2003-2004 ANNUAL REPORT About the District Table of Contents About the District Before the Flood Control District's inception in 1959, severe flooding occurred throughout much of the County, primarily during the winter rains and summer monsoon. By establishing the District, the Arizona State Legislature created an organization charged with keeping County residents safe from flood hazards and established an independent funding source for essential projects. Today, through effective engineering, dam and channel construction, regulation, and public education, massive flooding is less of a hazard. The District, as created, is a municipal corporation and political subdivision of the State of Arizona. The Maricopa County Board of Supervisors also serves as the District's Board of Directors, who in turn receive counsel from the Flood Control Advisory Board, comprised of county citizens. Under the state's enabling legislation, the District is designated as a special taxing district, and as such, is given the authority to levy a secondary property tax on parcels within Maricopa County. Additional revenue are derived from other sources including the sale or lease of rights-of-way, fees that developers and individuals are required to pay to obtain building permits within Maricopa County and cost-sharing arrangements with the State of Arizona, County, cities and other agencies. 1 Chairman's Message 2 Flood Control Advisory Board 2 Flood Control Board of Directors 3 Chief Engineer and General Manager's Message 4 Mission and Vision 5 District Programs 5 Division Highlights 6 and 7 Financial Commentary 8 and 9 Statement of Revenues and Expenditures 10 Capital Improvement Expenditures 11 About Maricopa County 12 Governing Boards Chairman's Message The work of the Flood Control District continues to preserve many of our natural resources while helping to rejuvenate and revitalize some lost assets. The District has recognized that rivers are a unique and valued aspect of our communities and to the industries dependent on water. As riverbeds in Arizona have become endangered, they have become less and less inviting. Through the diligent work of the District, rivers throughout Maricopa County are being restored to maintain their flood carrying capabilities and public amenities are being created and preserved for the enjoyment of future generations. Through responsible land planning and creative development Maricopa County residents will be able to enjoy the many wonders of the native desert environment. The District has established goals above and beyond the basics of flood control while maintaining its original mission. Staff members have been progressive yet fiscally responsible in their efforts to protect and educate county residents and resources while establishing multiuse facilities. Andrew Kunasek District 3 The County's future is bright as the District works hard to enhance the environment. Through its environment friendly projects the District will create multi-use areas that will be embraced and enjoyed by our great-grand children. Flood Control District of Maricopa County 2004 Board of Directors Chairman Flood Control Advisory Board Scott Ward District 1 Melvin Martin District 5 Kent Cooper District 2 Hermant Patel District 3 Paul Cherrington Salt River Project Shirley Long District 4 Tom Callow City of Phoenix The Flood Control District Advisory Board (FCAB) acts in an advisory role to the Board of Directors on flood control, floodplain management, drainage and related matters. The FCAB reviews planning, operations and maintenance of flood control facilities, reviews program priorities and new policies, and recommends an annual budget to the Board of Directors that includes a five-year Capital improvement program (CIP). The FCAB consists of seven members. Five are appointed by the Board of Supervisors for five-year terms. In addition to those five members, the Salt Rover Project and City of Phoenix appoint representatives who are ex officio members of the board. The FCAB members also serve as members of the District Floodplain and Drainage Review Boards. Don Stapley District 2 Fulton Brock District 1 Flood Control District Board of Directors Andrew Kunasek District 3 Max Wilson District 4 The Flood Control District is governed by a fivemember Board of Directors, who also serve as the Board of Supervisors for Maricopa County. The Board of Directors exercises all the powers and duties in the acquisition and operation of District properties, contracting, and carrying out regulatory functions as ordinarily exercised by governing bodies. Board members elect a new chairman each year. The chairman conducts the meetings of the Board of