CMAQ DETAILED PROJECT LISTING REPORT ( FY 2013 ) 06-March-2015 Fiscal Year = '2013' and Status Selection Criteria = 'ALL' and State = 'Arizona' STATE Arizona Apportion ments APPORTION. AMOUNT OBLIGATED AMOUNT $0 $41,367,207 OBLIG. % PROJECT AMOUNT PROJECT TYPE PROJECT TITLE & DESCRIPTION VOC (Kg/ Day) CO (Kg/ Day) NOx (Kg/ Day) PM 10 (Kg/ Day) 0% Arizona $1,579,761 I/M and Other TCMs Phoenix: Pave unpaved alleys Pave 38.1 miles of unpaved alleys 147 Arizona $1,414,500 I/M and Other TCMs Phoenix: Pave unpaved alleys Pave 31.8 miles of unpaved alleys 615 Arizona $1,227,728 I/M and Other TCMs Maricopa Association of Governments: PM-10 Certified Street Sweepers Purchase PM-10 certified street sweepers region wide 667 Arizona $1,000,000 I/M and Other TCMs Salt River Pima-Maricopa Indian Community: Pave unpaved roads Right-of-way for pave unpaved roads for approximately 5.4 miles on Center Rd; Mesa Dr; McDonald Dr; and Alma School Rd 884 Arizona $961,105 I/M and Other TCMs Tempe: Alley stabilization Construct 10.5 mile alley stabilization project in North Tempe Neighborhood area 53 Arizona $747,823 I/M and Other TCMs Tempe: Alley stabilization Construct 7.8 mile alley stabilization project in Holdeman Neighborhood area 166 Arizona $741,198 I/M and Other TCMs Chandler: Pave unpaved alleys Pave unpaved alleys for a length of 9.68 miles. 50 Arizona $581,180 I/M and Other TCMs Surprise: Pave unpaved shoulders Pave unpaved shoulders at various locations on 10 segments including Cactus Rd from 143rd Ave to Bullard Ave 17 Page 1 of 9 PM 2.5 (Kg/ CO2 (MT/ Day) CONTINUIN G PROJECT? CMAQ DETAILED PROJECT LISTING REPORT ( FY 2013 ) 06-March-2015 Fiscal Year = '2013' and Status Selection Criteria = 'ALL' and State = 'Arizona' STATE Apportion ments APPORTION. AMOUNT OBLIGATED AMOUNT OBLIG. % PROJECT AMOUNT PROJECT TYPE PROJECT TITLE & DESCRIPTION VOC (Kg/ Day) CO (Kg/ Day) NOx (Kg/ Day) PM 10 (Kg/ Day) Arizona $554,144 I/M and Other TCMs Maricopa County: Pave unpaved roads Design and construct pave unpaved road on 87th Ave from Deer Valley Rd to Peoria city limits 25 Arizona $482,057 I/M and Other TCMs Tempe: Alley stabilization Construct 4.5 mile alley stabilization project in Evergreen Neighborhood area bounded by Broadway Rd; the Price Fwy; Southern Ave and the eastern city limits 23 Arizona $277,215 I/M and Other TCMs Maricopa County: Pave unpaved roads Design various low volume roads in the Dove Valley area 350 Arizona $249,518 I/M and Other TCMs Buckeye: Pave unpaved road Design and construct pave unpaved road on N Watson Rd and MC85 Phase I and Phase II 41 Arizona $220,000 I/M and Other TCMs Maricopa County: Pave unpaved roads Design paving project at seven locations in the New River area for 4.37 miles 309 Arizona $215,000 I/M and Other TCMs Buckeye: Pave Unpaved Road Design pave unpaved road on Watson Rd 650 feet North of Van Buren St to McDowell Rd 237 Arizona $50,000 I/M and Other TCMs Phoenix: Pave unpaved alleys Design 29.3 miles of unpaved alleys in various locations in twelve quarter sections 113 Arizona $37,500 I/M and Other TCMs Maricopa County: Pave Unpaved Roads Design pave dirt road on Rockaway Hills Dr from beginning of Maintenance to End of Maintenance a distance of approximately 0.7 mile 114 Page 2 of 9 PM 2.5 (Kg/ CO2 (MT/ Day) CONTINUIN G PROJECT? CMAQ DETAILED PROJECT LISTING REPORT ( FY 2013 ) 06-March-2015 Fiscal Year = '2013' and Status Selection Criteria = 'ALL' and State = 'Arizona' STATE Apportion ments APPORTION. AMOUNT OBLIGATED AMOUNT OBLIG. % PROJECT AMOUNT PROJECT TYPE PROJECT TITLE & DESCRIPTION VOC (Kg/ Day) CO (Kg/ Day) NOx (Kg/ Day) PM 10 (Kg/ Day) Arizona $2,946,039 Pedestrian/Bicycle