Capital Improvments Program FY 2004-09 CAUTION WHEN PRINTING USE PAGE RANGE CITY OF TEMPE Capital Improvements Program Budget FY 2003-05 Will Manley City Manager Patrick M. Flynn Assistant City Manager Jerry Hart Financial Services Manager Cecilia Velasco-Robles Deputy Financial Services Manager Debbie Bair Budget and Research Analyst Michelle Caruso Budget and Research Analyst Travis Clark Budget and Research Analyst Anita Erspamer Executive Assistant Natalie Winger Accountant CIP Message June 30, 2003 To the Honorable Mayor and Members of the City Council: Pursuant to the Tempe City Charter, the City Manager is to prepare and submit a Capital Improvements Program (CIP) annually to the Council. Due to the City’s Biennial Budget, we have transitioned to a six-year program to ensure the City has two distinct five-year capital programs contained within the Biennial Budget. The enclosed document represents this program. FY 2003-04 $365,533,968 2003-04 B IENNIAL B UDGET PROGRAM SUMMARY The total CIP budgets approximate $118 (FY 200304) and $177 million (FY 2004-05). Combined with $247 and $257 million operating budgets, the total financial programs are $365 and $434 million in fiscal years 2003-04 and 2004-05, respectively. CIP 32% Operating Budget 68% 2004-05 Although capital projects are scheduled throughout the six-year plan, only those projects during the first year of the plan are adopted as part of the City's annual budget. Even though Tempe has adopted a biennial budget plan, State law mandates that cities and towns adopt a budget annually. The remaining years within the CIP serve as a guide for future planning and are subject to annual review and modification in subsequent years. FY 2004-05 $433,744,628 CIP 41% Operating Budget 59% Fiscal Year Operating Budget Capital Budget Total ($ Millions) 2003-04 $247 $118 $365 2004-05 $257 $177 $434 Over the biennial budget period, the Capital Budgets consist of the following program areas: General Purpose, Transportation, Special Purpose, and Enterprise projects. General Purpose/ Transportation projects include police, fire, park, and street projects; Special Purpose includes Transit, Performing Arts and Rio Salado projects; and, Enterprise projects include water, wastewater, storm drain, cemetery and golf projects. CIP by Program ($ Millions) General Purpose Transportation Special Purpose Enterprise Total FY 2003-04 FY 2004-05 $7.6 11.2 64.2 35.0 $118.0 $12.3 6.3 104.0 154.4 $177.0 CIP PROCESS In late August, the CIP process began with the CIP Coordinating Committee meeting to review and discuss guidelines for the CIP process, budget request forms, and sources of funds. Over the ensuing months, a six-year capital program was developed, utilizing a select group of departmental representatives to form a Capital Improvement Program Executive Committee. This committee then recommended to the City Manager a comprehensive six-year capital program. On April 30th, the City Council held a public Issue Review Session to examine the capital program including funding sources, debt service requirements, operating budget impacts, and project priorities. As a result, and following the required public hearing, the City Council adopted the program on June 19, 2003. FINANCING OF THE CIP Traditionally, Tempe's capital program is funded primarily through the issuance of general obligation bonds. Even with such funding, the City finances a portion of the CIP from current operating revenues and through use of available fund balances. The CIP Source of Funds identifies various sources of funds for financing the City's FY 2003-05 capital program. Briefly, we have appropriated $117,968,707 and $176,983,222 for capital projects in the upcoming fiscal years 2003-04 and 2004-05. Of these amounts, the following table represents the various sources of funds by fiscal year, including general obligation and excise tax bonds, pay-as-you- go financing, outside revenues and capital projects fund balances. Sources of Funds ($ Millions) General Obligation/Excise Tax Bonds Pay-As-You-Go Financing Outside Revenue Capital Projects Fund Balance Total FY 2003-04 FY 2004-05 $78.0 31.2 8.1 $113.0 40.5 22.9 .7 .6 $177.0 $118.0 CIP/OPERATING BUDGET RELATIONSHIP The City of Tempe prepares a separate Capital Budget from the Operating Budget, but the two budgets are closely linked. The Capital Improvements Program (CIP) is a multi-year financial plan for the acquisition, expansion, or rehabilitation of infrastructure, and capital assets. Capital Projects typically apply to: (1) expenditures which take place over two or more years, requiring continuing appropriations beyond a single fiscal year; (2) funding with debt because of significant costs to be shared by current and future beneficiaries; (3) systematic acquisition over an extended period of time; and (4) scheduled replacement or maintenance of specific elements of physical assets. The Capital Budget, unlike the Operating Budget, is a six-year plan. Only those projects scheduled during the first year of the plan are adopted as part of the City’s Annual Budget. Total Impact of Capital Budget on Operating Budget 2003-04 2004-05 Existing Debt New Debt Enterprise Special Revenue Transportation General Purpose O&M by Project Pay-As-You-Go $24,569,738 $34,523,888 Total $69,728,808 $85,157,428 3,094,709 8,019,167 1,213,025 1,507,941 76,915 31,247,313 3,764,142 3,986,121 523,107 1,433,661 409,272 40,517,237 The above table provides a summary of the total impact of the Capital Budget on the Operating Budget. The estimated impact is $69.7 million in FY 2003-04 and $85.2 million in FY 2004-05. This includes debt service costs incurred from long term financing of capital projects approved this year and in prior years, operating and maintenance costs directly related to new capital projects, and “pay-asyou-go” financing of capital projects. As part of the Capital Improvement Program, departments were asked to identify those capital projects that have an impact on the operating budget. The following table summarizes the projected impact by project of the capital improvements on the operating budget for fiscal years 2003-05. DEBT MANAGEMENT PLAN The necessity to incur debt to finance the capital program carries with it the obligation to manage the debt program effectively. As a result, the level of outstanding debt and the City's capacity to incur and repay additional debt bear careful examination. In 1989 the City Council adopted a long-range debt plan for the City. Each year we update the debt plan revising assessed value, population, and operating revenue projections. The debt plan and our capital improvements program are linked to these factors. With the adoption of this plan and by utilizing these factors to size our debt program, the City has stabilized its outstanding debt while maintaining per capita debt costs well within stated guidelines. Such a plan has helped the City achieve bond rating upgrades over the last five years. For fiscal years 2003-04 and 2004-05, we plan to issue $23.0 million of general obligation and $96.0 million of excise tax-supported bonds. Over the sixyear capital program, we plan to issue $77.3 million of general obligation and $219.8 million of taxsupported bonds, all in accordance with our debt management plan. In addition to the above, we plan to issue approximately $85.0 million of Water/Wastewater general obligation bonds and $89.3 million of excise tax bonds over the next six years to finance improvements in this area. User fees will support the debt service costs on these bonds. The property tax rate will remain at $1.35 per $100 assessed valuation. No property tax increase is necessary to fund debt service requirements of the FY 2003-05 Capital Budget. Fitch: “AAA” 11/00 Moody’s: “Aa1”– 4/97 Standard & Poor’s: “AA+” 2/92 PAST AND FUTURE BOND PROGRAMS The capital improvements program, as well as debt management, is greatly facilitated when comprehensive bond authorizations, adequate to BOND RATING STATUS meet multi-year needs, are supported by the community. Generally, every five years since 1970 The City of Tempe enjoys excellent bond ratings Tempe voters have approved comprehensive bond indicating the City’s bonds are of the highest authorizations: $15.5 million in 1970, $39 million in 1975, $80 FY 2003-05 Operating Budget Impacts by Project million in 1980, $88 million in Fiscal Year 1985, $74.5 million in 1990, $90 Program 2003-04 2004-05 million in 1997, and $158 million in 2002. These Special Purpose authorizations have helped the Performing Arts Performing Arts Center 30,000 330,000 City finance a substantial Transit Western Canal Multi-Use Path 0 16,632 portion of its capital Total Special Purpose 30,000 346,632 improvement programs. Enterprise Water Kyrene Booster Zone New Production Wells Total Enterprise TOTAL PROGRAM investment quality. Currently, Tempe’s General Obligation Bond ratings are: in FY 2000-01, largely the result of decreases within the Transit and Rio Salado programs. The increase in the capital program from 2001-02 to 2002-03 can be attributed to the expansion of the City’s Water/Wastewater program, and to a new light rail system within the Transit capital program. The jump in the program from 2003-04 to 2004-05 is driven largely by Wastewater capacity expansion and 22,565 24,350 46,915 22,565 40,075 62,640 The following graph shows the City's capital improvement activity in the last four years $76,915 $409,272 and the proposed program for 2003-04 and 2004-05. As shown, our capital improvement budget decreases from $85.5 million in FY 1999-00 to $61.2 million construction of the Performing Arts Center. BIENNIAL HIGHLIGHTS Following are highlights from the biennial budget capital program: Continued funding for the Transit program ($139.4 million) including: CIP Funding Funding for the Central Phoenix and East Valley Light Rail Transit rail planning, design and construction ($125.8 million); Funding for the Transit Center ($5.9 million); and Funding for multi-use paths (phased) along the Western Canal ($4.7 million). 