Section 1 Introduction ........................................................................................4 1.1 Purpose...................................................................................................................... 4 1.2 Project Authority....................................................................................................... 4 1.3 Project Location ........................................................................................................ 5 1.4 Hydrologic and Hydraulic Methods.......................................................................... 5 1.4 Acknowledgments..................................................................................................... 6 1.5 Study Results ............................................................................................................ 6 Section 2 FEMA Forms.....................................................................................10 2.1 Study Documentation Abstract for FEMA submittals............................................ 10 2.1.1 Date Study Accepted........................................................................................ 10 2.1.2 Study Contractor .............................................................................................. 10 2.1.3 Local Technical Reviewer ............................................................................... 10 2.1.4 Reach Description............................................................................................ 10 2.1.5 USGS Quad Sheets .......................................................................................... 11 2.1.6 Unique Conditions and Problems .................................................................... 11 2.1.7 Coordination of Peak Discharges..................................................................... 11 2.2 FEMA Forms .......................................................................................................... 11 Section 3 Survey and Mapping Information ...................................................12 3.1 Field Survey Information........................................................................................ 12 3.2 Mapping .................................................................................................................. 12 Section 4 Hydrology .........................................................................................12 4.1 Method Description ................................................................................................ 12 4.2 Parameter Estimation .............................................................................................. 12 4.2.1 Drainage Area .................................................................................................. 12 4.2.2 Watershed Work Map ...................................................................................... 13 4.2.3 Gage Data......................................................................................................... 13 4.2.4 Statistical Parameters ....................................................................................... 13 4.2.5 Precipitation ..................................................................................................... 13 4.2.6 Physical Parameters ......................................................................................... 13 4.3 Problems Encountered During the Study................................................................ 16 4.3.1 Special Problems and Solutions....................................................................... 16 4.3.2 Modeling Warning and Error Messages .......................................................... 16 4.4 Calibration............................................................................................................... 16 4.5 Final Results........................................................................................................ 16 4.5.1 Hydrologic Analysis Results........................................................................ 16 4.5.2 Verification results....................................................................................... 17 Section 5 Hydraulics.........................................................................................18 5.1 Method Description ................................................................................................ 18 5.2 Work Study Maps ................................................................................................... 18 5.3 Parameter Estimation .............................................................................................. 18 5.3.1 Roughness Coefficients ................................................................................... 18 5.3.2 Expansion and Contraction Coefficients ......................................................... 20 5.4 Cross-Section Description ...................................................................................... 20 5.5 Modeling Consideration.......................................................................................... 20 5.5.1 Hydraulic Jump and Drop Analysis................................................................. 20 5.5.2. Bridges and Culverts....................................................................................... 20 1 5.5.3 Levees and Dikes ............................................................................................. 20 5.5.4 Island and Flow Splits...................................................................................... 20 5.5.5 Ineffective Flow Areas..................................................................................... 20 5.6 Floodway Modeling ................................................................................................ 21 5.7 Problems Encountered ............................................................................................ 21 5.7.1 Special Problems and Solutions....................................................................... 21 5.7.2 Model Warnings and Errors............................................................................. 22 5.8 Calibration............................................................................................................... 22 5.9 Final Results............................................................................................................ 22 5.9.1 Hydraulic Analysis Results.............................................................................. 22 5.9.2 Verification of Results ..................................................................................... 22 Section 6 Erosion and Sediment Transport ...................................................23 Section 7 Draft FIS Report Data.......................................................................23 7.1 Summary of Discharges.......................................................................................... 23 7.2 Floodway Data ........................................................................................................ 23 7.3 Annotated Flood Insurance Rate Map .................................................................... 23 7.4 Flood Profiles.......................................................................................................... 23 List of Tables Table 1 Methods used for the HEC-HMS analysis........................................................... 14 Table 2 Physical Parameters for the Sub-Basins .............................................................. 14 Table 3. Summary of the Hydrologic Analysis Results for Sub-Basins........................... 17 Table 4 Summary of the Hydrologic Analysis Results at the Concentration Points ........ 17 Table 5. Comparison of modeled 100-yr peak discharges to Regional Regression Equation 13 peak discharges............................................................................................. 