservoir discharges flows, which exceed the design criteria. This project is needed to pursue a crossing that can accommodate these instances. The City's Fire Station #7 is located immediately adjacent to the crossing and it is not advisable for emergency vehicles to cross the flooded roadway. Category Funding Source FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total CO-Constructi GO Bonds 2015 AT-Arts Proposed GO Bonds CB-Chargeba Proposed GO Bonds $17,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $8,000 $0 $0 $15,000 $0 $350 $3,000 $0 $27,000 $49,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $17,000 $27,350 $75,000 DS-Design Proposed GO Bonds LA-Land Acq Proposed GO Bonds SY-Study Proposed GO Bonds $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $80,000 $0 $420,000 $0 $35,000 $0 $0 $2,700,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,735,000 $420,000 $80,000 $17,000 $0 $0 $88,000 $435,000 $38,350 $2,776,000 $0 $0 $0 $3,354,350 $0 $0 $3,000 $3,000 Total Budget Total Operating Impacts $0 $0 $0 $0 $0 $3,000 $9,000 FY 2018-2027 Capital Improvement Program Drainage New River Trail - BLM Project Number: EN00371 Project Location: New River - Fletcher Hts 1A to River Stone Estates Description: This is a phased project. Phase 1 consisted of funding for design, ROW acquisition, property clean-up, construction and construction administration for an at grade trail along New River West Bank alignment to connect existing trail segments. The construction of the trail was completed in 2015. Phase 2 provides for the coordination with the ASPERA development and allowing the City to reimburse ASPERA for design and construction of approximately 300' New River bank improvements (west side) in accordance with the terms and conditions of the development agreement. The improvements will include: excavation, engineered fill, and installation of gabion mattress bank protection with hydroseeded soil covering, reconstruction of the trail along top of bank along New River West Bank to connect existing trail segments. Justification: The developer on the east side of the New River, ASPERA, is planning to construct a portion of the bank protection required on the east side of the river. It has been determined that approximately 300 feet of bank protection along the west side of the river also needs to be constructed. This funding allows the City to reimburse the developer to extend the bank protection on the west side of the river. 47 Category Funding Source LA-Land Acq Proposed GO Bonds SY-Study Proposed GO Bonds Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $79,529 $96,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $79,529 $96,000 $175,529 $0 $0 $0 $0 $0 $0 $0 $0 $0 $175,529 FY 2018-2027 Capital Improvement Program Drainage Peoria Storm Drain Master Plan - Land Preservation Project Number: EN00524 Project Location: City Wide Description: This project focuses on the preparation of legal descriptions and exhibits, title reports, appraisals, and the purchase and preservation of high priority lands for use as storm water management basins as identified in the City's Storm Drainage Master Plan provides. Preserving the land now will allow the City to construct the storm water management basins as future storm drain projects are funded. 48 Justification: The Peoria Storm Drain Master Plan (PSDMP) performed a thorough analysis to determine storm drain system needs through build-out. The master plan makes recommendations for locating storm drain facilities throughout Peoria. The recommendations are coordinated to work in concert to achieve a level of drainage protection dictated by the City. Each element of the plan is necessary to accomplish this protection. There have been in-fill developments that are encroaching upon and taking away lands that are recommended to accomplish the goals of the master plan. Since the City has no immediate funding to offer for purchase of these parcels, or for a cooperative effort to mutually achieve development with the master plan, these opportunities are often lost. The result is a more costly and more intrusive drainage option to accomplish the City's drainage goals. The purpose of this project is to preserve land rights needed to achieve the goals of the master plan. The project will exercise options for outright purchase, cooperative development agreements and possible reimbursements for elements that accomplish the master plan recommendations. Category Funding Source LA-Land Acq GO Bonds 2015 CB-Chargeba Proposed GO Bonds LA-Land Acq Proposed GO Bonds Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $333,264 $0 $363,851 $0 $0 $0 $0 $1,500 $600,000 $0 $0 $0 $0 $0 $0 $0 $1,500 $600,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $333,264 $3,000 $1,563,851 $697,115 $0 $601,500 $0 $0 $601,500 $0 $0 $0 $0 $1,900,115 FY 2018-2027 Capital Improvement Program Drainage Pinnacle Peak Drainage; 87th Ave to 91st Ave Project Number: EN00455 Project Location: Pinnacle Peak Road; 87th Av to 95th Av Description: This project provides for the coordination with adjacent property owners, public involvement, design, right-of-way acquisition, utility coordination, utility relocation and extensions, materials testing, construction and construction administration for the storm drainage improvements for Pinnacle Peak Road from 87th Avenue to 91st Avenue as a supplement to the facilities to be constructed by the developer. The construction will consist of installing storm drain pipe, manholes, junction structures, laterals and catch basins in Pinnacle Peak Road, including discharge facilities into the Camino a Lago drainage improvements. Processing of utility agreements (APS, Cox, CenturyLink, SRP, EPNG, SWG, etc) and intergovernmental agreements may also be required. Project costs will be split 50/50 with the Flood Control District of Maricopa County. 49 Justification: This project is an element of the Glendale-Peoria Area Drainage Master Plan, which is a regional drainage master plan serving several jurisdictions. The Flood Control District performed a study that recommended drainage improvements to Pinnacle Peak Road. The Flood Control District adopted this regional improvement project as a future CIP, where it remains today, at the City's request. This is the third and final segment of the regional drain in Pinnacle Peak Road. Previous drainage improvements in this reach of Pinnacle Peak road provide only a 10-year level of protection. The Flood Control District requires, and the City desires, to provide a 100-year level of protection from drainage. This project will supplement the existing drainage system to provide the difference in the level of protection. The project is dependent upon the construction of drainage facilities necessary for The Meadows development to serve as this system's outfall. Category AT-Arts Funding Source FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total Proposed GO Bonds $0 $0 $14,800 $0 $0 $0 $0 $0 $0 $0 $14,800 CB-Chargeba Proposed GO Bonds CO-Constructi Proposed GO Bonds $0 $320,000 $0 $0 $18,000 $1,480,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $18,000 $1,800,000 $320,000 $0 $1,512,800 $0 $0 $0 $0 $0 $0 $0 $1,832,800 $22,000 $22,000 $22,000 $22,000 $22,000 Total Budget Total Operating Impacts $0 $22,000 $22,000 $22,000 $22,000 $198,000 FY 2018-2027 Capital Improvement Program Drainage Pinnacle Peak Rd & 67th Av Channel to New River Project Number: EN00119 Project Location: 67th Av & Pinnacle Peak Rd - 67th Av to New River Description: This project provides for 2 projects: (1) drainage study, design, land acquisition, and construction of local drainage facilities in the area bounded by 67th Avenue, New River, Pinnacle Peak Road, and Hatfield Road, and (2) regional drainage improvements. Project 1 - The local project includes a study to develop drainage facility alternatives, coordination with adjacent property owners, public involvement, design, right-of-way acquisition, utility coordination, utility relocation and extensions, materials testing, construction and construction administration for the recommended alternative. Project 2 - The regional drainage project includes study or pre-design, coordination with adjacent property owners, public involvement, design, right-of-way acquisition, utility coordination, utility relocation and extensions, materials testing, construction and construction administration for a storm drainage project to capture the drainage along 67th Avenue from Hatfield Road to Pinnacle Peak Road and along Pinnacle Peak Road from 67th Avenue to New River. The improvements will consist of storm water basins, channel improvements, box culverts, storm drains, laterals and catch basins, which are an extension of the overall drainage system. The City will partner with the Flood Control District on the regional drainage aspects of this project. This project will likely include processing of utility agreements (APS, Cox, Centurylink, SWG, etc.) for design and construction, and development and intergovernmental agreements. 50 Justification: Project 1 - The area bounded by Pinnacle Peak Road on the south, Happy Valley Road on the north, 67th Avenue on the east and New River on the west. The natural drainage ways in this area are defined by the pattern of storm water runoff that occurred prior to development of the lots by homeowners. The storm run-off flows from the bluffs located to the northeast and crosses 67th Avenue at the Hatfield alignment and the southern end of the Chaminade subdivision. These natural drainage ways occur frequently throughout this area and should not be obstructed. Project 2 - This regional project is recommended by the Peoria Storm Drain Master Plan and is identified as a sister project to Project 1. Category CO-Constructi DS-Design SY-Study AT-Arts CO-Constructi AT-Arts CB-Chargeba Funding Source GO Bonds 2015 GO Bonds 2015 GO Bonds 2015 Outside Sources Outside Sources Proposed GO Bonds Proposed GO Bonds FY 2018 $1,583,476 $726,467 $600,000 $0 $0 $0 $0 FY 2019 $0 $0 $0 $0 $0 $22,630 $33,000 FY 2020 $0 $0 $0 $70,000 $7,000,000 $35,549 $0 FY 2021 $0 $0 $0 $0 $0 $0 $0 FY 2022 $0 $0 $0 $0 $0 $0 $0 FY 2023 $0 $0 $0 $0 $0 $0 $0 FY 2024 $0 $0 $0 $0 $0 $0 $0 FY 2025 $0 $0 $0 $0 $0 $0 $0 FY 2026 $0 $0 $0 $0 $0 $0 $0 FY 2027 $0 $0 $0 $0 $0 $0 $0 Total $1,583,476 $726,467 $600,000 $70,000 $7,000,000 $58,179 $33,000 FY 2018-2027 Capital Improvement Program Drainage Pinnacle Peak Rd & 67th Av Channel to New River CO-Constructi Proposed GO Bonds DS-Design Proposed GO Bonds LA-Land Acq Proposed GO Bonds Total Budget Total Operating Impacts $0 $586,533 $0 $0 $2,263,000 $37,000 $3,164,888 $390,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $3,164,888 $3,239,533 $37,000 $3,496,476 $2,355,630 $10,660,437 $0 $0 $0 $0 $0 $0 $0 $16,512,543 $30,000 $30,000 $30,000 $30,000 $30,000 $0 $0 $0 $30,000 $30,000 $210,000 51 FY 2018-2027 Capital Improvement Program Drainage Union Hills Channel Project Number: EN00137 Project Location: Union Hills Dr from 107th Av to 111th Av Description: This project provides for the City's proportionate share of the regional drainage project, including study, land acquisition, design, utility coordination, utility relocation and extension, materials testing, construction and construction administration for a storm drainage project to capture the drainage from determined storm water outfalls located in Sun City, and drainage along Union Hills Drive from the vicinity of 107th Avenue and Union Hills Drive. The improvements will reduce the impact of the storm water reaching and overwhelming the roadway, particularly the intersection at 107th Avenue and Union Hills Drive. The improvements will consist of channel improvements, box culverts, storm drains, laterals and catch basins that are extension of the overall drainage system. Processing of utility agreements (APS, Cox, CenturyLink, SRP, EPNG, SWG, etc) and intergovernmental agreements may also be required. The design has been completed and ROW acquisition is in progress. Construction is scheduled for January 2017 to June 2018. 52 Justification: This project is identified as an element of the Glendale-Peoria Area Drainage Master Plan (ADMP), a regional storm drainage plan. Each element proposed in an ADMP is essential to the proper function of the storm drainage system. The City is partnering with the Flood Control District of Maricopa County, the Maricopa County Department of Transportation, and the City of Surprise for the initial study. There may be future agreements for final design and construction with the partner agencies. Category Funding Source CO-Constructi GO Bonds 2015 AT-Arts Proposed GO Bonds CO-Constructi Proposed GO Bonds Total Budget Total Operating Impacts FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $575,730 $0 $500,000 $0 $5,000 $500,000 $0 $5,000 $500,000 $0 $11,344 $1,134,448 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $575,730 $21,344 $2,634,448 $1,075,730 $505,000 $505,000 $1,145,792 $0 $0 $0 $0 $0 $0 $3,231,522 $13,300 $13,300 $13,300 $13,300 $13,300 $0 $13,300 $13,300 $13,300 $13,300 $119,700 FY 2018-2027 Capital Improvement Program Drainage Williams Road Channel Improvements Project Number: EN00543 Project Location: Williams Rd Channel - 79th Av to New River Description: This project provides for the coordination with adjacent property owners, public involvement, design, ROW acquisition, utility coordination, utility relocation, construction and construction administration for the Williams Road drainage channel improvements. The improvements will include clearing and grubbing vegetation, regrading and concrete lining of the channel and constructing a 12-foot wide combination multi-use trail and maintenance road. The plan is to fit the channel and multiuse trail within the existing 40-foot easement. This project may also require processing of utility company (APS, Cox, Qwest, SRP. EPNG, SWG, etc) design and construction agreements, development and intergovernmental agreements. It is anticipated that the design and construction improvements will be cost shared with the developer of the Hidden Paradise Estates subdivision. 53 Justification: The existing earthen Williams Road channel was constructed in the 1990s as part of the Fletcher Heights subdivision. An easement was dedicated to the City for drainage purposes. The channel was constructed as an earthen channel and has become overgrown with vegetation. The channel was also constructed without providing an access for the Public Works Department to easily access and maintain the channel. A combination maintenance road and multi-use path will along be included. The maintenance road/multi-use path will extend from 79th Av and connect to the New river trail. The project will be coordinated and cost shared with the Hidden Paradise Estates. Category Funding Source FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total AT-Arts Proposed GO Bonds CB-Chargeba Proposed GO Bonds CO-Constructi Proposed GO Bonds $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,325 $6,116 $0 $6,971 $9,958 $697,071 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $8,296 $16,074 $697,071 DS-Design $0 $0 $0 $132,505 $0 $0 $0 $0 $0 $0 $132,505 $0 $0 $0 $139,946 $714,000 $0 $0 $0 $0 $0 $853,946 $0 $4,028 $4,028 $4,028 $4,028 Proposed GO Bonds Total Budget Total Operating Impacts $0 $0 $0 $0 $4,028 $20,140 City of Peoria FY 2018 – FY2027 Capital Improvement Program 54 City of Peoria FY 2018 Annual Program Budget Capital Improvement Program Economic Development Economic development is one of the City Council’s six policy goals. Economic development projects in the capital plan are meant to further the Economic Development Department’s mission “to build a diversified local economy that will create a strong and sustainable community in which residents are able to work, shop, and be entertained.” Key priorities include creating employment corridors and jobs, securing direct investment in the city, attracting institutions of higher education and health care campuses, and building community in Old Town and the entertainment district. obligation bonds, and county transportation sales tax reimbursements. FY 2017 Economic development projects include continuation of the revitalization of Peoria’s P83 Entertainment District featuring final design and construction of a final design and construction of the final phase of P83 Improvements including way finding signage, monument signage, bridge aesthetics, lighting, and landscaping on 83rd Avenue, Arrowhead Fountain Center, and Paradise Lane from 83rd to 75th. A related project in the capital plan is the re-development of the 17-acre parking lot at the Peoria Sports Complex into a mixeduse development with a parking structure to accommodate the parking displaced by the development. Economic development projects are supported by the general fund, half-cent sales tax fund, general Economic Development Total ‐ $31,049,940 $30,000,000 $25,000,000 $20,000,000 $15,000,000 $10,000,000 $5,000,000 $0 FY18 FY19 FY20 FY21 FY22 55 FY23 FY24 FY25 FY26 FY27 FY 2018-2027 Capital Improvement Program Economic Development Economic Development Summary by Project Project Name Pg# FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 23-27 Arrowhead Equities (Huntington Univ. Building) 58 Commercial Abatement $0 $0 $0 $73,760 $73,760 $368,800 $516,320 59 $500,000 $0 $0 $0 $0 $0 $500,000 Denaro Medical Plaza 60 $175,000 $0 $0 $0 $0 $0 $175,000 GE Avionics (Aviage Systems) 61 $673,000 $0 $0 $0 $0 $0 $673,000 Huntington University 62 $550,000 $425,000 $0 $0 $0 $0 $975,000 Maxwell Technologies 63 $1,109,000 $0 $0 $0 $0 $0 $1,109,000 Modern Round 64 $65,517 $65,516 $65,516 $65,516 $65,517 $327,585 $655,167 P83 Entertainment District Improvements 65 $773,418 $0 $0 $0 $0 $0 $773,418 P83 Innovation Center Project Parking Structure 66 $25,000,000 $0 $0 $0 $0 $0 $25,000,000 Washington Street Redevelopment 67 $673,035 $0 $0 $0 $0 $0 $673,035 $29,518,970 $490,516 $65,516 $139,276 $139,277 $696,385 $31,049,940 Total - Economic Development 56 Total FY 2018-2027 Capital Improvement Program Economic Development Economic Development Summary by Funding Source Fund Number and Name FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 23-27 $11,043 $0 $0 $0 $0 $0 $11,043 1210 - Half Cent Sales Tax $1,065,517 $65,516 $65,516 $65,516 $65,517 $327,585 $1,655,167 1900 - Economic Development $2,680,035 $425,000 $0 $73,760 $73,760 $368,800 $3,621,355 2050 - Water $0 $0 $0 $0 $0 $0 $0 2400 - Wastewater $0 $0 $0 $0 $0 $0 $0 $226,556 $0 $0 $0 $0 $0 $226,556 $25,000,000 $0 $0 $0 $0 $0 $25,000,000 $535,819 $0 $0 $0 $0 $0 $535,819 7010 - Transportation Sales Tax $0 $0 $0 $0 $0 $0 $0 Total - Economic Development $29,518,970 $490,516 $65,516 $139,276 $139,277 $696,385 $31,049,940 1000 - General 4150 - Capital Projects 4233 - Proposed MDA Bonds 4550 - CIP Capital Projects Fund 57 Total FY 2018-2027 Capital Improvement Program Economic Development Arrowhead Equities (Huntington Univ. Building) Project Number: ED00023 Project Location: 83rd Avenue, south of Bell Road Description: As part of the adopted Economic Development Implementation Strategy (EDIS) I/II, this project qualifies for assistance under the city's P83 Building Reuse Program, an economic development tool used to encourage a more diverse use of existing vacant buildings in the P83 area (a key investment zone), to include professional office, entertainment and retail tenants. Arrowhead Equities made substantial capital investment by purchasing a vacant building and completing interior tenant improvements in order to attract a targeted industry to the area. As a result, Huntington University executed a long-term lease with Arrowhead Equities and opened the Arizona Center for Digital Media Arts. Huntington University will have a significant fiscal/economic impact for Peoria through job creation and increased foot traffic in the area. Justification: These efforts are being used to revitalize and reinvigorate private investment in targeted properties within the P83 area. Converting empty restaurant buildings into professional office, retail and entertainment uses, promotes commercial reinvestment activities, increases daytime foot traffic and enhances the overall quality of life for Peoria residents. Funding for FY18 will be through carryover of existing funds; no new funds are needed. 58 Category OT-Other Funding Source Economic Development Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $0 $0 $73,760 $73,760 $73,760 $73,760 $73,760 $73,760 $73,760 $516,320 $0 $0 $0 $73,760 $73,760 $73,760 $73,760 $73,760 $73,760 $73,760 $516,320 FY 2018-2027 Capital Improvement Program Economic Development Commercial Abatement Project Number: ED00025 Project Location: Citywide Description: Commercial structures that are not properly maintained fall into disrepair and could become hazardous to the public. The abatement program utilizes code enforcement activities to identify the hazards and resolve through demolition if the structure cannot be repaired in a cost effective fashion. The City has budgeted $500,000 to abate any commercial structures where owners are not compliant. Justification: Commercial structures vary in size and construction materials, which can be much more costly to demolish and remove than a typical residence. Since a commercial use is frequented by the greater public, ensuring public safety is a priority of the City along with the ability to adequately fund a potentially costly demolition process, if needed. The city costs are eventually recovered through placing a lien on the property for all incurred expenses. 59 Category OT-Other Funding Source Half Cent Sales Tax Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $500,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $500,000 $500,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $500,000 FY 2018-2027 Capital Improvement Program Economic Development Denaro Medical Plaza Project Number: ED00021 Project Location: NWC of Happy Valley Road & Lake Pleasant Parkway Description: The city of Peoria has an EDA with Denaro Ventures, LLC to build a 24,500 medical office building at Denaro Medical Plaza in northern Peoria. HonorHealth will act as the single tenant to the landlord in the build-to-suit development. The Economic Development Activities Agreement includes the dealpoint that reimbursement to the project is only for city sewer and water lines and left in and left out turn lanes, for an amount not to exceed $175,000 following the creation of 57 FTE/benefited positions with average mid-point salaries at $98,047 within five years of the effective date of the agreement. Justification: The Economic Development Implementation Strategy (EDIS) I identified the attraction of targeted industries as a key objective in diversifying the city's economic base and work force. As part of implementing the EDIS I, the Economic Development Services Department actively pursues targeted industries as part of an overall sales and marketing effort to attract health care users, as well as other targeted industries, to Peoria. Funding for FY18 will be through carryover of existing funds; no new funds are needed. 60 Category OT-Other Funding Source Economic Development Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $175,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $175,000 $175,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $175,000 FY 2018-2027 Capital Improvement Program Economic Development GE Avionics (Aviage Systems) Project Number: ED00015 Project Location: Thunderbird, West of the Loop 101 Description: The Economic Development Implementation Strategy (EDIS I) identified the attraction of targeted industries as a key objective in diversifying the economy and workforce in the City of Peoria. As part of implementing the EDIS, the Economic Development Services Department (EDS) actively pursues targeted industries as part of an overall sales and marketing effort to attract high technology and innovative technology users, as well as other targeted industries, to Peoria. 61 Justification: GE AVIC Civil Avionics Systems Americas, Inc. is a civil avionics joint venture partnership between General Electric and the Aviation Industry Corporation of China (AVIC) for the purpose of aerospace software design, testing and development of the latest avionics systems and technologies for the commercial aircraft industry. Up to thirty new high-wage and advanced degree positions in systems and software engineering will be created. Key milestones involve building and establishing a core engineering team within the first year of operation; work directly with key commercial aircraft original equipment manufacturers as a tier one supplier to those aircraft manufacturers; and within three years develop a next generation avionics software system. The total project costs of $1,228,000 involve the City providing the services of a foreign trade zone consultant ($78,000), as well as reimbursing Aviage for a one-time payment of $100,000 for tenant improvement and rental reimbursement costs. A maximum of $900,000 for up to thirty positions ($30,000 each) will be paid upon documentation that the positions were created. The City also agrees to pay up to $150,000 ($5000 each) for employees that relocate and purchase a single-family residence within the City. FY18 funding will be through carryover of existing funds; no new funds are needed. Category OT-Other Funding Source Economic Development Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $673,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $673,000 $673,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $673,000 FY 2018-2027 Capital Improvement Program Economic Development Huntington University Project Number: ED00018 Project Location: 8385 W. Mariners Way, 83rd Ave., South of Bell Rd Description: As established in the adopted Economic Development Implementation Strategy (EDIS) Part I, this project implements the university recruitment initiative. University recruitment had been a key initiative because it addresses the high technology companies to have a ready and capable workforce in Peoria. It also supports economic development and job growth through technology commercialization efforts, assisting business and entrepreneurs. Justification: Huntington University established a Peoria location, offering programs in media, film production, graphic design and web development. These programs are a part of the city's overall science, technology, engineering and math (STEM) workforce development initiative which is absolutely critical to overarching economic development efforts to build an innovation economy. 62 Category OT-Other Funding Source Economic Development Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $550,000 $425,000 $0 $0 $0 $0 $0 $0 $0 $0 $975,000 $550,000 $425,000 $0 $0 $0 $0 $0 $0 $0 $0 $975,000 FY 2018-2027 Capital Improvement Program Economic Development Maxwell Technologies Project Number: ED00008 Project Location: Thunderbird west of 101 Description: In December 2010, the Peoria City Council adopted the Economic Development Implementation Strategy (EDIS I) to target business attraction activities to incentivize economic development and establish export base industries in the city of Peoria. As part of the city's business attraction activity, Peoria was awarded the Maxwell Technologies expansion project, adding 150 technology-related jobs and absorbing 120,000 sq.ft. of vacant shell space. 63 Justification: The Economic Development Implementation Strategy (EDIS I) established the targeted industries that Peoria should focus business attraction efforts on. These industries – bioscience, clean/sustainable technologies, advanced business services, advanced manufacturing and higher education were created to produce high wage jobs and increased employment diversity in the city. The EDIS had its first approved applicant: a clean technology company that will create a minimum of 90 jobs with an average salary of $48,000. We proposed using this funding to provide job creation reimbursement at a level of $500,000 each year, based on actual jobs created, for three years, beginning in FY14, with a total development agreement obligation of approximately $1,565,000. The payback to the city in the form of job creation will be complete after a period of seven years. Funding for FY18 will be through carryover of existing funding; no new funds are needed. Category OT-Other Funding Source Economic Development Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $1,109,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,109,000 $1,109,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,109,000 FY 2018-2027 Capital Improvement Program Economic Development Modern Round Project Number: ED00022 Project Location: 83rd Avenue, south of Bell Road Description: As part of the adopted Economic Development Implementation Strategy (EDIS) I/II, this project qualifies for assistance under the city's P83 Building Reuse Program, an economic development tool used to encourage a more diverse use of existing vacant buildings in the P83 area to include professional office, entertainment and retail tenants. Modern Round made substantial capital investment and tenant improvements to a vacant building in order to open/operate an entertainment-based business in the P83 area. Modern Round will have a significant fiscal and economic impact for Peoria through job creation, gross taxable sales and attracting people to the area. Justification: These efforts are being used to revitalize and reinvigorate private investment in targeted properties with the P83 area. Converting empty restaurant buildings into professional office, retail and entertainment uses, promotes commercial reinvestment activities, increases daytime foot traffic and enhances the overall quality of life for Peoria residents. Funding for FY18 will be through carryover of existing funding. 64 Category OT-Other Funding Source Half Cent Sales Tax Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $65,517 $65,516 $65,516 $65,516 $65,517 $65,517 $65,517 $65,517 $65,517 $65,517 $655,167 $65,517 $65,516 $65,516 $65,516 $65,517 $65,517 $65,517 $65,517 $65,517 $65,517 $655,167 FY 2018-2027 Capital Improvement Program Economic Development P83 Entertainment District Improvements Project Number: ED00002 Project Location: 83rd Avenue South of Bell Road Description: This project is for final design and construction of the final phase of P83 Improvements including way finding signage, monument signage, bridge aesthetics, lighting, and landscaping on 83rd Avenue, Arrowhead Fountain Center, and Paradise Lane from 83rd to 75th. The various phases of the project will include paving, concrete, landscaping, lighting, signage, aesthetics, utility relocations, right-of-way acquisition, public involvement, and drainage. Justification: As part of the adopted Economic Development Implementation Strategy (EDIS), this project addresses the Entertainment District Target area within the Investment Zones Initiatives and involves the revitalization of Peoria's Entertainment District consistent with the Peoria Sports Complex Area Urban Design Plan (adopted by Council in July 2010). 65 Category CO-Constructi SY-Study CO-Constructi EQ-Equipmen CO-Constructi Funding Source Capital Projects Capital Projects CIP Capital Projects Fund CIP Capital Projects Fund General Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $208,711 $17,845 $127,929 $407,890 $11,043 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $208,711 $17,845 $127,929 $407,890 $11,043 $773,418 $0 $0 $0 $0 $0 $0 $0 $0 $0 $773,418 FY 2018-2027 Capital Improvement Program Economic Development P83 Innovation Center Project Parking Structure Project Number: ED00020 Project Location: 83rd Avenue, south of Bell Road Description: As part of the adopted Economic Development Implementation Strategy (EDIS) II, this project addresses the city's need for class A office space to attract desired advanced industries to Peoria. P83 is a key investment zone for the city. The project involves a parking structure on the 17-acre city-owned property next to the Peoria Sports Complex. Business attraction efforts will be focused on EDIS II identified targeted industries, including advanced business services, corporate headquarters and software engineering companies. Justification: This development is critical to the objectives of both the EDIS I/II in that it will provide true class A office space needed to attract advanced industries to Peoria. To facilitate development on the site, a parking structure is needed to accommodate all parking that would be displaced by the development. 66 Category Funding Source CO-Constructi Proposed MDA Bonds FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $25,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $25,000,000 Total Budget $25,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $25,000,000 FY 2018-2027 Capital Improvement Program Economic Development Washington Street Redevelopment Project Number: ED00024 Project Location: 83rd Ave. & Washington St., Old Town Peoria Description: This project entails land acquisition, hazardous materials testing, abatement, structural forensics, historic documentation and salvage, and demolition related expenses related to the commercial properties in Old Town Peoria between 83rd Ave and 84th Drive, Washington Street to Jefferson St. The City purchased the former Kosier Hardware property in 2016 and in partnership with ADEQ, is conducting duediligence testing of the Peoria Dry Cleaners prior to property acquisition. Consistent with prior property acquisitions in the block, the City will stabilize the properties for dust control compliance and to provide additional off-street area for Old Town events. This project will be undertaken in phases which best align with the timing of property acquisitions. Project savings from the initial phase will be rolled forward to successive phases. Justification: For municipal owned commercial properties, regulatory compliance with ADEQ and Maricopa County is required prior to building demolition and the disposal of building materials. As properties in the project area are acquired, the City commences with the necessary testing, abatement, demolition, and site restoration expenses. 67 Category Funding Source LA-Land Acq Economic Development OT-Other Half Cent Sales Tax Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $173,035 $500,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $173,035 $500,000 $673,035 $0 $0 $0 $0 $0 $0 $0 $0 $0 $673,035 City of Peoria FY 2018 – FY2027 Capital Improvement Program 68 City of Peoria FY 2018 Annual Program Budget Capital Improvement Program Operational Facilities Operational facilities are the “bricks and mortar” from which the City of Peoria provides services to its residents and businesses. Increasingly, operational facilities also include the technology infrastructure and systems that facilitate service delivery in the information age. Projects include the construction of new facilities, as well as the maintenance, rehabilitation, renovation, and expansion of existing facilities. of the facility. Sources include general obligation bonds, operating funds, and outside sources. Projects in the 10-year program include Community Works Program, which provides funding for projects that have a local benefit or that may arise during the fiscal year, replacement of the fuel island, equipment, software, and tanks as well as the addition of a heavy duty vehicle lift at the Municipal Operations Center, and the replacement and/or upgrades to critical communication and information technology infrastructure. Operational facilities projects are funded from a variety of different sources, depending on the use Operational Facilities Total ‐ $32,375,348 $25,000,000 $20,000,000 $15,000,000 $10,000,000 $5,000,000 $0 FY18 FY19 FY20 FY21 FY22 69 FY23 FY24 FY25 FY26 FY27 FY 2018-2027 Capital Improvement Program Operational Facilities Operational Facilities Summary by Project Project Name Pg# FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 23-27 Arts Distribution FY2018 74 Asphalt Repair and Replacement-MOC $1,758,127 $0 $0 $0 $0 $0 $1,758,127 76 $1,621,406 $0 $0 $0 $0 $0 $1,621,406 Building Equipment Renovation and Replacement 77 $240,717 $75,000 $75,000 $0 $0 $0 $390,717 Building Fixture and Finish Renovation 78 $153,867 $0 $0 $0 $0 $0 $153,867 Chargeback Distribution FY2018 79 $1,811,700 $0 $0 $0 $0 $0 $1,811,700 City Hall Roof Replacement 80 $0 $0 $0 $0 $505,000 $0 $505,000 City Parks Parking Lots - Asphalt Replacement 81 $0 $268,660 $0 $151,500 $0 $703,970 $1,124,130 Citywide Security Program 82 $246,557 $0 $0 $0 $0 $0 $246,557 Community Works Program 83 $1,619,700 $0 $0 $0 $0 $0 $1,619,700 Council Chambers Building Repair Program 85 $0 $0 $80,800 $0 $151,500 $454,500 $686,800 Fire Department Building Needs 86 $303,526 $0 $0 $0 $0 $0 $303,526 Fleet Heavy Duty Vehicle Lift 87 $158,600 $0 $0 $0 $0 $0 $158,600 Historic Buildings Equipment and Finish Renovation 88 $94,800 $0 $0 $0 $0 $0 $94,800 Impact Fee Study 89 $100,000 $0 $100,000 $0 $0 $200,000 $400,000 MOC Fuel Island 90 $86,487 $0 $0 $0 $0 $0 $86,487 MOC Site Lighting Improvements 91 $380,000 $0 $0 $0 $0 $0 $380,000 Network Infrastructure Replacement Beardsley WRF 92 $0 $80,400 $0 $0 $0 $80,400 $160,800 Network Infrastructure Replacement Butler WRF 93 $0 $0 $93,800 $0 $0 $93,800 $187,600 Network Infrastructure Replacement City Hall 94 $174,000 $0 $0 $0 $0 $0 $174,000 Network Infrastructure Replacement Greenway WTF 95 $0 $93,800 $0 $0 $0 $93,800 $187,600 Network Infrastructure Replacement Jomax WTF 96 $0 $0 $70,000 $0 $0 $70,000 $140,000 Network Infrastructure Replacement Microwave WAN 97 $60,000 $0 $0 $0 $0 $0 $60,000 Network Infrastructure Replacement MOC 98 $0 $0 $96,003 $0 $0 $96,003 $192,006 Network Infrastructure Replacement Quintero WTF 99 $64,000 $0 $0 $0 $0 $64,000 $128,000 Network Infrastructure Replacement Remote Access 100 $100,000 $0 $0 $0 $0 $0 $100,000 Network Infrastructure ReplacementMunicipal Court 101 $90,000 $0 $0 $0 $0 $0 $90,000 70 Total FY 2018-2027 Capital Improvement Program Operational Facilities Operational Facilities Summary by Project Project Name Pg# FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 23-27 Parking Lot Maintenance for City Buildings 102 Peoria Center for Performing Arts $126,152 $0 $0 $0 $0 $0 $126,152 103 $49,955 $0 $0 $0 $0 $0 $49,955 Peoria Transit Center 104 $989,616 $0 $0 $0 $0 $2,567,171 $3,556,787 Pyramid Peak Radio Site 105 $975,704 $0 $0 $0 $0 $0 $975,704 Radio Subscriber Replacements 106 $549,535 $549,535 $549,535 $0 $0 $0 $1,648,605 Renovate Main Library 107 $1,485,000 $0 $0 $3,030,000 $0 $0 $4,515,000 Transit Park and Ride Lot 108 $6,741,722 $0 $0 $0 $0 $0 $6,741,722 Vistancia Radio Site 109 $0 $2,000,000 $0 $0 $0 $0 $2,000,000 $19,981,171 $3,067,395 $1,065,138 $3,181,500 $656,500 $4,423,644 $32,375,348 Total - Operational Facilities 71 Total FY 2018-2027 Capital Improvement Program Operational Facilities Operational Facilities Summary by Funding Source Fund Number and Name FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 23-27 1000 - General $1,655,662 $0 $31,790 $0 $0 $31,790 $1,719,242 $0 $0 $0 $0 $0 $0 $0 1970 - Municipal Office Complex Rsv $421,022 $75,000 $75,000 $0 $0 $0 $571,022 2050 - Water $252,603 $113,900 $60,900 $0 $0 $238,800 $666,203 2161 - Water Expansion $193,660 $0 $0 $0 $0 $0 $193,660 $47,392 $0 $0 $0 $0 $0 $47,392 2163 - Water Exp. S. of Bell $5,578 $0 $0 $0 $0 $0 $5,578 2164 - Water Exp. N. of Bell $140,762 $0 $0 $0 $0 $0 $140,762 $7,000 $0 $0 $0 $0 $0 $7,000 $25,000 $0 $0 $0 $0 $0 $25,000 $108,716 $60,300 $122,850 $0 $0 $183,150 $475,016 2506 - Wastewater Exp. E. of Agua Fria $1,679 $0 $0 $0 $0 $0 $1,679 2507 - Wastewater Exp. W. of Agua Fria $2,245 $0 $0 $0 $0 $0 $2,245 2509 - Wastewater Expansion Post 1/1/12 $17,700 $0 $0 $0 $0 $0 $17,700 2590 - Commercial Solid Waste $40,532 $0 $0 $0 $0 $0 $40,532 2600 - Residential Solid Waste $167,464 $0 $14,340 $0 $0 $14,340 $196,144 3400 - IT Reserve $424,000 $0 $0 $0 $0 $0 $424,000 $2,087 $0 $0 $0 $0 $0 $2,087 $250,000 $0 $0 $0 $0 $0 $250,000 4251 - GO Bonds 2015 $2,383,939 $0 $0 $0 $0 $0 $2,383,939 4252 - Proposed GO Bonds $2,076,837 $2,818,195 $630,335 $3,181,500 $656,500 $1,158,470 $10,521,837 4550 - CIP Capital Projects Fund $1,466,579 $0 $0 $0 $0 $0 $1,466,579 4810 - Outside Sources $7,835,067 $0 $0 $0 $0 $2,567,171 $10,402,238 7000 - Highway User $1,155,212 $0 $29,923 $0 $0 $29,923 $1,215,058 7003 - Streets Zone 3 Dev Fee $175,086 $0 $55,000 $0 $0 $110,000 $340,086 7007 - Street Impact Fees Z1 Post 010112 $188,300 $0 $0 $0 $0 $0 $188,300 7010 - Transportation Sales Tax $795,028 $0 $0 $0 $0 $0 $795,028 7150 - Public Transit $8,009 $0 $0 $0 $0 $0 $8,009 7904 - Neighborhood Park Dev Zone 2 $2,002 $0 $0 $0 $0 $0 $2,002 $12,100 $0 $0 $0 $0 $0 $12,100 1210 - Half Cent Sales Tax 2162 - Water Expansion Post 1/1/12 2167 - Water Resource Fee 2014 2270 - WIFA Bonds 2400 - Wastewater 4150 - Capital Projects 4233 - Proposed MDA Bonds 7907 - NeighPkDevl Fees - Z2 Post 1/1/12 72 Total FY 2018-2027 Capital Improvement Program Operational Facilities Operational Facilities Summary by Funding Source Fund Number and Name FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 23-27 $7,550 $0 $0 $0 $0 $0 $7,550 7910 - Citywide Park/Rec Facility Dev $13,360 $0 $0 $0 $0 $0 $13,360 7911 - Community Park Dev Fee - Post $9,500 $0 $0 $0 $0 $0 $9,500 7920 - River Corridors & Trails Dev $2,500 $0 $0 $0 $0 $0 $2,500 7930 - Law Enforcement Dev $15,000 $0 $0 $0 $0 $0 $15,000 7932 - Law Enfrcmnt IF 2014 $9,000 $0 $9,000 $0 $0 $18,000 $36,000 7937 - Fire/EmergSvs Imp Fees 2014 $9,000 $0 $9,000 $0 $0 $18,000 $36,000 $0 $0 $0 $0 $0 $0 $0 7941 - Park Imp Fee 2014 Bell to P.Peak $9,000 $0 $9,000 $0 $0 $18,000 $36,000 7942 - Parks Zone 2-Post 8/1/14 $9,000 $0 $9,000 $0 $0 $18,000 $36,000 $36,000 $0 $9,000 $0 $0 $18,000 $63,000 $19,981,171 $3,067,395 $1,065,138 $3,181,500 $656,500 $4,423,644 $32,375,348 7908 - NeighPkDevl Fees - Z3 Post 1/1/12 7940 - General Government Dev 7943 - Park Imp Fee 2014 W of Agua Fria Total - Operational Facilities 73 Total FY 2018-2027 Capital Improvement Program Operational Facilities Arts Distribution FY2018 Project Number: AT02018 Project Location: Description: Section 2-129 of the City Code requires that all "capital projects submitted for inclusion in the City's capital improvement program … shall include an amount equal to 1 percent of the project cost of such capital improvement for public art." This project, whose purpose is purely administrative, holds appropriation for all arts charges. Projects are charged the percent for the arts as qualifying capital expenditures are made throughout the fiscal year. 74 Category Funding Source FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total AT-Arts AT-Arts AT-Arts AT-Arts AT-Arts AT-Arts AT-Arts AT-Arts AT-Arts AT-Arts Capital Projects CIP Capital Projects Fund Citywide Park/Rec Facility Dev Commercial Solid Waste Community Park Dev Fee - Post General GO Bonds 2015 Highway User Law Enforcement Dev Municipal Office Complex Rsv $2,087 $110,875 $13,360 $385 $9,500 $27,312 $122,998 $111,457 $15,000 $1,050 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,087 $110,875 $13,360 $385 $9,500 $27,312 $122,998 $111,457 $15,000 $1,050 AT-Arts AT-Arts AT-Arts AT-Arts AT-Arts AT-Arts AT-Arts AT-Arts AT-Arts AT-Arts Neighborhood Park Dev Zone 2 NeighPkDevl Fees - Z2 Post 1/1 NeighPkDevl Fees - Z3 Post 1/1 Outside Sources Park Imp Fee 2014 W of Agua F Proposed GO Bonds Proposed MDA Bonds Public Transit Residential Solid Waste River Corridors & Trails Dev $2,002 $12,100 $7,550 $97,382 $27,000 $269,503 $250,000 $79 $1,658 $2,500 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,002 $12,100 $7,550 $97,382 $27,000 $269,503 $250,000 $79 $1,658 $2,500 FY 2018-2027 Capital Improvement Program Operational Facilities Arts Distribution FY2018 AT-Arts AT-Arts AT-Arts AT-Arts AT-Arts AT-Arts AT-Arts Street Impact Fees Z1 Post 0101 Streets Zone 3 Dev Fee Transportation Sales Tax Wastewater Wastewater Exp. E. of Agua Fri Wastewater Exp. W. of Agua Fr Wastewater Expansion Post 1/1/ $10,300 $16,847 $225,264 $86,616 $1,679 $2,245 $17,700 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $10,300 $16,847 $225,264 $86,616 $1,679 $2,245 $17,700 AT-Arts AT-Arts AT-Arts AT-Arts AT-Arts AT-Arts AT-Arts Water Water Exp. N. of Bell Water Exp. S. of Bell Water Expansion Water Expansion Post 1/1/12 Water Resource Fee 2014 WIFA Bonds $130,276 $65,562 $5,578 $57,878 $22,384 $7,000 $25,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $130,276 $65,562 $5,578 $57,878 $22,384 $7,000 $25,000 $1,758,127 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,758,127 Total Budget 75 FY 2018-2027 Capital Improvement Program Operational Facilities Asphalt Repair and Replacement-MOC Project Number: PW01199 Project Location: Municipal Operation Center Description: This project provides for asphalt repair and replacement of the entire parking area at the Municipal Operations Complex (MOC). The parking area is now 29 years old and in need of repair. Heavy equipment traffic has deteriorated the asphalt. Justification: Heavy trucks and equipment have deteriorated the pavement over time. Category Funding Source CO-Constructi GO Bonds 2015 76 Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $1,621,406 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,621,406 $1,621,406 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,621,406 FY 2018-2027 Capital Improvement Program Operational Facilities Building Equipment Renovation and Replacement Project Number: PW00050 Project Location: City Wide Description: In FY18 projects include replacement of three of the original 11 air handlers (25 years old) that are part of the original City Hall HVAC system $45,000; replacement of the City Hall Fire panel $30,000; and replacement of the sump pumps in the east and west City Hall Parking structures $20,000. $75,000 is being added each year in FY18-FY20 to have a building assessment study conducted. The first year of the study will be for the all Public Safety facilities, second year is General Government facilities and the third year is for Community Services (not including Sports Complex) and Utilities facilities. Justification: This program provides for the periodic renovation and replacement of major building equipment. 77 Category Funding Source EQ-Equipmen Municipal Office Complex Rsv SY-Study Municipal Office Complex Rsv Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $165,717 $75,000 $0 $75,000 $0 $75,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $165,717 $225,000 $240,717 $75,000 $75,000 $0 $0 $0 $0 $0 $0 $0 $390,717 FY 2018-2027 Capital Improvement Program Operational Facilities Building Fixture and Finish Renovation Project Number: PW00060 Project Location: City Wide Description: FY18 planned projects include interior painting in the Technology Center ($15,000), City Hall Complex water feature concrete repairs ($50,000) and interior painting of high use areas in the Main Library ($10,000). Justification: This program provides for the periodic renovation of building fixtures and finishes. The Facilities Division conducts an ongoing Asset Management assessment and prioritization for all City buildings. Category Funding Source 78 CO-Constructi General CO-Constructi Municipal Office Complex Rsv EQ-Equipmen Municipal Office Complex Rsv Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $4,612 $75,000 $74,255 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $4,612 $75,000 $74,255 $153,867 $0 $0 $0 $0 $0 $0 $0 $0 $0 $153,867 FY 2018-2027 Capital Improvement Program Operational Facilities Chargeback Distribution FY2018 Project Number: CB02018 Project Location: Description: Personnel costs associated with the design, acquisition of land, construction, and inspection of a capital project are charged back to that project. This project, whose purpose is purely administrative, holds appropriation for all chargebacks. Individual capital projects are charged throughout the fiscal year for staff time dedicated to the delivery of those projects. Category 79 CB-Chargeba CB-Chargeba CB-Chargeba CB-Chargeba CB-Chargeba CB-Chargeba CB-Chargeba CB-Chargeba CB-Chargeba CB-Chargeba CB-Chargeba Funding Source General GO Bonds 2015 Highway User Outside Sources Proposed GO Bonds Street Impact Fees Z1 Post 0101 Streets Zone 3 Dev Fee Transportation Sales Tax Wastewater Water Water Exp. N. of Bell CB-Chargeba Water Expansion CB-Chargeba Water Expansion Post 1/1/12 Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $187,946 $90,000 $37,653 $6,347 $322,334 $160,000 $121,239 $569,764 $22,100 $58,327 $75,200 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $187,946 $90,000 $37,653 $6,347 $322,334 $160,000 $121,239 $569,764 $22,100 $58,327 $75,200 $135,782 $25,008 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $135,782 $25,008 $1,811,700 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,811,700 FY 2018-2027 Capital Improvement Program Operational Facilities City Hall Roof Replacement Project Number: PW00150 Project Location: City Hall Building Description: The City Hall roof will be in excess of 30 years old in FY22 when the replacement roof is recommended for installation. The replacement will include a complete replacement of the underlayment, new tiles and flashing material. Justification: The life expectancy for a tile roof such as City Hall is 30 years. The underlayment will begin to deteriorate beyond the cost to maintain and repair. Category Funding Source 80 AT-Arts Proposed GO Bonds CO-Constructi Proposed GO Bonds Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $0 $0 $0 $0 $0 $0 $0 $5,000 $500,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,000 $500,000 $0 $0 $0 $0 $505,000 $0 $0 $0 $0 $0 $505,000 FY 2018-2027 Capital Improvement Program Operational Facilities City Parks Parking Lots - Asphalt Replacement Project Number: PW00995 Project Location: Various locations Description: The goal of this capital program is to establish a recurring pattern of asphalt surface maintenance to ensure the longevity of these parking lots. The Streets Division acts as consultant to the Community Services Department to program, plan and prioritize projects in alternating years. In FY18, the team will select and plan FY19 projects. Justification: The goal of the capital project is to establish a recurring pattern of asphalt surface maintenance to ensure the longevity of these parking lots. The Streets Division consults for the Community Services Department in assessing needs during the off years, and then a joint meeting is held to establish final improvement list based on Community Services priorities. New park facilities such as Pioneer Park have been added and it is important to add these to the inventory to ensure pavement preservation is applied early to extend the life of these facilities for greatest cost-benefit over the life-cycle. 81 Category Funding Source AT-Arts Proposed GO Bonds CO-Constructi Proposed GO Bonds Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $0 $2,660 $266,000 $0 $0 $1,500 $150,000 $0 $0 $2,610 $261,000 $0 $0 $1,750 $175,000 $0 $0 $2,610 $261,000 $11,130 $1,113,000 $0 $268,660 $0 $151,500 $0 $263,610 $0 $176,750 $0 $263,610 $1,124,130 FY 2018-2027 Capital Improvement Program Operational Facilities Citywide Security Program Project Number: PW00506 Project Location: Citywide Description: This project addresses security issues under the guidance of the Citywide Security Committee. The projects planned for FY18 are replacement of equipment including video cameras, recorders and adding emergency phones at the Technology Center, Public Safety Administration Building and East Public Parking Garage. Justification: Per the recommendations of the Citywide Security Committee co-chaired by the Public Works-Utilities Director and Police Chief, ongoing evaluation of citywide security issues are identified and will be addressed as funding becomes available. 82 Category Funding Source EQ-Equipmen General Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $246,557 $0 $0 $0 $0 $0 $0 $0 $0 $0 $246,557 $246,557 $0 $0 $0 $0 $0 $0 $0 $0 $0 $246,557 FY 2018-2027 Capital Improvement Program Operational Facilities Community Works Program Project Number: COP0001 Project Location: Citywide Description: The program provides a mechanism to fund smaller projects addressing more localized needs that may otherwise be overlooked in the capital program and projects that either the Council feels are advantageous to meet the city's mission or present a timely opportunity that could be missed if pursued under the regular CIP approval process, or address an immediate need that cannot or should not wait for the regular CIP approval process. Below is a list of the projects planned for FY2018. Engineering: - Quick Response - $125,000 - Entry Monuments - $65,000 - Neighborhood Traffic Management - $35,000 - Pedestrian Safety, Bicycle Infrastructure, Misc Signing/Striping - $75,000 - Arterial/Collector Wall Painting - $50,000 - Streetlight Infill - $50,000 - Utility Undergrounding - $100,000 83 Community Services: -Weed Abatement Quick Response - $20,000 - Refurbish Landscape at PSAB - $7,000 - Ash Tree Replacement along the east Parking Garage - $10,000 - Quick Response/ROW Landscape Refurbishment - $30,000 - Shade at Desert Amethyst, Hayes 2-5 yr. Playground, Scotland Yard Dog Park, Calbrisa and Alta Vista Dog Park - $180,000 - Mountain Trails/Trails Signage Study - $50,000 - Sustainable Lighting Replacements at Rio Vista Park - $71,300 - Permanent Fencing and Restroom Fixtures at Pioneer Park – $55,000 - Retention Basin Improvements - $76,700 Category CO-Constructi General Funding Source FY 2018 $624,700 FY 2019 $0 FY 2020 $0 FY 2021 $0 FY 2022 $0 FY 2023 $0 FY 2024 $0 FY 2025 $0 FY 2026 $0 FY 2027 $0 Total $624,700 FY 2018-2027 Capital Improvement Program Operational Facilities Community Works Program CO-Constructi Highway User Total Budget $995,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $995,000 $1,619,700 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,619,700 84 FY 2018-2027 Capital Improvement Program Operational Facilities Council Chambers Building Repair Program Project Number: PW00510 Project Location: Municipal Office Complex Description: The Council Chambers building is reaching an age where architectural, mechanical, electrical, lighting, and security systems are reaching the end of their serviceable life. The funding in this program will provide for the planned repair, replacement, and upgrade of building systems. The current planned improvements are: a) Refurbishment of the building envelope to include replacement of sealants at exterior joints, utility penetrations, windows, and doors $80,000 in FY2020; b) Replacement of the tile roof $150,000 in FY2022; c) Upgrade of mechanical systems to achieve improved operating efficiencies $250,000 in FY2024 and d) Upgrade and improvements to the building electrical and lighting systems $200,000 in FY2026. Justification: This project will provide an ongoing building improvements program for the Council Chambers. 85 Category Funding Source AT-Arts Proposed GO Bonds CO-Constructi Proposed GO Bonds Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $0 $0 $0 $800 $80,000 $0 $0 $1,500 $150,000 $0 $0 $2,500 $250,000 $0 $0 $2,000 $200,000 $0 $0 $6,800 $680,000 $0 $0 $80,800 $0 $151,500 $0 $252,500 $0 $202,000 $0 $686,800 FY 2018-2027 Capital Improvement Program Operational Facilities Fire Department Building Needs Project Number: PW00090 Project Location: Fire Station #3, 6 and Support Services building Description: This request is to address Facilities identified needs for Fire Station # 3, Fire Station #6, and the Fire Support Services building. 1. Fire Station # 3 was opened in 1991 and the renovations include flooring, finishes, reconstruction of bathroom and kitchen areas, replacement of appliances and general refurbishment. Not included are furnishings such as beds, TV's, and other non-facility equipment. ($170,000) 2. At Fire Station #6 the masonry wall that separates the living quarters from the apparatus bay has numerous cracks. While investigations have indicated that there is no structural threat, it does create problems in controlling the air quality environment in the station. ($50,000) Justification: 1. Fire Station #3 has not had any significant renovations or replacements in 23 years and a building of this type is typically renovated at 20 years. 2. The wall needs to be stabilized and sealed to allow appropriate control of station air quality. 86 Category Funding Source CO-Constructi General CO-Constructi Municipal Office Complex Rsv Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $273,526 $30,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $273,526 $30,000 $303,526 $0 $0 $0 $0 $0 $0 $0 $0 $0 $303,526 FY 2018-2027 Capital Improvement Program Operational Facilities Fleet Heavy Duty Vehicle Lift Project Number: PW13010 Project Location: MOC Fleet building Description: This project will fill in the vehicle service pit at Fleet and replace it with a heavy duty truck lift. The project will involve the demolition of utilities within the pit. Filling the pit with compacted 6 inch concrete slab and back fill. Install electric service and compressed air for the lift. Purchase of and installation of the new heavy duty vehicle lift. Category 87 CO-Constructi CO-Constructi CO-Constructi CO-Constructi Funding Source Commercial Solid Waste Highway User Public Transit Residential Solid Waste Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $26,962 $11,102 $7,930 $112,606 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $26,962 $11,102 $7,930 $112,606 $158,600 $0 $0 $0 $0 $0 $0 $0 $0 $0 $158,600 FY 2018-2027 Capital Improvement Program Operational Facilities Historic Buildings Equipment and Finish Renovation Project Number: PW10300 Project Location: Old Town Peoria Description: The Historical Society currently leases five buildings from the City for the purpose of operating a local museum. The City is responsible to maintain the building envelope and the tenant is responsible for maintenance of the interior along with any tenant improvements and contents. In FY18 the A/C units on the main school house need to be replaced ($75,000), the two large doors at the front of the building need to be replaced ($10,000) and the west exterior walls of the two north buildings need to be repaired. ($10,000) Justification: These replacements and renovations need to be made in order to preserve the buildings in an acceptable condition. 