Glendale: Multi-use path Construct New River east bank multi-use path and underpasses between Northern Ave to Bethany Home Rd 1 1 1 1 Arizona $2,349,956 Pedestrian/Bicycle Tempe: Bicycle and pedestrian facilities Construct bicycle and pedestrian facilities for 1.0 mile on University Dr - Priest Dr and Union Pacific Railroad 1 1 1 1 Arizona $1,811,884 Pedestrian/Bicycle Tempe: Pedestrian and bicycle facilities Construct 1.0 mile pedestrian and bicycle improvements on Hardy Dr from University Dr to Broadway Rd 1 1 1 1 Arizona $961,861 Pedestrian/Bicycle Tempe: Multi-use path Construct 1.0 mile multi-use path along Salt River from Interstate-10/Tempe Drain to Priest Dr 1 1 1 1 Arizona $455,469 Pedestrian/Bicycle Phoenix: Pedestrian facilities Construct Pedestrian Enhancement on 32nd Street from Washington St to McDowell Rd 1 1 1 1 Arizona $320,000 Pedestrian/Bicycle Cave Creek: Bicycle lanes Design bike lanes on Cave Creek Rd from Carefree Hwy to Pima Rd 1 1 1 6 Arizona $217,000 Pedestrian/Bicycle Avondale: Multi-use path Design asphalt path and underpass at Interstate-10 and Agua Fria River 1 1 1 1 Arizona $146,500 Pedestrian/Bicycle Mesa: Multi-use path Design multi-use path along Rio Salado 1 1 1 1 Page 3 of 9 PM 2.5 (Kg/ CO2 (MT/ Day) CONTINUIN G PROJECT? CMAQ DETAILED PROJECT LISTING REPORT ( FY 2013 ) 06-March-2015 Fiscal Year = '2013' and Status Selection Criteria = 'ALL' and State = 'Arizona' STATE Apportion ments APPORTION. AMOUNT OBLIGATED AMOUNT OBLIG. % PROJECT AMOUNT PROJECT TYPE PROJECT TITLE & DESCRIPTION VOC (Kg/ Day) CO (Kg/ Day) NOx (Kg/ Day) PM 10 (Kg/ Day) Arizona $99,000 Pedestrian/Bicycle Phoenix: Pedestrian facilities Design pedestrian facilities on Roosevelt St from 4th St to 7th St 1 1 1 1 Arizona $70,725 Pedestrian/Bicycle Youngtown: Multi-use path Design 5.0 mile multi-use path on Grand Ave and 111th Ave to Olive Ave and Agua Fria Pkwy 1 1 1 1 Arizona $942,373 Shared Ride Maricopa Association of Governments: Trip Reduction Program Maricopa County Trip Reduction Program 100 1,297 273 137 Arizona $606,065 Shared Ride Maricopa Association of Governments: Regional Rideshare and Telework Program Regional Rideshare and Telework Program 57 744 157 79 Arizona $135,000 Shared Ride Maricopa Association of Governments: Travel Reduction Program Capitol Rideshare Program 1 9 2 1 Arizona $972,721 Traffic Flow Improvements Glendale: Intelligent Transportation Systems project Install variable message signs including ITS conduit and fiber on 59th Ave; Northern Ave; Bethany Home Rd; Glendale Ave; 51st Ave and 67th Ave; Peoria Ave; 47th Ave and 67th Ave 3 26 7 1 Page 4 of 9 PM 2.5 (Kg/ CO2 (MT/ Day) CONTINUIN G PROJECT? CMAQ DETAILED PROJECT LISTING REPORT ( FY 2013 ) 06-March-2015 Fiscal Year = '2013' and Status Selection Criteria = 'ALL' and State = 'Arizona' STATE Apportion ments APPORTION. AMOUNT OBLIGATED AMOUNT OBLIG. % PROJECT AMOUNT PROJECT TYPE PROJECT TITLE & DESCRIPTION VOC (Kg/ Day) CO (Kg/ Day) NOx (Kg/ Day) PM 10 (Kg/ Day) Arizona $943,000 Traffic Flow Improvements Maricopa County: Intelligent Transportation Systems project Install arterial dynamic message signs and associated conduit pull boxes fiber optic cable communication equipment and electrical service equipment on McDowell Rd at Avondale Blvd; McDowell Rd at Estrella Pkwy; and other various locations 8 75 19 3 Arizona $899,276 Traffic Flow Improvements Glendale: Intelligent Transportation Systems project Install ITS fiber optic cable and closed-circuit television cameras on Cactus Rd; Thunderbird Rd; and Greenway Rd 2 14 2 1 Arizona $848,700 Traffic Flow Improvements Goodyear: Intelligent Transportation Systems