17 Table 6. Stage-storage relationship for overbank ponding located at River Station 1430.................................................................................................................................. 21 List of Figures Figure 1.1 Sub-basins for the Trails End Wash .................................................................. 7 Figure 1.2 Study limits of the Trails End Wash LOMR study ........................................... 8 Figure 1.3 Hydrologic soil groups for the Trails End Wash watershed.............................. 9 Figure 4.2 Soil Classification Map ....................................................................................15 Figure 5.1. Trails End Wash Photo 1............................................................................... 19 Figure 5.2. Trails End Wash Photo 2............................................................................... 19 Appendix A: References Appendix B: General Documentation and Correspondence Appendix C: Survey Field Notes Appendix D: Hydrologic Analysis, Supporting Documents Appendix E: Hydraulic Analysis, Supporting Documents Appendix F: Erosion Analysis, Supporting Documents 2 Exhibit Exhibit 1 100-yr floodplain limits for the Trails End Wash Exhibit 2 Annotated Flood Insurance Rate Map for the Trails End Wash Attached CD Trails End Wash TDN with supporting models and GIS data. 3 Section 1 Introduction 1.1 Purpose This Technical Data notebook (TDN) has been prepared for a Letter of Map Revision (LOMR) application for a portion of the Trails End Wash (TRA) located in Pima County, Arizona. The objective of the TDN and LOMR submission is to provide regulatory discharge rates and floodplain limits along the Trails End Wash using better topographic, hydrologic, and hydraulic data. This TDN was prepared in accordance with the “Instructions for Organizing and Submitting Technical Documentation for Flood Studies” prepared by the Arizona Department of Water Resources, Flood Mitigation Section (Arizona State Standard, SSA 1-97) and FEMA Guideline. FEMA LOMR forms are included in this TDN. 1.2 Project Authority The State of Arizona has delegated the responsibility to each county flood control district to adopt floodplain regulations designed to promote the public health, safety and general welfare of its citizenry as provided under the Arizona Revised Statutes, Title 48, Chapter 21, Article 1, Sections 48-3601 through 3627. More specifically, A.R.S. 3609 directs county flood control districts to adopt floodplain regulations that: A. Regulate all development of land, construction of residential, commercial or industrial structures or uses of any kind which may divert, retard or obstruct flood water and threaten public health or safety or the general welfare; and B. Establish minimum flood protection elevations and flood damage prevention requirements for uses, structures and facilities which are vulnerable to flood damage; and C. Comply with state and local land use plans and ordinances, if any. In conformance with A.R.S. 3609, this ordinance provides for protection of the public health safety and welfare by regulation of flood and erosion hazard areas to control flood hazards and prevent repetitive loss from flood damage. D. The flood hazard areas of Pima County are subject to periodic inundation which may result in loss of life and property, create health and safety hazards, disrupt commerce and governmental services, require extraordinary public expenditures for flood protection and relief, and impair the tax base, all of which adversely affect the public health, safety, and general welfare. E. These flood losses are caused by the cumulative effect of obstructions in areas of special flood hazards which increase flood heights, flow velocities, and cause flood and erosion damage. Uses that are inadequately flood-proofed, elevated, or otherwise protected from flood damage, also contribute to the flood loss. (Ord. 2005 FC-2 § 2 (part), 2005). 4 Section 16 of the Pima County Ordinance describes the provisions for floodplain regulation in Pima County. This study has been prepared by the Pima County Regional Flood Control District (RFCD): Pima County Regional Flood Control District 97 East Congress, Tucson, AZ 85701 The project was prepared by: Dave Stewart, EIT, Civil Engineering Assistant. Pima County Regional Flood Control District 97 East Congress, Tucson, AZ 85701 1.3 Project Location The study reach of the Trails End Wash (TRA) is located within a Federal Emergency Management Agency (FEMA)-designated “Zone A” flood-hazard area, as depicted on FIRM Map Panel Numbers 04019C1618K and 04019C1619K (February 8, 1999). The objective of the TDN and LOMR submission is to provide regulatory discharge rates and floodplain limits along the Trails End Wash using better topographic, hydrologic, and hydraulic data. The study reach of the Trails End Wash is located primarily west of N. Silverbell Rd. and extends from Section 20 of Township 13 South, Range 13 East into Section 29 of Township 13 South, Range 13 East, in Pima County, Arizona. 1.4 Hydrologic and Hydraulic Methods The hydrologic analysis was performed to determine proposed regulatory discharge rates at concentration points along the Trails End Wash using the U.S. Army Corps of Engineers Hydrologic Modeling System, HEC-HMS. The proposed regulatory discharges are flow rates that have a 1-percent chance of being equaled or exceeded each year (“100year” discharge rates). Hydraulic analysis was performed to delineate floodplain limits along the study reach of the Trails End Wash using the Hydrologic Engineering Center’s River Analysis System (HEC-RAS). No duplicate effective model is being provided because the area of the proposed map revision represents a complete replacement of the Trails End Wash existing model based on better topographical data and revised hydrology. The revised hydrology is based on the newer rainfall values from NOAA Atlas 14. 5 1.4 Acknowledgments This study relied on assistance of RFCD staff, who were integral to the development of the models and maps. 1.5 Study Results The regulatory discharges were calculated for floodplain mapping at three concentration points along the Trails End Wash (TRA A, B, and C). The 100-yr discharge of the Trails End Wash at N. Silverbell Rd. (TRA A) was found to be 2546.0 cfs with a drainage area of 2.84 mi2. 6 VE SIL RB Figure 1.1 Watershed Map Trails End Wash EL L SWEETWATER CP_A EL MORAGA ( ! CP_B ( ! TrailsEnd_ConcPoints TrailsEnd_MainStream TRE_contour20ft Trails End_subbasins TRA A TRA B TRA C TRA D TRA E TRA F TRA G TRA H ( ! CP_C ( ! GORET 2008PAGclr01ft.ecw IRONWOOD HILL CAMINO DE OESTE Pima County Index Map Index Map Scale 1:5,250,000 The information depicted on this display is the result of digital analyses performed on a variety of databases provided and maintained by several governmental agencies. The accuracy of the information presented is limited to the collective accuracy of these databases on the date of the analysis. The Pima County Regional Flood Control Department makes no claims regarding the accuracy of the information depicted herein. SPEEDWAY S TE GA SS PA This product is subject to the Department of Transportation Technical Services Division's Use Restriction Agreement. Pima County Regional Flood Control District Scale 1:2000' ANK LAM 03/2010 \\gislib\rfcd\projects\imd\xavi\mxd\AKITSU\Trails_End_wash_Watershed_Fig1_1.mxd VE SIL RB EL MORAGA ShadedX L SWEETWATER EL Study Limit Figure 1.2 Study Limit Map Trails End Wash A CP_A ShadedX A ( ! A TRA A CP_B ( ! TrailsEnd_ConcPoints TrailsEnd_MainStream Subbasin Existing Floodplain ZONE A ZONE AE ZONE X - SHADED ( ! TRA B CP_C ( ! GORET TRA E TRA C 2008PAGclr01ft.ecw TRA F TRA D IRONWOOD HILL Pima County Index Map CAMINO DE OESTE TRA G Index Map Scale 1:5,250,000 The information depicted on this display is the result of digital analyses performed on a variety of databases provided and maintained by several governmental agencies. The accuracy of the information presented is limited to the collective