TECHNICAL DATA NOTEBOOK FOR THE VENTANA CANYON WASH/ESPERERO WASH LETTER OF MAP REVISION (LOMR) PIMA COUNTY, ARIZONA Prepared for: Pima County Regional Flood Control District 97 East Congress, Third Floor Tucson, Arizona 85701 By: JE Fuller / Hydrology & Geomorphology, Inc. 40 East Helen Street Tucson, Arizona 85705 520-623-3112 July 8, 2009 Final September 13, 2010 JE Fuller/Hydrology & Geomorphology, Inc. EXPIRES 06/30/2013 TDN – VENTANA CANYON WASH/ESPERERO WASH LOMR TABLE OF CONTENTS (Note: Page numbering does not include the FEMA forms/attachments provided in Section 2.2.) I. INTRODUCTION ...............................................................................................................1 II. ADWR/FEMA Forms..........................................................................................................6 2.1 2.2 III. MAPPING AND SURVEY INFORMATION....................................................................8 3.1 3.2 IV. Study Documentation Abstract (LOMR).................................................................6 FEMA MT-2 Forms.................................................................................................7 Field Survey Information.........................................................................................8 Mapping and Records ..............................................................................................8 HYDROLOGY ....................................................................................................................9 4.1 Method Description .................................................................................................9 V. HYDRAULICS..................................................................................................................10 VI. SEDIMENT TRANSPORT/EROSION.............................................................................11 VII. FIS REPORT DATA .........................................................................................................12 LIST OF APPENDICES Appendix A References Appendix B General Documentation & Correspondence Appendix C Site Photographs & Survey Field Notes Appendix D Hydrologic Analysis Summary of Supporting Documentation Appendix E Hydraulic Analysis Summary of Supporting Documentation Appendix F GIS Shape Files i JE Fuller/Hydrology & Geomorphology, Inc. TDN – VENTANA CANYON WASH/ESPERERO WASH LOMR LIST OF FIGURES Figure 1 – Vicinity Map...................................................................................................................3 Figure 2 – Location Map..................................................................................................................4 Work Maps.......................................................................... Section C, FEMA Form 2 Attachment) Annotated FIRM .................................................................. Section C, FEMA Form 2 Attachment Watershed Exhibit .........................................................................................................Appendix D LIST OF TABLES Table 1.1 Summary of Applied Discharges with Comparison to Effective.............................5 Table 7.1 Revised FIS Summary of Discharges ....................................................................12 Table 7.2 Floodway Data .......................................................................................................13 ii JE Fuller/Hydrology & Geomorphology, Inc. TDN – VENTANA CANYON WASH/ESPERERO WASH LOMR I. Page 1 INTRODUCTION The Pima County Regional Flood Control District (RFCD) contracted with JE Fuller/Hydrology and Geomorphology, Inc. (JEF) to prepare this request for a Letter of Map Revision (LOMR) for the Ventana Canyon Wash and the Esperero Wash (see Figures 1 and 2). The Pima County contract number is PO 09019014, and the project manager is Terry Hendricks, CFM, Chief Hydrologist. A copy of the scope of work is included in Appendix B. This LOMR will address changes to the regulatory flood plain as currently mapped on Panels 1655, 1663, and 1665 (Reference 1). This Technical Data Notebook (TDN), which follows the outline specified in Arizona Department of Water Resources, State Standard 1-97, contains all the information required in support of this request, including the applicable Federal Emergency Management Agency (FEMA) forms. The request is based on a more detailed hydrologic analysis of the contributing watersheds and on updated topographic mapping. It consolidates the numerous Letters of Map Change (LOMC) that have been issued since the current mapping became effective and includes revisions to areas affected by private developments. In addition, the effect of one newly constructed culvert and enlarged bridge are accounted for with the revised mapping. The project reach for the Ventana Canyon Wash begins at the Tanque Verde Creek confluence, which is the downstream limit of the effective mapping, and extends approximately 6.6 miles upstream to the boundary of the Coronado National Forest. The majority of the project reach was previously mapped by detailed methods using HEC-2 (Reference 2) and includes a combination of Zone AE and shaded Zone X designations. However, approximately 1000 feet was only mapped by approximate methods (i.e., the effective Zone A areas), and approximately 1000 feet was not previously mapped. The revised mapping of the entire project reach is by detailed methods. The modeling was performed using HEC-RAS (Reference 3). The project reach for the Esperero Wash begins at the Ventana Canyon Wash confluence and extends approximately 1.8 miles. The majority of the project reach was previously mapped by detailed methods (HEC-2) and includes a combination of Zone AE and shaded Zone X designations. However, approximately 1900 feet was only mapped by approximate methods (i.e., the effective Zone A areas), and approximately 800 feet was not previously mapped. The revised mapping of the entire project reach is by detailed methods (HEC-RAS). The discharges associated with this request were computed using HEC-1 (Reference 4). The RFCD provided JEF with a base model that was complied by Tetra Tech, Inc. in 2002 under contract with the RFCD (Reference 5). However, Tetra Tech's base model was limited to the 100-year return interval. A copy of the Tetra Tech's summary report is provided in PDF format in Appendix D. As part of this LOMR request, per the Pima County's current hydrologic modeling criteria, JEF updated the base model to incorporate (1) the new NOAA Atlas Volume 14 data; (2) the 3-hour, upper 90% confidence interval precipitation values from NOAA 14; (3) the Hydro-40 aerial reduction factors, and (4) the SCS Type II distribution. In addition, JEF expanded the modeling effort to included the 10-, 50-, 100-, and 500-year return intervals. A total of ten point-precipitation-value data sets were obtained from the NOAA 14 web site based JE Fuller/Hydrology & Geomorphology, Inc. TDN – VENTANA CANYON WASH/ESPERERO WASH LOMR Page 2 on the longitude and latitude of the centroid of each the ten major sub-basins. However, since the range of individual values was narrow, an average value was selected for each return interval. An areal reduction factor was then applied to define a basin average value for each of the ten major sub-basins. The results of the HEC-1 analysis are summarized in Table 1.1. In addition, Table 1.1 provides a comparison between the effective discharges and the revised discharges. The revised HEC-1 models are provided in Appendix D. A printout of the watershed map is also provided in Appendix D. As previously noted, the hydraulic analysis was conducted using HEC-RAS. Using the results of the HEC-1 modeling, interpolated discharge values were defined at key locations in the HEC-RAS model in an attempt to maintain the gradually-varied flow assumption while accounting for the variation in peak discharges in the downstream direction. A combination of as-built plans and field survey (performed by Stantec Consulting, Inc.) was used to define the geometry