200,000 150,000 100,000 50,000 Bonds Operating and Outside 04 -05 03 -04 02 -03 01 -02 00 -01 99 -00 0 Continued funding for Wastewater projects ($46.3 million) including: st Continued funding for 91 Avenue Treatment Plant treatment capacity expansion ($24.6 million); Continued funding for the plant expansion at the Kyrene Water Reclamation Facility (KWRF) ($17.3 million); and Funding for Rural Road Influent Line to KWRF ($3.0 million). Continued funding for Water projects ($40.3 million) including: Continued funding for expansion and waterline improvements at the Johnny G. Martinez Water Treatment Plant (JGMWTP) ($31.2 million); Funding for waterline improvements along the Apache Blvd. corridor ($2.6 million); and Continued funding for the expansion of the Kyrene Booster Zone ($2.0 million). Continued funding for Transportation and rightof-way improvements ($17.6 million) including: Continued funding for local and major street renovation and reconstruction ($15.6 million). Funding for Police Property Facility/Apache Blvd. Police Substation ($7.5 million). Funding for including: Fire projects ($1.9 million) Funding for conversion to 800 telecommunication system ($1.3 million). MHz Completed funding for the North Side Multigenerational Complex ($1.9 million). CONCLUSION The preparation of the six-year capital program serves as an excellent guide for future planning. Given the debt plan approved by the City Council, the parameters established within this plan will guide the size of our future capital programs. While the debt plan may have the impact of slowing some capital programs down, it will not jeopardize critical capital improvements required in the City. Most of all, the debt program has positioned us well for the future, by slowing the growth of outstanding debt. In closing, the completion of a budget requires the effort of many people. To the Mayor, City Council, the City Manager, departmental managers and staff, and to the Budget Division whose efforts provided invaluable assistance to me in its preparation, I express my sincere appreciation. Respectfully Submitted, Jerry Hart Financial Services Manager Capital Improvements Program Summary 2003-04 Funded Program Program Enterprise Program Water $20,977,680 Wastewater 13,546,612 Golf 170,000 Cemetery 225,000 34,919,292 Subtotal Enterprise Special Purpose Program Transit 62,122,070 Performing Arts 1,863,320 Rio Salado 200,000 Total Special Purpose 64,185,390 General Purpose Program Police 794,300 Fire 1,900,000 Storm Drains 200,000 Park Improvements Recreation 1,873,000 Public Works 50,000 General Governmental Community Services 0 Development Services 930,000 Financial Services 167,000 Information Technology 725,000 Municipal Arts Program 345,243 Neighborhood Program 225,000 Public Works 447,000 Total General Purpose 7,656,543 Transportation Program Transportation and R.O.W. 10,262,482 Traffic Signals / Street Lighting 945,000 Total Transportation 11,207,482 Total General/Transportation 18,864,025 83,049,415 Subtotal Tax Supported TOTAL PROGRAM $117,968,707 2004-05 Funded Program $19,355,000 32,789,500 1,490,000 770,000 54,404,500 2005-06 Additional Needs 2006-07 2007-08 $7,933,000 $20,858,000 $20,983,000 27,722,201 13,164,394 10,112,620 50,000 50,000 50,000 1,400,000 0 0 37,105,201 34,072,394 31,145,620 77,324,792 88,018,672 26,107,768 22,228,912 526,269 4,435,545 103,958,829 114,683,129 86,096,440 0 4,090,000 90,186,440 3,243,110 0 875,000 4,118,110 2008-09 Total 6-Year Program $2,308,000 $92,414,680 7,900,209 105,235,536 50,000 1,860,000 0 2,395,000 10,258,209 201,905,216 0 316,805,084 0 50,200,000 125,000 10,251,814 125,000 377,256,898 6,715,950 0 200,000 12,522,814 0 200,000 150,000 0 250,000 1,490,000 127,330 250,000 3,672,000 2,134,484 250,000 25,345,064 4,161,814 1,350,000 2,335,000 50,000 1,060,000 50,000 9,560,000 50,000 310,000 50,000 310,000 50,000 15,448,000 300,000 0 930,000 175,000 725,000 521,445 225,000 402,000 12,279,395 200,000 1,648,750 175,000 225,000 356,552 225,000 707,000 17,370,116 0 1,777,150 175,000 725,000 340,224 225,000 402,000 13,654,374 0 1,062,750 175,000 225,000 310,956 225,000 402,000 4,628,036 0 1,062,750 175,000 725,000 102,082 225,000 402,000 9,108,316 200,000 7,411,400 1,042,000 3,350,000 1,976,502 1,350,000 2,762,000 64,696,780 5,395,498 5,771,061 5,542,878 4,837,804 3,775,398 35,585,121 945,000 945,000 995,000 995,000 995,000 5,820,000 6,340,498 6,716,061 6,537,878 5,832,804 4,770,398 41,405,121 18,619,893 24,086,177 20,192,252 10,460,840 13,878,714 106,101,901 122,578,722 138,769,306 110,378,692 14,578,950 14,003,714 483,358,799 $176,983,222 $175,874,507 $144,451,086 $45,724,570 $24,261,923 $685,264,015 Capital Improvements Program Source of Funds 2003-04 Funded Program 2004-05 Funded Program 2008-09 Total 6-Year Program $16,450,000 13,550,000 550,000 545,620 31,095,620 $4,950,000 4,500,000 250,000 508,209 10,208,209 $84,550,000 89,250,000 20,800,000 3,050,216 197,650,216 50,000 50,000 1,860,000 0 31,145,620 0 10,258,209 2,395,000 201,905,216 32,110 0 3,211,000 0 0 3,243,110 0 0 0 0 0 0 52,677,084 168,000,000 75,605,000 15,480,000 5,043,000 316,805,084 0 0 0 0 0 0 47,500,000 2,700,000 50,200,000 750,000 125,000 875,000 4,118,110 0 125,000 125,000 125,000 6,715,000 3,536,814 10,251,814 377,256,898 8,650,000 560,956 0 1,249,884 0 0 0 12,300,000 352,082 0 1,226,632 0 0 0 77,300,000 3,326,502 945,000 8,795,169 2,257,030 6,328,200 500,000 Additional Needs 2006-07 2007-08 Program 2005-06 Enterprise Supported Water/Wastewater General Obligation Bonds - W/WW $12,750,000 $19,100,000 $13,700,000 $17,600,000 Excise Tax Bonds - W/WW 11,300,000 22,550,000 21,450,000 15,900,000 Water/Wastewater (FB Applied) 10,000,000 10,000,000 0 0 Development Fees 474,292 494,500 505,201 522,394 Total Water/Wastewater 34,524,292 52,144,500 35,655,201 34,022,394 Golf Excise Tax Bonds - Golf Fund 170,000 1,490,000 50,000 50,000 Cemetery Excise Tax Bonds - Cemetery Fund 225,000 770,000 1,400,000 0 Subtotal Enterprise Supported 34,919,292 54,404,500 37,105,201 34,072,394 Special Purpose Program Transit Transit Tax Revenues 17,655,070 23,260,792 8,251,672 3,477,440 Excise Tax Bonds 38,000,000 30,000,000 60,000,000 40,000,000 FTA (Rail-Federal Share) 5,044,000 19,964,000 19,767,000 27,619,000 FTA (Reg Facility/Fuel Station) 480,000 0 0 15,000,000 Federal Multi-Use Grants 943,000 4,100,000 0 0 Total Transit 62,122,070 77,324,792 88,018,672 86,096,440 Performing Arts Center Excise Tax Bonds - Performing Arts 1,463,320 23,807,768 22,228,912 0 Performing Arts Tax Revenue 400,000 2,300,000 0 0 Total Performing Arts 1,863,320 26,107,768 22,228,912 0 Rio Salado Grants 0 0 2,000,000 3,965,000 Capital Projects Fund Balance 200,000 526,269 2,435,545 125,000 Total Rio Salado 200,000 526,269 4,435,545 4,090,000 Total Special Purpose Program 64,185,390 103,958,829 114,683,129 90,186,440 General Purpose & Transportation Program General Obligation Bonds 7,735,000 15,315,000 22,300,000 11,000,000 Water/Wastewater Fund 545,243 721,445 556,552 590,224 HURF/LTAF Fund Balance 945,000 0 0 0 Transfers from Other Funds 1,902,000 1,235,000 1,229,625 1,952,028 Other Revenue 908,582 1,348,448 0 0 Improvement District Bonds 6,328,200 0 0 0 Capital Projects Fund Balance 500,000 0 0 0 Specific Project Funding Sources TSA Grant 0 0 0 6,650,000 Total General/Transportation 18,864,025 18,619,893 24,086,177 20,192,252 Subtotal Tax Supported 83,049,415 122,578,722 138,769,306 110,378,692 TOTAL PROGRAM $117,968,707 $176,983,222 $175,874,507 $144,451,086 0 0 6,650,000 10,460,840 13,878,714 106,101,901 14,578,950 14,003,714 483,358,799 $45,724,570 $24,261,923 $685,264,015 Capital Improvements Program Fund Balances FY 2003-04 Program Enterprise Water/Wastewater Golf Cemetery Subtotal Enterprise Special Purpose Transit Performing Arts Rio Salado Subtotal Special Purpose General Purpose Police Protection Fire Protection Storm Drains Park Improvements General Governmental Subtotal General Purpose Transportation Transp. & R.O.W. Improvements Traffic Signals/Street Lighting Subtotal Transportation Total Program Estimated Fund Bal. 06-30-03 Transfers from Other Funds Outside Revenue Bond Proceeds Appropriation Estimated Fund Bal. 06-30-04 5,405,000 0 0 5,405,000 10,000,000 0 0 10,000,000 474,292 0 0 474,292 24,050,000 170,000 225,000 24,445,000 34,524,292 170,000 225,000 34,919,292 5,405,000 0 0 5,405,000 10,497,500 0 2,201,500 12,699,000 17,655,070 400,000 0 18,055,070 6,467,000 0 0 6,467,000 38,000,000 1,463,320 0 39,463,320 62,122,070 1,863,320 200,000 64,185,390 10,497,500 0 2,001,500 12,499,000 $0 0 200,000 805,000 1,242,243 2,247,243 $0 0 0 0 1,097,000 1,097,000 $794,300 1,900,000 0 1,118,000 0 3,812,300 $794,300 1,900,000 200,000 1,923,000 2,839,243 7,656,543 2,046,000 64,300 2,110,300 $21,034,300 0 945,000 945,000 $31,247,313 0 0 0 $8,038,292 10,262,482 0 10,262,482 $77,983,102 10,262,482 945,000 11,207,482 $117,968,707 2,046,000 64,300 2,110,300 $20,334,300 Estimated Fund Bal. 06-30-04 Transfers from Other Funds Outside Revenue Bond Proceeds Appropriation Estimated Fund Bal. 06-30-04 ($50,000) 0 555,400 0 314,600 820,000 ($50,000) 0 555,400 0 (185,400) 320,000 FY 2004-05 Program Enterprise Water/Wastewater Golf Cemetery Subtotal Enterprise Special Purpose Transit Performing Arts Rio Salado Subtotal Special Purpose General Purpose Police Protection Fire Protection Storm Drains Park Improvements General Governmental Subtotal General Purpose Transportation Transp. & R.O.W. Improvements Traffic Signals/Street Lighting Subtotal Transportation Total Program 5,405,000 0 0 5,405,000 10,000,000 0 0 10,000,000 494,500 0 0 494,500 41,650,000 1,490,000 770,000 43,910,000 52,144,500 1,490,000 770,000 54,404,500 5,405,000 0 0 5,405,000 10,497,500 0 2,001,500 12,499,000 23,260,792 2,300,000 0 25,560,792 24,064,000 0 0 24,064,000 30,000,000 23,807,768 0 53,807,768 77,324,792 26,107,768 526,269 103,958,829 10,497,500 0 1,475,231 11,972,731 $0 0 200,000 130,000 1,873,445 2,203,445 $0 0 0 0 1,105,000 1,105,000 $6,715,950 0 0 2,255,000 0 8,970,950 $6,715,950 0 200,000 2,385,000 2,978,445 12,279,395 2,046,000 64,300 0 0 0 0 5,395,498 945,000 5,395,498 945,000 2,046,000 64,300 2,110,300 0 0 6,340,498 6,340,498 2,110,300 $20,334,300 $37,764,237 $25,663,500 $113,029,216 $176,983,222 $19,808,031 (50,000) 0 555,400 0 (185,400) 320,000 ($50,000) 0 555,400 0 (185,400) 320,000 Remaining General Obligation Bond Authorizations Original Authorization Prior Issues 2003-04 Issue 2004-05 Issue Remaining Authorization $77,000,000 31,500,000 6,000,000 12,000,000 31,500,000 158,000,000 $25,100,000 2,670,000 1,370,000 2,405,000 2,200,000 33,745,000 $12,550,000 795,000 1,900,000 1,795,000 3,245,000 20,285,000 $18,985,000 6,715,000 0 2,255,000 6,345,000 34,300,000 $20,365,000 21,320,000 2,730,000 5,545,000 19,710,000 69,670,000 $158,000,000 $33,745,000 $20,285,000 $34,300,000 $69,670,000 2002 Program Water/Wastewater Police Protection Fire Protection Park Improvements Streets/Transportation Sub Total TOTAL Long-Term Outstanding Debt Summary July 1 General Obligation Bonds Water/Wastewater Police Protection Fire Protection Storm Drains Park Improvements Library/Museum Streets/Transportation Total G.O. Debt Outstanding Tempe Municipal Property Corp. Bonds Golf Course Improvements Total Tempe Municipal Property Debt Tempe Sports Authority Corp. Bonds / COP's Certificates of Particiption (COP's) Total Tempe Sports Authority Corp. Bonds / COP's Total Water/Wastewater Excise Tax Bonds Total Transit Excise Tax Bonds Total Performing Arts Excise Tax Bonds Total Rio Salado Excise Tax Bonds Total Governmental Excise Tax Bonds Total Long-Term Outstanding Debt 2001 2002 2003 2004 $70,860,000 5,210,000 7,045,000 3,940,000 15,850,000 165,000 39,895,000 142,965,000 $78,595,000 5,085,000 8,210,000 4,490,000 16,545,000 130,000 41,075,000 154,130,000 $98,015,000 7,135,000 11,080,000 