88 Category Funding Source EQ-Equipmen General Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $94,800 $0 $0 $0 $0 $0 $0 $0 $0 $0 $94,800 $94,800 $0 $0 $0 $0 $0 $0 $0 $0 $0 $94,800 FY 2018-2027 Capital Improvement Program Operational Facilities Impact Fee Study Project Number: CD00007 Project Location: Citywide Description: This study will update City impact fees. These fees should be updated every three years to ensure that they accurately recover the cost of constructing infrastructure required by new development. The project will be coordinated with the Finance Department. Justification: Impact fees are updated every three years to ensure the fees cover the cost of infrastructure required by new development. Category Funding Source 89 SY-Study Fire/EmergSvs Imp Fees 2014 SY-Study SY-Study SY-Study SY-Study SY-Study SY-Study FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $9,000 $0 $9,000 $0 $0 $9,000 $0 $0 $9,000 $0 $36,000 Law Enfrcmnt IF 2014 Park Imp Fee 2014 Bell to P.Pea Park Imp Fee 2014 W of Agua F Parks Zone 2-Post 8/1/14 Street Impact Fees Z1 Post 0101 Streets Zone 3 Dev Fee $9,000 $9,000 $9,000 $9,000 $18,000 $37,000 $0 $0 $0 $0 $0 $0 $9,000 $9,000 $9,000 $9,000 $0 $55,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $9,000 $9,000 $9,000 $9,000 $0 $55,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $9,000 $9,000 $9,000 $9,000 $0 $55,000 $0 $0 $0 $0 $0 $0 $36,000 $36,000 $36,000 $36,000 $18,000 $202,000 Total Budget $100,000 $0 $100,000 $0 $0 $100,000 $0 $0 $100,000 $0 $400,000 FY 2018-2027 Capital Improvement Program Operational Facilities MOC Fuel Island Project Number: PW00305 Project Location: MOC Description: Install a central delivery system at the MOC fuel island for pumping of Diesel Exhaust Fluid (DEF) into vehicles running diesel fuel. Provide engineering services as need to support the installation. Install an above ground storage tank, underground piping, and two dispensers. Associated electrical and connection to the TRAK fuel management system is included. This central delivery system will replace two temporary low volume pumping systems currently in use. Justification: City vehicles operating on diesel fuel are required by Federal EPA regulations to use Diesel Exhaust Fluid (DEF). DEF is a non-hazardous liquid injected into the vehicle exhaust. This reduces PM and NOx in diesel emissions to be compliant with current requirements from the Clean Air Act. Utilization of a central delivery system will allow for purchasing higher quantities less frequently at a lower cost. This system connected to the fuel management system will provide tracking of the use of DEF per vehicle, just as fuel use is tracked. The underground infrastructure for the DEF delivery system was installed during the reconstruction of the fuel island facility in FY16 in preparation for the system being installed at a later date. 90 Category CO-Constructi EQ-Equipmen CO-Constructi EQ-Equipmen CO-Constructi Funding Source Commercial Solid Waste Commercial Solid Waste General General Residential Solid Waste Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $11,535 $1,650 $13,265 $6,837 $53,200 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $11,535 $1,650 $13,265 $6,837 $53,200 $86,487 $0 $0 $0 $0 $0 $0 $0 $0 $0 $86,487 FY 2018-2027 Capital Improvement Program Operational Facilities MOC Site Lighting Improvements Project Number: PW00402 Project Location: Municipal Operations Center Description: A study of the current lighting at the MOC was completed in October 2016. This CIP in FY18 will provide improvements to the exterior lighting systems and reduce energy costs. The project will include engineering services, replacement of lighting fixtures with current technology LED lighting, and adding or replacing light poles to achieve a more uniformly lighted MOC yard. Justification: The study identified areas for improvement due largely to aged and degraded lighting fixtures. Category Funding Source 91 CO-Constructi CIP Capital Projects Fund DS-Design CIP Capital Projects Fund Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $368,000 $12,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $368,000 $12,000 $380,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $380,000 FY 2018-2027 Capital Improvement Program Operational Facilities Network Infrastructure Replacement - Beardsley WRF Project Number: IT00011 Project Location: Beardsley Treatment Facility Description: Establish funding for network infrastructure replacement, including all network infrastructure equipment. Network equipment would be replaced as it reaches the end of its useful life (typically five to seven years), or as performance and/or growth issues require to provide acceptable and uninterrupted service to all city departments. Infrastructure in the Beardsley Treatment Facility will require replacement in FY19 and FY24. Justification: Due to the substantial investment in technology infrastructure the city has made, it is necessary to provide for the replacement of the equipment to maintain existing service levels to citizens and city employees. This funding would be used to replace network equipment as it reaches the end of its useful life, or as performance and/or growth issues require to maintain acceptable service levels to all city departments. This would alleviate the need to continue to ask for one-time funding during budget cycles to replace these items. 92 Category Funding Source EQ-Equipmen Wastewater EQ-Equipmen Water Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $0 $60,300 $20,100 $0 $0 $0 $0 $0 $0 $0 $0 $60,300 $20,100 $0 $0 $0 $0 $0 $0 $120,600 $40,200 $0 $80,400 $0 $0 $0 $0 $80,400 $0 $0 $0 $160,800 FY 2018-2027 Capital Improvement Program Operational Facilities Network Infrastructure Replacement - Butler WRF Project Number: IT00013 Project Location: Butler Treatment Facility Description: Establish funding for network infrastructure replacement, including all network infrastructure equipment. Network equipment would be replaced as it reaches the end of its useful life (typically five to seven years), or as performance and/or growth issues require to provide acceptable and uninterrupted service to all City departments. Infrastructure in the Butler Treatment Facility will require replacement in FY20 and FY25. Justification: Due to the substantial investment in technology infrastructure the City has made, it is necessary to provide for the replacement of the equipment to maintain existing service levels to citizens and City employees. This funding would be used to replace network equipment as it reaches the end of its useful life, or as performance and/or growth issues require to maintain acceptable service levels to all City departments. This would alleviate the need to continue to ask for one-time funding during budget cycles to replace these items. 93 Category Funding Source EQ-Equipmen Wastewater EQ-Equipmen Water Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $0 $0 $0 $70,350 $23,450 $0 $0 $0 $0 $0 $0 $0 $0 $70,350 $23,450 $0 $0 $0 $0 $140,700 $46,900 $0 $0 $93,800 $0 $0 $0 $0 $93,800 $0 $0 $187,600 FY 2018-2027 Capital Improvement Program Operational Facilities Network Infrastructure Replacement - Greenway WTF Project Number: IT00010 Project Location: Greenway Water Treatment Plant Description: Establish funding for network infrastructure replacement, including all network infrastructure equipment. Network equipment would be replaced as it reaches the end of its useful life (typically five to seven years), or as performance and/or growth issues require to provide acceptable and uninterrupted service to all city departments. Infrastructure in the Greenway Water Treatment Plant will require replacement in FY19 and FY24. Justification: Due to the substantial investment in technology infrastructure the city has made, it is necessary to provide for the replacement of the equipment to maintain existing service levels to citizens and city employees. This funding would be used to replace network equipment as it reaches the end of its useful life, or as performance and/or growth issues require to maintain acceptable service levels to all city departments. This would alleviate the need to continue to ask for one-time funding during budget cycles to replace these items. 94 Category Funding Source EQ-Equipmen Water Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $93,800 $0 $0 $0 $0 $93,800 $0 $0 $0 $187,600 $0 $93,800 $0 $0 $0 $0 $93,800 $0 $0 $0 $187,600 FY 2018-2027 Capital Improvement Program Operational Facilities Network Infrastructure Replacement - Jomax WTF Project Number: IT00012 Project Location: Jomax Water Treatment Facility Description: Establish funding for network infrastructure replacement, including all network infrastructure equipment. Network equipment would be replaced as it reaches the end of its useful life (typically five to seven years), or as performance and/or growth issues require to provide acceptable and uninterrupted service to all city departments. Infrastructure in the Jomax Water Treatment Facility will require replacement in FY19 and FY24. Justification: Due to the substantial investment in technology infrastructure the city has made, it is necessary to provide for the replacement of the equipment to maintain existing service levels to citizens and city employees. This funding would be used to replace network equipment as it reaches the end of its useful life, or as performance and/or growth issues require to maintain acceptable service levels to all city departments. This would alleviate the need to continue to ask for one-time funding during budget cycles to replace these items. 95 Category Funding Source EQ-Equipmen Wastewater EQ-Equipmen Water Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $0 $0 $0 $52,500 $17,500 $0 $0 $0 $0 $0 $0 $0 $0 $52,500 $17,500 $0 $0 $0 $0 $105,000 $35,000 $0 $0 $70,000 $0 $0 $0 $0 $70,000 $0 $0 $140,000 FY 2018-2027 Capital Improvement Program Operational Facilities Network Infrastructure Replacement - Microwave WAN Project Number: IT00026 Project Location: Citywide Description: Establish funding for network infrastructure replacement, including all network infrastructure equipment. Network equipment would be replaced as it reaches the end of its useful life (typically five to seven years), or as performance and/or growth issues require to provide acceptable and uninterrupted service to all city departments. Microwave WAN infrastructure equipment at various city locations will require replacement in FY18, FY21, FY24, and FY27. Justification: Due to the substantial investment in technology infrastructure the city has made, it is necessary to provide for the replacement of the equipment to maintain existing service levels to citizens and city employees. This funding would be used to replace network equipment as it reaches the end of its useful life, or as performance and/or growth issues require to maintain acceptable service levels to all city departments. This would alleviate the need to continue to ask for one-time funding during budget cycles to replace these items. 96 Category Funding Source EQ-Equipmen IT Reserve Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $60,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $60,000 $60,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $60,000 FY 2018-2027 Capital Improvement Program Operational Facilities Network Infrastructure Replacement - MOC Project Number: IT00014 Project Location: MOC Description: Establish funding for network infrastructure replacement, including all network infrastructure equipment. Network equipment would be replaced as it reaches the end of its useful life (typically five to seven years), or as performance and/or growth issues require to provide acceptable and uninterrupted service to all City departments. Infrastructure in the Municipal Operations Center (MOC) will require replacement in FY20 and FY25. Justification: Due to the substantial investment in technology infrastructure the City has made, it is necessary to provide for the replacement of the equipment to maintain existing service levels to citizens and City employees. This funding would be used to replace network equipment as it reaches the end of its useful life, or as performance and/or growth issues require to maintain acceptable service levels to all City departments. This would alleviate the need to continue to ask for one-time funding during budget cycles to replace these items. 97 Category EQ-Equipmen EQ-Equipmen EQ-Equipmen EQ-Equipmen Funding Source General Highway User Residential Solid Waste Water Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $0 $0 $0 $0 $0 $0 $0 $31,790 $29,923 $14,340 $19,950 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $31,790 $29,923 $14,340 $19,950 $0 $0 $0 $0 $0 $0 $0 $0 $63,580 $59,846 $28,680 $39,900 $0 $0 $96,003 $0 $0 $0 $0 $96,003 $0 $0 $192,006 FY 2018-2027 Capital Improvement Program Operational Facilities Network Infrastructure Replacement - Quintero WTF Project Number: IT00017 Project Location: Quintero Water Treatment Facility Description: Establish funding for network infrastructure replacement, including all network infrastructure equipment. Network equipment would be replaced as it reaches the end of its useful life (typically five to seven years), or as performance and/or growth issues require to provide acceptable and uninterrupted service to all City departments. Infrastructure in the Quintero Water Treatment Facility will require replacement in FY18 and FY23. Justification: Due to the substantial investment in technology infrastructure the City has made, it is necessary to provide for the replacement of the equipment to maintain existing service levels to citizens and City employees. This funding would be used to replace network equipment as it reaches the end of its useful life, or as performance and/or growth issues require to maintain acceptable service levels to all City departments. This would alleviate the need to continue to ask for one-time funding during budget cycles to replace these items. 98 Category Funding Source EQ-Equipmen Water Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $64,000 $0 $0 $0 $0 $64,000 $0 $0 $0 $0 $128,000 $64,000 $0 $0 $0 $0 $64,000 $0 $0 $0 $0 $128,000 FY 2018-2027 Capital Improvement Program Operational Facilities Network Infrastructure Replacement - Remote Access Project Number: IT00032 Project Location: Citywide Description: Establish funding for network infrastructure replacement, including all network infrastructure equipment. Network equipment and systems would be replaced as it reaches the end of its useful life (typically five to seven years), or as performance and/or growth issues require to provide acceptable and uninterrupted service to all city departments. Network infrastructure equipment allowing remote access to Citywide systems will require replacement in FY18 and FY23. Justification: Due to the substantial investment in technology infrastructure the city has made, it is necessary to provide for the replacement of the equipment and systems to maintain existing service levels to citizens and city employees. This funding would be used to replace network equipment and systems as it reaches the end of its useful life, or as performance and/or growth issues require to maintain acceptable service levels to all city departments. This would alleviate the need to continue to ask for one-time funding during budget cycles to replace these items. 99 Category Funding Source EQ-Equipmen IT Reserve Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $100,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $100,000 $100,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $100,000 FY 2018-2027 Capital Improvement Program Operational Facilities Network Infrastructure Replacement - City Hall Project Number: IT00027 Project Location: City Hall Description: Establish funding for network infrastructure replacement, including all network infrastructure equipment. Network equipment would be replaced as it reaches the end of its useful life (typically five to seven years), or as performance and/or growth issues require to provide acceptable and uninterrupted service to all City departments. Network infrastructure equipment at City Hall will require replacement in FY18 and FY23. Justification: Due to the substantial investment in technology infrastructure the City has made, it is necessary to provide for the replacement of the equipment to maintain existing service levels to citizens and City employees. This funding would be used to replace network equipment as it reaches the end of its useful life, or as performance and/or growth issues require to maintain acceptable service levels to all City departments. This would alleviate the need to continue to ask for one-time funding during budget cycles to replace these items. 100 Category Funding Source EQ-Equipmen IT Reserve Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $174,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $174,000 $174,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $174,000 FY 2018-2027 Capital Improvement Program Operational Facilities Network Infrastructure Replacement-Municipal Court Project Number: IT00020 Project Location: Municipal Court Description: Establish funding for network infrastructure replacement, including all network infrastructure equipment. Network equipment would be replaced as it reaches the end of its useful life (typically five to seven years), or as performance and/or growth issues require to provide acceptable and uninterrupted service to all City departments. Infrastructure in the Municipal Court will require replacement in FY18 and FY23. Justification: Due to the substantial investment in technology infrastructure the City has made, it is necessary to provide for the replacement of the equipment to maintain existing service levels to citizens and City employees. This funding would be used to replace network equipment as it reaches the end of its useful life, or as performance and/or growth issues require to maintain acceptable service levels to all City departments. This would alleviate the need to continue to ask for one-time funding during budget cycles to replace these items. 101 Category Funding Source EQ-Equipmen IT Reserve Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $90,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $90,000 $90,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $90,000 FY 2018-2027 Capital Improvement Program Operational Facilities Parking Lot Maintenance for City Buildings Project Number: PW11150 Project Location: Citywide Description: This project will address the need for ongoing repairs and maintenance for parking lots at City facilities. This request is to repair, slurry coat and restripe the Greenway Water Treatment Plant asphalt. Justification: Asphalt parking lots have a useful life of over 20 years if properly maintained. The Greenway Water Treatment Plant yard asphalt has deteriorated due to settling and requires repair and resurfacing. Category Funding Source 102 CO-Constructi General EQ-Equipmen General Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $96,452 $29,700 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $96,452 $29,700 $126,152 $0 $0 $0 $0 $0 $0 $0 $0 $0 $126,152 FY 2018-2027 Capital Improvement Program Operational Facilities Peoria Center for Performing Arts Project Number: PW00080 Project Location: 8355 W. Peoria Avenue Description: The Peoria Center for Performing Arts is over nine years old. It now requires refurbishment and enhancements to maintain a high quality level of performance and improvement of operational efficiencies. Work in FY18 will include replacement of flooring, replacement of sound attenuation wall coverings, and interior painting. Justification: The building has a significant amount of public exposure and should be maintained at the highest level of appearance. Staff meets regularly with PCPA management to identify improvement needs, and to prioritize facility improvements and capital reinvestment. 103 Funding Source Category SY-Study General Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $49,955 $0 $0 $0 $0 $0 $0 $0 $0 $0 $49,955 $49,955 $0 $0 $0 $0 $0 $0 $0 $0 $0 $49,955 FY 2018-2027 Capital Improvement Program Operational Facilities Peoria Transit Center Project Number: PW00325 Project Location: TBD Description: The Regional Transportation Plan, which is funded by the regional transportation sales tax, includes a transit center located in Peoria. It is anticipated that the transit center will be co-located with a Peoria Park and Ride facility. The location of the facility will be determined by an implementation study. Justification: The City has conducted a study for the revitalization of the downtown area. The component of the revitalization is transportation service through the downtown. The Regional Transportation Plan also anticipates a Park and Ride facility that may be directly linked to the transit center. 104 Category AT-Arts CB-Chargeba CO-Constructi DS-Design LA-Land Acq SY-Study Funding Source Outside Sources Outside Sources Outside Sources Outside Sources Outside Sources Outside Sources Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $0 $156,575 $0 $782,876 $50,165 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $24,990 $43,225 $2,342,381 $156,575 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $24,990 $43,225 $2,498,956 $156,575 $782,876 $50,165 $989,616 $0 $0 $0 $0 $0 $0 $2,567,171 $0 $0 $3,556,787 FY 2018-2027 Capital Improvement Program Operational Facilities Pyramid Peak Radio Site Project Number: IT00035 Project Location: Pyramid Peak Plant Description: This project will provide a new communications site to provide enhanced radio coverage primarily in the northeast part of Peoria. Due to the mountainous terrain, the existing radio system does not provide adequate ocverage for this area. The site plans include a lattice-style tower and moving an existing shelter to house the site radio equipment. Justification: A need for the new site was identified in late 2015, when it was determined no current radio site will support adequate radio coverage in northeast Peoria, especially in the Sonoran Mountain Ranch area. Coverage studies indicated that a location within the Pyramid Peak Water Treatment Plant is positioned to provide the necessary coverage. 105 Category Funding Source EQ-Equipmen CIP Capital Projects Fund Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $975,704 $0 $0 $0 $0 $0 $0 $0 $0 $0 $975,704 $975,704 $0 $0 $0 $0 $0 $0 $0 $0 $0 $975,704 FY 2018-2027 Capital Improvement Program Operational Facilities Radio Subscriber Replacements Project Number: IT00018 Project Location: Citywide Description: The City's subscriber radio units deployed citywide will require replacement in order to continue operation on the RWC network. Subscriber replacements began in FY16 and will continue through FY20. Justification: The radio subscriber units must be replaced in order for the city's public safety and general government personnel to be able to continue to communicate on the RWC radio system. Category Funding Source 106 EQ-Equipmen GO Bonds 2015 EQ-Equipmen Proposed GO Bonds Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $549,535 $0 $0 $549,535 $0 $549,535 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $549,535 $1,099,070 $549,535 $549,535 $549,535 $0 $0 $0 $0 $0 $0 $0 $1,648,605 FY 2018-2027 Capital Improvement Program Operational Facilities Renovate Main Library Project Number: PW00509 Project Location: Municipal Office Complex Description: The purpose of this project is to evaluate, renovate and replace building systems in the City of Peoria Main Library. The library was originally built in 1991. Funding in FY 21 and FY 25 will renovate the library including mechanical, lighting, painting, carpeting, and fire systems. Justification: This request will provide needed refurbishments to the building's major components and address the evolving business model of public libraries. 107 Category AT-Arts CO-Constructi EQ-Equipmen SY-Study Funding Source Proposed GO Bonds Proposed GO Bonds Proposed GO Bonds Proposed GO Bonds Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $0 $1,225,000 $260,000 $0 $0 $0 $0 $0 $0 $0 $0 $30,000 $3,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $30,000 $3,000,000 $1,225,000 $260,000 $1,485,000 $0 $0 $3,030,000 $0 $0 $0 $0 $0 $0 $4,515,000 FY 2018-2027 Capital Improvement Program Operational Facilities Transit Park and Ride Lot Project Number: PW00335 Project Location: TBD Description: The Regional Transportation Plan, which is funded by the regional transportation sales tax, includes a transit park and ride lot located in Peoria. It is anticipated that the park and ride lot will be co-located with a Peoria Transit Center. The location of the facility will be determined by an implementation study. Justification: The City has conducted a study for the revitalization of the downtown area. The component of the revitalization is transportation service through the downtown. The Regional Transportation Plan also anticipates a Park and Ride facility that may be directly linked to the transit center. 108 Category Funding Source CO-Constructi Outside Sources DS-Design Outside Sources LA-Land Acq Outside Sources Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $4,216,647 $386,400 $2,138,675 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $4,216,647 $386,400 $2,138,675 $6,741,722 $0 $0 $0 $0 $0 $0 $0 $0 $0 $6,741,722 FY 2018-2027 Capital Improvement Program Operational Facilities Vistancia Radio Site Project Number: IT00034 Project Location: Vistancia Description: Due to current radio system coverage that is less than sufficient in the northern area, an additional radio site is being requested in the Vistancia area. Site development, including environmental studies will be conducted. The new site will include a shelter, tower, generator, radio equipment, and microwave backhaul equipment. Justification: The current system coverage is not good in the northern area of development, including the school. This is an area that is, and will continue to be, growing. A final location for the site has not been determined, but the current or planned Utilities locations will be considered as first choices. The radio site for this area would support Police, Fire, Public Works-Utilities (including Solid Waste), and other City department communications. 109 Category Funding Source EQ-Equipmen Proposed GO Bonds Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $2,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $2,000,000 $0 $2,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $2,000,000 City of Peoria FY 2018 – FY2027 Capital Improvement Program 110 City of Peoria FY 2018 Annual Program Budget Capital Improvement Program Parks, Trails, Open Space and Libraries Quality of life initiatives, such as those represented by parks, libraries, open space, and trails projects, are an important component of the Capital Improvement Program. Rio Vista and Pioneer Community Park each offer lighted ball fields, extensive picnic grounds, shaded playgrounds, a water play area, batting cages, an urban lake, and much, much more. Neighborhood parks provide recreational amenities close to home, while the city’s evergrowing network of trails accommodates walkers, joggers, strollers, bicyclists, roller- bladers, and equestrians. Funding for parks, libraries, open space, and trails projects is primarily from general obligation bonds and development impact fees. Projects in the 10-year program include development of a new community park in the northern portion of Peoria, and design and construction of a southern access point to the New River Trail system near the south side of Olive in the vicinity of 99th Avenue. Parks Total ‐ $62,131,656 $50,000,000 $45,000,000 $40,000,000 $35,000,000 $30,000,000 $25,000,000 $20,000,000 $15,000,000 $10,000,000 $5,000,000 $0 FY18 FY19 FY20 FY21 FY22 111 FY23 FY24 FY25 FY26 FY27 FY 2018-2027 Capital Improvement Program Parks - Community Parks - Community Summary by Project Project Name Pg# FY 2018 Northern Community Park 128 Total - Parks - Community FY 2019 FY 2020 FY 2021 FY 2022 FY 23-27 $39,285,333 $0 $2,020,000 $553,141 $0 $0 $41,858,474 $39,285,333 $0 $2,020,000 $553,141 $0 $0 $41,858,474 112 Total FY 2018-2027 Capital Improvement Program Parks - Neighborhood Parks - Neighborhood Summary by Project Project Name Pg# FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 23-27 Camino a Lago Park#2 (The Meadows) 123 Country Meadows Park Improvements $0 $710,258 $3,772,086 $0 $0 $0 $4,482,344 126 $0 $265,982 $1,234,018 $0 $0 $0 $1,500,000 Sonoran Mountain Ranch Park Improvements 132 $0 $82,649 $317,351 $0 $0 $0 $400,000 Varney Park Improvements 136 $200,000 $0 $0 $0 $0 $0 $200,000 $200,000 $1,058,889 $5,323,455 $0 $0 $0 $6,582,344 Total - Parks - Neighborhood 113 Total FY 2018-2027 Capital Improvement Program Parks - Other Parks - Other Summary by Project Project Name Pg# FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 23-27 Community Services ADA Compliance 124 Community Services Master Plan $273,300 $0 $0 $0 $0 $0 $273,300 125 $0 $300,000 $0 $0 $0 $0 $300,000 Palo Verde Ruin - Interpretive Plan 130 $750,786 $0 $0 $0 $0 $0 $750,786 Park and Recreation Facility Refurbishment 131 $1,434,300 $0 $0 $0 $0 $0 $1,434,300 Sports Complex Asphalt Remediation 134 $50,000 $0 $0 $0 $0 $0 $50,000 Veterans Memorial Improvements 137 $700,000 $0 $0 $0 $0 $0 $700,000 $3,208,386 $300,000 $0 $0 $0 $0 $3,508,386 Total - Parks - Other 114 Total FY 2018-2027 Capital Improvement Program Parks - Trails & Open Space Parks - Trails & Open Space Summary by Project Project Name Pg# FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 23-27 75th Avenue and Deer Valley Trailhead 120 83rd Avenue and Village Parkway Trailhead $400,000 $0 $0 $0 $0 $0 $400,000 121 $532,783 $0 $0 $0 $0 $0 $532,783 99th Ave and Olive Trailhead 122 $1,985,908 $0 $0 $0 $0 $0 $1,985,908 New River Trail - Williams Rd to Happy Valley Rd 127 $645,263 $173,110 $195,655 $0 $0 $0 $1,014,028 Sonoran Preservation Program (Open Space) 133 $1,170,000 $2,340,000 $0 $0 $0 $0 $3,510,000 Trailhead at Vistancia 135 $0 $0 $0 $0 $787,923 $1,951,810 $2,739,733 $4,733,954 $2,513,110 $195,655 $0 $787,923 $1,951,810 $10,182,452 Total - Parks - Trails & Open Space 115 Total FY 2018-2027 Capital Improvement Program Parks - Community Parks - Community Summary by Funding Source Fund Number and Name FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 23-27 $0 $0 $0 $505,000 $0 $0 $505,000 4252 - Proposed GO Bonds $20,613,876 $0 $0 $48,141 $0 $0 $20,662,017 4550 - CIP Capital Projects Fund $10,000,000 $0 $2,020,000 $0 $0 $0 $12,020,000 $220,000 $0 $0 $0 $0 $0 $220,000 7907 - NeighPkDevl Fees - Z2 Post 1/1/12 $1,210,000 $0 $0 $0 $0 $0 $1,210,000 7908 - NeighPkDevl Fees - Z3 Post 1/1/12 $755,000 $0 $0 $0 $0 $0 $755,000 7910 - Citywide Park/Rec Facility Dev $1,336,001 $0 $0 $0 $0 $0 $1,336,001 7911 - Community Park Dev Fee - Post $950,456 $0 $0 $0 $0 $0 $950,456 7942 - Parks Zone 2-Post 8/1/14 $1,500,000 $0 $0 $0 $0 $0 $1,500,000 7943 - Park Imp Fee 2014 W of Agua Fria $2,700,000 $0 $0 $0 $0 $0 $2,700,000 $39,285,333 $0 $2,020,000 $553,141 $0 $0 $41,858,474 1000 - General 7904 - Neighborhood Park Dev Zone 2 Total - Parks - Community 116 Total FY 2018-2027 Capital Improvement Program Parks - Neighborhood Parks - Neighborhood Summary by Funding Source Fund Number and Name FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 23-27 4240 - GO Bonds 2010 $0 $0 $0 $0 $0 $0 $0 4251 - GO Bonds 2015 $0 $710,258 $161,121 $0 $0 $0 $871,379 $200,000 $348,631 $4,051,119 $0 $0 $0 $4,599,750 4550 - CIP Capital Projects Fund $0 $0 $1,111,215 $0 $0 $0 $1,111,215 4810 - Outside Sources $0 $0 $0 $0 $0 $0 $0 $200,000 $1,058,889 $5,323,455 $0 $0 $0 $6,582,344 4252 - Proposed GO Bonds Total - Parks - Neighborhood 117 Total FY 2018-2027 Capital Improvement Program Parks - Other Parks - Other Summary by Funding Source Fund Number and Name FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 23-27 1000 - General $1,858,386 $0 $0 $0 $0 $0 $1,858,386 1111 - Percent for the Arts $700,000 $0 $0 $0 $0 $0 $700,000 1210 - Half Cent Sales Tax $50,000 $0 $0 $0 $0 $0 $50,000 1970 - Municipal Office Complex Rsv $0 $0 $0 $0 $0 $0 $0 2000 - Sports Complex $0 $0 $0 $0 $0 $0 $0 2001 - Sports Complex Capital Reserve $0 $0 $0 $0 $0 $0 $0 2002 - Sports Complex Imp Reserve $0 $0 $0 $0 $0 $0 $0 2003 - Sports Complex GA Surcharge $0 $0 $0 $0 $0 $0 $0 4250 - GO Bonds 2012 $0 $0 $0 $0 $0 $0 $0 4251 - GO Bonds 2015 $400,000 $0 $0 $0 $0 $0 $400,000 4252 - Proposed GO Bonds $200,000 $174,000 $0 $0 $0 $0 $374,000 4550 - CIP Capital Projects Fund $0 $0 $0 $0 $0 $0 $0 4810 - Outside Sources $0 $0 $0 $0 $0 $0 $0 7904 - Neighborhood Park Dev Zone 2 $0 $42,000 $0 $0 $0 $0 $42,000 7941 - Park Imp Fee 2014 Bell to P.Peak $0 $42,000 $0 $0 $0 $0 $42,000 7943 - Park Imp Fee 2014 W of Agua Fria $0 $42,000 $0 $0 $0 $0 $42,000 $3,208,386 $300,000 $0 $0 $0 $0 $3,508,386 Total - Parks - Other 118 Total FY 2018-2027 Capital Improvement Program Parks - Trails & Open Space Parks - Trails & Open Space Summary by Funding Source Fund Number and Name FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 23-27 4251 - GO Bonds 2015 $2,053,571 $0 $0 $0 $0 $0 $2,053,571 4252 - Proposed GO Bonds $1,260,383 $152,110 $171,655 $0 $787,923 $1,951,810 $4,323,881 4550 - CIP Capital Projects Fund $1,170,000 $2,340,000 $0 $0 $0 $0 $3,510,000 $0 $0 $0 $0 $0 $0 $0 7920 - River Corridors & Trails Dev $250,000 $21,000 $24,000 $0 $0 $0 $295,000 Total - Parks - Trails & Open Space $4,733,954 $2,513,110 $195,655 $0 $787,923 $1,951,810 $10,182,452 7915 - Open Space Dev 119 Total FY 2018-2027 Capital Improvement Program Parks - Trails & Open Space 75th Avenue and Deer Valley Trailhead Project Number: CS00173 Project Location: 75th Avenue and Deer Valley Description: This project will provide a connection to the New River Trail from the south side of Deer Valley Road, and will include shade, benches, drinking fountains, and limited parking. This project will provide a vital link for both pedestrian and bicycles, as it will enable the extension of bike lanes on Deer Valley Road to New River and will provide direct access to the Deer Valley Road underpass and New River Trail. Justification: This project has only recently been identified through a survey of bicycle infrastructure gaps as part of Peoria's Bicycle Development Plan update. 120 Category Funding Source CO-Constructi GO Bonds 2015 Total Budget Total Operating Impacts FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $400,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $400,000 $400,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $400,000 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $100,000 FY 2018-2027 Capital Improvement Program Parks - Trails & Open Space 83rd Avenue and Village Parkway Trailhead Project Number: CS00156 Project Location: 83rd Avenue and Village Parkway Description: With the path connection complete to the New River the next phase will include: design and construction off-street parking, drinking fountain, resting area and landscaping. Justification: The construction of this path connects residents in Westbrook Village directly to the New River Trail. Category Funding Source CO-Constructi Proposed GO Bonds 121 Total Budget Total Operating Impacts FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $532,783 $0 $0 $0 $0 $0 $0 $0 $0 $0 $532,783 $532,783 $0 $0 $0 $0 $0 $0 $0 $0 $0 $532,783 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $100,000 FY 2018-2027 Capital Improvement Program Parks - Trails & Open Space 99th Ave and Olive Trailhead Project Number: CS00088 Project Location: 99th Avenue and Olive Avenue Description: This project is for design and construction of an access point to the New River Trail system with comfort facilities such as a shade ramadas, drinking fountain, and resting areas. Since this is also near an equestrian area in the community, facilities will also include services that accommodate those wishing to access the trail on horseback. Coordination is necessary with the Maricopa County Flood Control District through the existing IGA. The extent of remediation of buried landfill debris within the trailhead and access road impact area is under evaluation. Justification: This project is consistent with the Community Services Master Plan and the West Valley Corridor plan to provide a trailhead and comfort station along the New River Trail system at various points. Despite the costs to mitigate buried landfill debris, this trailhead site remains advantageous given a presumed land cost of zero dollars and its adjacency to the recently completed New River Trail between Northen and Olive. 122 Category Funding Source CO-Constructi GO Bonds 2015 CO-Constructi Proposed GO Bonds Total Budget Total Operating Impacts FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $1,530,908 $455,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,530,908 $455,000 $1,985,908 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,985,908 $15,000 $15,000 $15,000 $15,000 $15,000 $15,000 $15,000 $15,000 $15,000 $15,000 $150,000 FY 2018-2027 Capital Improvement Program Parks - Neighborhood Camino a Lago Park#2 (The Meadows) Project Number: CS00086 Project Location: Northern Camino a Lago Area (south of Pinnacle Peak Rd.) Description: This project involves development of a neighborhood park in the North section of the Camino a Lago site (The Meadows). This project includes land acquisition, design and construction of a 10 - acre neighborhood park with typical amenities such as playgrounds, picnic shelters, hard court surfacing, landscaping, restroom, lighted multi-use fields, etc. Justification: As development continues in the northern portion of the Camino a Lago area, a neighborhood park will be needed. This park has been identified in the Community Services Master Plan. 123 Funding Source Category AT-Arts CO-Constructi AT-Arts CO-Constructi AT-Arts CO-Constructi CIP Capital Projects Fund CIP Capital Projects Fund GO Bonds 2015 GO Bonds 2015 Proposed GO Bonds Proposed GO Bonds Total Budget Total Operating Impacts FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $0 $0 $0 $0 $0 $0 $0 $6,558 $703,700 $0 $0 $11,002 $1,100,213 $1,121 $160,000 $24,750 $2,475,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $11,002 $1,100,213 $7,679 $863,700 $24,750 $2,475,000 $0 $710,258 $3,772,086 $0 $0 $0 $0 $0 $0 $0 $4,482,344 $149,638 $149,638 $149,638 $149,638 $0 $0 $178,138 $149,638 $149,638 $149,638 $1,225,604 FY 2018-2027 Capital Improvement Program Parks - Other Community Services ADA Compliance Project Number: CS00177 Project Location: city wide Description: Title II of the Americans with Disabilities Act (ADA) requires that all municipal sites and facilities be evaluated for accessibility to the programs and services provided, including those that existed before 1992. In September 2010, the Department of Justice published a new ADA Title II regulation that included new accessibility standards known as the “2010 ADA Standards for Accessible Design”. The City of Peoria is required to use these new “2010 ADA Standards for Accessible Design” to evaluate all existing sites. Justification: The ADA study was completed in early 2014. A final report identifies access deficits and a solution for each throughout the parks and recreation system. Recommendations have been provided in the report for phasing of the changes that are required by Title II of the Americans with Disabilities Act. These changes include everything from parking lots, signage, structural barriers and more in the City’s recreational facilities, libraries, sports complexes, parks and trail systems. 124 Category Funding Source CO-Constructi General Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $273,300 $0 $0 $0 $0 $0 $0 $0 $0 $0 $273,300 $273,300 $0 $0 $0 $0 $0 $0 $0 $0 $0 $273,300 FY 2018-2027 Capital Improvement Program Parks - Other Community Services Master Plan Project Number: CS00067 Project Location: Citywide Description: This project is a request to update the comprehensive Community Services Master Plan (CSMP) to guide and assist with development and prioritization, especially in the northern portion of the city. The project will include a thorough inventory analysis, benchmarking study, community input surveys, public meetings and comments to help direct the future program and development of parks, recreation, open spaces, and trails. Justification: By performing regularly scheduled updates of the CSMP, future planning will be more responsive to address the needs of the city. The CSMP contains information used when planning for future parks, trail systems, recreation programming, future recreational sites and open space. 125 Category SY-Study SY-Study SY-Study SY-Study Funding Source FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total Neighborhood Park Dev Zone 2 Park Imp Fee 2014 Bell to P.Pea Park Imp Fee 2014 W of Agua F Proposed GO Bonds $0 $0 $0 $0 $42,000 $42,000 $42,000 $174,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $42,000 $42,000 $42,000 $174,000 Total Budget $0 $300,000 $0 $0 $0 $0 $0 $0 $0 $0 $300,000 FY 2018-2027 Capital Improvement Program Parks - Neighborhood Country Meadows Park Improvements Project Number: CS00203 Project Location: W. Butler Dr. & N. 111th Ave. Description: This project entails the addition of one or more new park amenities that will be determined through a public input process. A design professional will be chosen to assist the City in facilitating public meeting(s) and preparing visuals of amenity alternatives. The City will utilize its contracted Parks Job Order Contractor(s) to advise on project costs and for project construction in the subsequent year. Amenities at Country Meadows Park could include an airnasium, dog park, or skate plaza. Minor enhancements of existing playgrounds, fall surfacing, lighting repairs, and/or a restroom refresh would be undertaken concurrently. Justification: Country Meadows Park was constructed in the late 1990's. Residential growth in the Pine District and the proximity to the adjacent school has led to increased utilization of the park. This park is of a size that can accommodate one or more additional park amenities without compromising the open turf park character. 126 Category Funding Source AT-Arts Proposed GO Bonds CB-Chargeba Proposed GO Bonds CO-Constructi Proposed GO Bonds Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $0 $0 $2,396 $23,973 $239,613 $11,981 $23,973 $1,198,064 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $14,377 $47,946 $1,437,677 $0 $265,982 $1,234,018 $0 $0 $0 $0 $0 $0 $0 $1,500,000 FY 2018-2027 Capital Improvement Program Parks - Trails & Open Space New River Trail - Williams Rd to Happy Valley Rd Project Number: CS00128 Project Location: East side of New River between Pinnacle Peak and Happy Valley Road Description: New River Trail; Williams Rd to Happy Valley Rd. This project is separated into 2 Phases; Phase 1 - Williams Rd to Pinnacle Pk Rd and, Phase 2 - Pinnacle Pk Rd to Happy Valley Rd. Phase 1 - Provides for the coordination with the City of Glendale, adjacent property owners, public involvement, design, ROW acquisition, utility coordination, construction and construction administration for the construction of the low-water crossing at New River connecting the City's trail that terminates at Williams Rd on the west side of New River to the City of Glendale's New River Trail Path to be located on the east side of New River. Glendale's trail will extend from Hillcrest Blvd to Pinnacle Pk Rd. Phase 2 - Provides for the coordination with adjacent property owners, public involvement, design, land acquisition, utility coordination, construction and construction administration for the remaining sections of the trail along the east side of New River and extending from Pinnacle Peak Road to Happy Valley Road. The improvements will include: clearing and grubbing, obtaining new easements, construction of a concrete trail. This project may also require processing of design and construction agreements, development and intergovernmental agreements. Justification: The segment of the New River Trail is consistent with the Community Services Master Plan and the West Valley Recreation Corridor plan. 127 Funding Source Category FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total CO-Constructi AT-Arts CB-Chargeba CO-Constructi GO Bonds 2015 Proposed GO Bonds Proposed GO Bonds Proposed GO Bonds $122,663 $0 $0 $0 $0 $0 $0 $0 $0 $1,591 $11,000 $159,064 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $122,663 $1,591 $11,000 $159,064 DS-Design LA-Land Acq CB-Chargeba CO-Constructi LA-Land Acq Proposed GO Bonds Proposed GO Bonds River Corridors & Trails Dev River Corridors & Trails Dev River Corridors & Trails Dev $272,600 $0 $0 $250,000 $0 $0 $152,110 $11,000 $0 $10,000 $0 $0 $24,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $272,600 $152,110 $35,000 $250,000 $10,000 $645,263 $173,110 $195,655 $0 $0 $0 $0 $0 $0 $0 $1,014,028 $84,514 $84,514 $84,514 $84,514 $84,514 Total Budget Total Operating Impacts $0 $78,500 $0 $84,514 $84,514 $670,098 FY 2018-2027 Capital Improvement Program Parks - Community Northern Community Park Project Number: CS00059 Project Location: Lake Pleasant Parkway at Dixileta Dr. Description: This is a request to fund the development of a community park in the northern portion of Peoria. In FY 2015, a study was conducted that concluded that the New River Dam impoundment area near Lake Pleasant Parkway and Dixileta Drive was the most viable location for the next community park. The study evaluated multiple parcels and analyzed landform factors, infrastructure requirements, and costs of acquisition. Park test fit concepts were presented to the public in early 2016 in a series of public meetings. Park amenities will be similar to those offered at Rio Vista and Pioneer Community Parks including lighted fields, playgrounds, ball courts, a fishing lake, and a possible trailhead. Funding will be used for expenses related to, design, construction, development fees, outside agency and public utility agreements, and park related capital equipment costs. A future phase of development (not funded) includes a recreation center and pool. Justification: Through the Community Services Master Plan update, it recommended building a community park north of Bell Road. According to the 2013 Needs Assessment Survey, large community parks were listed as one of the facility types identified by households as being the most needed north of Bell Road. 128 Category Funding Source FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total AT-Arts CO-Constructi CO-Constructi CO-Constructi OT-Other CIP Capital Projects Fund $0 CIP Capital Projects Fund $10,000,000 Citywide Park/Rec Facility Dev $1,336,001 Community Park Dev Fee - Post $950,000 Community Park Dev Fee - Post $456 $0 $0 $0 $0 $0 $20,000 $2,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $20,000 $12,000,000 $1,336,001 $950,000 $456 AT-Arts CO-Constructi CO-Constructi CO-Constructi CO-Constructi CO-Constructi EQ-Equipmen AT-Arts CO-Constructi General $0 General $0 Neighborhood Park Dev Zone 2 $220,000 NeighPkDevl Fees - Z2 Post 1/1 $1,210,000 NeighPkDevl Fees - Z3 Post 1/1 $755,000 Park Imp Fee 2014 W of Agua F $2,700,000 Parks Zone 2-Post 8/1/14 $1,500,000 Proposed GO Bonds $0 Proposed GO Bonds $20,613,876 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,000 $500,000 $0 $0 $0 $0 $0 $477 $47,664 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,000 $500,000 $220,000 $1,210,000 $755,000 $2,700,000 $1,500,000 $477 $20,661,540 Total Budget $39,285,333 $0 $2,020,000 $553,141 $0 $0 $0 $0 $0 $0 $41,858,474 FY 2018-2027 Capital Improvement Program Parks - Community Northern Community Park Total Operating Impacts $0 $1,542,787 $1,542,787 $1,542,787 $1,542,787 $1,542,787 $1,542,787 $1,542,787 $1,542,787 $1,542,787 $13,885,083 129 FY 2018-2027 Capital Improvement Program Parks - Other Palo Verde Ruin - Interpretive Plan Project Number: CS00178 Project Location: 73rd Drive and Briles Road Description: The Palo Verde Ruin is a significant cultural resource within the City of Peoria. At one time, the ruin was the largest prehistoric habitation village of the Hohokam on the New River. In 2011, the ruin was placed on the National Register of Historic Places. The site is connected to the city’s Palo Verde Park and is located within the Terramar development. In 2013, the city installed interpretive signs within the park site. These signs provided visitors with general information about the ruins and were the first phase of a Councilapproved interpretive plan for the ruins. The next phase of the interpretive plan is to construct: - Decorative security fencing to secure the ruins from the park site and the connection at the New River trail leading to the Palo Verde Park - An interpretive trail within the ruins with additional interpretive signage - Partial excavation and protection of some artifacts The project will also fund the completion of drainage improvements along the north edge of the site. In the past decade, water from the surrounding development has been eroding the site and damaging the artifacts. 130 Justification: The Palo Verde Ruin is a significant cultural resource within the City of Peoria. Once completed, this work will help share Peoria's archeological heritage with both residents and visitors as well as protect the integrity of the site. Category Funding Source FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total EQ-Equipmen General EQ-Equipmen GO Bonds 2015 $150,786 $400,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $150,786 $400,000 CO-Constructi Proposed GO Bonds $200,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $200,000 $750,786 $0 $0 $0 $0 $0 $0 $0 $0 $0 $750,786 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 Total Budget Total Operating Impacts $10,000 $10,000 $100,000 FY 2018-2027 Capital Improvement Program Parks - Other Park and Recreation Facility Refurbishment Project Number: CS00185 Project Location: various Description: This is a request to refurbish/replace items at the following locations: Sunrise Family Center, Murphy, Wacker, Hayes, Rio Vista, Fletcher Heights, Westgreen, Country Meadows, Windrose, Monroe and other various parks, various trails, outdoor recreation, Centennial, Sunrise and Peoria Pools, Rio Vista Recreation Center, the Sports Complex, the Community Center and both libraries. Justification: Some of the parks and facilities are aging and experience heavy use by citizens and visitors to our City, resulting in many of the parks and facilities showing a worn look. 131 Category Funding Source CO-Constructi General Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $1,434,300 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,434,300 $1,434,300 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,434,300 FY 2018-2027 Capital Improvement Program Parks - Neighborhood Sonoran Mountain Ranch Park Improvements Project Number: CS00204 Project Location: N. Chaffen Blvd & W. Miner Trail Description: This project entails the addition of one or more new park amenities that will be determined through a public input process. A design professional will be chosen to assist the City in facilitating public meeting(s) and preparing visuals of amenity alternatives. The City will utilize its contracted Parks Job Order Contractor(s) to advise on project costs and for project construction in the subsequent year. Amenities at Sonoran Mountain Ranch Park could include a hard court shade structure, enhanced playground shade, skate pad, misting pad, or fenced dog run. Minor enhancements of existing playground fall surfacing, lighting repairs, and/or a restroom refresh would be undertaken concurrently. Justification: Sonoran Mountain Ranch Park was constructed in the mid 2000's. Continued residential growth in this community has led to increased utilization of the park. This park is of a size that can accommodate one or more additional park amenities without compromising the open turf park character. 132 Category Funding Source AT-Arts Proposed GO Bonds CB-Chargeba Proposed GO Bonds CO-Constructi Proposed GO Bonds Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $0 $0 $581 $23,973 $58,095 $2,905 $23,973 $290,473 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $3,486 $47,946 $348,568 $0 $82,649 $317,351 $0 $0 $0 $0 $0 $0 $0 $400,000 FY 2018-2027 Capital Improvement Program Parks - Trails & Open Space Sonoran Preservation Program (Open Space) Project Number: CS00089 Project Location: Citywide Description: In concert with Peoria’s goal to “preserve our natural environment”, and supporting policy directives in the city’s General Plan, staff is creating a dynamic Sonoran Desert Preservation Program. The program identifies areas that merit special consideration and then outlines how the city can strategically assemble them over time into a meaningful network of connected open spaces. The project funds are needed to complete studies on specific properties, including cultural surveys, along with the direct land acquisition of areas threatened by development. Justification: The City Council has adopted a policy-level goal to “preserve our natural environment,” with defined objectives of (a) land banking for open space and (b) incorporating open space into our built environment. Also, the city’s General Plan and Parks Recreation Open Space and Trails Master Plan outline policy directives to develop a system of open spaces for meaningful network of connected space for a variety of users. 133 Category Funding Source LA-Land Acq CIP Capital Projects Fund Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $1,170,000 $2,340,000 $0 $0 $0 $0 $0 $0 $0 $0 $3,510,000 $1,170,000 $2,340,000 $0 $0 $0 $0 $0 $0 $0 $0 $3,510,000 FY 2018-2027 Capital Improvement Program Parks - Other Sports Complex Asphalt Remediation Project Number: CS00179 Project Location: Sports Complex Description: This project will begin replacement of the 20+ year old asphalt paving at the Peoria Sports Complex beginning with the major roadways: Mariners Way, Padres Way, Stadium Drive, and Stadium Circle. Any surplus funds, or funds added in subsequent years, will be allocated to crack seal and/or surface treat the larger parking lots on the Mariners (west) and Padres (north) sides of the stadium. The asphalt replacement efforts will be timed to occur during non-peak summer months and will be coordinated with any ongoing construction improvements in the stadium. Justification: During the construction phases at the Sports Complex(2014-2016), it became apparent that the stadium’s asphalt was reaching the end of its life and was suffering additional stress due to heavy truck traffic. Staff initially identified the Mariners and Padres Clubhouse parking lots as high priority, but subsequent geotechnical investigations revealed that the major stadium roadways were in greater need of remediation. Milling and overlay options were explored, however testing results revealed an inadequate asphalt base which would shorten the overlay life to 5 years. Additional funds will be requested to complete the major roadways and systematic replacement cost implications will be assembled for consideration in future CIP years. 134 Category Funding Source EQ-Equipmen Half Cent Sales Tax Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $50,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $50,000 $50,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $50,000 FY 2018-2027 Capital Improvement Program Parks - Trails & Open Space Trailhead at Vistancia Project Number: CS00159 Project Location: Vistancia Description: This project will provide funding to construct a Type I trailhead near White Peak mountain in Vistancia North to provide access to mountain hiking trails. Amenities will include parking, restroom, picnic shelters, benches, drinking fountain, bike racks, signage, landscape, shade, etc. Justification: This project is identified in the Community Services Master Plan. Funding Source Category 135 AT-Arts CB-Chargeba CO-Constructi DS-Design LA-Land Acq Proposed GO Bonds Proposed GO Bonds Proposed GO Bonds Proposed GO Bonds Proposed GO Bonds Total Budget Total Operating Impacts FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $3,326 $47,948 $0 $332,649 $404,000 $18,850 $47,948 $1,885,012 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $22,176 $95,896 $1,885,012 $332,649 $404,000 $0 $0 $0 $0 $787,923 $1,951,810 $0 $0 $0 $0 $2,739,733 $22,850 $22,850 $22,850 $22,850 $22,850 $0 $0 $0 $0 $22,850 $137,100 FY 2018-2027 Capital Improvement Program Parks - Neighborhood Varney Park Improvements Project Number: CS00201 Project Location: Varney Park Description: This project is to replace and upgrade the entire irrigation system, install turf instead of hydro-seed, add additional landscaping, repair parking lot drainage and lighting. Justification: This is a very popular park for the neighborhood as well as a key location for Little League. Category Funding Source CO-Constructi Proposed GO Bonds 136 Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $200,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $200,000 $200,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $200,000 FY 2018-2027 Capital Improvement Program Parks - Other Veterans Memorial Improvements Project Number: CS00187 Project Location: Rio Vista Community Park Description: This project entails the design and construction of architectural and landscape enhancements to the Veterans Memorial at Rio Vista Park. The Veterans Memorial was constructed concurrent with the Recreation Center and opened for citizen viewing in 2007. This popular memorial in etched black granite honors our men and women who have served our country during times of both peace and conflict across all branches of the military. The proposed improvements include shade parasols and flagpoles standing at attention along the length of the memorial to create a shaded reflection deck. The addition of vegetation will help to provide additional respite from the sun. Justification: The addition of this feature will provide respite from the sun for people to reflect. 