TRIP REDUCTION PROGRAM Annual Report 2011 Maricopa County Air Quality Department Trip Reduction Program July 1, 2010 – June 30, 2011 William D. Wiley, Director Air Quality Department Prepared by Maricopa County Trip Reduction Program Staff A. Neil Yockey, Environmental Program Manager Maricopa County Air Quality Department Trip Reduction Program 1001 North Central Ave. – Ste 550 Phoenix, AZ 85004 (602)506-6750 Permission to quote from or reproduce materials from this publication is granted when due acknowledgement is made. Maricopa County Air Quality Department SUBJECT: DATES: Trip Reduction Program – Fiscal Year 2011 Annual Report July 1, 2010 – June 30, 2011 ADEQ Contract No. - EV11-00065 EXECUTIVE SUMMARY During the Fiscal Year 2010-2011 (FY11) grant year, Maricopa County continued the Trip Reduction Program (TRP) and outreach efforts in support of the voluntary “Clean Air Campaign”. Results were gathered from detailed statistical summary reports from each employee and student site participating in the program. During FY11, there were 2,993 sites in the TRP representing 1,158 companies. This year, the survey was administered to over 675,000 commuters. In addition, the TRP Task Force, along with the TRP staff, reviewed and approved 1,139 trip reduction plans. The following report tracks and analyzes the commuting habits of employees and students in Maricopa County. The TRP is continually identifying new sites required to participate in the program. This ongoing effort has resulted in 139 new employee and student sites incorporated into the TRP and completing their baseline year during FY11. While companies phased in and out of the TRP, the number of active sites remained approximately 3,000 throughout the year. An aggregate analysis of the sites processed during FY11, for both employee and student participants, produced the following statistical results: 1) commuters in the TRP saved 14,764 tons of pollution by using an alternative mode of transportation; and 2) the TRP’s esurvey was used by more companies than ever before, an increase of 18% year-over-year. The TRP has two forms of its online e-survey. Employers can choose either the intranet or internet version. Overall, 234 companies had their employees use the e-survey this year. Thirteen companies programmed the intranet version onto their systems for their employees to use and 221 companies had their employees access the Maricopa County web-site for the internet form. Some of the larger companies used the intranet version, accounting for nearly one-quarter of all employees. Companies that used the e-survey saved the TRP from providing over 241,000 paper forms; this was an increase of 8% more surveys compared to last year. When TRP first started administering the e-survey, its goal was to have a 35% usage by all employees. This year, 42% of TRP employees used the e-survey to complete their survey. In addition to the time that TRP saves in processing surveys, those companies using the e-survey saved an estimated $102,000 in administrative and processing costs for the TRP. 1001 North Central Avenue, Suite 550, Phoenix, AZ 85004 ~ Phone 602-506-6750 ~ www.maricopa.gov/aq/ MARICOPA COUNTY REGIONAL TRIP REDUCTION PROGRAM 2011 Annual Report INTRODUCTION During Fiscal Year 2011, 2,993 employment sites were processed by the Trip Reduction Program (TRP). Of all the sites, 139 were baseline (first year sites). The TRP produces a detailed statistical summary report for each employment and student site. This year, we administered the survey to over 675,000 employees and students. In addition, the TRP Task Force, along with the TRP staff, reviewed and approved 1,139 Trip Reduction plans. The following report tracks and analyzes the commuting habits of employees and students in Maricopa County. The 1988 Omnibus Clean Air Legislation laid the foundation for the Maricopa County TRP. Employers with 100 or more employees were required to (1) reduce the single occupancy vehicle rate (SOV) by 5% annually, (2) name a transportation coordinator, (3) provide trip reduction information to all employees and/or students, (4) conduct an annual trip reduction survey and (5) submit an annual trip reduction plan. The Trip Reduction Ordinance (TRO) adopted by the Board of Supervisors in September 1992 became effective January 1, 1993. This ordinance expanded the TRP by requiring employers with 75 to 99 employees to participate. The 1993 ordinance also established a SOV floor of 60%, and it improved SOV rate and SOV target calculations. The TRO was amended May 26, 1994 with the following changes effective July 1, 1994; (1) employer SOV reduction goals were increased from 5% for the first five target years to 10% (employers in their sixth and subsequent target years have a SOV target of 5% annually), (2) employers with 50 to 74 employees were incorporated into the program and (3) employers were given credit towards SOV reduction goals for using Reduced Emission Vehicles (REV). In May 1996, the TRO was