4,210,000 20,060,000 130,000 47,345,000 187,975,000 $103,615,737 7,393,613 12,102,031 3,925,235 20,367,932 130,000 47,168,084 194,702,632 735,000 735,000 630,000 630,000 520,000 520,000 400,000 400,000 4,270,000 4,270,000 3,810,000 3,810,000 3,335,000 3,335,000 2,840,000 2,840,000 2,612,500 2,351,250 0 40,500,000 7,371,250 0 0 0 40,500,000 6,880,000 0 0 14,740,000 39,275,000 6,635,000 34,465,209 38,724,954 59,765,165 37,935,000 6,380,000 $200,805,000 $205,950,000 $252,480,000 $375,212,960 Ten Year Historical Trends Budgeted Capital Fiscal Improvements Year Program 1995-96 22,192,124 1996-97 35,466,698 1997-98 79,717,004 1998-99 87,651,929 1999-00 85,587,326 2000-01 61,256,862 2001-02 85,541,430 2002-03 130,638,313 2003-04 (est.) 117,968,707 2004-05 (est.) 176,983,222 Outstanding Debt Service Principal Requirements Debt P&I 145,830,000 29,841,317 141,285,000 27,161,881 173,470,000 24,533,678 203,495,000 24,297,657 197,735,000 31,836,932 200,805,000 29,772,986 205,950,000 26,675,235 252,480,000 23,996,164 375,212,960 39,191,569 455,043,401 43,555,527 Net % Change Property Secondary in Secondary Tax Rate ($) Assessed Assessed Value Valuation PrimarySecondary Total 887,858,508 2.3 .56 .84 1.40 912,856,941 2.8 .57 .83 1.40 993,270,348 8.8 .56 .84 1.40 1,098,826,160 10.6 .54 .86 1.40 1,223,438,321 11.3 .55 .85 1.40 1,356,429,397 10.9 .54 .81 1.35 1,456,361,617 7.4 .53 .82 1.35 1,556,492,294 6.9 .52 .83 1.35 1,688,452,415 8.5 .55 .80 1.35 1,755,990,512 4.0 .55 .80 1.35 Summary: (1) The increase in the Capital Budget from $35 million in FY 1996-97 to $80 million in FY 1997-98 is principally due to the addition of the Transit and Rio Salado capital programs; the increase from $86 to $177 million between FY 2001-02 and FY 2004-05 primarily comes from the addition of light-rail construction within the Transit program, an expanded Water/Wastewater capital program, and the building of the Performing Arts Center; and (2) the City decreased the property tax rate from $1.40 to $1.35 in FY 2000-01, with no change planned in FY 2003-04 or FY 2004-05. Bonded Debt Limits Summary, July 1, 2003 and July 1, 2004 Under Arizona law(1), cities may issue general obligation bonds for purposes of water, wastewater, artificial light, open space preserves, parks, playgrounds and recreational facilities up to an amount not exceeding 20% of the secondary assessed value. Cities may also issue general obligation bonds for all other purposes not included in the 20% Debt Margin category up to an amount not exceeding 6% of the secondary assessed value. FY 2003-05 Bonded Debt Limits 6% Bond Limit (2) Outstanding Bonded Debt Previously Issued by City FY 2003-04 20% 6% FY 2004-05 20% $101,307,145 $337,690,483 $105,359,431 $351,198,103 (61,165,000) (120,905,000) (57,667,000) (113,005,000) 0 0 0 (5,940,000) (12,550,000) (200,000) (1,795,000) 0 0 0 0 (13,060,000) $34,202,145 $202,240,483 $34,632,431 Proposed Bonds to be Sold in FY 2003-05 Water/Wastewater Storm Drains Park Improvements All Others Debt Margin Available (1) Article 9, Section 8 – Arizona Constitution (2) FY 2003-04 is based upon an estimated secondary assessed value of $1,688,452,415, compared to the FY 2002-03 secondary assessed value of $1,556,492,294. FY 2004-05 is based upon an estimated secondary assessed value of $1,755,990,512. (18,985,000) (115,000) (2,255,000) 0 $216,838,103 Debt Policy The objective of the City of Tempe debt management policy is to maintain the City’s ability to incur present and future debt at the most beneficial interest rates in amounts needed for financing the adopted Capital Improvements Program without adversely affecting the city’s ability to finance essential City services. Policy Statements: § A six-year capital improvement program will be developed and updated annually along with corresponding anticipated funding sources. § Capital projects financed through the issuance of bonded debt will be financed for a period not to exceed the useful life of the project. § § § § Debt service schedules will be based upon level annual principal and interest payments. Capital improvement operating budget impacts will be coordinated with the development of the Operating Budget. Pay-as-you-go financing, at a minimal level of at least 5%, will be an integral part of each capital program. Benchmark ratios of per capita debt, debt service to operating revenue, and outstanding debt as a percent of full cash value will be updated regularly and incorporated into the Debt Management Plan. Capital Improvements Project Map Location Project Description Location Project Description 1 Police Property Facility & Police Substation 11 CP & EVLRT Rail Planning, Design & Construction 2 3 4 North Side Multigenerational Center Cole & Rotary Park Playgrounds Performing Arts Center 12 13 14 Transit Center Western Canal Multi-Use Path, Phase 1 Western Canal Multi-Use Path, Phase 2 5 6 Performing Arts Park Double Butte Cemetery Expansion 15 16 Western Canal Multi-Use Path, Phase 3 JGMWTP: 30 MGD Expansion 7 8 Rolling Hills Irrigation System Replacement Playa del Norte / Miller Road Widening I.D. 17 18 JGMWTP: Waterline Improvements Apache Blvd. Corridor Waterline Improvements 9 10 Playa del Norte / Rural Road Widening I.D. Rio Salado S. Bank Multi-Use Path Hardy/Priest 19 20 Kyrene Booster Zone Kyrene Water Reclamation Facility Expansion Enterprise The Enterprise element of the Capital Improvements Program consists of Water, Wastewater, Golf, and Cemetery programs. Combined, they constitute $34.9 million of the $118.0 million Capital Improvements Program for FY 2003-04 and $54.4 million of the $177.0 million Capital Improvements Program for FY 2004-05. The City's capital budget appropriations in this area are driven largely by federal and state compliance requirements. A total of $24.4 million in the first year and $43.9 million in the second year of General Obligation bonds and Excise Bonds will be sold to fund these projects. Enterprise bonds are paid for by user charges from their respective program activity. Major projects include: Water - funding for the Johnny G. Martinez Water Treatment Plant expansion, new pumps at the Kyrene Water Reclamation Facility, new production wells, and various waterline improvements; Wastewater - funding provides for 91st Avenue Wastewater Treatment Plant expansion, various sewer upgrades and extensions, expansion at the Kyrene Wastewater Treatment Plant, and a Southern Avenue Interceptor Diversion Structure; Golf - funding is provided for a new irrigation system at Rolling Hills golf course as well as annual renovation and improvement projects at Rolling Hills and Ken McDonald golf courses; and Cemetery - funding for improvements and expansion of the Tempe Double Butte Cemetery. CAPITAL PROGRAM PROGRAM Enterprise FY 2003-04 FY 2004-05 $34,919,292 $54,404,500 Special Purpose 64,185,390 103,958,829 General Purpose 7,656,543 12,279,395 11,207,482 $117,968,707 6,340,498 $176,983,222 Transportation TOTAL CAPITAL PROGRAM Water Program Summary 2003-04 2004-05 Funded Funded Project Description Program Program 2005-06 2006-07 2007-08 Recommended JGMWTP: 30 MGD Expansion JGMWTP: Waterline Improvements 14,150,105 2,250,000 12,500,000 2,250,000 4,300,000 0 19,000,000 0 19,000,000 0 0 0 68,950,105 4,500,000 2,000,000 1,350,000 0 1,250,000 0 0 0 0 0 0 0 0 2,000,000 2,600,000 311,140 250,000 233,000 175,000 150,000 1,330,000 250,000 233,000 0 150,000 0 250,000 233,000 0 150,000 0 250,000 233,000 0 150,000 0 250,000 233,000 0 150,000 625,000 250,000 233,000 0 150,000 2,266,140 1,500,000 1,398,000 175,000 900,000 108,435 0 650,000 300,000 650,000 0 650,000 0 650,000 300,000 650,000 0 3,358,435 600,000 0 292,000 2,200,000 425,000 0 0 2,917,000 0 150,000 150,000 150,000 150,000 150,000 750,000 0 0 0 0 250,000 250,000 500,000 Kyrene Booster Zone Apache Blvd. Corridor Waterline Improvements New Production Wells Distribution System Fittings CAP Capital Charge Compound Meter Replacement JGMWTP: Capital Equipment Replacement WL Upgrades/Extensions Update Integrated Master Plan (IMP) Utility Services & Warehouse Building STWTP: Capital Equipment Replacement Automation Improvements Total Recommended Source of Funds General Obligation Bonds Water/Wastewater Fund Balance Development Fees Total $20,977,680 2003-04 $10,827,680 10,000,000 150,000 $20,977,680 Total 6-Year Additional Needs 2008-09 Program $19,355,000 $7,933,000 $20,858,000 $20,983,000 $2,308,000 $92,414,680 2004-05 $9,205,000 10,000,000 150,000 $19,355,000 JGMWTP: 30 MGD Expansion Project Description Estimated Project Costs Johnny G. Martinez Water Treatment Plant (JGMWTP) - Additional capacity is Legal Administration required to meet the projected growth resulting from in-fill development, Architectural/Engineering development of remaining vacant land, and re-development of existing parcels. This project includes a comprehensive site study, 30 MGD of new treatment Right-of-Way capacity, a second 12 MG potable water storage reservoir and pump station, Site Acquisition replacing gaseous chlorine with on-site generated NaOCl, moving to UV for Construction primary disinfection, a new building for the Environmental Services (ES) work group, and improvements to the Marigold Lane entrance to the plant to enhanceUtility Costs security. Landscaping GO Bonds $10,000,000 $4,150,105 W/WW Fund Balance Furnishings/Equipment $0 $0 $39,989,000 $0 $1,025,000 $966,000 $24,070,000 Other Project Costs Total $0 $68,950,105 Project Number: $10,000,000 GO Bonds $2,550,105 Testing/Staking/Inspection This project will be divided into three distinct bid packages: 1) UV disinfection, NaOCl, ES Building and Marigold Improvements. 2) 12 MG Reservoir and Pump Station. 3) 30 MGD Expansion. 