137 Category Funding Source CO-Constructi Percent for the Arts Total Budget Total Operating Impacts FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $700,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $700,000 $700,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $700,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $0 $5,000 $45,000 City of Peoria FY 2018 – FY2027 Capital Improvement Program 138 City of Peoria FY 2018 Annual Program Budget Capital Improvement Program Public Safety Peoria’s public safety functions include not only the Police and Fire departments, but also the City Attorney’s Office and the Municipal Court. Capital needs for these functions are addressed either as operational facilities, such as the Municipal Court Expansion, or as public safety projects. Public safety projects include police precincts, fire stations, ladder trucks, and training facilities. Public safety projects in the 10-year program are funded primarily through operating revenues, general obligation bonds, and development impact fees. FY 2017 Public Safety projects include additional space for the Police Department’s north command on the campus of the Pinnacle Peak Public Safety Facility and installation of an emergency-only traffic signal in front of the fire station on Jomax Road. Public Safety Total ‐ $16,157,074 $8,000,000 $7,000,000 $6,000,000 $5,000,000 $4,000,000 $3,000,000 $2,000,000 $1,000,000 $0 FY18 FY19 FY20 FY21 FY22 139 FY23 FY24 FY25 FY26 FY27 FY 2018-2027 Capital Improvement Program Public Safety Public Safety Summary by Project Project Name Pg# FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 23-27 800 MHz Mobile and Portable Radios 142 Fire Station #8 $0 $0 $2,000,000 $0 $0 $0 $2,000,000 143 $0 $0 $0 $0 $0 $8,899,983 $8,899,983 Fire Station No. 3 Apparatus Bay Expansion 144 $367,400 $1,079,396 $0 $0 $0 $0 $1,446,796 Jomax Fire Station #7 Emergency Traffic Signal 145 $0 $0 $191,095 $0 $0 $0 $191,095 Pinnacle Peak Public Safety Facility Expansion 146 $1,854,200 $0 $0 $0 $0 $0 $1,854,200 Self Contained Breathing Apparatus 147 $0 $1,765,000 $0 $0 $0 $0 $1,765,000 $2,221,600 $2,844,396 $2,191,095 $0 $0 $8,899,983 $16,157,074 Total - Public Safety 140 Total FY 2018-2027 Capital Improvement Program Public Safety Public Safety Summary by Funding Source Fund Number and Name FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 23-27 $0 $1,765,000 $0 $0 $0 $0 $1,765,000 $30,000 $0 $0 $0 $0 $0 $30,000 $0 $0 $2,000,000 $0 $0 $0 $2,000,000 $367,400 $1,079,396 $0 $0 $0 $0 $1,446,796 $1,698,052 $0 $0 $0 $0 $0 $1,698,052 $0 $0 $0 $0 $0 $0 $0 $126,148 $0 $0 $0 $0 $0 $126,148 7935 - Fire & Emergency Svc Dev $0 $0 $191,095 $0 $0 $1,562,362 $1,753,457 7936 - Fire & Emergency Svc Dev Post $0 $0 $0 $0 $0 $1,500,001 $1,500,001 7937 - Fire/EmergSvs Imp Fees 2014 $0 $0 $0 $0 $0 $5,837,620 $5,837,620 7940 - General Government Dev $0 $0 $0 $0 $0 $0 $0 $2,221,600 $2,844,396 $2,191,095 $0 $0 $8,899,983 $16,157,074 1000 - General 4251 - GO Bonds 2015 4252 - Proposed GO Bonds 4550 - CIP Capital Projects Fund 7930 - Law Enforcement Dev 7931 - Law Enforcement Dev - Post 1/1/12 7932 - Law Enfrcmnt IF 2014 Total - Public Safety 141 Total FY 2018-2027 Capital Improvement Program Public Safety 800 MHz Mobile and Portable Radios Project Number: FD00018 Project Location: City-Wide Description: Replacement of existing mobile and portable 800 MHz radios for the entire fire department. Our current radios will become outdated, with spare parts and support from Motorola for the APX7000 radios becoming increasingly difficult. Justification: New and improved technology, combined with the probable lack of replacement parts or support from Motorola for our current radios. Category Funding Source EQ-Equipmen Proposed GO Bonds 142 Total Budget Total Operating Impacts FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $0 $2,000,000 $0 $0 $0 $0 $0 $0 $0 $2,000,000 $0 $0 $2,000,000 $0 $0 $0 $0 $0 $0 $0 $2,000,000 $25,000 $25,000 $25,000 $25,000 $25,000 $0 $0 $0 $25,000 $25,000 $175,000 FY 2018-2027 Capital Improvement Program Public Safety Fire Station #8 Project Number: FD00008 Project Location: TBD Description: This project provides funding to construct a fire station in the northwest section of the city. The facility would mimic the City's district fire station prototype and be programmed at approximately 14,150 square feet. Total building and site capital cost is estimated at $8.9 million. This cost includes administrative fees, engineering and design, furniture, fixtures, land, construction, and equipment. Apparatus cost for one fire pumper is included as well as costs for one traffic signal. This building is priced to include LEED silver level certification consistent with city sustainability objectives. Justification: A new station is needed to support development in the northwestern portion of the city. Timing of the facility is dependent upon the rate of development, but design is tentatively scheduled for FY2023, with construction in FY2024. 143 Category Funding Source AT-Arts DS-Design LA-Land Acq OT-Other AT-Arts CO-Constructi EQ-Equipmen OT-Other Fire & Emergency Svc Dev Fire & Emergency Svc Dev Fire & Emergency Svc Dev Fire & Emergency Svc Dev Fire & Emergency Svc Dev Post Fire & Emergency Svc Dev Post Fire & Emergency Svc Dev Post Fire & Emergency Svc Dev Post $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 AT-Arts CO-Constructi EQ-Equipmen OT-Other Fire/EmergSvs Imp Fees 2014 Fire/EmergSvs Imp Fees 2014 Fire/EmergSvs Imp Fees 2014 Fire/EmergSvs Imp Fees 2014 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total Budget Total Operating Impacts FY 2018 FY 2019 $0 FY 2020 $0 FY 2021 $0 FY 2022 FY 2023 FY 2024 $0 $0 $0 $0 $0 $0 $0 $0 $8,637 $863,727 $620,000 $69,998 $0 $0 $0 $0 $0 $0 $0 $0 $14,302 $1,430,186 $41,207 $14,306 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $8,637 $863,727 $620,000 $69,998 $14,302 $1,430,186 $41,207 $14,306 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $55,659 $5,565,922 $160,365 $55,674 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $55,659 $5,565,922 $160,365 $55,674 $0 $0 $1,562,362 $7,337,621 $0 $0 $0 $8,899,983 $0 $1,550,000 $0 $1,550,000 FY 2025 $1,550,000 FY 2026 FY 2027 $1,550,000 $1,550,000 Total $7,750,000 FY 2018-2027 Capital Improvement Program Public Safety Fire Station No. 3 Apparatus Bay Expansion Project Number: FD13400 Project Location: 8330 W. Emile Zola Ave Description: This project entails the expansion of Peoria Fire Station No. 3 to include an additional 1800 sf apparatus bay and related storage functions on the east side of the existing station. The expansion of the station will also entail modifications to existing driveway aprons, motorized security gates, site retention and landscaping. Additional City project expenses include the re-roofing of the apparatus bay, energy management system tie-ins, expanded IT infrastructure, and storage room fixtures. Justification: The Peoria Fire-Medical Department is improving medical response for our residents in innovative ways. New programs include deploying a Low Acuity Vehicle, implementing Community Paramedicine and purchasing and adding adding ambulance service starting in 2017. Each new program increases service delivery from each fire station. Station No. 3 is currently a three bay station serving one of Peoria's more densely populated areas with a high demand for fire and medical services. 144 Category AT-Arts CO-Constructi DS-Design EQ-Equipmen OT-Other Funding Source CIP Capital Projects Fund CIP Capital Projects Fund CIP Capital Projects Fund CIP Capital Projects Fund CIP Capital Projects Fund Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $0 $320,532 $0 $46,868 $10,092 $1,009,194 $0 $13,242 $46,868 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $10,092 $1,009,194 $320,532 $13,242 $93,736 $367,400 $1,079,396 $0 $0 $0 $0 $0 $0 $0 $0 $1,446,796 FY 2018-2027 Capital Improvement Program Public Safety Jomax Fire Station #7 Emergency Traffic Signal Project Number: FD13101 Project Location: Jomax Rd. at 77th Ave. Alignment Description: The Jomax Fire Station #7 Emergency Traffic Signal project includes the design and construction of an emergency (only) traffic signal in front of the fire station on Jomax Road at approximately the 77th Av alignment. During an emergency call, the departure of fire apparatus from the fire station bay(s) will trigger the signal to stop east and west bound traffic on Jomax Road, thereby avoiding traffic conflict. The signal will be clearly identified as serving the fire station (only) and does not interrupt normal traffic flow. The project may entail a minor easement purchase for a signal arm on the south side of Jomax Road. Justification: In September 2006, the Mayor and Council awarded the construction contract for the Jomax Fire Station. The surrounding development was in its infancy at the time of the station's construction, therefore $150,000 was identified as a future expenditure for the emergency traffic signal. Subsequent development in the vicinity continues to increase traffic flow on Jomax Road. The project's cost timing anticipates a recovery of development activity in the area and heightened traffic within five years. Once completed, all of Peoria's fire stations will have an emergency traffic signal. 145 Funding Source Category AT-Arts CB-Chargeba CO-Constructi DS-Design LA-Land Acq Fire & Emergency Svc Dev Fire & Emergency Svc Dev Fire & Emergency Svc Dev Fire & Emergency Svc Dev Fire & Emergency Svc Dev Total Budget Total Operating Impacts FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,595 $15,000 $139,500 $20,000 $15,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,595 $15,000 $139,500 $20,000 $15,000 $0 $0 $191,095 $0 $0 $0 $0 $0 $0 $0 $191,095 $360 $360 $360 $360 $360 $0 $0 $360 $360 $360 $2,880 FY 2018-2027 Capital Improvement Program Public Safety Pinnacle Peak Public Safety Facility Expansion Project Number: PD00021 Project Location: Pinnacle Peak Public Safety Description: This project responds to a space needs study undertaken in 2013 and entails land acquisition and an anticipated 17,000 square feet of new building construction to accommodate growth in the Peoria Police Department on the campus of the Pinnacle Peak Public Safety Facility. The LEED certified building will be home to police employees providing service to the northern reaches of the city. This new expanded campus is anticipated to require a deceleration lane and median improvements at Lake Pleasant Parkway, campus entry drive reconfiguration, and half street improvements along 102nd Ave. Water, sewer, telecom, and power infrastructure will be constructed in this phase to support a future community or general government facility. New building construction will also include furnishings, information technology, security, and audio visual systems consistent with other City of Peoria public safety facilities. Justification: In FY 2010, the Police Department created a fully functioning north command at the Pinnacle Peak Substation. This included decentralizing specialty squads (i.e. motors, detectives) to equalize city resources at both stations. Additional office space is needed to complete our decentralization of resources. 146 Funding Source Category CO-Constructi CO-Constructi EQ-Equipmen EQ-Equipmen GO Bonds 2015 Law Enforcement Dev Law Enforcement Dev Law Enfrcmnt IF 2014 Total Budget Total Operating Impacts FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $30,000 $1,500,000 $198,052 $126,148 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $30,000 $1,500,000 $198,052 $126,148 $1,854,200 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,854,200 $128,074 $128,074 $128,074 $128,074 $128,074 $128,074 $128,074 $128,074 $128,074 $128,074 $1,280,740 FY 2018-2027 Capital Improvement Program Public Safety Self Contained Breathing Apparatus Project Number: FD00017 Project Location: City-Wide Description: Self Contained Breathing Apparatus have a safe usable lifespan of approximately ten years. Our current SCBA's were purchased in 2009. With new technology comes increased safety and reliability, in addition to an improved external communication component for the end user (the firefighter). Justification: Increased safety for firefighters. Newer technology. Current SCBA's no longer supported by the manufacturer with spare parts. Met their ten-year life span. 147 Funding Source Category EQ-Equipmen General Total Budget Total Operating Impacts FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $1,765,000 $0 $0 $0 $0 $0 $0 $0 $0 $1,765,000 $0 $1,765,000 $0 $0 $0 $0 $0 $0 $0 $0 $1,765,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $0 $0 $25,000 $200,000 City of Peoria FY 2018 – FY2027 Capital Improvement Program 148 City of Peoria FY 2018 Annual Program Budget Capital Improvement Program Streets and Traffic Control Transportation-related issues are a high priority for the City of Peoria. The Capital Improvement Program addresses traffic congestion by constructing new roadways, adding lanes to existing roadways, widening intersections, and enhancing traffic management systems. The maintenance and preservation of roadways is an important component of the program, which provides the necessary resources for scheduled pavement maintenance applications throughout the city. Transportation projects in the city’s 10-year plan are funded from operating revenues, general obligation bonds, development impact fees, the city’s three-tenths of a cent transportation sales tax, and reimbursements from Maricopa County’s half-cent transportation sales tax. Major projects in the plan include the widening of 67th Ave from Pinnacle Peak to Happy Valley, the widening of the intersections along 75th Avenue at Peoria Avenue and Cactus Road and reconstruction of the west ½ street improvements on 103rd Avenue between Northern and Olive Avenues. Streets & Traffic Control Total ‐ $178,276,470 $50,000,000 $45,000,000 $40,000,000 $35,000,000 $30,000,000 $25,000,000 $20,000,000 $15,000,000 $10,000,000 $5,000,000 $0 FY18 FY19 FY20 FY21 FY22 149 FY23 FY24 FY25 FY26 FY27 FY 2018-2027 Capital Improvement Program Streets Streets Summary by Project Project Name Pg# FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 23-27 103rd Av; Northern Ave to Olive Ave Full Street 155 67th Av; Olive Av to Redfield Rd Landscape Enhance $4,801,531 $0 $0 $0 $0 $0 $4,801,531 156 $75,000 $601,000 $0 $0 $0 $0 $676,000 67th Ave Widening; Pinnacle Peak to Happy Valley 157 $160,000 $905,645 $1,324,756 $5,159,000 $0 $0 $7,549,401 75th Av; Grand Av to Tbird Rd Landscape Enhancemnt 159 $150,000 $937,000 $0 $0 $0 $0 $1,087,000 75th Ave & Cactus Rd Intersection Improvements 160 $2,314,480 $0 $0 $0 $0 $0 $2,314,480 75th Ave & Peoria Ave Intersection Improvements 161 $1,153,204 $0 $0 $0 $0 $0 $1,153,204 83rd Ave Bus Shelters 162 $981,875 $0 $0 $0 $0 $0 $981,875 83rd Ave Sidewalks and Bike Lanes 163 $405,926 $0 $0 $0 $0 $0 $405,926 87th Ave & Peoria Ave Intersection Alignment 164 $49,325 $0 $0 $0 $0 $0 $49,325 89th Ave; Golden Ln to Olive Av 165 $916,198 $0 $0 $0 $0 $0 $916,198 91st Av; Mtn Vw Rd to Grand Av Landscape Enhancemn 166 $75,000 $361,900 $0 $0 $0 $0 $436,900 91st Ave; Deer Valley Rd to Pinnacle Pk Rd 167 $259,024 $0 $0 $0 $0 $0 $259,024 99th Ave Reconstruction; Butler Dr to Olive Av 168 $600,000 $0 $0 $0 $0 $0 $600,000 ADA Accessibility 169 $853,538 $159,550 $578,700 $159,550 $578,700 $1,636,050 $3,966,088 Arterial Road Pavement Preservation & Restoration 170 $0 $4,545,000 $0 $1,515,000 $0 $4,999,500 $11,059,500 Bell Rd and 83rd Ave Right Turn Lane 171 $0 $253,700 $908,000 $0 $0 $0 $1,161,700 Bridge Maintenance and Management Program 172 $502,941 $227,000 $227,000 $227,000 $227,000 $1,135,000 $2,545,941 Bus Stop Improvements 173 $83,329 $0 $0 $0 $0 $0 $83,329 Cactus Rd & 69th Av Sidewalk, North Side 174 $374,000 $0 $0 $0 $0 $0 $374,000 Chip Seal Dirt Roads 175 $0 $0 $423,695 $0 $0 $423,695 $847,390 Deer Valley Rd & 87th Av Intesection Improvements 176 $627,000 $0 $0 $0 $0 $0 $627,000 Deer Valley Rd; 109th Ave to Lake Pleasant Pkwy 177 $150,000 $1,047,590 $0 $0 $0 $0 $1,197,590 Dirt Shoulders, Dust Abatement PM-10 Program 178 $0 $202,000 $0 $202,000 $0 $606,000 $1,010,000 Guardrail Program 179 $80,000 $0 $0 $0 $0 $0 $80,000 Happy Valley Pkwy Widening; LPP to Agua Fria 180 $3,752,725 $15,231,810 $0 $0 $0 $0 $18,984,535 150 Total FY 2018-2027 Capital Improvement Program Streets Streets Summary by Project Project Name Pg# FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 23-27 Jomax Rd Improvements; 73rd Av to 75th Av 181 Jomax Rd; L303 to Vistancia Blvd $1,367,906 $0 $0 $0 $0 $0 $1,367,906 182 $833,000 $0 $2,963,000 $0 $0 $0 $3,796,000 Lake Pleasant Parkway Pavement Maintenance 183 $500,000 $0 $0 $0 $0 $505,000 $1,005,000 Lake Pleasant Parkway Sidewalk 184 $1,883,332 $0 $0 $0 $0 $0 $1,883,332 Lake Pleasant Pkwy & Dixileta Dr Intersection Mods 185 $1,945,000 $0 $0 $0 $0 $0 $1,945,000 Lone Mountain ROW Acquistion 186 $600,000 $0 $0 $0 $0 $0 $600,000 Major Street Repairs 187 $150,000 $151,500 $151,500 $151,500 $151,500 $757,500 $1,513,500 Monroe St; 83rd Av to 85th Av Roadway Improvements 188 $200,000 $0 $0 $0 $0 $0 $200,000 Northern Parkway 189 $1,600,000 $1,020,000 $1,020,000 $1,020,000 $1,020,000 $10,304,125 $15,984,125 Paradise Lane Widening; Skunk Creek Bridge to 75th 190 $160,000 $561,300 $0 $0 $0 $0 $721,300 Peoria Auto District 191 $75,957 $0 $0 $0 $0 $0 $75,957 Peoria Homes Alley Improvements 192 $591,000 $0 $0 $0 $0 $0 $591,000 Pinnacle Peak Road; 91st Ave-Lake Pleasant Pkwy 193 $3,562,000 $0 $0 $0 $0 $0 $3,562,000 Residential Roads Rehabilitation and Preservation 194 $5,700,000 $303,000 $5,757,000 $303,000 $2,727,000 $6,363,000 $21,153,000 Resurvey Benchmarks 195 $0 $0 $234,000 $0 $0 $0 $234,000 Rural-Standard Roads Program 196 $1,400,000 $0 $0 $0 $0 $1,515,000 $2,915,000 Sidewalks Annual Program 197 $190,000 $105,900 $105,900 $105,900 $105,900 $529,500 $1,143,100 Street Light Infill and Replacement Program 198 $790,000 $898,900 $393,900 $393,900 $393,900 $1,969,500 $4,840,100 Street Maintenance Program 199 $2,254,950 $2,535,000 $3,535,000 $3,535,000 $3,787,500 $18,937,500 $34,584,950 Sunrise Mtn HS Traffic Solutions 200 $368,000 $0 $0 $0 $0 $0 $368,000 Technical Pavement Condition Survey & Support 201 $0 $0 $250,000 $0 $0 $500,000 $750,000 Thunderbird Road Corridor Improvements 202 $1,842,763 $0 $0 $0 $0 $0 $1,842,763 Traffic Signal Renovation and Replacement 203 $309,000 $312,090 $312,090 $312,090 $312,090 $1,560,450 $3,117,810 Utility Undergrounding Program 204 $0 $0 $0 $0 $0 $2,525,000 $2,525,000 Vistancia Blvd & Happy Valley Rd Intersection Mods 205 $727,000 $0 $0 $0 $0 $0 $727,000 $45,415,004 $30,359,885 $18,184,541 $13,083,940 $9,303,590 $54,266,820 $170,613,780 Total - Streets 151 Total FY 2018-2027 Capital Improvement Program Traffic Control Traffic Control Summary by Project Project Name Pg# FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 23-27 Traffic Management Center Equipment Replacement 206 Traffic Signal Interconnect Project (TSIP) $111,093 $101,000 $101,000 $101,000 $101,000 $0 $515,093 207 $254,086 $0 $207,000 $0 $207,000 $414,000 $1,082,086 Traffic Signal Program 208 $628,053 $600,000 $600,000 $600,000 $600,000 $3,000,000 $6,028,053 Traffic Signal System Software Replacement 209 $37,458 $0 $0 $0 $0 $0 $37,458 $1,030,690 $701,000 $908,000 $701,000 $908,000 $3,414,000 $7,662,690 Total - Traffic Control 152 Total FY 2018-2027 Capital Improvement Program Streets Streets Summary by Funding Source Fund Number and Name FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 23-27 $0 $0 $234,000 $0 $0 $0 $234,000 $75,957 $0 $0 $0 $0 $0 $75,957 2050 - Water $0 $0 $0 $0 $0 $0 $0 2162 - Water Expansion Post 1/1/12 $0 $0 $0 $0 $0 $0 $0 4240 - GO Bonds 2010 $0 $0 $0 $0 $0 $0 $0 4251 - GO Bonds 2015 $4,085,198 $0 $0 $0 $0 $0 $4,085,198 4252 - Proposed GO Bonds $1,771,585 $905,645 $1,324,756 $5,159,000 $1,020,000 $12,829,125 $23,010,111 $259,024 $0 $0 $0 $0 $0 $259,024 4810 - Outside Sources $4,499,080 $2,328,050 $0 $0 $0 $0 $6,827,130 7000 - Highway User $9,929,638 $7,792,880 $8,150,467 $5,257,880 $4,572,090 $28,042,227 $63,745,182 7003 - Streets Zone 3 Dev Fee $1,967,046 $5,050,000 $0 $0 $0 $0 $7,017,046 7007 - Street Impact Fees Z1 Post 010112 $1,030,000 $0 $0 $0 $0 $0 $1,030,000 7010 - Transportation Sales Tax $21,797,476 $14,283,310 $8,475,318 $2,667,060 $3,711,500 $13,395,468 $64,330,132 Total - Streets $45,415,004 $30,359,885 $18,184,541 $13,083,940 $9,303,590 $54,266,820 $170,613,780 1000 - General 1210 - Half Cent Sales Tax 4550 - CIP Capital Projects Fund 153 Total FY 2018-2027 Capital Improvement Program Traffic Control Traffic Control Summary by Funding Source Fund Number and Name FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 23-27 $0 $0 $0 $0 $0 $0 $0 7010 - Transportation Sales Tax $1,030,690 $701,000 $908,000 $701,000 $908,000 $3,414,000 $7,662,690 Total - Traffic Control $1,030,690 $701,000 $908,000 $701,000 $908,000 $3,414,000 $7,662,690 4810 - Outside Sources 154 Total FY 2018-2027 Capital Improvement Program Streets 103rd Av; Northern Ave to Olive Ave -Full Street Project Number: EN00422 Project Location: 103rd Av; Northern Av to Olive Av Description: The first phase of this project provided for the geotechnical investigation to determine the limits of the old City of Glendale landfill impacting 103rd Av, public meetings and a preliminary traffic study and these tasks have been completed. The second phase of this project provides for an additional public meeting, final design, ROW acquisition, materials testing, construction, construction administration, signal modifications, utility coordination, utility relocation, and undergrounding overhead facilities as needed, replacement of a section of existing water line, drainage facilities, coordination with the 103rd Av & Butler Dr well site improvements, reconstruction and construction of the 103rd Av street improvements from Northern Av to Olive Av and construction of a new fence along the old Glendale landfill and golf course. This project will likely include processing utility company (APS, Cox, CenturyLink, SRP, EPNG, SWG, etc) design and construction agreements, as well as development and intergovernmental agreements. The improvements will include clearing and grubbing, saw cut along existing pavement, install new pavement, construct curb and gutter, concrete sidewalk, landscaping and irrigation system, signing and striping, and construction of a combination screen wall and fence around the Glendale Landfill. 155 Justification: Previously, the city had received a number of complaints regarding the failure of the existing pavement on 103rd Av south of Olive Av, poor drainage conditions, differential settlement, and vandalism to the chain link fence surrounding the old City of Glendale landfill. Based on input from the first public meeting, staff recommends construction for full street improvements on 103rd Av. These improvements will provide additional traffic capacity, provide pedestrian facilities, repair the section of roadway that is failing, improve drainage, and secure the old City of Glendale Landfill. Category CO-Constructi CO-Constructi CO-Constructi LA-Land Acq Funding Source GO Bonds 2015 Proposed GO Bonds Transportation Sales Tax Transportation Sales Tax Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $500,000 $390,000 $3,511,531 $400,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $500,000 $390,000 $3,511,531 $400,000 $4,801,531 $0 $0 $0 $0 $0 $0 $0 $0 $0 $4,801,531 FY 2018-2027 Capital Improvement Program Streets 67th Av; Olive Av to Redfield Rd Landscape Enhance Project Number: EN00593 Project Location: West side 67th Av; Olive Av to Redfield Rd Description: This project provides for the coordination with adjacent property owners, public involvement, utility coordination, construction and construction administration for refreshing decomposed granite, enhancing landscape and irrigation system, repair, wash and paint existing perimeter walls along the west side of 67th Avenue between Olive Avenue and Redfield Road. This project may also require processing of utility company (APS, Cox, Qwest, SRP. EPNG, SWG, etc) design and construction agreements, development and intergovernmental agreements. Justification: Certain sections of landscape within the existing right-of-way along the west side of 67th Avenue between Olive Avenue and Redfield Road are outdated and in need of being enhanced, restored and beautified. Upgrading the landscape material, refreshing the decomposed granite and painting the walls will improve the attractiveness of the area and promote community pride. 156 Category Funding Source AT-Arts Transportation Sales Tax CB-Chargeba Transportation Sales Tax CO-Constructi Transportation Sales Tax Total Budget Total Operating Impacts FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $0 $75,000 $6,000 $70,000 $525,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $6,000 $70,000 $600,000 $75,000 $601,000 $0 $0 $0 $0 $0 $0 $0 $0 $676,000 $7,500 $7,500 $7,500 $7,500 $7,500 $7,500 $7,500 $0 $7,500 $7,500 $67,500 FY 2018-2027 Capital Improvement Program Streets 67th Ave Widening; Pinnacle Peak to Happy Valley Project Number: EN00100 Project Location: 67th Av from Pinnacle Peak Rd to Happy Valley Rd Description: This project provides for the coordination with adjacent property owners, developers, public involvement, design, ROW acquisition, utility coordination, utility relocation, burying overhead facilities, construction and construction administration for the construction for the widening of 67th Avenue between Pinnacle Peak Road and Happy Valley Road. The cross section varies from BL:3:M:3:BL between Hatfield Road and Happy Valley Road and transitions to BL:2:M:2:BL from Pinnacle Pk Road to Hatfield Road. The drainage portion of this project is a separate regional drainage project that must be completed prior to the construction of the roadway widening or simultaneously with the construction of the roadway widening. The improvements will include clearing and grubbing, saw cut along existing pavement, install new pavement, mill and overlay existing asphalt, storm drain laterals and catchbasins, water line, curb, gutter, valley gutter and apron, sidewalk, and handicap ramps, landscape, street lights and future traffic signal improvements. This project may also require processing of utility company (APS, Cox, Qwest, SRP. EPNG, SWG, etc) design and construction agreements, development and intergovernmental agreements. 157 Justification: 67th Avenue is designated as a major arterial. The original roadway was constructed by the County in 1982. The roadway was annexed by the City of Peoria in 2007 and widened to a five-lane roadway. Traffic on 67th Avenue has increased due to increases in population and recent development activity. Motorists experience delays during peak weekday hours and on weekends. The proposed roadway improvements will be coordinated with the regional drainage project. Both the Northwest Valley Transportation Study and the Peoria Transportation Needs Study recommend widening 67th Avenue. This project assumes the City of Peoria will be the lead agency and a future IGA will be executed with MCDOT. It is anticipated that MCDOT will reimburse the City for 50 percent of the design, construction and post-design service costs. Category AT-Arts CB-Chargeba CO-Constructi DS-Design LA-Land Acq SY-Study Funding Source Proposed GO Bonds Proposed GO Bonds Proposed GO Bonds Proposed GO Bonds Proposed GO Bonds Proposed GO Bonds Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $0 $0 $0 $0 $160,000 $7,745 $123,388 $0 $774,512 $0 $0 $5,767 $159,783 $576,722 $0 $582,484 $0 $49,000 $210,000 $4,900,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $62,512 $493,171 $5,476,722 $774,512 $582,484 $160,000 $160,000 $905,645 $1,324,756 $5,159,000 $0 $0 $0 $0 $0 $0 $7,549,401 FY 2018-2027 Capital Improvement Program Streets 67th Ave Widening; Pinnacle Peak to Happy Valley Total Operating Impacts $0 $0 $0 $0 $4,000 $4,000 $4,000 $4,000 $4,000 $4,000 $24,000 158 FY 2018-2027 Capital Improvement Program Streets 75th Av; Grand Av to Tbird Rd Landscape Enhancemnt Project Number: EN00592 Project Location: E & W Sides; 75th Av; Grand Av to Tbird Rd Description: This project provides for the coordination with adjacent property owners, public involvement, utility coordination, construction and construction administration for refreshing decomposed granite, enhancing landscape and irrigation system, repair, wash and paint existing perimeter walls along the east and west sides of 75th Avenue between Olive Avenue and Thunderbird Rd and refreshing the 3 basins maintained by the city along the east side of 75th Av at Eva St and Sanna St. This project may also require processing of utility company (APS, Cox, Qwest, SRP. EPNG, SWG, etc) design and construction agreements, development and intergovernmental agreements. Justification: Certain sections of landscape within the existing right-of-way along the east and west sides of 75th Avenue between Olive Avenue and Thunderbird Road and the 3 basins along the east side of 75th Av maintained by the city are outdated and in need of being enhanced, restored and beautified. Upgrading the landscape material, refreshing the decomposed granite and painting the walls will improve the attractiveness of the area and promote community pride. 159 Category Funding Source AT-Arts Transportation Sales Tax CB-Chargeba Transportation Sales Tax CO-Constructi Transportation Sales Tax Total Budget Total Operating Impacts FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $0 $150,000 $10,000 $77,000 $850,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $10,000 $77,000 $1,000,000 $150,000 $937,000 $0 $0 $0 $0 $0 $0 $0 $0 $1,087,000 $4,700 $4,700 $4,700 $4,700 $4,700 $4,700 $4,700 $0 $0 $4,700 $37,600 FY 2018-2027 Capital Improvement Program Streets 75th Ave & Cactus Rd Intersection Improvements Project Number: EN00088 Project Location: 75th Av & Cactus Rd Description: This project provides for the coordination with adjacent property owners, public involvement, pre-design services, noise study, traffic study, design, ROW acquisition, utility coordination, utility relocations, utility extensions, burying overhead facilities as determined, materials testing, construction, construction administration, for intersection widening improvements. This project will likely include processing of utility agreements (APS, Cox, Centurylink, SRP, SWG, EPNG, etc.) for design and construction, as well as development and intergovernmental agreements. The improvements include installation of a section of 16-inch water line, additional turn lanes (both right and left), additional through lanes determined through an analysis and projection of traffic data, installation of raised medians for access management, paving, curb, gutter, driveways, pavement marking, signing and striping, street lighting, traffic signal modifications/upgrades, interconnect conduit and ITS facilities, sidewalks, pedestrian access ramps, landscaping and irrigation. 160 Justification: A citywide intersection study identified this intersection as one of the top 10 high-accident locations in Peoria. This intersection will be widened to provide additional capacity, improve safety, and reduce crashes. The project has received federal funds totaling $5.4 million. As such, the Arizona Department of Transportation is managing the design and construction of the project, while the city has taken the lead on property acquisition. Category Funding Source CO-Constructi Transportation Sales Tax Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $2,314,480 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,314,480 $2,314,480 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,314,480 FY 2018-2027 Capital Improvement Program Streets 75th Ave & Peoria Ave Intersection Improvements Project Number: EN00081 Project Location: 75th Av & Peoria Av Description: This project provides for the coordination with adjacent property owners, public involvement, pre-design services, design, ROW acquisition, utility coordination, utility relocations, utility extensions, burying overhead facilities as determined, materials testing, construction, construction administration, for constructing intersection widening improvements. This project will likely include processing of utility agreements (APS, Cox, CenturyLink, SRP, EPNG, SWG, etc) for design and construction, as well as development and intergovernmental agreements. The improvements include: additional turn lanes (both right and left), additional through lanes determined through an analysis and projection of traffic data, installation of raised medians for access control, paving, curb, gutter, driveways, pavement marking, signing and striping, street lighting, traffic signal modifications/upgrades, interconnect conduit and ITS facilities, sidewalks, pedestrian access ramps, landscaping and landscaping and irrigation. 161 Justification: A citywide intersection study identified this intersection as one of the top 10 high-accident locations in Peoria. This intersection will be widened to provide additional capacity, improve safety, and reduce crashes. The project has received federal funds totaling $5.9 million. As such, the Arizona Department of Transportation is managing the design and construction of the project, while the city has taken the lead on property acquisition. Category Funding Source CO-Constructi Transportation Sales Tax Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $1,153,204 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,153,204 $1,153,204 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,153,204 FY 2018-2027 Capital Improvement Program Streets 83rd Ave Bus Shelters Project Number: EN00582 Project Location: 83rd Av; Northern Av to Bell Rd Description: This project provides for the coordination with adjacent property owners, public involvement, design, ROW acquisition, utility coordination, utility relocation, materials testing, construction and construction administration for construction of 47 bus shelters along the 83rd avenue bus route. This new bus route will extend from Camelback Road to Bell Road. The enhanced bus shelters will be installed between Northern Avenue and Bell Road. The improvements will include: clearing and grubbing, construction of concrete pads, enhanced bus shelters and lighting. This project may also require processing of utility company (APS, Cox, Qwest, SRP. EPNG, SWG, etc) design and construction agreements, development and intergovernmental agreements. " Justification: As part of the Quality of Life initiative, these added bus shelters will enhance the transit system experience for Peoria residents. It will also provide a holistic and aesthetic character to the 83rd Avenue corridor that functions as the spine of Peoria. Specifically, could also be designed to provide ad space along the bus route, if desired. 162 Category Funding Source CO-Constructi Outside Sources DS-Design Outside Sources LA-Land Acq Outside Sources Total Budget Total Operating Impacts FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $897,000 $82,000 $2,875 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $897,000 $82,000 $2,875 $981,875 $0 $0 $0 $0 $0 $0 $0 $0 $0 $981,875 $34,000 $34,000 $34,000 $34,000 $34,000 $34,000 $34,000 $34,000 $0 $34,000 $306,000 FY 2018-2027 Capital Improvement Program Streets 83rd Ave Sidewalks and Bike Lanes Project Number: EN00546 Project Location: 83rd Av; Happy Valley Rd to Jomax Rd Description: This project provides for the coordination with adjacent property owners, public involvement, design, ROW acquisition, utility coordination, utility relocation, construction and construction administration for the project to widen the east half-street of 83rd Avenue between Happy Valley Road and Jomax Road to provide width for 6-foot bike lanes on both sides (with curb on the west side and without curb on the east side) and one lane in each direction. The project will also include construction of 5-8 foot (as space and conflicts permit) sidewalk along the west side attached to the existing curb and gutter. This project may also require processing of utility company (APS, Cox, Qwest, SRP. EPNG, SWG, etc) design and construction agreements, development and intergovernmental agreements. 163 Justification: 83rd Avenue between Happy Valley Road and Jomax Road is a 26-foot wide half street striped for two-way traffic separated by a double yellow centerline with curb and gutter on the west side and a 2-foot painted shoulder on the east side. This segment is a gap in the City's bicycle infrastructure between the bike lanes on Westwing Parkway and Happy Valley Road. Cyclists must either assume the full 12-foot lane or ride as close to the pavement edge as possible. Either option places the cyclist in a situation where motorists make unsafe and/or illegal maneuvers and violate the 3-foot safe passing distance. Additionally, there are no pedestrian facilities in the project area, so pedestrians must walk along an uneven dirt or gravel shoulder along this segment. The City applied for and received federal funding for the design and construction of this project. Category Funding Source CO-Constructi Transportation Sales Tax Total Budget Total Operating Impacts FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $405,926 $0 $0 $0 $0 $0 $0 $0 $0 $0 $405,926 $405,926 $0 $0 $0 $0 $0 $0 $0 $0 $0 $405,926 $6,300 $6,300 $6,300 $6,300 $6,300 $6,300 $6,300 $6,300 $0 $6,300 $56,700 FY 2018-2027 Capital Improvement Program Streets 87th Ave & Peoria Ave Intersection Alignment Project Number: PW00109 Project Location: 87th Av and Peoria Av Description: This project provides for the coordination with adjacent property owners, public involvement, design,right-of-way acquisition, utility coordination, utility relocation and extensions, as determined, materials testing, construction and construction administration for the realignment and construction of the street improvements for the south leg of the 87th Avenue and Peoria Avenue intersection to Jefferson Street and updating all ADA ramps. Improvements will consist of paving, curb, gutter, sidewalk, relocation of SRP irrigation and structure, other utilities, traffic signal modification and upgrades, and pavement signing and striping. This project will likely include processing of utility agreements (APS, Cox, CenturyLink, SRP, SWG, EPNG, etc.) for design and construction, as well as intergovernmental agreements. Justification: Currently, each leg of 87th Av performs separately and the signal operates inefficiently. The independent operation causes an unnecessary back-up of traffic on Peoria Avenue due to the severe misalignment of the intersection. Correcting the alignment will improve the efficiency of the intersection. The widening will require the redesign and relocation of the traffic signal and the change in traffic control, which currently phases the 87th Avenue legs separately. 164 Category Funding Source LA-Land Acq Transportation Sales Tax Total Budget Total Operating Impacts FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $49,325 $0 $0 $0 $0 $0 $0 $0 $0 $0 $49,325 $49,325 $0 $0 $0 $0 $0 $0 $0 $0 $0 $49,325 $380 $380 $380 $380 $380 $0 $0 $0 $380 $380 $2,660 FY 2018-2027 Capital Improvement Program Streets 89th Ave; Golden Ln to Olive Av Project Number: EN00472 Project Location: West side of 89th Ave; Golden Ln to Olive Av Description: This project provides for the project coordination, public involvement, pre-design studies, design, ROW acquisition, materials testing, utility coordination, utility relocation, construction and construction administration to complete the west one-half street improvements on 89th Av between Golden Lane and Olive Av (approx. 750 feet). The project will be coordinated with developer for the vacant property at the SWC of 89th Av & Olive Av. The improvements include: acquire ROW, relocate existing irrigation facilities, remove and replace the existing block wall, remove existing trees, constructing new pavement, curb, gutter and sidewalks. The project also includes burying the overhead utilities along the south side of Olive Av between Fry's and 85th Av, approximately 4,200ft. Additional funds are being requested to accommodate the design and construction of the new street light system. 165 Justification: The existing 89th Av between Golden Lane and Olive Av is currently a very narrow paved two way roadway (one lane each direction) constructed on the east half of what would ultimately be the final roadway. The city has received a number of complaints from existing homeowners indicating that the existing roadway does not allow enough space for two cars to pass by each other safely at the same time. When completed this project will widen 89th Av to its full buildout width in accordance with city street roadway guidelines. As part of the SRP aesthetics program the City will be burying the overhead utilities. This will require the installation of new street light consult, wire and new streets. The actual improvements to be constructed are being coordinated with the developer of the vacant parcel located at the SWC of 89th Av and Olive Avenue. Category Funding Source FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total CO-Constructi GO Bonds 2015 $778,198 $0 $0 $0 $0 $0 $0 $0 $0 $0 $778,198 LA-Land Acq GO Bonds 2015 $138,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $138,000 $916,198 $0 $0 $0 $0 $0 $0 $0 $0 $0 $916,198 $3,300 $3,300 $3,300 $3,300 $3,300 $3,300 $3,300 $3,300 Total Budget Total Operating Impacts $3,300 $3,300 $33,000 FY 2018-2027 Capital Improvement Program Streets 91st Av; Mtn Vw Rd to Grand Av Landscape Enhancemn Project Number: EN00594 Project Location: E & W Side of 91st Av; Mtn Vw Rd to Grand Av Description: This project provides for the coordination with adjacent property owners, public involvement, utility coordination, construction and construction administration for refreshing decomposed granite, enhancing landscape and irrigation system, repair, wash and paint existing perimeter walls along the east and west sides of 91st Avenue between Mountain View Road and Grand Avenue. This project may also require processing of utility company (APS, Cox, Qwest, SRP. EPNG, SWG, etc) design and construction agreements, development and intergovernmental agreements. Justification: Certain sections of landscape within the existing right-of-way along the east and west sides of 91st Avenue between Mountain View Road and Grand Avenue are outdated and in need of being enhanced, restored and beautified. Upgrading the landscape material, refreshing the decomposed granite and painting the walls will improve the attractiveness of the area and promote community pride. 166 Category Funding Source AT-Arts Transportation Sales Tax CB-Chargeba Transportation Sales Tax CO-Constructi Transportation Sales Tax Total Budget Total Operating Impacts FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $0 $75,000 $3,900 $43,000 $315,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $3,900 $43,000 $390,000 $75,000 $361,900 $0 $0 $0 $0 $0 $0 $0 $0 $436,900 $4,900 $4,900 $4,900 $4,900 $4,900 $0 $0 $0 $4,900 $4,900 $34,300 FY 2018-2027 Capital Improvement Program Streets 91st Ave; Deer Valley Rd to Pinnacle Pk Rd Project Number: EN00505 Project Location: 91st Ave - Deer Valley Rd to Pinnacle Pk Rd Description: This project provides for the cost sharing with the developer of The Meadows for the coordination with adjacent property owners, public involvement, design, materials testing, construction and construction administration for the mill & overlay of the east side of 91st Ave between Deer Valley Rd and Pinnacle Pk Rd. This project may also require processing of utility company (APS, Cox, Qwest, SRP. EPNG, SWG, etc) design and construction agreements, development and intergovernmental agreements. Justification: As the west 1/2 street improvements to 91st Ave are constructed by the developer of The Meadows, the City will participate and contribute funding to mill & overlay, restripe and sign the existing east 1/2 street of 91st Ave between Deer Valley Rd and Pinnacle Pk Rd. A portion of 91st Ave was constructed by the County and does not meet current City standards. This project will result in the one-mile section of 91st Ave being widened to accommodate 2 lanes in each direction. 167 Category Funding Source CO-Constructi CIP Capital Projects Fund Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $259,024 $0 $0 $0 $0 $0 $0 $0 $0 $0 $259,024 $259,024 $0 $0 $0 $0 $0 $0 $0 $0 $0 $259,024 FY 2018-2027 Capital Improvement Program Streets 99th Ave Reconstruction; Butler Dr to Olive Av Project Number: EN00421 Project Location: 99th Av - Butler Dr to Olive Av Description: This project provides for the coordination with MCDOT and adjacent property owners, public involvement, design, utility coordination, utility relocation, as needed, materials management, construction, and construction administration for conducting geotechnical investigation, reconstruct 99th Av between Butler Drive and Olive Av, construct a concrete sidewalk along the east side of 99th Av and address drainage issues. This project will likely include processing utility agreements (APS, Cox, CenturyLink, SRP, SWG, EPNG, etc.) for design and construction, as well as development and intergovernmental agreements. Justification: This section of 99th Av is in poor condition. The pavement is settling and failing, possibly as a result of decomposition of organic material in the old wildcat landfill located south of Olive Av and along New River. The dips in the roadway, combined with the storm run-off ponding in the low areas, create unsafe driving conditions. This project will provide for the clean-up/removal of the old wildcat landfill debris and trash and reconstruction of the roadway. 168 Category Funding Source CO-Constructi Transportation Sales Tax Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $600,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $600,000 $600,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $600,000 FY 2018-2027 Capital Improvement Program Streets ADA Accessibility Project Number: PW00025 Project Location: Citywide Description: This program funds the city's ongoing effort to comply with the requirements of the Americans with Disabilities Act (ADA). The funds will be used to address 3 projects; 1) to procure a consultant for the purpose of identifying accessibility deficiencies within the public right-ofway, including existing curb ramps, sidewalks and driveways and recommending improvements needed to achieve full compliance with ADA requirements and city-approved policies (ADA Transition Plan); 2) respond to individual ADA requests and as ADA deficiencies are identified, the program funding will be used to design and construct the improvements and; 3) the ADA regulations identify that specific asphalt and concrete repair treatments that are considered to be alterations require installation of curb ramps within the scope of the project. 169 Justification: The Americans with Disabilities Act of 1990 is a civil rights statute that prohibits discrimination against people with disabilities. There are five separate titles (sections) of the Act relating to different aspects of potential discrimination. Title II dictates that public entities must perform self-evaluations of their existing facilities relative to the accessibility requirements of the ADA. The agencies are then required to develop a program access plan, or a transition plan, to address any deficiencies. The transition plan identifies physical obstacles that limit the accessibility of facilities to individuals with disabilities, describes the methods to be used to make the facilities accessible, provides a schedule for making the access modifications, and identifies the public officials responsible for implementation of the plan. The plan is required to be updated periodically until all accessibility barriers are removed. This program is to ensure continued compliance with the federal requirements. As stated above the funding will be used to address 3 projects; 1) $100,00/year for the ADA Transition Plan and inventory (Dev & Engr Dept); 2) $55,000/year to address daily ADA requests in the ROW (Dev & Engr Dept), and; 3) $415,000 every other year to address ADA improvements are part of street alteration projects (PW-UT Dept) Category AT-Arts CB-Chargeba CO-Constructi SY-Study Funding Source Highway User Highway User Highway User Highway User Total Budget FY 2018 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 $0 $0 $643,493 $210,045 FY 2019 $550 $4,000 $55,000 $100,000 $4,700 $4,000 $470,000 $100,000 $550 $4,000 $55,000 $100,000 $4,700 $4,000 $470,000 $100,000 $550 $4,000 $55,000 $100,000 $4,700 $4,000 $470,000 $100,000 $550 $4,000 $55,000 $100,000 $4,700 $4,000 $470,000 $100,000 $550 $4,000 $55,000 $100,000 Total $21,550 $36,000 $2,798,493 $1,110,045 $853,538 $159,550 $578,700 $159,550 $578,700 $159,550 $578,700 $159,550 $578,700 $159,550 $3,966,088 FY 2018-2027 Capital Improvement Program Streets Arterial Road Pavement Preservation & Restoration Project Number: PW00992 Project Location: Various Locations Description: This program provides for pavement preservation and restoration on arterial streets throughout the city. There are 100 miles of arterial roadways in Peoria. Through this program approximately 1 mile is treated in every funded year. The Streets Division evaluates the existing arterials and prioritizes maintenance projects based upon condition, impact, and coordination with other city projects and private development. Scheduled for FY19: 91st Avenue from Peoria Avenue to Grand Avenue; 75th Avenue from Northern Avenue to Olive Avenue; 75th Avenue from Olive Avenue to Peoria Avenue; 107th Avenue from Beardsley Road to Deer Valley Road; 107th Avenue from Deer Valley Road to Williams Road; 170 This work requires the addition or replacement of ADA sidewalk ramps which is funded in a separate CIP project. Justification: Arterial roadways are those with the heaviest volume of traffic and are the most integral to our transportation infrastructure. Category AT-Arts CO-Constructi AT-Arts CO-Constructi Funding Source Highway User Highway User Transportation Sales Tax Transportation Sales Tax Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $0 $0 $0 $38,940 $3,894,000 $6,060 $606,000 $0 $0 $0 $0 $8,940 $894,000 $6,060 $606,000 $0 $0 $0 $0 $8,925 $892,500 $7,575 $757,500 $0 $0 $0 $0 $8,925 $892,500 $7,575 $757,500 $0 $0 $0 $0 $16,500 $1,650,000 $0 $0 $82,230 $8,223,000 $27,270 $2,727,000 $0 $4,545,000 $0 $1,515,000 $0 $1,666,500 $0 $1,666,500 $0 $1,666,500 $11,059,500 FY 2018-2027 Capital Improvement Program Streets Bell Rd and 83rd Ave Right Turn Lane Project Number: EN00562 Project Location: Eastbound Bell Rd to southbound 83rd Av Description: This project provides for the coordination with adjacent property owners, design, ROW acquisition, utility coordination, utility relocation, burying overhead facilities, construction and construction administration for the construction of an eastbound to southbound right turn lane at the intersection of Bell Road and 83rd Avenue. The improvements will include clearing and grubbing, saw cut along existing pavement, constructing additional pavement, relocating the return and constructing the ramps to meet current ADA standards, street lights, landscape and catch basins, traffic signal equipment modifications, and re-striping the intersection. Since the signal facilities are in the City of Glendale, an agreement is required. This project may also require processing of utility company (APS, Cox, Qwest, SRP. EPNG, SWG, etc) design and construction agreements, development and intergovernmental agreements. Justification: The Highway Safety Improvement Program funded Road Safety Assessment completed in April 2013 recommends that an exclusive right turn lane be constructed for eastbound to southbound traffic from Bell Road onto 83rd Avenue. The purpose of this right turn lane is to improve safety and maximize the capacity of Bell Road by reducing the speed differential between the right turning vehicles and the other vehicles on Bell Road. 171 Funding Source Category AT-Arts CB-Chargeba CO-Constructi DS-Design FY 2018 FY 2019 FY 2020 Transportation Sales Tax Transportation Sales Tax Transportation Sales Tax Transportation Sales Tax $0 $0 $0 $0 $700 $80,000 $0 $70,000 LA-Land Acq Transportation Sales Tax $0 $0 Total Budget Total Operating Impacts $0 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $8,000 $100,000 $800,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $103,000 $0 $0 $0 $0 $0 $0 $0 $0 $103,000 $253,700 $908,000 $0 $0 $0 $0 $0 $0 $0 $1,161,700 $2,000 $200 $200 $200 $200 $200 $0 $0 $200 $8,700 $180,000 $800,000 $70,000 $3,200 FY 2018-2027 Capital Improvement Program Streets Bridge Maintenance and Management Program Project Number: EN00243 Project Location: Various Locations Description: This project provides funding for the ongoing bridge and culvert maintenance and management program. The purpose of this program is to develop and implement a system to manage the city’s expanding inventory of bridge structures. Bridges and culverts are typically some of the more costly elements of a transportation system. The program set up a system of routine procedures and actions that enable the city to both monitor and initiate repair and maintenance actions at the appropriate times in order to extend the structure’s service life at a manageable cost. The project also provides for the design and construction of safety improvements including bridge barrier and lighting upgrades, pedestrian and vehicular safety improvements and determining overload haul routes. 172 Justification: The city’s current bridge inventory has been identified, logged, photographed, located on GIS, named, numbered and placed into an internal database as part of the program. Through an intergovernmental agreement with the Arizona Department of Transportation (ADOT), each structure is inspected per National Bridge Inspection Standards (NBIS) and assessed at regular intervals by ADOT. The ADOT inspection program does not address interim structural or safety issues that may arise, nor does it address preventative maintenance. Conditions may arise in the period between ADOT inspections that knowledgeable city crews may be able to detect and report to the City Engineer for evaluation and possible action. Safety issues such as bridge rail impact damage typically cannot wait for biannual inspections to report, evaluate and repair. Routine and preventative maintenance actions may also be appropriate to help maintain or improve the performance of individual bridge elements and the bridge as a whole. Category AT-Arts Funding Source FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total Transportation Sales Tax $0 $2,000 $2,000 $2,000 $2,000 $2,000 $2,000 $2,000 $2,000 $2,000 $18,000 CB-Chargeba Transportation Sales Tax CO-Constructi Transportation Sales Tax $0 $502,941 $25,000 $200,000 $25,000 $200,000 $25,000 $200,000 $25,000 $200,000 $25,000 $200,000 $25,000 $200,000 $25,000 $200,000 $25,000 $200,000 $25,000 $200,000 $225,000 $2,302,941 $502,941 $227,000 $227,000 $227,000 $227,000 $227,000 $227,000 $227,000 $227,000 $227,000 $2,545,941 Total Budget FY 2018-2027 Capital Improvement Program Streets Bus Stop Improvements Project Number: PW11190 Project Location: Peoria Av; 67th Av to 99th Av Description: The city’s Multi-Modal Master Plan created new standards for bus stops in Peoria. These standards outline a hierarchy of different stops to account for different purposes and passenger volumes, and define different amenities to be provided at each type of stop. In addition, the master plan outlines a process for incorporating art into bus stops to make them more attractive, improve the character of the surrounding areas, and help the city create unique identities for specific areas. This funding request will help to implement the short-term recommendations identified in the city’s Multi-Modal Master Plan. The recommendation is to fund improvements to the existing Peoria Av Route 106 bus stops to meet the new standards and potentially incorporate public art at key stops. Justification: Peoria’s General Plan recognizes that transportation systems must integrate multi-modal opportunities to reduce reliance on the automobile. Improving bus stops will help provide a comfortable waiting environment for passengers and encourage transit usage. 173 Category Funding Source CO-Constructi Transportation Sales Tax Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $83,329 $0 $0 $0 $0 $0 $0 $0 $0 $0 $83,329 $83,329 $0 $0 $0 $0 $0 $0 $0 $0 $0 $83,329 FY 2018-2027 Capital Improvement Program Streets Cactus Rd & 69th Av Sidewalk, North Side Project Number: EN00550 Project Location: North side of cactus Rd between Description: This project provides for the coordination with adjacent property owners, public involvement, design, ROW acquisition, utility coordination, utility relocation, construction, and construction administration for the construction of a 5' concrete sidewalk along the north side of Cactus Road for approximately 635 feet in the vicinity of 69th Avenue. The improvements will include constructing a new concrete sidewalk, driveways, a small retaining wall, and landscaping/decomposed granite. This project may also require processing of utility company (APS, Cox, Qwest, SRP. EPNG, SWG, etc) design and construction agreements, development and intergovernmental agreements." Justification: With the construction of the sidewalk along the north side of Cactus Road by the Peoria Village subdivision there is one remaining section of sidewalk that has yet to be constructed. The City is taking the lead to design and construct the missing sections of sidewalk on Cactus Road adjacent to parcels 200-77-003E and 200-77-003B. Pedestrians that walk on the north side of Cactus Road have to either walk in the road or trespass on private property. This project will allow pedestrians continued access along the north side of Cactus Road. 174 Category Funding Source CO-Constructi Transportation Sales Tax Total Budget Total Operating Impacts FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $374,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $374,000 $374,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $374,000 $87 $87 $87 $87 $87 $87 $87 $87 $87 $87 $870 FY 2018-2027 Capital Improvement Program Streets Chip Seal Dirt Roads Project Number: PW00163 Project Location: 67th Ave. to 95th Ave., Happy Valley to Jomax Road Description: This project provides for the application of a rubberized chip seal in rural, residential areas of the city where city standard roadways do not exist. In order to reduce dust and meet PM10 regulations, a rubber chip seal is replaced every five years. The areas subject to this program are 67th Avenue to 72nd Avenue from Camino De Oro north to Villa Linda; 77th Avenue to 79th Avenue from Pinnacle Peak north to Cielo Grande; 92nd Avenue to 95th Avenue from Happy Valley north to Jomax Road. Justification: This project includes annexed and rural areas of residential development where paving was not previously required, but for which the city is now required to address for air quality implications. The dirt roads encompass 106,510 square yards and the estimated cost will be $426,000 in FY20. 