Directors, which generally follow the meetings of the Board of Supervisors. Mary Rose Wilcox District 5 3 General Manager’s Message The Flood Control District of Maricopa County (District) was formed 45 years ago to specifically address flooding issues throughout the County. Even though we live in a desert, floods occur due to the unique character of the desert and two distinct rainy seasons that occur in the summer and winter. In fact, some portion of Maricopa County generally experiences flooding at least once a year. The District has made a lot of progress over the years, yet work remains as the County continues to be one of the fastest growing in the United States. Unprecedented growth has resulted in development beyond the flood control structures built during the 1960s and 1970s. As the District strives to stay ahead of development, it faces new issues and opportunities. Historically, the District has focused on building dams, basins and channels. As we move forward, and our population continues to grow, we will use dynamic flood education programs to inform the public of this hazard potential; identify specific hazard areas so residents will make better decisions about where to build; and control development that directly impacts rivers and washes through our mandated drainage administration and flood plain management regulation program. As we build flood control structures throughout the County and within our client cities, we have been challenged to move away from the traditional hardened, concrete lined structures, to softer more aesthetic channels and basins that provide quality open space and multi-use opportunities coincident with flood protection. Our challenge is to make the most of all of these programs while minimizing our costs. In the finest tradition of the Flood Control District, we will continue to respond to the threat of significant rainfall, runoff and potential flooding by expanding our efforts to provide the public protection; loss of life and loss of property, from major storm events Tim Phillips, PE Acting Chief Engineer and General Manager 4 Mission and Vision The mission of the Flood Control District of Maricopa County is to provide regional flood hazard identification, regulation, remediation, and education to Maricopa County residents so that they can reduce the risk of injury, death, and property damage from flooding, while still enjoying the natural and beneficial values served by floodplains. The District's vision is for the residents of Maricopa County and future generations to have the maximum level of protection from the effects of flooding through fiscally responsible flood control actions and multi-use facilities that complement and enhance the beauty of our desert environment. We pledge to be responsive to our clients in an efficient, effective, and fiscally responsible manner. We will show personal integrity and professionalism in all our actions, and display continuous improvement, innovative thinking, and technical expertise. We will be stewards of the environment and the public’s trust, and we will be concerned about the effects of our actions on not only the current, but also future generations. District Programs The Flood Hazard Education program supplies usable information to the public enabling them to be more knowledgeable about the risks of floods and flood hazards, and the Flood Control District projects, studies, and activities that will affect them. The Flood Hazard Identification program provides for the identification of, and alternative solutions for flood hazards, and flood warning data to public and private organizations allowing them to incorporate this information of flood hazards into their plans within presently developed and future urban growth areas. The Flood Hazard Regulation program offers guidance, direction, and enforcement to the public so that they can avoid causing adverse impacts to floodplains, and use their property safely and in compliance with applicable state and federal laws. The Flood Hazard Remediation program protects members of the public from flood hazards through structural mitigation and buyout so that they can live with an lower risk of loss of life or property due to flooding. 