2003-04 Source of Funds 2004-05 Source of Funds W/WW Fund Balance $100,000 $2,500,000 3201099 Estimated Start Date: 11/02 Estimated Completion Date: 12/08 New Appropriations by Fiscal Year Prior Funding: $5,742,675 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $14,150,105 $12,500,000 $4,300,000 $19,000,000 $19,000,000 $0 Total $68,950,105 JGMWTP: Waterline Improvements Project Description Estimated Project Costs Legal Administration The Johnny G. Martinez Water Treatment Plant (JGMWTP) needs to be expanded to meet increasing demands from growth and re-development in theArchitectural/Engineering City. It will also be necessary to enlarge the size of the major transmission lines leaving the plant to accommodate the increased demand for water from our Right-of-Way customers. This project provides for replacing existing 42" diameter and 30" Site Acquisition diameter pipes that have nearly reached their useful lives with 4500 lf of 60" Construction diameter and 8600 lf of 42" diameter pipe to accomodate the increased future Utility Costs flows from the expanded plant. $0 $0 $0 $0 $4,000,000 $0 Landscaping $250,000 Testing/Staking/Inspection $0 Furnishings/Equipment $250,000 Other Project Costs 2003-04 Source of Funds GO Bonds $2,250,000 Total 2004-05 Source of Funds GO Bonds $0 $4,500,000 Project Number: $2,250,000 3200039 Estimated Start Date: 1/03 Estimated Completion Date: 3/04 New Appropriations by Fiscal Year Prior Funding: $500,000 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $2,250,000 $2,250,000 $0 $0 $0 $0 Total $4,500,000 Kyrene Booster Zone Project Description Estimated Project Costs The demand in the Sende Vista Booster Zone is growing and is projected to Legal Administration exceed the pumping capability of the existing booster station. This project will Architectural/Engineering expand the booster zone and move the pumping to the potable water pump station Right-of-Way located at the Kyrene Water Reclamation Facility. This will provide a much better pressure distribution in the larger zone, eliminate some chronic low Site Acquisition pressure areas to the north of the existing zone, and eliminate pumping the water Construction twice. The project includes new valves and piping and adding new pumps. Utility Costs $15,000 $0 $0 $0 $700,000 $0 Landscaping $0 Testing/Staking/Inspection Furnishings/Equipment $35,000 $1,250,000 Other Project Costs 2003-04 Source of Funds GO Bonds 2004-05 Source of Funds Total $0 $2,000,000 Project Number: $2,000,000 3200059 Estimated Start Date: 1/03 Estimated Completion Date: 3/04 New Appropriations by Fiscal Year Prior Funding: $275,000 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $2,000,000 $0 $0 $0 $0 $0 Total $2,000,000 Apache Blvd. Corridor Waterline Improvements Project Description Estimated Project Costs Redevelopment on Apache Blvd. and additional development by ASU south of Legal Administration Apache and along the McAllister Ave. corridor require upgrades of the main Architectural/Engineering distribution line on Apache Blvd. as well as improvements on several north/south feeder streets to Apache Blvd. This project will replace 50+ year old lead-jointedRight-of-Way cast iron pipe with new ductile iron pipe that meets City codes and specifications. Site Acquisition It will enhance fire protection and water service reliability to Tempe St. Lukes Construction Hospital and also provide additional system control and flexibility. Utility Costs $0 $400,000 $0 $0 $2,000,000 $0 Landscaping $0 Testing/Staking/Inspection 2003-04 Source of Funds GO Bonds $1,350,000 Furnishings/Equipment $0 Other Project Costs $0 Total 2004-05 Source of Funds GO Bonds $200,000 $2,600,000 Project Number: $1,250,000 3201310 Estimated Start Date: 7/03 Estimated Completion Date: 12/04 New Appropriations by Fiscal Year Prior Funding: $0 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $1,350,000 $1,250,000 $0 $0 $0 $0 Total $2,600,000 New Production Wells Project Description Estimated Project Costs The Integrated Master Plan identified a shortage of well capacity in Tempe and Legal Administration recommended that the City increase well capacity to meet emergency supply Architectural/Engineering needs. These wells would provide an additional 8.7 MGD of production capacity to the City, and coupled with existing wells, meet the needs of an emergency Right-of-Way situation. The wells also double as storage capacity reducing capital requirements Site Acquisition for additional above-ground storage and pumping. This project provides funding Construction to drill two new potable water wells, one in 03/04 and one in 04/05. The wells Utility Costs will be as follows: Landscaping #16: a new City of Tempe well to be drilled and equipped in south Tempe. Land Testing/Staking/Inspection will need to be acquired as well. 4.2 MGD. To be done in FY 03/04. #17: an existing Salt River Project well to be renovated and connected to the Furnishings/Equipment City's distribution system. 4.5 MGD. To be done in FY 04/05. Other Project Costs 2003-04 Source of Funds GO Bonds $311,140 2004-05 Source of Funds GO Bonds Total $10,000 $80,000 $0 $0 $1,226,140 $0 $0 $85,000 $865,000 $0 $2,266,140 Project Number: $1,330,000 3200019 Estimated Start Date: 8/03 Estimated Completion Date: 6/05 New Appropriations by Fiscal Year Prior Funding: 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $311,140 $1,330,000 $0 $0 $0 $625,000 $3,651,581 Total $2,266,140 Distribution System Fittings Project Description Estimated Project Costs This project provides for the acquisition, assembly, and installation of water works infrastructure including meters, valves, hydrants and water lines. Legal Administration $0 Architectural/Engineering $0 Right-of-Way $0 Site Acquisition Construction $0 $0 Utility Costs $0 Landscaping $0 Testing/Staking/Inspection $0 Furnishings/Equipment $1,500,000 Other Project Costs 2003-04 Source of Funds GO Bonds $250,000 Total 2004-05 Source of Funds GO Bonds $250,000 $0 $1,500,000 Project Number: 3299999 Estimated Start Date: 7/03 Estimated Completion Date: 6/09 New Appropriations by Fiscal Year Prior Funding: 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $250,000 $250,000 $250,000 $250,000 $250,000 $250,000 $145,500 Total $1,500,000 CAP Capital Charge Project Description Estimated Project Costs An agreement with the Central Arizona Water Conservation District (CAWCD) Legal Administration imposes a semi-annual capital charge payable annually through 2034. These Architectural/Engineering charges repay the federal government's advance of construction funding to build Right-of-Way the Central Arizona Project (CAP). Site Acquisition Construction 2003-04 Source of Funds GO Bonds $233,000 $0 $0 $0 $1,398,000 Utility Costs $0 Landscaping $0 Testing/Staking/Inspection $0 Furnishings/Equipment $0 Other Project Costs $0 2004-05 Source of Funds GO Bonds $0 Total $1,398,000 Project Number: $233,000 32-966700 Estimated Start Date: 7/03 Estimated Completion Date: 6/09 New Appropriations by Fiscal Year Prior Funding: $457,400 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $233,000 $233,000 $233,000 $233,000 $233,000 $233,000 Total $1,398,000 Compound Meter Replacement Project Description Estimated Project Costs There are approximately 300 compound meters installed in the City. Most of Legal Administration these meters have surpassed their useful lives of 10 to 15 years and are becoming Architectural/Engineering more difficult to repair as spare parts are becoming scarce. This project provides for a systematic replacement program over a three year period. Less frequent Right-of-Way maintenance and improved accuracy are the expected results of this program. Site Acquisition Construction $0 $0 $0 $0 $0 Utility Costs $0 Landscaping $0 Testing/Staking/Inspection $0 Furnishings/Equipment $175,000 Other Project Costs 2003-04 Source of Funds GO Bonds $0 Total 2004-05 Source of Funds $175,000 Project Number: $175,000 3200049 Estimated Start Date: 1/03 Estimated Completion Date: 6/04 New Appropriations by Fiscal Year Prior Funding: $350,000 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $175,000 $0 $0 $0 $0 $0 Total $175,000 JGMWTP: Capital Equipment Replacement Project Description Estimated Project Costs Johnny G. Martinez Water Treatment Plant - Every year there are unexpected Legal Administration failures of pumps, valves, and other operating equipment due to fatigue, wear, Architectural/Engineering structural failure and many other reasons. These failures cannot always be Right-of-Way predicted even though we are developing comprehensive preventive and predictive maintenance programs and procedures. This project provides an annual Site Acquisition funding mechanism to facilitate replacement of equipment that fails and has not Construction been specifically budgeted for. Utility Costs 2003-04 Source of Funds Development Fees $150,000 2004-05 Source of Funds Development Fees $0 $900,000 $0 $0 $0 $0 Landscaping $0 Testing/Staking/Inspection $0 Furnishings/Equipment $0 Other Project Costs $0 Total $150,000 $900,000 Project Number: 3200089 Estimated Start Date: 7/03 Estimated Completion Date: 6/09 New Appropriations by Fiscal Year Prior Funding: 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $150,000 $150,000 $150,000 $150,000 $150,000 $150,000 $165,000 Total $900,000 WL Upgrades/Extensions Project Description Estimated Project Costs Legal Administration The Water Utility Department Integrated Master Plan identifies most of the specific water lines that need to be replaced to meet increasing demands. ThisArchitectural/Engineering project provides a recurring funding source to replace water lines that break Right-of-Way during normal operation or that have reached their useful life. Site Acquisition Construction 2003-04 Source of Funds GO Bonds $108,435 GO Bonds $650,000 $0 $0 $0 $3,358,435 Utility Costs $0 Landscaping $0 Testing/Staking/Inspection $0 Furnishings/Equipment $0 Other Project Costs $0 Total 2004-05 Source of Funds $0 $3,358,435 Project Number: 3299989 Estimated Start Date: 7/03 Estimated Completion Date: 6/09 New Appropriations by Fiscal Year Prior Funding: 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $108,435 $650,000 $650,000 $650,000 $650,000 $650,000 $1,532,565 Total $3,358,435 Update Integrated Master Plan (IMP) Project Description Estimated Project Costs The Water Utility Department recently completed (1999 - 2000) the first master Legal Administration planning effort for water, wastewater, stormwater and flood irrigation. In order Architectural/Engineering to continually meet service delivery goals it is necessary to regularly update the Right-of-Way master plan. Because of the projected intense capital spending to meet growing service demand, it is imperative to update the master plan initially on a three-year Site Acquisition cycle. If growth slows in the future, the period between IMP updates may be Construction increased. This project provides funding to facilitate the first IMP update on the Utility Costs recommended three-year initial cycle. Landscaping 2003-04 Source of Funds $600,000 $0 $0 $0 $0 $0 Testing/Staking/Inspection $0 Furnishings/Equipment $0 Other Project Costs $0 2004-05 Source of Funds GO Bonds $0 Total $600,000 Project Number: $300,000 3200591 Estimated Start Date: 8/04 Estimated Completion Date: 6/05 New Appropriations by Fiscal Year Prior Funding: $0 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $0 $300,000 $0 $0 $300,000 $0 Total $600,000 Utility Services & Warehouse Building Project Description Estimated Project Costs Legal Administration The staff of the Utilitiy Services workgroup and the Water User Department Warehouse are currently housed at the JGMWTP campus. With the planned Architectural/Engineering expansion of that facility, space becomes premium. In addition, it is desireable to Right-of-Way relocate these functions so they are more centralized to their customer base and out of principally residential neighborhoods. This project provides for design and Site Acquisition construction of new facilities on the site of the Kyrene Water Reclamation Construction Facility to house these two workgroups. Utility Costs $22,000 $238,000 $0 $0 $2,000,000 $0 Landscaping $0 Testing/Staking/Inspection $232,000 Furnishings/Equipment $425,000 Other Project Costs 2003-04 Source of Funds Total 2004-05 Source of Funds GO Bonds $0 $2,917,000 Project Number: $292,000 3201320 Estimated Start Date: 7/04 Estimated Completion Date: 12/06 New Appropriations by Fiscal Year Prior Funding: $0 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $0 $292,000 $2,200,000 $425,000 $0 $0 Total $2,917,000 STWTP Capital Equipment Replacement Project Description Estimated Project Costs South Tempe Water Treatment Plant - Every year there are unexpected failures Legal Administration of pumps, valves, and other operating equipment due to fatigue, wear, structural Architectural/Engineering failure and many other reasons. These failures cannot always be predicted even Right-of-Way though we are developing comprehensive preventive and predictive maintenance programs and procedures. This project provides an annual funding mechanism to Acquisition Site facilitate replacement of equipment that fails and has not been specifically Construction budgeted for. Utility Costs 2003-04 Source of Funds 2004-05 Source of Funds GO Bonds $0 $750,000 $0 $0 $0 $0 Landscaping $0 Testing/Staking/Inspection $0 Furnishings/Equipment $0 Other Project Costs $0 Total $150,000 $750,000 Project Number: 3200079 Estimated Start Date: 7/03 Estimated Completion Date: 6/09 New Appropriations by Fiscal Year Prior Funding: 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $0 $150,000 $150,000 $150,000 $150,000 $150,000 $150,000 Total $750,000 Wastewater Program Summary Project Description Recommended 91st Avenue WWTP KWRF Expansion SAI Diversion Structure Rural Road Influent Line to KWRF Sewer Reconstruction Rural Road Sewer Replacement SAI Rehabilitation - All Phases Total Recommended Source of Funds General Obligation Bonds Excise Bonds-Wastewater Development Fees Total 2003-04 2004-05 Total Funded Funded Program Program 2005-06 2006-07 11,369,256 1,277,356 900,000 0 13,214,500 15,955,000 0 2,958,000 10,152,513 15,955,000 0 0 11,549,706 0 0 0 9,075,495 0 0 0 6,863,084 0 0 0 62,224,554 33,187,356 900,000 2,958,000 0 0 0 500,000 162,000 0 500,000 0 1,114,688 500,000 0 1,114,688 500,000 0 537,125 500,000 0 537,125 2,500,000 162,000 3,303,626 6-Year Additional Needs 2007-08 2008-09 Program $13,546,612 $32,789,500 $27,722,201 $13,164,394 $10,112,620 $7,900,209 $105,235,536 2003-04 2004-05 $1,922,320 $9,895,000 11,300,000 22,550,000 324,292 344,500 $13,546,612 $32,789,500 91st Avenue WWTP Project Description Estimated Project Costs The 91st Avenue Wastewater Treatment Plant (WWTP) is a regional treatment Legal Administration facility that is jointly owned by 5 valley cities and is operated by the City of Architectural/Engineering Phoenix. 91st Avenue represents the majority of Tempe's wastewater treatment Right-of-Way program. This project represents Tempe's share of all activities at the 91st Avenue WWTP including: capacity expansion projects, capital equipment Site Acquisition replacement, modifications and additions to meet regulatory requirements, Construction process enhancements and also rehabilitation of the jointly owned trunk sewer Utility Costs lines that convey wastewater flows to the plant. Landscaping 2003-04 Source of Funds W/WW Excise Bonds $9,446,936 GO Bonds $1,922,320 W/WW Excise Bonds $0 $0 $0 $62,224,554 $0 $0 Testing/Staking/Inspection $0 Furnishings/Equipment $0 Other Project Costs $0 2004-05 Source of Funds GO Bonds $0 Total $62,224,554 $9,895,000 Project Number: $3,319,500 Estimated Start Date: 7/03 Estimated Completion Date: 6/09 New Appropriations by Fiscal Year Prior Funding: 32-926419 $29,188,000 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $11,369,256 $13,214,500 $10,152,513 $11,549,706 $9,075,495 $6,863,084 Total $62,224,554 KWRF Expansion Project Description Estimated Project Costs The Water Utility Department Integrated Master Plan has projected growth in wastewater flows from the south part of the City which can be treated at the Kyrene Water Reclamation Facility (KWRF) to provide a reclaimed water resource. This project provides funding to renovate the KWRF to a 9 MGD membrane treatment facility. The reclaimed water produced will be used to irrigate the Ken McDonald Golf Course, provide water for the Salt River Project Kyrene Generating Station, and other uses. Legal Administration Architectural/Engineering $250,000 $4,523,000 Right-of-Way $0 Site Acquisition Construction $0 $24,010,000 Utility Costs $0 Landscaping $0 Testing/Staking/Inspection $1,140,000 Furnishings/Equipment $3,264,356 Other Project Costs 2003-04 Source of Funds W/WW Excise Bonds $1,277,356 Total 2004-05 Source of Funds W/WW Excise Bonds $0 $33,187,356 Project Number: $15,955,000 32-997044 Estimated Start Date: 11/02 Estimated Completion Date: 12/08 New Appropriations by Fiscal Year Prior Funding: $3,790,644 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $1,277,356 $15,955,000 $15,955,000 $0 $0 $0 Total $33,187,356 SAI Diversion Structure Project Description Estimated Project Costs Priest Drive and Southern Avenue is the location of major confluences of regional Legal Administration sewer outfalls. The cities of Mesa and Tempe own various capacities in both the Architectural/Engineering Southern Avenue Interceptor (SAI) and the Salt River Outfall (SRO) which cross and mix flows at that intersection. A diversion structure which enables control ofRight-of-Way the flows diverted to each of those regional sewers is required to insure that only Site Acquisition the owned capacity is used. Without this control the City faces high penalties forConstruction exceeding owned capacity in the regional outfall sewer. This project provides for the refinement of an existing design and construction of a diversion structure. Utility Costs This request represents the full estimated cost but the project will be jointly Landscaping funded by Tempe and Mesa. At this time the assumed share will be Tempe 50% Testing/Staking/Inspection and Mesa 50%. Furnishings/Equipment $0 $0 $0 $0 $900,000 $0 $0 $0 $0 Other Project Costs 2003-04 Source of Funds W/WW Excise Bonds Development Fees 2004-05 Source of Funds $0 Total $900,000 $575,708 Project Number: $324,292 Estimated Start Date: 11/02 Estimated Completion Date: 12/03 3200109 New Appropriations by Fiscal Year Prior Funding: $350,000 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $900,000 $0 $0 $0 $0 $0 Total $900,000 Rural Road Influent Line to KWRF Project Description Estimated Project Costs Legal Administration Escalating sewage discharges projected by the Water User Department Integrated Master Plan in the southern portions of the City require the existing 30" diameterArchitectural/Engineering sewer that diverts flow from Rural Road to the Kyrene Water Reclamation Right-of-Way Facility (KWRF) to be upgraded to a 42" diameter pipe. Site Acquisition Construction $20,000 $258,000 $0 $0 $2,450,000 Utility Costs $0 Landscaping $35,000 Testing/Staking/Inspection 2003-04 Source of Funds Furnishings/Equipment $0 Other Project Costs $0 Total 2004-05 Source of Funds W/WW Excise Bonds $195,000 $2,958,000 Project Number: $2,958,000 3201330 Estimated Start Date: 7/04 Estimated Completion Date: 6/05 New Appropriations by Fiscal Year Prior Funding: $0 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $0 $2,958,000 $0 $0 $0 $0 Total $2,958,000 Sewer Reconstruction Project Description Estimated Project Costs The Water Utility Department Integrated Master Plan (IMP) identified most of Legal Administration the specific sewer lines that need to be replaced to meet increasing wastewater Architectural/Engineering flows. This project provides a recurring funding source to replace sewer lines Right-of-Way that break during normal operation. Site Acquisition Construction 2003-04 Source of Funds Development Fees $0 $0 $0 $2,500,000 Utility Costs $0 Landscaping $0 Testing/Staking/Inspection $0 Furnishings/Equipment $0 Other Project Costs $0 2004-05 Source of Funds W/WW Excise Bonds $0 Total $2,500,000 $317,500 Project Number: $182,500 Estimated Start Date: 7/03 Estimated Completion Date: 6/09 32-99969 New Appropriations by Fiscal Year Prior Funding: $670,000 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $0 $500,000 $500,000 $500,000 $500,000 $500,000 Total $2,500,000 Rural Road Sewer Replacement Project Description Estimated Project Costs Legal Administration Escalating sewage discharges projected by the Water Utility Department Integrated Master Plan in the southern portions of the City require the existing Architectural/Engineering 21" diameter sewer that conveys flow from Bel de Mar north on Rural Road to Right-of-Way Guadalupe be upgraded to a 36" diameter pipe. Site Acquisition Construction $2,000 $30,000 $0 $0 $110,500 Utility Costs $0 Landscaping $0 Testing/Staking/Inspection 2003-04 Source of Funds Furnishings/Equipment $0 Other Project Costs $0 Total 2004-05 Source of Funds Development Fees $19,500 $162,000 Project Number: $162,000 3201340 Estimated Start Date: 7/04 Estimated Completion Date: 6/05 New Appropriations by Fiscal Year Prior Funding: $0 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $0 $162,000 $0 $0 $0 $0 Total $162,000 Golf Program Summary Project Description Recommended Rolling Hills Irrigation System Replacement Golf Course Improvements Total Recommended Source of Funds Excise Tax Bonds - Golf Total 2003-04 2004-05 Funded Funded Program Program Total 6-Year Additional Needs 2005-06 2006-07 2007-08 2008-09 Program 120,000 1,440,000 0 0 0 0 1,560,000 50,000 50,000 50,000 50,000 50,000 50,000 300,000 $170,000 $1,490,000 $50,000 $50,000 $50,000 2003-04 2004-05 $170,000 $1,490,000 $170,000 $1,490,000 $50,000 $1,860,000 Rolling Hills Irrigation System Replacement Project Description Estimated Project Costs The irrigation system at the Rolling Hills Golf Course is old and proving to be Legal Administration inadequate for the current golf course needs. The sprinkler system needs Architectural/Engineering renovation similar to that which was done at Ken McDonald. In addition, the Right-of-Way current system uses potable water and a replacement system could use raw water provided through an adjacent SRP canal. The use of raw water will result in Site Acquisition significant savings over the current potable source. The project would also Construction reduce current acreage of turf and replace portions with desert landscape to Utility Costs further reduce water consumption. Landscaping This project is only recommended for consideration should the City wish to maintain the current golf course in its current location and current condition. Testing/Staking/Inspection Furnishings/Equipment $72,000 $120,000 $0 $0 $1,200,000 $0 $0 $48,000 $0 Other Project Costs 2003-04 Source of Funds Excise Tax Bonds $120,000 2004-05 Source of Funds Excise Tax Bonds Total $120,000 $1,560,000 Project Number: $1,440,000 6401081 Estimated Start Date: 7/03 Estimated Completion