175 Category AT-Arts CO-Constructi AT-Arts CO-Constructi Funding Source Highway User Highway User Transportation Sales Tax Transportation Sales Tax Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $0 $0 $0 $0 $0 $0 $0 $2,954 $295,423 $1,241 $124,077 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,954 $295,423 $1,241 $124,077 $0 $0 $0 $0 $0 $0 $0 $0 $5,908 $590,846 $2,482 $248,154 $0 $0 $423,695 $0 $0 $0 $0 $423,695 $0 $0 $847,390 FY 2018-2027 Capital Improvement Program Streets Deer Valley Rd & 87th Av Intesection Improvements Project Number: EN00590 Project Location: Deer Valley Rd & 87th Av Description: This project provides for the coordination with adjacent property owners and Maricopa County , public involvement, design, ROW acquisition, utility coordination, utility relocation, annexation, construction and construction administration for the construction of the traffic signal and incidental intersection improvements at Deer Valley Rd and 87th Av. The improvements will include: purchase and annexation of ROW, restore property, construction of a traffic signal, restriping the intersection as needed. This project may also require processing of utility company (APS, Cox, Qwest, SRP. EPNG, SWG, etc) design and construction agreements, development and intergovernmental agreements. Justification: The MUTCD specifies 8 "traffic control signal needs studies", known as warrants. A warrant is a condition that an intersection must meet to justify a signal installation. The satisfaction of a signal warrant or warrants do not in itself require the installation of a traffic signal. The final decision is based upon the Traffic engineer's judgment. According to a recent traffic study conducted by staff the intersection currently meets warrant #1 - number of vehicles entering the intersection from all directions during 4-hour periods. Staff recommends installation of a traffic signal. 176 Category Funding Source CO-Constructi Transportation Sales Tax DS-Design Transportation Sales Tax LA-Land Acq Transportation Sales Tax Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $570,000 $45,000 $12,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $570,000 $45,000 $12,000 $627,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $627,000 FY 2018-2027 Capital Improvement Program Streets Deer Valley Rd; 109th Ave to Lake Pleasant Pkwy Project Number: EN00395 Project Location: Deer Valley Rd; 109th Av to Lake Pleasant Pkwy Description: This project provides for the coordination with adjacent property owners and MCDOT, public involvement, acquisition of right-of-way, utility coordination, utility relocation, design, materials testing, construction, construction administration for the construction of a roundabout at 109th Avenue and Deer Valley Road and raising of the existing privacy walls where necessary on Deer Valley Road between 109th Avenue and Lake Pleasant Parkway. The City will also install an entry monument just west of the intersection of 109th Avenue and Deer Valley Road. Justification: MCDOT is planning to extend Deer Valley Road from 109th Avenue to El Mirage Road. In doing so, the City is concerned that the increased volume of traffic will result in increased noise and speeding. The City will be coordinating with MCDOT to construct a roundabout at 109th Avenue and Deer Valley Road and raising the height of the privacy walls along the south and north sides of Deer Valley Road between 109th Avenue and Lake Pleasant Pkwy. MCDOT has the project scheduled for construction in Fall 2019. 177 Funding Source Category AT-Arts CB-Chargeba CO-Constructi LA-Land Acq Transportation Sales Tax Transportation Sales Tax Transportation Sales Tax Transportation Sales Tax Total Budget Total Operating Impacts FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $0 $100,000 $50,000 $10,090 $28,500 $1,009,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $10,090 $28,500 $1,109,000 $50,000 $150,000 $1,047,590 $0 $0 $0 $0 $0 $0 $0 $0 $1,197,590 $8,800 $8,800 $8,800 $8,800 $8,800 $0 $0 $0 $8,800 $8,800 $61,600 FY 2018-2027 Capital Improvement Program Streets Dirt Shoulders, Dust Abatement PM-10 Program Project Number: PW01001 Project Location: Various Locations Description: This program will provide funding to apply a dust palliative to road shoulders that have no curbing. The shoulders will be covered with gravel or recycled asphalt millings. There are approximately 45 miles of dirt shoulders in the city. Lake Pleasant Parkway - Loop 303 to State Route 74 (4.0 miles) is currently federally and regionally funded in FY 2016. Other dirt shoulders which have previously been treated will be required to be retreated on a two year cycle. These include: Jomax Road - Terramar Boulevard to 83rd Av (1.5 miles); Jomax Road 103rd Av to Lake Pleasant Parkway (2.5 miles); New River Road - State Route 74 to City limits (1.6 miles); Castle Hot Springs Road State Route 74 to City limits (11 miles); Old Carefree Highway - Lake Pleasant Parkway to Cowtown (4.5 miles). Justification: This project is an EPA mandate. All cities are required to mitigate airborne dust by application of a dust palliative to roads that do not have curbing. While all new roads require curbing, many older and existing roads do not. The Department of Environmental Quality (ADEQ) and the Maricopa County Air Quality Department requires cities to control the dust from publicly maintained roadways. 178 Category Funding Source AT-Arts Highway User CO-Constructi Highway User Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $0 $2,000 $200,000 $0 $0 $2,000 $200,000 $0 $0 $2,000 $200,000 $0 $0 $2,000 $200,000 $0 $0 $2,000 $200,000 $10,000 $1,000,000 $0 $202,000 $0 $202,000 $0 $202,000 $0 $202,000 $0 $202,000 $1,010,000 FY 2018-2027 Capital Improvement Program Streets Guardrail Program Project Number: EN00555 Project Location: Citywide Description: This project provides for the inventory and assessment of the City's guardrail assets and coordination with adjacent property owners, public involvement, design, ROW acquisition, utility coordination, utility relocation, burying overhead facilities, construction and construction administration for the repair and safety upgrades to roadway guardrail. The improvements may include clearing and grubbing, saw cut along existing pavement, install new pavement, curb, gutter, valley gutter and apron, sidewalk, and handicap ramps. This project may also require processing of utility company (APS, Cox, Qwest, SRP. EPNG, SWG, etc) design and construction agreements, development and intergovernmental agreements. Justification: City staff has identified a need to maintain, preserve, and improve the City's current aging inventory of roadside guardrail. In addition, the Federal Highway Administration has set new height and performance requirements for new and replaced barriers. Typical work to be performed will consist of assessing partial or full replacement, replacing aging wood post elements, tightening bolts and hardware, grading, clearing vegetation, evaluating length of need. 179 Category SY-Study Funding Source Highway User Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $80,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $80,000 $80,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $80,000 FY 2018-2027 Capital Improvement Program Streets Happy Valley Pkwy Widening; LPP to Agua Fria Project Number: EN00463 Project Location: Happy Valley Pkwy; LPP to Agua Fria River Description: This project provides for the coordination with MCDOT, the State Land Department, and adjacent property owners, public involvement, design, ROW acquisition and annexation, utility coordination, utility relocation, burying overhead facilities, construction and construction administration for the widening of Happy Valley Parkway from Lake Pleasant Parkway to the west end of the bridge over the Agua Fria River. The specific improvements will include clearing and grubbing, saw cut along existing pavement, install new pavement, micro-seal, curb, gutter, valley gutter and apron, sidewalk and ADA ramps, widening and installing drainage facilities, widening of the bridge and accommodating the Agua Fria River trail connection under the bridge, striping and signage, street lighting, and landscape and irrigation. This project may also require processing of utility company (APS, Cox, CenturyLink, SRP, SWG, EPNG, etc.) design and construction agreements, development and intergovernmental agreements, and annexing the western portion of the parkway. Justification: According to the North Peoria Traffic Study completed in 2013, the projected traffic volumes on Happy Valley Parkway between Lake Pleasant Pkwy and L303 will exceed the existing capacity of the roadway by 2016. Therefore, it is recommended that the project to widen this section of Happy Valley Parkway to accommodate six lanes and bike lanes be advanced. 180 Funding Source Category CO-Constructi AT-Arts CO-Constructi CO-Constructi GO Bonds 2015 Outside Sources Outside Sources Proposed GO Bonds AT-Arts CO-Constructi AT-Arts CO-Constructi Streets Zone 3 Dev Fee Streets Zone 3 Dev Fee Transportation Sales Tax Transportation Sales Tax Total Budget Total Operating Impacts FY 2018 FY 2019 $1,869,000 $0 $263,000 $1,021,585 $0 $23,050 $2,305,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,869,000 $23,050 $2,568,000 $1,021,585 $0 $599,140 $0 $0 $50,000 $5,000,000 $77,760 $7,776,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $50,000 $5,599,140 $77,760 $7,776,000 $3,752,725 $15,231,810 $0 $0 $0 $0 $0 $0 $0 $0 $18,984,535 $46,000 $46,000 $46,000 $46,000 $46,000 $46,000 $46,000 $0 FY 2020 $0 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 $46,000 Total $368,000 FY 2018-2027 Capital Improvement Program Streets Jomax Rd Improvements; 73rd Av to 75th Av Project Number: EN00591 Project Location: Jomax Rd; 73rd Av Alignment to 75th Av Description: This project provides for the coordination with adjacent property owners, public involvement, design, ROW acquisition, utility coordination, utility relocation, construction and construction administration for the construction of the south 1/2 street improvements on Jomax Road between the 73rd Avenue alignment and 75th Avenue. The improvements will include clearing and grubbing, saw cut along existing pavement, and construction of approximately 1,400 lineal feet of roadway improvements to accommodate a cross section consisting of 2-1-2 with bike lanes. Other improvements include, connecting to the existing curb and gutter at the east end and transitioning back to two lanes west of 75th Avenue, curb, gutter, 8-foot wide sidewalk, extend storm drain culverts, install conduit at the intersection of 75th Avenue for a future traffic signal, street lights, landscape and irrigation and extension of an 8-inch water lateral south along the 74th Drive alignment. This project may also require processing of utility company (APS, Cox, Qwest, SRP. EPNG, SWG, etc) design and construction agreements, development and intergovernmental agreements. 181 Justification: The proposed Aloravita subdivison will be constructing the Jomax Road north 1/2 street improvements between 75th Avenue and 71st Avenue. The remainder of the north 1/2 street improvements between 71st Avenue and 67th Avenue will be constructed with the later phases of Aloravita. Staff is recommending that the City coordinate with the developer of Aloravita Phase 1 for the design and construction of the Jomax Road south 1/2 street improvements between the 73rd Avenue alignment and 75th Avenue. This project will complete the south 1/2 street improvements between 67th Avenue and 75th Avenue. Category Funding Source FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total CO-Constructi Streets Zone 3 Dev Fee $981,556 $0 $0 $0 $0 $0 $0 $0 $0 $0 $981,556 DS-Design Streets Zone 3 Dev Fee LA-Land Acq Streets Zone 3 Dev Fee $104,014 $282,336 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $104,014 $282,336 $1,367,906 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,367,906 $9,200 $9,200 $9,200 $9,200 $9,200 $9,200 $9,200 $9,200 Total Budget Total Operating Impacts $0 $9,200 $82,800 FY 2018-2027 Capital Improvement Program Streets Jomax Rd; L303 to Vistancia Blvd Project Number: EN00585 Project Location: Jomax Rd; L303 to Vistancia Blvd Description: This project provides for the coordination with adjacent property owners, public involvement, study, design, ROW acquisition, utility coordination, utility relocation, materials testing, construction and construction administration for the complete street improvements along Jomax Road between L303 and Vistancia Blvd. This project will include two phases; 1) Alignment study for Jomax Rd between L303 and El Mirage Rd and 2) design, ROW acquisition and construction of Jomax Rd between L303 and Vistancia Blvd. Phase 2 will also include: confirming the area has been annexed by the City; water, wastewater, and drainage improvements; and constructing new street improvements to accommodate a cross section consisting of BL:2:M:2:BL. This project may also require processing of utility company (APS, Cox, Qwest, SRP, EPNG, SWG, EPCOR, etc) design and construction agreements, development and intergovernmental agreements. Justification: This project will provide for: (1) an alignment study for Jomax Road between L303 and El Mirage Road, (2) design, right-of-way acquisition, and construction of Jomax Rd between L303 and Vistancia Boulevard. The design, right-of-way acquisition, and construction of Jomax Road between Vistancia Boulevard and El Mirage Road will be submitted as a later project. Therefore, the funding for the design, ROW and construction funding for Jomax Road from Vistancia Boulevard to El Mirage Road has not been input into the database 182 Funding Source Category AT-Arts CB-Chargeba CO-Constructi DS-Design FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total Transportation Sales Tax Transportation Sales Tax Transportation Sales Tax Transportation Sales Tax $0 $0 $0 $230,000 $0 $0 $0 $0 $29,000 $34,000 $2,900,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $29,000 $34,000 $2,900,000 $230,000 LA-Land Acq Transportation Sales Tax SY-Study Transportation Sales Tax $403,000 $200,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $403,000 $200,000 $833,000 $0 $2,963,000 $0 $0 $0 $0 $0 $0 $0 $3,796,000 $0 $0 Total Budget Total Operating Impacts $0 $0 $0 $0 $0 $0 $17,000 $17,000 $34,000 FY 2018-2027 Capital Improvement Program Streets Lake Pleasant Parkway Pavement Maintenance Project Number: PW13005 Project Location: LPP from Cibola Vista to SR-74 Description: Our pavement management program calls for interim maintenance of new pavement to preserve conditions and manage lifecycles. In an ideal program, surfaces are treated early in their lifecycles to preserve good conditions. LPP was constructed approximately 4 years ago and due to the heavy daily traffic and other wear factors, it is already beginning to show signs of premature degradation including edge raveling and loss of fine aggregate. A microseal treatment is needed to preserve and prevent further degradation that is very expensive to repair. $500,000 in every 5th year will allow the Streets Division to microseal LPP from Cibola Vista to SR74 and maintain the Parkway in good condition considering its heavy traffic volumes. Justification: Pavement preservation is integral to a fiscally sound program of pavement management. Allocated funds are applied to pavements for which the greatest cost benefit will be realized. 183 Category Funding Source AT-Arts Highway User CO-Constructi Highway User Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $500,000 $0 $0 $0 $0 $0 $0 $0 $0 $5,000 $500,000 $0 $0 $0 $0 $0 $0 $0 $0 $5,000 $1,000,000 $500,000 $0 $0 $0 $0 $505,000 $0 $0 $0 $0 $1,005,000 FY 2018-2027 Capital Improvement Program Streets Lake Pleasant Parkway Sidewalk Project Number: EN00480 Project Location: LPP; Williams Rd to Jomax Rd Description: This project provides for the coordination with adjacent property owners, public involvement, design, ROW acquisition, utility coordination, utility relocation, materials testing, construction, construction administration for the construction of a concrete sidewalk ranging in width from 5 feet to 8 feet, along the east side of Lake Pleasant Parkway between Deer Valley Road and Jomax Road. The improvements will include re-grading the existing drainage channel, constructing a new concrete sidewalk, upgrading ramps, installing decomposed granite, restoring some landscaping, and traffic signal modifications at Yearling Road and Hatfield Road. This project may also require processing of utility company (APS, Cox, Qwest, SRP. EPNG, SWG, etc) design and construction agreements, development and intergovernmental agreements. 184 Justification: As development has continued along Lake Pleasant Parkway the demand for a sidewalk along both sides has increased. Completing the sidewalk on both sides of LPP is very expensive. Therefore, the City took the approach of designing and constructing the sidewalk along the west side of Lake Pleasant Parkway between Williams Road and Hatfield Road. This project was completed in early 2016. This project will provide for the design, ROW and construction of the sidewalk along the east side of Lake Pleasant Parkway between Williams Road and Jomax Road. Category Funding Source CO-Constructi Outside Sources CO-Constructi Transportation Sales Tax LA-Land Acq Transportation Sales Tax Total Budget Total Operating Impacts FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $14,355 $1,808,977 $60,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $14,355 $1,808,977 $60,000 $1,883,332 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,883,332 $1,500 $1,500 $1,500 $1,500 $1,500 $1,500 $1,500 $1,500 $0 $1,500 $13,500 FY 2018-2027 Capital Improvement Program Streets Lake Pleasant Pkwy & Dixileta Dr Intersection Mods Project Number: EN00588 Project Location: Dixileta Dr; LPP to Park Access Road Description: This project provides for the coordination with adjacent property owners, public involvement, design, ROW acquisition, utility coordination, utility relocation, materials testing, construction and construction administration for the design and construction of intersection modifications and a traffic signal at Lake Pleasant Parkway and Dixileta Drive, a northbound to eastbound deceleration lane, and an access road extending from the intersection approximately 500 feet to the east, and interconnect conduit duct bank and fiber optics cable between Westwing Parkway and Dixileta Drive. The improvements will include trench and install duct bank and inner duct, vaults, pull fiber optics and splicing as needed, install traffic signal, modify the intersection for ADA, intersection deceleration lane, and roadway improvements. This project may also require processing of utility company (APS, Cox, Qwest, SRP. EPNG, SWG, etc) design and construction agreements, development and intergovernmental agreements. 185 Justification: This project is a sister project to the Northern Community Park project. This project will: (1) design, acquire ROW and construct intersection modifications and connect the park access to Lake Pleasant Parkway; (2) provide maintenance access for the Flood Control District to the New River Dam and levee; and (3) provide a hard wire communications connection between the City's ITS system and Northern Community Park and the traffic signal. Category Funding Source CO-Constructi Transportation Sales Tax DS-Design Transportation Sales Tax Total Budget Total Operating Impacts FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $1,800,000 $145,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,800,000 $145,000 $1,945,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,945,000 $1,100 $1,100 $1,100 $1,100 $1,100 $1,100 $1,100 $1,100 $0 $1,100 $9,900 FY 2018-2027 Capital Improvement Program Streets Lone Mountain ROW Acquistion Project Number: EN00479 Project Location: Lone Mountain Pkwy:LPP to L303 Description: This project provides the funding for the acquisition of the ROW along Lone Mountain Pkwy between Lake Pleasant Pkwy and L303 and the ROW for 99th Av between the north boundary of the Pleasant Valley Unit 3 subdivision and Lone Mountain Pkwy. Justification: The North Peoria Traffic Study recommends the construction of Lone Mountain Pkwy (LMP) as one of the higher priorities. LMP will provide a secondary access to Vistancia and the surrounding area and the future Community Park #3. The developer at Vistancia is responsible to construct the water line extension on LMP from L303 to Lake Pleasant Pkwy. The purchase of the ROW will be coordinated with the purchase of the water line easement. 186 Category Funding Source LA-Land Acq Transportation Sales Tax Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $600,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $600,000 $600,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $600,000 FY 2018-2027 Capital Improvement Program Streets Major Street Repairs Project Number: PW00027 Project Location: Various Locations Description: This project provides for street repairs in response to urgent, unplanned, or unfunded situations or concerns. Repairs typically consist of paving, milling, overlaying, re-surfacing of roadways (with minor concrete curb, gutter, valley gutter, and apron improvements). Justification: This project is reserved for street repairs that are initiated by urgency of prioritization that are not programmed as part of the ongoing maintenance program. The specific projects will be identified throughout the year based on staff review, prioritization criteria and justification. 187 Category Funding Source AT-Arts Highway User CO-Constructi Highway User Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $150,000 $1,500 $150,000 $1,500 $150,000 $1,500 $150,000 $1,500 $150,000 $1,500 $150,000 $1,500 $150,000 $1,500 $150,000 $1,500 $150,000 $1,500 $150,000 $13,500 $1,500,000 $150,000 $151,500 $151,500 $151,500 $151,500 $151,500 $151,500 $151,500 $151,500 $151,500 $1,513,500 FY 2018-2027 Capital Improvement Program Streets Monroe St; 83rd Av to 85th Av Roadway Improvements Project Number: EN00549 Project Location: Monroe St; 83rd Av to 85th Av Description: This project provides for the coordination with adjacent property owners, public involvement, design, ROW acquisition, utility coordination, utility relocation, burying overhead facilities, construction and construction administration for the Monroe Street aesthetic improvements between 83rd Av and 85th Ave. This improvements will include; construction of a raised landscape median, upgrade ADA ramps and improve landscape. This project may also require processing of utility company (APS, Cox, Qwest, SRP. EPNG, SWG, etc) design and construction agreements, development and intergovernmental agreements. Justification: Staff has been asked to evaluate the possibility of reducing the street width and improving the aesthetics of Monroe Street in front of City Hall. Adding the raised landscape median will reduce the street width and improvement the street aesthetics. Improving the landscape along both sides of Monroe Street ROW will also improve the street aesthetics. 188 Category Funding Source CO-Constructi Proposed GO Bonds Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $200,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $200,000 $200,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $200,000 FY 2018-2027 Capital Improvement Program Streets Northern Parkway Project Number: EN00142 Project Location: Northern Av From 71st Av to 115th Av Description: This project provides for the City's contribution toward land acquisition and construction to convert the existing Northern Avenue to an eight-lane, limited access "regionally significant" arterial roadway that will be designated Northern Parkway. The project will construct overpasses at the intersections of mile roadways, including bridged mainline overpasses, median barriers, exit and entrance ramps, traffic signals, landscape and irrigation, barrier walls, utility relocations, and drainage improvements, paving, curb, gutters, street lighting, pavement markings and signing. Per the City Attorney's Office, the City has a contractual obligation to contribute financially to this project under the terms of a 2008 intergovernmental agreement. The project budget reflects the latest financial plan formalized in the Arterial Life Cycle Program published by the Maricopa Association of Governments. 189 Justification: The Maricopa Association of Governments conducted a study for east-west mobility across the Valley. Considering the location of the I-10 freeway, Bell Road and Loop 101, another east-west route was needed to handle high volumes of regional traffic. The connectivity with the three State Routes of US60, Loop 101 and Loop 303 were also considered vital to the regional traffic circulation. Considering natural and manmade obstructions such as New River, Agua Fria River, military installations, airports, Sun City, etc., the recommended route is Northern Avenue. The following agencies are partnering to design, acquire ROW and construct the Northern Pkwy: Maricopa County and the cities of Peoria, Glendale and El Mirage. Proposition 400 funding covers 70 percent of the entire projects costs. In accordance with the IGA, the City's share is 20 percent of the remainder. Funding Source Category CO-Constructi GO Bonds 2015 AT-Arts CB-Chargeba CO-Constructi AT-Arts CB-Chargeba CO-Constructi Proposed GO Bonds Proposed GO Bonds Proposed GO Bonds Transportation Sales Tax Transportation Sales Tax Transportation Sales Tax Total Budget Total Operating Impacts FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $600,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $600,000 $0 $0 $0 $0 $0 $1,000,000 $0 $0 $0 $10,000 $10,000 $1,000,000 $0 $0 $0 $10,000 $10,000 $1,000,000 $0 $0 $0 $10,000 $10,000 $1,000,000 $10,000 $10,000 $1,000,000 $0 $0 $0 $10,000 $10,000 $1,000,000 $0 $0 $0 $10,000 $10,000 $1,000,000 $0 $0 $0 $10,000 $10,000 $1,000,000 $0 $0 $0 $71,625 $10,000 $7,162,500 $0 $0 $0 $0 $0 $0 $0 $0 $0 $111,625 $50,000 $11,162,500 $30,000 $30,000 $4,000,000 $1,600,000 $1,020,000 $1,020,000 $1,020,000 $1,020,000 $1,020,000 $1,020,000 $1,020,000 $7,244,125 $0 $15,984,125 $100,000 $100,000 $30,000 $30,000 $100,000 $100,000 $100,000 $100,000 $100,000 $100,000 $860,000 FY 2018-2027 Capital Improvement Program Streets Paradise Lane Widening; Skunk Creek Bridge to 75th Project Number: EN00373 Project Location: Paradise Ln; Skunk Creek bridge to 75th Ave Description: This project provides for the project coordination with adjacent property owners, public involvement, design, utility coordination, utility relocation, ROW acquisition, materials testing, construction, and construction administration for the completion of the widening of the south side of Paradise Lane between the Skunk Creek Bridge and 75th Avenue to accommodate an eastbound to northbound left turn lane, one future through lane and one eastbound to southbound right turn lane. The proposed improvements include clearing, grubbing, and grading of the work area; removal of existing pavement and installing new pavement; curb, gutter, and sidewalk; a Skunk Creek Bridge deck sealant; micro-seal Paradise Lane from 75th Avenue to west of the Skunk Creek Bridge; signing and striping; traffic signal modifications; and installing decomposed granite. This project may also include processing of utility company (APS, Cox, Qwest/Century link, SRP, etc) design and construction agreements, development and intergovernmental agreements. 190 Justification: The parcel located at the southwest corner of 75th Avenue and Paradise Lane has not been developed and as a result this section of Paradise Lane has not been completed. During special events at the Sports Complex this missing section of Paradise Lane causes traffic restrictions when directing traffic into the event and especially at the conclusion of the event as traffic lets out of the area. The recent traffic study recommends completing this section of Paradise Lane to provide additional lane capacity and allow increased traffic volumes to be moved through the area. Category Funding Source FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total AT-Arts Transportation Sales Tax CB-Chargeba Transportation Sales Tax $0 $0 $5,300 $26,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,300 $26,000 CO-Constructi Transportation Sales Tax DS-Design Transportation Sales Tax LA-Land Acq Transportation Sales Tax $0 $130,000 $30,000 $530,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $530,000 $130,000 $30,000 $160,000 $561,300 $0 $0 $0 $0 $0 $0 $0 $0 $721,300 $700 $700 $700 $700 $700 $700 $700 Total Budget Total Operating Impacts $0 $0 $700 $5,600 FY 2018-2027 Capital Improvement Program Streets Peoria Auto District Project Number: EN00556 Project Location: Bell Rd; L101 to West City Limits Description: This project is for final design and construction of way finding signage, monument signage, gateway features, lighting, and landscaping on Bell Rd from L101 to the West City Limits. This project will be phased over time. The phases of the project will expand the theme and elements to various areas within the Auto District to make this a regional destination with a vibrant streetscape. The various phases of the project will include paving, concrete, landscaping, lighting, signage, aesthetics, utility relocations, right-of-way acquisition, public involvement, and drainage. Justification: The City of Peoria has decided to reinvest in one of our greatest sources of tax revenue, the Auto Dealers on Bell Road in Peoria. The Auto District is over 20 years old and is in need of an identity, theming, increased visibility, and a refreshing of the landscaping. 191 Category SY-Study Funding Source Half Cent Sales Tax Total Budget Total Operating Impacts FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $75,957 $0 $0 $0 $0 $0 $0 $0 $0 $0 $75,957 $75,957 $0 $0 $0 $0 $0 $0 $0 $0 $0 $75,957 $52,000 $52,000 $52,000 $162,000 $52,000 $52,000 $52,000 $0 $0 $52,000 $526,000 FY 2018-2027 Capital Improvement Program Streets Peoria Homes Alley Improvements Project Number: EN00580 Project Location: Peoria Homes Subdivision Description: This project provides for the coordination with adjacent property owners, public involvement, design, utility coordination, construction and construction administration for reconstruction of the Peoria Homes alleys. The improvements will include: Remove the existing pavement and chip seal, weeds, trash, debris, over excavate and construction a new 18' wide pavement section with a ribbon curb on each side. This project may also require processing of utility company (APS, Cox, Qwest, SRP. EPNG, SWG, etc) design and construction agreements. Justification: This project will resurface the existing alleys within the Peoria Homes subdivision to provide for better access and improve the aesthetics of the alleys. The limits of the project are: 73rd Dr on the east, 75th Av on the west, Becker Ln on the south and Desert Cove Av on the north. 192 Category Funding Source CO-Constructi Transportation Sales Tax DS-Design Transportation Sales Tax Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $520,000 $71,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $520,000 $71,000 $591,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $591,000 FY 2018-2027 Capital Improvement Program Streets Pinnacle Peak Road; 91st Ave-Lake Pleasant Pkwy Project Number: EN00015 Project Location: Pinnacle Pk Rd; 91st Av to Lake Pleasant Pkwy Description: This project provides for the coordination with adjacent property owners, developer of The Meadows, and the Maricopa County Department of Transportation (MCDOT), public involvement, design, ROW acquisition, annexation, utility coordination, burying overhead utilities, utility relocation, materials testing, construction and construction administration for roadway improvements to Pinnacle Peak Road from 91st Avenue to Lake Pleasant Parkway to City standards. The improvements will include clearing and grubbing, saw cut along existing pavement, installing drainage facilities, new pavement, curb, gutter, valley gutter and apron, sidewalk, ramps, streetlights, traffic signal modifications, and landscaping and irrigation system. This project may also require processing of utility company (APS, Cox, Qwest, SRP. EPNG, SWG, etc) design and construction agreements, development and intergovernmental agreements. 193 Justification: Pinnacle Peak Road from 99th Avenue to 91st Avenue is a two-lane arterial road owned and maintained by the County. Unincorporated Maricopa County borders Pinnacle Peak Road to the north and City of Peoria borders Pinnacle Peak Road to the south. The City plans to improve Pinnacle Peak Road from Lake Pleasant Pkwy to 91st Avenue to a five-lane arterial road with a raised median and upgrade the traffic signal at the intersection of Pinnacle Peak Road and 91st Avenue. The project is expected to be completed by the City, the developer of The Meadows and with funding provided by MCDOT. The developer is responsible to design and construct the south 1/2 street improvements along the south side of Pinnacle Pk Rd; 91st Av - 99th Av, MCDOT will provide funding to the City through an IGA for construction of the north 1/2 street improvements of Pinnacle Pk Rd; 91st Av and 99th Av to County standards. The City will be responsible for the cost differential between constructing the north 1/2 street from County standards to City standards (raised landscape median, landscape , irrigation system, streetlights, curb, gutter and sidewalk, and drainage improvements. In addition, the City is responsible for the north 1/2 street improvements along Pinnacle Pk Rd between 99th Av and LPP. Funding Source Category CO-Constructi CO-Constructi DS-Design LA-Land Acq Outside Sources Transportation Sales Tax Transportation Sales Tax Transportation Sales Tax Total Budget Total Operating Impacts FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $2,997,000 $315,000 $100,000 $150,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,997,000 $315,000 $100,000 $150,000 $3,562,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $3,562,000 $50,000 $50,000 $50,000 $50,000 $50,000 $50,000 $50,000 $0 $0 $50,000 $400,000 FY 2018-2027 Capital Improvement Program Streets Residential Roads Rehabilitation and Preservation Project Number: PW13000 Project Location: Citywide Description: This Program provides for comprehensive, large-scale rehabilitation projects in residential neighborhoods. This work may include a variety of work as necessary to restore neighborhood roads to good condition including patching and surface treatments, mill and overlay up to full-depth removal of damaged asphalt and replacement with new. At the FY17 rate of funding, we can rehabilitate approximately 5 miles of residential roads every other year. There are 630 miles of residential roads in Peoria and approximately 42% of those roads are 20 years old or more so it is important to accelerate this Program to catch up to our aging infrastructure. Justification: With such large scale projects, preparation begins one year in advance with testing of core samples and preparatory repairs. This work requires the addition or replacement of ADA sidewalk ramps which is funded in a separate CIP project. In FY18 the areas to be rehabilitated are Westgreen Estates, Foxboro, Countryside Manor, Monroe Park Estates, Alta Loma, and Cedarbrook. 194 Category Funding Source AT-Arts CO-Constructi DS-Design AT-Arts CO-Constructi Highway User Highway User Highway User Transportation Sales Tax Transportation Sales Tax DS-Design Transportation Sales Tax Total Budget FY 2018 FY 2019 $0 $3,000,000 $0 $0 $2,700,000 $0 $0 $0 $3,000 $0 $0 $5,700,000 FY 2020 FY 2021 $30,000 $3,000,000 $0 $27,000 $2,700,000 $0 $0 $0 $3,000 $0 $300,000 $0 $303,000 $5,757,000 FY 2022 FY 2023 $0 $0 $0 $27,000 $2,700,000 $0 $0 $0 $3,000 $0 $300,000 $0 $303,000 $2,727,000 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $0 $0 $27,000 $2,700,000 $3,000 $0 $300,000 $0 $0 $33,000 $6,000,000 $300,000 $120,000 $13,500,000 $0 $0 $0 $27,000 $2,700,000 $0 $0 $0 $3,000 $0 $300,000 $0 $300,000 $0 $0 $1,200,000 $303,000 $2,727,000 $303,000 $2,727,000 $303,000 $21,153,000 FY 2018-2027 Capital Improvement Program Streets Resurvey Benchmarks Project Number: PW00137 Project Location: Citywide Description: This project will establish horizontal controls and vertical benchmarks for section and quarter corners within the City of Peoria. The city must establish a grid of monuments completed with second order survey accuracy. Additionally, reference to other datum found within the city, namely, FEMA, City of Glendale, City of Phoenix, MCDOT and ADOT datum, shall be corresponded, coordinated and compared with City of Peoria "Inertial System Benchmark Survey." 195 Justification: At the present time, any developer who is serious about beginning design of a project must first call the city to get an elevation on an adjacent benchmark. This elevation coordinates the project with others that have already been built and those that will be built in the future. The elevation of various benchmarks used in the city comes from a survey performed several years ago. It has been found that since the time of that survey, many of the monuments have been either destroyed or replaced, and that the elevations currently in use are in question. The survey will also establish monuments and elevations in the north portion of the city. This project will allow future developments and services to be on the same elevation base as the rest of the city. This work will minimize the task of recreating benchmark references for any survey conducted by a public or private entity for accurate elevation and coordinate surveys within the city limits. The work will result in a reliable comprehensive, single source, reference for this information to be interpreted consistently by any and all parties. Further implementation into the GIS database will be needed as the information system is improved. Funding Source Category SY-Study General Total Budget Total Operating Impacts FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $0 $234,000 $0 $0 $0 $0 $0 $0 $0 $234,000 $0 $0 $234,000 $0 $0 $0 $0 $0 $0 $0 $234,000 $5,000 $5,000 $5,000 $5,000 $5,000 $0 $0 $0 $5,000 $5,000 $35,000 FY 2018-2027 Capital Improvement Program Streets Rural-Standard Roads Program Project Number: PW01003 Project Location: Various Locations Description: This program provides for resurfacing non-residential roads built to rural standards with no curb and gutter. Currently, there are approximately 10 miles of non-residential, rural standard roads in the city. Through this program, these roads are chip sealed approximately every 5 years. They are inspected for appropriate treatments and prioritized in accordance with our pavement management program. Roads in this category include north Peoria/Lake Pleasant area roads: Christian Camp Road from SR 74 north to end of maintenance; Castle Hot Springs from SR 74 to the end of maintenance; 87th Avenue from SR 74 to end of maintenance; New River Road from SR 74 to end of maintenance. Justification: These roads are the gateway to Lake Pleasant and need to be maintained routinely. 196 Category Funding Source CO-Constructi Highway User AT-Arts Transportation Sales Tax CO-Constructi Transportation Sales Tax Total Budget Total Operating Impacts FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $1,400,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $15,000 $1,500,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,400,000 $15,000 $1,500,000 $1,400,000 $0 $0 $0 $0 $1,515,000 $0 $0 $0 $0 $2,915,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $250,000 FY 2018-2027 Capital Improvement Program Streets Sidewalks Annual Program Project Number: PW00046 Project Location: Citywide Description: This program addresses sidewalk deficiencies along arterial streets due to lack of adjacent development or older developments that did not complete the sidewalk improvements. The program provides for public involvement, design, utility coordination, utility relocation, ROW acquisition, materials testing, construction and construction administration for installing concrete sidewalks, repair or replacement of landscape and irrigation system improvements, applying pre-emergent and decomposed granite, along with incidental work to accomplish connectivity. The project will likely include processing of utility agreements for design and construction, as well as development agreements and intergovernmental agreements. 197 Justification: In the early 2002, Council approved the funding of the Sidewalks Annual Program to be used for improvements to the City's existing infrastructure. The program is used to construct sidewalks along arterial streets. The Development and Engineering Department prioritizes projects based the following criteria; input from various departments, city management, Council, and citizen requests, ADA requests, areas around high pedestrian generators; such as, parks, and schools, safe routes, impacts of development, provisions in existing agreements, is right-of-way sufficient to accommodate improvement, neighborhood support, decorative fences, walls, lights, and landscaping (trees, shrubs, grass, sprinklers, etc.) that conflict with the proposed street improvements and are within existing city right-of-way must be removed or relocated by the property owner prior to construction of the improvements or improvements cannot be constructed. Category Funding Source FY 2018 FY 2019 $900 $15,000 FY 2021 $900 $15,000 FY 2022 $900 $15,000 FY 2023 $900 $15,000 FY 2024 $900 $15,000 FY 2025 $0 $0 CO-Constructi Highway User $190,000 $90,000 $90,000 $90,000 $90,000 $90,000 $90,000 $90,000 $190,000 $105,900 $105,900 $105,900 $105,900 $105,900 $105,900 $105,900 Total Budget $900 $15,000 FY 2020 AT-Arts Highway User CB-Chargeba Highway User $900 $15,000 FY 2026 $900 $15,000 FY 2027 Total $900 $15,000 $8,100 $135,000 $90,000 $90,000 $1,000,000 $105,900 $105,900 $1,143,100 FY 2018-2027 Capital Improvement Program Streets Street Light Infill and Replacement Program Project Number: PW11160 Project Location: Various Locations Description: This program provides for the replacement of old street lights and allows the city to respond to citizen requests for additional street lights in residential areas. Staff evaluates the condition of existing street lights which may be more than 30 years old and prioritizes these for replacement. The division also accepts applications for new street lights to address areas which may need additional lighting based on current lighting standards. Justification: In time, street light poles will often rust at the base, especially in areas where they are exposed to frequent sprinklers, irrigation and other water sources. When the base rusts, the pole’s integrity is compromised and it may fall causing a risk to the public. This program provides for the replacement of old street light poles which have become rusted and compromised due to age and wear. When the poles are replaced, new energy efficient LED fixtures are also installed to further the City’s commitment to sustainability. 198 At the FY17 rate of funding, only about 56 poles can be replaced each year. Each new pole/fixture replacement costs about $5,200. There are approximately 1,583 poles that are 30 years old or more in the city so it is important to accelerate this Program to catch up to our aging infrastructure. After this 5 year push, the number of pole replacements can be reduced. Category Funding Source AT-Arts Highway User CO-Constructi Highway User Total Budget FY 2018 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 $0 $790,000 FY 2019 $8,900 $890,000 $3,900 $390,000 $3,900 $390,000 $3,900 $390,000 $3,900 $390,000 $3,900 $390,000 $3,900 $390,000 $3,900 $390,000 $3,900 $390,000 Total $40,100 $4,800,000 $790,000 $898,900 $393,900 $393,900 $393,900 $393,900 $393,900 $393,900 $393,900 $393,900 $4,840,100 FY 2018-2027 Capital Improvement Program Streets Street Maintenance Program Project Number: PW00138 Project Location: Various Locations Description: This program provides for general street pavement maintenance throughout the city. Currently there are approximately 629 centerline miles of arterial, collector and residential streets in the city. The Streets Division evaluates the condition of the existing streets and prioritizes the required maintenance which may include crack seal and repairs, surface treatments, pavement replacement and small-scale restorations as needed. In FY18 some planned maintenance activities include: 199 Arterial & Collector Roads: Beardsley Road from 81st Avenue to Lake Pleasant Road. 91st Avenue from Union Hills Drive to Beardsley Road. Deer Valley Road from 83rd Avenue to 95th Avenue. 85th Avenue from Grand Avenue to Peoria Avenue. Terramar Boulevard from Happy Valley Parkway to Jomax Road. Desert Moon Way from 67th Avenue to Terramar Boulevard Residential: Terramar, New River Ranch, Pioneer Village, Windwood, Braemar unit 7, Suntown, Suntown 2,3 & 4. Ventana Lakes Subdivisions: Landings, Moonlight Bay, South Bay, South Bay Unit 2, Bay Point, Bay Point Unit 2, Greystone Heritage Unit 2 Justification: Pavement preservation is integral to a fiscally sound program of pavement management. Allocated funds are applied to pavements for which the greatest cost benefit will be realized. Category AT-Arts CO-Constructi AT-Arts CO-Constructi Funding Source Highway User Highway User Transportation Sales Tax Transportation Sales Tax Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $2,004,950 $0 $250,000 $25,050 $2,004,950 $5,000 $500,000 $25,050 $3,004,950 $5,000 $500,000 $25,050 $3,004,950 $5,000 $500,000 $30,000 $3,000,000 $7,500 $750,000 $30,000 $3,000,000 $7,500 $750,000 $30,000 $3,000,000 $7,500 $750,000 $30,000 $3,000,000 $7,500 $750,000 $30,000 $3,000,000 $7,500 $750,000 $37,500 $3,750,000 $0 $0 $262,650 $28,769,800 $52,500 $5,500,000 $2,254,950 $2,535,000 $3,535,000 $3,535,000 $3,787,500 $3,787,500 $3,787,500 $3,787,500 $3,787,500 $3,787,500 $34,584,950 FY 2018-2027 Capital Improvement Program Streets Sunrise Mtn HS Traffic Solutions Project Number: EN00589 Project Location: Lone Cactus Dr; 83rd Av to 87th Av & Driveway Modications Description: This project provides for the coordination with adjacent property owners, public involvement, design, utility coordination, construction and construction administration for the resurfacing, restriping and construction of a pedestrian area for a school crosswalk. The improvements will include: micro sealing Lone Cactus Dr from 83rd Av to 87th Av, providing a new parking lane, installing a new pedestrian refuse area, retrofitting existing ramps, and restriping the roadway. The project will also provide improved access and visibility at the southern driveway near the Challenger Space Center through the construction of an acceleration and/or deceleration lane on 83rd Avenue. This project may also require processing of utility company (APS, Cox, Qwest, SRP. EPNG, SWG, etc) design and construction agreements. 200 Justification: This project is intended to help alleviate school-related congestion and back-up on 83rd Avenue from Sunrise Mountain High School parents dropping off and picking up students in the school's main parking lot. During discussions with the school, staff proposed an option to provide a supplementary student loading area on the south side of Lone Cactus Road by eliminating the little used two-way left turn lane to provide the width for a parking lane. In addition to providing relief to the back-ups on 8rd Avenue, this will also provide several hundred feet of legal on-street parking adjacent the high school for special events. Additionally, this project will provide new bike lanes on Lone Cactus Road from 87th Avenue to 86th Drive. Finally, visibility is a concern for vehicles exiting the high school campus at the southern driveway near the Challenger Space Center due to a combination of fencing, vehicles and a curve in the road, so this project will seek methods to mitigate these concerns. Category Funding Source CO-Constructi Highway User DS-Design Highway User Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $350,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $18,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $350,000 $18,000 $368,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $368,000 FY 2018-2027 Capital Improvement Program Streets Technical Pavement Condition Survey & Support Project Number: PW00512 Project Location: Citywide Description: Pavement preservation is integral to a fiscally sound program of pavement management. Allocated funds are applied to pavements where the greatest cost benefit will be realized in extended lifecycles and enhanced fiscal management through pavement lifecycle management. In FY17, the Streets Division employed the first electronic survey of its entire pavement network. This survey provided multiple levels of data reporting on the conditions of our pavement surfaces as well as structure and sub-structure. Based upon data collected and allocated budgets, the electronic survey data allows the streets division to prioritize maintenance projects based upon the objective data which is all gathered at once. The electronic survey results are transmitted to the city’s Hansen work order system and the Streets Division’s Lucity Pavement Management software which is then used to run various reports and scenarios to plan future maintenance projects. The technical survey should be repeated every three (3) years to capture changed conditions. Justification: This survey greatly enhances the division’s ability to report, forecast and plan our maintenance projects based upon consistent, objective data. Most larger cities in the valley utilize this technical inspection and reporting system. 201 Category OT-Other Funding Source Highway User Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $0 $250,000 $0 $0 $250,000 $0 $0 $250,000 $0 $750,000 $0 $0 $250,000 $0 $0 $250,000 $0 $0 $250,000 $0 $750,000 FY 2018-2027 Capital Improvement Program Streets Thunderbird Road Corridor Improvements Project Number: EN00086 Project Location: Thunderbird Rd; 83rd Av to Loop 101 Description: This project provides for two projects; 1) a conceptual design (15%) for widening the south side of Thunderbird Rd between 83rd Av to 75th Av to accommodate the third lane and 2) the coordination with adjacent property owners, public involvement, design, ROW acquisition, utility coordination, utility relocation, materials testing, construction and construction administration for the construction of the ultimate corridor capacity improvements between L101 and 83rd Av. The improvements may include: dual eastbound to northbound left turn lanes, westbound to southbound left turn lanes, restriping of lanes to other purposes, and installing or extending turn lanes throughout the corridor from 83rd Avenue west to the Loop 101 on Thunderbird Road. This project may also require processing of utility companies (APS, Cox, Qwest, SRP. EPNG, SWG, etc) design and construction agreements, development and intergovernmental agreements. 202 Justification: As part of the 2007 intersection widening project a traffic study was completed. The study recommended dual left turn lanes on the north and south legs of the intersection. The study did not recommend dual left turn lanes on the east and west legs of the intersection. The City's Transportation Needs Study recommends that the intersection eventually be widened to accommodate dual left turn lanes on the east and west legs of the intersection. The new turn lanes will provide additional capacity. The City is currently conducting a study to evaluate the Thunderbird Road corridor between 83rd Avenue and Loop 101, including the interchange at Loop 101, 84th Avenue and 83rd Avenue for capacity, efficiency, safety, access and traffic control. The 2007 Transportation Needs Study also recommended the widening of Thunderbird Rd between 83rd Av and 75th Av to a six lane roadway. The current traffic volumes for the EB direction have almost reached the threshold capacity and a third through lane in the EB direction is required. Category Funding Source FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total CO-Constructi Street Impact Fees Z1 Post 0101 CO-Constructi Transportation Sales Tax $1,030,000 $812,763 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,030,000 $812,763 Total Budget $1,842,763 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,842,763 $1,800 $1,800 $1,800 $1,800 $1,800 $1,800 $1,800 $1,800 Total Operating Impacts $0 $1,800 $16,200 FY 2018-2027 Capital Improvement Program Streets Traffic Signal Renovation and Replacement Project Number: PW00993 Project Location: Various Locations Description: There are currently 120 signalized intersections in the City. This project provides for the replacement of wiring, signal cabinets, and controllers at an average rate of 6 intersections per year. Signal rewiring is planned for every year and on alternate years, signal cabinets and controllers are renovated and/or replaced to avoid deterioration-related problems. Using this alternative project maintenance schedule allows for a more efficient use of our funding and staffing resources. As part of the replacements, updated technology will be incorporated. Justification: The traffic signal system requires ongoing maintenance and replacement to avoid malfunctions and failures. This electronic equipment is subject to a high temperature environment. The technology and functionality of traffic management systems is becoming more complex and requires upgrades to keep up with these changes. 203 Category Funding Source CO-Constructi GO Bonds 2015 AT-Arts Highway User CO-Constructi Highway User Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $200,000 $0 $109,000 $0 $3,090 $309,000 $0 $3,090 $309,000 $0 $3,090 $309,000 $0 $3,090 $309,000 $0 $3,090 $309,000 $0 $3,090 $309,000 $0 $3,090 $309,000 $0 $3,090 $309,000 $0 $3,090 $309,000 $200,000 $27,810 $2,890,000 $309,000 $312,090 $312,090 $312,090 $312,090 $312,090 $312,090 $312,090 $312,090 $312,090 $3,117,810 FY 2018-2027 Capital Improvement Program Streets Utility Undergrounding Program Project Number: EN00563 Project Location: Citywide Description: This project provides for the coordination with adjacent property owners, public involvement, design, ROW acquisition, utility coordination, utility relocations, materials testing, construction and construction management for a utility undergrounding program. The improvements will include trenching; installing conduit, cabinets, pedestals, etc.; pulling new wire; removing existing overhead facilities; and installing a new streetlight system. This program will also include processing of agreements (Cox, SRP, APS, El Paso Natural Gas, SWG, Centurylink, etc) for design and construction, as well as development agreements and IGAs. Justification: Undergrounding overhead utilities can provide a number of benefits to Peoria residents, from more beautiful neighborhoods to more reliable utilities during extreme weather. City Code requires new or existing utilities to be placed underground when associated with new construction. Undergrounding overhead utilities faces many challenges, including cost, coordinating with other utilities, finding room within the existing right-of-way, and installing new streetlight systems. In 2013, the City prepared a Utility Undergrounding Master Plan (UUMP) that formalized a policy for burying overhead utilities, identified and prioritized projects, and evaluated possible funding sources. 204 The City of Peoria has a total of 170 miles of overhead utilities. The UUMP was based on a cost of $350 per foot. Most recently the costs have been realized at $400 per foot, which included installation of a new streetlight system. The UUMP identified removal of overhead utilities along arterial streets as a priority. In 2015, the city completed a project that buried the overhead utilities and installed a new streetlight system along the west side of 83rd Ave between Olive Av and Butler Dr and a second project is currently under design to bury the overhead utilities and install a new streetlight system along the south side of Olive Av between 91st Av and 85th Av. Category Funding Source AT-Arts Proposed GO Bonds CO-Constructi Proposed GO Bonds DS-Design Proposed GO Bonds Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,000 $0 $500,000 $20,000 $2,000,000 $0 $0 $0 $0 $25,000 $2,000,000 $500,000 $0 $0 $0 $0 $0 $0 $0 $505,000 $2,020,000 $0 $2,525,000 FY 2018-2027 Capital Improvement Program Streets Vistancia Blvd & Happy Valley Rd Intersection Mods Project Number: EN00586 Project Location: Vistancia Blvd & Happy Valley Rd Description: This project provides for the coordination with adjacent property owners and MCDOT, public involvement, design, ROW acquisition, utility coordination, utility relocation, materials testing, construction and construction administration for the design and construction of ramps, crosswalks, and a traffic signal at the intersection of Vistancia Boulevard and Happy Valley Road. The improvements will include removal of ramps, construction of new ramps, median modifications, swale modifications, striping a crosswalk on Happy Valley Road, no crosswalks on Vistancia Boulevard, and construction of a new traffic signal. This project may also require processing of utility company (APS, Cox, Qwest, SRP, EPNG, SWG, etc.) design and construction agreements, development and intergovernmental agreements. 