accuracy of these databases on the date of the analysis. The Pima County Regional Flood Control Department makes no claims regarding the accuracy of the information depicted herein. TRA H SPEEDWAY S TE GA SS PA This product is subject to the Department of Transportation Technical Services Division's Use Restriction Agreement. Pima County Regional Flood Control District Scale 1:2000' ANK LAM 03/2010 \\gislib\rfcd\projects\imd\xavi\mxd\AKITSU\Trails_End_wash_Watershed_Fig1_2.mxd VE SIL RB Figure 1.3 Zoning Classification Map Trails End Wash EL L EL MORAGA SWEETWATER TRA A Subbasin Pima County Zoning CB-1 CR-1 CR-2 CR-3 IR SR TUC 2008PAGclr01ft.ecw TRA B GORET TRA E TRA C TRA F TRA D IRONWOOD HILL Pima County Index Map CAMINO DE OESTE TRA G Index Map Scale 1:5,250,000 The information depicted on this display is the result of digital analyses performed on a variety of databases provided and maintained by several governmental agencies. The accuracy of the information presented is limited to the collective accuracy of these databases on the date of the analysis. The Pima County Regional Flood Control Department makes no claims regarding the accuracy of the information depicted herein. TRA H SPEEDWAY S TE GA SS PA This product is subject to the Department of Transportation Technical Services Division's Use Restriction Agreement. Pima County Regional Flood Control District Scale 1:2000' ANK LAM 03/2010 \\gislib\rfcd\projects\imd\xavi\mxd\AKITSU\Trails_End_wash_Watershed_Fig1_3.mxd Section 2 FEMA Forms 2.1 Study Documentation Abstract for FEMA submittals 2.1.1 Date Study Accepted: ___________________ 2.1.2 Study Contractor: Planning and Development Division, Pima County Regional Flood Control District 97 East Congress, Tucson, AZ 85701 (520) 243-1800 Prepared by Dave Stewart, Civil Engineering Assistant. 2.1.3 Local Technical Reviewer: ____________________________________ Terry Hendricks, C.F.M, Chief Hydrologist Planning and Development Division, Pima County Regional Flood Control District 97 East Congress, Tucson, AZ 85701 (520) 243-1800 2.1.4 Reach Description The study reach of the Trails End Wash (TRA) is located within a Federal Emergency Management Agency (FEMA)-designated “Zone A” flood-hazard area, as depicted on FIRM Map Panel Numbers 04019C1618K and 04019C1619K (February 8, 1999). The study reach of the TRA is located primarily west of N. Silverbell Rd. and extends from Section 20 of Township 13 South, Range 13 East into Section 29 of Township 13 South, Range 13 East, in Pima County, Arizona. The study reaches of the Trails End Wash contain coarse sand and cobble beds. Small shrubs and trees grow in some areas of the channel bed, and desert brush dominates the overbanks. 10 2.1.5 USGS Quad Sheets Not available for this study. 2.1.6 Unique Conditions and Problems There were no unique conditions or problems. 2.1.7 Coordination of Peak Discharges The 100-year regulatory discharge rates at the concentration points along the study reach were computed using HEC-HMS, assuming no base flow in the watersheds and no transmission loss within the reaches. All reaches were modeled with HEC-RAS. The discharge rates were acceptable per Suzanne Shields, Director of the Pima County Regional Flood Control District and Andrew Dinauer, Engineering Administrator of the City of Tucson. 2.2 FEMA Forms The FEMA MT-2 forms are included in Appendix B at the end of this TDN. 11 Section 3 Survey and Mapping Information 3.1 Field Survey Information 3.2 Mapping The topographic data for the hydrology was obtained using 2008 Pima Associations of Governments (PAG) Light Detection and Ranging (LiDAR) data in Geo-RAS and ArcGIS. A raster was created from the 2008 LiDAR data with 5’ cells and used with Geo-RAS. For the hydraulic analysis, the triangular irregular network (TIN) developed by HDR in the Silverbell Road, Grant Road to Ina Road Design Concept Report (2009) was used. The TIN was developed from 2005 Lidar (Appendix C) and supplemented with field survey methods that provide equal or better precision and accuracy to the Lidar data. The following data was used in this TDN; The aerial photo: 2008 PAG aerial photo Projection: UTM, Zone 12 Units: International feet The contour interval of the topographic map is 5 feet. Section 4 Hydrology 4.1 Method Description The 100-year peak discharges for the Trails End Wash were modeled using the U.S. Army Corps of Engineers Computer Hydrologic Modeling System, (HEC-HMS) version 3.2. The Trails End Wash basin upstream of N. Silverbell Rd. was split into eight subbasins. The HEC-HMS model requires parameters for rainfall, topography, soil, vegetation, and channel characteristics to determine runoff volume and peak discharge. Those parameters were determined according to the Pima County Regional Flood Control District Technical Policy 018 (Tech-018). Tech-018 is included in Appendix A. The HEC-HMS model is included in Appendix D. 4.2 Parameter Estimation 4.2.1 Drainage Area 12 The topographic data was obtained from a 5-ft cell raster created from 2008 PAG LiDAR data. ArcGIS was used to delineate watersheds from the raster and determine the drainage areas of each sub-basin. The composite watershed map is included in Exhibit A. 4.2.2 Watershed Work Map Eight sub-basins were delineated for the Trails End Wash basin. The 100-year peak discharge was calculated for three concentration points (CP A, B, C) and used in the HEC-RAS hydraulic analysis for the floodplain maps (Exhibit A). 4.2.3 Gage Data No gage data were used in this TDN. 4.2.4 Statistical Parameters No data record was available for the Trails End Wash and therefore no Bulletin 17B analysis was used for this TDN. 4.2.5 Precipitation According to Tech-018, the design storm should be used that produces the higher discharge between the 100-yr 3-hour SCS Type II distribution and the 100-yr 24-hr SCS Type I distribution. The 100-yr 3-hour SCS Type II distribution was found to produce the higher discharge on the Trails End Wash. NOAA Atlas 14, upper 90% confidence interval precipitation frequency estimate values (NOAA 14 rainfall) were used to determine 3-hour and 24-hour point rainfall depths for the watershed. The point rainfall depth for the 3-hour storm was obtained for the coordinates of the watershed centroid (Latitude 32.2506°, Longitude -111.0607°). An areal reduction factor was applied to watersheds larger than 1 square mile as noted in Tech-018. 4.2.6 Physical Parameters The physical parameters for the sub-basins and reaches of the HEC-HMS model are summarized in Tables 1 and 2. As mentioned in 4.1, all the methods and parameters were determined based on Tech-018. Table 1 summarizes the method used for the HEC-HMS analysis. 13 Table 1 Methods used for the HEC-HMS analysis Rainfall Depth Rainfall Distribution Rainfall Loss Time of Concentration Transform Routing Selected Method NOAA 14, upper 90% Confidence Interval 3-hr SCS Type II Storm SCS Curve number SCS Segmental Method SCS Unit Hydrograph Modified-Puls The SCS Curve Number (CN) method was utilized as a rainfall loss method in the HECHMS model. The CN was determined using the Curve Number tables and Hydrologic Soils Group maps associated with the PC Hydro User Guide (Arroyo Engineering, 2007). The CN was not adjusted for rainfall intensity or antecedent moisture conditions. The SCS Unit Hydrograph method was used as a transform method. Impervious cover was determined using 2008 PAG aerial photographs. The combination of the kinematic wave time of concentration method and the U.S. Natural Resources Conservation Service (NRCS) segmented Time of Concentration (Tc) calculation (USDA-NRCS, 1986) was used to determine Tc, based on the recommendation on Tech-018. The Tc was calculated by summing the travel time for sheet flow, shallow concentrated flow and channel flow. The Tc for sheet flow was estimated using the kinematic wave equation. Manning’s roughness coefficient for sheet flow was obtained using Table 3-1 in Technical Release 55, Urban Hydrology for Small Watersheds (USDA-NRCS, 1986). The