of all bridge openings and/or culvert crossing. The n-values were determined from an extensive field investigation. The results of that investigation, with supporting documentation (field photographs), was summarized in a field reconnaissance report (Reference 8). A copy of the field reconnaissance report prepared by JEF and the field notes from Stantec's survey are provided in Appendix C. The revised 500-year and 100-year floodplain and floodway boundaries are shown on the attached work maps. The topographic information used in conjunction with the re-mapping was based on the North American Vertical Datum of 1988 (NAVD 88). The effective mapping was based on the National Geodetic Vertical Datum of 1929 (NGVD 29). Therefore, both elevations are shown on the work maps. A tabular listing of water-surface elevations for both datums is also provided in Appendix E. The difference in elevations is based on a single conversion factor – 2.26 feet (i.e., the NAVD 88 elevations are approximately 2.26 feet higher than the NGVD 29 elevations). The only ties to the effective mapping occur at the Tanque Verde Creek confluence. The effective base water-surface elevation in the Tanque Verde Creek at the confluence is approximately 2463.0 (NGVD 29) or 2465.25 (NAVD 88). Since the computed water-surface elevation for the Ventana Canyon Wash at the confluence is 2467.4 (NGVD or 2469.7 (NAVD), which is based on critical depth, there is no hydraulic tie between the Tanque Verde Creek and the Ventana Canyon Wash. Therefore, graphic ties were made between the revised floodplain/floodway boundaries for the Ventana Canyon Wash and those associated with the Tanque Verde Creek. JE Fuller/Hydrology & Geomorphology, Inc. TDN - VENTANA CANYON WASH/ESPERERO WASH LOMR Page 3 TDN - VENTANA CANYON WASH/ESPERERO WASH LOMR Page 4 Ventana Canyon Wash Esperero Wash Flooding Source Node 4 Node 5 Node 6 Node 8 Node 10 Node 11 Node 6 +11 Node 15 Concentraton Point Drainage Area (sq mi) 5.9 6.11 6.19 3.85 6.98 7.94 14.14 16.64 Q10 revised (cfs) 5121 4333 4246 5179 5378 5271 8122 5066 effective (cfs) 8789 7319 6795 6621 8684 8888 11451 -- Q50 revised (cfs) 8907 7067 6949 8813 9448 9151 14053 9030 Q100 effective revised (cfs) (cfs) 11037 10762 9116 9170 8440 8898 7836 10596 10770 12044 11082 11484 14775 17753 9371 11527 JE Fuller/Hydrology and Geomorphology, Inc. effective (cfs) 4239 3350 2947 3304 4172 4140 4952 3217 (with a comparison between the effective and revised discharges) Q500 effective revised (cfs) (cfs) 19000 15953 16000 13663 14400 13574 13250 14864 19500 17805 18500 17544 27000 27253 17000 18238 Table 1.1 Summary of Applied Discharges for Esperero Wash and Ventana Canyon Wash LOMR TDN – VENTANA CANYON WASH/ESPERERO WASH LOMR Page 5 TDN – VENTANA CANYON WASH/ESPERERO WASH LOMR II. ADWR/FEMA FORMS 2.1 Study Documentation Abstract (LOMR) Subsection Information Requested Page 6 Response 2.1.1 Date Study Accepted: Accepted: April 27, 2010 Effective: September 13, 2010. 2.1.2 Study Contractor: Contact: Address: JE Fuller/Hydrology & Geomorphology, Inc. Robert L. Shand, P.E., Project Manager 40 E. Helen Street Tucson, Arizona 85705 520-623-3112 PCRFCD-Ventana_Esperero_LOMR Baker AECOM 2.1.3 Phone: Internal Reference Number: FEMA Technical Review Contractor: Contact: Address: 2.1.4 Phone: Internal Reference Number: FEMA Regional Reviewer: 2.1.6 Phone: State Technical Reviewer: Phone: Local Technical Reviewer: 2.1.7 Phone: Reach Descriptions (approximate): 2.1.5 Mounir Boudjemaa, M.S. c/o LOMC Clearinghouse 6730 Santa Barbara Court Elkridge, MD 21075 703-317-6295 Case No. 09-09-2406P Director, Mitigation Division , Dept. of Homeland Security's FEMA, Oakland, CA 510-627-7175 Brian Cosson, CFM. 602-771-8657 Terry Hendricks, CFM Chief Hydrologist 520-740-6350 (1) 6.6 miles of the Ventana Canyon Wash beginning at the Tanque Verde Creek confluence; (2) 1.8 miles of the Esperero Wash beginning at the Ventana Canyon Wash confluence. JE Fuller/Hydrology & Geomorphology, Inc. TDN – VENTANA CANYON WASH/ESPERERO WASH LOMR Subsection 2.1.8 2.1.9 2.1.10 2.2 Information Requested USGS Quad Sheets: Digital Mapping provided by Pima Association of Governments Unique Conditions and Problems: Coordination of Peak Discharges: Page 7 Response Sabino Canyon., 7.5' quadrangle, 1992 1998 and 2000 topo/photo coverage of study area None Pima County concurs with the application of the revised peak discharges. FEMA Forms FEMA MT-2 Forms 1, 2 and 3 are included as attachments to this section. Each form includes a supplemental information sheet that provides information that could not be placed within the form structure. The form's section and item number is referenced on this sheet. Normally, Sections 3 through 7 of the standard TDN provides overflow information that cannot be placed within the FEMA form structure. If the information requested in Sections 3 through 7 is already provided on the supplemental information sheet, it will be referenced accordingly. In addition, some of the information requested in Sections 3 through 7 may be provided in one of the appendices. If that is the case, the location where the information can be found will be referenced accordingly. JE Fuller/Hydrology & Geomorphology, Inc. U.S. DEPARTMENT OF HOMELAND SECURITY - FEDERAL EMERGENCY MANAGEMENT AGENCY O.M.B No. 1660-0016 Expires: 12/31/2010 OVERVIEW & CONCURRENCE FORM PAPERWORK BURDEN DISCLOSURE NOTICE Public reporting burden for this form is estimated to average 1 hour per response. The burden estimate includes the time for reviewing instructions, searching existing data sources, gathering and maintaining the needed data, and completing, reviewing, and submitting the form. You are not required to respond to this collection of information unless a valid OMB control number appears in the upper right corner of this form. Send comments regarding the accuracy of the burden estimate and any suggestions for reducing this burden to: Information Collections Management, U.S. Department of Homeland Security, Federal Emergency Management Agency, 500 C Street, SW, Washington DC 20472, Paperwork Reduction Project (1660-0016). Submission of the form is required to obtain or retain benefits under the National Flood Insurance Program. Please do not send your completed survey to the above address. A. REQUESTED RESPONSE FROM DHS-FEMA This request is for a (check one): CLOMR: A letter from DHS-FEMA commenting on whether a proposed project, if built as proposed, would justify a map revision, or proposed hydrology changes (See 44 CFR Ch. 1, Parts 60, 65 & 72). LOMR: A letter from DHS-FEMA officially revising the current NFIP map to show the changes to floodplains, regulatory floodway or flood elevations. (See 44 CFR Ch. 1, Parts 60, 65 & 72) B. OVERVIEW 1. The NFIP map panel(s) affected for all impacted communities is (are): Community No. Ex: 480301 480287 040073 Community Name City of Katy Harris County Pima County Arizona and Incorporated Areas State TX TX AZ Map No. 480301 48201C 04019C Panel No. 0005D 0220G 1655K Effective Date 02/08/83 09/28/90 02/08/99 040073 Pima County Arizona and Incorporated Areas AZ 04019C 1663K 04/22/04 2. a. Flooding Source: Ventana Canyon Wash, Esperero Wash b. Types of Flooding: Riverine Coastal Alluvial fan Shallow Flooding (e.g., Zones AO and AH) Lakes Other (Attach Description) 3. Project Name/Identifier: Ventana Canyon Wash/Esperero Wash LOMR 4. FEMA zone designations affected: A, AE, and X (shaded) (choices: A, AH, AO, A1-A30, A99, AE, AR, V, V1-V30, VE, B, C, D, X) 5. Basis for Request and Type of Revision: a. The basis for this revision request is (check all that apply) Physical Change Improved Methodology/Data Regulatory Floodway Revision Coastal Analysis Hydraulic Analysis Hydrologic Analysis Weir-Dam Changes Levee Certification Alluvial Fan Analysis New Topographic Data Other (Attach Description) Base Map Changes Corrections Natural Changes Note: A photograph and narrative description of the area of concern is not required, but is very helpful during review. b. The area of revision encompasses the following