205 Justification: When Vistancia was first constructed there were no roadways that provided access to the development. Vistancia was required to construct Vistancia Boulevard extending from the L303 interchange. The Arizona State Land Department conveyed the right of way for construction of Vistancia Boulevard, which was the County's responsibility for maintenance until the City annexed. In accordance with the 2003 IGA between MCDOT and the City, MCDOT was responsible to maintain Vistancia Boulevard from L303 to the City limits until March 2004, or until the City annexed the area. When the intersection of Vistancia Boulevard and Happy Valley Road met warrants for signalization, the cost of the signal was to be paid by the developer. Due to issues beyond the City's control, the area still has not been annexed; however, the City agreed to assume maintenance responsibilities effective January 1, 2013. According to a recent warrant study conducted by MCDOT, the intersection now meets warrants for signalization. MCDOT did not obtain the funding from the developer in accordance with the IGA and has asked the City to cost share in the design and construction of the traffic signal and ADA modifications. Funding Source Category CO-Constructi DS-Design CO-Constructi DS-Design Highway User Highway User Outside Sources Outside Sources Total Budget Total Operating Impacts FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $429,542 $54,608 $215,458 $27,392 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $429,542 $54,608 $215,458 $27,392 $727,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $727,000 $600 $600 $600 $600 $600 $600 $600 $600 $0 $600 $5,400 FY 2018-2027 Capital Improvement Program Traffic Control Traffic Management Center Equipment Replacement Project Number: EN00433 Project Location: DCSB Description: This project provides funding for periodic equipment replacement in the city’s Traffic Management Center (TMC) located in the Development and Community Services Building. This equipment includes the video wall monitors, computer hardware and switches, video conferencing equipment, and other related equipment. The city was awarded federal CMAQ funds to offset the costs of the first equipment replacement. Justification: The equipment in the Traffic Management Center has an average life of five years. This funding will allow for the regular replacement of this equipment to ensure that the TMC continues to operate at an acceptable level of service. 206 Category Funding Source AT-Arts Transportation Sales Tax CO-Constructi Transportation Sales Tax Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $111,093 $1,000 $100,000 $1,000 $100,000 $1,000 $100,000 $1,000 $100,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $4,000 $511,093 $111,093 $101,000 $101,000 $101,000 $101,000 $0 $0 $0 $0 $0 $515,093 FY 2018-2027 Capital Improvement Program Traffic Control Traffic Signal Interconnect Project (TSIP) Project Number: PW00133 Project Location: Various Locations Description: The project provides for extension of the fiber optic system to provide communications to the city's traffic signals. This funding will provide the additional conduit, fiber optic cable, computer networking equipment, communication lines and ITS equipment (CCTV cameras, dynamic message signs, etc.). The fiber optics communication system will aid in maintaining the coordination of the city's traffic signals, as well as obtaining valuable intersection information from a central location. Justification: The city installed a fiber optic backbone on 83rd Avenue from Olive Avenue to Bell Road, and has installed additional interconnect conduit to connect to the backbone system. The system needs to be extended to allow us to communicate with the traffic signals, make changes to the timing, and monitor the operation of the signal from a central location. This project will improve transportation efficiency and safety, and improve the response to traffic problems such as stalled vehicles, crashes and other obstructions to traffic flow. 207 Category AT-Arts CB-Chargeba CO-Constructi DS-Design Funding Source Transportation Sales Tax Transportation Sales Tax Transportation Sales Tax Transportation Sales Tax Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $0 $229,086 $25,000 $0 $0 $0 $0 $2,000 $5,000 $175,000 $25,000 $0 $0 $0 $0 $2,000 $5,000 $175,000 $25,000 $0 $0 $0 $0 $2,000 $5,000 $175,000 $25,000 $0 $0 $0 $0 $2,000 $5,000 $175,000 $25,000 $0 $0 $0 $0 $8,000 $20,000 $929,086 $125,000 $254,086 $0 $207,000 $0 $207,000 $0 $207,000 $0 $207,000 $0 $1,082,086 FY 2018-2027 Capital Improvement Program Traffic Control Traffic Signal Program Project Number: EN00170 Project Location: Various Locations Description: The Traffic Signal Program provides funding for traffic studies, coordination with adjacent property owners, public involvement, design, materials testing, construction and construction administration for various traffic control improvements/enhancements. These improvements may include, but are not limited to, new signals, modification of existing signals and handicap ramps, the purchase and installation of miscellaneous traffic signal equipment, intelligent transportation system equipment, speed display signs, CCTV, etc. Justification: The Traffic Signal Program consistently follows the city’s General Plan and reflects City Council goals and policies to create a safe, efficient transportation network for the movement of traffic, people, and goods; improve the coordination with regional transportation management; and provide a way to address evolving needs in response to growth and development. The Development and Engineering Department prioritizes projects based on input from various departments, city management, Council, and citizen requests. 208 Category Funding Source AT-Arts Transportation Sales Tax CB-Chargeba Transportation Sales Tax CO-Constructi Transportation Sales Tax Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $0 $628,053 $5,500 $44,500 $550,000 $5,500 $44,500 $550,000 $5,500 $44,500 $550,000 $5,500 $44,500 $550,000 $5,500 $44,500 $550,000 $5,500 $44,500 $550,000 $5,500 $44,500 $550,000 $5,500 $44,500 $550,000 $5,500 $44,500 $550,000 $49,500 $400,500 $5,578,053 $628,053 $600,000 $600,000 $600,000 $600,000 $600,000 $600,000 $600,000 $600,000 $600,000 $6,028,053 FY 2018-2027 Capital Improvement Program Traffic Control Traffic Signal System Software Replacement Project Number: EN00430 Project Location: Development and Community Services Building Description: This is to request funding for replacement of the city’s existing traffic signal system software. This project includes the software installation, integration with traffic system hardware, software licenses, personnel training and software maintenance agreement. Justification: The city purchased the existing Siemens i2 Traffic Signal System in FY 2005. The software is at the end of its life expectancy, has become increasingly unstable, and the software vendor has discontinued support. There have also been several recent instances of signalized intersections going into a flashing condition as a result of routine data downloads from the central signal system. There are newer programs with up-to-date features such as GIS mapping, easier to use graphic user interface, easier data input modules, better data reporting, and better technical support. 209 Category Funding Source EQ-Equipmen Transportation Sales Tax Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $37,458 $0 $0 $0 $0 $0 $0 $0 $0 $0 $37,458 $37,458 $0 $0 $0 $0 $0 $0 $0 $0 $0 $37,458 City of Peoria FY 2018 – FY2027 Capital Improvement Program 210 City of Peoria FY 2018 Annual Program Budget Capital Improvement Program Wastewater The measure of success when collecting and treating wastewater is when no one so much as wonders how it is done. It takes a complex network of infrastructure to make this operation seamless. In addition to building and operating large water treatment and reclamation facilities, the City of Peoria ensures that infrastructure is in place from an individual residence or commercial establishment, along roadway alignments, to the treatment facility. Facilities within Peoria also can reuse a portion of flows, providing a new, non-potable water resource opportunity. Wastewater infrastructure is funded primarily through operating revenues from rate payers, as well as revenue bonds and development impact fees. The 10-year program includes funding for the oversizing of selected wastewater trunk sewers to provide collection system capacity for new development in northern areas of the City, acquisition of land at the influent pump stations where the City recharges the water table and additional treatment capacity be added to meet the needs of continuing development in the north and northwest portions of the City. Wastewater Total ‐ $92,924,243 $25,000,000 $20,000,000 $15,000,000 $10,000,000 $5,000,000 $0 FY18 FY19 FY20 FY21 FY22 211 FY23 FY24 FY25 FY26 FY27 FY 2018-2027 Capital Improvement Program Wastewater Wastewater Summary by Project Project Name Pg# FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 23-27 101st Ave and Northern Lift Station Pretreatment 214 Agua Fria Lift Station-Wastewater Campus Land $242,401 $489,451 $0 $0 $0 $0 $731,852 215 $200,000 $4,000,000 $0 $0 $0 $0 $4,200,000 Beardsley Plant Equipment Upgrade and Expansion 216 $1,772,516 $153,000 $153,000 $153,000 $9,369,751 $8,829,786 $20,431,053 Beardsley WRF Solids Pipeline Rehabilitation 217 $534,310 $1,879,025 $0 $0 $0 $0 $2,413,335 Butler IPS Equipment Upgrade/Replacement 218 $148,500 $150,995 $150,995 $101,000 $101,000 $505,000 $1,157,490 Butler Recharge Wells (ASR) 219 $2,075,452 $2,467,600 $704,502 $2,467,600 $0 $0 $7,715,154 Butler WRF Aeration System Upgrades 221 $1,176,946 $0 $0 $0 $0 $0 $1,176,946 Butler WRF Headworks Rehabilitation 222 $420,000 $404,000 $0 $0 $0 $0 $824,000 Butler WRF Plant Equipment Upgrade and Replacement 223 $607,073 $180,000 $180,000 $180,000 $100,000 $500,000 $1,747,073 Dixileta 21 inch Sewer Extension 224 $1,000,000 $0 $0 $0 $0 $0 $1,000,000 El Mirage Road Sewer Infrastructure Upsizing 225 $0 $0 $0 $1,970,056 $0 $0 $1,970,056 Jomax WRF Expansion 226 $0 $191,300 $1,946,881 $16,664,048 $5,210,939 $0 $24,013,168 Jomax WRF Operational Improvement/Upgrade/Replace 228 $132,027 $50,500 $75,751 $101,000 $50,500 $252,500 $662,278 Lift Station Reconditioning 229 $736,941 $383,800 $383,800 $383,800 $383,800 $1,919,000 $4,191,141 Manhole Rehabilitation 230 $365,153 $277,725 $277,725 $277,725 $277,725 $1,388,625 $2,864,678 Miscellaneous Local Wastewater Line Improvements 231 $200,000 $204,000 $204,000 $204,000 $204,000 $1,020,000 $2,036,000 Reclaimed Water Booster Land Purchase at IPS 232 $643,830 $0 $0 $0 $0 $0 $643,830 SROG Line Assessment& Repair 233 $920,888 $0 $0 $170,795 $223,347 $501,437 $1,816,467 Trunk Sewer Line Inspection 234 $700,000 $0 $0 $0 $0 $600,000 $1,300,000 Trunk Sewer Rehabilitation 235 $2,363,745 $1,505,000 $555,000 $0 $0 $0 $4,423,745 Wastewater System Additional R & M Expense 236 $0 $0 $714,000 $714,000 $714,000 $3,570,000 $5,712,000 West Agua Fria Wastewater Lines 237 $954,525 $199,778 $489,951 $249,723 $0 $0 $1,893,977 $15,194,307 $12,536,174 $5,835,605 $23,636,747 $16,635,062 $19,086,348 $92,924,243 Total - Wastewater 212 Total FY 2018-2027 Capital Improvement Program Wastewater Wastewater Summary by Funding Source Fund Number and Name FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 23-27 2050 - Water $1,724,155 $217,324 $102,188 $108,500 $37,625 $188,125 $2,377,917 $0 $47,825 $0 $0 $52,424 $0 $100,249 2163 - Water Exp. S. of Bell $681,540 $925,350 $264,188 $925,350 $0 $0 $2,796,428 2164 - Water Exp. N. of Bell $897,095 $2,005,350 $750,908 $925,350 $5,330,602 $2,207,285 $12,116,590 $0 $0 $0 $2,474,859 $0 $0 $2,474,859 $9,646,627 $6,304,447 $2,592,083 $2,341,811 $9,065,030 $16,690,938 $46,640,936 $0 $0 $0 $14,024,198 $0 $0 $14,024,198 2506 - Wastewater Exp. E. of Agua Fria $209,115 $2,527,650 $88,063 $308,450 $0 $0 $3,133,278 2507 - Wastewater Exp. W. of Agua Fria $265,775 $508,228 $2,038,175 $2,528,229 $2,149,381 $0 $7,489,788 $1,770,000 $0 $0 $0 $0 $0 $1,770,000 $15,194,307 $12,536,174 $5,835,605 $23,636,747 $16,635,062 $19,086,348 $92,924,243 2162 - Water Expansion Post 1/1/12 2270 - WIFA Bonds 2400 - Wastewater 2452 - WIFA Bonds 2006 Clean Water 2509 - Wastewater Expansion Post 1/1/12 Total - Wastewater 213 Total FY 2018-2027 Capital Improvement Program Wastewater 101st Ave and Northern Lift Station Pretreatment Project Number: UT00398 Project Location: 101st Ave and Northern Description: This project provides for the project coordination, public involvement, pre-design studies, design, ROW acquisition, construction, materials testing, construction administration, utility coordination, utility relocation, burying overhead facilities, as needed, clearing and grubbing, and all related sitework for realigning the existing 18" influent sewer lines, the installation of an in-line channel grinder and replacing the electrical and instrumentation equipment. This project may also include processing of utility company (APS, Cox, Qwest/Centurylink, SRP, etc.) design and construction agreements, development and intergovernmental agreements. Justification: The 101st Avenue and Northern Lift Station has significant ragging and debris issues as well as aging electrical equipment that has been damaged by H2S gases which both lead to extensive maintenance problems for city staff. Adding a channel grinder and replacing the electrical and instrumentation equipment at this location will reduce the maintenance issues created by the heavy ragging and H2S gases and thus reduce staff time and maintenance costs. 214 Category Funding Source AT-Arts Wastewater CO-Constructi Wastewater DS-Design Wastewater Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $176,877 $65,524 $4,846 $484,605 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $4,846 $661,482 $65,524 $242,401 $489,451 $0 $0 $0 $0 $0 $0 $0 $0 $731,852 FY 2018-2027 Capital Improvement Program Wastewater Agua Fria Lift Station-Wastewater Campus Land Project Number: UT00284 Project Location: CAP Canal and Agua Fria River Description: This project will purchase a 40-acre site for a future water reclamation facility campus. This project site is identified in the Integrated Water Utilities Master Plan and will initially be used for a regional wastewater lift station that will provide service for the portion of the city located north of the Central Arizona Project (CAP) canal and east of the Agua Fria River. Justification: A centrally located campus will increase operational efficiency. Purchasing the site for this campus ahead of need will take advantage of lower land costs. 215 Category LA-Land Acq SY-Study LA-Land Acq LA-Land Acq Funding Source Wastewater Wastewater Wastewater Exp. E. of Agua Fri Water Exp. N. of Bell Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $200,000 $0 $0 $700,800 $0 $2,219,200 $1,080,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $700,800 $200,000 $2,219,200 $1,080,000 $200,000 $4,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $4,200,000 FY 2018-2027 Capital Improvement Program Wastewater Beardsley Plant Equipment Upgrade and Expansion Project Number: UT00314 Project Location: Beardsley Treatment Plant Description: This project will replace and update existing plant equipment and provide for the expansion of the facility. The replacement of this equipment will maintain plant reliability and increase efficiencies. The main elements are upgrades to the disinfection system, odor control, overhauling of headworks equipment, and instrumentation equipment replacement. The FY22-23 component of this project will increase plant treatment capacity from 4 MGD to 6 MGD. The project will entail expanding plant capacity using the current plant process technology at Beardsley. New basins, clarifiers, pump capacity, filters, disinfection systems, recharge capacity and backup generator power are the main elements of this project. Justification: As the facility ages existing equipment requires replacement and upgrade to maintain reliability of the existing treatment facility. Expected growth in the northern part of Peoria will require expansion of the treatment facility from the existing capacity of 4.0 MGD to 6.0 MGD. 216 Category Funding Source FY 2018 AT-Arts CB-Chargeba CO-Constructi EQ-Equipmen CO-Constructi CB-Chargeba CO-Constructi Wastewater Wastewater Wastewater Wastewater Wastewater Exp. E. of Agua Fri Water Water $0 $0 $1,113,750 $187,500 $27,865 $0 $371,250 EQ-Equipmen AT-Arts CB-Chargeba CO-Constructi Water Water Exp. N. of Bell Water Exp. N. of Bell Water Exp. N. of Bell Total Budget FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 $0 $2,250 $0 $112,500 $0 $750 $0 $0 $2,250 $0 $112,500 $0 $750 $0 $72,151 $0 $0 $0 $37,500 $0 $0 $0 $1,772,516 $153,000 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $2,250 $0 $112,500 $0 $750 $0 $52,313 $0 $6,975,000 $0 $0 $0 $0 $64,528 $2,250 $6,404,223 $0 $0 $0 $0 $375 $0 $37,500 $0 $0 $0 $0 $375 $0 $37,500 $0 $0 $0 $0 $375 $0 $37,500 $0 $0 $0 $0 $375 $0 $37,500 $0 $0 $0 $0 $118,341 $9,000 $14,642,973 $525,000 $27,865 $2,250 $371,250 $37,500 $0 $0 $0 $37,500 $0 $0 $0 $0 $17,438 $0 $2,325,000 $0 $21,507 $750 $2,134,528 $0 $125 $0 $12,500 $0 $125 $0 $12,500 $0 $125 $0 $12,500 $0 $125 $0 $12,500 $184,651 $39,445 $750 $4,509,528 $153,000 $153,000 $9,369,751 $8,627,786 $50,500 $50,500 $50,500 $50,500 $20,431,053 FY 2018-2027 Capital Improvement Program Wastewater Beardsley WRF Solids Pipeline Rehabilitation Project Number: UT00308 Project Location: Beardsley and 91st Av to 99th Av Description: This project involves the rehabilitation of an 8-inch force main that transports solids from the Beardsley Water Reclamation Facility to the sewer collector along 91st Av and then ultimately to the Butler Water Reclamation Facility. Justification: As the city's wastewater infrastructure ages, increasing importance is being placed on rehabilitation of the wastewater system. Recently, the 8-inch force main on Beardsley Road was inspected and deterioration of the system was discovered, such as cracks, settlement, pipe corrosion, etc. The rehabilitation report recommended the rehabilitation of the force main as a high priority. Staff is recommending the use of trenchless technologies to complete the work. The benefit of trenchless technology is that the existing pipeline does not have to be unearthed and replaced. Instead the existing pipeline can be used as a host for a new pipe liner. 217 Funding Source Category CB-Chargeba CO-Constructi DS-Design AT-Arts Wastewater Wastewater Wastewater Water Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $221,601 $312,709 $0 $37,478 $1,821,098 $0 $20,449 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $37,478 $2,042,699 $312,709 $20,449 $534,310 $1,879,025 $0 $0 $0 $0 $0 $0 $0 $0 $2,413,335 FY 2018-2027 Capital Improvement Program Wastewater Butler IPS Equipment Upgrade/Replacement Project Number: UT00422 Project Location: Butler Water Reclamation Facility Description: This project provides for the project coordination, public involvement, pre-design studies, design, ROW acquisition, construction, materials testing, construction administration, utility coordination, utility relocation, burying overhead facilities, as needed, clearing and grubbing, and all related sitework for replacing odor control pumps, piping and appurtenances, coating warranty inspection, barscreen rehabilitation, and a study to determine the lifespan and capacity of the existing odor control scrubber. This project may also include processing of utility company (APS, Cox, Qwest/Centurylink, SRP, etc) design and construction agreements, development and intergovernmental agreements. Justification: The Butler IPS receives wastewater flow from the Butler drainage basin and is the sole provider of wastewater to the Butler WRF, therefore it is critical to upgrade and replace aging equipment to provide continuous and reliable service to the Butler WRF. 218 Category Funding Source AT-Arts Wastewater CO-Constructi Wastewater DS-Design Wastewater Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $120,156 $28,344 $1,495 $149,500 $0 $1,495 $149,500 $0 $1,000 $100,000 $0 $1,000 $100,000 $0 $1,000 $100,000 $0 $1,000 $100,000 $0 $1,000 $100,000 $0 $1,000 $100,000 $0 $1,000 $100,000 $0 $9,990 $1,119,156 $28,344 $148,500 $150,995 $150,995 $101,000 $101,000 $101,000 $101,000 $101,000 $101,000 $101,000 $1,157,490 FY 2018-2027 Capital Improvement Program Wastewater Butler Recharge Wells (ASR) Project Number: UT00309 Project Location: Butler WRF, Municipal Operations Center, Pioneer Park Description: This project will design and construct a new Aquifer Storage and Recovery (ASR) well at or near the Butler Water Reclamation Facility, Municipal Operations Center and Butler Influent Pump Station. The project will provide for the project coordination, public involvement, pre-design studies, design, ROW acquisition, construction, materials testing, construction administration, utility coordination, utility relocation, burying overhead facilities, as needed, clearing and grubbing, grade the work area for installation of pipe, and restoration and or replacement of pavement and striping, landscaping, etc. This project may also include processing of utility company (APS, Cox, CenturyLink, SRP, SWG, EPNG, etc.) design and construction agreements, as well as development and intergovernmental agreements. Justification: Drilling and installation of new groundwater recharge wells allows the city to pump treated wastewater from the Butler Water Reclamation Facility back into the groundwater aquifer. Doing so allows the city to gain recharge credits that help maintain the city's water supply. In addition, this project would lessen the amount of effluent water needing to be sent to the New River/Agua Fria Underground Storage Project (NAUSP). This helps the city reduce the loss of long term storage credits currently being used to rent space at the NAUSP. 219 Category Funding Source AT-Arts CO-Constructi DS-Design SY-Study AT-Arts Wastewater Exp. E. of Agua Fri Wastewater Exp. E. of Agua Fri Wastewater Exp. E. of Agua Fri Wastewater Exp. E. of Agua Fri Wastewater Exp. W. of Agua Fr $0 $150,000 $21,875 $9,375 $0 $2,200 $275,000 $31,250 $0 $2,200 $563 $56,250 $21,875 $9,375 $563 $2,200 $275,000 $31,250 $0 $2,200 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $4,963 $756,250 $106,250 $18,750 $4,963 CO-Constructi DS-Design SY-Study CO-Constructi AT-Arts CO-Constructi DS-Design SY-Study AT-Arts CO-Constructi Wastewater Exp. W. of Agua Fr Wastewater Exp. W. of Agua Fr Wastewater Exp. W. of Agua Fr Water Water Exp. N. of Bell Water Exp. N. of Bell Water Exp. N. of Bell Water Exp. N. of Bell Water Exp. S. of Bell Water Exp. S. of Bell $50,000 $21,875 $9,375 $234,317 $0 $803,345 $65,625 $28,125 $0 $587,790 $275,000 $31,250 $0 $0 $6,600 $825,000 $93,750 $0 $6,600 $825,000 $56,250 $21,875 $9,375 $0 $1,688 $168,750 $65,625 $28,125 $1,688 $168,750 $275,000 $31,250 $0 $0 $6,600 $825,000 $93,750 $0 $6,600 $825,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $656,250 $106,250 $18,750 $234,317 $14,888 $2,622,095 $318,750 $56,250 $14,888 $2,406,540 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total FY 2018-2027 Capital Improvement Program Wastewater Butler Recharge Wells (ASR) DS-Design SY-Study Water Exp. S. of Bell Water Exp. S. of Bell Total Budget $65,625 $28,125 $93,750 $0 $65,625 $28,125 $93,750 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $318,750 $56,250 $2,075,452 $2,467,600 $704,502 $2,467,600 $0 $0 $0 $0 $0 $0 $7,715,154 220 FY 2018-2027 Capital Improvement Program Wastewater Butler WRF Aeration System Upgrades Project Number: UT00420 Project Location: Butler Water Reclamation Facility Description: This project provides for the project coordination, public involvement, pre-design studies, design ROW acquisition, construction, materials testing, construction administration, utility coordination, utility relocation, burying overhead facilities, as needed, clearing and grubbing, and all related sitework for the installation of new aeration system blowers at the Butler Water Reclamation Facility. This project may also include processing of utility company (APS, Cox, Qwest/Centurylink, SRP, etc) design and construction agreements, development and intergovernmental agreements. Justification: The Butler Water Reclamation Facility utilizes aeration system blowers for the wastewater treatment process. After operating the plant for the last eight years, City staff has determined that the blowers could be downsized for greater energy efficiency and operation. A study was preformed that identified the optimum size blowers for the plant and determined that installation of these new blowers would result in an annual energy savings of approx. $280,000 along with increased operational efficiencies. 221 Funding Source Category CO-Constructi DS-Design CO-Constructi DS-Design Wastewater Wastewater Water Water Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $813,442 $70,273 $269,807 $23,424 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $813,442 $70,273 $269,807 $23,424 $1,176,946 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,176,946 FY 2018-2027 Capital Improvement Program Wastewater Butler WRF Headworks Rehabilitation Project Number: UT00100 Project Location: Butler Water Reclamation Facility Description: This project provides for the project coordination, public involvement, pre-design studies, design, ROW acquisition, construction, materials testing, construction administration, utility coordination, utility relocation, burying overhead facilities, as needed, clearing and grubbing, and all related sitework for the rehabilitation of the concrete influent screening channels inside of the Butler WRF Headworks Building including coffer dam installation, concrete repairs, and coating installation. This project may also include processing of utility company (APS, Cox, Qwest/Centurylink, SRP, etc) design and construction agreements, development and intergovernmental agreements. Justification: This rehabilitation project will prevent further deterioration of the concrete channels and restore the structural integrity of the concrete and ensure the concrete is protected from exposure to corrosive gases in order to maximize the useful life of the influent screening channels. 222 Funding Source Category AT-Arts CO-Constructi SY-Study AT-Arts CO-Constructi SY-Study Wastewater Wastewater Wastewater Water Water Water Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $285,000 $37,500 $0 $85,000 $12,500 $3,000 $300,000 $0 $1,000 $100,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $3,000 $585,000 $37,500 $1,000 $185,000 $12,500 $420,000 $404,000 $0 $0 $0 $0 $0 $0 $0 $0 $824,000 FY 2018-2027 Capital Improvement Program Wastewater Butler WRF Plant Equipment Upgrade and Replacement Project Number: UT00333 Project Location: Butler Water Reclamation Facility Description: The Butler Water Reclamation Facility (WRF) is a complex, highly automated wastewater treatment facility. Equipment operates in, or is exposed to, harsh environmental conditions. As equipment degrades or ages, replacement is required. Some of the larger pieces of equipment identified for replacement or major rebuilding/over-haul include the Influent Pump Station (IPS), various pumps and motors, centrifuge scrolls, various variable frequency drives, and chemical systems. Justification: The Butler WRF and the IPS provide wastewater treatment services to approximately two thirds of Peoria’s customers. Repairing and replacing equipment is an important part of keeping this facility in operating condition and in compliance with all applicable permits and regulatory requirements. 223 Category Funding Source CO-Constructi Wastewater EQ-Equipmen Wastewater EQ-Equipmen Water Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $124,355 $341,468 $141,250 $0 $135,000 $45,000 $0 $135,000 $45,000 $0 $135,000 $45,000 $0 $75,000 $25,000 $0 $75,000 $25,000 $0 $75,000 $25,000 $0 $75,000 $25,000 $0 $75,000 $25,000 $0 $75,000 $25,000 $124,355 $1,196,468 $426,250 $607,073 $180,000 $180,000 $180,000 $100,000 $100,000 $100,000 $100,000 $100,000 $100,000 $1,747,073 FY 2018-2027 Capital Improvement Program Wastewater Dixileta 21 inch Sewer Extension Project Number: UT00404 Project Location: Varies Description: Project includes the addition of 2,200 linear feet of new 21-inch VCP sewer main. Pipeline construction will occur in undeveloped territory. Justification: This extension is part of a regional sewer needed to allow for future development in the area. Category Funding Source FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total 224 CO-Constructi Wastewater Expansion Post 1/1/ $1,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,000,000 Total Budget $1,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,000,000 FY 2018-2027 Capital Improvement Program Wastewater El Mirage Road Sewer Infrastructure Upsizing Project Number: UT00432 Project Location: El Mirage Rd from Westland Rd to Jomax Rd Description: This project provides for the project coordination, public involvement, pre-design studies, design, ROW acquisition, construction, materials testing, construction administration, utility coordination, utility relocation, burying overhead facilities, as needed, clearing and grubbing, and all related sitework for the installation of a new trunk sewer main primarily along El Mirage Road from Westland Road to Jomax Road. This project may also include processing of utility company (APS, Cox, Qwest/Centurylink, SRP, etc) design and construction agreements, development and intergovernmental agreements. Justification: While this trunk sewer main is expected to be constructed by developers in the area, the City will often look to "oversize" a main to meet future development needs beyond those of the developer. This process is done through a development agreement where the City reimburses the developer for the oversize cost. 225 Category Funding Source FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total AT-Arts Wastewater Exp. W. of Agua Fr CO-Constructi Wastewater Exp. W. of Agua Fr $0 $0 $0 $0 $0 $0 $19,506 $1,950,550 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $19,506 $1,950,550 Total Budget $0 $0 $0 $1,970,056 $0 $0 $0 $0 $0 $0 $1,970,056 FY 2018-2027 Capital Improvement Program Wastewater Jomax WRF Expansion Project Number: UT00388 Project Location: Jomax Water Reclamation Facility, Jomax Rd., east of El Mirage Rd. Description: This project will include design and construction of an expansion to the Jomax WRF located just north of the Beardsley Canal and west of the Agua Fria River. The current treatment capacity of the Jomax WRF is 2.25 million gallons per day (MGD). Development in the north and northwest portions of the city will require that additional treatment capacity be added at this facility to meet the needs of continuing development in the area. As currently planned the WRF will be expanded by 2.75 MGD to 5 MGD in accordance with the Integrated Water Utilities Master Plan. Peoria's cost share is for an additional 1.25 MGD. Justification: The Jomax Water Reclamation Facility was originally constructed in 2005 to treat wastewater generated by the northwest area of Peoria and is located on Jomax Road, east of El Mirage Road. This facility is a regional wastewater treatment and reclamation facility serving the needs of the Vistancia and Trilogy communities and the surrounding area. The plant has previously been expanded from 0.75 MGD to its current capacity of 2.25 MGD. Development within Vistancia, Saddleback Heights, and Trilogy West will require that the facility be expanded to provide required treatment capacity. 226 Category Funding Source AT-Arts CO-Constructi SY-Study AT-Arts CO-Constructi Wastewater Wastewater Wastewater Wastewater Exp. W. of Agua Fr Wastewater Exp. W. of Agua Fr $0 $0 $0 $0 $0 $0 $0 $143,475 $0 $0 $0 $0 $0 $14,602 $0 $1,634 $163,357 $0 $0 $0 $208 $20,762 $0 $21,281 $2,128,100 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,842 $184,119 $143,475 $35,883 $2,128,100 DS-Design AT-Arts CO-Constructi DS-Design AT-Arts CO-Constructi SY-Study AT-Arts CO-Constructi AT-Arts Wastewater Exp. W. of Agua Fr Water Exp. N. of Bell Water Exp. N. of Bell Water Exp. N. of Bell Water Expansion Post 1/1/12 Water Expansion Post 1/1/12 Water Expansion Post 1/1/12 WIFA Bonds WIFA Bonds WIFA Bonds 2006 Clean Water $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $47,825 $0 $0 $0 $1,445,559 $4,867 $0 $481,853 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $24,504 $2,450,355 $138,854 $0 $29,586 $2,958,578 $0 $519 $51,905 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,445,559 $34,453 $2,958,578 $481,853 $519 $51,905 $47,825 $24,504 $2,450,355 $138,854 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total FY 2018-2027 Capital Improvement Program Wastewater Jomax WRF Expansion CO-Constructi WIFA Bonds 2006 Clean Water $0 $0 $0 $13,885,344 $0 $0 $0 $0 $0 $0 $13,885,344 Total Budget $0 $191,300 $1,946,881 $16,664,048 $5,210,939 $0 $0 $0 $0 $0 $24,013,168 227 FY 2018-2027 Capital Improvement Program Wastewater Jomax WRF Operational Improvement/Upgrade/Replace Project Number: UT00323 Project Location: Jomax WRF Description: The equipment at Jomax Water Reclamation Facility is exposed to a harsh wastewater environment and is subject to continuous operation. Replacement of equipment is required as the facility ages. An efficiency study provided an energy and equipment audit focusing on replacement needs and more efficient technology. Potential projects determined via the study and additional operations evaluation include scrubber replacement with more efficient technology, turbo blower addition with more efficient technology, electrical component replacements and upgrades, influent screens and screening components, various pumps. Justification: Jomax WRF is the sole supplier of wastewater services to our Vistancia area residents and is a critical facility to foster growth in that area. Replacement and upgrade of treatment components and equipment ensure that the facility is ready to provide continuous, reliable service. This is not only important for our core service but is required by county and state regulations. 228 Funding Source Category AT-Arts CO-Constructi AT-Arts CO-Constructi Wastewater Wastewater Water Water Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $98,901 $0 $33,126 $375 $37,500 $125 $12,500 $563 $56,250 $188 $18,750 $750 $75,000 $250 $25,000 $375 $37,500 $125 $12,500 $375 $37,500 $125 $12,500 $375 $37,500 $125 $12,500 $375 $37,500 $125 $12,500 $375 $37,500 $125 $12,500 $375 $37,500 $125 $12,500 $3,938 $492,651 $1,313 $164,376 $132,027 $50,500 $75,751 $101,000 $50,500 $50,500 $50,500 $50,500 $50,500 $50,500 $662,278 FY 2018-2027 Capital Improvement Program Wastewater Lift Station Reconditioning Project Number: UT00116 Project Location: Citywide Description: This project addresses ongoing needs at all City of Peoria lift stations. The funds will be used to address pre-treatment, odor control, corrosion prevention, eye wash units, equipment upgrades, replacements, and efficiency/cost savings projects. The city has 13 lift stations in the wastewater collection system. Justification: Wastewater lift stations operate in a very corrosive environment where equipment damage and odor generation are ongoing issues. Maintaining operational efficiencies and extending the life of these facilities can be accomplished through effective replacement and upgrade of key components. 229 Category Funding Source AT-Arts Wastewater CO-Constructi Wastewater Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $736,941 $3,800 $380,000 $3,800 $380,000 $3,800 $380,000 $3,800 $380,000 $3,800 $380,000 $3,800 $380,000 $3,800 $380,000 $3,800 $380,000 $3,800 $380,000 $34,200 $4,156,941 $736,941 $383,800 $383,800 $383,800 $383,800 $383,800 $383,800 $383,800 $383,800 $383,800 $4,191,141 FY 2018-2027 Capital Improvement Program Wastewater Manhole Rehabilitation Project Number: UT00307 Project Location: Citywide Description: This project will repair and rehabilitate manholes throughout the city's wastewater collection system. The city has over 14,000 manholes with an expected life of 30 to 50 years. Manholes to be rehabilitated were identified in a sewer line assessment done in FY11. Justification: As the city's wastewater collection system ages, capital repairs and maintenance are necessary to ensure continuous and reliable service. Rehabilitation restores the structural integrity of manholes, stops water infiltration and exfiltration, and protects manholes from deterioration from exposure to corrosive gases present in the sewer system. Proactive rehabilitation projects help ensure these assets reach their maximum useful life and minimizes system failures. The cost to renovate a single manhole is $4,000 - $10,000 and is dependent on the size and condition of the manhole. 230 Category Funding Source AT-Arts Wastewater CB-Chargeba Wastewater CO-Constructi Wastewater Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $0 $365,153 $2,725 $2,500 $272,500 $2,725 $2,500 $272,500 $2,725 $2,500 $272,500 $2,725 $2,500 $272,500 $2,725 $2,500 $272,500 $2,725 $2,500 $272,500 $2,725 $2,500 $272,500 $2,725 $2,500 $272,500 $2,725 $2,500 $272,500 $24,525 $22,500 $2,817,653 $365,153 $277,725 $277,725 $277,725 $277,725 $277,725 $277,725 $277,725 $277,725 $277,725 $2,864,678 FY 2018-2027 Capital Improvement Program Wastewater Miscellaneous Local Wastewater Line Improvements Project Number: UT00191 Project Location: Citywide Description: This project provides funding to rehabilitate, realign, or extend the city's existing wastewater collection system to ensure its continued compliant and efficient operation. Examples, though not limited to, include sewer extensions in coordination with street improvement projects, realignment/rehabilitation of downtown alley sewer mains, and immediate need sewer repairs. Justification: The city's wastewater collection system requires ongoing upgrading and rehabilitation to ensure efficient and reliable operation. In addition, these funds provide means for the Public Works-Utilities Department to take advantage of coordinating efforts with other city projects to ensure a complete total project. This project provides for the repair of historical problem areas and also minimizes the risk of sanitary sewer overflows. 231 Category Funding Source AT-Arts Wastewater CB-Chargeba Wastewater CO-Constructi Wastewater Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $0 $200,000 $2,000 $2,000 $200,000 $2,000 $2,000 $200,000 $2,000 $2,000 $200,000 $2,000 $2,000 $200,000 $2,000 $2,000 $200,000 $2,000 $2,000 $200,000 $2,000 $2,000 $200,000 $2,000 $2,000 $200,000 $2,000 $2,000 $200,000 $18,000 $18,000 $2,000,000 $200,000 $204,000 $204,000 $204,000 $204,000 $204,000 $204,000 $204,000 $204,000 $204,000 $2,036,000 FY 2018-2027 Capital Improvement Program Wastewater Reclaimed Water Booster Land Purchase at IPS Project Number: UT00329 Project Location: 99th Av and Northern Av Description: This project provides funding for the purchase of land directly around the influent pump station for a reclaimed water booster station and reservoir. This land is estimated at 213,939 square feet. The actual total may vary. Justification: Land immediately adjacent to the IPS is needed for vadose zone recharge wells and a reclaimed water booster station. The area will also allow for development of a small outdoor educational center on water sustainability with access to the New River trail system. Category Funding Source 232 LA-Land Acq Wastewater LA-Land Acq Water Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $162,500 $481,330 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $162,500 $481,330 $643,830 $0 $0 $0 $0 $0 $0 $0 $0 $0 $643,830 FY 2018-2027 Capital Improvement Program Wastewater SROG Line Assessment& Repair Project Number: UT00321 Project Location: 99th Avenue from Olive to Hwy 10 Description: This project will fund a portion of an assessment and rehabilitation effort to be done to the 99th Avenue West Sub Regional Operating Group (SROG) interceptor. Under the SROG agreement, the City of Peoria is responsible for 21.68 percent of all capital costs associated with this line. In addition, the agreement details a 56 percent cost share of assessment and rehabilitation of a flow meter vault (GL02). The rehabilitation of GL02 will be included in this project. Justification: In case of a wastewater treatment emergency, a bypass to the 99th Avenue interceptor can deliver the City's raw wastewater to the SROG system. Having this backup in place is key to effectively managing and maintaining the City's wastewater system. 233 Category Funding Source AT-Arts Wastewater CO-Constructi Wastewater SY-Study Wastewater Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $817,407 $103,481 $0 $0 $0 $0 $0 $0 $1,691 $169,104 $0 $2,211 $221,136 $0 $4,965 $496,472 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $8,867 $1,704,119 $103,481 $920,888 $0 $0 $170,795 $223,347 $501,437 $0 $0 $0 $0 $1,816,467 FY 2018-2027 Capital Improvement Program Wastewater Trunk Sewer Line Inspection Project Number: UT00322 Project Location: Citywide Description: This project will perform an inspection and assessment of all sanitary sewer mains 15 inches and larger within the wastewater collection system on a five-year basis to ensure the structural and operational viability of these large sewer mains. In addition, this project will perform an assessment of the City's existing sanitary sewer force mains. These assessments will identify any existing or potential structural and operational issues. Justification: An original assessment of all trunk sewer lines was executed in FY 2011 and FY 2012. This original inspection created a condition baseline and generated multiple projects that were completed by a subsequent CIP project and improved the condition of the collection system. As sewer lines age and operate in a very harsh environment, periodic assessments are needed to monitor the condition of the infrastructure, providing a proactive approach and increasing the performance predictability of the system. 234 Funding Source Category SY-Study Wastewater Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $700,000 $0 $0 $0 $0 $600,000 $0 $0 $0 $0 $1,300,000 $700,000 $0 $0 $0 $0 $600,000 $0 $0 $0 $0 $1,300,000 FY 2018-2027 Capital Improvement Program Wastewater Trunk Sewer Rehabilitation Project Number: UT00296 Project Location: Citywide Description: Project includes the rehabilitation of approx. 3,300 LF of T-LOCK RCP trunk sewer pipe utilizing the CIPP process. Locations were selected from the 2015 Trunk Sewer System Condition Assessment. Locations include four segments on Beardsley Road from 107th Avenue to 111th Avenue and three segments at various locations along New River from Peoria to Thunderbird. Justification: The City's Public Works/Utilities Department performs regular condition assessments of our existing sewer infrastructure to identify areas of concern. A recent assessment completed in 2015 identified several trunk sewer segments in need of rehabilitation. This project will address those segments. 235 Category Funding Source AT-Arts Wastewater CO-Constructi Wastewater DS-Design Wastewater Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $2,363,745 $0 $12,900 $1,290,000 $202,100 $5,022 $502,078 $47,900 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $17,922 $4,155,823 $250,000 $2,363,745 $1,505,000 $555,000 $0 $0 $0 $0 $0 $0 $0 $4,423,745 FY 2018-2027 Capital Improvement Program Wastewater Wastewater System Additional R & M Expense Project Number: UT00436 Project Location: Citywide Description: This project will provide for major repair, maintenance, and rehabilitation of our wastewater infrastructure, inluding the Beardsley, Butler, Jomax and Quintero Water Reclamation Facilities, lift stations, mains and manholes. Justification: Aging infrastructure requires additional major repair, maintenance, and rehabilitation to extend the life of wastewater utility assets and to ensure uninterrupted service to our customers. Planning and funding major repair, maintenance, and rehabilitation projects as opposed to addressing concerns reactively allows for coordinated scheduling, and reduces both service interruption duration and overall project costs. 236 Category Funding Source AT-Arts Wastewater CO-Constructi Wastewater Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $0 $0 $0 $14,000 $700,000 $14,000 $700,000 $14,000 $700,000 $14,000 $700,000 $14,000 $700,000 $14,000 $700,000 $14,000 $700,000 $14,000 $700,000 $112,000 $5,600,000 $0 $0 $714,000 $714,000 $714,000 $714,000 $714,000 $714,000 $714,000 $714,000 $5,712,000 FY 2018-2027 Capital Improvement Program Wastewater West Agua Fria Wastewater Lines Project Number: UT00171 Project Location: Vistancia Development Description: This project will provide additional wastewater collection capacity throughout the Vistancia community. The Vistancia Utilities Master Plan identified the wastewater trunk sewers that are needed to support the Vistancia wastewater system. The city is funding oversizing of selected wastewater trunk sewers to provide collection system capacity for new development in surrounding areas. Justification: This project provides for additional collection capacity in the wastewater system in the Vistancia area. These lines are part of the Wastewater Master Plan and will be used to convey wastewater to the appropriate treatment facility. 237 Category Funding Source FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total AT-Arts Wastewater Exp. W. of Agua Fr CO-Constructi Wastewater Exp. W. of Agua Fr CO-Constructi Wastewater Expansion Post 1/1/ $0 $184,525 $770,000 $1,978 $197,800 $0 $4,851 $485,100 $0 $2,473 $247,250 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $9,302 $1,114,675 $770,000 Total Budget $954,525 $199,778 $489,951 $249,723 $0 $0 $0 $0 $0 $0 $1,893,977 City of Peoria FY 2018 – FY2027 Capital Improvement Program 238 City of Peoria FY 2018 Annual Program Budget Capital Improvement Program Water Water operations are considerably more complex than one might imagine. Acquisition of the water itself is only the first step, whether it comes from renewable sources like the Colorado River or the city’s own well sites. A successful water operation depends upon large treatment facilities, as well as a network of infrastructure to distribute water to the facilities for treatment and then ultimately to the users. impact fees. The 10-year program includes funding for an additional 10 million gallons per day of treatment capacity to serve the growing needs for water in the northern portion of Peoria, replacement of water meters that are using transmission technology and equipment that has reached the end of its useful life as well as upgrading existing water distribution and production sites to address reliability and efficiency issues as these facilities age. These upgrades allow the system to continue to operate with reliability, efficiency, and redundancy as well as ensuring water quality. Like wastewater projects, water infrastructure is funded primarily through operating revenues from user fees, revenue bonds, and development Water Total ‐ $209,740,913 $45,000,000 $40,000,000 $35,000,000 $30,000,000 $25,000,000 $20,000,000 $15,000,000 $10,000,000 $5,000,000 $0 FY18 FY19 FY20 FY21 FY22 239 FY23 FY24 FY25 FY26 FY27 FY 2018-2027 Capital Improvement Program Water Water Summary by Project Project Name Pg# FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 23-27 103rd Ave 12" Waterline Northern to Olive 243 75 Ave 16-inch Waterline, Cactus and Peoria $701,442 $0 $0 $0 $0 $0 $701,442 244 $1,552,831 $0 $0 $0 $0 $0 $1,552,831 75th Ave 16" Waterline Cholla St to Thunderbird Rd 245 $0 $0 $0 $910,429 $1,508,533 $0 $2,418,962 75th Avenue and Grand PRV Upgrade 246 $0 $227,683 $371,973 $0 $0 $0 $599,656 85th Avenue Reclaimed Waterline-Mtn View to Grand 247 $0 $0 $1,359,276 $0 $0 $0 $1,359,276 ADOT Well-Sports Complex Well Connection 249 $0 $2,574,962 $0 $0 $0 $0 $2,574,962 Agua Fria Booster/PRV 250 $3,970,000 $0 $0 $0 $0 $0 $3,970,000 Butler Well Site Rehabilitation 251 $1,317,265 $0 $0 $0 $0 $0 $1,317,265 Central Arizona Project Curtailment Study 252 $50,000 $0 $0 $0 $0 $0 $50,000 Condition Assessment of Remote Sites 253 $80,966 $300,000 $0 $0 $0 $0 $380,966 Desert Harbor-Arrowhead Shores Well Mixing 254 $2,126,112 $1,000,000 $0 $0 $0 $0 $3,126,112 El Mirage Road Waterline Upsizing 255 $0 $0 $0 $1,695,790 $0 $0 $1,695,790 Fire Hydrant Infill and Replacement 256 $331,598 $161,600 $161,600 $161,600 $161,600 $808,000 $1,785,998 Greenway Plant Equipment Upgrade/Replacement 257 $251,789 $102,000 $102,000 $102,000 $102,000 $510,000 $1,169,789 Greenway WTP 8 MGD Expansion 258 $0 $0 $0 $0 $0 $31,694,078 $31,694,078 Hillcrest 8 inch Waterline 259 $588,583 $0 $0 $0 $0 $0 $588,583 Integrated Utility Master Plan 260 $0 $0 $0 $0 $336,000 $224,000 $560,000 Jomax In-Line Booster Station Upgrades 261 $0 $2,607,146 $0 $0 $0 $0 $2,607,146 Lake Plsnt Pkwy 24-inch Waterline; Loop 303- LPWTP 262 $0 $0 $0 $0 $1,685,749 $4,796,265 $6,482,014 Lone Mtn Pkwy 36-inch Waterline; LPP to L303 263 $3,236,382 $0 $0 $0 $0 $0 $3,236,382 Miscellaneous Local Waterline Improvements 264 $386,658 $308,000 $308,000 $207,000 $207,000 $1,035,000 $2,451,658 New River Utility Co. Acquisition & Improvements 265 $4,000,000 $0 $0 $0 $425,000 $2,125,000 $6,550,000 Northern Community Park Well 266 $655,017 $1,322,354 $0 $0 $0 $0 $1,977,371 Patterson Well-W209, W210 Well Mixing 267 $0 $0 $0 $484,166 $5,594,841 $0 $6,079,007 Pyramid Peak Water Treatment Plant Upgrades 268 $1,153,000 $2,232,642 $1,742,723 $297,500 $297,500 $1,487,500 $7,210,865 Pyramid Peak Water Treatment Plant Expansion 269 $7,885,266 $24,176,436 $21,713,897 $1,200,000 $0 $0 $54,975,599 240 Total FY 2018-2027 Capital Improvement Program Water Water Summary by Project Project Name Pg# FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 23-27 Quintero Plant Equipment Upgrade/Replacement 270 SCADA Equipment Replacement $267,458 $245,785 $0 $0 $0 $0 $513,243 271 $410,522 $150,000 $150,000 $150,000 $150,000 $750,000 $1,760,522 Technology and Security Master Plan 272 $0 $300,000 $0 $0 $0 $0 $300,000 Terramar Booster Pump Station Rehabilitation 273 $0 $1,018,213 $1,018,214 $0 $0 $0 $2,036,427 Thunderbird Rd 16" Watermain Replacement 274 $500,000 $0 $0 $0 $0 $0 $500,000 Utility Billing System 275 $0 $0 $0 $0 $0 $2,800,000 $2,800,000 Ventana Well, Booster Rehabilitation 276 $2,000,000 $0 $0 $0 $0 $0 $2,000,000 W108 Bailey Well Site Improvements 277 $0 $0 $0 $500,439 $0 $0 $500,439 Water & Wastewater Rate Study 278 $90,000 $0 $0 $90,000 $0 $180,000 $360,000 Water Facility Reconditioning 279 $891,533 $813,000 $813,000 $813,000 $813,000 $4,065,000 $8,208,533 Water Line Assessment and Replacement 280 $0 $1,010,000 $1,010,000 $0 $0 $0 $2,020,000 Water Meter Replacement Program 281 $1,274,092 $0 $0 $1,500,000 $1,500,000 $4,500,000 $8,774,092 Water System Additional R & M Expense 282 $0 $0 $816,000 $816,000 $816,000 $4,080,000 $6,528,000 Water/Wastewater Hydraulic Model Update 283 $200,000 $200,000 $0 $0 $0 $0 $400,000 Water/Wastewater/Expansion Fee Update 284 $100,000 $0 $100,000 $0 $0 $200,000 $400,000 Wellhead Water Quality Mitigation 285 $3,702,820 $0 $0 $0 $0 $0 $3,702,820 Wells - New Construction 286 $0 $959,370 $2,039,055 $0 $0 $0 $2,998,425 West Agua Fria Water Lines 287 $792,987 $184,830 $327,998 $580,144 $551,460 $866,580 $3,303,999 Western Area CAP Pump Station 288 $0 $400,773 $3,091,014 $0 $0 $0 $3,491,787 Westland Rd. Reservoir and Booster Station 289 $1,487,836 $0 $0 $0 $0 $0 $1,487,836 White Mountain Apache Tribe Water Rights Purchase 290 $2,209,306 $457,395 $431,505 $0 $0 $0 $3,098,206 Zone 1/2 PRV Upgrades (91st and Cactus) 291 $0 $1,514,095 $0 $0 $0 $0 $1,514,095 Zone 5E/6E PRV Station 292 $0 $0 $0 $0 $5,926,737 $0 $5,926,737 $42,213,463 $42,266,284 $35,556,255 $9,508,068 $20,075,420 $60,121,423 $209,740,913 Total - Water 241 Total FY 2018-2027 Capital Improvement Program Water Water Summary by Funding Source Fund Number and Name FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 23-27 Total 2050 - Water $16,278,794 $12,895,612 $9,764,383 $7,407,924 $14,656,083 $18,181,500 $79,184,296 2161 - Water Expansion $2,713,986 $0 $0 $0 $0 $0 $2,713,986 2162 - Water Expansion Post 1/1/12 $5,241,534 $496,594 $0 $0 $28,620 $64,080 $5,830,828 2163 - Water Exp. S. of Bell $3,000 $13,500 $387,356 $0 $18,000 $37,000 $458,856 2164 - Water Exp. N. of Bell $6,589,973 $1,315,200 $2,794,409 $1,480,144 $4,629,717 $6,017,765 $22,827,208 2167 - Water Resource Fee 2014 $1,183,286 $457,395 $431,505 $0 $0 $0 $2,072,186 2270 - WIFA Bonds $8,826,525 $26,687,983 $21,713,897 $0 $0 $31,694,078 $88,922,483 2400 - Wastewater $1,326,365 $400,000 $159,953 $620,000 $584,000 $2,571,000 $5,661,318 2506 - Wastewater Exp. E. of Agua Fria $29,500 $0 $156,876 $0 $93,810 $269,040 $549,226 2507 - Wastewater Exp. W. of Agua Fria $11,500 $0 $147,876 $0 $65,190 $186,960 $411,526 2509 - Wastewater Expansion Post 1/1/12 $9,000 $0 $0 $0 $0 $0 $9,000 2590 - Commercial Solid Waste $0 $0 $0 $0 $0 $250,000 $250,000 2600 - Residential Solid Waste $0 $0 $0 $0 $0 $600,000 $600,000 2650 - Solid Waste Expansion $0 $0 $0 $0 $0 $250,000 $250,000 $42,213,463 $42,266,284 $35,556,255 $9,508,068 $20,075,420 $60,121,423 $209,740,913 Total - Water 242 FY 2018-2027 Capital Improvement Program Water 103rd Ave 12" Waterline Northern to Olive Project Number: UT00392 Project Location: 103rd Ave Northern to Olive Description: This project provides for the project coordination, public involvement, pre-design studies, design, ROW acquisition, construction, materials testing, construction administration, utility coordination, utility relocation, burying overhead facilities, as needed, clearing and grubbing, and all related sitework for installation of new 12" waterlines to replace existing AC and PVC pipe through the construction limits of the project, 103rd Ave Northern to Olive and, including fittings, valves, hydrants, appurtenances and abandonment of replaced waterlines, and restoration and or replacement of pavement, including, landscaping, etc. This project may also include processing of utility company (APS, Cox, Qwest/Centurylink, SRP, etc) design and construction agreements, development and intergovernmental agreements. This project is anticipated to be constructed in association with the city street improvement project EN00422, which will be combined into one managed project. Justification: Major water transmission pipelines and booster stations are required to convey and deliver surface water. This reach of waterline is dependent upon and being coordinated with the 103rd Ave Street project. Replacement of aging waterlines within the construction limits will prevent disturbing the new street for some years to come. 243 Category Funding Source CO-Constructi Water Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $701,442 $0 $0 $0 $0 $0 $0 $0 $0 $0 $701,442 $701,442 $0 $0 $0 $0 $0 $0 $0 $0 $0 $701,442 FY 2018-2027 Capital Improvement Program Water 75 Ave 16-inch Waterline, Cactus and Peoria Project Number: UT00143 Project Location: 75th Av, Cactus and Peoria intersections Description: This project provides for the project coordination, public involvement, pre-design studies, design, ROW acquisition, construction, materials testing, construction administration, utility coordination, utility relocation, burying overhead facilities, as needed, clearing and grubbing, and all related sitework for installation of new waterlines to replace existing AC and PVC Pipe through the construction limits of each intersection, 75th and Cactus and 75th and Peoria and to install new 16" watermain on 75th Ave. through the construction limits of the Cactus intersection, including fittings, valves, hydrants, appurtenances and abandonment of replaced waterlines, and restoration and or replacement of pavement, including, landscaping, etc. This project may also include processing of utility company (APS, Cox, Qwest/Centurylink, SRP, etc) design and construction agreements, development and intergovernmental agreements. This project is anticipated to be constructed in association with the City street intersection improvement projects EN00081 and EN00088, which will be combined into one managed project by ADOT. 244 Justification: Major water transmission pipelines and booster stations are required to convey and deliver surface water. These pipelines will connect the water treatment plant to the local water distribution system. This waterline was recommended by the Water Infrastructure Master Plan. This reach of waterline is dependent upon and being coordinated with the 75th Av and Cactus Road intersection projects. Replacement of aging waterlines within the construction limits of each intersection will prevent disturbing the new intersections for some years to come. Category Funding Source CO-Constructi Water Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $1,552,831 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,552,831 $1,552,831 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,552,831 FY 2018-2027 Capital Improvement Program Water 75th Ave 16" Waterline Cholla St to Thunderbird Rd Project Number: UT00400 Project Location: 75th Ave Cholla St to Thunderbird Rd Description: This project provides for the project coordination, public involvement, pre-design studies, design, ROW acquisition, construction, materials testing, construction administration, utility coordination, utility relocation, burying overhead facilities, as needed, clearing and grubbing, and all related sitework for installation of new ductile iron waterlines to replace existing AC and PVC Pipe along 75th Avenue from Cholla Street to Thunderbird Road excluding segments constructed with the Thunderbird Road and Cactus Road intersection widening projects. Install new 16" watermain, including fittings, valves, hydrants, appurtenances and abandonment of existing replaced waterlines, and restoration and or replacement of pavement, including, landscaping, as necessary, etc. This project may also include processing of utility company (APS, Cox, Qwest/Centurylink, SRP, etc) design and construction agreements, development and intergovernmental agreements. This project is anticipated to be constructed separately from the 75th Avenue and Cactus Road Intersection Safety improvements project EN00088 and will be managed by City of Peoria. 