amended and ten Equivalent Emission Reduction (EER) measures were implemented. The ordinance became effective in July 1997. The EER ordinance measures allow for credit to be given to companies toward meeting their trip reduction goals by implementing alternative air pollution reduction strategies. These strategies are listed on a separate form and submitted with their trip reduction surveys on an annual basis. In the first program year of the TRP, approximately 500 employers and 800 employment sites were affected by the TRP. The implementation of the 1993 TRO added 300 employers and 700 sites to the program. With the implementation of the 1994 TRO, there are currently over 1,100 employers and 3,000 sites participating in the TRP. Maricopa County Regional Travel Reduction Program ADEQ Annual Report, July 1, 2010 - June 30, 2011 PROGRAM OVERVIEW The TRP’s operational functions are divided into two sections: Operations/Research Data Analysis and Plan Review/Monitoring. Operations / Research Data Analysis Operations section’s primary responsibilities are: 1) coordinating survey delivery and processing data; 2) monitoring new employers for incorporation into the TRP; 3) tracking effected employers to ensure that questionnaires and other requirements are submitted on schedule; and 4) developing policies and procedures. The Research Data Analysis section is responsible for analyzing survey data and generating Summary Analysis reports for each employment site; analyzing and measuring the overall impact of the TRP on reducing single occupant commutes; and producing quarterly, annual and special reports for internal and external requests. In FY11, the Research/Data Analysis section sent out 3,101 summary analyses for employers and schools. In addition, they completed reports and supplied statistical data results for employers, researchers, city planners, news affiliates and individuals. Plan Review/Monitoring The Plan Review/Monitoring section reviews and evaluates all submitted TRP plans to determine if proposed strategies and/or incentives are adequate to achieve targeted SOV reductions. There were 1,139 TRP plans that were reviewed and approved by the Task Force and staff during FY11. The Plan Review staff also monitors employers to ensure that trip reduction plans are implemented accordingly. Monitoring activities include on-site visits and phone calls to employers. This year there were 514 monitoring phone calls and 848 site visits made. Employers not in compliance with TRP’s policies and procedures can receive a Notice of Violation (NOV). During FY11, 83 NOV’s were issued to employers who did not meet the statutory requirements. Of those referred to the TRP Task Force for enforcement, all were withdrawn following compliance by the respective employer. Valley Metro/ RPTA Both the Maricopa County TRP and the Valley Metro/Regional Public Transportation Authority (RPTA) provide staff to coordinate the benefits of both the TRP and the Clean Air Campaign. The RPTA is a sub-contracted organization that provides training, technical assistance and promotional material to all affected organizations. During the past year, 12 training classes were conducted with a total of 191 attendees. Training sessions included formal Transportation Coordinator (TC) training, in-house workshops and webinars. In all, 42 meetings were held with 494 in attendance. Seven webinars were held with a total of 847 in attendance. Over 9,400 technical assistance and consultative service contacts were made to Valley organizations. Now in its twenty-second year, awareness of the Clean Air Campaign continues to grow with the public. Maricopa County Regional Travel Reduction Program ADEQ Annual Report, July 1, 2010 - June 30, 2011 ANNUAL REPORT METHODOLOGY The Maricopa County Regional Trip Reduction Program’s method for measuring employers’ compliance with the program is based on an employer’s current site year. This methodology allows for the aggregation of data by the current TRP program year. New employment sites are added on a continual basis. The total number of employees/students commuting patterns is measured to determine TRP’s overall effectiveness on reducing single occupant vehicle trips and miles. This year, aggregate data is only shown for the first program year (FY 1991) and the last five fiscal years. This is done to show how the TRP compares to the inaugural year and reflect the most recent trend of data. For purposes of maintaining consistency and tracking a company’s historical data from one year to the next, data gathered for a company are based upon the company’s anniversary date. The regional calculation for the number of miles needed to generate one-pound of pollution, for an average vehicle, was 45.8 for the first and second quarters and 46.0 miles for third and fourth quarters of the fiscal year. This factor was used to calculate the amount of pollution saved annually in the program. The Maricopa Association of Governments (MAG) has provided the