structures (check all that apply) Structures: DHS- FEMA Form 81-89,DEC 07 Channelization Levee/Floodwall Bridge/Culvert Dam Fill Other (Attach Description) Overview & Concurrence Form MT-2 Form 1 Page 1 of 2 MT-2, Form 1 – Overview and Concurrence (Supplemental Information) Note: This supplemental information applies either in whole or in part to all flooding sources. „ Section B – OVERVIEW • Item 1, Panels Affected/Effective Date – Panels 1655K (effective 02/08/99), 1663K (effective 02/08/99, LOMR 04/22/04), and 1665 (effective 02/08/33, LOMR 07/24/00). „ Section C – REVIEW FEE • This map change request is based on more detailed hydrologic and hydraulic analyses and is intended to improve upon the information shown on the effective map and within the effective FIS. In addition, the request provides detailed mapping to replace areas that were previously mapped by approximate methods. JE Fuller / Hydrology & Geomorphology, Inc. Page 1 of 1 U.S. DEPARTMENT OF HOMELAND SECURITY - FEDERAL EMERGENCY MANAGEMENT AGENCY RIVERINE HYDROLOGY & HYDRAULICS FORM O.M.B No. 1660-0016 Expires: 12/31/2010 PAPERWORK REDUCTION ACT Public reporting burden for this form is estimated to average 3.25 hours per response. The burden estimate includes the time for reviewing instructions, searching existing data sources, gathering and maintaining the needed data, and completing, reviewing, and submitting the form. You are not required to respond to this collection of information unless a valid OMB control number appears in the upper right corner of this form. Send comments regarding the accuracy of the burden estimate and any suggestions for reducing this burden to: Information Collections Management, U.S. Department of Homeland Security, Federal Emergency Management Agency, 500 C Street, SW, Washington DC 20472, Paperwork Reduction Project (1660-0016). Submission of the form is required to obtain or retain benefits under the National Flood Insurance Program. Please do not send your completed survey to the above address. Flooding Source: Ventana Canyon Wash Note: Fill out one form for each flooding source studied A. HYDROLOGY 1. Reason for New Hydrologic Analysis (check all that apply) Not revised (skip to section B) No existing analysis Improved data Alternative methodology Proposed Conditions (CLOMR) Changed physical condition of watershed 2. Comparison of Representative 1%-Annual-Chance Discharges Location upstream of Resort Drive Drainage Area (Sq. Mi.) 3.85 Effective/FIS (cfs) 7836 Revised (cfs) 10596 downstream of Ventana W. 14.14 14775 17753 at Tanque Verde Wash 16.64 9371 11527 3. Methodology for New Hydrologic Analysis (check all that apply) Statistical Analysis of Gage Records Regional Regression Equations Precipitation/Runoff Model HEC-1 Other (please attach description) Please enclose all relevant models in digital format, maps, computations (including computation of parameters) and documentation to support the new analysis. 4. Review/Approval of Analysis If your community requires a regional, state, or federal agency to review the hydrologic analysis, please attach evidence of approval/review. 5. Impacts of Sediment Transport on Hydrology Yes No If yes, then fill out Section F (Sediment Transport) of Form 3. If No, then attach Was sediment transport considered? your explanation for why sediment transport was not considered. B. HYDRAULICS 1. Reach to be Revised Description Cross Section Water-Surface Elevations (ft.) Effective Proposed/Revised Downstream Limit confluence with Tanque Verde Crk RS 2, A (effective) 2473.1 NGVD 2472.1 NGVD Upstream Limit of detailed study RS 81 n/a 3220.6 NGVD 2. Hydraulic Method/Model Used HEC-RAS Version 4 DHS - FEMA Form 81-89A, DEC 07 Riverine Hydrology & Hydraulics Form MT-2 Form 2 Page 1 of 2 B. HYDRAULICS (CONTINUED) 3. Pre-Submittal Review of Hydraulic Models DHS-FEMA has developed two review programs, CHECK-2 and CHECK-RAS, to aid in the review of HEC-2 and HEC-RAS hydraulic models, respectively. These review programs may help verify that the hydraulic estimates and assumptions in the model data are in accordance with NFIP requirements, and that the data are comparable with the assumptions and limitations of HEC-2/HEC-RAS. CHECK-2 and CHECK-RAS identify areas of potential error or concern. These tools do not replace engineering judgment. CHECK-2 and CHECK-RAS can be downloaded from http://www.fema.gov/plan/prevent/fhm/frm_soft.shtm. We recommend that you review your HEC-2 and HEC-RAS models with CHECK-2 and CHECK-RAS. Review of your submittal and resolution of valid modeling discrepancies may result in reduced review time. 4. Natural Run Models Submitted Duplicate Effective Model* Corrected Effective Model* Existing or Pre-Project Conditions Model Revised or Post-Project Conditions Model NAVD Other - (attach description) Floodway Run Datum File Name: Plan Name: File Name: Plan Name: File Name: Plan Name: File Name: Ventana Plan Name: File Name: Plan Name: File Name: Plan Name: File Name: Plan Name: File Name: Ventana Plan Name: File Name: File Name: Plan Name: Plan Name: * For details, refer to the corresponding section of the instructions. Digital Models Submitted? (Required) C. MAPPING REQUIREMENTS A certified topographic map must be submitted showing the following information (where applicable): the boundaries of the effective, existing, and proposed conditions 1%-annual-chance floodplain (for approximate Zone A revisions) or the boundaries of the 1%- and 0.2%-annual-chance floodplains and regulatory floodway (for detailed Zone AE, AO, and AH revisions); location and alignment of all cross sections with stationing control indicated; stream, road, and other alignments (e.g., dams, levees, etc.); current community easements and boundaries; boundaries of the requester's property; certification of a registered professional engineer registered in the subject State; location and description of reference marks; and the referenced vertical datum (NGVD, NAVD, etc.). Digital Mapping (GIS/CADD) Data Submitted Note that the boundaries of the existing or proposed conditions floodplains and regulatory floodway to be shown on the revised FIRM and/or FBFM must tie-in with the effective floodplain and regulatory floodway boundaries. Please attach a copy of the effective FIRM and/or FBFM, annotated to show the boundaries of the revised 1%- and 0.2%-annual-chance floodplains and regulatory floodway that tie-in with the boundaries of the effective 1%- and 0.2%-annual-chance floodplain and regulatory floodway at the upstream and downstream limits of the area of revision. Annotated FIRM and/or FBFM (Required) D. COMMON REGULATORY REQUIREMENTS* 1. 2. For LOMR/CLOMR requests, do Base Flood Elevations (BFEs) increase? Yes No a. For CLOMR requests, if either of the following is true, please submit evidence of compliance with Section 65.12 of the NFIP regulations: • The proposed project encroaches upon a regulatory floodway and would result in increases above 0.00 foot. • The proposed project encroaches upon a SFHA with or without BFEs established and would result in increases above 1.00 foot. b. For LOMR requests, does this request require property owner notification and acceptance of BFE increases? Yes No If Yes, please attach proof of property owner notification and acceptance (if available). Elements of and examples of property owner notification can be found in the MT-2 Form 2 Instructions. Does the request involve the placement or proposed placement of fill? Yes No If Yes, the community must be able to certify that the area to be removed from the special flood hazard area, to include any structures or proposed structures, meets all of the standards of the local floodplain ordinances, and is reasonably safe from flooding in accordance with the NFIP regulations set forth at 44 CFR 60.3(a)(3), 65.5(a)(4), and 65.6(a)(14). Please see the MT-2 instructions for more information. 