245 Justification: Major water transmission pipelines and booster stations are required to convey and deliver surface water. These pipelines will connect the water treatment plant to the local water distribution system. This waterline was recommended by the Water Infrastructure Master Plan. These reaches of waterline are dependent upon and being coordinated with the 75th Avenue and Cactus Road Intersection project. Replacement of aging waterlines within the construction limits of each intersection will prevent disturbing the new intersections for some years to come. Funding Source Category AT-Arts FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total Water $0 $0 $0 $7,983 $15,968 $0 $0 $0 $0 $0 $23,951 CO-Constructi Water DS-Design Water $0 $0 $0 $0 $0 $0 $746,170 $156,276 $1,492,565 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,238,735 $156,276 $0 $0 $0 $910,429 $1,508,533 $0 $0 $0 $0 $0 $2,418,962 Total Budget FY 2018-2027 Capital Improvement Program Water 75th Avenue and Grand PRV Upgrade Project Number: UT00408 Project Location: 75th Avenue and Grand Description: Project includes the abandonment and demolition of an existing PRV station located at 75th Avenue and Grand Avenue. A new PRV station, located in the same vicinity, will be constructed per City standards. The project will upsize the existing 8-inch PRV to a 10-inch, and add a 4-inch low flow bypass as well. Justification: The current pressure reducing valve station (PRV) at 75th Avenue and Grand Avenue is not to current City standards. A PRV is needed at the intersection to allow drinking water to flow between two City pressure zones (1 and 2). By removing the older, substandard PRV the City can construct a new PRV station that is much more efficient and safe for City maintenance staff. In addition, staff cannot currently control this PRV through our SCADA system. This project will add the required SCADA elements to allow for remote monitoring and operation that will increase staff efficiency. 246 Funding Source Category AT-Arts CB-Chargeba CO-Constructi DS-Design Water Water Water Water Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $0 $0 $0 $1,854 $12,642 $171,463 $41,724 $3,708 $25,289 $342,976 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,562 $37,931 $514,439 $41,724 $0 $227,683 $371,973 $0 $0 $0 $0 $0 $0 $0 $599,656 FY 2018-2027 Capital Improvement Program Water 85th Avenue Reclaimed Waterline-Mtn View to Grand Project Number: UT00310 Project Location: 85th Av Mountain View Rd to Grand Av Description: This project provides for the project coordination, public involvement, pre-design studies, design, ROW acquisition, construction, materials testing, construction administration, utility coordination, utility relocation, burying overhead facilities, as needed, clearing and grubbing, and all related sitework for the installation of approx. 4,170 linear feet of new 12-inch ductile iron reclaimed waterline and appurtenances on 85th Av from Mountain View Road to Grand Av. This project may also include processing of utility company (APS, Cox, Qwest/CenturyLink, SRP, etc.) design and construction agreements, as well as development and intergovernmental agreements. Justification: This project will expand the reclaimed water system in Old Town Peoria. Installation of new reclaimed waterlines allows for reclaimed water to be used for landscape irrigation in parks, schools, and the city right-of-way. By providing reclaimed water for these customers, the city helps preserve valuable drinking water resources. This new 12-inch reclaimed waterline will expand the reclaimed water system in Old Town Peoria and provide reclaimed water to Osuna Park, as well as other potential customers. 247 Category Funding Source AT-Arts CB-Chargeba CO-Constructi DS-Design AT-Arts CB-Chargeba Wastewater Wastewater Wastewater Wastewater Wastewater Exp. E. of Agua Fri Wastewater Exp. E. of Agua Fri $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $876 $2,355 $79,864 $1,858 $1,313 $3,531 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $876 $2,355 $79,864 $1,858 $1,313 $3,531 CO-Constructi DS-Design AT-Arts CB-Chargeba CO-Constructi DS-Design AT-Arts CB-Chargeba CO-Constructi DS-Design Wastewater Exp. E. of Agua Fri Wastewater Exp. E. of Agua Fri Wastewater Exp. W. of Agua Fr Wastewater Exp. W. of Agua Fr Wastewater Exp. W. of Agua Fr Wastewater Exp. W. of Agua Fr Water Water Water Water $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $119,746 $2,786 $1,313 $3,531 $119,746 $2,786 $2,627 $7,065 $239,593 $5,574 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $119,746 $2,786 $1,313 $3,531 $119,746 $2,786 $2,627 $7,065 $239,593 $5,574 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total FY 2018-2027 Capital Improvement Program Water 85th Avenue Reclaimed Waterline-Mtn View to Grand AT-Arts CB-Chargeba CO-Constructi DS-Design AT-Arts CB-Chargeba CO-Constructi Water Exp. N. of Bell Water Exp. N. of Bell Water Exp. N. of Bell Water Exp. N. of Bell Water Exp. S. of Bell Water Exp. S. of Bell Water Exp. S. of Bell $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 DS-Design Water Exp. S. of Bell $0 $0 Total Budget $3,940 $10,600 $359,454 $8,362 $3,940 $10,600 $359,454 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $3,940 $10,600 $359,454 $8,362 $3,940 $10,600 $359,454 $0 $8,362 $0 $0 $0 $0 $0 $0 $0 $8,362 $0 $1,359,276 $0 $0 $0 $0 $0 $0 $0 $1,359,276 248 FY 2018-2027 Capital Improvement Program Water ADOT Well-Sports Complex Well Connection Project Number: UT00327 Project Location: Sports Complex Description: This project provides for the project coordination, public involvement, pre-design studies, design, ROW acquisition, construction, materials testing, construction administration, utility coordination, utility relocation, burying overhead facilities, as needed, clearing and grubbing, and all related sitework for installation of 12-inch waterline and appurtenances on 83rd Av and Paradise Lane from the Sports Complex well site to the ADOT well metering site, and restoration and/or replacement of pavement and striping, landscaping, etc. Installation of arsenic treatment is included in this project. This project may also include processing of utility company (APS, Cox, CenturyLink, SRP, SWG, EPNG, etc.) design and construction agreements, as well as development and intergovernmental agreements. Justification: The Sports Complex and ADOT well sites are known for having arsenic levels approaching or exceeding the maximum contaminant limit (MCL). By blending the water produced from both wells, the arsenic levels should be below the MCL enough to allow the city to begin using these wells for potable water purposes again. Bringing these wells back online for potable purposes provides a good source of added system redundancy in our water system. 249 Category AT-Arts CO-Constructi DS-Design SY-Study AT-Arts Funding Source FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total Water Water Water Water Water Expansion Post 1/1/12 $0 $0 $0 $0 $0 $21,467 $1,683,429 $463,246 $46,325 $3,495 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $21,467 $1,683,429 $463,246 $46,325 $3,495 CO-Constructi Water Expansion Post 1/1/12 DS-Design Water Expansion Post 1/1/12 SY-Study Water Expansion Post 1/1/12 $0 $0 $0 $274,047 $75,412 $7,541 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $274,047 $75,412 $7,541 $0 $2,574,962 $0 $0 $0 $0 $0 $0 $0 $0 $2,574,962 Total Budget FY 2018-2027 Capital Improvement Program Water Agua Fria Booster/PRV Project Number: UT00245 Project Location: North Peoria Description: This project provides for the project coordination, public involvement, pre-design studies, design, ROW acquisition, construction, materials testing, construction administration, utility coordination, utility relocation, burying overhead facilities, as needed, clearing and grubbing, and all related sitework for the booster pump station and pressure reducing valve station, including hydrotank, piping, mechanical, electrical, instrumentation, SCADA, treatment processes to meet 2012 water quality requirements and restoration and or replacement of pavement, gates and site wall, including, landscaping, etc. This project may also include processing of utility company (APS, Cox, CenturyLink, SRP, SWG, EPNG, etc.) design and construction agreements, development and intergovernmental agreements. Justification: Construction of the project will increase water supply quantity to meet demand in areas to the west served by the proposed Lone Mountain Parkway watermain and in areas to the north served by the new Lake Pleasant Parkway watermain. 250 Category Funding Source CO-Constructi Water Exp. N. of Bell Total Budget Total Operating Impacts FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $3,970,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $3,970,000 $3,970,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $3,970,000 $27,600 $27,600 $27,600 $27,600 $27,600 $27,600 $27,600 $27,600 $0 $27,600 $248,400 FY 2018-2027 Capital Improvement Program Water Butler Well Site Rehabilitation Project Number: UT00410 Project Location: 103rd Avenue and Butler Dr Description: Project includes several site rehabilitation tasks to bring the site up to City standard. General site work includes grading, tree removal, wall painting, and landscaping. Concrete work includes new pad for the electrical lineup, the discharge box, and a few other minor items. Project will add an onsite retention basin with drywell for well startup waste. Justification: A condition assessment of the City's water and wastewater remote facilities was completed in 2014. The Butler Well and Reservoir site (W102) was identified in this assessment as not currently meeting City standards. The site is an important site for the southern portion of the City's water supply. 251 Category Funding Source CO-Constructi Water Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $1,317,265 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,317,265 $1,317,265 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,317,265 FY 2018-2027 Capital Improvement Program Water Central Arizona Project Curtailment Study Project Number: UT00434 Project Location: Citywide Description: This study addresses future shortage of renewable water resources due to projected reductions in deliveries of Colorado River water via the CAP Canal. The results of the study will identify the impacts of a declared shortage on Peoria's largest single surface water source, including infrastructure, operational and other water rights' needs. Justification: Due to the extended drought, shortages declared on Arizona and the CAP Canal by the US Department of Interior are expected within the next 5 years. Because it is not possible at this time to determine how much of a percentage cut Peoria would take, a study needs to be conducted to identify how Peoria can meet its water demands under various probable scenarios. 252 Funding Source Category SY-Study Water Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $50,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $50,000 $50,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $50,000 FY 2018-2027 Capital Improvement Program Water Condition Assessment of Remote Sites Project Number: UT00256 Project Location: Citywide Description: This project will assess the condition of all water, wastewater, and reuse water sites (excluding treatment plants). The information gathered will be used to assess the overall funding needs for utility sites. In addition, this information may be used to increase the accuracy of some master plan elements. Justification: This project will provide an overall condition assessment of all utility infrastructure that will be used for project costs and timing as well as providing information for the Integrated Master Plan. 253 Funding Source Category SY-Study SY-Study Wastewater Water Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $28,066 $52,900 $150,000 $150,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $178,066 $202,900 $80,966 $300,000 $0 $0 $0 $0 $0 $0 $0 $0 $380,966 FY 2018-2027 Capital Improvement Program Water Desert Harbor-Arrowhead Shores Well Mixing Project Number: UT00312 Project Location: 91st Av and Greenway Rd to Arrowhead Shores Well Description: This project will recommission the waterline from the Desert Harbor well to the Arrowhead Shores reservoir in order to facilitate mixing of the water sources. In addition, this project will evaluate the need for arsenic treatment and will implement the needed technologies and site improvements to meet water quality standards. Justification: The Desert Harbor and Arrowhead Shores wells are not connected to the potable water system due to arsenic concentrations above the permitted limits. The treatment and blending provided by this project will allow for a safe and reliable water supply from these sources. 254 Category AT-Arts CB-Chargeba CO-Constructi CO-Constructi CO-Constructi DS-Design Funding Source Water Water Water Water Exp. N. of Bell Water Expansion Post 1/1/12 Water Expansion Post 1/1/12 Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $0 $0 $200,000 $1,488,964 $437,148 $9,920 $8,032 $982,048 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $9,920 $8,032 $982,048 $200,000 $1,488,964 $437,148 $2,126,112 $1,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $3,126,112 FY 2018-2027 Capital Improvement Program Water El Mirage Road Waterline Upsizing Project Number: UT00430 Project Location: El Mirage Rd from Lone Mntn to Westland Reservoir Description: This project provides for the project coordination, public involvement, pre-design studies, design, ROW acquisition, construction, materials testing, construction administration, utility coordination, utility relocation, burying overhead facilities, as needed, clearing and grubbing, and all related sitework for the installation of new ductile iron waterline along El Mirage Road from Lone Mountain Road to the Westland Reservoir Facility. This project may also include processing of utility company (APS, Cox, Qwest/Centurylink, SRP, etc) design and construction agreements, development and intergovernmental agreements. Justification: While this waterline is expected to be constructed by developers in the area, the City will often look to "oversize" a waterline to meet future development needs beyond those of the developer. This process is done through a development agreement where the City reimburses the developer for the oversize cost. 255 Category Funding Source AT-Arts Water CO-Constructi Water Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $0 $0 $0 $0 $0 $16,790 $1,679,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $16,790 $1,679,000 $0 $0 $0 $1,695,790 $0 $0 $0 $0 $0 $0 $1,695,790 FY 2018-2027 Capital Improvement Program Water Fire Hydrant Infill and Replacement Project Number: UT00204 Project Location: Citywide Description: This is an ongoing program to install new fire hydrants in areas of the city where fire hydrant spacing exceeds city infrastructure guidelines. In addition, this program will provide for the systematic replacement of obsolete fire hydrants in the water distribution system. There are currently 8,717 fire hydrants in our water distribution system. This program will provide for the replacement of 20 hydrants per year at a cost of $110,000. Justification: Identification of the need for additional fire hydrants in the water distribution system and the replacement of obsolete fire hydrants is ongoing to ensure compliance with Fire Code standards. 256 Category Funding Source AT-Arts Water CO-Constructi Water Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $331,598 $1,600 $160,000 $1,600 $160,000 $1,600 $160,000 $1,600 $160,000 $1,600 $160,000 $1,600 $160,000 $1,600 $160,000 $1,600 $160,000 $1,600 $160,000 $14,400 $1,771,598 $331,598 $161,600 $161,600 $161,600 $161,600 $161,600 $161,600 $161,600 $161,600 $161,600 $1,785,998 FY 2018-2027 Capital Improvement Program Water Greenway Plant Equipment Upgrade/Replacement Project Number: UT00316 Project Location: Greenway Water Treatment Plant Description: The Greenway Water Treatment Plant was constructed in 2001, and like any critical facility, requires equipment and component replacement and overhaul on a periodic basis to ensure continuous and reliable operation. Replacement, upgrade, and overhaul projects include replacement of chemical feed pumps, motors, VFDs, replacement of ozone generator and destruct unit components, mixers, influent screens, various analyzers, and miscellaneous building and site improvements. Justification: The Greenway Water Treatment Plant provides potable water services to approximately one-third of Peoria customers. Repairing and replacing equipment is an important part of keeping this facility in good and reliable working order. This is not only important for our core service, but is required by county and state regulations. 257 Category Funding Source CB-Chargeba Water CO-Constructi Water EQ-Equipmen Water Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $150,000 $101,789 $2,000 $0 $100,000 $2,000 $0 $100,000 $2,000 $0 $100,000 $2,000 $0 $100,000 $2,000 $0 $100,000 $2,000 $0 $100,000 $2,000 $0 $100,000 $2,000 $0 $100,000 $2,000 $0 $100,000 $18,000 $150,000 $1,001,789 $251,789 $102,000 $102,000 $102,000 $102,000 $102,000 $102,000 $102,000 $102,000 $102,000 $1,169,789 FY 2018-2027 Capital Improvement Program Water Greenway WTP 8 MGD Expansion Project Number: UT00311 Project Location: Greenway WTP Description: This project provides for an 8 million gallons per day (MGD) expansion of the Greenway Water Treatment Plant from its current capacity of 16 MGD to 24 MGD. The treatment plant was master planned to be expanded further to an ultimate capacity of 32 MGD. This project includes sizing major unit processes to increase existing capacity. The following unit processes will be sized to achieve a total capacity of 24 MGD - flocculation basin, final sedimentation basin, filters, chlorination equipment, ozone production equipment, and ancillary equipment and components. Justification: The City’s continuing growth and development results in the increased demand for potable water. This expansion will ensure that sufficient water production is provided to meet the increasing demands by adding treatment capacity at the existing facility. 258 Category AT-Arts CB-Chargeba CO-Constructi DS-Design Funding Source WIFA Bonds WIFA Bonds WIFA Bonds WIFA Bonds Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $35,216 $50,000 $0 $3,521,584 $277,102 $100,000 $27,710,176 $0 $0 $0 $0 $0 $312,318 $150,000 $27,710,176 $3,521,584 $0 $0 $0 $0 $0 $0 $0 $3,606,800 $28,087,278 $0 $31,694,078 FY 2018-2027 Capital Improvement Program Water Hillcrest 8 inch Waterline Project Number: UT00426 Project Location: Hillcrest Blvd from 83rd Avenue to 78th Lane Description: This project provides for the project coordination, public involvement, pre-design studies, design, ROW acquisition, construction, materials testing, construction administration, utility coordination, utility relocation, burying overhead facilities, as needed, clearing and grubbing, and all related sitework for the installation of approx. 2,700 linear feet of new 8-inch ductile iron waterline and appurtenances on Hillcrest Boulevard from 83rd Avenue to 78th Lane. This project may also include processing of utility company (APS, Cox, Qwest/Centurylink, SRP, etc) design and construction agreements, development and intergovernmental agreements. Justification: This project will allow for increased water system redundancy and reliability in the Fletcher Heights and Deer Valley Estates developments. 259 Funding Source Category CO-Constructi Water DS-Design Water Total Budget Total Operating Impacts FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $441,773 $146,810 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $441,773 $146,810 $588,583 $0 $0 $0 $0 $0 $0 $0 $0 $0 $588,583 $1,512 $1,512 $1,512 $1,512 $1,512 $1,512 $1,512 $1,512 $0 $1,512 $13,608 FY 2018-2027 Capital Improvement Program Water Integrated Utility Master Plan Project Number: UT00271 Project Location: Citywide Description: This project will update the 2015 Integrated Utility Master Plan, which addresses the city's water, wastewater, and reuse systems. The Integrated Utility Master Plan will identify the water resources needed to support the City's adopted General Plan Land Use map. This will be accomplished by determining the amount of potable and reuse water required along with the amount of wastewater generated at buildout. These requirements must be identified to determine future water resource, production, distribution, collection, and treatment facility requirements. Because it is so broad in scope, this project will require 18 months to complete. Justification: According to the city's adopted Principles of Sound Water Management, staff will update the Utility Master Plans on a five year cycle, to keep up with development and regulatory changes. The current Integrated Utility Master Plan was completed in FY2015, accordingly the next update will need to start in FY2020. 260 Category Funding Source FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total CB-Chargeba SY-Study CB-Chargeba SY-Study CB-Chargeba SY-Study CB-Chargeba Wastewater Wastewater Wastewater Exp. E. of Agua Fri Wastewater Exp. E. of Agua Fri Wastewater Exp. W. of Agua Fr Wastewater Exp. W. of Agua Fr Water $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $836 $8,164 $8,714 $85,096 $6,056 $59,134 $836 $557 $5,443 $5,810 $56,730 $4,037 $39,423 $557 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,393 $13,607 $14,524 $141,826 $10,093 $98,557 $1,393 SY-Study CB-Chargeba SY-Study CB-Chargeba SY-Study CB-Chargeba SY-Study Water Water Exp. N. of Bell Water Exp. N. of Bell Water Exp. S. of Bell Water Exp. S. of Bell Water Expansion Post 1/1/12 Water Expansion Post 1/1/12 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $8,164 $10,439 $101,941 $1,672 $16,328 $2,659 $25,961 $5,443 $6,960 $67,960 $1,115 $10,885 $1,772 $17,308 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $13,607 $17,399 $169,901 $2,787 $27,213 $4,431 $43,269 $0 $0 $0 $0 $336,000 $224,000 $0 $0 $0 $0 $560,000 Total Budget FY 2018-2027 Capital Improvement Program Water Jomax In-Line Booster Station Upgrades Project Number: UT00285 Project Location: Jomax Rd and Terramar Blvd Description: This project includes upgrading the existing Jomax Booster Station from 12 to 18 million gallons per day (MGD) firm capacity. This will involve upgrading pumps 1 and 2 to 100 hp each to match pumps 3 and 4. The project will require a new emergency generator rated at 450 KW. The two 75 KW VFD drives will be replaced with 100 KW constant speed soft start motor controls. A section of the 16-inch water main near the turnout will be replaced with 24-inch pipe and a new 24-inch MAG meter installed. Justification: Construction of the project will increase water supply quantity by increasing infrastructure capacity to meet the newly available supply from the Glendale PPWTP. 261 Funding Source Category AT-Arts CB-Chargeba CO-Constructi DS-Design OT-Other AT-Arts CB-Chargeba CO-Constructi DS-Design Water Expansion Post 1/1/12 Water Expansion Post 1/1/12 Water Expansion Post 1/1/12 Water Expansion Post 1/1/12 Water Expansion Post 1/1/12 WIFA Bonds WIFA Bonds WIFA Bonds WIFA Bonds Total Budget Total Operating Impacts FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $446 $2,267 $41,255 $3,385 $48,246 $23,677 $120,225 $2,188,108 $179,537 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $446 $2,267 $41,255 $3,385 $48,246 $23,677 $120,225 $2,188,108 $179,537 $0 $2,607,146 $0 $0 $0 $0 $0 $0 $0 $0 $2,607,146 $20,100 $20,100 $20,100 $20,100 $20,100 $20,100 $20,100 $0 $0 $20,100 $160,800 FY 2018-2027 Capital Improvement Program Water Lake Plsnt Pkwy 24-inch Waterline; Loop 303- LPWTP Project Number: UT00269 Project Location: Lake Plsnt Pkwy 24-inch Waterline, Loop 303 - LPWTP Description: This project is part of the infrastructure necessary to gain access to the Lake Pleasant Water Treatment Plant (LPWTP). This project provides for the project coordination, public involvement, pre-design studies, design, ROW acquisition, construction, materials testing, construction administration, utility coordination, utility relocation, burying overhead facilities, as needed, clearing and grubbing, grade the work area for installation of 24-inch waterline and appurtenances on Lake Pleasant Parkway from Loop 303 to a future take out structure south of LPWTP, and restoration and or replacement of pavement and striping, landscaping, etc. This project may also include processing of utility company (APS, Cox, Qwest/Centurylink, SRP, etc) design and construction agreements, development and intergovernmental agreements. Justification: As development begins to occur along the Lake Pleasant Parkway corridor in northern Peoria, a reliable water source will be needed. This 24-inch waterline will form the backbone of the water system for the areas of Peoria north of Loop 303, and it could serve as an alternative source of water for the City by connecting to the LPWTP, when such connection is agreed upon and approved. 262 Category AT-Arts CB-Chargeba CO-Constructi OT-Other AT-Arts Funding Source FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total Water Water Water Water Water Exp. N. of Bell $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $13,000 $42,987 $535,637 $554,984 $6,113 $0 $0 $0 $0 $50,516 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $13,000 $42,987 $535,637 $554,984 $56,629 CB-Chargeba Water Exp. N. of Bell CO-Constructi Water Exp. N. of Bell OT-Other Water Exp. N. of Bell $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $20,213 $251,859 $260,956 $62,640 $4,683,109 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $82,853 $4,934,968 $260,956 $0 $0 $0 $0 $1,685,749 $4,796,265 $0 $0 $0 $0 $6,482,014 Total Budget FY 2018-2027 Capital Improvement Program Water Lone Mtn Pkwy 36-inch Waterline; LPP to L303 Project Number: UT00233 Project Location: Lone Mountain Pkwy, El Mirage Rd to Loop 303 Description: This project provides funding for the oversizing of waterline infrastructure, including the project coordination, public involvement, predesign studies, design, ROW acquisition, construction, materials testing, construction administration, utility coordination, utility relocation, burying overhead facilities, as needed, clearing and grubbing, grade the work area for installation of 36-inch waterline and appurtenances in Lone Mountain Parkway from the crossing of the Loop 303 freeway to the existing waterline near Lake Pleasant Parkway in accordance with the Water Master Plan, and restoration and or replacement of pavement and striping, landscaping, etc. This project may also include processing of utility company (APS, Cox, CenturyLink, SRP, SWG, EPNG, etc.) design and construction agreements, as well as development and intergovernmental agreements. Justification: The city's Water Master Plan identifies a water transmission main along Lone Mountain Parkway as part of the overall water system. This water transmission facility was planned to be constructed to respond to growth and demand in Vistancia and to provide a redundant supply. This waterline provides additional benefits by connecting the Vistancia system with the primary city water distribution system, allowing large amounts of water to be transferred in either direction. 263 Category Funding Source CO-Constructi Water Expansion CO-Constructi Water Expansion Post 1/1/12 Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $1,865,986 $1,370,396 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,865,986 $1,370,396 $3,236,382 $0 $0 $0 $0 $0 $0 $0 $0 $0 $3,236,382 FY 2018-2027 Capital Improvement Program Water Miscellaneous Local Waterline Improvements Project Number: UT00203 Project Location: Citywide Description: This project provides funding to upgrade the city's existing water distribution system to ensure its continued operation and to replace water valves and ACP, HDPE, PVC, pipes and unlined ductile mains in streets and alleyways that have exceeded their usable life expectancy. These funds may also be used to construct water line extensions in coordination with street improvement projects, address water line rehabilitations identified during inspections, and replace on an annual basis approximately 10 deficient water valves. Justification: The existing city water distribution system needs continual upgrading to ensure uninterrupted operation and compliance with water quality regulations. In addition, these funds provide a means for the Public Works-Utilities Department to coordinate efforts with other city projects where opportunities are identified for water system improvements. 264 Category Funding Source AT-Arts Water CB-Chargeba Water CO-Constructi Water Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $0 $386,658 $3,000 $5,000 $300,000 $3,000 $5,000 $300,000 $2,000 $5,000 $200,000 $2,000 $5,000 $200,000 $2,000 $5,000 $200,000 $2,000 $5,000 $200,000 $2,000 $5,000 $200,000 $2,000 $5,000 $200,000 $2,000 $5,000 $200,000 $20,000 $45,000 $2,386,658 $386,658 $308,000 $308,000 $207,000 $207,000 $207,000 $207,000 $207,000 $207,000 $207,000 $2,451,658 FY 2018-2027 Capital Improvement Program Water New River Utility Co. Acquisition & Improvements Project Number: UT00390 Project Location: Deer Valley Rd./Beardsley Rd. & 83rd Ave. and surrounding area Description: This project entails preliminary costs associated with the purchase of the New River Utility Company water system such as water resource acquisition costs, system improvement costs, meter replacement costs, and costs associated with the integration of the water system into the City's water production and distribution system. This project excludes the cost of the purchase of the utility. Justification: Acquisition of the private water utility company will provide for an integrated system in that portion of the city, allow the city to address chronic pressure complaints expressed by citizens, and allow for enhanced planning and modeling of the overall water system. The funding will allow the water system to be improved to a level consistent with that of the City's existing water system. 265 Category Funding Source AT-Arts Water CO-Constructi Water CO-Constructi WIFA Bonds Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $1,500,000 $2,500,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $4,208 $420,792 $0 $4,208 $420,792 $0 $4,208 $420,792 $0 $4,208 $420,792 $0 $4,208 $420,792 $0 $4,208 $420,792 $0 $25,248 $4,024,752 $2,500,000 $4,000,000 $0 $0 $0 $425,000 $425,000 $425,000 $425,000 $425,000 $425,000 $6,550,000 FY 2018-2027 Capital Improvement Program Water Northern Community Park Well Project Number: UT00424 Project Location: Northern Community Park Description: This project provides for the project coordination, public involvement, pre-design studies, design, ROW acquisition, construction, materials testing, construction administration, utility coordination, utility relocation, burying overhead facilities, as needed, clearing and grubbing, and all related sitework for the drilling and installation of a new irrigation well at the planned Northern Community Park. This project may also include processing of utility company (APS, Cox, Qwest/Centurylink, SRP, etc) design and construction agreements, development and intergovernmental agreements. Justification: Potable water resources are in high demand and are very expensive for regular landscape and turf irrigation needs. The planned Northern Community Park would like to drill and install a new irrigation well that will supply non-potable water for these needs rather than utilize the City's drinking water supply. 266 Category Funding Source AT-Arts Water CO-Constructi Water DS-Design Water Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $508,207 $146,810 $12,123 $1,310,231 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $12,123 $1,818,438 $146,810 $655,017 $1,322,354 $0 $0 $0 $0 $0 $0 $0 $0 $1,977,371 FY 2018-2027 Capital Improvement Program Water Patterson Well-W209, W210 Well Mixing Project Number: UT00328 Project Location: 105th/Deer Valley to 104th/Rose Garden Description: This project provides for the project coordination, public involvement, pre-design studies, design, ROW acquisition, construction, materials testing, construction administration, utility coordination, utility relocation, burying overhead facilities, as needed, clearing and grubbing, grade the work area for installation of waterline as needed to connect the three well sites to the Patterson Reservoir site, and restoration and/or replacement of pavement and striping, landscaping, etc. This project may also include processing of utility company, (APS, Cox, Qwest/Centurylink, SRP, etc) design and construction agreements, as well as development and intergovernmental agreements. Justification: Three City well sites, W209, W210 and W213 currently have issues with air entrainment that causes the water produced from these wells to appear cloudy when initially getting into the water delivery system. Some of this water with the cloudy appearances is making its way to the homes of residents. While not a health risk, this is still an aesthetic issue for our customers and needs to be removed. This project will connect these three wells to the W211 Patterson Reservoir site for the purpose of air entrainment removal through dissipation in the reservoir. Eventually this may facilitate well field treatment as may be needed in the future. 267 Funding Source Category AT-Arts CB-Chargeba CO-Constructi DS-Design Water Water Water Water Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $4,372 $42,600 $0 $437,194 $55,395 $0 $5,539,446 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $59,767 $42,600 $5,539,446 $437,194 $0 $0 $0 $484,166 $5,594,841 $0 $0 $0 $0 $0 $6,079,007 FY 2018-2027 Capital Improvement Program Water Pyramid Peak Water Treatment Plant - Upgrades Project Number: UT00037 Project Location: 67th Av and Jomax Rd Description: This project is for capital costs associated with the Pyramid Peak Water Treatment Plant, including the continuation of a study for condition assessment of the facility and 60-inch water transmission main from the facility to the Peoria turnout, and anticipated construction costs for projects identified as necessary as a result of early phases of the study. Peoria currently owns 23 percent of the Pyramid Peak Water Treatment Plant and is responsible for 23 percent of the cost of the study and resultant plant improvements. Justification: The Pyramid Peak Water Treatment Plant treats approximately 11 million gallons of drinking water for the City of Peoria per day and is a vital component of the city's drinking water supply. Improvements, upgrades, and capital investment at the facility enhance the reliability of this critical source of water for the city. 268 Category Funding Source CO-Constructi Water CO-Constructi Water Expansion Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 $1,130,000 $23,000 $2,232,642 $0 $1,153,000 $2,232,642 Total $1,742,723 $0 $297,500 $0 $297,500 $0 $297,500 $0 $297,500 $0 $297,500 $0 $297,500 $0 $297,500 $0 $7,187,865 $23,000 $1,742,723 $297,500 $297,500 $297,500 $297,500 $297,500 $297,500 $297,500 $7,210,865 FY 2018-2027 Capital Improvement Program Water Pyramid Peak Water Treatment Plant Expansion Project Number: UT00334 Project Location: North Peoria Description: The project will provide for the design, permitting, construction, construction administration, and project management of an expansion of the City of Glendale Pyramid Peak Water Treatment Plant. The project includes addition of a new treatment train, chemical feed systems, solids disposal facilities, pumping equipment, distribution or transmission piping, SCADA, instrumentation, electrical, mechanical, and other ancillary equipment, structures, and appurtenances. Justification: Projected growth in the northern part of the city will require additional Central Arizona Project (CAP) treatment capacity. The city has rights to use CAP water but will need additional treatment capacity by FY2020. The city owns capacity in the City of Glendale Pyramid Peak Water Plant, which treats a portion of Peoria's CAP allocation. This project is proposed to purchase additional treatment capacity to provide Peoria capacity ownership of 24 million gallons per day. 269 Category CO-Constructi CO-Constructi CO-Constructi CO-Constructi Funding Source Water Water Exp. N. of Bell Water Expansion Post 1/1/12 WIFA Bonds Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $769,125 $789,616 $6,326,525 $0 $0 $0 $24,176,436 $0 $0 $0 $21,713,897 $300,000 $900,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $300,000 $1,669,125 $789,616 $52,216,858 $7,885,266 $24,176,436 $21,713,897 $1,200,000 $0 $0 $0 $0 $0 $0 $54,975,599 FY 2018-2027 Capital Improvement Program Water Quintero Plant Equipment Upgrade/Replacement Project Number: UT00418 Project Location: Quintero Water Treatment Plant Description: This project provides for the project coordination, public involvement, pre-design studies, design, ROW acquisition, construction, materials testing, construction administration, utility coordination, utility relocation, burying overhead facilities, as needed, clearing and grubbing, and all related sitework for painting the facility, rebuilding the potable water pumps, and performing a study to determine the best disinfection method suited for the remote location of the plant. This project may also include processing of utility company (APS, Cox, Qwest/Centurylink, SRP, etc) design and construction agreements, development and intergovernmental agreements. Justification: The Quintero Water Treatment Plant provides potable water service to the Quintero service area. Repairing and replacing equipment is an important part of keeping this facility in operating condition and in compliance with all applicable permits and regulatory requirements. 270 Category Funding Source AT-Arts Water CO-Constructi Water Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $267,458 $2,433 $243,352 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,433 $510,810 $267,458 $245,785 $0 $0 $0 $0 $0 $0 $0 $0 $513,243 FY 2018-2027 Capital Improvement Program Water SCADA Equipment Replacement Project Number: UT00266 Project Location: Citywide Description: This project will replace, upgrade and add supervisory control and data acquisition (SCADA) equipment and associated communication network equipment at water, wastewater and reclaimed water facilities operated by the city. Included in the project will be the items necessary for full functionality, such as programmable logic controllers (PLCs), monitoring devices, flow meters, radios, sensors, transducers, and related support equipment and housings. The project will also provide for project coordination, pre-design studies, design, programming, construction, materials testing, construction administration, utility coordination, utility relocation, processing of utility company (APS, Cox, CenturyLink, SRP, SWG, EPNG, etc.) design and construction agreements, as well as development and intergovernmental agreements, as needed. Justification: As equipment ages and becomes obsolete, new equipment is needed to more effectively and efficiently operate our water and wastewater systems and provide more flexibility for our operations staff. 271 Funding Source Category CO-Constructi EQ-Equipmen CO-Constructi EQ-Equipmen Wastewater Wastewater Water Water Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $43,645 $75,000 $66,877 $225,000 $0 $75,000 $0 $75,000 $0 $75,000 $0 $75,000 $0 $75,000 $0 $75,000 $0 $75,000 $0 $75,000 $0 $75,000 $0 $75,000 $0 $75,000 $0 $75,000 $0 $75,000 $0 $75,000 $0 $75,000 $0 $75,000 $0 $75,000 $0 $75,000 $43,645 $750,000 $66,877 $900,000 $410,522 $150,000 $150,000 $150,000 $150,000 $150,000 $150,000 $150,000 $150,000 $150,000 $1,760,522 FY 2018-2027 Capital Improvement Program Water Technology and Security Master Plan Project Number: UT00304 Project Location: Citywide Description: This project merges three previous master plans into a consolidated plan, linking planning efforts for Utilities technology, Supervisory Control and Data Acquisition (SCADA) and security into a single master plan. Justification: The integration of technology and security into utility operating systems is a best management practice in the water and wastewater industry and allows the city to improve the performance and security of its systems. To maximize the use of technology, it is critical to have a system-wide master plan to ensure a long-term, system-wide approach is developed. 272 Category SY-Study SY-Study SY-Study SY-Study Funding Source Wastewater Water Exp. N. of Bell Water Exp. S. of Bell Water Expansion Post 1/1/12 Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $0 $0 $0 $75,000 $171,000 $13,500 $40,500 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $75,000 $171,000 $13,500 $40,500 $0 $300,000 $0 $0 $0 $0 $0 $0 $0 $0 $300,000 FY 2018-2027 Capital Improvement Program Water Terramar Booster Pump Station Rehabilitation Project Number: UT00412 Project Location: Jomax Rd and Terramar Description: Complete site rehabilitation including structural, mechanical and electrical as needed. Justification: Construction of the project will increase reliability and resiliency by replacing worn out equipment and upgrading to current City standards. Category Funding Source FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total 273 AT-Arts Water CB-Chargeba Water $0 $0 $6,280 $31,861 $12,562 $63,789 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $18,842 $95,650 CO-Constructi Water DS-Design Water OT-Other Water $0 $0 $0 $799,509 $142,879 $37,684 $941,863 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,741,372 $142,879 $37,684 $0 $1,018,213 $1,018,214 $0 $0 $0 $0 $0 $0 $0 $2,036,427 Total Budget FY 2018-2027 Capital Improvement Program Water Thunderbird Rd 16" Watermain Replacement Project Number: UT00416 Project Location: L101 to 88th Avenue Description: This project will replace approximately 1500 feet of existing 16-inch PVC watermain. The new watermain will tie into existing piping at two locations and will be placed beneath the Loop 101 using a jack and bore method. Justification: The 16" watermain located in Thunderbird Road is aging and needs replacement. Replacement of aging waterlines will increase reliability of the pipe line and prevent disturbing the street for some years to come. Category Funding Source 274 CO-Constructi Water Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $500,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $500,000 $500,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $500,000 FY 2018-2027 Capital Improvement Program Water Utility Billing System Project Number: UT00160 Project Location: Citywide Description: This project will replace the existing utility billing system with a new customer information system (CIS) for utility billing and revenue collection. This system will interface with other city information systems, such as meter reading, fixed asset accounting, financial accounting and e-government software. The current utility billing system needs to be replaced to handle new accounts as the number of customers increases. Justification: The current utility billing system is several years old. The current system's performance will likely begin to degrade as the number of utility accounts increases, and the vendor may soon stop providing support for this version of its product. A new system will enhance functionality for utility customers and provide a stable, supported platform for this critical system that will accommodate the city's system requirements for several more years. 275 Category EQ-Equipmen EQ-Equipmen EQ-Equipmen EQ-Equipmen EQ-Equipmen EQ-Equipmen EQ-Equipmen Funding Source Commercial Solid Waste Residential Solid Waste Solid Waste Expansion Wastewater Wastewater Exp. E. of Agua Fri Wastewater Exp. W. of Agua Fr Water EQ-Equipmen Water Exp. N. of Bell EQ-Equipmen Water Exp. S. of Bell EQ-Equipmen Water Expansion Post 1/1/12 Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $250,000 $600,000 $250,000 $600,000 $147,500 $102,500 $600,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $250,000 $600,000 $250,000 $600,000 $147,500 $102,500 $600,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $190,000 $15,000 $45,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $190,000 $15,000 $45,000 $0 $0 $0 $0 $0 $2,800,000 $0 $0 $0 $0 $2,800,000 FY 2018-2027 Capital Improvement Program Water Ventana Well, Booster Rehabilitation Project Number: UT00394 Project Location: Beardsley Rd and 107th Ave Description: This project provides for the project coordination, public involvement, pre-design studies, design, ROW acquisition, construction, materials testing, construction administration, utility coordination, utility relocation, burying overhead facilities, as needed, clearing and grubbing, and all related sitework for rehabilitation of the existing two water wells, booster pump station, hydrotank, storage reservoir, including, piping, mechanical, electrical, instrumentation, SCADA, treatment processes to meet 2012 water quality requirements, and restoration and or replacement of pavement, gates and site wall, including, landscaping, etc. This project may also include processing of utility company (APS, Cox, Qwest/Centurylink, SRP, etc) design and construction agreements, development and intergovernmental agreements. Justification: Construction of the project will increase water supply quantity by improving water quality to meet 2012 standards and utilization of existing ground water resources. 276 Category Funding Source CO-Constructi Water Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $2,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,000,000 $2,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,000,000 FY 2018-2027 Capital Improvement Program Water W108 Bailey Well Site Improvements Project Number: UT00414 Project Location: Cactus Rd and 75th Avenue Description: Well site improvements including a new CMU wall and access gates, site grading, site lighting and new dry well. Justification: Construction of the project will enhance security at the site as well as provide easier access to the well pump and appurtenances and improve the grading, drainage and site lighting. Funding Source Category FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total 277 AT-Arts Water $0 $0 $0 $4,630 $0 $0 $0 $0 $0 $0 $4,630 CB-Chargeba CO-Constructi DS-Design OT-Other Water Water Water Water $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $23,512 $427,924 $35,112 $9,261 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $23,512 $427,924 $35,112 $9,261 $0 $0 $0 $500,439 $0 $0 $0 $0 $0 $0 $500,439 Total Budget FY 2018-2027 Capital Improvement Program Water Water & Wastewater Rate Study Project Number: UT00298 Project Location: Citywide Description: This study will update the city’s water and wastewater rates. Rates will be reviewed to ensure that they cover the costs of system operations and maintenance, fund the systems’ capital program requirements, and support the financial strength of the enterprise funds. Studies are anticipated to be performed with the help of outside consultants and coordinated with staff from the Finance and Public Works-Utilities departments. During the interim years between full studies, staff anticipates a lower level of annual support to update information and findings. Justification: Water and wastewater rates and structures are reviewed annually to ensure that they provide necessary funding to operate, maintain, and upgrade the city’s utility systems in a financially sound and sustainable manner. 278 Funding Source Category SY-Study SY-Study Wastewater Water Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $45,000 $45,000 $0 $0 $0 $0 $45,000 $45,000 $0 $0 $0 $0 $45,000 $45,000 $0 $0 $0 $0 $45,000 $45,000 $180,000 $180,000 $90,000 $0 $0 $90,000 $0 $0 $90,000 $0 $0 $90,000 $360,000 FY 2018-2027 Capital Improvement Program Water Water Facility Reconditioning Project Number: UT00206 Project Location: Citywide Description: This project will upgrade and recondition over 40 existing water distribution and production facilities. Utilities staff prioritizes projects to be included in this program based on operational needs and facility conditions in the city's aging water conveyance system. Currently, the Department plans to rehabilitate the following reservoirs over the next five (5) years: Sports Complex (East Tank); Sonoran Mtn. Ranch; Vistancia 4/5 East Tank; and Vistancia 4/5 West Tank. Justification: This project will upgrade existing distribution and production sites to address reliability and efficiency issues as these facilities age. This project will also upgrade sites with new technologies as appropriate. These upgrades allow the system to continue to operate with reliability, efficiency, and redundancy as well as ensuring water quality. 279 Category Funding Source AT-Arts Water CB-Chargeba Water CO-Constructi Water Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $0 $891,533 $8,000 $5,000 $800,000 $8,000 $5,000 $800,000 $8,000 $5,000 $800,000 $8,000 $5,000 $800,000 $8,000 $5,000 $800,000 $8,000 $5,000 $800,000 $8,000 $5,000 $800,000 $8,000 $5,000 $800,000 $8,000 $5,000 $800,000 $72,000 $45,000 $8,091,533 $891,533 $813,000 $813,000 $813,000 $813,000 $813,000 $813,000 $813,000 $813,000 $813,000 $8,208,533 FY 2018-2027 Capital Improvement Program Water Water Line Assessment and Replacement Project Number: UT00335 Project Location: City of Peoria Description: This project will entail the identification, design, and replacement of small diameter water mains throughout the city to minimize main breaks, service outages, and property damage. Justification: Portions of the city's distribution system exceed 25 years in age and are constructed of materials that would not meet current design criteria. Issues are compounded by improper pipe bedding and system pressures resulting in main breaks and service outages. Funding will provide for a systematic review and replacement of small diameter pipelines that service neighborhoods and have a history of breaks or leaks. 280 Category Funding Source AT-Arts Water CO-Constructi Water Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $0 $10,000 $1,000,000 $10,000 $1,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $20,000 $2,000,000 $0 $1,010,000 $1,010,000 $0 $0 $0 $0 $0 $0 $0 $2,020,000 FY 2018-2027 Capital Improvement Program Water Water Meter Replacement Program Project Number: UT00326 Project Location: Citywide Description: The city’s inventory of over 49,000 water meters includes approximately 37,000 water meters that are using transmission technology and equipment that has reached its life expectancy and/or will not be supported with current technology within the next two to three years. A large portion of these meters have also reached, or will soon reach, the end of their useful lives during this timeframe. To ensure that the city’s water billing data meets accuracy standards going forward, the most cost-effective approach is to replace all of these meters over a sixyear cycle. Staff will, however, continue to explore alternatives that might reduce the number of meters to be replaced. Replacement labor will be provided by contracted staff. The project includes $800,000 per year that was originally programmed in the Finance Utilities Meter Services operating budget. 281 Justification: Water rate revenues are dependent on accurate volume metering from the city’s meter inventory. Not updating our technology in a timely manner would lead to an increasing level of effort and cost to repair failing equipment, less accurate billing information, and the potential that the timeliness of the current billing process could be jeopardized. The city’s current meter reading process requires a minimal level of staff effort to complete with the existing reading technology. Keeping this technology current will enable continued timely processing of water meter information and is more cost-effective than investing in additional staff to perform manual reading. Category Funding Source CO-Constructi Wastewater EQ-Equipmen Wastewater CO-Constructi Water EQ-Equipmen Water Total Budget FY 2021 FY 2022 FY 2026 FY 2027 $1,021,984 $12,670 $237,848 FY 2018 FY 2019 $0 $0 $0 FY 2020 $0 $0 $0 $0 $500,000 $0 $0 $500,000 $0 FY 2023 $0 $0 $0 FY 2024 $0 $0 $0 FY 2025 $0 $0 $0 $0 $750,000 $0 $0 $750,000 $0 $1,021,984 $2,512,670 $237,848 Total $1,590 $0 $0 $1,000,000 $1,000,000 $0 $0 $0 $1,500,000 $1,500,000 $5,001,590 $1,274,092 $0 $0 $1,500,000 $1,500,000 $0 $0 $0 $2,250,000 $2,250,000 $8,774,092 FY 2018-2027 Capital Improvement Program Water Water System Additional R & M Expense Project Number: UT00438 Project Location: Citywide Description: This project will provide for major repair, maintenance, and rehabilitation of our water infrastructure, including the Greenway and Quintero Water Treatment Plants, wells, booster stations, metering stations, PRV stations and reservoirs. Justification: Aging infrastructure requires additional major repair, maintenance, and rehabilitation to extend the life of water utility assets and to ensure uninterrupted service to our customers. Planning and funding major repair, maintenance, and rehabilitation projects as opposed to addressing concerns reactively allows for coordinated scheduling, and reduces both service interruption duration and overall project costs. 282 Category Funding Source AT-Arts Water CO-Constructi Water Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $0 $0 $0 $16,000 $800,000 $16,000 $800,000 $16,000 $800,000 $16,000 $800,000 $16,000 $800,000 $16,000 $800,000 $16,000 $800,000 $16,000 $800,000 $128,000 $6,400,000 $0 $0 $816,000 $816,000 $816,000 $816,000 $816,000 $816,000 $816,000 $816,000 $6,528,000 FY 2018-2027 Capital Improvement Program Water Water/Wastewater Hydraulic Model Update Project Number: UT00428 Project Location: Citywide Description: This project provides for the project coordination, public involvement, pre-design studies, design, ROW acquisition, construction, materials testing, construction administration, utility coordination, utility relocation, burying overhead facilities, as needed, clearing and grubbing, and all related sitework for the update and/or replacement of the existing water/wastewater hydraulic model. This project may also include processing of utility company (APS, Cox, Qwest/Centurylink, SRP, etc) design and construction agreements, development and intergovernmental agreements. Justification: This project provides for the update and/or replacement of the City's existing water and wastewater hydraulic model. The hydraulic model assists City Staff in planning the existing and future needs of the City's water and wastewater infrastructure. It is necessary to have a working hydraulic model that can be updated throughout the year based on any changes or proposed changes to the water and wastewater systems. 283 Funding Source Category SY-Study SY-Study Wastewater Water Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $100,000 $100,000 $100,000 $100,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $200,000 $200,000 $200,000 $200,000 $0 $0 $0 $0 $0 $0 $0 $0 $400,000 FY 2018-2027 Capital Improvement Program Water Water/Wastewater/Expansion Fee Update Project Number: UT00070 Project Location: Citywide Description: This study will update water and wastewater expansion fees. These fees are required to be updated every two years to ensure that they accurately recover the cost of constructing infrastructure required by new development. The project will be coordinated with the Finance Department. Justification: Expansion fees are updated every two years to ensure the fees cover the cost of infrastructure required by new development. Category 284 SY-Study SY-Study SY-Study SY-Study SY-Study SY-Study Funding Source FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total Wastewater Exp. E. of Agua Fri Wastewater Exp. W. of Agua Fr Wastewater Expansion Post 1/1/ Water Exp. N. of Bell Water Exp. S. of Bell Water Expansion Post 1/1/12 $29,500 $11,500 $9,000 $38,000 $3,000 $9,000 $0 $0 $0 $0 $0 $0 $29,500 $20,500 $0 $45,000 $5,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $29,500 $20,500 $0 $45,000 $5,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $29,500 $20,500 $0 $45,000 $5,000 $0 $0 $0 $0 $0 $0 $0 $118,000 $73,000 $9,000 $173,000 $18,000 $9,000 Total Budget $100,000 $0 $100,000 $0 $0 $100,000 $0 $0 $100,000 $0 $400,000 FY 2018-2027 Capital Improvement Program Water Wellhead Water Quality Mitigation Project Number: UT00272 Project Location: Citywide Description: This project will provide for arsenic treatment at various well sites in Utility project UT00312, UT00327, UT00328, and UT00394 on an as needed basis. The treatment technology will allow the reduction of arsenic levels to allowable regulatory limits. Well blending may be utilized in addition to arsenic treatment to achieve regulatory compliance. Water quality testing and blending capabilities will be considered in determining if arsenic treatment is required. Justification: The project will increase water supply quantity by increasing utilization of existing ground water resources and improving water quality to meet current standards. 285 Category CO-Constructi CO-Constructi CO-Constructi OT-Other Funding Source Water Water Expansion Water Expansion Post 1/1/12 Water Expansion Post 1/1/12 Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $2,399,385 $825,000 $400,000 $78,435 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,399,385 $825,000 $400,000 $78,435 $3,702,820 $0 $0 $0 $0 $0 $0 $0 $0 $0 $3,702,820 FY 2018-2027 Capital Improvement Program Water Wells - New Construction Project Number: UT00117 Project Location: Citywide Description: The city uses surface water, a renewable water source, as its primary water supply. However, it is still necessary to drill and equip new wells to meet system redundancy requirements as well as future water demand. The wells are expected to be located in the vicinity of the Loop 303 and Lake Pleasant Parkway and other suitable areas. These wells will be "recovery wells" that will recover water available to the city through credits for water reclaimed and recharged to the aquifer. This project provides for the project coordination, public involvement, predesign studies, design, ROW acquisition, construction, materials testing, construction administration, utility coordination, utility relocation, burying overhead facilities, as needed, clearing and grubbing, grade the work area for installation and equipping of the wells, and restoration and or replacement of pavement and striping, landscaping, etc. This project may also include processing of utility company (APS, Cox, CenturyLink, SRP, SWG, EPNG, etc.) design and construction agreements, as well as development and intergovernmental agreements. 