data, citing EPA's Mobile 6A as its source. The staff members of the Maricopa County Trip Reduction Program and the Regional Public Transportation Authority (RPTA) work closely to the benefit of both the TRP and the Clean Air Campaign. The RPTA is sub-contracted by the County to provide training, technical support and promotional materials to all organizations effected by the TRP. The FY11 Trip Reduction Program Final Report is highlighted with samples of program material, aggregate results of the annual survey, and the calculation methodology. Questions or comments should be addressed to the Maricopa County Air Quality Department, Trip Reduction Program, 1001 N. Central Ave. #550, Phoenix, AZ 85004. Maricopa County Regional Travel Reduction Program ADEQ Annual Report, July 1, 2010 - June 30, 2011 NUMBER OF TRP PARTICIPANTS The Maricopa County region affected by the Trip Reduction Program (TRP) has recorded continual growth since the inception of the program in 1989. TRP’s overall participation has increased 122% since the first program year. Based on current DES estimates for the Greater Phoenix-Glendale-Mesa metropolitan Area nonfarm workforce, there are approximately 1,677,600 employees. TRP employees account for over 34.1% of those Maricopa County residents. In addition, ‘Student’ sites contribute another 102,478 participants to the overall population tracked by the TRP. Number of TRP Participants FY 1991 / FY 2007 - 2011 600,000 500,000 400,000 300,000 '91 '07 200,000 '08 '09 100,000 '10 2011 0 Students Employees All The number of all TRP participants has steadily increased each year of the program. When compared to DES estimates for non-farm workforce, TRP employees decreased by 1.1%, while the DES workforce showed an increase of 0.2% from the previous year. The student population has remained fairly level over the previous four years, showing a slight decrease for this year. Program participation shows an average annual rate increase of 0.3% since FY 2007. Number of Participants Site Type Students* Employees All FY 91 FY 07 FY 08 FY 09 FY 10 53,943 251,112 305,055 89,657 576,969 666,626 90,392 559,728 650,120 89,017 561,492 650,509 100,172 579,576 679,748 *Student population includes high school juniors and seniors, colleges, universities and vocational institutions. FY 2011 102,478 573,002 675,480 1 Maricopa County Regional Trip Reduction Program ADEQ Annual Report --- July 1, 2010 - June 30, 2011 TRP Participation by Quarter for FY 2011 During the fourth quarter, the TRP surveyed many of the larger companies and high schools. Most secondary schools, which make up 70% of the student population, surveyed in the second and third quarters. This ensures that high schools will receive their survey results before the end of the school year and have time to implement their TRP plan. For employees, the least amount of surveys administered was during the first quarter, which is traditionally lower because employees are taking time off during the summer months. Site Type Students Employees All 1st Quarter 11,910 134,401 146,311 2nd Quarter 37,386 143,079 180,465 3rd Quarter 50,246 147,093 197,339 4th Quarter 2,936 148,429 151,365 Total Year 102,478 573,002 675,480 Number of TRP Participants FY 2011 by Quarter 175,000 Students Employees 150,000 125,000 100,000 75,000 50,000 25,000 0 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 2 Maricopa County Regional Trip Reduction Program ADEQ Annual Report --- July 1, 2010 - June 30, 2011 TRP RESPONSE RATES During FY11, 2,993 sites were analyzed. This included 2,862 ‘Employee’ sites and 131 ‘Student’ sites. The TRP questionnaire was administered to 675,480 employees and students this year with an overall response rate of 76.72%. Response Rates by Sites FY 1991 / 2007 - 2011 85% Stud en ts Emp lo yees All Sites 80% 75% 70% '91 '07 '08 '09 10 2011 The response rate is calculated by dividing the number of questionnaires completed by the number of the employees at the site. If the response rate for an employer is less than the required 60%, a company is directed to resurvey that site. The TRP continues to achieve high response rates each year. Because of this, data collected by the TRP is very comprehensive, and is requested by numerous outside agencies and organizations for detailed analysis. The response rate for 'All' site types decreased for this year. The student response rate was lower than the employee response rate, 70.39% and 77.85% respectively. Response Rates FY 10 FY 2011 77.05% 76.71% 76.76% *Student population includes high school juniors and seniors, colleges, universities and vocational institutions. 