project Implement traffic signal system including installation of ITS backbone and communications equipment 15 118 49 5 Arizona $737,031 Traffic Flow Improvements Phoenix: Intelligent Transportation Systems project Construct Intelligent Transportation Systems fiber optic backbone Phase B-1 66 673 89 26 Arizona $726,110 Traffic Flow Improvements Tempe: Intelligent Transportation Systems project Procure and install traffic control cabinets and hardware citywide 1 4 1 1 Page 5 of 9 PM 2.5 (Kg/ CO2 (MT/ Day) CONTINUIN G PROJECT? CMAQ DETAILED PROJECT LISTING REPORT ( FY 2013 ) 06-March-2015 Fiscal Year = '2013' and Status Selection Criteria = 'ALL' and State = 'Arizona' STATE Apportion ments APPORTION. AMOUNT OBLIGATED AMOUNT OBLIG. % PROJECT AMOUNT PROJECT TYPE PROJECT TITLE & DESCRIPTION VOC (Kg/ Day) CO (Kg/ Day) NOx (Kg/ Day) PM 10 (Kg/ Day) Arizona $683,675 Traffic Flow Improvements Surprise: Intelligent Transportation Systems project Construct fiber optic interconnect to connect traffic interchange traffic signals; closed-circuit television cameras; dynamic message signs; and connection to ITS fiber backbone on Loop 303 from Peoria Ave to Mountain View Blvd 1 1 1 1 Arizona $660,100 Traffic Flow Improvements Arizona Department of Transportation: Freeway Management System Design Freeway Management System on Loop 202 Santan from Dobson Rd to Val Vista Dr 3 58 10 1 Arizona $549,362 Traffic Flow Improvements Mesa: Intelligent Transportation Systems project Install Anonymous Re-Identification (ARID) Sensors to Detect Travel Time and Traffic Incidents 15 145 39 6 Arizona $494,963 Traffic Flow Improvements Mesa: Intelligent Transportation Systems project Upgrade central traffic control system software to accommodate a lite version of adaptive control West Side Real Time Adaptive Project (initial deploy in Fiesta district) West city limits to Country Club Dr and Broadway Rd to Baseline Rd 5 45 12 2 Arizona $402,739 Traffic Flow Improvements Maricopa County: Intelligent Transportation Systems project Develop and implement arterial Advanced Traveler Information Systems (ATIS) Enhancements region wide 1 1 1 1 Page 6 of 9 PM 2.5 (Kg/ CO2 (MT/ Day) CONTINUIN G PROJECT? CMAQ DETAILED PROJECT LISTING REPORT ( FY 2013 ) 06-March-2015 Fiscal Year = '2013' and Status Selection Criteria = 'ALL' and State = 'Arizona' STATE Apportion ments APPORTION. AMOUNT OBLIGATED AMOUNT OBLIG. % PROJECT AMOUNT PROJECT TYPE PROJECT TITLE & DESCRIPTION VOC (Kg/ Day) CO (Kg/ Day) NOx (Kg/ Day) PM 10 (Kg/ Day) Arizona $400,000 Traffic Flow Improvements Glendale: Intelligent Transportation Systems project Install Traffic Management Center including the purchase of video wall and control equipment 28 232 63 14 Arizona $377,200 Traffic Flow Improvements Arizona Department of Transportation: Freeway Management System Rehabilitation Design Freeway Management System Rehabilitation region wide 14 285 49 3 Arizona $314,094 Traffic Flow Improvements Arizona Department of Transportation: Freeway Management System Construct Freeway Management System on Loop 202 Red Mountain from Loop 101 to Gilbert Rd 1 29 5 1 Arizona $300,000 Traffic Flow Improvements Maricopa County: Intelligent Transportation Systems project Design Adaptive Signal Control Technology (ASCT) deployment in Surprise; Glendale; Phoenix; and Scottsdale 1 2 1 1 Arizona $254,235 Traffic Flow Improvements Queen Creek: Intelligent Transportation Systems project Construct traffic signal and closed circuit television system on Ellsworth Rd from Sierra Park Blvd to Empire Blvd (Hunt Hwy) 1 3 1 1 Arizona $174,676 Traffic Flow Improvements Gilbert: Intelligent Transportation Systems project Design 