286 Justification: Surface water supplies may be interrupted during periods of extreme drought or if there is a failure in the canal delivery system. In addition, the Central Arizona Project and the Salt River Project canal systems are shut down periodically for maintenance and repairs, requiring backup sources of water. Groundwater wells provide the redundancy necessary to ensure a reliable water system for city residents. Category Funding Source CO-Constructi Water Exp. N. of Bell Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $959,370 $2,039,055 $0 $0 $0 $0 $0 $0 $0 $2,998,425 $0 $959,370 $2,039,055 $0 $0 $0 $0 $0 $0 $0 $2,998,425 FY 2018-2027 Capital Improvement Program Water West Agua Fria Water Lines Project Number: UT00170 Project Location: Vistancia Development Description: This project provides for additional transmission capacity in the water system throughout the Vistancia community. The Vistancia Utilities Master Plan identifies the water transmission mains that are needed to supply the Vistancia community. The city is funding the oversizing of selected transmission mains to provide water distribution capacity for new development in surrounding areas. Justification: This project provides for additional transmission capacity in the water system in the Vistancia area. These lines are part of the Water System Master Plan and will be used to convey water from the water treatment plants and connect to local distribution lines. 287 Category Funding Source AT-Arts Water Exp. N. of Bell CO-Constructi Water Exp. N. of Bell Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $792,987 $1,830 $183,000 $3,248 $324,750 $5,744 $574,400 $5,460 $546,000 $8,580 $858,000 $0 $0 $0 $0 $0 $0 $0 $0 $24,862 $3,279,137 $792,987 $184,830 $327,998 $580,144 $551,460 $866,580 $0 $0 $0 $0 $3,303,999 FY 2018-2027 Capital Improvement Program Water Western Area CAP Pump Station Project Number: UT00274 Project Location: 163rd Ave and Jomax Description: The project will design and construct upgrades to the CAP Pump Station that provides raw water to the Quintero Water Treatment Facility. Project includes backfill of an existing basin, replacement of pump station piping, replacement of existing pumps, and the relocation and replacement of existing electrical equipment. Justification: The Western Area CAP Pump Station is the sole source of potable water for the Quintero subdivision in northern Peoria. The site is outdated and not to City standard. 288 Funding Source Category AT-Arts CB-Chargeba CO-Constructi DS-Design LA-Land Acq Water Water Water Water Water Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $0 $0 $0 $0 $0 $0 $0 $52,733 $348,040 $32,484 $158,200 $2,900,330 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $32,484 $158,200 $2,900,330 $52,733 $348,040 $0 $400,773 $3,091,014 $0 $0 $0 $0 $0 $0 $0 $3,491,787 FY 2018-2027 Capital Improvement Program Water Westland Rd. Reservoir and Booster Station Project Number: UT00336 Project Location: Westland Rd & CAP Canal Description: The Westland Rd. Reservoir/Booster facility will serve as a regional storage and booster facility for a large geographical area encompassing Lake Pleasant Heights, Saddleback Heights, Trilogy West, Vistancia, state land parcels, and city oversizing needs. The facility is located on Westland Rd. in proximity to the CAP canal. This project ensures that onsite piping and ancillary facilities are sized properly to provide the city oversizing capacity in future expansion phases of the facility. 289 Category Funding Source CO-Constructi Water Exp. N. of Bell CO-Constructi Water Expansion Post 1/1/12 Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $819,861 $667,975 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $819,861 $667,975 $1,487,836 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,487,836 FY 2018-2027 Capital Improvement Program Water White Mountain Apache Tribe Water Rights Purchase Project Number: UT00234 Project Location: Northern Peoria Description: This project addresses a future shortage of renewable water resources as identified in the Water Resource Master Plan. This project will purchase additional Central Arizona Project (CAP) water rights from the White Mountain Apache Tribe. Justification: These water rights will help the city to maintain its designation as an Assured Water Supplier by the Arizona Department of Water Resources, as well as provide water for Peoria's future demands. Category Funding Source 290 CO-Constructi Water CO-Constructi Water Resource Fee 2014 OT-Other Water Resource Fee 2014 Total Budget FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $1,026,020 $700,000 $483,286 $0 $0 $457,395 $0 $0 $431,505 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,026,020 $700,000 $1,372,186 $2,209,306 $457,395 $431,505 $0 $0 $0 $0 $0 $0 $0 $3,098,206 FY 2018-2027 Capital Improvement Program Water Zone 1/2 PRV Upgrades (91st and Cactus) Project Number: UT00261 Project Location: 91st Avenue and Cactus Rd Description: Project includes the abandonment and demolition of two existing PRV stations located on the southwest and southeast corners at 91st Avenue and Cactus Road. A new PRV station, located in a concrete vault, will be installed on the northeast corner of the intersection. The new PRV will serve the function of both existing PRV's. Justification: The City's Public Works/Utilities Department requires the abandonment and demolition of two small pressure reducing valve (PRV) stations at the 91st and Cactus intersection that are not to current City standards. A PRV is needed at the intersection to allow drinking water to flow between two City pressure zones (1 and 2). By removing the older, substandard PRV's the City can construct one new PRV station that is much more efficient and safe for City maintenance staff. 291 Funding Source Category AT-Arts CB-Chargeba CO-Constructi DS-Design Water Water Water Water Total Budget Total Operating Impacts FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total $0 $0 $0 $0 $13,000 $95,759 $1,300,000 $105,336 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $13,000 $95,759 $1,300,000 $105,336 $0 $1,514,095 $0 $0 $0 $0 $0 $0 $0 $0 $1,514,095 $4,200 $4,200 $4,200 $4,200 $4,200 $4,200 $4,200 $0 $4,200 $4,200 $37,800 FY 2018-2027 Capital Improvement Program Water Zone 5E/6E PRV Station Project Number: UT00286 Project Location: Loop 303 and Lake Pleasant Pkwy Description: This project includes land purchase and construction of a pressure reducing valve (PRV) station at the Pressure Zone 5E/6E boundary near Loop 303 on Lake Pleasant Parkway. This PRV will be in line with the 24-inch water main that will allow service to Zone 5E south of Loop 303. The site may be used for a future reservoir booster station to serve Zone 6E. Justification: As development near the Loop 303 begins, this water facility will be needed to provide water service to the area (Zone 5E/6E). Category 292 AT-Arts CB-Chargeba CO-Constructi DS-Design LA-Land Acq OT-Other SY-Study AT-Arts CB-Chargeba CO-Constructi DS-Design Funding Source FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 Total Water Water Water Water Water Water Water Water Exp. N. of Bell Water Exp. N. of Bell Water Exp. N. of Bell Water Exp. N. of Bell $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $21,856 $106,440 $1,951,375 $234,167 $58,542 $69,079 $58,542 $29,957 $145,894 $2,674,747 $320,968 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $21,856 $106,440 $1,951,375 $234,167 $58,542 $69,079 $58,542 $29,957 $145,894 $2,674,747 $320,968 LA-Land Acq Water Exp. N. of Bell OT-Other Water Exp. N. of Bell SY-Study Water Exp. N. of Bell $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $80,242 $94,686 $80,242 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $80,242 $94,686 $80,242 $0 $0 $0 $0 $5,926,737 $0 $0 $0 $0 $0 $5,926,737 Total Budget City of Peoria FY 2018 – FY2027 Capital Improvement Program 293 FY 2018-2027 Capital Improvement Program Appendix A - Account Number Detail Drainage Account Program Project/ Segment Carry/ Base FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 23-27 Total $50,000 $0 $0 $0 $0 $0 $50,000 Carryover $194,932 $0 $0 $0 $0 $0 $194,932 Project Total $244,932 $0 $0 $0 $0 $0 $244,932 81st Ave / Varney Park Drainage Solution EN00482 (Page Number 38) 4252-4252-543004 CIPDR CO 4251-4251-543004 CIPDR CO 85th Ave Storm Drain; Peoria Av to Grand Av EN00182 (Page Number 39) 4252-4252-525515 CIPDR AT $0 $0 $0 $0 $0 $2,120 $2,120 4252-4252-540000 CIPDR LA $0 $0 $0 $0 $0 $1,100,000 $1,100,000 4252-4252-543004 CIPDR DS $0 $0 $0 $0 $0 $212,000 $212,000 4252-4252-544001 CB $0 $0 $0 $0 $0 $96,000 $96,000 $0 $0 $0 $0 $0 $1,410,120 $1,410,120 $4,037 $20,042 $24,079 CIPOF Project Total 87th Ave Storm Drain; Hatcher Rd to Monroe St EN00257 (Page Number 40) 4252-4252-525515 CIPDR AT $0 $0 $0 $0 4252-4252-543004 CIPDR CO $0 $0 $0 $0 $0 $2,004,152 $2,004,152 4252-4252-543004 CIPDR DS $0 $0 $0 $0 $403,684 $0 $403,684 4252-4252-544001 CB $0 $0 $0 $0 $0 $61,200 $61,200 Project Total $0 $0 $0 $0 $407,721 $2,085,394 $2,493,115 CIPOF Beardsley Rd Channel Improvements PW00112 (Page Number 41) 4251-4251-543004 CIPDR CO Carryover $1,500,000 $0 $0 $0 $0 $0 $1,500,000 4252-4252-543004 CIPDR CO Carryover $1,008,377 $0 $0 $0 $0 $0 $1,008,377 Project Total $2,508,377 $0 $0 $0 $0 $0 $2,508,377 $0 $6,153 Desert Harbor/91st Ave Channel Improvements EN00531 (Page Number 42) 4252-4252-525515 CIPDR AT $0 $0 $0 $6,153 $0 4252-4252-543004 CIPDR CO $0 $0 $0 $550,258 $0 $0 $550,258 4252-4252-543004 CIPDR DS $0 $0 $0 $65,000 $0 $0 $65,000 4252-4252-544001 CIPOF CB $0 $0 $0 $14,521 $0 $0 $14,521 4252-4252-543004 CIPDR CO Carryover $49,500 $0 $0 $0 $0 $0 $49,500 Project Total $49,500 $0 $0 $635,932 $0 $0 $685,432 294 FY 2018-2027 Capital Improvement Program Appendix A - Account Number Detail Drainage Account Program Project/ Segment Carry/ Base FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 23-27 Total Lake Pleasant Basin Access Ramp EN00523 (Page Number 43) 4252-4252-525515 CIPDR AT $0 $0 $0 $4,995 $0 4252-4252-543004 CIPDR CO $0 $0 $0 $450,000 4252-4252-543004 CIPDR DS $0 $0 $0 $49,500 4252-4252-544001 CB $0 $0 $0 $0 $0 CIPOF Project Total $0 $4,995 $0 $0 $450,000 $0 $0 $49,500 $6,000 $0 $0 $6,000 $0 $510,495 $0 $0 $510,495 Mountain View Rd Drainage; 91st Av to 89th Av EN00130 (Page Number 44) 4252-4252-525515 CIPDR AT $0 $0 $0 $0 $1,500 $10,550 $12,050 4252-4252-543004 CIPDR CO $0 $0 $0 $0 $0 $1,055,000 $1,055,000 4252-4252-543004 CIPDR DS $0 $0 $0 $0 $150,000 $0 $150,000 4252-4252-544001 CB $0 $0 $0 $0 $22,000 $44,000 $66,000 $0 $0 $0 $0 $173,500 $1,109,550 $1,283,050 $350,000 $0 $0 $0 $0 $0 $350,000 CIPOF Project Total Neighborhood Drainage Program EN00458 (Page Number 45) 4252-4252-543004 CIPDR CO 4251-4251-543004 CIPDR CO Carryover $50,000 $0 $0 $0 $0 $0 $50,000 4252-4252-543004 CIPDR CO Carryover $200,000 $0 $0 $0 $0 $0 $200,000 Project Total $600,000 $0 $0 $0 $0 $0 $600,000 $0 $80,000 $0 $0 $80,000 New River & Jomax Rd Concrete Box Culvert EN00354 (Page Number 46) 4252-4252-520099 CIPDR SY $0 $0 4252-4252-525515 CIPDR AT $0 $0 $0 $0 $0 $27,350 $27,350 4252-4252-540000 CIPDR LA $0 $0 $0 $0 $420,000 $0 $420,000 4252-4252-543004 CIPDR DS $0 $0 $0 $0 $0 $2,735,000 $2,735,000 4252-4252-544001 CIPOF CB $0 $0 $0 $8,000 $15,000 $52,000 $75,000 4251-4251-543004 CIPDR CO Carryover $17,000 $0 $0 $0 $0 $0 $17,000 Project Total $17,000 $0 $0 $88,000 $435,000 $2,814,350 $3,354,350 New River Trail - BLM EN00371 (Page Number 47) 4252-4252-520099 CIPRT SY Carryover $96,000 $0 $0 $0 $0 $0 $96,000 4252-4252-540000 CIPRT LA Carryover $79,529 $0 $0 $0 $0 $0 $79,529 Project Total $175,529 $0 $0 $0 $0 $0 $175,529 295 FY 2018-2027 Capital Improvement Program Appendix A - Account Number Detail Drainage Account Program Project/ Segment Carry/ Base FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 23-27 Total $0 $0 $600,000 $0 $0 $600,000 $1,200,000 Peoria Storm Drain Master Plan - Land Preservation EN00524 (Page Number 48) 4252-4252-540000 CIPDR LA 4252-4252-544001 CIPOF CB $0 $0 $1,500 $0 $0 $1,500 $3,000 4251-4251-540000 CIPDR LA Carryover $333,264 $0 $0 $0 $0 $0 $333,264 4252-4252-540000 CIPDR LA Carryover $363,851 $0 $0 $0 $0 $0 $363,851 Project Total $697,115 $0 $601,500 $0 $0 $601,500 $1,900,115 Pinnacle Peak Drainage; 87th Ave to 91st Ave EN00455 (Page Number 49) 4252-4252-525515 CIPDR AT $0 $0 $14,800 $0 $0 $0 $14,800 4252-4252-543004 CIPDR CO $0 $0 $1,480,000 $0 $0 $0 $1,480,000 CIPOF CB 4252-4252-543004 CIPDR 4252-4252-544001 CO $0 $0 $18,000 $0 $0 $0 $18,000 Carryover $320,000 $0 $0 $0 $0 $0 $320,000 Project Total $320,000 $0 $1,512,800 $0 $0 $0 $1,832,800 Pinnacle Peak Rd & 67th Av Channel to New River EN00119 (Page Number 50) 4251-4251-543004 CIPDR DS $726,467 $0 $0 $0 $0 $0 $726,467 4810-4810-525515 CIPDR AT $0 $0 $70,000 $0 $0 $0 $70,000 4810-4810-543004 CIPDR CO $0 $0 $7,000,000 $0 $0 $0 $7,000,000 4252-4252-525515 CIPDR AT $0 $22,630 $35,549 $0 $0 $0 $58,179 4252-4252-540000 CIPDR LA $0 $37,000 $0 $0 $0 $0 $37,000 4252-4252-543004 CIPDR CO $0 $0 $3,164,888 $0 $0 $0 $3,164,888 4252-4252-543004 CIPDR DS $586,533 $2,263,000 $390,000 $0 $0 $0 $3,239,533 4252-4252-544001 CIPOF CB $0 $33,000 $0 $0 $0 $0 $33,000 4251-4251-520099 CIPDR SY Carryover $600,000 $0 $0 $0 $0 $0 $600,000 4251-4251-543004 CIPDR CO Carryover $1,583,476 $0 $0 $0 $0 $0 $1,583,476 Project Total $3,496,476 $2,355,630 $10,660,437 $0 $0 $0 $16,512,543 Union Hills Channel EN00137 (Page Number 52) 4252-4252-525515 CIPDR AT $0 $5,000 $5,000 $11,344 $0 $0 $21,344 4252-4252-543004 CIPDR CO $500,000 $500,000 $500,000 $1,134,448 $0 $0 $2,634,448 4251-4251-543004 CIPDR CO Carryover $575,730 $0 $0 $0 $0 $0 $575,730 Project Total $1,075,730 $505,000 $505,000 $1,145,792 $0 $0 $3,231,522 296 FY 2018-2027 Capital Improvement Program Appendix A - Account Number Detail Drainage Account Program Project/ Segment Carry/ Base FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 23-27 Total $1,325 $6,971 $0 $8,296 Williams Road Channel Improvements EN00543 (Page Number 53) 4252-4252-525515 CIPDR AT $0 $0 $0 4252-4252-543004 CIPDR CO $0 $0 $0 $0 $697,071 $0 $697,071 4252-4252-543004 CIPDR DS $0 $0 $0 $132,505 $0 $0 $132,505 4252-4252-544001 CB $0 $0 $0 $6,116 $9,958 $0 $16,074 $0 $0 $0 $139,946 $714,000 $0 $853,946 $2,860,630 $13,279,737 $2,520,165 $1,730,221 $8,020,914 $37,596,326 CIPOF Project Total Total - Drainage $9,184,659 297 FY 2018-2027 Capital Improvement Program Appendix A - Account Number Detail Economic Development Account Program Project/ Segment Carry/ Base FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 Carryover $0 $0 $0 $73,760 $73,760 $368,800 $516,320 Project Total $0 $0 $0 $73,760 $73,760 $368,800 $516,320 $500,000 $0 $0 $0 $0 $0 $500,000 Project Total $500,000 $0 $0 $0 $0 $0 $500,000 Carryover $175,000 $0 $0 $0 $0 $0 $175,000 Project Total $175,000 $0 $0 $0 $0 $0 $175,000 Carryover $673,000 $0 $0 $0 $0 $0 $673,000 Project Total $673,000 $0 $0 $0 $0 $0 $673,000 $550,000 $425,000 $0 $0 $0 $0 $975,000 Project Total $550,000 $425,000 $0 $0 $0 $0 $975,000 Carryover $1,109,000 $0 $0 $0 $0 $0 $1,109,000 Project Total $1,109,000 $0 $0 $0 $0 $0 $1,109,000 $0 $65,516 $65,516 $65,516 $65,517 $327,585 $589,650 FY 23-27 Total Arrowhead Equities (Huntington Univ. Building) ED00023 (Page Number 58) 1900-1900-522070 CIPOF OT Commercial Abatement ED00025 (Page Number 59) 1210-0350-541003 CIPOF OT Denaro Medical Plaza ED00021 (Page Number 60) 1900-1900-522070 CIPOF OT GE Avionics (Aviage Systems) ED00015 (Page Number 61) 1900-1900-522070 CIPOF OT Huntington University ED00018 (Page Number 62) 1900-1900-522070 CIPOF OT Maxwell Technologies ED00008 (Page Number 63) 1900-1900-522070 CIPOF OT Modern Round ED00022 (Page Number 64) 1210-0350-522070 CIPOF OT 1210-0350-522070 CIPOF OT Carryover $65,517 $0 $0 $0 $0 $0 $65,517 Project Total $65,517 $65,516 $65,516 $65,516 $65,517 $327,585 $655,167 P83 Entertainment District Improvements ED00002 (Page Number 65) 4150-4150-520099 CIPOF SY Carryover $17,845 $0 $0 $0 $0 $0 $17,845 4150-4150-543001 CIPOF CO Carryover $208,711 $0 $0 $0 $0 $0 $208,711 4550-4550-541003 CIPOF EQ Carryover $407,890 $0 $0 $0 $0 $0 $407,890 $127,929 4550-4550-543001 CIPOF CO Carryover $127,929 $0 $0 $0 $0 $0 1000-0310-543001 CIPOF CO Carryover $11,043 $0 $0 $0 $0 $0 $11,043 Project Total $773,418 $0 $0 $0 $0 $0 $773,418 298 FY 2018-2027 Capital Improvement Program Appendix A - Account Number Detail Economic Development Account Program Project/ Segment Carry/ Base FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 23-27 Total $25,000,000 $0 $0 $0 $0 $0 $25,000,000 $25,000,000 $0 $0 $0 $0 $0 $25,000,000 $500,000 $0 $0 $0 $0 $0 $500,000 P83 Innovation Center Project Parking Structure ED00020 (Page Number 66) 4233-4233-541003 CIPOF CO Project Total Washington Street Redevelopment ED00024 (Page Number 67) 1210-0350-541003 CIPOF OT 1900-1900-520099 CIPOF LA Carryover $169,657 $0 $0 $0 $0 $0 $169,657 1900-1900-540000 CIPOF LA Carryover $3,378 $0 $0 $0 $0 $0 $3,378 Project Total $673,035 $0 $0 $0 $0 $0 $673,035 $29,518,970 $490,516 $65,516 $139,276 $139,277 $696,385 $31,049,940 Total - Economic Development 299 FY 2018-2027 Capital Improvement Program Appendix A - Account Number Detail Operational Facilities Account Program Project/ Segment Carry/ Base FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 Carryover $2,087 $0 $0 $0 $0 FY 23-27 Total Arts Distribution FY2018 AT02018 (Page Number 74) 4150-4150-525515 CIPOT AT $0 $2,087 4550-4550-525515 CIPOT AT Carryover $110,875 $0 $0 $0 $0 $0 $110,875 7910--525515 CIPOT AT Carryover $13,360 $0 $0 $0 $0 $0 $13,360 2590--525515 CIPOT AT Carryover $385 $0 $0 $0 $0 $0 $385 7911-7911-525515 CIPOT AT Carryover $9,500 $0 $0 $0 $0 $0 $9,500 1000-0310-525515 CIPOT AT Carryover $27,312 $0 $0 $0 $0 $0 $27,312 4251-4251-525515 CIPOT AT Carryover $122,998 $0 $0 $0 $0 $0 $122,998 7000-7050-525515 CIPOT AT Carryover $111,457 $0 $0 $0 $0 $0 $111,457 7930-7930-525515 CIPOT AT Carryover $15,000 $0 $0 $0 $0 $0 $15,000 1970-1970-525515 CIPOT AT Carryover $1,050 $0 $0 $0 $0 $0 $1,050 7904--525515 CIPOT AT Carryover $2,002 $0 $0 $0 $0 $0 $2,002 7907--525515 CIPOT AT Carryover $12,100 $0 $0 $0 $0 $0 $12,100 7908--525515 CIPOT AT Carryover $7,550 $0 $0 $0 $0 $0 $7,550 4810-4810-525515 CIPOT AT Carryover $97,382 $0 $0 $0 $0 $0 $97,382 7943--525515 CIPOT AT Carryover $27,000 $0 $0 $0 $0 $0 $27,000 4252-4252-525515 CIPOT AT Carryover $269,503 $0 $0 $0 $0 $0 $269,503 4233--525515 CIPOT AT Carryover $250,000 $0 $0 $0 $0 $0 $250,000 7150--525515 CIPOT AT Carryover $79 $0 $0 $0 $0 $0 $79 2600--525515 CIPOT AT Carryover $1,658 $0 $0 $0 $0 $0 $1,658 7920-7920-525515 CIPOT AT Carryover $2,500 $0 $0 $0 $0 $0 $2,500 7007--525515 CIPOT AT Carryover $10,300 $0 $0 $0 $0 $0 $10,300 7003-7053-525515 CIPOT AT Carryover $16,847 $0 $0 $0 $0 $0 $16,847 7010-7075-525515 CIPOT AT Carryover $225,264 $0 $0 $0 $0 $0 $225,264 2400-2550-525515 CIPOT AT Carryover $86,616 $0 $0 $0 $0 $0 $86,616 2506-2626-525515 CIPOT AT Carryover $1,679 $0 $0 $0 $0 $0 $1,679 2507-2627-525515 CIPOT AT Carryover $2,245 $0 $0 $0 $0 $0 $2,245 2509-2629-525515 CIPOT AT Carryover $17,700 $0 $0 $0 $0 $0 $17,700 2050-2140-525515 CIPOT AT Carryover $130,276 $0 $0 $0 $0 $0 $130,276 2164-2224-525515 CIPOT AT Carryover $65,562 $0 $0 $0 $0 $0 $65,562 2163-2223-525515 CIPOT AT Carryover $5,578 $0 $0 $0 $0 $0 $5,578 2161-2221-525515 CIPOT AT Carryover $57,878 $0 $0 $0 $0 $0 $57,878 2162-2222-525515 CIPOT AT Carryover $22,384 $0 $0 $0 $0 $0 $22,384 2167-2227-525515 CIPOT AT Carryover $7,000 $0 $0 $0 $0 $0 $7,000 2270-2350-525515 CIPOT AT Carryover $25,000 $0 $0 $0 $0 $0 $25,000 Project Total $1,758,127 $0 $0 $0 $0 $0 $1,758,127 300 FY 2018-2027 Capital Improvement Program Appendix A - Account Number Detail Operational Facilities Account Program Project/ Segment Carry/ Base FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 23-27 Total $1,621,406 $0 $0 $0 $0 $0 $1,621,406 $1,621,406 $0 $0 $0 $0 $0 $1,621,406 $75,000 $75,000 $75,000 $0 $0 $0 $225,000 Asphalt Repair and Replacement-MOC PW01199 (Page Number 76) 4251-4251-541003 CIPOF CO Project Total Building Equipment Renovation and Replacement PW00050 (Page Number 77) 1970-1970-520099 CIPOF SY 1970-1970-542006 CIPOF EQ 1970-1970-541003 CIPOT EQ $95,000 $0 $0 $0 $0 $0 $95,000 Carryover $70,717 $0 $0 $0 $0 $0 $70,717 Project Total $240,717 $75,000 $75,000 $0 $0 $0 $390,717 $75,000 $0 $0 $0 $0 $0 $75,000 Building Fixture and Finish Renovation PW00060 (Page Number 78) 1970-1970-540500 CIPOF CO 1000-0310-524002 CIPOF CO Carryover $4,612 $0 $0 $0 $0 $0 $4,612 1970-1970-541003 CIPOT EQ Carryover $74,255 $0 $0 $0 $0 $0 $74,255 Project Total $153,867 $0 $0 $0 $0 $0 $153,867 Carryover $187,946 $0 $0 $0 $0 $0 $187,946 Chargeback Distribution FY2018 CB02018 (Page Number 79) 1000--544001 CIPOF CB 4251--544001 CIPOF CB Carryover $90,000 $0 $0 $0 $0 $0 $90,000 7000--544001 CIPOF CB Carryover $37,653 $0 $0 $0 $0 $0 $37,653 4810--544001 CIPOF CB Carryover $6,347 $0 $0 $0 $0 $0 $6,347 4252--544001 CIPOF CB Carryover $322,334 $0 $0 $0 $0 $0 $322,334 7007--544001 CIPOF CB Carryover $160,000 $0 $0 $0 $0 $0 $160,000 7003--544001 CIPOF CB Carryover $121,239 $0 $0 $0 $0 $0 $121,239 7010--544001 CIPOF CB Carryover $569,764 $0 $0 $0 $0 $0 $569,764 2400--544001 CIPOF CB Carryover $22,100 $0 $0 $0 $0 $0 $22,100 2050--544001 CIPOF CB Carryover $58,327 $0 $0 $0 $0 $0 $58,327 2164--544001 CIPOF CB Carryover $75,200 $0 $0 $0 $0 $0 $75,200 2161--544001 CIPOF CB Carryover $135,782 $0 $0 $0 $0 $0 $135,782 2162--544001 CIPOF CB Carryover $25,008 $0 $0 $0 $0 $0 $25,008 Project Total $1,811,700 $0 $0 $0 $0 $0 $1,811,700 City Hall Roof Replacement PW00150 (Page Number 80) 4252-4252-525515 CIPOF AT $0 $0 $0 $0 $5,000 $0 $5,000 4252-4252-540500 CIPOF CO $0 $0 $0 $0 $500,000 $0 $500,000 $0 $0 $0 $0 $505,000 $0 $505,000 Project Total 301 FY 2018-2027 Capital Improvement Program Appendix A - Account Number Detail Operational Facilities Account Program Project/ Segment Carry/ Base FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 23-27 $0 $6,970 Total City Parks Parking Lots - Asphalt Replacement PW00995 (Page Number 81) 4252-4252-525515 CIPOF AT $0 $2,660 $0 $1,500 4252-4252-541003 CIPOF CO $0 $266,000 $0 $150,000 $0 $697,000 $1,113,000 Project Total $0 $268,660 $0 $151,500 $0 $703,970 $1,124,130 $55,000 $0 $0 $0 $0 $0 $55,000 Carryover $191,557 $0 $0 $0 $0 $0 $191,557 Project Total $246,557 $0 $0 $0 $0 $0 $246,557 $11,130 Citywide Security Program PW00506 (Page Number 82) 1000-0310-542006 CIPOF EQ 1000-0310-541003 CIPOF EQ Community Works Program COP0001 (Page Number 83) 1000-0310-542003 CIPOF CO $500,000 $0 $0 $0 $0 $0 $500,000 7000-7050-543001 CIPOF CO $495,000 $0 $0 $0 $0 $0 $495,000 1000-0310-543005 CIPPK CO Carryover $124,700 $0 $0 $0 $0 $0 $124,700 7000-7050-543001 CIPST CO Carryover $500,000 $0 $0 $0 $0 $0 $500,000 Project Total $1,619,700 $0 $0 $0 $0 $0 $1,619,700 Council Chambers Building Repair Program PW00510 (Page Number 85) 4252-4252-525515 CIPOF AT $0 $0 $800 $0 $1,500 $4,500 $6,800 4252-4252-540500 CIPOF CO $0 $0 $80,000 $0 $150,000 $450,000 $680,000 $0 $0 $80,800 $0 $151,500 $454,500 $686,800 $50,000 $0 $0 $0 $0 $0 $50,000 Project Total Fire Department Building Needs PW00090 (Page Number 86) 1000-0310-540500 CIPOF CO 1000-0310-524002 CIPOF CO Carryover $223,526 $0 $0 $0 $0 $0 $223,526 1970-1970-524002 CIPOF CO Carryover $30,000 $0 $0 $0 $0 $0 $30,000 Project Total $303,526 $0 $0 $0 $0 $0 $303,526 CO $26,962 $0 $0 $0 $0 $0 $26,962 Fleet Heavy Duty Vehicle Lift PW13010 (Page Number 87) 2590-2720-542004 CIPOF 7000-7050-542004 CIPOF CO $11,102 $0 $0 $0 $0 $0 $11,102 7150-7200-542004 CIPOF CO $7,930 $0 $0 $0 $0 $0 $7,930 2600-2750-542004 CIPOF CO $112,606 $0 $0 $0 $0 $0 $112,606 $158,600 $0 $0 $0 $0 $0 $158,600 Project Total 302 FY 2018-2027 Capital Improvement Program Appendix A - Account Number Detail Operational Facilities Account Program Project/ Segment Carry/ Base FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 23-27 Total Carryover $94,800 $0 $0 $0 $0 $0 $94,800 Project Total $94,800 $0 $0 $0 $0 $0 $94,800 Historic Buildings Equipment and Finish Renovation PW10300 (Page Number 88) 1000-0310-541003 CIPOF EQ Impact Fee Study CD00007 (Page Number 89) 7937-7937-520099 CIPOF SY $0 $0 $9,000 $0 $0 $18,000 $27,000 7932-7932-520099 CIPOF SY $0 $0 $9,000 $0 $0 $18,000 $27,000 7941-7941-520099 CIPOF SY $0 $0 $9,000 $0 $0 $18,000 $27,000 7943-7943-520099 CIPOF SY $0 $0 $9,000 $0 $0 $18,000 $27,000 7942-7942-520099 CIPOF SY $0 $0 $9,000 $0 $0 $18,000 $27,000 7003-7053-520099 CIPOF SY $0 $0 $55,000 $0 $0 $110,000 $165,000 7937-7937-520099 CIPOF SY Carryover $9,000 $0 $0 $0 $0 $0 $9,000 7932-7932-520099 CIPOF SY Carryover $9,000 $0 $0 $0 $0 $0 $9,000 7941-7941-520099 CIPOF SY Carryover $9,000 $0 $0 $0 $0 $0 $9,000 7943-7943-520099 CIPOF SY Carryover $9,000 $0 $0 $0 $0 $0 $9,000 7942-7942-520099 CIPOF SY Carryover $9,000 $0 $0 $0 $0 $0 $9,000 7007-7057-520099 CIPOF SY Carryover $18,000 $0 $0 $0 $0 $0 $18,000 7003-7053-520099 CIPOF SY Carryover $37,000 $0 $0 $0 $0 $0 $37,000 Project Total $100,000 $0 $100,000 $0 $0 $200,000 $400,000 $11,535 $0 $0 $0 $0 $0 $11,535 MOC Fuel Island PW00305 (Page Number 90) 2590-2720-542004 CIPOF CO 1000-0310-542004 CIPOF CO $13,265 $0 $0 $0 $0 $0 $13,265 2600-2750-542004 CIPOF CO $53,200 $0 $0 $0 $0 $0 $53,200 2590-2720-541003 CIPOF EQ Carryover $1,650 $0 $0 $0 $0 $0 $1,650 1000-0310-541003 CIPOF EQ Carryover $6,775 $0 $0 $0 $0 $0 $6,775 1000-0310-542006 CIPOF EQ Carryover $62 $0 $0 $0 $0 $0 $62 Project Total $86,487 $0 $0 $0 $0 $0 $86,487 MOC Site Lighting Improvements PW00402 (Page Number 91) 4550-4550-541003 CIPOF CO $368,000 $0 $0 $0 $0 $0 $368,000 4550-4550-541003 CIPOF DS $12,000 $0 $0 $0 $0 $0 $12,000 $380,000 $0 $0 $0 $0 $0 $380,000 Project Total 303 FY 2018-2027 Capital Improvement Program Appendix A - Account Number Detail Operational Facilities Account Program Project/ Segment Carry/ Base FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 23-27 Total Network Infrastructure Replacement - Beardsley WRF IT00011 (Page Number 92) 2400-2550-542008 CIPOF EQ $0 $60,300 $0 $0 $0 2050-2140-542008 CIPOF EQ $0 $20,100 $0 $0 $0 $20,100 $40,200 $0 $80,400 $0 $0 $0 $80,400 $160,800 Project Total $60,300 $120,600 Network Infrastructure Replacement - Butler WRF IT00013 (Page Number 93) 2400-2550-542008 CIPOF EQ $0 $0 $70,350 $0 $0 $70,350 $140,700 2050-2140-542008 CIPOF EQ $0 $0 $23,450 $0 $0 $23,450 $46,900 $0 $0 $93,800 $0 $0 $93,800 $187,600 $174,000 $0 $0 $0 $0 $0 $174,000 $174,000 $0 $0 $0 $0 $0 $174,000 $0 $93,800 $0 $0 $0 $93,800 $187,600 $0 $93,800 $0 $0 $0 $93,800 $187,600 Project Total Network Infrastructure Replacement - City Hall IT00027 (Page Number 94) 3400-3850-542008 CIPOF EQ Project Total Network Infrastructure Replacement - Greenway WTF IT00010 (Page Number 95) 2050-2140-542008 CIPOF EQ Project Total Network Infrastructure Replacement - Jomax WTF IT00012 (Page Number 96) 2400-2550-542008 CIPOF EQ $0 $0 $52,500 $0 $0 $52,500 $105,000 2050-2140-542008 CIPOF EQ $0 $0 $17,500 $0 $0 $17,500 $35,000 $0 $0 $70,000 $0 $0 $70,000 $140,000 $60,000 $0 $0 $0 $0 $0 $60,000 $60,000 $0 $0 $0 $0 $0 $60,000 Project Total Network Infrastructure Replacement - Microwave WAN IT00026 (Page Number 97) 3400-3850-542008 CIPOF EQ Project Total Network Infrastructure Replacement - MOC IT00014 (Page Number 98) 1000-0310-542008 CIPOF EQ $0 $0 $31,790 $0 $0 $31,790 $63,580 7000-7050-542008 CIPOF EQ $0 $0 $29,923 $0 $0 $29,923 $59,846 2600-2750-542008 CIPOF EQ $0 $0 $14,340 $0 $0 $14,340 $28,680 2050-2140-542008 CIPOF EQ $0 $0 $19,950 $0 $0 $19,950 $39,900 $0 $0 $96,003 $0 $0 $96,003 $192,006 $64,000 $0 $0 $0 $0 $64,000 $128,000 $64,000 $0 $0 $0 $0 $64,000 $128,000 Project Total Network Infrastructure Replacement - Quintero WTF IT00017 (Page Number 99) 2050-2140-542008 CIPOF EQ Project Total 304 FY 2018-2027 Capital Improvement Program Appendix A - Account Number Detail Operational Facilities Account Program Project/ Segment Carry/ Base FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 23-27 Total $100,000 $0 $0 $0 $0 $0 $100,000 $100,000 $0 $0 $0 $0 $0 $100,000 $90,000 $0 $0 $0 $0 $0 $90,000 $90,000 $0 $0 $0 $0 $0 $90,000 $95,000 $0 $0 $0 $0 $0 $95,000 Network Infrastructure Replacement - Remote Access IT00032 (Page Number 100) 3400-3850-542008 CIPOF EQ Project Total Network Infrastructure Replacement-Municipal Court IT00020 (Page Number 101) 3400-3850-542008 CIPOF EQ Project Total Parking Lot Maintenance for City Buildings PW11150 (Page Number 102) 1000-0310-541003 CIPOF CO 1000-0310-540500 CIPOF CO Carryover $1,452 $0 $0 $0 $0 $0 $1,452 1000-0310-541003 CIPOF EQ Carryover $29,700 $0 $0 $0 $0 $0 $29,700 Project Total $126,152 $0 $0 $0 $0 $0 $126,152 Carryover $49,955 $0 $0 $0 $0 $0 $49,955 Project Total $49,955 $0 $0 $0 $0 $0 $49,955 Peoria Center for Performing Arts PW00080 (Page Number 103) 1000-0310-520099 CIPOF SY Peoria Transit Center PW00325 (Page Number 104) 4810-4810-525515 CIPOF AT $0 $0 $0 $0 $0 $24,990 $24,990 4810-4810-540500 CIPOF CO $0 $0 $0 $0 $0 $2,342,381 $2,342,381 4810-4810-540500 CIPOF DS $0 $0 $0 $0 $0 $156,575 $156,575 4810-4810-544001 CIPOF CB $0 $0 $0 $0 $0 $43,225 $43,225 4810-4810-520099 CIPOF SY Carryover $50,165 $0 $0 $0 $0 $0 $50,165 4810-4810-540000 CIPOF LA Carryover $782,876 $0 $0 $0 $0 $0 $782,876 4810-4810-540500 CIPOF CO Carryover $156,575 $0 $0 $0 $0 $0 $156,575 Project Total $989,616 $0 $0 $0 $0 $2,567,171 $3,556,787 Carryover $975,704 $0 $0 $0 $0 $0 $975,704 Project Total $975,704 $0 $0 $0 $0 $0 $975,704 $549,535 Pyramid Peak Radio Site IT00035 (Page Number 105) 4550-4550-541003 CIPOF EQ Radio Subscriber Replacements IT00018 (Page Number 106) 4251-4251-542008 CIPOF EQ $549,535 $0 $0 $0 $0 $0 4252-4252-542008 CIPOF EQ $0 $549,535 $549,535 $0 $0 $0 $1,099,070 $549,535 $549,535 $549,535 $0 $0 $0 $1,648,605 Project Total 305 FY 2018-2027 Capital Improvement Program Appendix A - Account Number Detail Operational Facilities Account Program Project/ Segment Carry/ Base FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 $0 $0 $0 $30,000 $0 FY 23-27 Total Renovate Main Library PW00509 (Page Number 107) 4252-4252-525515 CIPOF AT $0 $30,000 4252-4252-540500 CIPOF CO $0 $0 $0 $3,000,000 4252-4252-520099 CIPOF SY Carryover $260,000 $0 $0 $0 $0 $0 $3,000,000 $0 $0 $260,000 4252-4252-541003 CIPOF EQ Carryover $975,000 $0 $0 $0 $0 $0 $975,000 4252-4252-541500 CIPOF EQ Carryover $250,000 $0 $0 $0 $0 $0 $250,000 Project Total $1,485,000 $0 $0 $3,030,000 $0 $0 $4,515,000 $3,714,400 $0 $0 $0 $0 $0 $3,714,400 Transit Park and Ride Lot PW00335 (Page Number 108) 4810-4810-540500 CIPOF CO 4810-4810-540500 CIPOF DS $386,400 $0 $0 $0 $0 $0 $386,400 4810-4810-540000 CIPOF LA Carryover $2,138,675 $0 $0 $0 $0 $0 $2,138,675 4810-4810-540500 CIPOF CO Carryover $502,247 $0 $0 $0 $0 $0 $502,247 Project Total $6,741,722 $0 $0 $0 $0 $0 $6,741,722 $0 $2,000,000 $0 $0 $0 $0 $2,000,000 $0 $2,000,000 $0 $0 $0 $0 $2,000,000 $19,981,171 $3,067,395 $1,065,138 $3,181,500 $656,500 $4,423,644 $32,375,348 Vistancia Radio Site IT00034 (Page Number 109) 4252-4252-542008 CIPOF EQ Project Total Total - Operational Facilities 306 FY 2018-2027 Capital Improvement Program Appendix A - Account Number Detail Parks - Community Account Program Project/ Segment Carry/ Base FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 AT $0 $0 $20,000 $0 $0 FY 23-27 Total Northern Community Park CS00059 (Page Number 128) 4550-4550-525515 CIPPK $0 $20,000 4550-4550-543005 CIPPK CO $10,000,000 $0 $2,000,000 $0 $0 $0 $12,000,000 7910-7910-543005 CIPPK CO $1,336,001 $0 $0 $0 $0 $0 $1,336,001 1000-0310-525515 CIPPK AT $0 $0 $0 $5,000 $0 $0 $5,000 1000-0310-542006 CIPPK CO $0 $0 $0 $500,000 $0 $0 $500,000 7904-7904-543005 CIPPK CO $220,000 $0 $0 $0 $0 $0 $220,000 7907-7907-543005 CIPPK CO $1,210,000 $0 $0 $0 $0 $0 $1,210,000 7908-7908-543005 CIPPK CO $755,000 $0 $0 $0 $0 $0 $755,000 7943-7943-543005 CIPPK CO $2,700,000 $0 $0 $0 $0 $0 $2,700,000 7942-7942-542003 CIPPK EQ $1,500,000 $0 $0 $0 $0 $0 $1,500,000 4252-4252-525515 CIPPK AT $0 $0 $0 $477 $0 $0 $477 4252-4252-543005 CIPPK CO $20,613,876 $0 $0 $47,664 $0 $0 $20,661,540 7911-7911-520510 CIPPK OT Carryover $456 $0 $0 $0 $0 $0 $456 7911-7911-543005 CIPPK CO Carryover $950,000 $0 $0 $0 $0 $0 $950,000 Project Total $39,285,333 $0 $2,020,000 $553,141 $0 $0 $41,858,474 $39,285,333 $0 $2,020,000 $553,141 $0 $0 $41,858,474 Total - Parks - Community 307 FY 2018-2027 Capital Improvement Program Appendix A - Account Number Detail Parks - Neighborhood Account Program Project/ Segment Carry/ Base FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 23-27 Total $0 $11,002 $0 $0 $0 $11,002 Camino a Lago Park#2 (The Meadows) CS00086 (Page Number 123) 4550-4550-525515 CIPPK AT $0 4550-4550-542006 CIPPK CO $0 $0 $1,100,213 $0 $0 $0 $1,100,213 4251-4251-525515 CIPPK AT $0 $6,558 $1,121 $0 $0 $0 $7,679 4251-4251-542006 CIPPK CO $0 $703,700 $160,000 $0 $0 $0 $863,700 4252-4252-525515 CIPPK AT $0 $0 $24,750 $0 $0 $0 $24,750 4252-4252-542006 CIPPK CO $0 $0 $2,475,000 $0 $0 $0 $2,475,000 $0 $710,258 $3,772,086 $0 $0 $0 $4,482,344 Project Total Country Meadows Park Improvements CS00203 (Page Number 126) 4252-4252-525515 CIPOT AT $0 $2,396 $11,981 $0 $0 $0 $14,377 4252-4252-543005 CIPPK CO $0 $239,613 $1,198,064 $0 $0 $0 $1,437,677 4252-4252-544001 CIPOF CB $0 $23,973 $23,973 $0 $0 $0 $47,946 $0 $265,982 $1,234,018 $0 $0 $0 $1,500,000 Project Total Sonoran Mountain Ranch Park Improvements CS00204 (Page Number 132) 4252-4252-525515 CIPOT AT $0 $581 $2,905 $0 $0 $0 $3,486 4252-4252-543005 CIPPK CO $0 $58,095 $290,473 $0 $0 $0 $348,568 4252-4252-544001 CIPOF CB $0 $23,973 $23,973 $0 $0 $0 $47,946 Project Total $0 $82,649 $317,351 $0 $0 $0 $400,000 $200,000 $0 $0 $0 $0 $0 $200,000 Project Total $200,000 $0 $0 $0 $0 $0 $200,000 $200,000 $1,058,889 $5,323,455 $0 $0 $0 $6,582,344 Varney Park Improvements CS00201 (Page Number 136) 4252-4252-543005 CIPPK CO Total - Parks - Neighborhood 308 FY 2018-2027 Capital Improvement Program Appendix A - Account Number Detail Parks - Other Account Program Project/ Segment Carry/ Base FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 23-27 Total $100,000 $0 $0 $0 $0 $0 $100,000 Carryover $173,300 $0 $0 $0 $0 $0 $173,300 Project Total $273,300 $0 $0 $0 $0 $0 $273,300 Community Services ADA Compliance CS00177 (Page Number 124) 1000-0310-543005 CIPPK CO 1000-0310-543005 CIPPK CO Community Services Master Plan CS00067 (Page Number 125) 7904-7904-520099 CIPPK SY $0 $42,000 $0 $0 $0 $0 $42,000 7941-7941-520099 CIPPK SY $0 $42,000 $0 $0 $0 $0 $42,000 7943-7943-520099 CIPPK SY $0 $42,000 $0 $0 $0 $0 $42,000 4252-4252-520099 CIPPK SY $0 $174,000 $0 $0 $0 $0 $174,000 Project Total $0 $300,000 $0 $0 $0 $0 $300,000 Carryover $150,786 $0 $0 $0 $0 $0 $150,786 Palo Verde Ruin - Interpretive Plan CS00178 (Page Number 130) 1000-0310-541003 CIPPK EQ 4251-4251-541003 CIPPK EQ Carryover $400,000 $0 $0 $0 $0 $0 $400,000 4252-4252-543004 CIPDR CO Carryover $200,000 $0 $0 $0 $0 $0 $200,000 Project Total $750,786 $0 $0 $0 $0 $0 $750,786 $1,400,000 $0 $0 $0 $0 $0 $1,400,000 Carryover $34,300 $0 $0 $0 $0 $0 $34,300 Project Total $1,434,300 $0 $0 $0 $0 $0 $1,434,300 Carryover $50,000 $0 $0 $0 $0 $0 $50,000 Project Total $50,000 $0 $0 $0 $0 $0 $50,000 $700,000 $0 $0 $0 $0 $0 $700,000 $700,000 $0 $0 $0 $0 $0 $700,000 $3,208,386 $300,000 $0 $0 $0 $0 $3,508,386 Park and Recreation Facility Refurbishment CS00185 (Page Number 131) 1000-0310-543005 CIPPK CO 1000-0310-543005 CIPPK CO Sports Complex Asphalt Remediation CS00179 (Page Number 134) 1210-0350-541003 CIPPK EQ Veterans Memorial Improvements CS00187 (Page Number 137) 1111-0120-543005 CIPPK CO Project Total Total - Parks - Other 309 FY 2018-2027 Capital Improvement Program Appendix A - Account Number Detail Parks - Trails & Open Space Account Program Project/ Segment Carry/ Base FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 Carryover $400,000 $0 $0 $0 $0 $0 $400,000 Project Total $400,000 $0 $0 $0 $0 $0 $400,000 $432,783 $0 $0 $0 $0 $0 $432,783 Carryover $100,000 $0 $0 $0 $0 $0 $100,000 Project Total $532,783 $0 $0 $0 $0 $0 $532,783 FY 23-27 Total 75th Avenue and Deer Valley Trailhead CS00173 (Page Number 120) 4251-4251-543005 CIPPK CO 83rd Avenue and Village Parkway Trailhead CS00156 (Page Number 121) 4252-4252-543005 CIPRT CO 4252-4252-543005 CIPRT CO 99th Ave and Olive Trailhead CS00088 (Page Number 122) 4251-4251-543005 CIPPK CO Carryover $1,295,000 $0 $0 $0 $0 $0 $1,295,000 4251-4251-543005 CIPRT CO Carryover $235,908 $0 $0 $0 $0 $0 $235,908 4252-4252-543005 CIPRT CO Carryover $455,000 $0 $0 $0 $0 $0 $455,000 Project Total $1,985,908 $0 $0 $0 $0 $0 $1,985,908 New River Trail - Williams Rd to Happy Valley Rd CS00128 (Page Number 127) 4252-4252-525515 CIPRT AT $0 $0 $1,591 $0 $0 $0 $1,591 4252-4252-542006 CIPOF CB $0 $0 $11,000 $0 $0 $0 $11,000 4252-4252-542006 CIPRT CO $0 $0 $159,064 $0 $0 $0 $159,064 4252-4252-542006 CIPRT LA $0 $152,110 $0 $0 $0 $0 $152,110 4252-4252-543005 CIPRT DS $272,600 $0 $0 $0 $0 $0 $272,600 7920-7920-542006 CIPRT LA $0 $10,000 $0 $0 $0 $0 $10,000 7920-7920-544001 CIPOF CB $0 $11,000 $24,000 $0 $0 $0 $35,000 4251-4251-543005 CIPPK CO Carryover $23,628 $0 $0 $0 $0 $0 $23,628 4251-4251-543005 CIPRT CO Carryover $99,035 $0 $0 $0 $0 $0 $99,035 7920-7920-543005 CIPPK CO Carryover $250,000 $0 $0 $0 $0 $0 $250,000 Project Total $645,263 $173,110 $195,655 $0 $0 $0 $1,014,028 $1,170,000 $2,340,000 $0 $0 $0 $0 $3,510,000 $1,170,000 $2,340,000 $0 $0 $0 $0 $3,510,000 Sonoran Preservation Program (Open Space) CS00089 (Page Number 133) 4550-4550-540000 CIPRT LA Project Total 310 FY 2018-2027 Capital Improvement Program Appendix A - Account Number Detail Parks - Trails & Open Space Account Program Project/ Segment Carry/ Base FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 AT $0 $0 $0 $0 $3,326 FY 23-27 Total Trailhead at Vistancia CS00159 (Page Number 135) 4252-4252-525515 CIPRT $18,850 $22,176 4252-4252-542006 CIPOF CB $0 $0 $0 $0 $47,948 $47,948 $95,896 4252-4252-542006 CIPRT CO $0 $0 $0 $0 $0 $1,885,012 $1,885,012 4252-4252-542006 CIPRT DS $0 $0 $0 $0 $332,649 $0 $332,649 4252-4252-542006 CIPRT LA $0 $0 $0 $0 $404,000 $0 $404,000 $0 $0 $0 $0 $787,923 $1,951,810 $2,739,733 $4,733,954 $2,513,110 $195,655 $0 $787,923 $1,951,810 $10,182,452 Project Total Total - Parks - Trails & Open Space 311 FY 2018-2027 Capital Improvement Program Appendix A - Account Number Detail Public Safety Account Program Project/ Segment Carry/ Base FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 23-27 Total $0 $0 $2,000,000 $0 $0 $0 $2,000,000 $0 $0 $2,000,000 $0 $0 $0 $2,000,000 $0 $0 $0 $8,637 $8,637 800 MHz Mobile and Portable Radios FD00018 (Page Number 142) 4252-4252-542006 CIPPS EQ Project Total Fire Station #8 FD00008 (Page Number 143) 7935-7935-525515 CIPPS AT $0 $0 7935-7935-540000 CIPPS LA $0 $0 $0 $0 $0 $620,000 $620,000 7935-7935-540500 CIPPS DS $0 $0 $0 $0 $0 $863,727 $863,727 7935-7935-541003 CIPPS OT $0 $0 $0 $0 $0 $69,998 $69,998 7936-7936-525515 CIPPS AT $0 $0 $0 $0 $0 $14,302 $14,302 7936-7936-540500 CIPPS CO $0 $0 $0 $0 $0 $1,430,186 $1,430,186 7936-7936-541003 CIPPS OT $0 $0 $0 $0 $0 $14,306 $14,306 7936-7936-542006 CIPPS EQ $0 $0 $0 $0 $0 $41,207 $41,207 7937-7937-525515 CIPPS AT $0 $0 $0 $0 $0 $55,659 $55,659 7937-7937-540500 CIPPS CO $0 $0 $0 $0 $0 $5,565,922 $5,565,922 7937-7937-541003 CIPPS OT $0 $0 $0 $0 $0 $55,674 $55,674 7937-7937-542006 CIPPS EQ $0 $0 $0 $0 $0 $160,365 $160,365 $0 $0 $0 $0 $0 $8,899,983 $8,899,983 Project Total Fire Station No. 3 Apparatus Bay Expansion FD13400 (Page Number 144) 4550-4550-525515 CIPPS AT $0 $10,092 $0 $0 $0 $0 $10,092 4550-4550-540500 CIPPS CO $0 $1,009,194 $0 $0 $0 $0 $1,009,194 4550-4550-540500 CIPPS DS $320,532 $0 $0 $0 $0 $0 $320,532 4550-4550-541003 CIPPS OT $46,868 $46,868 $0 $0 $0 $0 $93,736 4550-4550-542006 CIPPS EQ $0 $13,242 $0 $0 $0 $0 $13,242 $367,400 $1,079,396 $0 $0 $0 $0 $1,446,796 Project Total Jomax Fire Station #7 Emergency Traffic Signal FD13101 (Page Number 145) 7935-7935-525515 CIPPS AT $0 $0 $1,595 $0 $0 $0 $1,595 7935-7935-540000 CIPPS LA $0 $0 $15,000 $0 $0 $0 $15,000 7935-7935-540500 CIPPS CO $0 $0 $139,500 $0 $0 $0 $139,500 7935-7935-540500 CIPPS DS $0 $0 $20,000 $0 $0 $0 $20,000 7935-7935-544001 CIPPS CB $0 $0 $15,000 $0 $0 $0 $15,000 $0 $0 $191,095 $0 $0 $0 $191,095 Project Total 312 FY 2018-2027 Capital Improvement Program Appendix A - Account Number Detail Public Safety Account Program Project/ Segment Carry/ Base FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 Carryover $30,000 $0 $0 $0 $0 FY 23-27 Total Pinnacle Peak Public Safety Facility Expansion PD00021 (Page Number 146) 4251-4251-540500 CIPPS CO $0 $30,000 7930-7930-540500 CIPPS CO Carryover $1,500,000 $0 $0 $0 $0 $0 $1,500,000 7930-7930-542006 CIPPS EQ Carryover $198,052 $0 $0 $0 $0 $0 $198,052 7932-7932-542006 CIPPS EQ Carryover $126,148 $0 $0 $0 $0 $0 $126,148 Project Total $1,854,200 $0 $0 $0 $0 $0 $1,854,200 $0 $1,765,000 $0 $0 $0 $0 $1,765,000 $0 $1,765,000 $0 $0 $0 $0 $1,765,000 $2,221,600 $2,844,396 $2,191,095 $0 $0 $8,899,983 $16,157,074 Self Contained Breathing Apparatus FD00017 (Page Number 147) 1000-0310-542006 CIPPS EQ Project Total Total - Public Safety 313 FY 2018-2027 Capital Improvement Program Appendix A - Account Number Detail Streets Account Program Project/ Segment Carry/ Base FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 Carryover $500,000 $0 $0 $0 $0 FY 23-27 Total 103rd Av; Northern Ave to Olive Ave -Full Street EN00422 (Page Number 155) 4251-4251-543001 CIPST CO $0 $500,000 4252-4252-543001 CIPST CO Carryover $390,000 $0 $0 $0 $0 $0 $390,000 7010-7075-540000 CIPST LA Carryover $400,000 $0 $0 $0 $0 $0 $400,000 7010-7075-543001 CIPST CO Carryover $3,511,531 $0 $0 $0 $0 $0 $3,511,531 Project Total $4,801,531 $0 $0 $0 $0 $0 $4,801,531 67th Av; Olive Av to Redfield Rd Landscape Enhance EN00593 (Page Number 156) 7010-7075-525515 CIPST AT $0 $6,000 $0 $0 $0 $0 $6,000 7010-7075-543001 CIPST CO $75,000 $525,000 $0 $0 $0 $0 $600,000 7010-7075-544001 CIPOF CB $0 $70,000 $0 $0 $0 $0 $70,000 $75,000 $601,000 $0 $0 $0 $0 $676,000 Project Total 67th Ave Widening; Pinnacle Peak to Happy Valley EN00100 (Page Number 157) 4252-4252-520099 CIPST SY $160,000 $0 $0 $0 $0 $0 $160,000 4252-4252-525515 CIPST AT $0 $7,745 $5,767 $49,000 $0 $0 $62,512 4252-4252-540000 CIPST LA $0 $0 $582,484 $0 $0 $0 $582,484 4252-4252-543001 CIPST CO $0 $0 $576,722 $4,900,000 $0 $0 $5,476,722 4252-4252-543001 CIPST DS $0 $774,512 $0 $0 $0 $0 $774,512 4252-4252-544001 CIPOF CB $0 $123,388 $159,783 $210,000 $0 $0 $493,171 $160,000 $905,645 $1,324,756 $5,159,000 $0 $0 $7,549,401 Project Total 75th Av; Grand Av to Tbird Rd Landscape Enhancemnt EN00592 (Page Number 159) 7010-7075-525515 CIPST AT $0 $10,000 $0 $0 $0 $0 $10,000 7010-7075-543001 CIPST CO $150,000 $850,000 $0 $0 $0 $0 $1,000,000 7010-7075-544001 CIPOF CB $0 $77,000 $0 $0 $0 $0 $77,000 $150,000 $937,000 $0 $0 $0 $0 $1,087,000 Carryover $2,314,480 $0 $0 $0 $0 $0 $2,314,480 Project Total $2,314,480 $0 $0 $0 $0 $0 $2,314,480 Carryover $1,153,204 $0 $0 $0 $0 $0 $1,153,204 Project Total $1,153,204 $0 $0 $0 $0 $0 $1,153,204 Project Total 75th Ave & Cactus Rd Intersection Improvements EN00088 (Page Number 160) 7010-7075-543001 CIPST CO 75th Ave & Peoria Ave Intersection Improvements EN00081 (Page Number 161) 7010-7075-543001 CIPST CO 314 FY 2018-2027 Capital Improvement Program Appendix A - Account Number Detail Streets Account Program Project/ Segment Carry/ Base FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 $0 $0 $0 FY 23-27 Total 83rd Ave Bus Shelters EN00582 (Page Number 162) 4810-4810-540000 CIPST LA $2,875 $0 $0 $2,875 4810-4810-543001 CIPST CO $897,000 $0 $0 $0 4810-4810-543001 CIPST DS $82,000 $0 $0 $0 $0 $0 $897,000 $0 $0 $82,000 $981,875 $0 $0 $0 $0 $0 $981,875 $399,504 $0 $0 $0 $0 $0 $399,504 Carryover $6,422 $0 $0 $0 $0 $0 $6,422 Project Total $405,926 $0 $0 $0 $0 $0 $405,926 Carryover $49,325 $0 $0 $0 $0 $0 $49,325 Project Total $49,325 $0 $0 $0 $0 $0 $49,325 Project Total 83rd Ave Sidewalks and Bike Lanes EN00546 (Page Number 163) 7010-7075-543001 CIPST CO 7010-7075-543001 CIPST CO 87th Ave & Peoria Ave Intersection Alignment PW00109 (Page Number 164) 7010-7075-540000 CIPST LA 89th Ave; Golden Ln to Olive Av EN00472 (Page Number 165) 4251-4251-540000 CIPST LA Carryover $138,000 $0 $0 $0 $0 $0 $138,000 4251-4251-543001 CIPST CO Carryover $778,198 $0 $0 $0 $0 $0 $778,198 Project Total $916,198 $0 $0 $0 $0 $0 $916,198 $0 $3,900 91st Av; Mtn Vw Rd to Grand Av Landscape Enhancemn EN00594 (Page Number 166) 7010-7075-525515 CIPST AT $0 $3,900 $0 $0 $0 7010-7075-543001 CIPST CO $75,000 $315,000 $0 $0 $0 $0 $390,000 7010-7075-544001 CIPOF CB $0 $43,000 $0 $0 $0 $0 $43,000 Project Total $75,000 $361,900 $0 $0 $0 $0 $436,900 Carryover $259,024 $0 $0 $0 $0 $0 $259,024 Project Total $259,024 $0 $0 $0 $0 $0 $259,024 Carryover $600,000 $0 $0 $0 $0 $0 $600,000 Project Total $600,000 $0 $0 $0 $0 $0 $600,000 91st Ave; Deer Valley Rd to Pinnacle Pk Rd EN00505 (Page Number 167) 4550-4550-543001 CIPST CO 99th Ave Reconstruction; Butler Dr to Olive Av EN00421 (Page Number 168) 7010-7075-543001 CIPST CO 315 FY 2018-2027 Capital Improvement Program Appendix A - Account Number Detail Streets Account Program Project/ Segment Carry/ Base FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 23-27 Total $100,000 $100,000 $100,000 $100,000 $100,000 $500,000 $1,000,000 ADA Accessibility PW00025 (Page Number 169) 7000-7050-520099 CIPST SY 7000-7050-525515 CIPST AT $0 $550 $4,700 $550 $4,700 $11,050 $21,550 7000-7050-543001 CIPST CO $470,000 $55,000 $470,000 $55,000 $470,000 $1,105,000 $2,625,000 7000-7050-544001 CIPST CB $0 $4,000 $4,000 $4,000 $4,000 $20,000 $36,000 7000-7050-520099 CIPST SY Carryover $110,045 $0 $0 $0 $0 $0 $110,045 7000-7050-543001 CIPST CO Carryover $173,493 $0 $0 $0 $0 $0 $173,493 Project Total $853,538 $159,550 $578,700 $159,550 $578,700 $1,636,050 $3,966,088 Arterial Road Pavement Preservation & Restoration PW00992 (Page Number 170) 7000-7050-525515 CIPST AT $0 $38,940 $0 $8,940 $0 $34,350 $82,230 7000-7050-543001 CIPST CO $0 $3,894,000 $0 $894,000 $0 $3,435,000 $8,223,000 7010-7075-525515 CIPST AT $0 $6,060 $0 $6,060 $0 $15,150 $27,270 7010-7075-543001 CIPST CO $0 $606,000 $0 $606,000 $0 $1,515,000 $2,727,000 $0 $4,545,000 $0 $1,515,000 $0 $4,999,500 $11,059,500 AT $0 $700 $8,000 $0 $0 $0 $8,700 Project Total Bell Rd and 83rd Ave Right Turn Lane EN00562 (Page Number 171) 7010-7075-525515 CIPST 7010-7075-540000 CIPST LA $0 $103,000 $0 $0 $0 $0 $103,000 7010-7075-543001 CIPST CO $0 $0 $800,000 $0 $0 $0 $800,000 7010-7075-543001 CIPST DS $0 $70,000 $0 $0 $0 $0 $70,000 7010-7075-544001 CIPOF CB $0 $80,000 $100,000 $0 $0 $0 $180,000 $0 $253,700 $908,000 $0 $0 $0 $1,161,700 Project Total Bridge Maintenance and Management Program EN00243 (Page Number 172) 7010-7075-525515 CIPST AT $0 $2,000 $2,000 $2,000 $2,000 $10,000 $18,000 7010-7075-543001 CIPST CO $200,000 $200,000 $200,000 $200,000 $200,000 $1,000,000 $2,000,000 7010-7075-544001 CIPOF CB $0 $25,000 $25,000 $25,000 $25,000 $125,000 $225,000 7010-7075-543001 CIPST CO Carryover $302,941 $0 $0 $0 $0 $0 $302,941 Project Total $502,941 $227,000 $227,000 $227,000 $227,000 $1,135,000 $2,545,941 Carryover $83,329 $0 $0 $0 $0 $0 $83,329 Project Total $83,329 $0 $0 $0 $0 $0 $83,329 Bus Stop Improvements PW11190 (Page Number 173) 7010-7075-543001 CIPST CO 316 FY 2018-2027 Capital Improvement Program Appendix A - Account Number Detail Streets Account Program Project/ Segment Carry/ Base FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 Carryover $374,000 $0 $0 $0 $0 $0 $374,000 Project Total $374,000 $0 $0 $0 $0 $0 $374,000 $0 $0 $2,954 $5,908 FY 23-27 Total Cactus Rd & 69th Av Sidewalk, North Side EN00550 (Page Number 174) 7010-7075-543001 CIPST CO Chip Seal Dirt Roads PW00163 (Page Number 175) 7000-7050-525515 CIPST AT $0 $0 $2,954 7000-7050-543001 CIPST CO $0 $0 $295,423 $0 $0 $295,423 $590,846 7010-7075-525515 CIPST AT $0 $0 $1,241 $0 $0 $1,241 $2,482 7010-7075-543001 CIPST CO $0 $0 $124,077 $0 $0 $124,077 $248,154 $0 $0 $423,695 $0 $0 $423,695 $847,390 Project Total Deer Valley Rd & 87th Av Intesection Improvements EN00590 (Page Number 176) 7010-7075-540000 CIPST LA $12,000 $0 $0 $0 $0 $0 $12,000 7010-7075-543001 CIPST CO $570,000 $0 $0 $0 $0 $0 $570,000 7010-7075-543001 CIPST DS $45,000 $0 $0 $0 $0 $0 $45,000 $627,000 $0 $0 $0 $0 $0 $627,000 Project Total Deer Valley Rd; 109th Ave to Lake Pleasant Pkwy EN00395 (Page Number 177) 7010-7075-525515 CIPST AT $0 $10,090 $0 $0 $0 $0 $10,090 7010-7075-543001 CIPST CO $0 $1,009,000 $0 $0 $0 $0 $1,009,000 7010-7075-544001 CIPOF CB $0 $28,500 $0 $0 $0 $0 $28,500 7010-7075-540000 CIPST LA Carryover $50,000 $0 $0 $0 $0 $0 $50,000 7010-7075-543001 CIPST CO Carryover $100,000 $0 $0 $0 $0 $0 $100,000 Project Total $150,000 $1,047,590 $0 $0 $0 $0 $1,197,590 Dirt Shoulders, Dust Abatement PM-10 Program PW01001 (Page Number 178) 7000-7050-525515 CIPST AT $0 $2,000 $0 $2,000 $0 $6,000 $10,000 7000-7050-543001 CIPST CO $0 $200,000 $0 $200,000 $0 $600,000 $1,000,000 Project Total $0 $202,000 $0 $202,000 $0 $606,000 $1,010,000 Carryover $80,000 $0 $0 $0 $0 $0 $80,000 Project Total $80,000 $0 $0 $0 $0 $0 $80,000 Guardrail Program EN00555 (Page Number 179) 7000-7050-520099 CIPST SY 317 FY 2018-2027 Capital Improvement Program Appendix A - Account Number Detail Streets Account Program Project/ Segment Carry/ Base FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 $1,869,000 $0 $0 $0 $0 FY 23-27 Total Happy Valley Pkwy Widening; LPP to Agua Fria EN00463 (Page Number 180) 4251-4251-543001 CIPST CO $0 $1,869,000 4810-4810-525515 CIPST AT $0 $23,050 $0 $0 $0 $0 $23,050 4810-4810-543001 CIPST CO $263,000 $2,305,000 $0 $0 $0 $0 $2,568,000 7003-7053-525515 CIPST AT $0 $50,000 $0 $0 $0 $0 $50,000 7003-7053-543001 CIPST CO $0 $5,000,000 $0 $0 $0 $0 $5,000,000 7010-7075-525515 CIPST AT $0 $77,760 $0 $0 $0 $0 $77,760 7010-7075-543001 CIPST CO $0 $7,776,000 $0 $0 $0 $0 $7,776,000 4252-4252-543001 CIPST CO Carryover $1,021,585 $0 $0 $0 $0 $0 $1,021,585 7003-7053-543001 CIPST CO Carryover $599,140 $0 $0 $0 $0 $0 $599,140 $3,752,725 $15,231,810 $0 $0 $0 $0 $18,984,535 $0 $0 $0 $0 $282,336 Project Total Jomax Rd Improvements; 73rd Av to 75th Av EN00591 (Page Number 181) 7003-7053-540000 CIPST LA $282,336 7003-7053-543001 CIPST CO $981,556 $0 $0 $0 $0 $0 $981,556 7003-7053-543001 CIPST DS $104,014 $0 $0 $0 $0 $0 $104,014 $1,367,906 $0 $0 $0 $0 $0 $1,367,906 Project Total $0 Jomax Rd; L303 to Vistancia Blvd EN00585 (Page Number 182) 7010-7075-520099 CIPST SY $200,000 $0 $0 $0 $0 $0 $200,000 7010-7075-525515 CIPST AT $0 $0 $29,000 $0 $0 $0 $29,000 7010-7075-540000 CIPST LA $403,000 $0 $0 $0 $0 $0 $403,000 7010-7075-543001 CIPST CO $0 $0 $2,900,000 $0 $0 $0 $2,900,000 7010-7075-543001 CIPST DS $230,000 $0 $0 $0 $0 $0 $230,000 7010-7075-544001 CIPOF CB $0 $0 $34,000 $0 $0 $0 $34,000 $833,000 $0 $2,963,000 $0 $0 $0 $3,796,000 Project Total Lake Pleasant Parkway Pavement Maintenance PW13005 (Page Number 183) 7000-7050-525515 CIPST AT $0 $0 $0 $0 $0 $5,000 $5,000 7000-7050-543001 CIPST CO $500,000 $0 $0 $0 $0 $500,000 $1,000,000 $500,000 $0 $0 $0 $0 $505,000 $1,005,000 Project Total 318 FY 2018-2027 Capital Improvement Program Appendix A - Account Number Detail Streets Account Program Project/ Segment Carry/ Base FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 $1,500,000 $0 $0 $0 $0 FY 23-27 Total Lake Pleasant Parkway Sidewalk EN00480 (Page Number 184) 7010-7075-543001 CIPST CO $0 $1,500,000 4810-4810-543001 CIPST CO Carryover $14,355 $0 $0 $0 $0 $0 $14,355 7010-7075-540000 CIPST LA Carryover $60,000 $0 $0 $0 $0 $0 $60,000 7010-7075-543001 CIPST CO Carryover $308,977 $0 $0 $0 $0 $0 $308,977 Project Total $1,883,332 $0 $0 $0 $0 $0 $1,883,332 Lake Pleasant Pkwy & Dixileta Dr Intersection Mods EN00588 (Page Number 185) 7010-7075-543001 CIPST CO $1,800,000 $0 $0 $0 $0 $0 $1,800,000 7010-7075-543001 CIPST DS $145,000 $0 $0 $0 $0 $0 $145,000 Project Total $1,945,000 $0 $0 $0 $0 $0 $1,945,000 Carryover $600,000 $0 $0 $0 $0 $0 $600,000 Project Total $600,000 $0 $0 $0 $0 $0 $600,000 $13,500 Lone Mountain ROW Acquistion EN00479 (Page Number 186) 7010-7075-540000 CIPST LA Major Street Repairs PW00027 (Page Number 187) 7000-7050-525515 CIPST AT $0 $1,500 $1,500 $1,500 $1,500 $7,500 7000-7050-543001 CIPST CO $150,000 $150,000 $150,000 $150,000 $150,000 $750,000 $1,500,000 $150,000 $151,500 $151,500 $151,500 $151,500 $757,500 $1,513,500 Carryover $200,000 $0 $0 $0 $0 $0 $200,000 Project Total $200,000 $0 $0 $0 $0 $0 $200,000 $10,000 $101,625 $111,625 $1,000,000 $10,162,500 $11,162,500 Project Total Monroe St; 83rd Av to 85th Av Roadway Improvements EN00549 (Page Number 188) 4252-4252-543001 CIPST CO Northern Parkway EN00142 (Page Number 189) 4252-4252-525515 CIPST AT $0 $0 $0 $0 4252-4252-543001 CIPST CO $0 $0 $0 $0 4252-4252-544001 CIPOF CB $0 $0 $0 $0 $10,000 $40,000 $50,000 7010-7075-525515 CIPST AT $0 $10,000 $10,000 $10,000 $0 $0 $30,000 7010-7075-543001 CIPST CO $1,000,000 $1,000,000 $1,000,000 $1,000,000 $0 $0 $4,000,000 7010-7075-544001 CIPOF CB $0 $10,000 $10,000 $10,000 $0 $0 $30,000 4251-4251-543001 CIPST CO Carryover $600,000 $0 $0 $0 $0 $0 $600,000 Project Total $1,600,000 $1,020,000 $1,020,000 $1,020,000 $1,020,000 $10,304,125 $15,984,125 319 FY 2018-2027 Capital Improvement Program Appendix A - Account Number Detail Streets Account Program Project/ Segment Carry/ Base FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 23-27 AT $0 $5,300 $0 $0 $0 $0 Total Paradise Lane Widening; Skunk Creek Bridge to 75th EN00373 (Page Number 190) 7010-7075-525515 CIPST $5,300 7010-7075-540000 CIPST LA $30,000 $0 $0 $0 $0 $0 $30,000 7010-7075-543001 CIPST CO $0 $530,000 $0 $0 $0 $0 $530,000 7010-7075-543001 CIPST DS $130,000 $0 $0 $0 $0 $0 $130,000 7010-7075-544001 CIPOF CB $0 $26,000 $0 $0 $0 $0 $26,000 Project Total $160,000 $561,300 $0 $0 $0 $0 $721,300 Carryover $75,957 $0 $0 $0 $0 $0 $75,957 Project Total $75,957 $0 $0 $0 $0 $0 $75,957 $520,000 $0 $0 $0 $0 $0 $520,000 $71,000 $0 $0 $0 $0 $0 $71,000 $591,000 $0 $0 $0 $0 $0 $591,000 Peoria Auto District EN00556 (Page Number 191) 1210-0350-520099 CIPOF SY Peoria Homes Alley Improvements EN00580 (Page Number 192) 7010-7075-543001 CIPST CO 7010-7075-543001 CIPST DS Project Total Pinnacle Peak Road; 91st Ave-Lake Pleasant Pkwy EN00015 (Page Number 193) 4810-4810-543001 CIPST CO $2,997,000 $0 $0 $0 $0 $0 $2,997,000 7010-7075-540000 CIPST LA $150,000 $0 $0 $0 $0 $0 $150,000 7010-7075-543001 CIPST CO $315,000 $0 $0 $0 $0 $0 $315,000 7010-7075-543001 CIPST DS $100,000 $0 $0 $0 $0 $0 $100,000 $3,562,000 $0 $0 $0 $0 $0 $3,562,000 $0 $0 $3,000 $33,000 Project Total Residential Roads Rehabilitation and Preservation PW13000 (Page Number 194) 7000-7050-525515 CIPST AT $0 $0 $30,000 7000-7050-543001 CIPST CO $3,000,000 $0 $3,000,000 $0 $0 $0 $6,000,000 7000-7050-543001 CIPST DS $0 $0 $0 $0 $0 $300,000 $300,000 7010-7075-525515 CIPST AT $0 $3,000 $27,000 $3,000 $27,000 $60,000 $120,000 7010-7075-543001 CIPST CO $2,700,000 $0 $2,700,000 $0 $2,700,000 $5,400,000 $13,500,000 7010-7075-543001 CIPST DS Project Total $0 $300,000 $0 $300,000 $0 $600,000 $1,200,000 $5,700,000 $303,000 $5,757,000 $303,000 $2,727,000 $6,363,000 $21,153,000 $0 $0 $234,000 $0 $0 $0 $234,000 $0 $0 $234,000 $0 $0 $0 $234,000 Resurvey Benchmarks PW00137 (Page Number 195) 1000-0310-520099 CIPST SY Project Total 320 FY 2018-2027 Capital Improvement Program Appendix A - Account Number Detail Streets Account Program Project/ Segment Carry/ Base FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 CO $1,400,000 $0 $0 $0 $0 FY 23-27 Total Rural-Standard Roads Program PW01003 (Page Number 196) 7000-7050-543001 CIPST 7010-7075-525515 CIPST AT $0 $0 $0 $0 $0 $15,000 $15,000 7010-7075-543001 CIPST CO $0 $0 $0 $0 $0 $1,500,000 $1,500,000 $1,400,000 $0 $0 $0 $0 $1,515,000 $2,915,000 Project Total $0 $1,400,000 Sidewalks Annual Program PW00046 (Page Number 197) 7000-7050-525515 CIPST AT $0 $900 $900 $900 $900 $4,500 $8,100 7000-7050-543001 CIPST CO $90,000 $90,000 $90,000 $90,000 $90,000 $450,000 $900,000 7000-7050-544001 CIPST CB $0 $15,000 $15,000 $15,000 $15,000 $75,000 $135,000 7000-7050-543001 CIPST CO Carryover $100,000 $0 $0 $0 $0 $0 $100,000 Project Total $190,000 $105,900 $105,900 $105,900 $105,900 $529,500 $1,143,100 Street Light Infill and Replacement Program PW11160 (Page Number 198) 7000-7050-525515 CIPST AT $0 $8,900 $3,900 $3,900 $3,900 $19,500 $40,100 7000-7050-543001 CIPST CO $790,000 $890,000 $390,000 $390,000 $390,000 $1,950,000 $4,800,000 $790,000 $898,900 $393,900 $393,900 $393,900 $1,969,500 $4,840,100 $30,000 $157,500 $262,650 $3,000,000 $15,750,000 $28,769,800 Project Total Street Maintenance Program PW00138 (Page Number 199) 7000-7050-525515 CIPST AT $0 $25,050 $25,050 $25,050 7000-7050-543001 CIPST CO $2,004,950 $2,004,950 $3,004,950 $3,004,950 7010-7075-525515 CIPST AT $0 $5,000 $5,000 $5,000 7010-7075-543001 CIPST CO Project Total $250,000 $500,000 $500,000 $500,000 $2,254,950 $2,535,000 $3,535,000 $3,535,000 $7,500 $30,000 $750,000 $3,000,000 $5,500,000 $3,787,500 $18,937,500 $34,584,950 $52,500 Sunrise Mtn HS Traffic Solutions EN00589 (Page Number 200) 7000-7050-543001 CIPST CO $350,000 $0 $0 $0 $0 $0 $350,000 7000-7050-543001 CIPST DS $18,000 $0 $0 $0 $0 $0 $18,000 $368,000 $0 $0 $0 $0 $0 $368,000 $0 $0 $250,000 $0 $0 $500,000 $750,000 $0 $0 $250,000 $0 $0 $500,000 $750,000 Project Total Technical Pavement Condition Survey & Support PW00512 (Page Number 201) 7000-7050-543001 CIPST OT Project Total 321 FY 2018-2027 Capital Improvement Program Appendix A - Account Number Detail Streets Account Program Project/ Segment Carry/ Base FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 23-27 $1,030,000 $0 $0 $0 $0 $0 Total Thunderbird Road Corridor Improvements EN00086 (Page Number 202) 7007-7057-543001 CIPST CO 7010-7075-543001 CIPST CO $1,030,000 Carryover $812,763 $0 $0 $0 $0 $0 $812,763 Project Total $1,842,763 $0 $0 $0 $0 $0 $1,842,763 Traffic Signal Renovation and Replacement PW00993 (Page Number 203) 4251-4251-543001 CIPST CO $200,000 $0 $0 $0 $0 $0 $200,000 7000-7050-525515 CIPST AT $0 $3,090 $3,090 $3,090 $3,090 $15,450 $27,810 7000-7050-543001 CIPST CO $109,000 $309,000 $309,000 $309,000 $309,000 $1,545,000 $2,890,000 $309,000 $312,090 $312,090 $312,090 $312,090 $1,560,450 $3,117,810 Project Total Utility Undergrounding Program EN00563 (Page Number 204) 4252-4252-525515 CIPST AT $0 $0 $0 $0 $0 $25,000 $25,000 4252-4252-543001 CIPST CO $0 $0 $0 $0 $0 $2,000,000 $2,000,000 4252-4252-543001 CIPST DS $0 $0 $0 $0 $0 $500,000 $500,000 $0 $0 $0 $0 $0 $2,525,000 $2,525,000 Project Total Vistancia