70.39% 77.85% 76.72% Site Type FY 91 FY 07 FY 08 FY 09 Students* Employees All 73.36% 84.24% 82.32% 76.28% 78.64% 78.32% 70.19% 77.02% 76.92% 78.01% 74.25% 74.83% 3 Maricopa County Regional Trip Reduction Program ADEQ Annual Report --- July 1, 2010 - June 30, 2011 TRP Response Rates by Quarter for FY 2011 In FY11, the response rates fluctuated each quarter. Although there is no distinguishable pattern throughout the year, the second quarter had the highest response rates for ‘All’ sites. For ‘Employee’ sites, the second quarter had the highest response rates. ‘Student’ responses were their lowest during the fourth quarter when the majority of trade-school students were surveyed. Site Type Students Employees All 1st Quarter 75.17% 77.85% 77.65% 2nd Quarter 73.82% 80.23% 78.90% 3rd Quarter 67.19% 78.52% 75.64% 4th Quarter 62.19% 74.89% 74.64% Current Year Average 70.39% 77.85% 76.72% Response Rates by Quarter by Sites - FY 2011 90% Students 85% Employees All 80% 75% 70% 65% 60% 55% 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 4 Maricopa County Regional Trip Reduction Program ADEQ Annual Report --- July 1, 2010 - June 30, 2011 ALTERNATIVE MODE TRIPS Alternative Trips by Mode as a Percentage of Total Trips FY 2011 35% AFV Bike 30% Bus - P Bus - S Light Rail 25% C-Pool Walk 20% CWW T-Comm V-Pool 15% 10% 5% 0% Stud en ts Emp lo yees All TRP participants continue to use alternative modes more often each year. During this year, carpool usage continued to be the highest type of alternative mode used for ‘All’ site types. ‘Student’ and ‘Employee’ sites used carpooling as their primary alternative mode. Students used carpooling for 34.8% of all their commuting trips. Other alternative modes used mainly by students were taking the bus (16.1%) and walking (7.6%). These three modes account for over 58% of commuting habits by students. Employees carpooled 10.5% of the time, while CWW accounted for 3.5% of alternative trips and taking the bus resulted in 2.3%. Alternative Mode Trips by Quarter as a Percentage of Total Trips FY 2011 1st Qtr 12% 2n d Qtr 3rd Qtr 4th Qtr 10% 8% 6% 4% 2% 0% AFV Bike Bus - P Lig h t Rail C-Po o l Walk CWW T-Co mm V-Po o l Carpooling continues to be the highest percentage of trips taken by alternative mode users. The first and fourth quarters showed the largest use of carpooling. The two other alternative modes mostly used by commuters (compressed work week and public bus) were used in the fourth quarter. 5 Maricopa County Regional Trip Reduction Program ADEQ Annual Report --- July 1, 2010 - June 30, 2011 POUNDS OF POLLUTION TRP participants continue to use alternative modes of transportation for 33.4% of their commuting miles. In FY11, for ‘All’ sites, pounds of pollution saved daily totaled 113,566 pounds per day. There were multiple circumstances that affected the results of the amount of pollution saved by the program: 1) because of newer and environmentally cleaner vehicles on the road, the pounds of pollution factor was recalculated mid-way through the year from 45.8 to 46.0 miles per one-pound of pollution, thus causing a decrease in pounds of pollution saved; and 2) the number of completed surveys returned by employers cause fluctuations in the aggregated results year over year. Pounds of Pollution Saved by Mode MODE Generated SOV Saved AFV Bike Bus (Public) Bus (School) Carpool Light Rail CWW* TeleComm* Vanpool Walk Alternative Mode Total Total Miles * Miles not driven STUDENT SITES Miles Daily (Both - Ways) Pounds of Pollution EMPLOYEE SITES Miles Daily (Both - Ways) Saved Daily 1 419,414 Pounds of Pollution Saved Daily 1 9,994,180 23,625 7,787 41,585 104,968 458,521 14,181 514 169 904 2,282 9,968 308 19,944 670,611 434 14,579 1,090,025 ALL SITES Miles Daily (Both - Ways) Saved Daily 1 10,413,594 288,964 44,869 296,136 6,282 975 6,438 1,975,743 34,808 520,228 356,100 1,024,355 12,199 4,553,402 42,951 757 11,309 7,741 22,269 265 98,987 14,547,582 Pounds of Pollution 312,589 52,656 337,721 104,968 2,434,264 48,989 520,228 356,100 1,024,355 32,143 5,224,013 6,796 1,144 7,342 2,282 52,919 1,065 11,309 7,741 22,269 699 113,566 15,637,607 1 To calculate the pounds of pollution saved daily, the “Miles Daily” was divided by 45.8 for the first and second quarters and 46.0 for the third and fourth quarters. Using the third and fourth quarters as an example, 46.0 is the number of miles driven needed to generate one pound of pollution using the most recent standards. 6 Maricopa County Regional Trip Reduction Program ADEQ Annual Report --- July 1, 2010 - June 30, 2011 POLLUTION SAVED TRP participants continue to save more pounds of pollution each year. This year alone, the amount of pollution potentially saved by the 675,480 employees/students responding to the survey was estimated at 19,222 tons. Total Pounds of Pollution Saved Site Type Students Employees All 5 Pounds of Pollution Saved Daily Tons of Pollution Saved Weekly 2 14,579 98,987 113,566 36.4 247.5 283.9 Tons of Pollution Saved Annually 3 1,895 12,868 14,763 Potential Tons of Pollution Saved by TRP Annually 4 2,692 16,530 19,222 2 “Tons of Pollution Saved Weekly” is calculated by dividing the “Pounds of Pollution Saved Daily” by 2000, and then multiplying the result by the number of trips taken weekly by an average commuter, which is set to be five by the TRP, i.e. for students, (14,579/2000)* 5 = 36.4 tons. 3 Weekly tons are then multiplied by 52 to calculate “Tons of Pollution Saved Annually”, 36.4 * 52 = 1,895 tons. 4 “Potential Tons of Pollution Saved by TRP Annually” is calculated by extrapolating out to the number of TRP participants who had the survey administered to them. The “Tons of Pollution Saved Annually” is divided by the response rate, i.e. 72,136 students answered the survey for a response rate of 70.39% (.7039); 1,895/.7039 = 2,692. All 102,478 TRP students could have saved 2,692 tons of pollution in FY 2011. 