5 2003-2004 Flood Control District Highlights The District continues to place emphasis on creating more community friendly facilities through cost-sharing arrangements with cities and developers, and recently completed the first phase of assessing the safety of its 22 dams, which provide critical flood protection. Digital Flood Insurance Rate Maps Project Division Highlights Engineering Division In-house engineering staff, for two jobs that were put out to bid, completed plans and Specifications for construction: ACDC Skunk Creek Low Flow Channel, Bids opened July 2003 The federal government has been struggling for years to keep flood maps up to date for over 19,000 communities in the US. Currently more than two-thirds of the maps are at least ten years old. To alleviate this problem, Federal Emergency Management Agency (FEMA) created a partnership program that would use local resources in the production of the maps. The District decided to be a Cooperating Technical Partner (CTP) to FEMA for the production of Maricopa Digital Flood Insurance Rate Maps (DFIRM). The decision was made in July of 2003 and the GIS started the generation of new DFIRM maps with the help of all other divisions. The project entailed the digitization and production of over 300 flood insurance maps, the printing of the maps according to FEMA specifications and the delivery of the digital data according to FEMA's database standards. After six months the maps were completed and ready to be distributed to the rest of the communities in Maricopa County for review. Since then, FEMA has updated the standards and changed the specifications for the maps. The District is currently in the process of updating the maps to reflect the new data required by FEMA. By having the DFIRM, the District will be providing benefits to a broad array of stakeholders such as community planners, local officials, builders and developers, insurance agents, companies, lending institutions and mainly home and business owners that will have the information available at their fingertips via the internet. 6 Hawes Road Channel Improvements, Bids opened October 2003 Information Technology Data Distribution The District acquires large quantities of information every year for ADMS and floodplain delineation studies. Data includes aerial photography, topographic mapping and other information that is received and stored by the GIS branch. This data is very valuable to the engineering/consulting community, the real estate community, college students and regular citizens of Maricopa County. The GIS branch generated approximately $240K dollars in revenue during FY 2004 by selling and providing this information. We have received many letters from individual citizens, the consulting community and academia, thanking the District for the excellent job we are doing providing this information in a very timely manner and with savings to all people involved. Lands and Right-of-way Through the District's Property Management Branch, a comprehensive enforcement agreement was worked out with the City of Phoenix Parks Department, Phoenix Police Department, the District, and County Environmental Services, toward getting control of illegal trespass use of the Cave Buttes Dam impoundment area. Much of this trespass activity was creating dust and air quality problems that had placed the District on notice regarding non-compliance with EPA standards for dust particulates. Through this collaborative effort, control of the property has been restored. Vegetation is once again growing. Law enforcement action has deterred offroad vehicle and other non-authorized uses which had previously denuded surface areas and caused monetary damage to many of the structures at this project. The success of this pilot law enforcement partnering has surpassed expectations, and will serve as the model for future efforts at other projects. The District's Acquisition staff successfully completed the purchase of 72 residences in Phoenix, for the Bethany Home Outfall Channel project. Of the 72 homes purchased, only one home had to be acquired via condemnation, and that was only because of a complicated title question, not due to any contention on behalf of the owner. The District also successfully completed the acquisition of several basin sites in the East Valley which are now being planned for construction in upcoming years, and are being negotiated with local jurisdictions for multiple use opportunities. Web Site Operations and Maintenance Web Site General Statistics Completed 70 percent of work orders issued, a 9 percent increase over the previous year. Hits Entire Site (Successful) Average per Day Home Page Planning and Project Management Page Views Page Views Average per Day Average per Unique Visitor Document Views 850,670 2,324 16 850,653 Visits Visits Average per Day Visits Referred by Search Engines Visits from Spiders 282,420 771 360 17,685 One major project was completed: Carefree Drainage Master Plan June 2004 Three ADMS/ADMP projects continue: Rio Verde, started May 2002 Wittmann, started April 2003 Buckeye/Sun Valley, started June 2003 Continuing WCMPs Lower Hassayampa, started May 