Date: 6/05 New Appropriations by Fiscal Year Prior Funding: $0 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $120,000 $1,440,000 $0 $0 $0 $0 Total $1,560,000 Golf Course Improvements Project Description Estimated Project Costs Legal Administration This ongoing project provides funds for small annual renovation and improvement projects at both golf courses. Projects could involve: concrete Architectural/Engineering replacement and installation; fencing replacement and installation; sand Right-of-Way replacement and additions; tee and green renovations and improvements; small landscaping and sprinkler projects; and replacement of tables, benches and other Site Acquisition amenities. Construction Excise Tax Bonds $50,000 Excise Tax Bonds $50,000 $0 $270,000 $0 Landscaping $0 $12,000 Furnishings/Equipment $0 Other Project Costs $0 Total 2004-05 Source of Funds $0 Utility Costs Testing/Staking/Inspection 2003-04 Source of Funds $0 $18,000 $300,000 Project Number: Estimated Start Date: 64-986850 Ongoing Estimated Completion Date: Ongoing New Appropriations by Fiscal Year Prior Funding: 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $50,000 $50,000 $50,000 $50,000 $50,000 $50,000 $50,000 Total $300,000 Cemetery Program Summary Project Description Recommended Double Butte Cemetery Improvements and Expansion Total Recommended Source of Funds Excise Tax Bonds - Cemetery Total 2003-04 2004-05 Funded Funded Program Program 225,000 $225,000 2003-04 $225,000 $225,000 770,000 Total 6-Year Additional Needs 2005-06 2006-07 2007-08 2008-09 1,400,000 0 0 $770,000 $1,400,000 $0 $0 2004-05 $770,000 $770,000 Program 0 2,395,000 $0 $2,395,000 Double Butte Cemetery Improvements and Expansion Project Description Estimated Project Costs This project provides funding for improvements and expansion of the Double Legal Administration Butte Cemetery based on the completed master plan as recommended by the Architectural/Engineering Cemetery Advisory Committee. Right-of-Way Site Acquisition Construction $120,000 $225,000 $0 $0 $1,819,391 Utility Costs $0 Landscaping $0 Testing/Staking/Inspection $80,000 Furnishings/Equipment $0 Other Project Costs 2003-04 Source of Funds Excise Tax Bonds $225,000 2004-05 Source of Funds Excise Tax Bonds Total $150,609 $2,395,000 Project Number: $770,000 5901350 Estimated Start Date: 7/03 Estimated Completion Date: 6/06 New Appropriations by Fiscal Year Prior Funding: $0 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $225,000 $770,000 $1,400,000 $0 $0 $0 Total $2,395,000 Special Purpose The Special Purpose element of the Capital Improvements Program includes Transit, Performing Arts, and Rio Salado capital programs. Combined, they constitute 54% of the $117,968,707 Capital Improvements Program for FY 2003-04 and 59% of the $176,983,222 Capital Improvements Program for FY 2004-05. On September 10, 1996, Tempe voters approved a one half of one percent sales tax increase for transit improvements. On May 16, 2000, the voters approved a one tenth of one percent sales tax increase to build a performing arts center. The 2003-04 and 2004-05 Capital Improvements Program provides for: Transit - continued funding for a new light-rail system, a new Transit Center, and various multi-use paths; Performing Arts continued funding for a new Performing Arts Center and an adjacent Performing Arts Park; and Rio Salado - funding for ancillary construction, consultant studies, and habitat restoration. CAPITAL PROGRAM PROGRAM Enterprise FY 2003-04 FY 2004-05 $34,919,292 $54,404,500 Special Purpose 64,185,390 103,958,829 General Purpose 7,656,543 12,279,395 11,207,482 $117,968,707 6,340,498 $176,983,222 Transportation TOTAL CAPITAL PROGRAM Transit Program Summary Project Description Recommended CP & EVLRT Rail Planning, Design & Construction Rio Salado S. Bank Multi-Use Path Hardy/Priest Local Participation in Regional Transit Maintenance Facility/Fueling Station Transit Center Western Canal Multi-Use Path, Phase 2 Western Canal Multi-Use Path, Phase 3 Western Canal Multi-Use Path, Phase 1 College Ave: Apache/US 60 Municipal Arts - Transit Tempe Canal Multi-Use Path, Phase II Total Recommended Source of Funds Transit Tax Revenues Excise Tax Bonds FTA (Rail-Federal Share) FTA (Reg Facility/Fuel Station) Federal Multi-Use Grants Total 2003-04 2004-05 Funded Funded Program Program 2005-06 2006-07 2007-08 59,684,000 66,123,000 85,625,000 68,084,000 3,211,000 0 282,727,000 943,000 0 0 0 0 0 943,000 480,000 200,000 0 15,000,000 0 0 15,680,000 400,000 0 5,476,200 2,000,000 1,282,200 0 0 0 0 0 0 0 7,158,400 2,000,000 0 1,450,000 0 0 0 0 1,450,000 0 1,250,000 0 0 0 0 1,250,000 0 615,070 0 60,000 765,592 0 0 871,472 240,000 0 852,440 2,160,000 0 32,110 0 0 0 0 60,000 3,136,684 2,400,000 $62,122,070 2003-04 $17,655,070 38,000,000 5,044,000 480,000 943,000 $62,122,070 Total 6-Year Additional Needs 2008-09 $77,324,792 $88,018,672 $86,096,440 $3,243,110 2004-05 $23,260,792 30,000,000 19,964,000 0 4,100,000 $77,324,792 Program $0 $316,805,084 CP & EVLRT Rail Planning, Design & Construction Project Description Estimated Project Costs Central Phoenix and East Valley Light Rail Transit - This project provides Legal Administration $0 funding for design, engineering and construction of a light rail transit corridor Architectural/Engineering $12,172,000 that would link downtown Phoenix and downtown Mesa to Tempe including Sky Right-of-Way $30,991,000 Harbor Airport and ASU. In addition, this project provides for optioning necessary project rights of way It also provides the City's share of any necessary Site Acquisition $0 expenditures related to a north/south Major Investment Study among the cites ofConstruction $123,738,000 Scottsdale, Tempe , Regional Public Transportation Authority (RPTA) and the Utility Costs $0 Maricopa Association of Governments (MAG). Landscaping $0 Testing/Staking/Inspection $3,761,000 Furnishings/Equipment Other Project Costs 2003-04 Source of Funds Excise Tax Bonds Transit Tax FTA Grant $38,000,000 $16,640,000 $5,044,000 2004-05 Source of Funds Excise Tax Bonds FTA Grant Transit Tax Total $0 $112,065,000 $282,727,000 $30,000,000 Project Number: $19,964,000 Estimated Start Date: $16,159,000 Estimated Completion Date: New Appropriations by Fiscal Year Prior Funding: 60-966710 9/96 12/07 $24,109,000 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $59,684,000 $66,123,000 $85,625,000 $68,084,000 $3,211,000 $0 Total $282,727,000 Rio Salado S. Bank Multi-Use Path - Hardy/Priest Project Description Estimated Project Costs The proposed multi-use path would be located on City of Tempe right-of-way onLegal Administration the south bank of the Rio Salado Town Lake between Hardy and Priest Drive. Architectural/Engineering The scope of work would include design and construction cost for a .5 mile-long Right-of-Way 12 foot wide path, including landscaping and lighting. Site Acquisition Grant Funding - $943,000 Federal CMAQ funding - Secured Grant Construction 2003-04 Source of Funds Federal Grants $0 $0 $0 $0 $943,000 Utility Costs $0 Landscaping $0 Testing/Staking/Inspection $0 Furnishings/Equipment $0 Other Project Costs $0 Total 2004-05 Source of Funds $943,000 Project Number: $943,000 60-026984 Estimated Start Date: 7/02 Estimated Completion Date: New Appropriations by Fiscal Year Prior Funding: 10/03 $100,000 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $943,000 $0 $0 $0 $0 $0 Total $943,000 Local Participation in Regional Transit Maintenance Facility/Fueling Station Project Description Estimated Project Costs This project would provide the local match in the design and construction of a Legal Administration $0 cooperative multi-jurisdictional regional transit maintenance center located in the Architectural/Engineering $480,000 east valley. This center is envisioned to serve transit contractors working for the Right-of-Way $0 City of Tempe, the Regional Public Transportation Authority, Scottsdale, Phoenix, and possibly Mesa and Chandler. The center would provide adequateSite Acquisition $0 resources for larger scale bus operations and would include a fueling station. Construction $15,200,000 The design and construction of the maintenance facility would be contingent upon Utility Costs $0 obtaining Section 5309 - discretionary federal transportation grant funding. FY 03-04 $480,000 Section 5309 Discretionary Federal Funding - Secured - Landscaping $0 Design Funding $0 FY 04-05 $880,000 Section 5307 Formula Federal Funding - Secured - FuelingTesting/Staking/Inspection Furnishings/Equipment $0 Station FY 06-07 $7,500,000 Section 5309 Discretionary Federal Funding - Non Other Project Costs $0 Secured - Facility Construction 2003-04 Source of Funds 2004-05 Source of Funds Total $15,680,000 Federal Grants $480,000 Transit Tax Project Number: $200,000 6000560 Estimated Start Date: 7/01 Estimated Completion Date: 6/07 New Appropriations by Fiscal Year Prior Funding: $100,000 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $480,000 $200,000 $0 $15,000,000 $0 $0 Total $15,680,000 Transit Center Project Description Estimated Project Costs Legal Administration On September 10, 1996, Tempe voters approved a one half of one percent sales tax increase for transit improvements, including the construction of two transit Architectural/Engineering centers. The operating budget impact will be funded with transit sales tax. The project has Federal Transit Section 5307 grant funding identified currently in FYRight-of-Way 2006-07, but the project must be completed by 12/06 to coincide with the opening Site Acquisition of the first segment of the Central Phoenix/East Valley Light Rail Transit Construction Project. One component of this project would design and construct a downtown Utility Costs transit center. Projected programming for this project includes some replacement parking, commercial, passenger information and other ancillary uses, as well as a Landscaping minimum of 10 bus bays. The operating impact is currently budgeted in the Testing/Staking/Inspection existing Transit Store operations. Existing operations will be relocated to the Furnishings/Equipment new Transit Facility upon completion. $0 $400,000 $0 $0 $5,744,020 $0 $164,320 $715,840 $134,220 Other Project Costs 2003-04 Source of Funds Transit Tax $400,000 Total 2004-05 Source of Funds Transit Tax $0 $7,158,400 Project Number: $5,476,200 60-976762 Estimated Start Date: 7/02 Estimated Completion Date: New Appropriations by Fiscal Year Prior Funding: 12/05 $600,000 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $400,000 $5,476,200 $1,282,200 $0 $0 $0 Total $7,158,400 Western Canal Multi-Use Path, Phase 2 Project Description Estimated Project Costs This project involves design and construction of a 1.5 mile segment of concreteLegal Administration off-street pathway that will include lighting, landscaping and art elements along Architectural/Engineering the Western Canal from Baseline Road to Ken McDonald Golf Course. The Right-of-Way