5 The numbers for ‘All’ site types is calculated by adding the totals from the ‘Student’ site and ‘Employee’ site rows. 7 Maricopa County Regional Trip Reduction Program ADEQ Annual Report --- July 1, 2010 - June 30, 2011 SOV TRIP RATES The SOV trip and SOVMT rates indicate how well a company is doing at reducing employee/student trips and miles. In order for a company to achieve their reduction goal for the year it must meet or exceed either one of these target rates. Of the 2,993 sites surveyed, 2,853 were analyzed this year for the purposes of the aggregate data. There were 140 first year sites (baseline year sites) that were processed. However, their results are not aggregated since employers do not fully implement their incentives and/or strategies until their first year trip reduction plan has been approved. SOV Rates FY 1991 / 2007 - 2011 85% 75% 65% 55% 45% All Sites Emp lo yees Stud en ts 35% '91 07 08 '09 '10 2011 The SOV trip rate is calculated by dividing the number of SOV trips by the total trips taken for all commuters. This is also done separately for ‘Employee’ sites and ‘Student’ sites in order to compare their rate of change. Single Occupancy Vehicle (SOV) Trip Rate Students FY 91 FY07 FY08 FY09 FY10 FY11 46.78% 51.40% 56.00% 43.90% 38.21% 37.82% Change from Previous Year 8.94% -21.60% -12.96% -1.02% Employees 81.86% 80.57% 76.22% 75.38% 76.53% 76.94% Change from Previous Year -5.40% -1.10% 1.52% 0.53% All 74.92% 76.83% 75.97% 72.40% 71.44% 72.09% Change from Previous Year -1.12% -4.69% -1.32% 0.90% 8 Maricopa County Regional Trip Reduction Program ADEQ Annual Report --- July 1, 2010 - June 30, 2011 SOVMT RATES This year the SOVMT showed an increase of 0.93% for ‘All’ sites when compared to last fiscal year. 'Student' and 'Employee' sites also showed the following rate changes, -2.19% and 0.77% respectively. SOVMT Rates FY 1991 / 2007 - 2011 All Sites 85% Employees Students 75% 65% 55% 45% '91 07 08 '09 '10 2011 Similar to the methodology used for SOV trips, 2,853 sites were analyzed this year for the purposes of the aggregate data. The SOVMT rate is calculated by dividing the number of SOV miles traveled by the total number of miles driven by all commuters. This is also done separately for ‘Employee’ sites and ‘Student’ sites in order to compare their rate of change. FY 91 FY07 FY08 FY09 FY10 FY11 Single Occupancy Vehicle Miles Traveled (SOVMT) Rate Students Employees All Change from Change from Change from Previous Year Previous Year Previous Year 65.49% 85.78% 83.57% 65.78% 80.82% 79.90% 65.29% -0.75% 77.10% -4.60% 76.29% -4.52% 53.10% -18.67% 73.37% -4.83% 72.29% -5.24% 46.98% -11.52% 74.97% 2.18% 72.96% 0.92% 45.95% -2.19% 75.55% 0.77% 73.64% 0.93% 9 Maricopa County Regional Trip Reduction Program ADEQ Annual Report --- July 1, 2010 - June 30, 2011 COMMUTING TO WORK Start Times for TRP Participation - FY11 30% 25% 20% 15% 10% 5% 0% Mid 2:00 4:00 6:00 8:00 10:00 Noon 2:00 4:00 A.M. 6:00 8:00 10:00 P.M. The peak hours for Maricopa County commuters traveling to work are between 5:00 a.m. and 8:00 a.m.; 72% of all commuters are on the road during this time. During the morning rush, the time between 7:00 a.m. and 8:30 a.m. is the most heavily traveled. There is also a second shift peak between 2:00 p.m. and 3:30 p.m. when commuters make their way to work. Quit Times for TRP Participation - FY11 30% 25% 20% 15% 10% 5% 0% Mid 2:00 4:00 6:00 A.M. 8:00 10:00 Noon 2:00 4:00 6:00 8:00 10:00 P.M. Conversely, quit times for commuters peak between 2:00 p.m. and 7:00 p.m.. Over 74% of all commuters are leaving the workplace during this time. However, the peak for departing workers is not as great as that of arrival times. This is caused by workers who complete their eight-hour shifts prior to the afternoon rush or those who put in extended hours. The time between 5:00 p.m. and 6:00 p.m. showed the largest numbers of commuters leaving from work. 10 Maricopa County Regional Trip Reduction Program ADEQ Annual Report --- July 1, 2010 - June 30, 2011 HOW FAR IS THE COMMUTE? Commute to work in Miles Employees Emp lo yee 60% Stud en t All Percentage of Commuters 50% 40% 30% 20% 10% 0% <= 5 6-10 11-15 16-20 21-25 26-30 36-40 31-35 41-50 >50 Miles In FY11, the typical TRP commuter (employee or student) could have expected to drive, on the average, 14.8 miles one-way to work or school. While the average drive for an employee was 15.8 miles to work, students drove an average of 7.9 miles one-way to school. Compared to previous years’ data, more commuters are experiencing longer drives. Overall, 27.2% of all TRP participants drive less than five miles to work/school. Another 42.8% of the commuters live between 11 and 30 miles from work. Over 8.7% of all commuters have a drive of over 30 miles. AVERAGE T RIP LENGT H BY MODE OF T RANSPORTATION July 2010 - June 2011 35 30 25 Overall Miles 20 Bike Bus (Public) 15.8 14.8 15 Car Pool Lig ht Rail SOV 10 Walk 7.6 Bus (School) CWW 5 TeleComm VanPool 0 Stud en ts Emp lo yees All Values are shown for Overall trip length The average trip length by mode split shows that employee trips on all accounts are longer than student trips. However, employees’ longest commuting trips are taken using an alternative mode, not SOV’s. The longest of these trips using alternative modes are vanpools (34.1 miles) and trips not taken (CWW’s – 17.9 miles, and Telecommuting – 20.6 miles). This indicates that those commuters who live farthest from work are more likely to use these alternative mode types as their commuting method. 11 Maricopa County Regional Trip Reduction Program ADEQ Annual Report --- July 1, 2010 - June 30, 2011 HOW LONG DOES THE COMMUTE TAKE? Commute to work in Minutes 30% Percentage of Commuters 25% 20% 15% 10% 5% 0% <= 5 6-10 11-15 16-20 21-25 26-30 31-35 36-40 41-45 46-50 >50 Minutes Employee Students Typically, TRP participants can expect to spend an average of 24.85 minutes commuting to work or school. Students take an average of 17.9 minutes to get to school, while employees average 25.8 minutes to get to their worksite. Approximately 54% of all commuters take less than 20 minutes to arrive at work/school. The largest group of all respondents is represented by those who take between 11 and 15 minutes to commute, while 24% of commuters take over 30 minutes or more to get to their worksite. For students, 66% commute to school in 15 minutes or less. Over 26% of all employees take more than 30 minutes to arrive at their workplace. 12 Maricopa County Regional Trip Reduction Program ADEQ Annual Report --- July 1, 2010 - June 30, 2011 VALLEY COMMUTING PATTERNS Commuting within the Valley 30 Minutes Miles 25 20 15 10 5 Ch an dler Gilbert Glen dale Mesa Peo ria Ph o en ix Sco ttsd ale Temp e Of the eight largest municipalities in the Valley, the time and distance spent commuting to work can vary depending upon where one lives. For all communities, the time spent commuting correlates to the distance traveled to work. The two Valley communities that have the longest commute in minutes and miles are Peoria and Gilbert. This may be that these commuters must travel outside of their area of residence to get to their worksite. For nearly all these major cities, TRP participants found that their distance traveled and time spent commuting decreased from last year. Commuting During the Morning Rush 30 27.7 28 26 24 22 20 5:30 AM 6:00 17.4 18 6:30 7:00 16 7:30 14 8:00 8:30 12 10 9:00 9:30AM 5:30am 9:30am Minutes to work 5:30am 9:30am Miles to work For Valley commuters, the morning rush is worse during the later portion of the commute. The average morning commute takes about 27.7 minutes and is 17.4 miles long, both increased from last year. A TRP commuter may experience, nearly a 28-minute drive if they begin work at 8:30 a.m., even though it is one of the shorter commute trips. It is also noted that those who have longer commutes depart for work earlier in the morning. 13 Maricopa County Regional Trip Reduction Program ADEQ Annual Report --- July 1, 2010 - June 30, 2011 WHERE TRP EMPLOYEES LIVE COMPARED TO WHERE THEY WORK Where People Live/Work Live 200,000 Work 175,000 150,000 125,000 100,000 75,000 50,000 25,000 Unknown Outside County Maricopa County Tempe Scottsdale Phoenix Peoria Mesa Glendale Gilbert Chandler 0 During FY11, 437,752 employees responded to the survey indicating their city of residence. For the purposes of this report, only those cities whose residents total 19,000 or more employees in the TRP for the year are listed. As expected, the City of Phoenix is the largest contributor in both residents and number of employees in the workforce. While 134,207 residents live in Phoenix, 201,331 work within the city limits. Other cities that have a positive employee/resident ratio (more employees working in an area than live in that area) are Scottsdale and Tempe. This trend indicates that these cities have to accommodate more commuters coming into their communities during the rush hours. Additional scheduling of alternative modes of transportation will be needed in order to reduce traffic congestion associated with commuters getting to their worksite. Conversely, all other major cities in the area have a negative employee/resident ratio. These communities also face the task of commuters returning to their residences. The Town of Gilbert shows true characteristics of a ‘bedroom community’; while there are 26,474 residents in Gilbert who participate in the TRP, only 10,503 TRP participants work in Gilbert. The following charts show two completely different examples of demographic trends here in the Valley. The city of Phoenix represents the typically large metropolitan area with major employers within the city limits, while the Town of Gilbert shows signs of being the suburban enclave where commuters live, but work in surrounding cities. 