3. For LOMR requests, is the regulatory floodway being revised? Yes No If Yes, attach evidence of regulatory floodway revision notification. As per Paragraph 65.7(b)(1) of the NFIP Regulations, notification is required for requests involving revisions to the regulatory floodway. (Not required for revisions to approximate 1%-annual-chance floodplains [studied Zone A designation] unless a regulatory floodway is being added. Elements and examples of regulatory floodway revision notification can be found in the MT-2 Form 2 Instructions.) 4. For LOMR/CLOMR requests, does this request have the potential to impact an endangered species? Yes No If Yes, please submit documentation to the community to show that you have complied with Sections 9 and 10 of the Endangered Species Act (ESA). Section 9 of the ESA prohibits anyone from “taking” or harming an endangered species. If an action might harm an endangered species, a permit is required from U.S. Fish and Wildlife Service or National Marine Fisheries Service under Section 10 of the ESA. For actions authorized, funded, or being carried out by Federal or State agencies, please submit documentation from the agency showing its compliance with Section 7(a)(2) of the ESA. * Not inclusive of all applicable regulatory requirements. For details, see 44 CFR parts 60 and 65. DHS - FEMA Form 81-89A, DEC 07 Riverine Hydrology & Hydraulics Form MT-2 Form 2 Page 2 of 2 U.S. DEPARTMENT OF HOMELAND SECURITY - FEDERAL EMERGENCY MANAGEMENT AGENCY RIVERINE HYDROLOGY & HYDRAULICS FORM O.M.B No. 1660-0016 Expires: 12/31/2010 PAPERWORK REDUCTION ACT Public reporting burden for this form is estimated to average 3.25 hours per response. The burden estimate includes the time for reviewing instructions, searching existing data sources, gathering and maintaining the needed data, and completing, reviewing, and submitting the form. You are not required to respond to this collection of information unless a valid OMB control number appears in the upper right corner of this form. Send comments regarding the accuracy of the burden estimate and any suggestions for reducing this burden to: Information Collections Management, U.S. Department of Homeland Security, Federal Emergency Management Agency, 500 C Street, SW, Washington DC 20472, Paperwork Reduction Project (1660-0016). Submission of the form is required to obtain or retain benefits under the National Flood Insurance Program. Please do not send your completed survey to the above address. Flooding Source: Esperero Wash Note: Fill out one form for each flooding source studied A. HYDROLOGY 1. Reason for New Hydrologic Analysis (check all that apply) Not revised (skip to section B) No existing analysis Improved data Alternative methodology Proposed Conditions (CLOMR) Changed physical condition of watershed 2. Comparison of Representative 1%-Annual-Chance Discharges Location Drainage Area (Sq. Mi.) Effective/FIS (cfs) Revised (cfs) d/s of Thimble View Way 5.9 11037 10762 d/s of Sunrise Dr. 6.11 9116 9170 u/s of Ventana Cyn Wash 6.19 8440 8898 3. Methodology for New Hydrologic Analysis (check all that apply) Statistical Analysis of Gage Records Regional Regression Equations Precipitation/Runoff Model HEC-1 Other (please attach description) Please enclose all relevant models in digital format, maps, computations (including computation of parameters) and documentation to support the new analysis. 4. Review/Approval of Analysis If your community requires a regional, state, or federal agency to review the hydrologic analysis, please attach evidence of approval/review. 5. Impacts of Sediment Transport on Hydrology Yes No If yes, then fill out Section F (Sediment Transport) of Form 3. If No, then attach Was sediment transport considered? your explanation for why sediment transport was not considered. B. HYDRAULICS 1. Reach to be Revised Description Cross Section Water-Surface Elevations (ft.) Effective Proposed/Revised Downstream Limit convfluence Ventana Cyn Wash RS 1 ~2678.9 NGVD 2679.2 NGVD Upstream Limit of detailed study RS 25 n/a 3070.9 NGVD 2. Hydraulic Method/Model Used HEC-RAS version 4 DHS - FEMA Form 81-89A, DEC 07 Riverine Hydrology & Hydraulics Form MT-2 Form 2 Page 1 of 2 B. HYDRAULICS (CONTINUED) 3. Pre-Submittal Review of Hydraulic Models DHS-FEMA has developed two review programs, CHECK-2 and CHECK-RAS, to aid in the review of HEC-2 and HEC-RAS hydraulic models, respectively. These review programs may help verify that the hydraulic estimates and assumptions in the model data are in accordance with NFIP requirements, and that the data are comparable with the assumptions and limitations of HEC-2/HEC-RAS. CHECK-2 and CHECK-RAS identify areas of potential error or concern. These tools do not replace engineering judgment. CHECK-2 and CHECK-RAS can be downloaded from http://www.fema.gov/plan/prevent/fhm/frm_soft.shtm. We recommend that you review your HEC-2 and HEC-RAS models with CHECK-2 and CHECK-RAS. Review of your submittal and resolution of valid modeling discrepancies may result in reduced review time. 4. Natural Run Models Submitted Duplicate Effective Model* Corrected Effective Model* Existing or Pre-Project Conditions Model Revised or Post-Project Conditions Model NAVD Other - (attach description) Floodway Run Datum File Name: Plan Name: File Name: Plan Name: File Name: Plan Name: File Name: Ventana Plan Name: File Name: Plan Name: File Name: Plan Name: File Name: Plan Name: File Name: Ventana Plan Name: File Name: File Name: Plan Name: Plan Name: * For details, refer to the corresponding section of the instructions. Digital Models Submitted? (Required) C. MAPPING REQUIREMENTS A certified topographic map must be submitted showing the following information (where applicable): the boundaries of the effective, existing, and proposed conditions 1%-annual-chance floodplain (for approximate Zone A revisions) or the boundaries of the 1%- and 0.2%-annual-chance floodplains and regulatory floodway (for detailed Zone AE, AO, and AH revisions); location and alignment of all cross sections with stationing control indicated; stream, road, and other alignments (e.g., dams, levees, etc.); current community easements and boundaries; boundaries of the requester's property; certification of a registered professional engineer registered in the subject State; location and description of reference marks; and the referenced vertical datum (NGVD, NAVD, etc.). Digital Mapping (GIS/CADD) Data Submitted Note that the boundaries of the existing or proposed conditions floodplains and regulatory floodway to be shown on the revised FIRM and/or FBFM must tie-in with the effective floodplain and regulatory floodway boundaries. Please attach a copy of the effective FIRM and/or FBFM, annotated to show the boundaries of the revised 1%- and 0.2%-annual-chance floodplains and regulatory floodway that tie-in with the boundaries of the effective 1%- and 0.2%-annual-chance floodplain and regulatory floodway at the upstream and downstream limits of the area of revision. Annotated FIRM and/or FBFM (Required) D. COMMON REGULATORY REQUIREMENTS* 1. 2. For LOMR/CLOMR requests, do Base Flood Elevations (BFEs) increase? Yes No a. For CLOMR requests, if either of the following is true, please submit evidence of compliance with Section 65.12 of the NFIP regulations: • The proposed project encroaches upon a regulatory floodway and would result in increases above 0.00 foot. • The proposed project encroaches upon a SFHA with or without BFEs established and would result in increases above 1.00 foot. b. For LOMR requests, does this request require property owner notification and acceptance of BFE increases? Yes No If Yes, please attach proof of property owner notification and acceptance (if available). Elements of and examples of property owner notification can be found in the MT-2 Form 2 Instructions. Does the request involve the placement or proposed placement of fill? Yes No If Yes, the community must be able to certify that the area to be removed from the special flood hazard area, to include any structures or proposed structures, meets all of the standards of the local floodplain ordinances, and is reasonably safe from flooding in accordance with the NFIP regulations set forth at 44 CFR 60.3(a)(3), 65.5(a)(4), and 65.6(a)(14). Please see the MT-2 instructions for more information. 