project will include integration of one mid-block crossing at Baseline Road. The path will have linkages to adjacent residential developments, Kiwanis Park, theSite Acquisition Kyrene Canal Multi-use Path and nearby businesses. The project involves Construction coordination with all the nearby neighborhoods and includes several public Utility Costs meetings. It will meet all AASHTO and ADA guidelines, as well as all City standard details. Landscaping $0 $0 $0 $0 $1,370,000 $0 $315,000 Grant Funding - FY 03-04 $1,600,000 Federal CMAQ funding - Secured Grant Testing/Staking/Inspection Furnishings/Equipment $315,000 $0 Other Project Costs 2003-04 Source of Funds 2004-05 Source of Funds Federal Grants Total $2,000,000 Project Number: $1,600,000 Transit Tax $0 6000429 Estimated Start Date: $400,000 7/03 Estimated Completion Date: 12/04 New Appropriations by Fiscal Year Prior Funding: $0 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $0 $2,000,000 $0 $0 $0 $0 Total $2,000,000 Western Canal Multi-Use Path, Phase 3 Project Description Estimated Project Costs Legal Administration This project involves design and construction of a 1.5 mile segment of paved offstreet pathway that will include lighting, landscaping and art elements along theArchitectural/Engineering Western Canal from Arizona Mills Mall to Baseline Road. The project will Right-of-Way include integration of two mid-block crossings at Hardy Drive and at Priest Drive. The path will have linkages to adjacent residential developments and Site Acquisition nearby businesses. The project involves coordination with all the nearby Construction neighborhoods and includes several public meetings. It will meet all AASHTO Utility Costs and ADA guidelines, as well as all appropriate City and regional standard details. Grant Funding - FY 04-05 $1,250,000 Federal CMAQ funding - Secured Grant 2003-04 Source of Funds $0 $0 $985,000 $0 $232,500 Testing/Staking/Inspection $232,500 Furnishings/Equipment $0 Other Project Costs $0 Total $1,450,000 Project Number: $1,250,000 Transit Tax $0 Landscaping 2004-05 Source of Funds Federal Grants $0 $200,000 6000429 Estimated Start Date: 7/03 Estimated Completion Date: 4/05 New Appropriations by Fiscal Year Prior Funding: $0 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $0 $1,450,000 $0 $0 $0 $0 Total $1,450,000 Western Canal Multi-Use Path, Phase 1 Project Description Estimated Project Costs This project involves design and construction of a 2.5 mile segment of concreteLegal Administration off-street pathway that will include lighting, landscaping and art elements along Architectural/Engineering the Western Canal from Price Road to Ken McDonald Golf Course. The project Right-of-Way will include integration of two mid-block crossings at Rural Road and at McClintock Drive. The path will have linkages to adjacent residential Site Acquisition developments and nearby businesses. The project involves coordination with Construction all the nearby neighborhoods and includes several public meetings. It will meet all Utility Costs AASHTO and ADA guidelines, as well as all City standard details. Federal Congestion Mitigation & Air Quality (CMAQ) grants totaling $1.25M have been Landscaping awarded in the Transportation Improvement Program (TIP) for FY 02-03. The Testing/Staking/Inspection $300,000 funding allocated for design will be split between phase 1,2 & 3. Furnishings/Equipment Design for all three phases of the Western Canal will be completed concurrently. $0 $0 $0 $0 $845,000 $0 $202,500 $202,500 $0 Other Project Costs 2003-04 Source of Funds 2004-05 Source of Funds Federal Grants Total $0 $1,250,000 Project Number: $1,250,000 6000429 Estimated Start Date: 7/03 Estimated Completion Date: 9/04 New Appropriations by Fiscal Year Prior Funding: $0 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $0 $1,250,000 $0 $0 $0 $0 Total $1,250,000 College Ave: Apache/US 60 Project Description Estimated Project Costs Legal Administration The total project cost will be determined as design work proceeds forward. This project will improve pedestrian facilities along College Avenue from Apache to Architectural/Engineering the Superstition Freeway. Federal funding has been secured for a portion of the Right-of-Way construction costs. Site Acquisition Construction 2003-04 Source of Funds $0 $0 $0 Utility Costs $0 Landscaping $0 Testing/Staking/Inspection $0 Furnishings/Equipment $0 Other Project Costs $0 Total 2004-05 Source of Funds Transit Tax $0 $60,000 $60,000 Project Number: $60,000 6001280 Estimated Start Date: 7/03 Estimated Completion Date: 6/07 New Appropriations by Fiscal Year Prior Funding: $0 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $0 $60,000 $0 $0 $0 $0 Total $60,000 Municipal Arts Program - Transit Project Description Estimated Project Costs This project provides for various Transit related Municipal Arts projects as Legal Administration determined by the Transit and Cultural Services Divisions, Municipal Arts and Architectural/Engineering Transportation Commissions, and the City Council. Right-of-Way $0 $0 $0 Site Acquisition Construction $0 $0 Utility Costs $0 Landscaping $0 Testing/Staking/Inspection $0 Furnishings/Equipment Other Project Costs 2003-04 Source of Funds Transit Tax $615,070 2004-05 Source of Funds Transit Tax Total $765,592 $0 $3,136,684 $3,136,684 Project Number: 6699810 Estimated Start Date: Ongoing Estimated Completion Date: Ongoing New Appropriations by Fiscal Year Prior Funding: 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $615,070 $765,592 $871,472 $852,440 $32,110 $0 Total $3,136,684 Performing Arts Program Summary Project Description Recommended Performing Arts Center Performing Arts Park Total Recommended Source of Funds Performing Arts Bonds Performing Arts Revenue Total 2003-04 2004-05 Funded Funded Program Program 2005-06 23,807,768 2,300,000 22,228,912 0 0 0 0 0 $1,863,320 $26,107,768 $22,228,912 $0 $0 1,463,320 400,000 2003-04 2004-05 $1,463,320 $23,807,768 400,000 2,300,000 $1,863,320 $26,107,768 Total 6-Year Additional Needs 2006-07 2007-08 2008-09 Program 0 0 47,500,000 2,700,000 $0 $50,200,000 Performing Arts Center Project Description Estimated Project Costs The project will produce the Tempe Center for the Arts located on the south Legal Administration $0 shore of Tempe Town Lake. The 88,000 square foot facility will house a 600Architectural/Engineering $0 seat proscenium theater and a 200-seat studio theater, as well as a 3500 square Right-of-Way $0 foot visual arts gallery space and a 3200 square foot multipurpose room. Sitting on approximately 21 acres at the southwest end of Town Lake, the facility will Site Acquisition $0 provide performance space for several Tempe-based arts organizations including Construction $47,500,000 Childsplay, Tempe Symphony Orchestra, Tempe Community Chorus, and Tempe Utility Costs $0 Little Theatre. Landscaping $0 This project is funded by a 1/10% sales tax, voter-approved via Proposition 400, Testing/Staking/Inspection $0 May 2000. Furnishings/Equipment $0 Other Project Costs 2003-04 Source of Funds Performing Arts Bonds $1,463,320 2004-05 Source of Funds Performing Arts Bonds Total $0 $47,500,000 Project Number: $23,807,768 57-997005 Estimated Start Date: 10/01 Estimated Completion Date: 02/06 New Appropriations by Fiscal Year Prior Funding: $15,500,000 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $1,463,320 $23,807,768 $22,228,912 $0 $0 $0 Total $47,500,000 Performing Arts Park Project Description Estimated Project Costs As part of the Tempe Visual and Performing Arts Center, Council directed staff Legal Administration to proceed with developing plans and construction documents for an "Arts Park"Architectural/Engineering to connect the new center with Tempe Beach Park to the east. The park comprises approximately 15 acres of land and is currently under design with Right-of-Way funds allocated from the arts tax. Site Acquisition Construction This request seeks additional funding for the anticipated construction and related Utility Costs costs based on engineering estimates for the park. $91,902 $339,865 $0 $0 $2,084,000 $0 Landscaping $0 Testing/Staking/Inspection $11,150 Furnishings/Equipment $39,889 Other Project Costs 2003-04 Source of Funds Performing Arts Revenue $400,000 Total 2004-05 Source of Funds Performing Arts Revenue $133,194 $2,700,000 Project Number: $2,300,000 5700812 Estimated Start Date: 3/02 Estimated Completion Date: 3/06 New Appropriations by Fiscal Year Prior Funding: $0 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $400,000 $2,300,000 $0 $0 $0 $0 Total $2,700,000 Rio Salado Program Summary Project Description Recommended Rio Salado Ancillary Construction Rio Salado Consultant Studies US Army Corps Match Money Downstream Pedestrian Bridge@Town Lake Town Lake Boat House Park Improvements at Mill Ave. Bridges Total Recommended Source of Funds Capital Projects Fund Balance Total 2003-04 2004-05 Total Funded Funded Program Program 6-Year Additional Needs 2005-06 2006-07 2007-08 2008-09 Program 100,000 100,000 0 0 100,000 75,000 351,269 0 100,000 50,000 603,366 2,250,000 75,000 50,000 0 1,000,000 75,000 50,000 0 750,000 75,000 50,000 0 0 525,000 375,000 954,635 4,000,000 0 0 0 0 1,357,179 75,000 1,500,000 1,465,000 0 0 0 0 2,857,179 1,540,000 $526,269 $4,435,545 $4,090,000 $875,000 $200,000 2003-04 $200,000 $200,000 2004-05 $526,269 $526,269 $125,000 $10,251,814 Rio Salado Ancillary Construction Project Description Estimated Project Costs Rio Salado Ancillary Projects will fund the various design, safety requirements, Legal Administration emergency signage and fencing projects, additional hardscape and landscaping, Architectural/Engineering and other park enhancements, as well as any other unforeseen project that Right-of-Way becomes necessary at Tempe Town Lake, Tempe Beach Park, and the linear park system. Site Acquisition $0 $0 $0 $0 $525,000 Construction 2003-04 Source of Funds CIP Fund Balance $100,000 2004-05 Source of Funds CIP Fund Balance Utility Costs $0 Landscaping $0 Testing/Staking/Inspection $0 Furnishings/Equipment $0 Other Project Costs $0 Total $100,000 $525,000 Project Number: 65-996931A Estimated Start Date: 6/99 Estimated Completion Date: 6/09 New Appropriations by Fiscal Year Prior Funding: 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $100,000 $100,000 $100,000 $75,000 $75,000 $75,000 $20,000 Total $525,000 Rio Salado Consultant Studies Project Description Estimated Project Costs This project provides funding to retain and administer consultant studies and Legal Administration participate in agreements to design improvements and monitor the Rio SaladoArchitectural/Engineering Project. Expected studies include Lake Management plans, Community Facilities Right-of-Way District, continuation of State and Federal funding efforts, land appraisals, wildlife monitoring agreements, site surveys, and environmental assessments.Site Acquisition Construction CIP