14 Maricopa County Regional Trip Reduction Program ADEQ Annual Report --- July 1, 2010 - June 30, 2011 Of all Phoenix residents in the TRP, 67.7% (88,376) live and work within the city limits. Approximately 25% of all other Phoenicians work in adjoining major cities. While the rest of the city’s residents work throughout the County, representing only 5.5% of Phoenix TRP residents. Where Phoenix Residents Work 130,374 Resid en ts 70% 60% 50% 40% 30% 20% 10% 0% Chandler Glendale Phoenix Scottsdale Tempe Tolleson Rest of Maricopa County Representing the other side of commuter travel, the majority of the Town of Gilbert residents work in other cities in the Valley; over 86% work outside of Gilbert. Only 13.7% of the TRP participants (3,584) who live in Gilbert also work within the city limits. This indicates that Gilbert residents who participate in the TRP continue to seek work outside of the Town, resulting in a true bedroom community. Comparatively, for the other major cities in Maricopa County, the average percentage of residents who live and work in the same city is approximately 35% for TRP participants. The Town of Gilbert is substantially below the average for other major cities in Maricopa County. Where Gilbert Residents Work 26,254 Residents 30% 25% 20% 15% 10% 5% 0% Chandler Gilbert Mesa Phoenix Scottsdale Tempe Rest of Maricopa County 15 Maricopa County Regional Trip Reduction Program ADEQ Annual Report --- July 1, 2010 - June 30, 2011 DEMOGRAPHIC DATA Female Male SOV Total Mode Use by Gender 80.% 70.% 60.% 50.% 40.% 30.% 20.% 10.% Walk VanPool TeleComm Light Rail CWW CarPool Bus Bike 0.% For this year, over 372,000 TRP participants answered the optional question on gender. Females account for 53.0% of the total responses. While women show a higher percentage than men do of carpooling and tele-commuting, men are more likely to use a light rail, compressed work week and vanpool. The greatest disparity is represented by bicyclists. Men are more likely to bike to work than women, by a 3:1 ratio. Mode Use by Age Group 50.% 40.% 30.% Bike Bus 20.% CarPo o l CWW Lig h t Rail 10.% TeleCo mm Van Po o l Walk 0.% <25 Years 25-34 Years 35-44 Years 45-54 Years 55+ Years For those who responded to the optional question on age, the older the age group in TRP, the more likely the commuter will use telecommuting and compressed work week (CWW) to get to their worksite. The younger age groups are more apt to use biking and walking when traveling to work. The <25 year old group is more likely to use a bike, carpool or walk than any other group and are the least likely to use telecommuting as an alternative mode by a greater disparity. The 35-44 year old group telecommutes more often than other groups. The 55+ year-old group uses bus, CWW, light rail or vanpools more than any other group. 16 Maricopa County Regional Trip Reduction Program ADEQ Annual Report --- July 1, 2010 - June 30, 2011 WORK ACTIVITY FOR TRP PARTICIPANTS The TRP revised the questionnaire survey form this year and added a question regarding the work activity of employees. The question asks the following: “What best describes your primary work activity?” For an overall analysis of work activities by TRP employees, the chart on the left shows how commuters identify themselves in their jobs. Generally speaking, the largest number of respondents falls into the category of ‘Administrative’; over 23% of employees claim they perform some type of administrative function daily. In order to give a contrast of what type of work activity an employee does and what type of alternative mode they may use, a side by side comparison is shown below. To limit charts and graphs, only one example of an alternative mode is shown, tele-commuting. Comparatively, 10.1% of all tele-commuters work an administrative job. This comparison makes perfect sense. Those in ‘Production’ and ‘Personal Care’ are less likely to have the opportunity to tele-commute, because their type of job does not allow for them to work from home. Primary Work Activity of TRP Employees Production 13.6% Sales & Marketing 9.0% Tele-Commuting by Work Activity Technical 4.4% Personal Care 1.2% Personal Care 8.8% Engineering 7.1% Production 1.4% Administrative 23.1% Technical 12.3% Sales & Marketing 13.6% Administrative 10.1% Engineering 14.8% Community 10.8% Community 3.5% Business 43.1% Business 23.2% For brevity’s sake, all work activities are abbreviated on the pie charts. A more detailed listing of each work activity is described below. The work activities were chosen based upon demographic modeling tracked by the Maricopa Association of Governments (MAG). Administrative Business Community Engineering Personal