Blvd & Happy Valley Rd Intersection Mods EN00586 (Page Number 205) 7000-7050-543001 CIPST CO $429,542 $0 $0 $0 $0 $0 $429,542 7000-7050-543001 CIPST DS $54,608 $0 $0 $0 $0 $0 $54,608 4810-4810-543001 CIPST CO $215,458 $0 $0 $0 $0 $0 $215,458 4810-4810-543001 CIPST DS $27,392 $0 $0 $0 $0 $0 $27,392 $727,000 $0 $0 $0 $0 $0 $727,000 $9,303,590 $54,266,820 $170,613,780 Project Total Total - Streets $45,415,004 $30,359,885 $18,184,541 $13,083,940 322 FY 2018-2027 Capital Improvement Program Appendix A - Account Number Detail Traffic Control Account Program Project/ Segment Carry/ Base FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 $0 $1,000 $1,000 $1,000 $1,000 FY 23-27 Total Traffic Management Center Equipment Replacement EN00433 (Page Number 206) 7010-7075-525515 CIPTC AT 7010-7075-543001 CIPTC CO 7010-7075-543001 CIPTC CO $0 $4,000 $0 $100,000 $100,000 $100,000 $100,000 $0 $400,000 Carryover $111,093 $0 $0 $0 $0 $0 $111,093 Project Total $111,093 $101,000 $101,000 $101,000 $101,000 $0 $515,093 Traffic Signal Interconnect Project (TSIP) PW00133 (Page Number 207) 7010-7075-525515 CIPTC AT $0 $0 $2,000 $0 $2,000 $4,000 $8,000 7010-7075-543001 CIPTC CO $175,000 $0 $175,000 $0 $175,000 $350,000 $875,000 7010-7075-543001 CIPTC DS $25,000 $0 $25,000 $0 $25,000 $50,000 $125,000 7010-7075-544001 CIPTC CB 7010-7075-543001 CIPTC CO $0 $0 $5,000 $0 $5,000 $10,000 $20,000 Carryover $54,086 $0 $0 $0 $0 $0 $54,086 Project Total $254,086 $0 $207,000 $0 $207,000 $414,000 $1,082,086 Traffic Signal Program EN00170 (Page Number 208) 7010-7075-525515 CIPTC AT $0 $5,500 $5,500 $5,500 $5,500 $27,500 $49,500 7010-7075-543001 CIPTC CO $550,000 $550,000 $550,000 $550,000 $550,000 $2,750,000 $5,500,000 7010-7075-544001 CIPOF CB $0 $44,500 $44,500 $44,500 $44,500 $222,500 $400,500 7010-7075-543001 CIPTC CO Carryover $78,053 $0 $0 $0 $0 $0 $78,053 Project Total $628,053 $600,000 $600,000 $600,000 $600,000 $3,000,000 $6,028,053 Carryover $37,458 $0 $0 $0 $0 $0 $37,458 Project Total $37,458 $0 $0 $0 $0 $0 $37,458 $1,030,690 $701,000 $908,000 $701,000 $908,000 $3,414,000 $7,662,690 Traffic Signal System Software Replacement EN00430 (Page Number 209) 7010-7075-543007 CIPTC EQ Total - Traffic Control 323 FY 2018-2027 Capital Improvement Program Appendix A - Account Number Detail Wastewater Account Program Project/ Segment Carry/ Base FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 23-27 Total $0 $0 $0 $0 $4,846 101st Ave and Northern Lift Station Pretreatment UT00398 (Page Number 214) 2400-2550-525515 CIPWW AT $0 $4,846 2400-2550-543003 CIPWW CO $176,877 $484,605 $0 $0 $0 $0 $661,482 2400-2550-543003 CIPWW DS $65,524 $0 $0 $0 $0 $0 $65,524 $242,401 $489,451 $0 $0 $0 $0 $731,852 Project Total Agua Fria Lift Station-Wastewater Campus Land UT00284 (Page Number 215) 2164-2224-543003 CIPWW LA 1080000 $0 $1,080,000 $0 $0 $0 $0 $1,080,000 2506-2626-543003 CIPWW LA 2219200 $0 $2,219,200 $0 $0 $0 $0 $2,219,200 2400-2550-543003 CIPWW LA 700800 $0 $700,800 $0 $0 $0 $0 $700,800 2400-2550-520099 CIPWW SY Carryover $200,000 $0 $0 $0 $0 $0 $200,000 Project Total $200,000 $4,000,000 $0 $0 $0 $0 $4,200,000 Beardsley Plant Equipment Upgrade and Expansion UT00314 (Page Number 216) 2400-2550-525515 CIPWW AT $0 $0 $0 $0 $52,313 $66,028 $118,341 2400-2550-543003 CIPWW CO $1,113,750 $0 $0 $0 $6,975,000 $6,554,223 $14,642,973 2400-2550-543003 CIPWW EQ $187,500 $112,500 $112,500 $112,500 $0 $0 $525,000 2400-2550-544001 CIPWW CB $0 $2,250 $2,250 $2,250 $0 $2,250 $9,000 2050-2140-543003 CIPWW CO $371,250 $0 $0 $0 $0 $0 $371,250 2050-2140-543003 CIPWW EQ $62,500 $37,500 $37,500 $37,500 $0 $0 $175,000 2050-2140-544001 CIPWW CB $0 $750 $750 $750 $0 $0 $2,250 2164-2224-525515 CIPWW AT 39445 $0 $0 $0 $0 $17,438 $22,007 $39,445 2164-2224-543003 CIPWW CO 4509528 $0 $0 $0 $0 $2,325,000 $2,184,528 $4,509,528 2164-2224-544001 CIPWW CB 750 $0 $0 $0 $0 $0 $750 $750 2506-2626-543003 CIPWW CO Carryover $27,865 $0 $0 $0 $0 $0 $27,865 2050-2140-542006 CIPWW EQ Carryover $9,651 $0 $0 $0 $0 $0 $9,651 Project Total $1,772,516 $153,000 $153,000 $153,000 $9,369,751 $8,829,786 $20,431,053 CO $221,601 $1,821,098 $0 $0 $0 $0 $2,042,699 Beardsley WRF Solids Pipeline Rehabilitation UT00308 (Page Number 217) 2400-2550-543003 CIPWW 2400-2550-543003 CIPWW DS $312,709 $0 $0 $0 $0 $0 $312,709 2400-2550-544001 CIPWW CB $0 $37,478 $0 $0 $0 $0 $37,478 2050-2140-525515 CIPWW AT $0 $20,449 $0 $0 $0 $0 $20,449 $534,310 $1,879,025 $0 $0 $0 $0 $2,413,335 20449 Project Total 324 FY 2018-2027 Capital Improvement Program Appendix A - Account Number Detail Wastewater Account Program Project/ Segment Carry/ Base FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 23-27 Total Butler IPS Equipment Upgrade/Replacement UT00422 (Page Number 218) 2400-2550-525515 CIPWW AT $0 $1,495 $1,495 $1,000 $1,000 $5,000 $9,990 2400-2550-543003 CIPWW CO $120,156 $149,500 $149,500 $100,000 $100,000 $500,000 $1,119,156 2400-2550-543003 CIPWW DS $28,344 $0 $0 $0 $0 $0 $28,344 $148,500 $150,995 $150,995 $101,000 $101,000 $505,000 $1,157,490 Project Total Butler Recharge Wells (ASR) UT00309 (Page Number 219) 2506-2626-520099 CIPWR SY $9,375 $0 $9,375 $0 $0 $0 $18,750 2506-2626-525515 CIPWR AT $0 $2,200 $563 $2,200 $0 $0 $4,963 2506-2626-543002 CIPWR CO $50,000 $275,000 $56,250 $275,000 $0 $0 $656,250 2506-2626-543002 CIPWR DS $21,875 $31,250 $21,875 $31,250 $0 $0 $106,250 2507-2627-520099 CIPWR SY $9,375 $0 $9,375 $0 $0 $0 $18,750 2507-2627-525515 CIPWR AT $0 $2,200 $563 $2,200 $0 $0 $4,963 2507-2627-543002 CIPWR CO $50,000 $275,000 $56,250 $275,000 $0 $0 $656,250 2507-2627-543002 CIPWR DS $21,875 $31,250 $21,875 $31,250 $0 $0 $106,250 2164-2224-520099 CIPWR SY $28,125 $0 $28,125 $0 $0 $0 $56,250 2164-2224-525515 CIPWR AT $0 $6,600 $1,688 $6,600 $0 $0 $14,888 2164-2224-543002 CIPWR CO $150,000 $825,000 $168,750 $825,000 $0 $0 $1,968,750 2164-2224-543002 CIPWR DS $65,625 $93,750 $65,625 $93,750 $0 $0 $318,750 2163-2223-520099 CIPWR SY $28,125 $0 $28,125 $0 $0 $0 $56,250 2163-2223-525515 CIPWR AT $0 $6,600 $1,688 $6,600 $0 $0 $14,888 2163-2223-543002 CIPWR CO $150,000 $825,000 $168,750 $825,000 $0 $0 $1,968,750 2163-2223-543002 CIPWR DS $65,625 $93,750 $65,625 $93,750 $0 $0 $318,750 2506-2626-543003 CIPWW CO Carryover $100,000 $0 $0 $0 $0 $0 $100,000 2050-2140-543002 CIPWR CO Carryover $234,317 $0 $0 $0 $0 $0 $234,317 2164-2224-543003 CIPWW CO Carryover $653,345 $0 $0 $0 $0 $0 $653,345 2163-2223-543003 CIPWW CO Carryover $437,790 $0 $0 $0 $0 $0 $437,790 Project Total $2,075,452 $2,467,600 $704,502 $2,467,600 $0 $0 $7,715,154 Butler WRF Aeration System Upgrades UT00420 (Page Number 221) 2400-2550-543003 CIPWW CO $813,442 $0 $0 $0 $0 $0 $813,442 2400-2550-543003 CIPWW DS $70,273 $0 $0 $0 $0 $0 $70,273 2050-2140-543003 CIPWW CO $269,807 $0 $0 $0 $0 $0 $269,807 2050-2140-543003 CIPWW DS $23,424 $0 $0 $0 $0 $0 $23,424 $1,176,946 $0 $0 $0 $0 $0 $1,176,946 Project Total 325 FY 2018-2027 Capital Improvement Program Appendix A - Account Number Detail Wastewater Account Program Project/ Segment Carry/ Base FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 $37,500 $0 $0 $0 $0 FY 23-27 Total Butler WRF Headworks Rehabilitation UT00100 (Page Number 222) 2400-2550-520099 CIPWW SY $0 $37,500 2400-2550-525515 CIPWW AT $0 $3,000 $0 $0 $0 $0 $3,000 2400-2550-543003 CIPWW CO $285,000 $300,000 $0 $0 $0 $0 $585,000 2050-2140-520099 CIPWW SY $12,500 $0 $0 $0 $0 $0 $12,500 2050-2140-525515 CIPWW AT $0 $1,000 $0 $0 $0 $0 $1,000 2050-2140-543003 CIPWW CO Project Total $85,000 $100,000 $0 $0 $0 $0 $185,000 $420,000 $404,000 $0 $0 $0 $0 $824,000 Butler WRF Plant Equipment Upgrade and Replacement UT00333 (Page Number 223) 2400-2550-543003 CIPWW EQ $311,250 $135,000 $135,000 $135,000 $75,000 $375,000 $1,166,250 2050-2140-543003 CIPWW EQ $103,750 $45,000 $45,000 $45,000 $25,000 $125,000 $388,750 2400-2550-542006 CIPWW EQ Carryover $30,218 $0 $0 $0 $0 $0 $30,218 2400-2550-543003 CIPWW CO Carryover $124,355 $0 $0 $0 $0 $0 $124,355 2050-2140-542006 CIPWW EQ Carryover $37,500 $0 $0 $0 $0 $0 $37,500 Project Total $607,073 $180,000 $180,000 $180,000 $100,000 $500,000 $1,747,073 Carryover $1,000,000 $0 $0 $0 $0 $0 $1,000,000 Project Total $1,000,000 $0 $0 $0 $0 $0 $1,000,000 Dixileta 21 inch Sewer Extension UT00404 (Page Number 224) 2509-2629-543003 CIPWW CO El Mirage Road Sewer Infrastructure Upsizing UT00432 (Page Number 225) 2507-2627-543003 CIPWW CO 1950550 $0 $0 $0 $1,950,550 $0 $0 $1,950,550 2507-2627-525515 CIPWW AT 19506 $0 $0 $0 $19,506 $0 $0 $19,506 $0 $0 $0 $1,970,056 $0 $0 $1,970,056 Project Total 326 FY 2018-2027 Capital Improvement Program Appendix A - Account Number Detail Wastewater Account Program Project/ Segment Carry/ Base FY 2018 FY 2019 13885344 $0 FY 2020 FY 2021 FY 2022 $0 $0 $13,885,344 $0 FY 23-27 Total Jomax WRF Expansion UT00388 (Page Number 226) 2452-2572-543003 CIPWW CO $0 $13,885,344 2452-2572-525515 CIPWW AT 138854 $0 $0 $0 $138,854 $0 $0 $138,854 2400-2550-520099 CIPWW SY 143475 $0 $143,475 $0 $0 $0 $0 $143,475 2507-2627-543003 CIPWW DS 1445559 $0 $0 $1,445,559 $0 $0 $0 $1,445,559 2400-2550-543003 CIPWW CO 184119 $0 $0 $0 $163,357 $20,762 $0 $184,119 2400-2550-525515 CIPWW AT 1842 $0 $0 $0 $1,634 $208 $0 $1,842 2507-2627-543003 CIPWW CO 2128100 $0 $0 $0 $0 $2,128,100 $0 $2,128,100 2270-2350-543003 CIPWW CO 2450355 $0 $0 $0 $2,450,355 $0 $0 $2,450,355 2270-2350-525515 CIPWW AT 24504 $0 $0 $0 $24,504 $0 $0 $24,504 2164-2224-543003 CIPWW CO 2958578 $0 $0 $0 $0 $2,958,578 $0 $2,958,578 2164-2224-525515 CIPWW AT 34453 $0 $0 $4,867 $0 $29,586 $0 $34,453 2507-2627-525515 CIPWW AT 35883 $0 $0 $14,602 $0 $21,281 $0 $35,883 2162-2222-520099 CIPWW SY 47825 $0 $47,825 $0 $0 $0 $0 $47,825 2164-2224-543003 CIPWW DS 481853 $0 $0 $481,853 $0 $0 $0 $481,853 2162-2222-525515 CIPWW AT 519 $0 $0 $0 $0 $519 $0 $519 2162-2222-543003 CIPWW CO 51905 $0 $0 $0 $0 $51,905 $0 $51,905 $0 $191,300 $1,946,881 $16,664,048 $5,210,939 $0 $24,013,168 Project Total Jomax WRF Operational Improvement/Upgrade/Replace UT00323 (Page Number 228) 2400-2550-525515 CIPWW AT $0 $375 $563 $750 $375 $1,875 $3,938 2400-2550-543003 CIPWW CO $93,750 $37,500 $56,250 $75,000 $37,500 $187,500 $487,500 2050-2140-525515 CIPWW AT $0 $125 $188 $250 $125 $625 $1,313 2050-2140-543003 CIPWW CO $31,250 $12,500 $18,750 $25,000 $12,500 $62,500 $162,500 2400-2550-543003 CIPWW CO Carryover $5,151 $0 $0 $0 $0 $0 $5,151 2050-2140-543002 CIPWR CO Carryover $1,876 $0 $0 $0 $0 $0 $1,876 Project Total $132,027 $50,500 $75,751 $101,000 $50,500 $252,500 $662,278 $0 $3,800 $3,800 $3,800 $3,800 $19,000 $34,200 Lift Station Reconditioning UT00116 (Page Number 229) 2400-2550-525515 CIPWW AT 2400-2550-543003 CIPWW CO 2400-2550-543003 CIPWW CO $380,000 $380,000 $380,000 $380,000 $380,000 $1,900,000 $3,800,000 Carryover $356,941 $0 $0 $0 $0 $0 $356,941 Project Total $736,941 $383,800 $383,800 $383,800 $383,800 $1,919,000 $4,191,141 327 FY 2018-2027 Capital Improvement Program Appendix A - Account Number Detail Wastewater Account Program Project/ Segment Carry/ Base FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 23-27 Total Manhole Rehabilitation UT00307 (Page Number 230) 2400-2550-525515 CIPWW AT $0 $2,725 $2,725 $2,725 $2,725 $13,625 $24,525 2400-2550-543003 CIPWW CO $272,500 $272,500 $272,500 $272,500 $272,500 $1,362,500 $2,725,000 2400-2550-544001 CIPWW CB $0 $2,500 $2,500 $2,500 $2,500 $12,500 $22,500 2400-2550-543003 CIPWW CO Carryover $92,653 $0 $0 $0 $0 $0 $92,653 Project Total $365,153 $277,725 $277,725 $277,725 $277,725 $1,388,625 $2,864,678 Miscellaneous Local Wastewater Line Improvements UT00191 (Page Number 231) 2400-2550-525515 CIPWW AT $0 $2,000 $2,000 $2,000 $2,000 $10,000 $18,000 2400-2550-543003 CIPWW CO $200,000 $200,000 $200,000 $200,000 $200,000 $1,000,000 $2,000,000 2400-2550-544001 CIPWW CB Project Total $0 $2,000 $2,000 $2,000 $2,000 $10,000 $18,000 $200,000 $204,000 $204,000 $204,000 $204,000 $1,020,000 $2,036,000 Reclaimed Water Booster Land Purchase at IPS UT00329 (Page Number 232) 2400-2550-540000 CIPWW LA Carryover $162,500 $0 $0 $0 $0 $0 $162,500 2050-2140-540000 CIPWR LA Carryover $481,330 $0 $0 $0 $0 $0 $481,330 Project Total $643,830 $0 $0 $0 $0 $0 $643,830 SROG Line Assessment& Repair UT00321 (Page Number 233) 2400-2550-525515 CIPWW AT $0 $0 $0 $1,691 $2,211 $4,965 $8,867 2400-2550-543003 CIPWW CO $300,000 $0 $0 $169,104 $221,136 $496,472 $1,186,712 2400-2550-520099 CIPWW SY Carryover $103,481 $0 $0 $0 $0 $0 $103,481 2400-2550-543003 CIPWW CO Carryover $517,407 $0 $0 $0 $0 $0 $517,407 Project Total $920,888 $0 $0 $170,795 $223,347 $501,437 $1,816,467 $150,000 $0 $0 $0 $0 $600,000 $750,000 Carryover $550,000 $0 $0 $0 $0 $0 $550,000 Project Total $700,000 $0 $0 $0 $0 $600,000 $1,300,000 Trunk Sewer Line Inspection UT00322 (Page Number 234) 2400-2550-520099 CIPWW SY 2400-2550-520099 CIPWW SY Trunk Sewer Rehabilitation UT00296 (Page Number 235) 2400-2550-543003 CIPWW CO 1792078 $0 $1,290,000 $502,078 $0 $0 $0 $1,792,078 2400-2550-525515 CIPWW AT 17922 $0 $12,900 $5,022 $0 $0 $0 $17,922 $250,000 2400-2550-543003 CIPWW DS 250000 $0 $202,100 $47,900 $0 $0 $0 2400-2550-543003 CIPWW CO Carryover $2,363,745 $0 $0 $0 $0 $0 $2,363,745 Project Total $2,363,745 $1,505,000 $555,000 $0 $0 $0 $4,423,745 328 FY 2018-2027 Capital Improvement Program Appendix A - Account Number Detail Wastewater Account Project/ Segment Program Carry/ Base FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 $0 $0 $7,000 $7,000 $7,000 FY 23-27 Total Wastewater System Additional R & M Expense UT00436 (Page Number 236) 2400-2550-525515 CIPWW AT $35,000 $56,000 2400-2550-525515 CIPWW AT 56000 $0 $0 $7,000 $7,000 $7,000 $35,000 $56,000 2400-2550-543003 CIPWW CO 5600000 $0 $0 $700,000 $700,000 $700,000 $3,500,000 $5,600,000 Project Total $0 $0 $714,000 $714,000 $714,000 $3,570,000 $5,712,000 West Agua Fria Wastewater Lines UT00171 (Page Number 237) 2507-2627-525515 CIPWW AT $0 $1,978 $4,851 $2,473 $0 $0 $9,302 2507-2627-543003 CIPWW CO $32,500 $197,800 $485,100 $247,250 $0 $0 $962,650 2507-2627-543003 CIPWW CO Carryover $152,025 $0 $0 $0 $0 $0 $152,025 2509-2629-543003 CIPWW CO Carryover $770,000 $0 $0 $0 $0 $0 $770,000 Project Total $954,525 $199,778 $489,951 $249,723 $0 $0 $1,893,977 $5,835,605 $23,636,747 $16,635,062 $19,086,348 $92,924,243 Total - Wastewater $15,194,307 $12,536,174 329 FY 2018-2027 Capital Improvement Program Appendix A - Account Number Detail Water Account Program Project/ Segment Carry/ Base FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 Carryover $701,442 $0 $0 $0 $0 $0 $701,442 Project Total $701,442 $0 $0 $0 $0 $0 $701,442 Carryover $1,552,831 $0 $0 $0 $0 $0 $1,552,831 Project Total $1,552,831 $0 $0 $0 $0 $0 $1,552,831 $0 $156,276 FY 23-27 Total 103rd Ave 12" Waterline Northern to Olive UT00392 (Page Number 243) 2050-2140-543002 CIPWR CO 75 Ave 16-inch Waterline, Cactus and Peoria UT00143 (Page Number 244) 2050-2140-543002 CIPWR CO 75th Ave 16" Waterline Cholla St to Thunderbird Rd UT00400 (Page Number 245) 2050-2140-543002 CIPWR DS 156276 $0 $0 $0 $156,276 $0 2050-2140-543002 CIPWR CO 2238735 $0 $0 $0 $746,170 $1,492,565 $0 $2,238,735 2050-2140-525515 CIPWR AT 23951 $0 $0 $0 $7,983 $15,968 $0 $23,951 $0 $0 $0 $910,429 $1,508,533 $0 $2,418,962 Project Total 75th Avenue and Grand PRV Upgrade UT00408 (Page Number 246) 2050-2140-544001 CIPWR CB 37931 $0 $12,642 $25,289 $0 $0 $0 $37,931 2050-2140-543002 CIPWR DS 41724 $0 $41,724 $0 $0 $0 $0 $41,724 2050-2140-543002 CIPWR CO 514439 $0 $171,463 $342,976 $0 $0 $0 $514,439 2050-2140-525515 CIPWR AT 5562 $0 $1,854 $3,708 $0 $0 $0 $5,562 $0 $227,683 $371,973 $0 $0 $0 $599,656 Project Total 330 FY 2018-2027 Capital Improvement Program Appendix A - Account Number Detail Water Account Program Project/ Segment Carry/ Base FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 $0 $0 $10,600 $0 $0 FY 23-27 Total 85th Avenue Reclaimed Waterline-Mtn View to Grand UT00310 (Page Number 247) 2164-2224-544001 CIPWR CB 10600 $0 $10,600 2163-2223-544001 CIPWR CB 10600 $0 $0 $10,600 $0 $0 $0 $10,600 2506-2626-543002 CIPWR CO 119746 $0 $0 $119,746 $0 $0 $0 $119,746 2507-2627-543002 CIPWR CO 119746 $0 $0 $119,746 $0 $0 $0 $119,746 2506-2626-525515 CIPWR AT 1313 $0 $0 $1,313 $0 $0 $0 $1,313 2507-2627-525515 CIPWR AT 1313 $0 $0 $1,313 $0 $0 $0 $1,313 2400-2550-543002 CIPWR DS 1858 $0 $0 $1,858 $0 $0 $0 $1,858 2400-2550-544001 CIPWR CB 2355 $0 $0 $2,355 $0 $0 $0 $2,355 2050-2140-543002 CIPWR CO 239593 $0 $0 $239,593 $0 $0 $0 $239,593 2050-2140-525515 CIPWR AT 2627 $0 $0 $2,627 $0 $0 $0 $2,627 2506-2626-543002 CIPWR DS 2786 $0 $0 $2,786 $0 $0 $0 $2,786 2507-2627-543002 CIPWR DS 2786 $0 $0 $2,786 $0 $0 $0 $2,786 2506-2626-544001 CIPWR CB 3531 $0 $0 $3,531 $0 $0 $0 $3,531 2507-2627-544001 CIPWR CB 3531 $0 $0 $3,531 $0 $0 $0 $3,531 2164-2224-543002 CIPWR CO 359454 $0 $0 $359,454 $0 $0 $0 $359,454 2163-2223-543002 CIPWR CO 359454 $0 $0 $359,454 $0 $0 $0 $359,454 2164-2224-525515 CIPWR AT 3940 $0 $0 $3,940 $0 $0 $0 $3,940 2163-2223-525515 CIPWR AT 3940 $0 $0 $3,940 $0 $0 $0 $3,940 2050-2140-543002 CIPWR DS 5574 $0 $0 $5,574 $0 $0 $0 $5,574 2050-2140-544001 CIPWR CB 7065 $0 $0 $7,065 $0 $0 $0 $7,065 2400-2550-543002 CIPWR CO 79864 $0 $0 $79,864 $0 $0 $0 $79,864 2164-2224-543002 CIPWR DS 8362 $0 $0 $8,362 $0 $0 $0 $8,362 2163-2223-543002 CIPWR DS 8362 $0 $0 $8,362 $0 $0 $0 $8,362 2400-2550-525515 CIPWR AT 876 $0 $0 $876 $0 $0 $0 $876 Project Total $0 $0 $1,359,276 $0 $0 $0 $1,359,276 ADOT Well-Sports Complex Well Connection UT00327 (Page Number 249) 2050-2140-543002 CIPWR CO 1683429 $0 $1,683,429 $0 $0 $0 $0 $1,683,429 2050-2140-525515 CIPWR AT 21467 $0 $21,467 $0 $0 $0 $0 $21,467 2162-2222-543002 CIPWR CO 274047 $0 $274,047 $0 $0 $0 $0 $274,047 2162-2222-525515 CIPWR AT 3495 $0 $3,495 $0 $0 $0 $0 $3,495 2050-2140-543002 CIPWR DS 463246 $0 $463,246 $0 $0 $0 $0 $463,246 $46,325 2050-2140-520099 CIPWR SY 46325 $0 $46,325 $0 $0 $0 $0 2162-2222-520099 CIPWR SY 7541 $0 $7,541 $0 $0 $0 $0 $7,541 2162-2222-543002 CIPWR DS 75412 $0 $75,412 $0 $0 $0 $0 $75,412 $0 $2,574,962 $0 $0 $0 $0 $2,574,962 Project Total 331 FY 2018-2027 Capital Improvement Program Appendix A - Account Number Detail Water Account Program Project/ Segment Carry/ Base FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 23-27 $3,770,000 $0 $0 $0 $0 $0 Total Agua Fria Booster/PRV UT00245 (Page Number 250) 2164-2224-543002 CIPWR CO 2164-2224-543002 CIPWR CO $3,770,000 Carryover $200,000 $0 $0 $0 $0 $0 $200,000 Project Total $3,970,000 $0 $0 $0 $0 $0 $3,970,000 Carryover $1,317,265 $0 $0 $0 $0 $0 $1,317,265 Project Total $1,317,265 $0 $0 $0 $0 $0 $1,317,265 $50,000 $0 $0 $0 $0 $0 $50,000 $50,000 $0 $0 $0 $0 $0 $50,000 Butler Well Site Rehabilitation UT00410 (Page Number 251) 2050-2140-543002 CIPWR CO Central Arizona Project Curtailment Study UT00434 (Page Number 252) 2050-2140-520099 CIPWR SY Project Total Condition Assessment of Remote Sites UT00256 (Page Number 253) 2400-2550-520099 CIPWR SY 150000 $0 $150,000 $0 $0 $0 $0 $150,000 2050-2140-520099 CIPWR SY 150000 $0 $150,000 $0 $0 $0 $0 $150,000 2400-2550-520099 CIPWW SY Carryover $28,066 $0 $0 $0 $0 $0 $28,066 2050-2140-520099 CIPWR SY Carryover $52,900 $0 $0 $0 $0 $0 $52,900 Project Total $80,966 $300,000 $0 $0 $0 $0 $380,966 $1,488,964 $0 $0 $0 $0 $0 $1,488,964 Desert Harbor-Arrowhead Shores Well Mixing UT00312 (Page Number 254) 2162-2222-543002 CIPWR CO 2162-2222-543002 CIPWR DS $437,148 $0 $0 $0 $0 $0 $437,148 2050-2140-544001 CIPWR CB 8032 $0 $8,032 $0 $0 $0 $0 $8,032 2050-2140-543002 CIPWR CO 982048 $0 $982,048 $0 $0 $0 $0 $982,048 2050-2140-525515 CIPWR AT 9920 $0 $9,920 $0 $0 $0 $0 $9,920 2164-2224-543002 CIPWR CO Carryover $200,000 $0 $0 $0 $0 $0 $200,000 Project Total $2,126,112 $1,000,000 $0 $0 $0 $0 $3,126,112 El Mirage Road Waterline Upsizing UT00430 (Page Number 255) 2050-2140-525515 CIPWR AT 16790 $0 $0 $0 $16,790 $0 $0 $16,790 2050-2140-543002 CIPWR CO 1679000 $0 $0 $0 $1,679,000 $0 $0 $1,679,000 Project Total $0 $0 $0 $1,695,790 $0 $0 $1,695,790 332 FY 2018-2027 Capital Improvement Program Appendix A - Account Number Detail Water Account Program Project/ Segment Carry/ Base FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 23-27 Total $0 $1,600 $1,600 $1,600 $1,600 $8,000 $14,400 Fire Hydrant Infill and Replacement UT00204 (Page Number 256) 2050-2140-525515 CIPWR AT 2050-2140-543002 CIPWR CO 2050-2140-543002 CIPWR CO $160,000 $160,000 $160,000 $160,000 $160,000 $800,000 $1,600,000 Carryover $171,598 $0 $0 $0 $0 $0 $171,598 Project Total $331,598 $161,600 $161,600 $161,600 $161,600 $808,000 $1,785,998 Greenway Plant Equipment Upgrade/Replacement UT00316 (Page Number 257) 2050-2140-543002 CIPWR EQ $100,000 $100,000 $100,000 $100,000 $100,000 $500,000 $1,000,000 2050-2140-544001 CIPWR CB $0 $2,000 $2,000 $2,000 $2,000 $10,000 $18,000 2050-2140-542006 CIPWR EQ Carryover $1,789 $0 $0 $0 $0 $0 $1,789 2050-2140-543002 CIPWR CO Carryover $150,000 $0 $0 $0 $0 $0 $150,000 Project Total $251,789 $102,000 $102,000 $102,000 $102,000 $510,000 $1,169,789 Greenway WTP 8 MGD Expansion UT00311 (Page Number 258) 2270-2350-544001 CIPWR CB 150000 $0 $0 $0 $0 $0 $150,000 $150,000 2270-2350-543002 CIPWR CO 27710176 $0 $0 $0 $0 $0 $27,710,176 $27,710,176 2270-2350-525515 CIPWR AT 312318 $0 $0 $0 $0 $0 $312,318 $312,318 2270-2350-543002 CIPWR DS 3521584 $0 $0 $0 $0 $0 $3,521,584 $3,521,584 Project Total $0 $0 $0 $0 $0 $31,694,078 $31,694,078 Hillcrest 8 inch Waterline UT00426 (Page Number 259) 2050-2140-543002 CIPWR CO $441,773 $0 $0 $0 $0 $0 $441,773 2050-2140-543002 CIPWR DS $146,810 $0 $0 $0 $0 $0 $146,810 $588,583 $0 $0 $0 $0 $0 $588,583 Project Total 333 FY 2018-2027 Capital Improvement Program Appendix A - Account Number Detail Water Account Program Project/ Segment Carry/ Base FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 $0 $0 $0 $0 $6,056 FY 23-27 Total Integrated Utility Master Plan UT00271 (Page Number 260) 2507-2627-544001 CIPWR CB 10093 $4,037 $10,093 2400-2550-520099 CIPWR SY 13607 $0 $0 $0 $0 $8,164 $5,443 $13,607 2050-2140-520099 CIPWR SY 13607 $0 $0 $0 $0 $8,164 $5,443 $13,607 2400-2550-544001 CIPWR CB 1393 $0 $0 $0 $0 $836 $557 $1,393 2050-2140-544001 CIPWR CB 1393 $0 $0 $0 $0 $836 $557 $1,393 2506-2626-520099 CIPWR SY 141826 $0 $0 $0 $0 $85,096 $56,730 $141,826 2506-2626-544001 CIPWR CB 14524 $0 $0 $0 $0 $8,714 $5,810 $14,524 2164-2224-520099 CIPWR SY 169901 $0 $0 $0 $0 $101,941 $67,960 $169,901 2164-2224-544001 CIPWR CB 17399 $0 $0 $0 $0 $10,439 $6,960 $17,399 2163-2223-520099 CIPWR SY 27213 $0 $0 $0 $0 $16,328 $10,885 $27,213 2163-2223-544001 CIPWR CB 2787 $0 $0 $0 $0 $1,672 $1,115 $2,787 2162-2222-520099 CIPWR SY 43269 $0 $0 $0 $0 $25,961 $17,308 $43,269 2162-2222-544001 CIPWR CB 4431 $0 $0 $0 $0 $2,659 $1,772 $4,431 2507-2627-520099 CIPWR SY 98557 Project Total $0 $0 $0 $0 $59,134 $39,423 $98,557 $0 $0 $0 $0 $336,000 $224,000 $560,000 Jomax In-Line Booster Station Upgrades UT00285 (Page Number 261) 2270-2350-544001 CIPWR CB 120225 $0 $120,225 $0 $0 $0 $0 $120,225 2270-2350-543002 CIPWR DS 179537 $0 $179,537 $0 $0 $0 $0 $179,537 2270-2350-543002 CIPWR CO 2188108 $0 $2,188,108 $0 $0 $0 $0 $2,188,108 2162-2222-544001 CIPWR CB 2267 $0 $2,267 $0 $0 $0 $0 $2,267 2270-2350-525515 CIPWR AT 23677 $0 $23,677 $0 $0 $0 $0 $23,677 2162-2222-543002 CIPWR DS 3385 $0 $3,385 $0 $0 $0 $0 $3,385 2162-2222-543002 CIPWR CO 41255 $0 $41,255 $0 $0 $0 $0 $41,255 2162-2222-525515 CIPWR AT 446 $0 $446 $0 $0 $0 $0 $446 2162-2222-543002 CIPWR OT 47353 $0 $47,353 $0 $0 $0 $0 $47,353 2162-2222-543002 CIPWR OT 893 $0 $893 $0 $0 $0 $0 $893 $0 $2,607,146 $0 $0 $0 $0 $2,607,146 Project Total 334 FY 2018-2027 Capital Improvement Program Appendix A - Account Number Detail Water Account Program Project/ Segment Carry/ Base FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 $0 $0 $0 $0 $13,000 FY 23-27 Total Lake Plsnt Pkwy 24-inch Waterline; Loop 303- LPWTP UT00269 (Page Number 262) 2050-2140-525515 CIPWR AT 13000 $0 $13,000 2164-2224-543002 CIPWR OT 260956 $0 $0 $0 $0 $260,956 $0 $260,956 2050-2140-544001 CIPWR CB 42987 $0 $0 $0 $0 $42,987 $0 $42,987 2164-2224-543002 CIPWR CO 4934968 $0 $0 $0 $0 $251,859 $4,683,109 $4,934,968 2050-2140-543002 CIPWR CO 535637 $0 $0 $0 $0 $535,637 $0 $535,637 2050-2140-543002 CIPWR OT 554984 $0 $0 $0 $0 $554,984 $0 $554,984 2164-2224-525515 CIPWR AT 56629 $0 $0 $0 $0 $6,113 $50,516 $56,629 2164-2224-544001 CIPWR CB 82853 $0 $0 $0 $0 $20,213 $62,640 $82,853 $0 $0 $0 $0 $1,685,749 $4,796,265 $6,482,014 Project Total Lone Mtn Pkwy 36-inch Waterline; LPP to L303 UT00233 (Page Number 263) 2161-2221-543002 CIPWR CO Carryover $1,865,986 $0 $0 $0 $0 $0 $1,865,986 2162-2222-543002 CIPWR CO Carryover $1,370,396 $0 $0 $0 $0 $0 $1,370,396 Project Total $3,236,382 $0 $0 $0 $0 $0 $3,236,382 Miscellaneous Local Waterline Improvements UT00203 (Page Number 264) 2050-2140-525515 CIPWR AT $0 $3,000 $3,000 $2,000 $2,000 $10,000 $20,000 2050-2140-543002 CIPWR CO $300,000 $300,000 $300,000 $200,000 $200,000 $1,000,000 $2,300,000 2050-2140-544001 CIPWR CB $0 $5,000 $5,000 $5,000 $5,000 $25,000 $45,000 2050-2140-543002 CIPWR CO Carryover $86,658 $0 $0 $0 $0 $0 $86,658 Project Total $386,658 $308,000 $308,000 $207,000 $207,000 $1,035,000 $2,451,658 New River Utility Co. Acquisition & Improvements UT00390 (Page Number 265) 2050-2140-525515 CIPWR AT $0 $0 $0 $0 $4,208 $21,040 $25,248 2050-2140-543002 CIPWR CO $1,500,000 $0 $0 $0 $420,792 $2,103,960 $4,024,752 2270-2350-543002 CIPWR CO Carryover $2,500,000 $0 $0 $0 $0 $0 $2,500,000 Project Total $4,000,000 $0 $0 $0 $425,000 $2,125,000 $6,550,000 Northern Community Park Well UT00424 (Page Number 266) 2050-2140-525515 CIPWR AT $0 $12,123 $0 $0 $0 $0 $12,123 2050-2140-543002 CIPWR CO $508,207 $1,310,231 $0 $0 $0 $0 $1,818,438 2050-2140-543002 CIPWR DS $146,810 $0 $0 $0 $0 $0 $146,810 $655,017 $1,322,354 $0 $0 $0 $0 $1,977,371 Project Total 335 FY 2018-2027 Capital Improvement Program Appendix A - Account Number Detail Water Account Program Project/ Segment Carry/ Base FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 $0 $0 $0 $42,600 $0 FY 23-27 Total Patterson Well-W209, W210 Well Mixing UT00328 (Page Number 267) 2050-2140-544001 CIPWR CB 42600 $0 $42,600 2050-2140-543002 CIPWR DS 437194 $0 $0 $0 $437,194 $0 $0 $437,194 2050-2140-543002 CIPWR CO 5539446 $0 $0 $0 $0 $5,539,446 $0 $5,539,446 2050-2140-525515 CIPWR AT 59767 $0 $0 $0 $4,372 $55,395 $0 $59,767 $0 $0 $0 $484,166 $5,594,841 $0 $6,079,007 $580,000 $2,232,642 $1,742,723 $297,500 $297,500 $1,487,500 $6,637,865 $550,000 $0 $0 $0 $0 $0 $550,000 Project Total Pyramid Peak Water Treatment Plant - Upgrades UT00037 (Page Number 268) 2050-2140-543002 CIPWR CO 2050-2140-543002 CIPWR CO Carryover 2161-2221-543002 CIPWR CO Carryover $23,000 $0 $0 $0 $0 $0 $23,000 Project Total $1,153,000 $2,232,642 $1,742,723 $297,500 $297,500 $1,487,500 $7,210,865 Pyramid Peak Water Treatment Plant Expansion UT00334 (Page Number 269) 2270-2350-543002 CIPWR CO $0 $0 $0 $49,016,858 2050-2140-543002 CIPWR CO 300000 $0 $0 $0 $300,000 $0 $0 $300,000 2164-2224-543002 CIPWR CO 900000 $0 $0 $0 $900,000 $0 $0 $900,000 2164-2224-543002 CIPWR CO Carryover $769,125 $0 $0 $0 $0 $0 $769,125 2162-2222-543002 $3,126,525 $24,176,436 $21,713,897 CIPPS CO Carryover $789,616 $0 $0 $0 $0 $0 $789,616 2270-2350-543002 CIPWR CO Carryover $3,200,000 $0 $0 $0 $0 $0 $3,200,000 $7,885,266 $24,176,436 $21,713,897 $1,200,000 $0 $0 $54,975,599 Project Total Quintero Plant Equipment Upgrade/Replacement UT00418 (Page Number 270) 2050-2140-525515 CIPWR AT $0 $2,433 $0 $0 $0 $0 $2,433 2050-2140-543002 CIPWR CO $121,658 $243,352 $0 $0 $0 $0 $365,010 2050-2140-543002 CIPWR CO Carryover $145,800 $0 $0 $0 $0 $0 $145,800 Project Total $267,458 $245,785 $0 $0 $0 $0 $513,243 $75,000 $75,000 $75,000 $75,000 $75,000 $375,000 $750,000 SCADA Equipment Replacement UT00266 (Page Number 271) 2400-2550-543002 CIPWR EQ 2050-2140-543002 CIPWR EQ $225,000 $75,000 $75,000 $75,000 $75,000 $375,000 $900,000 2400-2550-543003 CIPWW CO Carryover $43,645 $0 $0 $0 $0 $0 $43,645 2050-2140-543002 CIPWR CO Carryover $66,877 $0 $0 $0 $0 $0 $66,877 Project Total $410,522 $150,000 $150,000 $150,000 $150,000 $750,000 $1,760,522 336 FY 2018-2027 Capital Improvement Program Appendix A - Account Number Detail Water Account Program Project/ Segment Carry/ Base FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 $0 $13,500 $0 $0 $0 FY 23-27 Total Technology and Security Master Plan UT00304 (Page Number 272) 2163-2223-520099 CIPWR SY 13500 $0 $13,500 2164-2224-520099 CIPWR SY 171000 $0 $171,000 $0 $0 $0 $0 $171,000 2162-2222-520099 CIPWR SY 40500 $0 $40,500 $0 $0 $0 $0 $40,500 2400-2550-520099 CIPWR SY 75000 $0 $75,000 $0 $0 $0 $0 $75,000 $0 $300,000 $0 $0 $0 $0 $300,000 Project Total Terramar Booster Pump Station Rehabilitation UT00412 (Page Number 273) 2050-2140-543002 CIPWR DS 142879 $0 $142,879 $0 $0 $0 $0 $142,879 2050-2140-543002 CIPWR CO 1741372 $0 $799,509 $941,863 $0 $0 $0 $1,741,372 2050-2140-525515 CIPWR AT 18842 $0 $6,280 $12,562 $0 $0 $0 $18,842 2050-2140-543002 CIPWR OT 37684 $0 $37,684 $0 $0 $0 $0 $37,684 2050-2140-544001 CIPWR CB 95650 $0 $31,861 $63,789 $0 $0 $0 $95,650 Project Total $0 $1,018,213 $1,018,214 $0 $0 $0 $2,036,427 Carryover $500,000 $0 $0 $0 $0 $0 $500,000 Project Total $500,000 $0 $0 $0 $0 $0 $500,000 Thunderbird Rd 16" Watermain Replacement UT00416 (Page Number 274) 2050-2140-543002 CIPWR CO Utility Billing System UT00160 (Page Number 275) 2507-2627-543002 CIPWR EQ 102500 $0 $0 $0 $0 $0 $102,500 $102,500 2506-2626-543002 CIPWR EQ 147500 $0 $0 $0 $0 $0 $147,500 $147,500 2163-2223-543002 CIPWR EQ 15000 $0 $0 $0 $0 $0 $15,000 $15,000 2164-2224-543002 CIPWR EQ 190000 $0 $0 $0 $0 $0 $190,000 $190,000 2590-2720-543002 CIPWR EQ 250000 $0 $0 $0 $0 $0 $250,000 $250,000 2650-2860-543002 CIPWR EQ 250000 $0 $0 $0 $0 $0 $250,000 $250,000 2162-2222-543002 CIPWR EQ 45000 $0 $0 $0 $0 $0 $45,000 $45,000 2600-2760-543002 CIPWR EQ 600000 $0 $0 $0 $0 $0 $600,000 $600,000 2400-2550-543002 CIPWR EQ 600000 $0 $0 $0 $0 $0 $600,000 $600,000 2050-2140-543002 CIPWR EQ 600000 $0 $0 $0 $0 $0 $600,000 $600,000 Project Total $0 $0 $0 $0 $0 $2,800,000 $2,800,000 Carryover $2,000,000 $0 $0 $0 $0 $0 $2,000,000 Project Total $2,000,000 $0 $0 $0 $0 $0 $2,000,000 Ventana Well, Booster Rehabilitation UT00394 (Page Number 276) 2050-2140-543002 CIPWR CO 337 FY 2018-2027 Capital Improvement Program Appendix A - Account Number Detail Water Account Program Project/ Segment Carry/ Base FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 $0 $0 $0 $23,512 $0 FY 23-27 Total W108 Bailey Well Site Improvements UT00414 (Page Number 277) 2050-2140-544001 CIPWR CB 23512 $0 $23,512 2050-2140-543002 CIPWR DS 35112 $0 $0 $0 $35,112 $0 $0 $35,112 2050-2140-543002 CIPWR CO 427924 $0 $0 $0 $427,924 $0 $0 $427,924 2050-2140-525515 CIPWR AT 4630 $0 $0 $0 $4,630 $0 $0 $4,630 2050-2140-543002 CIPWR OT 9261 $0 $0 $0 $9,261 $0 $0 $9,261 $0 $0 $0 $500,439 $0 $0 $500,439 $90,000 $180,000 Project Total Water & Wastewater Rate Study UT00298 (Page Number 278) 2400-2550-520099 CIPWR SY $45,000 $0 $0 $45,000 $0 2050-2140-520099 CIPWR SY $45,000 $0 $0 $45,000 $0 $90,000 $180,000 $90,000 $0 $0 $90,000 $0 $180,000 $360,000 Project Total Water Facility Reconditioning UT00206 (Page Number 279) 2050-2140-525515 CIPWR AT $0 $8,000 $8,000 $8,000 $8,000 $40,000 $72,000 2050-2140-543002 CIPWR CO $496,925 $800,000 $800,000 $800,000 $800,000 $4,000,000 $7,696,925 2050-2140-544001 CIPWR CB $0 $5,000 $5,000 $5,000 $5,000 $25,000 $45,000 2050-2140-543002 CIPWR CO Carryover $394,608 $0 $0 $0 $0 $0 $394,608 Project Total $891,533 $813,000 $813,000 $813,000 $813,000 $4,065,000 $8,208,533 $20,000 Water Line Assessment and Replacement UT00335 (Page Number 280) 2050-2140-525515 CIPWR AT 20000 $0 $10,000 $10,000 $0 $0 $0 2050-2140-543002 CIPWR CO 2000000 $0 $1,000,000 $1,000,000 $0 $0 $0 $2,000,000 Project Total $0 $1,010,000 $1,010,000 $0 $0 $0 $2,020,000 Water Meter Replacement Program UT00326 (Page Number 281) 2400-2550-543002 CIPWR EQ 2500000 $0 $0 $0 $500,000 $500,000 $1,500,000 $2,500,000 2050-2140-543002 CIPWR EQ 5000000 $0 $0 $0 $1,000,000 $1,000,000 $3,000,000 $5,000,000 2400-2550-542006 CIPWR EQ Carryover $12,670 $0 $0 $0 $0 $0 $12,670 2400-2550-543003 CIPWW CO Carryover $1,021,984 $0 $0 $0 $0 $0 $1,021,984 2050-2140-542006 CIPWR EQ Carryover $1,590 $0 $0 $0 $0 $0 $1,590 2050-2140-543002 CIPWR CO Carryover $237,848 $0 $0 $0 $0 $0 $237,848 Project Total $1,274,092 $0 $0 $1,500,000 $1,500,000 $4,500,000 $8,774,092 338 FY 2018-2027 Capital Improvement Program Appendix A - Account Number Detail Water Account Program Project/ Segment Carry/ Base FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 $0 $0 $8,000 $8,000 $8,000 FY 23-27 Total Water System Additional R & M Expense UT00438 (Page Number 282) 2050-2140-525515 525515 AT $40,000 $64,000 2050-2140-525515 CIPWR AT 64000 $0 $0 $8,000 $8,000 $8,000 $40,000 $64,000 2050-2140-543002 CIPWR CO 6400000 $0 $0 $800,000 $800,000 $800,000 $4,000,000 $6,400,000 Project Total $0 $0 $816,000 $816,000 $816,000 $4,080,000 $6,528,000 Water/Wastewater Hydraulic Model Update UT00428 (Page Number 283) 2400-2550-520099 CIPWR SY $100,000 $100,000 $0 $0 $0 $0 $200,000 2050-2140-520099 CIPWR SY $100,000 $100,000 $0 $0 $0 $0 $200,000 $200,000 $200,000 $0 $0 $0 $0 $400,000 Project Total Water/Wastewater/Expansion Fee Update UT00070 (Page Number 284) 2164-2224-520099 CIPWR SY 135000 $0 $0 $45,000 $0 $0 $90,000 $135,000 2163-2223-520099 CIPWR SY 15000 $0 $0 $5,000 $0 $0 $10,000 $15,000 2507-2627-520099 CIPWR SY 61500 $0 $0 $20,500 $0 $0 $41,000 $61,500 2506-2626-520099 CIPWR SY 88500 $0 $0 $29,500 $0 $0 $59,000 $88,500 2506-2626-520099 CIPWR SY Carryover $29,500 $0 $0 $0 $0 $0 $29,500 2507-2627-520099 CIPWR SY Carryover $11,500 $0 $0 $0 $0 $0 $11,500 2509-2629-520099 CIPWR SY Carryover $9,000 $0 $0 $0 $0 $0 $9,000 2164-2224-520099 CIPWR SY Carryover $38,000 $0 $0 $0 $0 $0 $38,000 2163-2223-520099 CIPWR SY Carryover $3,000 $0 $0 $0 $0 $0 $3,000 2162-2222-520099 CIPWR SY Carryover $9,000 $0 $0 $0 $0 $0 $9,000 Project Total $100,000 $0 $100,000 $0 $0 $200,000 $400,000 $2,399,385 $0 $0 $0 $0 $0 $2,399,385 Wellhead Water Quality Mitigation UT00272 (Page Number 285) 2050-2140-543002 CIPWR CO 2161-2221-543002 CIPWR CO $825,000 $0 $0 $0 $0 $0 $825,000 2162-2222-543002 CIPWR CO $400,000 $0 $0 $0 $0 $0 $400,000 2162-2222-543002 CIPWR OT $78,435 $0 $0 $0 $0 $0 $78,435 Project Total $3,702,820 $0 $0 $0 $0 $0 $3,702,820 2998425 $0 $959,370 $2,039,055 $0 $0 $0 $2,998,425 Project Total $0 $959,370 $2,039,055 $0 $0 $0 $2,998,425 Wells - New Construction UT00117 (Page Number 286) 2164-2224-543002 CIPWR CO 339 FY 2018-2027 Capital Improvement Program Appendix A - Account Number Detail Water Account Program Project/ Segment Carry/ Base FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 23-27 Total 2486150 $0 $183,000 $324,750 $574,400 $546,000 $858,000 $2,486,150 West Agua Fria Water Lines UT00170 (Page Number 287) 2164-2224-543002 CIPWR CO 2164-2224-525515 CIPWR AT 24862 $0 $1,830 $3,248 $5,744 $5,460 $8,580 $24,862 2164-2224-543002 CIPWR CO Carryover $792,987 $0 $0 $0 $0 $0 $792,987 Project Total $792,987 $184,830 $327,998 $580,144 $551,460 $866,580 $3,303,999 Western Area CAP Pump Station UT00274 (Page Number 288) 2050-2140-544001 CIPWR CB 158200 $0 $0 $158,200 $0 $0 $0 $158,200 2050-2140-543002 CIPWR CO 2900330 $0 $0 $2,900,330 $0 $0 $0 $2,900,330 2050-2140-525515 CIPWR AT 32484 $0 $0 $32,484 $0 $0 $0 $32,484 2050-2140-543002 CIPWR LA 348040 $0 $348,040 $0 $0 $0 $0 $348,040 2050-2140-543002 CIPWR DS 52733 $0 $52,733 $0 $0 $0 $0 $52,733 Project Total $0 $400,773 $3,091,014 $0 $0 $0 $3,491,787 Westland Rd. Reservoir and Booster Station UT00336 (Page Number 289) 2164-2224-543002 CIPWR CO Carryover $819,861 $0 $0 $0 $0 $0 $819,861 2162-2222-543002 CIPWR CO Carryover $667,975 $0 $0 $0 $0 $0 $667,975 Project Total $1,487,836 $0 $0 $0 $0 $0 $1,487,836 $483,286 $457,395 $431,505 $0 $0 $0 $1,372,186 $1,026,020 $0 $0 $0 $0 $0 $1,026,020 White Mountain Apache Tribe Water Rights Purchase UT00234 (Page Number 290) 2167-2227-543002 CIPWR OT 2050-2140-543002 CIPWR CO Carryover 2167-2227-543002 CIPWR CO Carryover $700,000 $0 $0 $0 $0 $0 $700,000 Project Total $2,209,306 $457,395 $431,505 $0 $0 $0 $3,098,206 Zone 1/2 PRV Upgrades (91st and Cactus) UT00261 (Page Number 291) 2050-2140-543002 CIPWR DS 105336 $0 $105,336 $0 $0 $0 $0 $105,336 2050-2140-525515 CIPWR AT 13000 $0 $13,000 $0 $0 $0 $0 $13,000 2050-2140-543002 CIPWR CO 1300000 $0 $1,300,000 $0 $0 $0 $0 $1,300,000 2050-2140-544001 CIPWR CB 95759 $0 $95,759 $0 $0 $0 $0 $95,759 $0 $1,514,095 $0 $0 $0 $0 $1,514,095 Project Total 340 FY 2018-2027 Capital Improvement Program Appendix A - Account Number Detail Water Account Project/ Segment Program Carry/ Base FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 106440 $0 $0 $0 $0 $106,440 FY 23-27 Total Zone 5E/6E PRV Station UT00286 (Page Number 292) 2050-2140-544001 CIPWR CB $0 $106,440 2164-2224-544001 CIPWR CB 145894 $0 $0 $0 $0 $145,894 $0 $145,894 2050-2140-543002 CIPWR CO 1951375 $0 $0 $0 $0 $1,951,375 $0 $1,951,375 2050-2140-525515 CIPWR AT 21856 $0 $0 $0 $0 $21,856 $0 $21,856 2050-2140-543002 CIPWR DS 234167 $0 $0 $0 $0 $234,167 $0 $234,167 2164-2224-543002 CIPWR CO 2674747 $0 $0 $0 $0 $2,674,747 $0 $2,674,747 2164-2224-525515 CIPWR AT 29957 $0 $0 $0 $0 $29,957 $0 $29,957 2164-2224-543002 CIPWR DS 320968 $0 $0 $0 $0 $320,968 $0 $320,968 2050-2140-520099 CIPWR SY 58542 $0 $0 $0 $0 $58,542 $0 $58,542 2050-2140-543002 CIPWR LA 58542 $0 $0 $0 $0 $58,542 $0 $58,542 2050-2140-543002 CIPWR OT 69079 $0 $0 $0 $0 $69,079 $0 $69,079 2164-2224-520099 CIPWR SY 80242 $0 $0 $0 $0 $80,242 $0 $80,242 2164-2224-543002 CIPWR LA 80242 $0 $0 $0 $0 $80,242 $0 $80,242 2164-2224-543002 CIPWR OT 94686 $0 $0 $0 $0 $94,686 $0 $94,686 $0 $0 $0 $0 $5,926,737 $0 $5,926,737 $9,508,068 $20,075,420 $60,121,423 $209,740,913 Project Total Total - Water Total 10-Year CIP FY 2018-2027 $42,213,463 $42,266,284 $35,556,255 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 23-27 Total $212,187,537 $98,998,279 $84,624,997 $50,235,993 $42,680,106 $160,881,327 $660,251,970 341 FY 2018-2027 Capital Improvement Program Appendix B - Project Listing by Number Project # Project Name Project Type Department AT02018 Arts Distribution FY2018 Operational Facilities Budget 74 CB02018 Chargeback Distribution FY2018 Operational Facilities Budget 79 CD00007 Impact Fee Study Operational Facilities Community Development 89 COP0001 Community Works Program Operational Facilities Community Services 83 CS00059 Northern Community Park Parks - Community Community Services 128 CS00067 Community Services Master Plan Parks - Other Community Services 125 CS00086 Camino a Lago Park#2 (The Meadows) Parks - Neighborhood Community Services 123 CS00088 99th Ave and Olive Trailhead Parks - Trails & Open Space Community Services 122 CS00089 Sonoran Preservation Program (Open Space) Parks - Trails & Open Space Community Development 133 CS00128 New River Trail - Williams Rd to Happy Valley Rd Parks - Trails & Open Space Community Services 127 CS00156 83rd Avenue and Village Parkway Trailhead Parks - Trails & Open Space Community Services 121 CS00159 Trailhead at Vistancia Parks - Trails & Open Space Community Services 135 CS00173 75th Avenue and Deer Valley Trailhead Parks - Trails & Open Space Community Services 120 CS00177 Community Services ADA Compliance Parks - Other Community Services 124 CS00178 Palo Verde Ruin - Interpretive Plan Parks - Other Community Services 130 CS00179 Sports Complex Asphalt Remediation Parks - Other Community Services 134 CS00185 Park and Recreation Facility Refurbishment Parks - Other Community Services 131 CS00187 Veterans Memorial Improvements Parks - Other Community Services 137 CS00201 Varney Park Improvements Parks - Neighborhood Community Services 136 CS00203 Country Meadows Park Improvements Parks - Neighborhood Community Services 126 CS00204 Sonoran Mountain Ranch Park Improvements Parks - Neighborhood Community Services 132 ED00002 P83 Entertainment District Improvements Economic Development Engineering 65 ED00008 Maxwell Technologies Economic Development Economic Development 63 ED00015 GE Avionics (Aviage Systems) Economic Development Economic Development 61 ED00018 Huntington University Economic Development Economic Development 62 ED00020 P83 Innovation Center Project Parking Structure Economic Development Economic Development 66 ED00021 Denaro Medical Plaza Economic Development Economic Development 60 ED00022 Modern Round Economic Development Economic Development 64 ED00023 Arrowhead Equities (Huntington Univ. Building) Economic Development Economic Development 58 ED00024 Washington Street Redevelopment Economic Development Engineering 67 ED00025 Commercial Abatement Economic Development Economic Development 59 EN00015 Pinnacle Peak Road; 91st Ave-Lake Pleasant Pkwy Streets Engineering 193 EN00081 75th Ave & Peoria Ave Intersection Improvements Streets Engineering 161 EN00086 Thunderbird Road Corridor Improvements Streets Engineering 202 EN00088 75th Ave & Cactus Rd Intersection Improvements Streets Engineering 160 EN00100 67th Ave Widening; Pinnacle Peak to Happy Valley Streets Engineering 157 EN00119 Pinnacle Peak Rd & 67th Av Channel to New River Drainage Engineering 50 EN00130 Mountain View Rd Drainage; 91st Av to 89th Av Drainage Engineering 44 EN00137 Union Hills Channel Drainage Engineering 52 EN00142 Northern Parkway Streets Engineering 189 342 Pg # FY 2018-2027 Capital Improvement Program Appendix B - Project Listing by Number Project # Project Name Project Type Department EN00170 Traffic Signal Program Traffic Control Engineering 208 EN00182 85th Ave Storm Drain; Peoria Av to Grand Av Drainage Engineering 39 EN00243 Bridge Maintenance and Management Program Streets Engineering 172 EN00257 87th Ave Storm Drain; Hatcher Rd to Monroe St Drainage Engineering 40 EN00354 New River & Jomax Rd Concrete Box Culvert Drainage Engineering 46 EN00371 New River Trail - BLM Drainage Engineering 47 EN00373 Paradise Lane Widening; Skunk Creek Bridge to 75th Streets Engineering 190 EN00395 Deer Valley Rd; 109th Ave to Lake Pleasant Pkwy Streets Engineering 177 EN00421 99th Ave Reconstruction; Butler Dr to Olive Av Streets Engineering 168 EN00422 103rd Av; Northern Ave to Olive Ave -Full Street Streets Engineering 155 EN00430 Traffic Signal System Software Replacement Traffic Control Engineering 209 EN00433 Traffic Management Center Equipment Replacement Traffic Control Engineering 206 EN00455 Pinnacle Peak Drainage; 87th Ave to 91st Ave Drainage Engineering 49 EN00458 Neighborhood Drainage Program Drainage Engineering 45 EN00463 Happy Valley Pkwy Widening; LPP to Agua Fria Streets Engineering 180 EN00472 89th Ave; Golden Ln to Olive Av Streets Engineering 165 EN00479 Lone Mountain ROW Acquistion Streets Engineering 186 EN00480 Lake Pleasant Parkway Sidewalk Streets Engineering 184 EN00482 81st Ave / Varney Park Drainage Solution Drainage Engineering 38 EN00505 91st Ave; Deer Valley Rd to Pinnacle Pk Rd Streets Engineering 167 EN00523 Lake Pleasant Basin Access Ramp Drainage Engineering 43 EN00524 Peoria Storm Drain Master Plan - Land Preservation Drainage Engineering 48 EN00531 Desert Harbor/91st Ave Channel Improvements Drainage Engineering 42 EN00543 Williams Road Channel Improvements Drainage Engineering 53 EN00546 83rd Ave Sidewalks and Bike Lanes Streets Engineering 163 EN00549 Monroe St; 83rd Av to 85th Av Roadway Improvements Streets Engineering 188 EN00550 Cactus Rd & 69th Av Sidewalk, North Side Streets Engineering 174 EN00555 Guardrail Program Streets Engineering 179 EN00556 Peoria Auto District Streets Engineering 191 EN00562 Bell Rd and 83rd Ave Right Turn Lane Streets Engineering 171 EN00563 Utility Undergrounding Program Streets Engineering 204 EN00580 Peoria Homes Alley Improvements Streets Engineering 192 EN00582 83rd Ave Bus Shelters Streets Engineering 162 EN00585 Jomax Rd; L303 to Vistancia Blvd Streets Engineering 182 EN00586 Vistancia Blvd & Happy Valley Rd Intersection Mods Streets Engineering 205 EN00588 Lake Pleasant Pkwy & Dixileta Dr Intersection Mods Streets Engineering 185 EN00589 Sunrise Mtn HS Traffic Solutions Streets Engineering 200 EN00590 Deer Valley Rd & 87th Av Intesection Improvements Streets Engineering 176 EN00591 Jomax Rd Improvements; 73rd Av to 75th Av Streets Engineering 181 EN00592 75th Av; Grand Av to Tbird Rd Landscape Enhancemnt Streets Engineering 159 343 Pg # FY 2018-2027 Capital Improvement Program Appendix B - Project Listing by Number Project # Project Name Project Type Department EN00593 67th Av; Olive Av to Redfield Rd Landscape Enhance Streets Engineering 156 EN00594 91st Av; Mtn Vw Rd to Grand Av Landscape Enhancemn Streets Engineering 166 FD00008 Fire Station #8 Public Safety Fire 143 FD00017 Self Contained Breathing Apparatus Public Safety Fire 147 FD00018 800 MHz Mobile and Portable Radios Public Safety Fire 142 FD13101 Jomax Fire Station #7 Emergency Traffic Signal Public Safety Fire 145 FD13400 Fire Station No. 3 Apparatus Bay Expansion Public Safety Fire 144 IT00010 Network Infrastructure Replacement - Greenway WTF Operational Facilities Information Technology 95 IT00011 Network Infrastructure Replacement - Beardsley WRF Operational Facilities Information Technology 92 IT00012 Network Infrastructure Replacement - Jomax WTF Operational Facilities Information Technology 96 IT00013 Network Infrastructure Replacement - Butler WRF Operational Facilities Information Technology 93 IT00014 Network Infrastructure Replacement - MOC Operational Facilities Information Technology 98 IT00017 Network Infrastructure Replacement - Quintero WTF Operational Facilities Information Technology 99 IT00018 Radio Subscriber Replacements Operational Facilities Information Technology 106 IT00020 Network Infrastructure Replacement-Municipal Court Operational Facilities Information Technology 101 IT00026 Network Infrastructure Replacement - Microwave WAN Operational Facilities Information Technology 97 IT00027 Network Infrastructure Replacement - City Hall Operational Facilities Information Technology 94 IT00032 Network Infrastructure Replacement - Remote Access Operational Facilities Information Technology 100 IT00034 Vistancia Radio Site Operational Facilities Information Technology 109 IT00035 Pyramid Peak Radio Site Operational Facilities Information Technology 105 PD00021 Pinnacle Peak Public Safety Facility Expansion Public Safety Police 146 PW00025 ADA Accessibility Streets Engineering 169 PW00027 Major Street Repairs Streets Public Works 187 PW00046 Sidewalks Annual Program Streets Engineering 197 PW00050 Building Equipment Renovation and Replacement Operational Facilities Public Works 77 PW00060 Building Fixture and Finish Renovation Operational Facilities Public Works 78 PW00080 Peoria Center for Performing Arts Operational Facilities Public Works 103 PW00090 Fire Department Building Needs Operational Facilities Public Works 86 PW00109 87th Ave & Peoria Ave Intersection Alignment Streets Engineering 164 PW00112 Beardsley Rd Channel Improvements Drainage Engineering 41 PW00133 Traffic Signal Interconnect Project (TSIP) Traffic Control Engineering 207 PW00137 Resurvey Benchmarks Streets Engineering 195 PW00138 Street Maintenance Program Streets Public Works 199 PW00150 City Hall Roof Replacement Operational Facilities Public Works 80 PW00163 Chip Seal Dirt Roads Streets Public Works 175 PW00305 MOC Fuel Island Operational Facilities Public Works 90 PW00325 Peoria Transit Center Operational Facilities Public Works 104 PW00335 Transit Park and Ride Lot Operational Facilities Public Works 108 PW00402 MOC Site Lighting Improvements Operational Facilities Public Works 91 PW00506 Citywide Security Program Operational Facilities Public Works 82 344 Pg # FY 2018-2027 Capital Improvement Program Appendix B - Project Listing by Number Project # Project Name Project Type Department PW00509 Renovate Main Library Operational Facilities Engineering 107 PW00510 Council Chambers Building Repair Program Operational Facilities Public Works 85 PW00512 Technical Pavement Condition Survey & Support Streets Public Works 201 PW00992 Arterial Road Pavement Preservation & Restoration Streets Public Works 170 PW00993 Traffic Signal Renovation and Replacement Streets Public Works 203 PW00995 City Parks Parking Lots - Asphalt Replacement Operational Facilities Public Works 81 PW01001 Dirt Shoulders, Dust Abatement PM-10 Program Streets Public Works 178 PW01003 Rural-Standard Roads Program Streets Public Works 196 PW01199 Asphalt Repair and Replacement-MOC Operational Facilities Public Works 76 PW10300 Historic Buildings Equipment and Finish Renovation Operational Facilities Public Works 88 PW11150 Parking Lot Maintenance for City Buildings Operational Facilities Public Works 102 PW11160 Street Light Infill and Replacement Program Streets Public Works 198 PW11190 Bus Stop Improvements Streets Public Works 173 PW13000 Residential Roads Rehabilitation and Preservation Streets Public Works 194 PW13005 Lake Pleasant Parkway Pavement Maintenance Streets Public Works 183 PW13010 Fleet Heavy Duty Vehicle Lift Operational Facilities Public Works 87 UT00037 Pyramid Peak Water Treatment Plant - Upgrades Water Utilities 268 UT00070 Water/Wastewater/Expansion Fee Update Water Utilities 284 UT00100 Butler WRF Headworks Rehabilitation Wastewater Utilities 222 UT00116 Lift Station Reconditioning Wastewater Utilities 229 UT00117 Wells - New Construction Water Utilities 286 UT00143 75 Ave 16-inch Waterline, Cactus and Peoria Water Utilities 244 UT00160 Utility Billing System Water Utilities 275 UT00170 West Agua Fria Water Lines Water Utilities 287 UT00171 West Agua Fria Wastewater Lines Wastewater Utilities 237 UT00191 Miscellaneous Local Wastewater Line Improvements Wastewater Utilities 231 UT00203 Miscellaneous Local Waterline Improvements Water Utilities 264 UT00204 Fire Hydrant Infill and Replacement Water Utilities 256 UT00206 Water Facility Reconditioning Water Utilities 279 UT00233 Lone Mtn Pkwy 36-inch Waterline; LPP to L303 Water Utilities 263 UT00234 White Mountain Apache Tribe Water Rights Purchase Water Utilities 290 UT00245 Agua Fria Booster/PRV Water Utilities 250 UT00256 Condition Assessment of Remote Sites Water Utilities 253 UT00261 Zone 1/2 PRV Upgrades (91st and Cactus) Water Utilities 291 UT00266 SCADA Equipment Replacement Water Utilities 271 UT00269 Lake Plsnt Pkwy 24-inch Waterline; Loop 303- LPWTP Water Utilities 262 UT00271 Integrated Utility Master Plan Water Utilities 260 UT00272 Wellhead Water Quality Mitigation Water Utilities 285 UT00274 Western Area CAP Pump Station Water Utilities 288 UT00284 Agua Fria Lift Station-Wastewater Campus Land Wastewater Utilities 215 345 Pg # FY 2018-2027 Capital Improvement Program Appendix B - Project Listing by Number Project # Project Name Project Type Department UT00285 Jomax In-Line Booster Station Upgrades Water Utilities 261 UT00286 Zone 5E/6E PRV Station Water Utilities 292 UT00296 Trunk Sewer Rehabilitation Wastewater Utilities 235 UT00298 Water & Wastewater Rate Study Water Utilities 278 UT00304 Technology and Security Master Plan Water Utilities 272 UT00307 Manhole Rehabilitation Wastewater Utilities 230 UT00308 Beardsley WRF Solids Pipeline Rehabilitation Wastewater Utilities 217 UT00309 Butler Recharge Wells (ASR) Wastewater Utilities 219 UT00310 85th Avenue Reclaimed Waterline-Mtn View to Grand Water Utilities 247 UT00311 Greenway WTP 8 MGD Expansion Water Utilities 258 UT00312 Desert Harbor-Arrowhead Shores Well Mixing Water Utilities 254 UT00314 Beardsley Plant Equipment Upgrade and Expansion Wastewater Utilities 216 UT00316 Greenway Plant Equipment Upgrade/Replacement Water Utilities 257 UT00321 SROG Line Assessment& Repair Wastewater Utilities 233 UT00322 Trunk Sewer Line Inspection Wastewater Utilities 234 UT00323 Jomax WRF Operational Improvement/Upgrade/Replace Wastewater Utilities 228 UT00326 Water Meter Replacement Program Water Finance 281 UT00327 ADOT Well-Sports Complex Well Connection Water Utilities 249 UT00328 Patterson Well-W209, W210 Well Mixing Water Utilities 267 UT00329 Reclaimed Water Booster Land Purchase at IPS Wastewater Utilities 232 UT00333 Butler WRF Plant Equipment Upgrade and Replacement Wastewater Utilities 223 UT00334 Pyramid Peak Water Treatment Plant Expansion Water Utilities 269 UT00335 Water Line Assessment and Replacement Water Utilities 280 UT00336 Westland Rd. Reservoir and Booster Station Water Utilities 289 UT00388 Jomax WRF Expansion Wastewater Utilities 226 UT00390 New River Utility Co. Acquisition & Improvements Water Utilities 265 UT00392 103rd Ave 12" Waterline Northern to Olive Water Utilities 243 UT00394 Ventana Well, Booster Rehabilitation Water Utilities 276 UT00398 101st Ave and Northern Lift Station Pretreatment Wastewater Utilities 214 UT00400 75th Ave 16" Waterline Cholla St to Thunderbird Rd Water Utilities 245 UT00404 Dixileta 21 inch Sewer Extension Wastewater Utilities 224 UT00408 75th Avenue and Grand PRV Upgrade Water Utilities 246 UT00410 Butler Well Site Rehabilitation Water Utilities 251 UT00412 Terramar Booster Pump Station Rehabilitation Water Utilities 273 UT00414 W108 Bailey Well Site Improvements Water Utilities 277 UT00416 Thunderbird Rd 16" Watermain Replacement Water Utilities 274 UT00418 Quintero Plant Equipment Upgrade/Replacement Water Utilities 270 UT00420 Butler WRF Aeration System Upgrades Wastewater Utilities 221 UT00422 Butler IPS Equipment Upgrade/Replacement Wastewater Utilities 218 UT00424 Northern Community Park Well Water Utilities 266 346 Pg # FY 2018-2027 Capital Improvement Program Appendix B - Project Listing by Number Project # Project Name Project Type Department UT00426 Hillcrest 8 inch Waterline Water Utilities 259 UT00428 Water/Wastewater Hydraulic Model Update Water Utilities 283 UT00430 El Mirage Road Waterline Upsizing Water Utilities 255 UT00432 El Mirage Road Sewer Infrastructure Upsizing Wastewater Utilities 225 UT00434 Central Arizona Project Curtailment Study Water Utilities 252 UT00436 Wastewater System Additional R & M Expense Wastewater Utilities 236 UT00438 Water System Additional R & M Expense Water Utilities 282 347 Pg # FY 2018-2027 Capital Improvement Program Appendix C - Funding By Source Capital Improvement Program FY 2018-2027 Summary by Funding Source Fund Number and Name FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 1000 - General $3,525,091 $1,765,000 $265,790 $505,000 $0 $31,790 $6,092,671 1111 - Percent for the Arts $700,000 $0 $0 $0 $0 $0 $700,000 1210 - Half Cent Sales Tax $1,191,474 $65,516 $65,516 $65,516 $65,517 $327,585 $1,781,124 1900 - Economic Development $2,680,035 $425,000 $0 $73,760 $73,760 $368,800 $3,621,355 $421,022 $75,000 $75,000 $0 $0 $0 $571,022 2000 - Sports Complex $0 $0 $0 $0 $0 $0 $0 2001 - Sports Complex Capital Reserve $0 $0 $0 $0 $0 $0 $0 2002 - Sports Complex Imp Reserve $0 $0 $0 $0 $0 $0 $0 2003 - Sports Complex GA Surcharge $0 $0 $0 $0 $0 $0 $0 $18,255,552 $13,226,836 $9,927,471 $7,516,424 $14,693,708 $18,608,425 $82,228,416 2161 - Water Expansion $2,907,646 $0 $0 $0 $0 $0 $2,907,646 2162 - Water Expansion Post 1/1/12 1970 - Municipal Office Complex Rsv 2050 - Water FY 23-27 Total $5,288,926 $544,419 $0 $0 $81,044 $64,080 $5,978,469 2163 - Water Exp. S. of Bell $690,118 $938,850 $651,544 $925,350 $18,000 $37,000 $3,260,862 2164 - Water Exp. N. of Bell $7,627,830 $3,320,550 $3,545,317 $2,405,494 $9,960,319 $8,225,050 $35,084,560 2167 - Water Resource Fee 2014 $1,190,286 $457,395 $431,505 $0 $0 $0 $2,079,186 2270 - WIFA Bonds 2400 - Wastewater 2452 - WIFA Bonds 2006 Clean Water 2506 - Wastewater Exp. E. of Agua Fria 2507 - Wastewater Exp. W. of Agua Fria $8,851,525 $26,687,983 $21,713,897 $2,474,859 $0 $31,694,078 $91,422,342 $11,081,708 $6,764,747 $2,874,886 $2,961,811 $9,649,030 $19,445,088 $52,777,270 $0 $0 $0 $14,024,198 $0 $0 $14,024,198 $240,294 $2,527,650 $244,939 $308,450 $93,810 $269,040 $3,684,183 $279,520 $508,228 $2,186,051 $2,528,229 $2,214,571 $186,960 $7,903,559 $1,796,700 $0 $0 $0 $0 $0 $1,796,700 2590 - Commercial Solid Waste $40,532 $0 $0 $0 $0 $250,000 $290,532 2600 - Residential Solid Waste $167,464 $0 $14,340 $0 $0 $614,340 $796,144 2650 - Solid Waste Expansion $0 $0 $0 $0 $0 $250,000 $250,000 3400 - IT Reserve $424,000 $0 $0 $0 $0 $0 $424,000 4150 - Capital Projects $228,643 $0 $0 $0 $0 $0 $228,643 2509 - Wastewater Expansion Post 1/1/12 $25,250,000 $0 $0 $0 $0 $0 $25,250,000 4240 - GO Bonds 2010 4233 - Proposed MDA Bonds $0 $0 $0 $0 $0 $0 $0 4250 - GO Bonds 2012 $0 $0 $0 $0 $0 $0 $0 4251 - GO Bonds 2015 $14,533,577 $710,258 $161,121 $0 $0 $0 $15,404,956 4252 - Proposed GO Bonds $29,726,471 $7,259,211 $14,387,602 $10,908,806 $4,194,644 $23,960,319 $90,437,053 4550 - CIP Capital Projects Fund $13,798,822 $3,419,396 $3,131,215 $0 $0 $0 $20,349,433 4810 - Outside Sources $12,334,147 $2,328,050 $7,070,000 $0 $0 $2,567,171 $24,299,368 7000 - Highway User $11,084,850 $7,792,880 $8,180,390 $5,257,880 $4,572,090 $28,072,150 $64,960,240 7003 - Streets Zone 3 Dev Fee $2,142,132 $5,050,000 $55,000 $0 $0 $110,000 $7,357,132 7007 - Street Impact Fees Z1 Post 010112 $1,218,300 $0 $0 $0 $0 $0 $1,218,300 $23,623,194 $14,984,310 $9,383,318 $3,368,060 $4,619,500 $16,809,468 $72,787,850 7010 - Transportation Sales Tax 348 FY 2018-2027 Capital Improvement Program Appendix C - Funding By Source Capital Improvement Program FY 2018-2027 Summary by Funding Source Fund Number and Name 7150 - Public Transit 7904 - Neighborhood Park Dev Zone 2 7907 - NeighPkDevl Fees - Z2 Post 1/1/12 7908 - NeighPkDevl Fees - Z3 Post 1/1/12 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 $8,009 $0 $0 $0 $0 FY 23-27 $0 Total $8,009 $222,002 $42,000 $0 $0 $0 $0 $264,002 $1,222,100 $0 $0 $0 $0 $0 $1,222,100 $762,550 $0 $0 $0 $0 $0 $762,550 7910 - Citywide Park/Rec Facility Dev $1,349,361 $0 $0 $0 $0 $0 $1,349,361 7911 - Community Park Dev Fee - Post $959,956 $0 $0 $0 $0 $0 $959,956 $0 $0 $0 $0 $0 $0 $0 7915 - Open Space Dev 7920 - River Corridors & Trails Dev 7930 - Law Enforcement Dev 7931 - Law Enforcement Dev - Post 1/1/12 7932 - Law Enfrcmnt IF 2014 $252,500 $21,000 $24,000 $0 $0 $0 $297,500 $1,713,052 $0 $0 $0 $0 $0 $1,713,052 $0 $0 $0 $0 $0 $0 $0 $135,148 $0 $9,000 $0 $0 $18,000 $162,148 7935 - Fire & Emergency Svc Dev $0 $0 $191,095 $0 $0 $1,562,362 $1,753,457 7936 - Fire & Emergency Svc Dev Post $0 $0 $0 $0 $0 $1,500,001 $1,500,001 $9,000 $0 $9,000 $0 $0 $5,855,620 $5,873,620 $0 $0 $0 $0 $0 $0 $0 7937 - Fire/EmergSvs Imp Fees 2014 7940 - General Government Dev 7941 - Park Imp Fee 2014 Bell to P.Peak $9,000 $42,000 $9,000 $0 $0 $18,000 $78,000 7942 - Parks Zone 2-Post 8/1/14 $1,509,000 $0 $9,000 $0 $0 $18,000 $1,536,000 7943 - Park Imp Fee 2014 W of Agua Fria $2,736,000 $42,000 $9,000 $0 $0 $18,000 $2,805,000 $212,187,537 $98,998,279 $84,624,997 $50,235,993 $42,680,106 $160,881,327 $660,251,970 Total 349 City of Peoria Produced by MANAGEMENT AND BUDGET DEPARTMENT 8401 West Monroe Street, Peoria, Arizona 85345 www.peoriaaz.gov