2004 El Rio, started August 2002 CIP projects currently in Construction: Doubletree Ranch Road, Phase I & II, started March 2004 Bethany Home Outfall Channel, started January 2003 Laveen Area Conveyance Channel, started August 2004 43rd Avenue/Southern Avenue Basin, started November 2003 Regulatory Completed four floodplain delineation studies for 450 miles of watercourses within the county providing the basis to regulate growth in flood hazard areas Floodplain Management Delineations Begun: New River West Tributaries FDS, January 2004 Lower Hassayampa River Watercourse Master Plan, May 2004 Lower Centennial Watershed Tributaries Zone A FDS, June 2004 Delineations Completed and sent to FEMA: North Scottsdale FDS, September 2003 Bullard Wash FDS Upstream of Indian School Road, September 2003 Camelback Road Wash FDS, December 2003 Jackrabbit Wash Watershed FDS Phase 2, February 2004 Durango ADMP FDS, April 2004 CLOMR for Bullard Wash Channel Improvements, May 2004 Carefree ADMP FDS, June 2004 12,382,810 33,832 163,482 Visitors Visitors Unique Visitors 51,260 Visitors Who Visited Once 37,695 Visitors Who Visited More Than Once 13,565 Flood Detection & Data Collection New ALERT Gauges 4 Gauge Repair Visits 944 Alert Page Visits Warning Messages & Alerts 19,222 456 Drainage Administration Inspections Conducted Miles driven by inspectors Permits reviewed 14,993 135,517 8562 Total plan reviews completed 815 Drainage complaints 343 Floodplain use Permits Approved 177 Floodplain Clearances Approved 275 Floodplain Management Delineations Begun 3 Delineations Completed 7 Floodplain Use Permits Phone Requests Walk-in Customers Flood Hazard Info Requests Flood Hazard Info Notices 177 2451 774 6,137 30 7 Financial Commentary Management Discussion and Analysis Improvement in the national and local economy experienced during the District's 2004 Fiscal Year had a direct and favorable impact upon the District's financial operations. The Operating and Capital Improvement Program financial results of operations showed a significant improvement over that achieved in Fiscal Year 2003. Continuing growth in the housing and business development construction sectors of the economy allowed for increased District revenue without the need for an increase in the Flood Control Secondary Property Tax Rate. The increased revenue was utilized, in part; to continue to fund the District's statutorily mandated responsibilities of education, regulation, floodwater mitigation and existing infrastructure maintenance. Evidence of the District's continuing commitment to its mandated responsibilities can be seen in increased FY 2004 funding for the Planning, Floodplain Delineation, Regulation, Maintenance and Dam Safety Programs. (Please see chart) The improving local economy allowed the District's Capital Project Cost Share Partners (municipalities, state agencies, developers, etc.) to commit funding to several infrastructure design and construction efforts that had been on hold pending greater assurance of future tax revenues. Prior District management of Capital Project planning and prioritization placed the District in position to participate in these efforts as local funding became available. Fiscal Year 2003/2004 Year End Expenditure Comparative Preliminary & Unaudited Title/Description Actual FY 2004 Flood Warning $693,981 Delineations $1,545,990 Regulation of Floodplains $511,309 Floodplain Hydrology Computer Modeling $308,823 Regulation of Drainage $1,792,245 Water Quality $592,395 Hydrometeorolgy $382,687 District Land Management $737,635 Planning Studies $2,795,058 Dam Safety Investigations $683,031 Structures Maintenance $3,478,579 Capital Improvement Program $40,773,261 Other Direct Service Expenses $1,275,873 $832,029 $1,367,979 $846,703 $95,878 $1,761,223 $424,795 $507,396 $456,682 $5,862,108 $768,680 $4,317,406 $47,719,674 $2,716,390 $55,570,867 $67,676,943 $5,046,140 $1,122,858 $5,091,889 $1,136,127 $61,739,865 $73,904,959 Administration Control Service Alloc Total Expenditures 8 Actual FY 2003 Revenue Capital Improvement Program The District recorded Fiscal Year total revenues of $70,729,165 was 93.1% of the total budgeted amount of $75,992,743. The variance to budget was primarily the result of a District management decision not to sell certain excess land parcels during FY 2004, but to retain the land assets in anticipation of improved real estate conditions in future fiscal years. This decision was made with consideration to the District's forecasted Fund Balance position and FY 2005 funding requirements. During Fiscal Year 2004, the District utilized approximately 91% of the Capital Funds available for the design, construction and land acquisition