velocity for channel was calculated using Manning’s equation. The detail of the Tc calculation is included in Appendix D. Table 2 Physical Parameters for the Sub-Basins Area Impervious Vegetation Sub-basin CN (sq mi) Area (%) Cover (%) TRA A 0.125 86.0 8.0 20 TRA B 0.316 88.4 24.1 20 TRA C 0.079 86.0 18.6 20 TRA D 0.562 88.6 23.4 20 TRA E 0.364 90.3 25.2 20 TRA F 0.124 87.0 24.8 20 TRA G 0.372 90.8 9.2 20 TRA H 0.899 90.9 10.2 20 Lag Time (min) 19.0 14.3 15.7 22.9 16.9 18.3 18.5 27.8 Runoff from sub-basins was routed using the Modified-Puls method. A storage discharge table for the channel routing was developed using the cross sections and slopes derived from HEC-HMS. The number of sub-reaches was calculated using the following method: 14 Figure 4.2 Soil Classification Map Trails End Wash EL MORAGA SWEETWATER TRA A LV SI L BE ER L Subbasin TRA B Soil Classification Soil Group: A (100%), ARIZO-RIVERWASH COMPLEX, 0 TO 3 PERCENT SLOPES Soil Group: B (100%), PINALENO VERY COBBLY SANDY LOAM, 1 TO 8 PERCENT SLOPES Soil Group: B (100%), PINALENO-STAGECOACH COMPLEX, 5 TO 16 PERCENT SLOPES Soil Group: C (47%) D (53%), PANTANO-GRANOLITE COMPLEX, 5 TO 25 PERCENT SLOPES GORET Soil Group: C (53%) D (47%), PALOS VERDES-JAYNES COMPLEX, 2 TO 8 PERCENT SLOPES Soil Group: D (100%), ANKLAM-CELLAR-ROCK OUTCROP COMPLEX, 15 TO 55 PERCENT SLOPES TRA E TRA C 2008PAGclr01ft.ecw TRA F TRA D IRONWOOD HILL Pima County Index Map CAMINO DE OESTE TRA G Index Map Scale 1:5,250,000 The information depicted on this display is the result of digital analyses performed on a variety of databases provided and maintained by several governmental agencies. The accuracy of the information presented is limited to the collective accuracy of these databases on the date of the analysis. The Pima County Regional Flood Control Department makes no claims regarding the accuracy of the information depicted herein. TRA H SPEEDWAY TE GA AS SP S This product is subject to the Department of Transportation Technical Services Division's Use Restriction Agreement. Pima County Regional Flood Control District ANK LA Scale 1:2000' M 03/2010 \\gislib\rfcd\projects\imd\xavi\mxd\AKITSU\Trails_End_wash_Watershed_Fig4_2.mxd Vw = 1.5 * Vave .........eq.1 K= L ...................eq.2 Vw Therefore, K N = ..................eq.3 Δt where Vave is the average flow velocity, L is the reach length, Vw is the velocity of the flood wave (a conversion factor of 1.5 is used for natural channels), K is the hydrograph travel time, Δt is the time interval for computations in the model, and N is the number of steps in the reach routing. Eq.4 was obtained from eq.1, 2, and 3. The detail of the calculation of the number of sub-reach is included in Appendix D. 4.3 Problems Encountered During the Study 4.3.1 Special Problems and Solutions There were no problems with the hydrologic modeling. 4.3.2 Modeling Warning and Error Messages The time interval of the rainfall data used in this study is 5 minutes, while the simulation time interval is 1 minute. The HEC-HMS model interpolated the 5-minute time interval of the rainfall data to 1-minute time interval. The following warnings were produced in the HEC-HMS; • The “3-hr SCS Type II” gage with data interval of 5 minutes was interpolated to a simulation time interval of 1 minute. 4.4 Calibration No calibration was conducted in this study. 4.5 Final Results 4.5.1 Hydrologic Analysis Results The 100-year peak discharges at the concentration points along the Trails End Wash were determined using HEC-HMS. The results are summarized in Tables 3 and 4. CP B 2 16 refers to the junction in the HEC-HMS model that receives flow from only the reach included in the hydraulic analysis and the TRA B sub-basin. The junction labeled CP B is the same location as CP B 2 but includes all incoming reaches at concentration point B and the TRA B sub-basin. The discharge at CP B 2 was used for the hydraulic analysis of the study reach above concentration point B. Table 3. Summary of the Hydrologic Analysis Results for Sub-Basins. Peak Area Rainfall Runoff Sub-basin Discharge (Sq mi) Depth (in) Volume (in) (cfs) TRA A 0.125 3.16 1.80 201.3 TRA B 0.316 3.16 2.00 671.3 TRA C 0.079 3.16 1.80 143.1 TRA D 0.562 3.16 2.01 891.8 TRA E 0.364 3.16 2.16 756.8 TRA F 0.124 3.16 1.88 214.0 TRA G 0.372 3.16 2.20 746.2 TRA H 0.899 3.16 2.21 1377.2 Table 4 Summary of the Hydrologic Analysis Results at the Concentration Points Concentration Point Location Area (Sq mi) Rainfall Depth (in) CP A At Silverbell Rd. 2.84 2.91 1.87 2546.0 2:21 CP B 2.72 2.92 1.89 2543.5 2:16 CP B 2 CP C 1.98 1.46 2.92 3.03 1.86 2.02 1749.5 1645.7 2:17 2:09 Runoff 100-yr Peak Volume (in) Discharge (cfs) Time to Peak 4.5.2 Verification results The modeled discharges were found to be relatively close to the Regional Regression Equation 13 (RRE) (Thomas et al., 1997) peak discharges (Table 5). Table 5. Comparison of modeled 100-yr peak discharges to Regional Regression Equation 13 peak discharges. Area Qp100 HMS Qp100 RRE CP Location 2 (cfs) (cfs) (mi ) CP A At Silverbell Rd. 2.84 2546.0 2426.5 CP B 2.72 2543.5 2362.6 CP B 2 1.98 1749.5 1951.6 CP C 1.46 1645.7 1612.7 17 Section 5 Hydraulics 5.1 Method Description The hydraulic modeling for the Trails End Wash was performed using HEC-RAS, Version 4.0, HEC-GeoRAS, Version 4.1.1, and ArcGIS, Version 9.2. The topographic data was obtained using a triangular irregular network (TIN) developed by HDR in the Silverbell Road, Grant Road to Ina Road Design Concept Report (2009) (Appendix C). The locations of the stream centerlines were determined using ArcGIS with the contour lines from the topographic data and 2008 PAG aerial photos. The physical attributes of the wash were digitized in ArcGIS using the HEC-GeoRAS extension and then exported to HEC-RAS to create geospatially referenced geometric data (cross sections, reach lengths). Other parameters for the steady-state analysis, such as the Manning’s n-values, obstructions, and ineffective flow areas were manually entered into HEC-RAS. The hydraulic data obtained from HEC-RAS were exported to ArcGIS to delineate the floodplain in the study area. The downstream boundary condition for the reach was assumed to be normal depth with a slope estimated as the bed slope between the two farthest downstream cross sections. The hydraulic analysis was performed in the area currently mapped as FEMA Zone A. A steady flow analysis was performed to determine 100-year water surface elevations in the study area by using HEC-RAS. The HEC-RAS data and shape files (contour lines, flow path, cross section lines, study watersheds, concentration points, sub-watersheds, hydrologic soil groups, proposed floodplain limit) used in the analysis are included in Appendix D with an attached CD. 5.2 Work Study Maps The work study map for the Trails End Wash is included in Exhibit B. 5.3 Parameter Estimation 5.3.1 Roughness Coefficients Manning’s n values were determined in the field and using 2008 PAG aerial photo based on USGS publications for Manning’s n values in southern Arizona (Phillips and Tadayon, 2006). A Manning’s n value of 0.045 was assigned for the channel based on the sand and cobble bed material with dense vegetation in some areas, and a value of 0.060 was assigned for the overbanks based on the desert brush (Figures 5.1 and 5.2). 18 Figure 5.1. Trails End Wash Photo 1. A location of the Trails End Wash containing cobbles and dense vegetation at Lloyd Bush Rd., farther upstream in the watershed than Silverbell Rd. Figure 5.2. Trails End Wash Photo 2. A location of the Trails End Wash with a primarily sand channel and scattered vegetation immediately downstream of Silverbell Rd. 19 5.3.2 Expansion and Contraction Coefficients The Trails End Wash is assumed to have relatively gradual transitions, and the default values for the expansion and contraction coefficient of 0.30 and 0.10 were used respectively. 