3. For LOMR requests, is the regulatory floodway being revised? Yes No If Yes, attach evidence of regulatory floodway revision notification. As per Paragraph 65.7(b)(1) of the NFIP Regulations, notification is required for requests involving revisions to the regulatory floodway. (Not required for revisions to approximate 1%-annual-chance floodplains [studied Zone A designation] unless a regulatory floodway is being added. Elements and examples of regulatory floodway revision notification can be found in the MT-2 Form 2 Instructions.) 4. For LOMR/CLOMR requests, does this request have the potential to impact an endangered species? Yes No If Yes, please submit documentation to the community to show that you have complied with Sections 9 and 10 of the Endangered Species Act (ESA). Section 9 of the ESA prohibits anyone from “taking” or harming an endangered species. If an action might harm an endangered species, a permit is required from U.S. Fish and Wildlife Service or National Marine Fisheries Service under Section 10 of the ESA. For actions authorized, funded, or being carried out by Federal or State agencies, please submit documentation from the agency showing its compliance with Section 7(a)(2) of the ESA. * Not inclusive of all applicable regulatory requirements. For details, see 44 CFR parts 60 and 65. DHS - FEMA Form 81-89A, DEC 07 Riverine Hydrology & Hydraulics Form MT-2 Form 2 Page 2 of 2 MT-2, Form 2 – Riverine Hydrology and Hydraulics (Supplemental Information) Note: This supplemental information applies either in whole or in part to all flooding sources. „ Section A, HYDROLOGY • Item 2, Comparison of Representative Discharges – (see Table 1.1) • Item 3, HEC-1 Model Submitted – A total of thirty-two (32) individual HEC-1 models are provided – one for each of the eight key concentration points or nodes and one for each of the four return intervals (10-, 50-, 100-, 500-year). The file name structure is as follows (example file name: 100N6-3.dat): 100 identifies the return interval; N6 identifies the concentration point or node; and, 3 denotes the 3-hour thunderstorm. The only exception is N61 which represents the combination of Node 6 and Node 11. The individual models, including the output, are provided in Appendix D. A watershed map showing the location of the concentration points is also provided in Appendix D. „ Section B, HYDRAULICS • Item 1, Reach to be Revised – The entire reach of the Ventana Canyon Wash from its downstream limit at the Tanque Verde Wash confluence to its upstream limit at the Coronado National Forest boundary, and the entire reach of the Esperero Wash from its confluence with the Ventana Canyon Wash to a point located just south of the Coronado National Forest boundary. • Item 4, Models Submitted – The HEC-RAS project file name is Ventana.prj (see Appendix E). The project was divided into three reaches described as Esperero Wash Reach-1, which extends from the Ventana Canyon Wash confluence to the upstream limit of the study reach); Ventana Canyon Lower Ventana, which extends from the Tanque Verde Creek confluence to the Esperero Wash confluence; and, Ventana Canyon Upper Ventana, which extends from the Esperero Wash confluence to the upstream limit of the study reach. The project file includes two (2) plans. Plan 1 models the 10-, 50-, and 100year discharges and the floodway. Plan 2 models the 500-year discharge. „ Section D, COMMON REGULATORY REQUIREMENTS • Item 1b and 3, Property Owner Notification – The notification process will begin after any major concerns with the modeling have been adequately addressed. Page 1 of 1 Flooding Source River Sta Ventana Canyon Wash 0.5 0.75 1 1.5 2 2.25 2.5 3 4 5 5.5 6 7 8 9 9.5 10 10.5 11 11.5 12 13 14 15 16 17 18 Cloud Road River Road NAVD88 NGVD29 Q Total Min Ch El W.S. Elev Min Ch El W.S. Elev (cfs) (ft) (ft) (ft) (ft) Tanque Verde Creek confluence 10186 2460.0 2469.7 2457.7 2467.4 Lat Struct 10209 2460.4 2471.4 2458.1 2469.2 Lat Struct 11099 2463.1 2473.8 2460.8 2471.6 Lat Struct 12058 2465.0 2478.9 2462.7 2476.6 12058 2467.0 2481.9 2464.8 2479.7 12058 2470.4 2482.3 2468.2 2480.1 12414 2473.7 2486.4 2471.5 2484.1 Culvert 12414 2474.2 2487.5 2471.9 2485.2 12414 2477.8 2488.5 2475.5 2486.2 13061 2480.3 2492.9 2478.0 2490.7 13061 2484.8 2496.2 2482.6 2493.9 13061 2486.7 2498.5 2484.4 2496.3 13061 2489.5 2502.9 2487.2 2500.7 13061 2491.3 2504.2 2489.0 2502.0 13613 2493.4 2508.2 2491.2 2506.0 Bridge 13613 2494.0 2513.3 2491.8 2511.1 13613 2498.4 2513.7 2496.1 2511.4 14255 2503.4 2513.9 2501.1 2511.7 14255 2511.7 2520.5 2509.4 2518.2 15070 2515.8 2525.2 2513.5 2523.0 15070 2519.8 2529.9 2517.5 2527.6 15070 2526.2 2534.4 2523.9 2532.2 Flooding Source River Sta Ventana Canyon Wash 18 19 20 21 21.5 22 23 24 25 26 27 28 29 30 31 32 33 34 35 Sabino Canyon Road Synder Road dip crossing NAVD88 NGVD29 Q Total Min Ch El W.S. Elev Min Ch El W.S. Elev (cfs) (ft) (ft) (ft) (ft) 15070 2526.2 2534.4 2523.9 2532.2 15519 2529.8 2539.9 2527.6 2537.6 15519 2534.0 2544.1 2531.7 2541.8 15939 2537.9 2546.9 2535.6 2544.6 Culvert 15939 2538.6 2549.4 2536.3 2547.1 15939 2544.1 2551.1 2541.8 2548.9 16556 2549.4 2557.3 2547.2 2555.0 16556 2552.9 2562.4 2550.6 2560.2 16556 2557.0 2567.7 2554.8 2565.5 16556 2565.5 2574.4 2563.3 2572.1 16556 2570.9 2581.2 2568.6 2578.9 16556 2577.3 2587.6 2575.0 2585.4 16556 2584.8 2594.1 2582.5 2591.8 16556 2588.8 2600.6 2586.5 2598.3 16556 2593.8 2606.8 2591.5 2604.6 16556 2598.1 2610.9 2595.8 2608.7 16556 2604.1 2612.5 2601.8 2610.3 16556 2611.1 2617.5 2608.8 2615.2 NAVD88 NGVD29 Flooding Source River Sta Q Total Min Ch El W.S. Elev Min Ch El W.S. Elev (cfs) (ft) (ft) (ft) (ft) 35 16556 2611.1 2617.5 2608.8 2615.2 Ventana Canyon Wash 36 16968 2613.5 2622.6 2611.2 2620.4 37 16968 2620.0 2628.9 2617.8 2626.6 38 16968 2626.0 2635.3 2623.7 2633.0 39 17342 2634.0 2643.3 2631.8 2641.0 40 17342 2643.5 2650.9 2641.2 2648.6 41 17753 2651.4 2659.6 2649.1 2657.4 42 17753 2657.3 2669.3 2655.0 2667.0 Esperero Wash confluence 43 11484 2666.4 2676.4 2664.2 2674.2 44 11916 2674.5 2683.6 2672.2 2681.3 45 11916 2683.0 2692.5 2680.7 2690.2 46 11916 2693.8 2701.8 2691.5 2699.5 46.5 11916 2696.5 2706.9 2694.3 2704.6 47 11916 2705.4 2714.7 2703.1 2712.5 48 11916 2716.1 2723.6 2713.9 2721.3 49 12044 2725.0 2732.6 2722.7 2730.3 Sunrise Drive 49.5 Bridge 50 12044 2725.0 2738.5 2722.7 2736.3 51 12044 2730.8 2740.0 2728.5 2737.7 Ventana Canyon Wash confluence 1 8898 2676.1 2681.4 2673.8 2679.2 Esperero Wash 2 9049 2683.4 2689.2 2681.1 2686.9 3 9049 2693.2 2699.1 2690.9 2696.8 4 9049 2699.9 2706.6 2697.7 2704.3 5 9170 2709.8 2718.0 2707.5 2715.7 Sunrise Drive 5.5 Culvert 6 9170 2712.9 2723.8 2710.6 2721.5 7 9170 2723.3 2730.5 2721.0 2728.2 8 9637 2735.4 2742.4 2733.1 2740.1 9 9637 2747.4 2754.3 2745.1 2752.0 Flooding Source Ventana Canyon Wash Sunrise Drive Ventana Canyon Drive River Sta 49 49.5 50 51 52 53 54 55 56 57 58 59 60 61 61.5 62 62.5 63 63.5 64 64.5 65 65.5 66 NAVD88 NGVD29 Q Total Min Ch El W.S. Elev Min Ch El W.S. Elev (cfs) (ft) (ft) (ft) (ft) 12044 2725.0 2732.6 2722.7 2730.3 Bridge 12044 2725.0 2738.5 2722.7 2736.3 12044 2730.8 2740.0 2728.5 2737.7 11100 2744.0 2752.8 2741.8 2750.5 11100 2758.2 2765.1 2755.9 2762.8 11100 2767.6 2776.0 2765.3 2773.8 11100 2777.5 2783.9 2775.3 2781.7 11100 2789.5 2797.2 2787.2 2794.9 11100 2801.1 2809.4 2798.9 2807.1 11100 2812.2 2821.7 2809.9 2819.4 11100 2825.3 2833.6 2823.1 2831.3 11017 2844.0 2850.7 2841.8 2848.5 11017 2850.0 2863.2 2847.7 2861.0 Bridge 11017 2850.9 2866.5 2848.6 2864.2 11017 2857.8 2867.2 2855.6 2864.9 11017 2861.6 2871.4 2859.4 2869.2 10768 2867.7 2878.1 2865.4 2875.8 10768 2876.2 2885.4 2873.9 2883.1 10768 2887.6 2893.5 2885.3 2891.3 10768 2897.1 2906.5 2894.8 2904.3 10768 2904.5 2913.4 2902.2 2911.1 10768 2917.6 2924.0 2915.3 2921.8 Flooding Source River Sta Ventana Canyon Wash 64 64.5 65 65.5 66 66.5 67 67.5 68 68.5 69 69.5 70 70.5 71 72 73 74 75 76 77 78 79 80 81 Resort Drive NAVD88 NGVD29 Q Total Min Ch El W.S. Elev Min Ch El W.S. Elev (cfs) (ft) (ft) (ft) (ft) 