required for capital infrastructure projects. This performance compares very favorably to the 84% utilization rate achieved during FY 2003. Several major flood mitigating projects that had been delayed as the result of the sluggish economy were significantly advanced during the year and are anticipated to carry into FY 2005. All other categories of revenue collection closely approximated FY 2004 budgeted expectations and showed a significant improvement over the results achieved in FY 2003. This was particularly true for Intergovernmental Cost Share revenue (an increase of $1,922,696) and License and Permitting revenues (an increase of ($241,014). Flood Control District Treasury Fund Balance The District's FY 2004 ending Treasury Fund Balance of $30,052,736 represents a decrease of $3,110,854 from the beginning fund balance of $33,163,590. The decrease is the result of management's determination to continue an aggressive Capital Program under favorable conditions while simultaneously advancing the District's mandated responsibilities. The ending fund balance of $30,052,854 places the District in a highly favorable financial position to continue this policy. Operating Expenditures FY 2004 total Operating Expenditures of $26,185,285 represent 95.3% of the total year budgeted expenditures of $27,484,663. The 95.3% funds utilization rate favorably compares to the 96% rate achieved during FY 2003 and continues the District's financial history of aggressively funding its statutorily mandated responsibilities. During FY 2004 expenditures for the Flood Warning System, Planning Studies, Hydrometeorology Studies, Infrastructure Maintenance and the Dam Safety Program were materially increased, while spending for administrative overhead was held essentially flat compared to FY 2003. 65.24% Capital Improvement Program Fiscal Year 2004 Treasury Fund Balance Analysis Preliminary & Unaudited FY 2004 Beginning Fund Balance Add FY 2004 Revenue Collections Total Funds Available for Operations $33,163,590 $70,729,165 $103,892,755 Less FY 2004 Expenditures Operating Expenditures -$26,185,285 Capital Improvement Program -$47,719,674 Total FY 2004 Expenditures Fiscal Year Closing Adjustments Ending Treasury Fund Balance 5.75% 1.07% 6.38% 0.88% 0.66% 0.75% 2.62% 0.3% 1% 2.15% 1.13% 1.67% 7.47% 2.94% -$73,904,959 $64,940 $30,052,736 Structures Maint Dam Safety Investigations Planning Studies District Land Mgmt Hydrometeorolgy Water Quality Regulation of Drainage Floodplain Hydrology Computer Modeling Regulation of Floodplains Delineations Flood Warning Cntrl Srvc Alloc Administration Other Direct Service Expenses Fiscal Year 2004 Statement of Revenues and Expenditures Preliminary and Unaudited FY 2004 Budget As Revised** FY 2004 Actual $51,153,993 $137,612 $1,800,700 $16,554,000 $391,606 $5,954,832 $50,550,367 $152,557 $2,000,338 $16,405,251 $326,565 $1,294,087 -$603,626 $14,945 $199,638 -$148,749 -$65,041 -$4,660,745 $75,992,743 $70,729,165 -$5,263,578 $8,283,976 $324,533 $39,050 $2,409,250 $0 $8,643,777 $226,658 $80,958 $2,287,384 $32,580 -$359,801 $97,875 -$41,908 $121,866 -$32,580 $11,056,809 $11,271,357 -$214,548 $0 -$229,529 $71,058 -$480,147 -$71,058 $250,618 -$229,529 -$409,089 $179,560 $833,605 $144,985 $45,054 $968,606 $153,479 $106,451 -$135,001 -$8,494 -$61,397 Total Supplies Expense $1,023,644 $1,228,536 -$204,892 Legal Expense Professional Services Other Services Inter-County Service Charges County Central Cost Allocation $346,000 $10,513,909 $870,116 $1,696,584 $1,206,127 $456,980 $9,306,807 $782,109 $1,687,465 $1,136,127 -$110,980 $1,207,102 $88,007 $9,119 $70,000 $14,632,736 $13,369,488 $1,263,248 $65,353 $802,450 $133,200 $6,126 $594,544 $124,323 $59,227 $207,906 $8,877 $1,001,003 $724,993 $276,010 27.6% $27,484,663 $26,185,285 $1,299,378 4.7% $2,296,000 $5,380,000 $20,863,000 $23,804,000 $301,000 $1,759,692 $6,445,364 $16,905,146 $22,609,472 $0 $536,308 -$1,065,364 $3,957,854 $1,194,528 $301,000 $52,644,000 $47,719,674 $4,924,326 9.4% $80,128,663 $73,904,959 $6,223,704 7.8% Variance Variance % REVENUE Secondary Property Taxes Payments in Lieu of Taxes Licenses & Permits Intergovernmental Revenue Fund Balance Interest Earnings Miscellaneous Revenue TOTAL REVENUE -6.9% OPERATING EXPENSE Salaries and Wages Temporary Labor Overtime Pay Employee Benefits Other Personnel Expenses Total Payroll Personnel Transfers - In Personnel Transfers - Out Total Personnel Transfers General Supplies Equipment Fuel Non-Capital Equipment Acquisitions Total Outside Service Expense Capital Equipment Acquisitions Capital Vehicle Acquisitions Capital Lease Payments Total Capital Acquisition Expense TOTAL OPERATING EXPENSE -1.9% N/A -20.0% 8.6% CAPITAL