5.4 Cross-Section Description Cross-section locations were determined primarily based on the channel topography from the TIN and 2008 PAG LiDAR data. Cross sections were placed at a spacing of approximately 100 ft. The cross-section lines were drawn to be perpendicular to flow paths in ArcGIS. 5.5 Modeling Consideration 5.5.1 Hydraulic Jump and Drop Analysis No hydraulic jumps or hydraulic drops were modeled in this study. 5.5.2. Bridges and Culverts There are no bridges located in the floodplain study reach of the Trails End Wash. 5.5.3 Levees and Dikes There are no levees or dikes located within the study limit. 5.5.4 Island and Flow Splits No islands or split flows were modeled in the study. 5.5.5 Ineffective Flow Areas Ineffective flow option was modeled in situations where: • The floodplain areas are not hydraulically connected • There is a contraction or expansion of the effective flow area. 20 5.6 Floodway Modeling No floodway modeling was performed in this study. 5.7 Problems Encountered 5.7.1 Special Problems and Solutions At three locations along the Trails End Wash near Silverbell Rd., the 100-yr discharge was not contained in the channel and a discharge could leave the channel without returning to the main flow path. As a result, River Stations 2093, 1030, and 684 have “hanging” cross sections. These locations were modeled in HEC-RAS using lateral structures along the overbank of the channel. The discharge leaving the channel was determined using the optimization feature in HEC-RAS for the lateral structures. The “break out” flow paths were modeled as separate reaches of the Trails End Wash using the discharge determined from the optimization feature. Two of these “break out” flow paths (River Station 2200 “Breakout 1,” and River Station 830 “Breakout 2”) are proposed as a Shallow 100 yr Flooding Zone where flow depth is less than one foot. The third location of a break out leads to a depression in the floodplain of the Santa Cruz (River Station 1430, “Overbank Ponding”). The stage-storage relationship for this depression was determined in a GIS using the 2-ft contour lines and the area measurement tool. The volume of the depression was calculated by assuming a conical volume change for increases in elevation and area (Table 6). The volume of flow leaving the channel was found by calculating the area of the top of the hydrograph that was determined to leave the channel by the lateral structure optimization feature. The peak discharge in the channel at Silverbell Rd. was determined as 2546.04 cfs, and the peak discharge leaving the channel into the depression was found as 20.28 cfs. The volume leaving the channel was calculated as 0.079 ac-ft by finding the area of the hydrograph with discharge exceeding 2525.76 cfs, or 20.28 cfs lower than the maximum discharge. The depth of the flow stored in the depression was determined as 1.24 ft from the calculated volume and the stage-storage relationship. The depression was found to contain the volume of flow leaving the channel and the depression was added to the floodplain map as a proposed Zone A. Table 6. Stage-storage relationship for overbank ponding located at River Station 1430. Elevation Depth (ft) Area (ac) 2254 2256 2258 2260 0 2 4 6 0.003 0.192 0.749 1.229 Increase in Volume (ac-ft) 0.000 0.128 0.870 1.461 Total Volume (ac-ft) 0.000 0.128 0.998 2.459 21 River Station 495 is a “hanging” cross section with an ineffective area that extends over a wastewater treatment pond near the Santa Cruz river and no right bank extending above the water surface elevation ; however, the cross section is within the current FEMA Zone A for the Santa Cruz River and should not affect the proposed Zone A for the Trails End Wash. 5.7.2 Model Warnings and Errors The FEMA guidelines require hydraulic models to simulate subcritical flow conditions. The HEC-RAS modeling produced warnings at some cross sections stating that: • The energy equation could not be balanced within the specified number of iterations • The energy loss was greater than 1.0 ft between cross sections • The conveyance ratio is less than 0.7 or greater than 1.4 • Multiple critical depths were found • Divided flow was computed and • The program defaulted to critical depth when the water surface was calculated below critical depth • Cross sections end points were extended vertically for the computed cross section A summary of errors is available in Appendix E. 5.8 Calibration The model was not calibrated in this study. 5.9 Final Results 5.9.1 Hydraulic Analysis Results The HEC-RAS modeling results are summarized in Appendix E. 5.9.2 Verification of Results The floodplain limit produced in this LOMR study was compared to the existing FEMA floodplain limit. The proposed limits are similar to the existing FEMA floodplain limit, but provide additional detail. This similarity to the existing FEMA floodplain limit suggests that the results are reasonable. 22 Section 6 Erosion and Sediment Transport No erosion or sediment transport analysis was conducted in this study. Section 7 Draft FIS Report Data 7.1 Summary of Discharges The peak discharge at Silverbell Rd. (CP A) was determined as 2546 cfs for the drainage area of 2.84 square miles. The discharges along the flow path upstream of Silverbell Rd., CP B 2 and CP C, were found to be 1749.5 and 1645.7 respectively with drainage areas of 1.98 and 1.46 square miles. 7.2 Floodway Data Not applicable. 7.3 Annotated Flood Insurance Rate Map An annotated Flood Insurance Rate Map (FIRM) is included in Exhibit 2. 7.4 Flood Profiles Flood profiles are included in Appendix E. 23 0 2300 0 22 7 0 22 9 2250 0 22 7 22 8 0 2300 2280 229 0 23 0 0 4 224 2258 2242 0 2250 22 54 22 2250 54 5 22 4 231 0 22 50 2257.74 5 23 2256 This product is subject to the Department of Transportation Technical Services Division's Disclaimer and Use Restrictions. Pima County Regional Flood Control District 200 100 0 200 Feet 0 0 23 2 0 2260 0 232 The information depicted on this display is the result of digital analyses performed on a variety of databases provided and maintained by several governmental agencies. The accuracy of the information presented is limited to the collective accuracy of these databases on the date of the analysis. The Pima County Department of Transportation Technical Services Division makes no claims regarding the accuracy of the information depicted herein. 2250 2256 56 2256 2256 22 211 2259. 226 2340 23 0 54 2340 231 0 2256 2256 232 0 64 2252 2330 2340 2350 231 0 2340 0 23 0 0 2320 0 23 4 0 2360 22 6 231 0 2350 22 2257.079 2246 2266 2 8 64 225 224 22 8 2248 2380 224 4 56 224 22 2252 2360 1 2242 2370 2250 EL MORAGA 22 2300 0 23 3 2350 2360 2242 2250 2252 0 2240 056 7 552 23 3 0 22 7 235 LL . 2249 .0 9 96 2360 BE 0 225 0 .6 11 V U 2390 ER LV SI 0 V U 5 22 31 847 U V 893 V U 1 .2 3 2258.313 64 225 12 66 668 0 V U 2380 7 2330 72 2340 8 5 5 0 226 52 V U 23 6 62 27 58 4 5 2320 398 V U U V 6 63 68 78 0 . 2251 37 46 0 2250 V V U U 87 V V .2 U V U U 58 22 4 U V 9. 23 5 062 .3 6 6 57 5 22 22 9 . 2251 3 .3 2 225 225 2350 2250 110 U 2250 V 8 93 4. 42 V U 70 0 04/2010 238 0 Study Limit 7663 19 9 348 GORET 2400 V U V1 U 38 10 65 10 .27377 2251 V U 22 .2 7 62 Index Map Scale 1:1,500,000 2250 2255.717 2256.392 2 225 22 645 3 .6 1 2 07 2260 2 225 638 6 666 U V 702 V U 759 V U 800 V U 2255.2 0 2252 56 436 0 2254 . 2 22 628 5 8 2260 .2 7 4 23 5 2262 2252 4 3 .6 U V V U V U V U U V 630 V U 586 Pima County Index Map 252 .8 1 2342 . 0 235 618 5 3 3 225 U530 V 22 5 54 2254 3 225 96 54 V U 578 5 2258 15 22 2254 22 2320 4 92 3U V 225 50 Feet 71 2U V U V 50 25 0 2254 54 V5 U Detail B 458 2250 22 327 234 0 558 5 5 2346.7 . 2348 2370 0 239 2361.256 7 54 54 548 5 2 3 25 30 22 54 22 7 03 ! ( 78 2359.8 8 10 22 97 7542 1 Breakout 2 54 674 V U 0 .1 CP_C 234 1. 2358. 1 V U 3 11 4 50 2330 6 02 35 22 22 43 V U 68 5 23 5 23 7442 2356. 8 12 225 2252 42 V U 69 42 V U 70 2 V U 0 5 2 48 7 23 U V V U V U 734 .0 9 13 0 235 5 3 .6 0 231 7 23 2 2280 2250 538 3 6085 724 20 5085 2336.948 V U 0 231 2290 2300 5985 23 5 20 4985 2335.379 2 14 U V V U V U V U V U V U V U V U V U V U V U V U V U 2360 714 24 5 568 5 2341.3 7 0 5 5888 V U 15 8 22 23 2334.031 16 V U V U V U U V 86 448 2332.558 5. 