10768 2876.2 2885.4 2873.9 2883.1 10768 2887.6 2893.5 2885.3 2891.3 10768 2897.1 2906.5 2894.8 2904.3 10768 2904.5 2913.4 2902.2 2911.1 10768 2917.6 2924.0 2915.3 2921.8 10768 2926.0 2932.4 2923.8 2930.2 10768 2935.6 2942.9 2933.3 2940.7 10768 2943.4 2951.6 2941.2 2949.3 10768 2953.7 2960.3 2951.4 2958.0 10768 2963.0 2968.9 2960.7 2966.6 10768 2970.7 2976.8 2968.4 2974.5 10768 2973.0 2982.3 2970.7 2980.0 10768 2979.6 2991.3 2977.3 2989.0 Culvert 10768 2981.7 2993.3 2979.5 2991.0 10768 2997.8 3007.5 2995.5 3005.2 10596 3010.8 3021.1 3008.5 3018.8 10596 3035.6 3047.9 3033.3 3045.6 10596 3064.9 3074.7 3062.7 3072.4 10596 3089.0 3103.1 3086.8 3100.9 10596 3111.2 3121.8 3108.9 3119.6 10596 3138.2 3147.3 3136.0 3145.0 10596 3158.1 3169.5 3155.9 3167.3 10596 3177.0 3190.2 3174.8 3188.0 10596 3208.5 3222.9 3206.2 3220.6 Flooding Source River Sta Esperero Wash 9 10 11 12 13 14 15 16 17 17.1 18 19 20 21 22 23 24 25 NAVD88 NGVD29 Q Total Min Ch El W.S. Elev Min Ch El W.S. Elev (cfs) (ft) (ft) (ft) (ft) 9637 2747.4 2754.3 2745.1 2752.0 9637 2759.7 2765.7 2757.4 2763.4 10274 2772.0 2780.3 2769.7 2778.1 10274 2787.0 2795.1 2784.7 2792.8 10274 2799.0 2806.6 2796.8 2804.3 10274 2812.0 2819.0 2809.8 2816.8 10762 2829.8 2835.9 2827.5 2833.7 10762 2840.4 2848.8 2838.1 2846.5 10762 2852.3 2861.9 2850.0 2859.7 7094 2857.1 2863.2 2854.8 2860.9 7094 2868.9 2877.6 2866.6 2875.3 7094 2890.9 2899.1 2888.6 2896.9 7094 2917.8 2928.2 2915.5 2926.0 7094 2949.7 2960.8 2947.5 2958.6 7094 2980.8 2994.2 2978.5 2992.0 7094 3013.9 3027.0 3011.6 3024.8 7094 3037.9 3050.0 3035.6 3047.7 7094 3060.2 3073.1 3057.9 3070.9 U.S. DEPARTMENT OF HOMELAND SECURITY - FEDERAL EMERGENCY MANAGEMENT AGENCY RIVERINE STRUCTURES FORM O.M.B No. 1660-0016 Expires: 12/31/2010 PAPERWORK REDUCTION ACT Public reporting burden for this form is estimated to average 7 hours per response. The burden estimate includes the time for reviewing instructions, searching existing data sources, gathering and maintaining the needed data, and completing, reviewing, and submitting the form. You are not required to respond to this collection of information unless a valid OMB control number appears in the upper right corner of this form. Send comments regarding the accuracy of the burden estimate and any suggestions for reducing this burden to: Information Collections Management, U.S. Department of Homeland Security, Federal Emergency Management Agency, 500 C Street, SW, Washington DC 20472, Paperwork Reduction Project (1660-0016). Submission of the form is required to obtain or retain benefits under the National Flood Insurance Program. Please do not send your completed survey to the above address. Flooding Source: Ventana Canyon Wash Note: Fill out one form for each flooding source studied A. GENERAL Complete the appropriate section(s) for each Structure listed below: Channelization................complete Section B Bridge/Culvert.................complete Section C Dam/Basin......................complete Section D Levee/Floodwall..............complete Section E Sediment Transport ........complete Section F (if required) Description Of Structure 1. Name of Structure: Cloud Road culvert Type (check one): Channelization Bridge/Culvert Levee/Floodwall Dam/Basin Bridge/Culvert Levee/Floodwall Dam/Basin Bridge/Culvert Levee/Floodwall Dam/Basin Location of Structure: at Cloud Road Downstream Limit/Cross Section: 5 Upstream Limit/Cross Section: 6 2. Name of Structure: Sabino Canyon Road bridge Type (check one): Channelization Location of Structure: at Sabino Canyon Road Downstream Limit/Cross Section: 21 Upstream Limit/Cross Section: 22 3. Name of Structure: Type (check one) Channelization Location of Structure: Downstream Limit/Cross Section: Upstream Limit/Cross Section: NOTE: For more structures, attach additional pages as needed. DHS - FEMA Form 81-89B, DEC 07 Riverine Structures Form MT-2 Form 3 Page 1 of 10 B. CHANNELIZATION Flooding Source: Name of Structure: 1. Accessory Structures The channelization includes (check one): Levees [Attach Section E (Levee/Floodwall)] Superelevated sections Debris basin/detention basin [Attach Section D (Dam/Basin)] Other (Describe): 2. Drop structures Transitions in cross sectional geometry Energy dissipator Drawing Checklist Attach the plans of the channelization certified by a registered professional engineer, as described in the instructions. 3. Hydraulic Considerations The channel was designed to carry (cfs) and/or the -year flood. The design elevation in the channel is based on (check one): Subcritical flow Critical flow Supercritical flow Energy grade line If there is the potential for a hydraulic jump at the following locations, check all that apply and attach an explanation of how the hydraulic jump is controlled without affecting the stability of the channel. Inlet to channel Outlet of channel Other locations (specify): 4. At Drop Structures At Transitions Sediment Transport Considerations Was sediment transport considered? Yes No If Yes, then fill out Section F (Sediment Transport). If No, then attach your explanation for why sediment transport was not considered. C. BRIDGE/CULVERT Flooding Source: Ventana Canyon Wash Name of Structure: Cloud Road culvert 1. This revision reflects (check one): Bridge/culvert not modeled in the FIS Modified bridge/culvert previously modeled in the FIS Revised analysis of bridge/culvert previously modeled in the FIS 2. Hydraulic model used to analyze the structure (e.g., HEC-2 with special bridge routine, WSPRO, HY8): HEC-RAS If different than hydraulic analysis for the flooding source, justify why the hydraulic analysis used for the flooding source could not analyze the structures. Attach justification. 3. Attach plans of the structures certified by a registered professional engineer. The plan detail and information should include the following (check the information that has been provided): Dimensions (height, width, span, radius, length) Shape (culverts only) Material Beveling or Rounding Wing Wall Angle Skew Angle Distances Between Cross Sections 4. Erosion Protection Low Chord Elevations – Upstream and Downstream Top of Road Elevations – Upstream and Downstream Structure Invert Elevations – Upstream and Downstream Stream Invert Elevations – Upstream and Downstream Cross-Section Locations Sediment Transport Considerations Was sediment transport considered? Yes No If yes, then fill out Section F (Sediment Transport). If No, then attach your explanation for why sediment transport was not considered. DHS - FEMA Form 81-89B, DEC 07 Riverine Structures Form MT-2 Form 3 Page 2 of 10 The information requested on Pages 3-10 are not applicable. MT-2, Form 3 – Riverine Structures (Supplemental Information) Note: This supplemental information applies to the Ventana Canyon Wash. No new structures exist along Esperero Wash flooding source. „ Section A, GENERAL • Description of Structures – Ventana Canyon Wash – Structure No. 4: Name: Resort Drive culvert; Type: Bridge/Culvert; Location of Structure: at Resort Drive; Downstream Cross Section 70; Upstream Cross Section 71. „ Section C, BRIDGE/CULVERT • Item 3, Plans of Structures – The information checked in this section was obtained from using a combination of the field survey notes, which includes sketches and an AutoCAD drawing file, and the actual plan sheets. Copies of this information are provided in Appendix C. Page 1 of 1 TDN – VENTANA CANYON WASH/ESPERERO WASH LOMR III. MAPPING AND SURVEY INFORMATION 3.1 Field Survey Page 8 Stantec Consulting conducted a field survey to define the geometry of all existing bridge openings and/or culvert crossings along the project reach. The survey included the following: (1) cross sections within five feet of the upstream and downstream face of each structure; (2) bed elevations at the base of each pier along the upstream and downstream face of each bridge; (3) vertical profiles of the bridge at the each pier, including a definition of the shape and the associated low cord elevation; (4) cross reference points in common with the Pima Association of Governments (PAG) topography; and (5) monuments at each structure. The basis of elevation was the North American Vertical Datum of 1988 (NAVD 88). Copies of the survey notes and an AutoCAD drawing file from Stantec Consulting are provided in Appendix C. In addition, a field reconnaissance was conducted to verify channel characteristics and to collect data for determining Manning's n-value. Photographs taken at various locations along the study reach are provided in Appendix C. 3.2 Mapping and Records The hydraulic analysis was conducted using a combination of 1998 and 2000, 1' = 100', two-foot contour interval mapping provided by Pima County for this study. The horizontal control was based on the North American Datum of 1983 (NAD 1983). As previously noted, the vertical control was based on the North American Vertical Datum of 1988 (NAVD 1988). JE Fuller/Hydrology & Geomorphology, Inc. TDN – VENTANA CANYON WASH/ESPERERO WASH LOMR IV. HYDROLOGY 4.1 Method Description Page 9 The regulatory discharges associated with this request were computed using HEC-1 (Reference 4). The base model, which was initially prepared by Tetra Tech, Inc. in 2002 (Reference 5), was provided by the RFCD. A copy of the Tetra Tech's summary report is provided in Appendix D. However, Tetra Tech's base model was limited to the 100-year return interval. As part of this LOMR request, per the Pima County's current hydrologic modeling criteria, JEF updated the base model to incorporate (1) the new NOAA Atlas Volume 14 data; (2) the 3-hour, upper 90% confidence interval precipitation values from NOAA 14; (3) the Hydro-40 aerial reduction factors, and (4) the SCS Type II distribution. In addition, JEF expanded the modeling effort to included the 10-, 50-, 100-, and 500-year return intervals. A total of ten point-precipitation-value data sets were obtained from the NOAA 14 web site based on the longitude and latitude of the centroid of each the ten major sub-basins. However, since the range of individual values was narrow, an average value was selected for each return interval. An areal reduction factor was then applied to define a basin average value for each of the ten major sub-basins. The results of the HEC-1 analysis are summarized in Table 1.1. In addition, Table 1.1 provides a comparison between the effective discharges and the revised discharges. The revised HEC-1 models are provided in Appendix D. Subsection Requested Information 4.1 Method Description 4.2 Parameter Estimation Description/Location Thirty-two HEC-1 models – separate models for each return interval at eight nodes (4, 6, 8, 10, 11, 6-11, 14, and 15). 4.2.1 Drainage Area Boundaries Watershed Map, Reference 5 4.2.2 Watershed Work Maps Reference 5 4.2.3 Gage Data n/a 4.2.4 Statistical Parameters n/a 4.2.5 Precipitation Reference 6 4.2.6 Physical Parameters Reference 5 4.3 Special Problems, Solution, Modeling Messages none 4.4 Calibration n/a 4.5 Final Results 4.5.1 Hydrologic Analysis Results Table 1.1 in Section I 4.5.2 Verification of results n/a JE Fuller/Hydrology & Geomorphology, Inc. TDN – VENTANA CANYON WASH/ESPERERO WASH LOMR V. Page 10 HYDRAULICS The majority of the information that pertains to this section is provided on FEMA MT-2 Form 2 or on the supplemental information sheet that accompanies that form. Using the outline provided in State Standard 1-97 – Instructions for Organizing and Submitting Technical Documentation for Flood Studies, the following table briefly describes the information requested and/or indicates its location in the TDN. Subsection Requested Information Description/Location 5.1 Method Description FEMA Forms 5.2 Work Study Maps Attached to MT-2 Form 2 5.3 Parameter Estimation 5.3.1 Roughness Coefficients 5.3.2 Expansion and Contraction Coefficients 5.4 Cross Section Description 5.5 Modeling Considerations 5.5.1 Hydraulic Jump and Drop Analysis 5.5.2 Bridges and Culverts 5.5.3 Levees and Dikes 5.5.4 5.5.5 Islands and Flow Splits Ineffective Flow Areas Reference 8 Typical values for uniform reaches and bridges were applied. New placement and orientation along majority of revised reach. All new sections from DTM and topographic mapping. n/a Special Bridge and Culvert Methods in HEC-RAS models. n/a 5.6 Floodway Modeling n/a Overbank depressions and/or low areas and areas immediately upstream and downstream of bridge crossings Method 4 followed by Method 1 5.7 Problems Encountered During the Study none 5.7.1 Special Problems and Solutions 5.7.2 Modeling Warning and Error Messages none Only typical messages that are not significant to results obtained. n/a 5.8 Calibration 5.9 Final Results 5.9.1 Hydraulic Analysis Results Appendix E 5.9.2 Verification of Results n/a JE Fuller/Hydrology & Geomorphology, Inc. TDN – VENTANA CANYON WASH/ESPERERO WASH LOMR VI. SEDIMENT TRANSPORT/EROSION No sediment transport study was conducted for this project. JE Fuller/Hydrology & Geomorphology, Inc. Page 11 TDN – VENTANA CANYON WASH/ESPERERO WASH LOMR VII. Page 12 FIS REPORT DATA Subsection Requested Information Description/Location 7.1 Summary of Discharges See Table 7.1 7.2 Floodway Data See Table 7.2 7.3 Annotated FIRM Attachment MT-2 Form 2 7.4 Flood Profiles Appendix B Table 7.1 Revised FIS Summary of Discharges Flooding Source Esperero Wash Ventana Canyon Wash Location Drainage Area (sq mi) downstream of Thimble View Way 5.9 5121 8907 10762 15953 upstream of Sunrise Drive 6.11 4333 7067 9170 13663 upstream of confluence with Ventana Canyon Wash 6.19 4246 6949 8898 13574 3.85 6.98 5179 5378 8813 9448 10596 12044 14864 17805 7.94 5271 9151 11484 17544 14.14 15.87 -- 8122 7271 5325 14053 12547 9453 17753 15939 12058 27253 25162 19072 16.64 5066 9030 11527 18238 upstream of Resort Drive upstream of Sunrise Drive upstream of confluence with Esperero Wash downstream of confluence with Esperero Wash upstream of Sabino Canyon Road downstream of River Road at confluence with Tanque Verde Creek Peak Discharges (cfs) 10-year 50-year 100-year 500-year (in) (in) (cfs) (cfs) JE Fuller/Hydrology & Geomorphology, Inc. TDN - VENTANA CANYON WASH/ESPERERO WASH LOMR Page 13 Table 7.2 Floodway Data Flooding Source Distance1 Distance1 Cross Section (ft) (mi) Esperero Wash 1 640 0.121 2 990 0.188 3 1400 0.265 4 1720 0.326 5 2060 0.390 6 2185 0.414 7 2605 0.493 8 3025 0.573 9 3445 0.652 10 3810 0.722 11 4250 0.805 12 4755 0.901 13 5055 0.957 14 5455 1.033 15 5905 1.118 16 6315 1.196 17 6715 1.272 17.1 6750 1.278 18 7125 1.349 19 7525 1.425 20 7940 1.504 21 8350 1.581 22 8765 1.660 23 9205 1.743 24 9545 1.808 25 9855 1.866 Watercourse 1 miles above confluence with Ventana Canyon Wash JE Fuller/Hydrology and Geomorphology, Inc. Width (ft) 276 228 267 284 169 681 152 169 177 223 269 154 302 328 223 248 121 89 65 54 98 71 58 87 82 68 Floodway Section Area (sq ft) 938.3 849.6 892.2 932.8 762.0 1894.7 735.6 789.7 807.2 876.4 1060.7 817.5 1049.0 1138.1 947.5 1057.7 800.5 519.3 476.4 438.9 558.4 491.3 457.5 525.8 502.3 472.8 Mean Velocity (ft/s) 9.5 10.7 10.1 9.7 12.0 8.1 12.5 12.2 11.9 11.0 9.7 12.6 9.8 9.0 11.4 10.2 13.4 13.7 14.9 16.2 12.7 14.4 15.5 13.5 14.1 15.0 Base Flood Water Surface Elevation Regulatory Without With Increase W.S. Elev Floodway Floodway (ft) (ft) (ft) (ft) 2681.4 2681.4 2681.9 0.5 2689.2 2689.2 2689.3 0.2 2699.1 2699.1 2699.1 0.0 2706.6 2706.6 2706.6 0.0 2718.0 2718.0 2718.0 0.0 2723.8 2723.8 2723.8 0.0 2730.5 2730.5 2730.5 0.0 2742.4 2742.4 2742.4 0.0 2754.3 2754.3 2754.3 0.0 2765.7 2765.7 2765.7 0.0 2780.3 2780.3 2780.3 0.0 2795.1 2795.1 2795.1 0.0 2806.6 2806.6 2806.6 0.0 2819.0 2819.0 2819.4 0.4 2835.9 2835.9 2836.2 0.3 2848.8 2848.8 2849.2 0.4 2861.9 2861.9 2862.1 0.2 2863.2 2863.2 2863.5 0.3 2877.6 2877.6 2877.7 0.2 2899.1 2899.1 2899.6 0.5 2928.2 2928.2 2928.2 0.0 2960.8 2960.8 2960.8 0.0 2994.2 2994.2 2994.2 0.0 3027.0 3027.0 3027.0 0.0 3050.0 3050.0 3050.0 0.0 3073.1 3073.1 3073.1 0.0 TDN - VENTANA CANYON WASH/ESPERERO WASH LOMR Page 14 Table 7.2 Floodway Data Watercourse Flooding Source Distance1 Distance1 Cross Section (ft) (mi) Ventana Canyon Wash 1 0.5 1 2 2.5 3 4 5 6 7 8 9 9.5 10 10.5 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 