IMPROVEMENT PROGRAM Force Account Labor Engineering (Outside Services) Land Acquisition Expense Construction Project Reserve TOTAL CAPITAL PROGRAM EXPENSE TOTAL FY 2004 EXPENDITURES ** Budget was amended through the Agenda Item Process during the course of Fiscal Year 2004 10 Capital Improvement Program Expenditures Project Central Chandler Area City Of Scottsdale Force Acct Labor Relocation & Construction Total $904,597 $985,470 $1,813 $10,869 Dam Safety Program $56,271 South Phoenix Drainage Land Cost $80,873 Town Of Guadalupe Alma School Drain Outside Services $1,813 $2,904 $29,764 $579,047 $635,318 $1,053 $412,265 $314,499 Paradise Valley, Scottsdale, Phoenix $82,508 $77,293 $109,755 $43,537 $493,631 $94,000 $95,053 $7,555,551 $8,775,946 $159,801 East Maricopa Floodway $58,279 $5,335,256 $66,500 $5,569,789 Salt/Gila River $13,814 Arlington Valley $11,252 $124,115 $985,510 $1,120,877 McMicken Dam $53,715 $690,053 $3,552 $747,320 $13,814 Buckeye/Sun Valley ADMP $3,880 $3,880 Cave Buttes Dam $6,962 $6,962 Skunk Creek Channelization $60,381 $4,090 $501 $4,438 $2,500 $8,183 $15,121 Skunk Creek/New River $46,827 $412,951 $4,600 $464,378 Spookhill Watershed ADMP $16,135 $26,774 $2,137,993 $2,180,902 Southeast Mesa ADMP $160,767 $151,706 $620,960 Glendale/Peoria ADMP $44,224 $101,367 $1,500 $147,091 White Tanks ADMP $159,168 $1,141,759 $2,767,255 $4,068,182 Queen Creek ADMP $46,224 $503,606 $305 New River Dam $1,112,457 $2,591,130 $976,450 $3,524,563 $1,526,585 Higley ADMP $6,624 Adobe Dam ADMP $1,456 $133,002 $31,558 $304,472 $2,024,287 ACDC ADMP $153,025 $70,671 $75 $4,921,227 $5,144,998 Maryvale ADMP $218,584 $1,588,386 $2,517,685 $4,357,797 $8,682,451 $27,568 $98,477 Durango ADMS Metro ADMP $949 $1,177,428 $7,573 $134,458 $2,360,317 $126,044 $1,759,692 $6,445,364 $16,905,146 $22,609,472 $47,719,674 11 About Maricopa County Established: Feb 14, 1871 Population: approximately 3,200,000 Budget: $2.5 Billion (02-03) Size: 9,226 square miles 4th most populous county in US 14th largest county in the US Maricopa County, named after the Maricopa Tribe, was created from portions of Pima and Yavapai counties in 1871. It was the fifth county formed in Arizona, and eventually portions were used to create Gila and Pinal counties. In the late 19th century, citizens living far south of Prescott, the territorial capital and site of the Territorial Legislature, petitioned for a more local seat of government. Residents of the Salt River Valley and the Gila River area wanted a new county in their respective locations. After weighing both proposals, the Legislature agreed with the Salt River Valley group and created Maricopa County. This metropolitan area is home to the state capitol as well as high-tech, manufacturing, service and agricultural industries, 15 institutions of higher learning, various cultural and professional sports attractions; major league professional basketball (Phoenix Suns and Phoenix Mercury), football (Arizona Cardinals), hockey (Phoenix Coyotes) and baseball's 2001 World Champion Arizona Diamondbacks. Today Maricopa County measures 9,224 square miles, 21 square miles of which is water. Five major river systems flow through the county draining an area of approximately 57,000 square miles, which includes portions of New Mexico and Mexico. Thirty-one percent of this area is owned individually or by corporation, and 41 percent is owned by the U.S. Bureau of Land Management. The U.S. Forest Service and the State of Arizona each control 11 percent of the County; an additional one percent is owned publicly. Almost four percent is Indian reservation land. Parts of western Maricopa County has 11 designated Enterprise Zones as well as central and southern areas in the City of Phoenix. Nearly 60 percent of Arizona's population resides in Maricopa County, which includes the cities of Phoenix, Tempe, Mesa, Chandler, Scottsdale, Glendale, Peoria, and Gilbert. The County has been consistently one of the fastest growing counties in the country during the last decade. Monthly Average Temperatures Maricopa County enjoys an average annual daily temperature of 72 degrees with 300 days of sunshine per year. Jan Avg temp (F) 53 Avg max temp (F) 66 Avg min temp (F) 41 Feb 57 71 45 Mar 62 76 49 Apr 69 85 55 May 78 94 64 Jun 88 104 73 Jul 93 106 81 Aug 91 104 79 Sep 85 98 73 Oct 74 88 61 Nov 61 75 49 Dec 54 66 42 Aug Sep 1.0 0.7 Oct 0.6 Nov Dec 0.6 0.9 Monthly Average Rainfall Maricopa County has an average rainfall of only 7.6 inches per year inches 12 Jan 0.8 Feb 0.7 Mar Apr 0.9 0.2 May Jun 0.1 0.1 Jul 0.8 Flood Control District of Maricopa County 2 8 0 1 We s t D u ra n g o S t re e t Phoenix, Arizona 85009 (602) 506-1501 www.fcd.maricopa.gov