8 438 2331.275 2390 4 .3 1 .7 1 5 3 2339.8 9 0 428 5 2329.865 23 4 4 V U 16 .115 2327.957 88 0 418 5 2326.527 4 .3 60 45 536 408 5 5285 70 23 22 6 398 5 2325.038 2338. 3 22 6 0 0 5185 23 4 0. 03 581 2323.808 50 Topo: 2008 Pima Association of Government Vertical Datum: NAVD 1988 388 5 2320.334 2321.944 Aerial Photo:2008 Pima Association of Government 0 22 6 4885 2350 0 235 60 V U 2318.717 2250 18 1 23 U V V U V U V U V U V U V U V U 2317.73 4785 50 22 6 457 9 V U 2380 5 22 5. 6 26 0 229 24 191 2316.6 9 14 0 70 23 Overbank Ponding 191 V U 6 3 75 4685 2350 7 22 05 6. 48 199 2315 . 5 V U U V 0 232 85 V U Discharge Points Trails End Main XS Trails End Main Stream Trails End Breakout1 XS Trails End Breakout1 Stream Trails End Breakout2 XS Trails End Breakout2 Stream Contour2ft Contour 10ft. Existing Zone AE Proposed 100yrFloodplain Proposed Shallow 100 yr Flooding Proposed Zone A 1 7 231 3 93 228 231 2 98 7 .9 .6 0 9 .8 3 6 5 3785 407 2310 . V U V U 7 2309 . V U 88 V U 15 3685 2307 . 2250 85 5 85 U V V U V U 230! 3.955 ( 2306. 5 15 ! ( 0 238 5 258 79 32 2302.529 2350 67 6 V U U V V U 3585 2305. 3 87 0 .2 99 V U 6. 3 5. 7 22 7 22 9 227 218 248 6 2301.108 0 209 3 V U U U V V V U U V 79 2299.552 3485 0 228 2 28 V U 22 6 1. Study Limit 9 3 7 2 2298. 2 6 2282.3 0 2283.5 01 90 7 22 0 522 3. 6 22 3. 8 22 . 2284 .8 6 8 5 V U .5 7 2296. 8 5 .3 6 228 22 9 4 .2 4 22 9 .7 6 63 22 9 85 37 80 9 .0 0 .6 V U 31 7 228 8 22 9 22 85 50 Feet 5 228 05 0 22 6 22 6 63 7 .7 7 22 5 5 2. 83 V U 29 9 22 V U 0 0 0 .5 6 22 268 278 9 22 2280 338 5 90 23 8 2 CP_A ! ( 30 7 4U V U6 V 51 25 22 6 6. 74 22 See Detail A Detail A 50 7. Breakout 1 70 0 227 2290 Breakout 1 U422 V 80 23 22 5 5 SWEETWATER 2300 6 22 20 U V 5 2290 V U 4 23 27 85 5 5 22 85 3 V U 2300 U343 V 4 23 10 V U 65 .8 80 22 V1 U 22 V U 49 79 0 230 29 0 235 12 5 V U 2. 23 U246 V 22 80 .2 86 U581 V V U 37 02 .9 62 22 4 2 .2 63 22 79 30 .8 8 10 63 22 4.23 8 6 75 22 64. 22 0 232 181 U V 00 22 7 2310 9.0 07 22 81 .18 11 8 2. 6 22 9 0 133 U V V U 7 22 22 76 .71 V U U V 406 22 6 LL 22 78 .0 94 22 77 .4 11 826 2260 BE 2320 58 U V V87 U See Detail B 2310 227 6. 0 683 029 Exhibit 1 100-year Floodplain with cross sections Trails End Wash Breakout 2 ER LV SI 227 5. 22 5 2300 227 5. Study Limit 22 5 70 227 4. 22 81 .5 13 2260 0 228 22 Study Limit 2240 SWEETWATER Pima County Regional Flood Control 97 East Congress Street - 3rd Floor Tucson. Arizona 85701-1207 (520)243-1800 - FAX (520)243-1821 http://www.rfcd.pima.gov gislib\rfcd\projects\imd\xavi\mdx\AKITSU\Trails_End_watershed_100yrFINALexh1.mxd ER 20 19 ZONE A Exhibit 2 Annotated Flood Insurance Rate Map 04019C1618 K Trails End Wash LV SI ZONE X - SHADED BE LL SWEETWATER ZONE A EL MORAGA ZONE A FIRM X-Sections çççççççççççççççç Proposed 100 year Floodplain Base Flood Elevations Streets Proposed 100yr Floodplain LOMR Case Studies FIRM - Flood Insurance Rate Map Floodways 29 30 Sections Jurisdictions TUCSON Existing Floodplain Zone A AE AO X X - (SHADED) GORET PIMA COUNTY ZONE A ççç2ç 358 ççççç ZONE X çççç ç ççç ç " ) A çç ççççç Pima County Index Map ç B " ) 74 2378 çç çççççççççççç ççççç çç23 çççççççççç çççççççç 23 ç ççç ç 7 0 çççç ç çç çççççççççççççççççç çççç2ç3çç8ç2ççççç çççç236 çççç4 çççç ç ç " ) C ççç ç 12 ççç 24çççç ç ççç E EST çççç240 çççç6 ççç ççççç çççç EO ççç ç 2385 OD 32 ççççç MIN ç çççççççç LOMR Case 99-09-434P Effective Date4/26/2000 D ç çççççç 23ç3çç4ççç çççç E çç ç ççç ç çççç " ) çç ççç ç çç 4 6 ççç 24çç ççç ç ççç 0 ç 24ç4çç ççç ççç çç ç çççç ç 50 ç ç ç 24 çç ç çççç ç çççç F " ) ççççççç2çç4ç5çç6 ççççççç " ) çç 24ç2çç2çççççç ç ççççççç ç ççççç ZONE AE ççççççç ççççççççççççççççççççççççççç 2428 31 çççççç2çç3ç99 çççççççç çççççç ççç ççççç ç çç ççç CA çççççççççççççççççç2ç 395 ççççççç ç ççç ç ç ç çç çç ççç ççççç çç ççççç çççç 23 çççç 90 çççç ççç ççççç ZONE A The information depicted on this display is the result of digital analyses performed on a variety of databases provided and maintained by several governmental agencies. The accuracy of the information presented is limited to the collective accuracy of these databases on the date of the analysis. The Pima County Department of Transportation Technical Services Division makes no claims regarding the accuracy of the information depicted herein. This product is subject to the Department of Transportation Technical Services Division's Disclaimer and Use Restrictions. 490 245 0 2462 çç çç ççç çç çç çç çç çç çç çç ç çççççççççç2468 ç çççç ççççç ççççç HILL IRONWOOD çççç ççç 06 ççç247 ççç 4 ç çç ççç çççç ççç ç " ) G 05 Pima County Regional Flood Control 97 East Congress Street - 3rd Floor Tucson. Arizona 85701-1207 (520)243-1800 - FAX (520)243-1821 http://www.rfcd.pima.gov ç çççç çççç ç çççç gislib\rfcd\projects\imd\xavi\mdx\AKITSU\Trails_End\Trails_End_watershed_Anno_FIRM28x40.mxd 490 Feet ç çççç ççç Exhibit 2 Annotated Flood Insurance Rate Map 04019C1619 K Trails End Wash ER ç çççç ç 21 20 SWEETWATER ZONE X ç çç ç ç ç ç Proposed 100 year Floodplain " ) ES çç ç çç ç ç çç ET " ) ZONE AE EU " ) ç ç çç çççççç ççççççç ççç ç çç ç ç ç 6 ççççç2 ç ç ç ç ç3 çççççç ç ç ç ç2 2 6 çç ççç ççç ç ç ç ç çç ç 2 ç ç ç0ç çç çç ç çç çç ç ççç ççç ç çç ç ç ççç ç ççç 28 ççç 29 ççç ç ç ç ç22 ç ç ç 58 ç çç ççç çç ççç ç ç çç ç ççç ççç TUCSON ç ç ç ç ç262 çç ç ç ç çç ç ç ç çç çç ç 7 çç 2ç2ç ç5ç ç ç ç ç ç ç çç ç ç çç ç çç ç çç ç çç ç çç ç çç ç ç ç çç çç ç ççç çç ZONE X ç çç ç ç ç çç ç ç ç ç ç ç ç " ) ZONE X - SHADED ççç çççç 2ç2ç ç5ç ç3ç ç ç ç ç ç ç ç ç ç ç ç ç ç EL çççççç RB çççççç E LV SI çççç çç 2 ZONE X - SHADED L ZONE X 0 The information depicted on this display is the result of digital analyses performed on a variety of databases provided and maintained by several governmental agencies. The accuracy of the information presented is limited to the collective accuracy of these databases on the date of the analysis. The Pima County Department of Transportation Technical Services Division makes no claims regarding the accuracy of the information depicted herein. This product is subject to the Department of Transportation Technical Services Division's Disclaimer and Use Restrictions. Pima County Regional Flood Control 97 East Congress Street - 3rd Floor Tucson. Arizona 85701-1207 (520)243-1800 - FAX (520)243-1821 http://www.rfcd.pima.gov Streets FIRM X-Sections 125 250 500 Feet ç ç ç ç ç Base Flood Elevations Proposed Floodplain LOMRs FIRM - Flood Insurance Rate Map Sections Jurisdictions Existing Floodplain Zone A AE AO X X (SHADED) Pima County Index Map gislib\rfcd\projects\imd\xavi\mdx\AKITSU\Trails_End\Trails_End_watershed_Anno_FIRM8X11.mxd A.1 Data Collection Summary Aldridge, B. and J. Garrett. 1973. Roughness Coefficients for Stream Channels in Arizona. US Department of the Interior Geological Survey. Tucson, AZ. Arizona Department of Water Resources, Flood Mitigation Section “Requirements for Flood Study Technical Documentation” SS1-97, November 1997 National Weather Service. 1984. Depth-Area Ratios in the Semi-Arid Southwest United States, NOAA Technical Memorandum NWS Hydro-40 Phillips, J., and S. Tadayon. 2006. Selection of Manning’s roughness coefficient for natural and constructed vegetated and non-vegetated channels, and vegetation maintenance plan guidelines for vegetated channels in central Arizona: U.S. Geological Survey Scientific Investigations Report 2006–5108, 41 p. Phillips, J., and T. Ingersoll. 1998. Verification of Roughness Coefficients for Selected Natural and Constructed Stream Channels in Arizona. U.S. Geological Survey Professional Paper 1584. Pima County Regional Flood Control District “Pima County Mapguide Map”, 2008 U.S. Army Corps of Engineers (COE). 2001. HEC-RAS, River Analysis System, Hydraulic Reference Manual, CPD-69, Hydraulic Engineering Center, Davis, CA. U.S. Army Corps of Engineers (COE). 2003. Geospatial Hydrologic Modeling Extension HEC-GeoHMS, (v 1.1) CPD-77, Hydraulic Engineering Center, Davis, CA. U.S. Army Corps of Engineers (COE). 