0 85 301.69 581.69 806.69 1123.28 1363.28 1438.28 1803.28 2157.67 2391.08 2681.08 3041.08 3351.08 3971.24 4049.37 4429.77 5054.96 5685.82 6157.08 6694.84 7278.79 7792.94 8156.36 8379.5 8443.51 8977 9541.37 10058.71 10530.25 11110.98 11632.31 12133.13 miles above confluence with Tanque Verde Creek JE Fuller/Hydrology and Geomorphology, Inc. 0 0.016 0.057 0.110 0.153 0.213 0.258 0.272 0.342 0.409 0.453 0.508 0.576 0.635 0.752 0.767 0.839 0.957 1.077 1.166 1.268 1.379 1.476 1.545 1.587 1.599 1.700 1.807 1.905 1.994 2.104 2.203 2.298 (ft) Floodway Section Area (sq ft) Mean Velocity (ft/s) 168 119 128 150 158 115 249 254 108 195 161 111 224 304 558 383 506 223 490 397 357 340 368 292 273 298 320 361 292 319 341 291 315 929.4 806.3 759.1 890.3 1337.0 774.4 1520.4 1715.7 794.0 1116.4 1045.7 961.8 1828.8 1443.6 1976.6 3328.7 4527.1 1303.1 2663.0 1798.5 2082.6 1746.1 1983.5 1603.7 1902.3 2452.3 1601.0 1796.0 1641.6 1705.3 1708.2 1647.6 1733.9 10.8 12.5 14.6 13.5 9.0 15.6 8.2 7.2 15.6 11.7 12.5 13.6 7.1 9.9 6.9 4.1 3.0 10.9 5.4 8.4 7.2 8.6 7.8 9.7 10.2 7.0 10.0 9.2 10.1 9.7 9.7 10.1 9.6 Width Base Flood Water Surface Elevation Regulatory Without With Increase W.S. Elev Floodway Floodway (ft) (ft) (ft) (ft) 2469.7 2471.4 2473.8 2478.9 2481.9 2482.3 2486.4 2487.5 2488.5 2492.9 2496.2 2498.5 2502.9 2504.2 2508.2 2513.3 2513.7 2513.9 2520.5 2525.2 2529.9 2534.4 2539.9 2544.1 2546.9 2549.4 2551.1 2557.3 2562.4 2567.7 2574.4 2581.2 2587.6 2469.7 2471.4 2473.8 2478.9 2481.9 2482.3 2486.4 2487.5 2488.5 2492.9 2496.2 2498.5 2502.9 2504.2 2508.2 2513.3 2513.7 2513.9 2520.5 2525.2 2529.9 2534.4 2539.9 2544.1 2546.9 2549.4 2551.1 2557.3 2562.4 2567.7 2574.4 2581.2 2587.6 2469.9 2471.8 2473.8 2478.9 2481.9 2482.3 2486.4 2488.4 2488.5 2492.9 2496.4 2499.5 2503.0 2504.7 2508.9 2513.5 2514.1 2514.3 2521.4 2525.3 2530.5 2535.1 2540.6 2544.9 2547.7 2550.2 2551.8 2557.8 2563.4 2568.3 2574.5 2582.0 2587.8 0.2 0.4 0.0 0.0 0.0 0.0 0.0 0.9 0.0 0.0 0.2 0.9 0.1 0.5 0.7 0.2 0.4 0.4 0.9 0.1 0.6 0.7 0.7 0.8 0.8 0.8 0.6 0.5 1.0 0.5 0.1 0.8 0.2 TDN - VENTANA CANYON WASH/ESPERERO WASH LOMR Page 15 Table 7.2 Floodway Data Flooding Source Distance1 Distance1 Cross Section (ft) (mi) Ventana Canyon Wash 30 12682.51 2.402 (continued) 31 13210.72 2.502 32 13647.69 2.585 33 13948.97 2.642 34 14035.41 2.658 35 14620.63 2.769 36 14927.75 2.827 37 15451.28 2.926 38 15789.69 2.990 39 16283.9 3.084 40 16853.9 3.192 41 17430.17 3.301 42 18020.09 3.413 43 18524.75 3.508 44 18966.38 3.592 45 19600.5 3.712 46 20093.75 3.806 46.5 20352.75 3.855 47 20638.75 3.909 48 21048.38 3.986 49 21298.79 4.034 50 21418.57 4.057 51 21794.69 4.128 52 22361.86 4.235 53 22942.31 4.345 54 23433.88 4.438 55 23853.88 4.518 56 24348.9 4.612 57 24822 4.701 58 25268.97 4.786 Watercourse 1 miles above confluence with Tanque Verde Creek JE Fuller/Hydrology and Geomorphology, Inc. Width (ft) 228 224 245 204 229 417 359 244 201 201 319 207 152 145 101 262 254 126 120 142 118 151 174 208 147 160 189 192 118 92 Floodway Section Area (sq ft) 1422.6 1457.0 1545.8 1432.3 1746.2 1680.6 1753.9 1426.9 1355.3 1322.5 1731.2 1397.2 1225.8 977.6 790.3 1239.2 1196.9 824.5 852.1 882.7 809.4 1542.3 977.3 1047.6 841.5 954.2 899.4 994.6 782.5 725.9 Mean Velocity (ft/s) 11.6 11.4 10.7 11.6 9.5 9.9 9.7 11.9 12.5 13.1 10.0 12.7 14.5 11.8 15.1 9.6 10.0 14.5 14.0 13.5 14.9 7.8 12.3 10.6 13.2 11.6 12.3 11.2 14.2 15.3 Base Flood Water Surface Elevation Regulatory Without With Increase W.S. Elev Floodway Floodway (ft) (ft) (ft) (ft) 2594.1 2594.1 2594.6 0.6 2600.6 2600.6 2601.0 0.5 2606.8 2606.8 2606.9 0.1 2610.9 2610.9 2611.0 0.0 2612.5 2612.5 2613.2 0.7 2617.5 2617.5 2618.2 0.7 2622.6 2622.6 2623.2 0.6 2628.9 2628.9 2629.6 0.7 2635.3 2635.3 2636.2 0.9 2643.3 2643.3 2643.6 0.3 2650.9 2650.9 2651.8 1.0 2659.6 2659.6 2660.6 1.0 2669.3 2669.3 2669.7 0.4 2676.4 2676.4 2677.0 0.6 2683.6 2683.6 2684.1 0.5 2692.5 2692.5 2693.3 0.8 2701.8 2701.8 2702.5 0.8 2706.9 2706.9 2707.4 0.5 2714.7 2714.7 2715.3 0.6 2723.6 2723.6 2724.6 1.0 2732.6 2732.6 2732.6 0.0 2738.5 2738.5 2738.5 0.0 2740.0 2740.0 2740.0 0.0 2752.8 2752.8 2753.4 0.7 2765.1 2765.1 2765.2 0.1 2776.0 2776.0 2776.9 0.9 2783.9 2783.9 2784.2 0.3 2797.2 2797.2 2797.9 0.7 2809.4 2809.4 2810.1 0.7 2821.7 2821.7 2822.4 0.7 TDN - VENTANA CANYON WASH/ESPERERO WASH LOMR Page 16 Table 7.2 Floodway Data Flooding Source Distance1 Distance1 Cross Section (ft) (mi) Ventana Canyon Wash 59 25775.08 4.882 (continued) 60 26244.94 4.971 61 26512.96 5.021 62 26576.02 5.033 62.5 26781.02 5.072 63 26951.02 5.104 63.5 27164.02 5.145 64 27375.02 5.185 64.5 27650.02 5.237 65 27911.02 5.286 65.5 28163.02 5.334 66 28438.02 5.386 66.5 28622.02 5.421 67 28838.02 5.462 67.5 29062.02 5.504 68 29267.02 5.543 68.5 29530.02 5.593 69 29768.02 5.638 69.5 29883.02 5.660 70 29988.02 5.680 71 30030.02 5.688 72 30500.02 5.777 73 30899.02 5.852 74 31410.02 5.949 75 31935.02 6.048 76 32484.02 6.152 77 32957.02 6.242 78 33462.02 6.338 79 33967.02 6.433 80 34463.02 6.527 81 35011.02 6.631 Watercourse 1 miles above confluence with Tanque Verde Creek JE Fuller/Hydrology and Geomorphology, Inc. Width (ft) 195 321 299 372 310 350 200 144 200 313 414 234 332 211 288 253 339 418 271 228 213 133 80 72 111 233 109 182 135 131 110 Floodway Section Area (sq ft) 959.8 1189.2 1471.9 2510.7 1225.8 1367.4 952.5 860.1 909.4 1218.0 1373.7 971.2 1149.0 984.3 1090.1 1046.1 1076.2 1227.3 1047.3 1157.9 1339.4 837.4 674.1 669.7 753.0 1117.5 754.8 918.8 852.0 865.5 800.2 Mean Velocity (ft/s) 11.6 9.3 9.2 5.3 9.0 8.1 11.3 12.5 11.8 8.8 7.8 11.1 9.4 10.9 9.9 10.3 10.0 8.8 10.3 9.3 8.0 12.9 15.7 15.8 14.1 9.5 14.0 11.5 12.4 12.2 13.2 Base Flood Water Surface Elevation Regulatory Without With Increase W.S. Elev Floodway Floodway (ft) (ft) (ft) (ft) 2833.6 2833.6 2834.3 0.8 2850.7 2850.7 2851.2 0.5 2863.2 2863.2 2863.9 0.7 2866.5 2866.5 2867.4 1.0 2867.2 2867.2 2867.3 0.1 2871.4 2871.4 2872.4 1.0 2878.1 2878.1 2878.3 0.3 2885.4 2885.4 2885.6 0.2 2893.5 2893.5 2894.1 0.5 2906.5 2906.5 2907.1 0.6 2913.4 2913.4 2914.4 1.0 2924.0 2924.0 2924.5 0.5 2932.4 2932.4 2933.0 0.6 2942.9 2942.9 2943.3 0.3 2951.6 2951.6 2951.9 0.4 2960.3 2960.3 2960.7 0.5 2968.9 2968.9 2969.4 0.6 2976.8 2976.8 2977.8 1.0 2982.3 2982.3 2982.6 0.3 2991.3 2991.3 2991.9 0.7 2993.3 2993.3 2994.2 0.9 3007.5 3007.5 3008.4 0.9 3021.1 3021.1 3021.8 0.8 3047.9 3047.9 3048.8 0.9 3074.7 3074.7 3075.1 0.4 3103.1 3103.1 3103.1 0.0 3121.8 3121.8 3121.8 0.0 3147.3 3147.3 3147.3 0.0 3169.5 3169.5 3169.5 0.0 3190.2 3190.2 3190.2 0.0 3222.9 3222.9 3222.9 0.0 TDN – VENTANA CANYON WASH/ESPERERO WASH LOMR APPENDIX A References JE Fuller/Hydrology & Geomorphology, Inc. TDN – VENTANA CANYON WASH/ESPERERO WASH LOMR REFERENCES 1. Federal Emergency Management Agency, Flood Insurance Study – Pima County, Arizona and Incorporated Areas, Pima County, Community Number – 040073, February 8, 1999. 2. U.S. Army Corps of Engineers, HEC-2: Water Surface Profiles, Version 4.6.2, May 1991. 3. US Army Corps of Engineers Hydrologic Engineering Center, HEC-RAS River Analysis System, Version 4, March 2008. 4. U.S. Army Corps of Engineers, HEC-1: Flood Hydrograph Package, Version 4.1, June 1998. 5. Tetra Tech, Inc., Summary of Ventana Canyon Hydrologic Modeling, June 20, 2002. 6. National Oceanic & Atmospheric Administration, Precipitation-Frequency Atlas of the United States, NOAA Atlas 14, Volume 1, Version 4, extracted October 3, 2008. 7. National Oceanic & Atmospheric Administration, Depth-Area Ratios in the Semi-Arid Southwest United States, NOAA Technical Memorandum NWS Hydro-40, August 1984. 8. JE Fuller / Hydrology and Geomorphology Inc., Ventana Canyon Wash and Esperero Wash, Letter of Map Revision, Field Reconnaissance Report, August 2005 JE Fuller/Hydrology & Geomorphology, Inc. TDN – VENTANA CANYON WASH/ESPERERO WASH LOMR APPENDIX B General Documentation & Correspondence APPENDIX C Site Photographs & Survey Field Notes APPENDIX D Hydrologic Analysis – Summary of Supporting Documentation APPENDIX E Hydraulic Analysis – Summary of Supporting Documentation Appendix F GIS Shape Files JE Fuller/Hydrology & Geomorphology, Inc.