3 miles of Gilbert Advanced Traffic Management System (ATMS) Fiber East Ring Project - Phase II for seven intersections near Baseline Rd and Val Vista Dr 2 17 5 1 Page 7 of 9 PM 2.5 (Kg/ CO2 (MT/ Day) CONTINUIN G PROJECT? CMAQ DETAILED PROJECT LISTING REPORT ( FY 2013 ) 06-March-2015 Fiscal Year = '2013' and Status Selection Criteria = 'ALL' and State = 'Arizona' STATE Apportion ments APPORTION. AMOUNT OBLIGATED AMOUNT OBLIG. % PROJECT AMOUNT PROJECT TYPE PROJECT TITLE & DESCRIPTION VOC (Kg/ Day) CO (Kg/ Day) NOx (Kg/ Day) PM 10 (Kg/ Day) Arizona $128,486 Traffic Flow Improvements Chandler: Intelligent Transportation Systems project Construct ITS fiber communications from signals on Ray Rd; Elliot Rd; and Dobson Rd connecting at Arizona Ave back to Traffic Management Center 2 11 6 1 Arizona $108,000 Traffic Flow Improvements Phoenix: Intelligent Transportation Systems project Design dynamic message signs on 7th Ave at Northern Ave; Glendale Ave; Camelback Rd; and McDowell Rd; and on 7th St at Bell Rd; Thunderbird Rd; Camelback Rd; and McDowell Rd 32 277 93 9 Arizona $94,300 Traffic Flow Improvements Phoenix: Intelligent Transportation Systems project Design fiber optic backbone expansion Phase B 92 930 123 36 Arizona $88,850 Traffic Flow Improvements Avondale: Intelligent Transportation Systems project Design ITS components on Dysart Rd from Rancho Santa Fe to Indian School Rd 1 9 1 1 Arizona $73,000 Traffic Flow Improvements Phoenix: Intelligent Transportation Systems project Design closed-circuit pan tilt zoom traffic monitoring cameras at 65 identified intersections 5 48 6 2 Arizona $56,580 Traffic Flow Improvements Peoria: Intelligent Transportation Systems project Design ITS upgrades the existing cabinets; traffic controllers; existing loop detection to video detection; and hardware and software on Peoria Ave; Northern Ave; and Olive Ave for an approximate distance of 15.0 miles 1 3 1 1 Page 8 of 9 PM 2.5 (Kg/ CO2 (MT/ Day) CONTINUIN G PROJECT? CMAQ DETAILED PROJECT LISTING REPORT ( FY 2013 ) 06-March-2015 Fiscal Year = '2013' and Status Selection Criteria = 'ALL' and State = 'Arizona' STATE Apportion ments APPORTION. AMOUNT OBLIGATED AMOUNT OBLIG. % PROJECT AMOUNT PROJECT TYPE PROJECT TITLE & DESCRIPTION VOC (Kg/ Day) CO (Kg/ Day) NOx (Kg/ Day) PM 10 (Kg/ Day) Arizona $47,150 Traffic Flow Improvements Maricopa County: Construct Intelligent Transportation Systems Design a multi-agency Operations Plan in the Southwest Valley from 99th Ave to Cotton Ln to include McDowell Rd; Van Buren St; MC85/Buckeye 1 1 1 Arizona $38,000 Traffic Flow Improvements Scottsdale: Highway Advisory Radio Design highway advisory radio 8 79 9 3 Arizona $36,000 Traffic Flow Improvements Tempe: Intelligent Transportation System project Design ITS project for fiber optic interconnection at various locations including Broadway Rd and Interstate-10 and Rio Salado and Loop 101 7 72 10 3 Arizona $5,308,358 Transit Valley Metro Rail: Fixed Guideway Corridor Tempe South Fixed Guideway Corridor Preliminary Engineering/Final Environmental Impact Statement 1 15 3 2 Arizona $3,900,000 Transit Valley Metro Rail: Light Rail Transit Light Rail Transit extension and right-of-way acquisition on Main St from Mesa Dr to Gilbert Rd 3 49 8 7 Arizona $350,000 Transit Maricopa Association of Governments: Southeast Valley Local Transit Study Southeast Valley Local Transit Study 1 6 2 1 Nationwide Totals . . . . $0 * States without ozone or CO Nonattainment or maintenance areas $41,367,207 0% QA - Qualitative Assessment PR - Previously Reported c - Changed benefit from previous year r Page 9 of 9 PM 2.5 (Kg/ CO2 (MT/ Day) CONTINUIN G PROJECT?