2006. HEC-HMS, Hydrologic Modeling System User’s Manual, (v. 3.1.0) CPD-74A, Hydraulic Engineering Center, Davis, CA. U.S. Department of Agriculture Natural Resources Conservation Service (NRCS), 1986. Urban Hydrology for Small Watersheds, Technical Release 55. Washington, DC. A 2. Referenced Documents Eychaner, J.H., 1984. Estimation of magnitude and frequency of floods in Pima County, Arizona, with comparisons of alternative methods: U.S. Geological Survey WaterResources Investigations Report 84-4142, 69 p. Haan, C.T., Barfield, B.J., Hayes, J.C. 1994. Design Hydrology and Sedimentology for Small Catchments, Academic Press. Thomas, B.E., H.W. Hjalmarson, and S.D. Waltemeyer. 1997. Methods for Estimating Magnitude and Frequency of Floods in the Southwestern United States. USGS Water Supply Paper 2433. 195 p. U.S. Department of Agriculture Natural Resources Conservation Service (NRCS), 1986. Urban Hydrology for Small Watersheds, Technical Release 55. Washington, DC. Appendix B General Documentation and Correspondence U.S. DEPARTMENT OF HOMELAND SECURITY - FEDERAL EMERGENCY MANAGEMENT AGENCY O.M.B No. 1660-0016 Expires: 12/31/2010 OVERVIEW & CONCURRENCE FORM PAPERWORK BURDEN DISCLOSURE NOTICE Public reporting burden for this form is estimated to average 1 hour per response. The burden estimate includes the time for reviewing instructions, searching existing data sources, gathering and maintaining the needed data, and completing, reviewing, and submitting the form. You are not required to respond to this collection of information unless a valid OMB control number appears in the upper right corner of this form. Send comments regarding the accuracy of the burden estimate and any suggestions for reducing this burden to: Information Collections Management, U.S. Department of Homeland Security, Federal Emergency Management Agency, 500 C Street, SW, Washington DC 20472, Paperwork Reduction Project (1660-0016). Submission of the form is required to obtain or retain benefits under the National Flood Insurance Program. Please do not send your completed survey to the above address. A. REQUESTED RESPONSE FROM DHS-FEMA This request is for a (check one): CLOMR: A letter from DHS-FEMA commenting on whether a proposed project, if built as proposed, would justify a map revision, or proposed hydrology changes (See 44 CFR Ch. 1, Parts 60, 65 & 72). LOMR: A letter from DHS-FEMA officially revising the current NFIP map to show the changes to floodplains, regulatory floodway or flood elevations. (See 44 CFR Ch. 1, Parts 60, 65 & 72) B. OVERVIEW 1. The NFIP map panel(s) affected for all impacted communities is (are): Community No. Ex: 480301 480287 040073 Community Name City of Katy Harris County Pima County State TX TX AZ Map No. 480301 48201C 04019C 040078 City of Tucson AZ 04019C 2. Panel No. 0005D 0220G 1618K 1619K 1619K Effective Date 02/08/83 09/28/90 02/08/99 02/08/99 a. Flooding Source: Trails End Wash b. Types of Flooding: Riverine Coastal Alluvial fan Shallow Flooding (e.g., Zones AO and AH) Lakes Other (Attach Description) 3. Project Name/Identifier: Trails End Wash 4. FEMA zone designations affected: A (choices: A, AH, AO, A1-A30, A99, AE, AR, V, V1-V30, VE, B, C, D, X) 5. Basis for Request and Type of Revision: a. The basis for this revision request is (check all that apply) Physical Change Improved Methodology/Data Regulatory Floodway Revision Coastal Analysis Hydraulic Analysis Hydrologic Analysis Weir-Dam Changes Levee Certification Alluvial Fan Analysis New Topographic Data Other (Attach Description) Base Map Changes Corrections Natural Changes Note: A photograph and narrative description of the area of concern is not required, but is very helpful during review. b. The area of revision encompasses the following structures (check all that apply) Structures: DHS- FEMA Form 81-89,DEC 07 Channelization Levee/Floodwall Bridge/Culvert Dam Fill Other (Attach Description) Overview & Concurrence Form MT-2 Form 1 Page 1 of 2 U.S. DEPARTMENT OF HOMELAND SECURITY - FEDERAL EMERGENCY MANAGEMENT AGENCY O.M.B No. 1660-0016 Expires: 12/31/2010 OVERVIEW & CONCURRENCE FORM PAPERWORK BURDEN DISCLOSURE NOTICE Public reporting burden for this form is estimated to average 1 hour per response. The burden estimate includes the time for reviewing instructions, searching existing data sources, gathering and maintaining the needed data, and completing, reviewing, and submitting the form. You are not required to respond to this collection of information unless a valid OMB control number appears in the upper right corner of this form. Send comments regarding the accuracy of the burden estimate and any suggestions for reducing this burden to: Information Collections Management, U.S. Department of Homeland Security, Federal Emergency Management Agency, 500 C Street, SW, Washington DC 20472, Paperwork Reduction Project (1660-0016). Submission of the form is required to obtain or retain benefits under the National Flood Insurance Program. Please do not send your completed survey to the above address. A. REQUESTED RESPONSE FROM DHS-FEMA This request is for a (check one): CLOMR: A letter from DHS-FEMA commenting on whether a proposed project, if built as proposed, would justify a map revision, or proposed hydrology changes (See 44 CFR Ch. 1, Parts 60, 65 & 72). LOMR: A letter from DHS-FEMA officially revising the current NFIP map to show the changes to floodplains, regulatory floodway or flood elevations. (See 44 CFR Ch. 1, Parts 60, 65 & 72) B. OVERVIEW 1. The NFIP map panel(s) affected for all impacted communities is (are): Community No. Ex: 480301 480287 040073 Community Name City of Katy Harris County Pima County State TX TX AZ Map No. 480301 48201C 04019C 040078 City of Tucson AZ 04019C 2. Panel No. 0005D 0220G 1618K 1619K 1619K Effective Date 02/08/83 09/28/90 02/08/99 02/08/99 a. Flooding Source: Trails End Wash b. Types of Flooding: Riverine Coastal Alluvial fan Shallow Flooding (e.g., Zones AO and AH) Lakes Other (Attach Description) 3. Project Name/Identifier: Trails End Wash 4. FEMA zone designations affected: A (choices: A, AH, AO, A1-A30, A99, AE, AR, V, V1-V30, VE, B, C, D, X) 5. Basis for Request and Type of Revision: a. The basis for this revision request is (check all that apply) Physical Change Improved Methodology/Data Regulatory Floodway Revision Coastal Analysis Hydraulic Analysis Hydrologic Analysis Weir-Dam Changes Levee Certification Alluvial Fan Analysis New Topographic Data Other (Attach Description) Base Map Changes Corrections Natural Changes Note: A photograph and narrative description of the area of concern is not required, but is very helpful during review. b. The area of revision encompasses the following structures (check all that apply) Structures: DHS- FEMA Form 81-89,DEC 07 Channelization Levee/Floodwall Bridge/Culvert Dam Fill Other (Attach Description) Overview & Concurrence Form MT-2 Form 1 Page 1 of 2 U.S. DEPARTMENT OF HOMELAND SECURITY - FEDERAL EMERGENCY MANAGEMENT AGENCY RIVERINE HYDROLOGY & HYDRAULICS FORM O.M.B No. 1660-0016 Expires: 12/31/2010 PAPERWORK REDUCTION ACT Public reporting burden for this form is estimated to average 3.25 hours per response. The burden estimate includes the time for reviewing instructions, searching existing data sources, gathering and maintaining the needed data, and completing, reviewing, and submitting the form. You are not required to respond to this collection of information unless a valid OMB control number appears in the upper right corner of this form. Send comments regarding the accuracy of the burden estimate and any suggestions for reducing this burden to: Information Collections Management, U.S. Department of Homeland Security, Federal Emergency Management Agency, 500 C Street, SW, Washington DC 20472, Paperwork Reduction Project (1660-0016). Submission of the form is required to obtain or retain benefits under the National Flood Insurance Program. Please do not send your completed survey to the above address. Flooding Source: Trails End Wash Note: Fill out one form for each flooding source studied A. HYDROLOGY 1. Reason for New Hydrologic Analysis (check all that apply) Not revised (skip to section B) No existing analysis Improved data Alternative methodology Proposed Conditions (CLOMR) Changed physical condition of watershed 2. Comparison of Representative 1%-Annual-Chance Discharges Location Silverbell Rd. Drainage Area (Sq. Mi.) 2.84 Effective/FIS (cfs) N/A Revised (cfs) 2546.0 Near N. Grannen Rd. 2.72 N/A 2543.5 Near Wilma Dell Rd. 1.46 N/A 1645.7 3. Methodology for New Hydrologic Analysis (check all that apply) Statistical Analysis of Gage Records Regional Regression Equations Precipitation/Runoff Model HEC-HMS Other (please attach description) Please enclose all relevant models in digital format, maps, computations (including computation of parameters) and documentation to support the new analysis. 