Care Production Sales & Marketing Technical Administrative/Clerical/Retail Business/Financial/Professional Community Support/Teaching Engineering/Research/Design Personal Care & Services Production/Construction/Transport Sales & Marketing Technical Support 17 Maricopa County Regional Trip Reduction Program ADEQ Annual Report --- July 1, 2010 - June 30, 2011 CONCLUSION In FY11, the TRP is currently in its twenty-second year. Analysis of the TRP data shows that the employees/students participating in the TRP continue to be strong supporters of using alternative modes of transportation in order to get to work or school. Although the TRP has consistently shown an increase in the number of trips saved and pounds of pollution saved each year, this year the recalculating of methodology for the alternative fuel vehicle modes from survey response increased the trips and pounds for pollution saved. A number of changes in methodology used to collect and calculate commuter miles, trips, modes and pollution saved impact this reporting period. The reporting outcome was affected by one or more of the following reasons: 1) Credits for Alternative Fuel Vehicle (AFV) use were calculated for trips or miles driven. Full or partial credit was given to electric, hybrid, hydrogen and natural gas vehicles; 2) Other external factors impacted commuter driving patterns, such as: a) a reduction in workforce commuters due to the downturn in the economy, and b) the calculation factors used to determine how many miles are driven to produce one-pound of pollution. The regional miles/pound factor increased from 45.8 to 46.0; and 3) the number of completed surveys returned by employers cause fluctuations in the aggregated results year over year. Alternative mode users in the TRP continue to support the program by showing a substantial amount of miles driven weekly in order to reduce Valley pollution. The total amount saved this year was 26.1 million miles weekly for alternative mode commuters. Carpool and vanpool miles accounted for 65.8% of all miles saved. The miles saved by TRP commuters resulted in 14,763 tons of pollution not being produced. Even though commuting distances and time traveled to the worksite have increased this year, TRP participants continue to make environmentally sound decisions by choosing to use an alternative mode in order to lessen their SOV trips. The employees who participate in the program continue their support of the TRP as shown by a high survey response rate, 77.85%. Employee's contribution to the amount of pollution saved annually accounted for 87.2% in the TRP. The e-survey continued to be a successful format for TRP employers to survey their employees. The number of companies using the e-survey this year increased from 199 to 234, 42% of all employees used the e-survey this year. The miles saved by alternative mode use for students was 1,895 tons of pollution annually. Since new high school students enter the TRP annually, RPTA’s efforts to educate students on the program's environmental benefits represent an ongoing training opportunity. Educating students on the use of alternative modes to commute will only increase the probability that once the students are out in the workplace they will continue with their learned environmental commuting practices. Future Goals: ● Have at least 15% of TRP students use the electronic survey within the first year of implementation. ● Continue to increase the number of TRP companies that use the e-survey, so that the majority of their employees use the electronic version, where 50% of all employees are using the e-survey. 18 Maricopa County Regional Trip Reduction Program ADEQ Annual Report --- July 1, 2010 - June 30, 2011 TRIP REDUCTION PLANS During Fiscal Year 2010-2011, the County received 1,159 plans and presented 1,139 plans to the Task Force for review and approval. Of those approved by the Task Force 66 of them were first year plans. TRP Plans Approved 200 175 150 125 100 75 50 25 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Plan Year MONITORING The TRP staff will follow-up with employer to confirm their approved plan has been implemented/documented. A substantial amount of monitoring occurs through written and verbal channels, with the balance accomplished by staff visiting the employer sites. During this year, 514 monitoring calls were made and 848 site visits were conducted. When an employer fails to implement or document one or more approved measure(s), staff will issue a ‘Request for Documentation’ (RFD) to resolve the matter. During this year, staff issued 638 RFDs. ENFORCEMENT Enforcement is initiated when an employer fails to respond to staff’s outreach regarding a pending delinquency. Enforcement activities occurring during FY11 are as follows: ● Eighty-three (83) Notices of Violation (NOV) were issued for failure to submit a plan, supply documentation or appoint a Transportation Coordinator. ● No formal legal action was taken and no civil penalties were levied in FY11.