4. Review/Approval of Analysis If your community requires a regional, state, or federal agency to review the hydrologic analysis, please attach evidence of approval/review. 5. Impacts of Sediment Transport on Hydrology Yes No If yes, then fill out Section F (Sediment Transport) of Form 3. If No, then attach your Was sediment transport considered? explanation for why sediment transport was not considered. B. HYDRAULICS 1. Reach to be Revised Description Cross Section Water-Surface Elevations (ft.) Effective Downstream Limit Confluence with the Santa Cruz River St#62.17 Upstream Limit Goret Rd. St# 7662.95 Proposed/Revised 2. Hydraulic Method/Model Used HEC-RAS DHS - FEMA Form 81-89A, DEC 07 Riverine Hydrology & Hydraulics Form MT-2 Form 2 Page 1 of 2 B. HYDRAULICS (CONTINUED) 3. Pre-Submittal Review of Hydraulic Models DHS-FEMA has developed two review programs, CHECK-2 and CHECK-RAS, to aid in the review of HEC-2 and HEC-RAS hydraulic models, respectively. These review programs may help verify that the hydraulic estimates and assumptions in the model data are in accordance with NFIP requirements, and that the data are comparable with the assumptions and limitations of HEC-2/HEC-RAS. CHECK-2 and CHECK-RAS identify areas of potential error or concern. These tools do not replace engineering judgment. CHECK-2 and CHECK-RAS can be downloaded from http://www.fema.gov/plan/prevent/fhm/frm_soft.shtm. We recommend that you review your HEC-2 and HEC-RAS models with CHECK-2 and CHECK-RAS. Review of your submittal and resolution of valid modeling discrepancies may result in reduced review time. 4. Natural Run Models Submitted Duplicate Effective Model* Corrected Effective Model* Existing or Pre-Project Conditions Model Revised or Post-Project Conditions Model Other - (attach description) File Name: File Name: File Name: File Name: File Name: N/A Plan Name: N/A TrailsEnd_FP Plan Name: N/A Plan Name: N/A Plan Name: N/A Plan Name: Floodway Run Datum File Name: N/A Plan Name: Plan 1 File Name: Plan Name: File Name: Plan Name: File Name: Plan Name: File Name: Plan Name: NAVD 88 * For details, refer to the corresponding section of the instructions. Digital Models Submitted? (Required) C. MAPPING REQUIREMENTS A certified topographic map must be submitted showing the following information (where applicable): the boundaries of the effective, existing, and proposed conditions 1%-annual-chance floodplain (for approximate Zone A revisions) or the boundaries of the 1%- and 0.2%-annual-chance floodplains and regulatory floodway (for detailed Zone AE, AO, and AH revisions); location and alignment of all cross sections with stationing control indicated; stream, road, and other alignments (e.g., dams, levees, etc.); current community easements and boundaries; boundaries of the requester's property; certification of a registered professional engineer registered in the subject State; location and description of reference marks; and the referenced vertical datum (NGVD, NAVD, etc.). Digital Mapping (GIS/CADD) Data Submitted Note that the boundaries of the existing or proposed conditions floodplains and regulatory floodway to be shown on the revised FIRM and/or FBFM must tie-in with the effective floodplain and regulatory floodway boundaries. Please attach a copy of the effective FIRM and/or FBFM, annotated to show the boundaries of the revised 1%- and 0.2%-annual-chance floodplains and regulatory floodway that tie-in with the boundaries of the effective 1%- and 0.2%-annual-chance floodplain and regulatory floodway at the upstream and downstream limits of the area of revision. Annotated FIRM and/or FBFM (Required) D. COMMON REGULATORY REQUIREMENTS* 1. For LOMR/CLOMR requests, do Base Flood Elevations (BFEs) increase? Yes No a. For CLOMR requests, if either of the following is true, please submit evidence of compliance with Section 65.12 of the NFIP regulations: • The proposed project encroaches upon a regulatory floodway and would result in increases above 0.00 foot. • The proposed project encroaches upon a SFHA with or without BFEs established and would result in increases above 1.00 foot. b. 2. Yes No For LOMR requests, does this request require property owner notification and acceptance of BFE increases? If Yes, please attach proof of property owner notification and acceptance (if available). Elements of and examples of property owner notification can be found in the MT-2 Form 2 Instructions. Does the request involve the placement or proposed placement of fill? Yes No If Yes, the community must be able to certify that the area to be removed from the special flood hazard area, to include any structures or proposed structures, meets all of the standards of the local floodplain ordinances, and is reasonably safe from flooding in accordance with the NFIP regulations set forth at 44 CFR 60.3(a)(3), 65.5(a)(4), and 65.6(a)(14). Please see the MT-2 instructions for more information. 3. For LOMR requests, is the regulatory floodway being revised? Yes No If Yes, attach evidence of regulatory floodway revision notification. As per Paragraph 65.7(b)(1) of the NFIP Regulations, notification is required for requests involving revisions to the regulatory floodway. (Not required for revisions to approximate 1%-annual-chance floodplains [studied Zone A designation] unless a regulatory floodway is being added. Elements and examples of regulatory floodway revision notification can be found in the MT-2 Form 2 Instructions.) 4. For LOMR/CLOMR requests, does this request have the potential to impact an endangered species? Yes No If Yes, please submit documentation to the community to show that you have complied with Sections 9 and 10 of the Endangered Species Act (ESA). Section 9 of the ESA prohibits anyone from “taking” or harming an endangered species. If an action might harm an endangered species, a permit is required from U.S. Fish and Wildlife Service or National Marine Fisheries Service under Section 10 of the ESA. For actions authorized, funded, or being carried out by Federal or State agencies, please submit documentation from the agency showing its compliance with Section 7(a)(2) of the ESA. * Not inclusive of all applicable regulatory requirements. For details, see 44 CFR parts 60 and 65. DHS - FEMA Form 81-89A, DEC 07 Riverine Hydrology & Hydraulics Form MT-2 Form 2 Page 2 of 2 Appendix C: Survey Field Notes Exhibit 1: 2008 LiDAR Coverage and FEMA Special Flood Hazard Areas 2008 LiDAR Coverage FEMA Floodplains Major Streets Jurisdiction Lines Not Shown: Western Pima County, including Ajo and LiDAR coverage on Tohono O'dham Nation. Pima County Index Map Index Map Scale 1:5,250,000 The information depicted on this display is the result of digital analyses performed on a variety of databases provided and maintained by several governmental agencies. The accuracy of the information presented is limited to the collective accuracy of these databases on the date of the analysis. The Pima County Regional Flood Control Department makes no claims regarding the accuracy of the information depicted herein. This product is subject to the Department of Transportation Technical Services Division's Use Restriction Agreement. Pima County Regional Flood Control District Scale 1:415,000 \\gislib\rfcd\projects\imd\ken\lidar08\fema_08cov.mxd km