Fund Balance $100,000 CIP Fund Balance $75,000 $0 $0 $0 Landscaping $0 Testing/Staking/Inspection $0 Furnishings/Equipment $0 Total 2004-05 Source of Funds $0 Utility Costs Other Project Costs 2003-04 Source of Funds $0 $0 $375,000 $375,000 Project Number: Estimated Start Date: 65-926435 7/92 Estimated Completion Date: Ongoing New Appropriations by Fiscal Year Prior Funding: 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $100,000 $75,000 $50,000 $50,000 $50,000 $50,000 $0 Total $375,000 US Army Corps Match Money Project Description Estimated Project Costs This project provides the required balance of City of Tempe match and operating Legal Administration funds for the US Army Corps of Engineers (USACOE) Habitat Restoration Architectural/Engineering Project, Rio Salado Tempe Reach. Project funding requirements include required studies, project design, cosntruction, monitoring programs, and maintenance. Right-of-Way $10,000 $80,000 $0 Site Acquisition Project design costs are 50% funded by USACOE. Construction Project construction costs are 65% funded by USACOE. Utility Costs Project recreational component capital costs (signs, recreational amenities) are 50% funded by USACOE. Landscaping Project monitoring and O&M is 100% City of Tempe cost. Testing/Staking/Inspection $0 $510,000 $0 $0 $0 Furnishings/Equipment $45,000 Other Project Costs 2003-04 Source of Funds 2004-05 Source of Funds CIP Fund Balance $309,635 Total $954,635 Project Number: $351,269 65-986860 Estimated Start Date: 7/94 Estimated Completion Date: 6/07 New Appropriations by Fiscal Year Prior Funding: $0 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $0 $351,269 $603,366 $0 $0 $0 Total $954,635 General Purpose The General Purpose element of the Capital Improvements Program includes Police Protection, Fire Protection, Storm Drains, Park Improvements, and General Governmental programs. Combined, they constitute $7.7 million of the $118.0 million Capital Improvements Program for FY 2003-04 and $12.3 million of the $177.0 million Capital Improvements Program for FY 2004-05. A total of $3.8 million in the first year and $9.0 million in the second year in General Obligation bonds will be sold to fund these projects. The balance will come primarily from transfers from other funds, fund balances, and other revenues. These General Purpose bonds are paid for by local property taxes. Major projects include: Police - funding for a new police property facility and a new police substation; Fire - continued funding for radio conversion and land acquisition for a new fire station in the southeast quadrant; Storm Drains - continued funding for upgrades to various retention facilities; Park Improvements - funding for improvements to Cole and Rotary playgrounds, replacement of the pump station at Kiwanis Park, and completion of the funding for the North Tempe Multigenerational Center; and General Governmental - continued funding for neighborhood improvements, historic properties preservation, and citywide software upgrades. CAPITAL PROGRAM PROGRAM Enterprise Special Purpose General Purpose Transportation TOTAL CAPITAL PROGRAM FY 2003-04 FY 2004-05 $34,919,292 $54,404,500 64,185,390 103,958,829 7,656,543 12,279,395 11,207,482 $117,968,707 6,340,498 $176,983,222 Police Protection Program Summary Project Description Recommended Apache Boulevard Property Facility / Police Substation TIPS (Technologically Integrated Police System) Laptop Refresh Police CAD/RMS/Report Writing System Total Recommended Source of Funds General Obligation Bonds Total 2003-04 2004-05 Funded Funded Program Program Total 6-Year Additional Needs 2005-06 2006-07 2007-08 2008-09 Program 794,300 6,715,950 12,372,814 0 0 0 19,883,064 0 0 150,000 150,000 150,000 150,000 600,000 0 0 0 0 0 0 0 0 1,200,000 140,000 0 3,522,000 1,200,000 3,662,000 $794,300 2003-04 $794,300 $794,300 $6,715,950 $12,522,814 2004-05 $6,715,950 $6,715,950 $150,000 $1,490,000 $3,672,000 $25,345,064 Apache Boulevard Property Facility / Police Substation Project Description Estimated Project Costs This program will allow for the construction of a new Property & Evidence Legal Administration Storage Facility, to meet the Police Department's projected needs for the next 10 Architectural/Engineering years. A new facility will provide a safe and OSHA compliant workplace for Right-of-Way employees and customers. The current Property Facility has no room for additional expansion absent major construction. Site Acquisition Construction This substation will house the North Patrol operations, Traffic operations, Utility Costs Communications dispatch center, and all associated support functions. This new facility will provide much needed interior operations space as well as external Landscaping space for the North Patrol fleet, storage, and a helipad. In addition, space for Testing/Staking/Inspection future expansion is included to ensure that the building is not obsolete by the time Furnishings/Equipment construction is complete. Other Project Costs The appropriations identified in this project do not include site acquisition costs. 2003-04 Source of Funds 2004-05 Source of Funds Total GO Bonds $794,300 GO Bonds $1,016,600 $1,036,800 $0 $0 $8,595,000 $311,100 $1,776,000 $311,100 $1,031,400 $3,467,364 $19,883,064 Project Number: $6,715,950 5500960 Estimated Start Date: 7/03 Estimated Completion Date: 6/06 New Appropriations by Fiscal Year Prior Funding: $0 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $794,300 $6,715,950 $12,372,814 $0 $0 $0 Total $19,883,064 Fire Protection Program Summary Project Description Recommended Radio Replacement for Conversion to 800 MHz Fire Station for Southeast Quadrant Total Recommended Source of Funds General Obligation Bonds Total 2003-04 2004-05 Total Funded Funded Program Program 6-Year Additional Needs 2005-06 2006-07 2007-08 2008-09 Program 1,300,000 0 0 0 0 0 1,300,000 600,000 0 0 0 127,330 2,134,484 2,861,814 $1,900,000 $0 $0 $0 2003-04 $1,900,000 $1,900,000 2004-05 $0 $0 $127,330 $2,134,484 $4,161,814 Radio Replacement for Conversion to 800 MHz Project Description Estimated Project Costs As a result of the FCC’s realignment of all frequency spectrums, all public safetyLegal Administration agencies must relinquish their VHF frequencies and convert to 800 megahertz Architectural/Engineering (MHz). This will affect all the fire departments in the Phoenix metro area automatic aid consortium. Implementation of the new system is being handledRight-of-Way through the cities of Phoenix and Mesa who provide the two dispatch centers forSite Acquisition all the fire departments in the valley. The requested funds in this project are forConstruction our portion of the infrastructure (repeater sites, base station radios, etc). This is Utility Costs the final allocation necessary to provide our total portion of the funding. Landscaping $0 $0 $0 $0 $0 $0 $0 Testing/Staking/Inspection $0 Furnishings/Equipment Other Project Costs 2003-04 Source of Funds GO Bonds 2004-05 Source of Funds Total $0 $1,300,000 $1,300,000 Project Number: $1,300,000 56-996947 Estimated Start Date: 7/02 Estimated Completion Date: 6/04 New Appropriations by Fiscal Year Prior Funding: 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $1,300,000 $0 $0 $0 $0 $0 Total $1,300,000 Fire Station for Southeast Quadrant Project Description Estimated Project Costs This project is for building a two bay fire station in the southeast quadrant. ThisLegal Administration funding includes everything necessary to put the facility in service, including Architectural/Engineering purchase of the land. Right-of-Way Staffing this station with an engine company will require 15 additional Site Acquisition personnel. Our plan will be to hire them during calendar year 2009, so that theyConstruction will be trained and ready to operate in conjuction with the completion of the Utility Costs station. $0 $127,330 $0 $600,000 $1,515,227 $76,398 Landscaping $38,199 Testing/Staking/Inspection $190,995 Furnishings/Equipment $50,000 Other Project Costs 2003-04 Source of Funds GO Bonds 2004-05 Source of Funds Total $113,665 $2,861,814 Project Number: $600,000 5601300 Estimated Start Date: 04/04 Estimated Completion Date: 06/09 New Appropriations by Fiscal Year Prior Funding: 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $600,000 $0 $0 $0 $127,330 $2,134,484 $0 Total $2,861,814 Storm Drains Program Summary Project Description Recommended Storm Drains 2003-04 2004-05 Funded Funded Program Program Total 6-Year Additional Needs 2005-06 2006-07 2007-08 2008-09 Program 200,000 200,000 200,000 250,000 250,000 250,000 1,350,000 Total Recommended $200,000 $200,000 $200,000 $250,000 $250,000 $250,000 $1,350,000 Source of Funds Water/Wastewater Fund Total 2003-04 $200,000 $200,000 2004-05 $200,000 $200,000 Storm Drains Project Description Estimated Project Costs This project will provide for the construction of minor storm drain extensions to Legal Administration relieve localized problems for replacement and/or upgrades associated with Architectural/Engineering various stormwater retension facilities. Right-of-Way Site Acquisition Construction W/WW Fund $200,000 2004-05 Source of Funds W/WW Fund $0 $0 $1,155,000 $0 Landscaping $0 $105,000 Furnishings/Equipment $0 Other Project Costs $0 Total $200,000 $90,000 Utility Costs Testing/Staking/Inspection 2003-04 Source of Funds $0 $1,350,000 Project Number: 58-999028 Estimated Start Date: Ongoing Estimated Completion Date: Ongoing New Appropriations by Fiscal Year Prior Funding: 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $200,000 $200,000 $200,000 $250,000 $250,000 $250,000 $0 Total $1,350,000 Park Improvements/Recreation Program Summary Project Description Recommended Cole & Rotary Park Playgrounds Kiwanis Park Pump Station Replacement Neighborhood Park Improvements Mitchell School Acquisition Sports Facility Relamping Pyle Adult Recreation Center North Side Multigenerational Center Diablo Stadium Complex Improvements Total Recommended Source of Funds General Obligation Bonds Transfer from Other Funds Total 2003-04 2004-05 Funded Funded Program Program 1,075,000 310,000 250,000 130,000 60,000 48,000 0 0 $1,873,000 2003-04 $1,068,000 805,000 $1,873,000 0 0 250,000 130,000 60,000 0 1,895,000 0 Total 2005-06 0 0 250,000 0 60,000 0 0 750,000 2006-07 2007-08 0 0 250,000 0 60,000 0 0 9,250,000 0 0 250,000 0 60,000 0 0 0 $2,335,000 $1,060,000 $9,560,000 $310,000 2004-05 $2,205,000 130,000 $2,335,000 6-Year Additional Needs 2008-09 0 0 250,000 0 60,000 0 0 0 Program 1,075,000 310,000 1,500,000 260,000 360,000 48,000 1,895,000 10,000,000 $310,000 $15,448,000 Cole & Rotary Park Playgrounds Project Description Estimated Project Costs As part of the expansion of US 60, Arizona Department of Transportation is Legal Administration required to construct an accessible pedestrian/bicycle bridge over US 60 at Architectural/Engineering Country Club Way. This new bridge will have major impacts on both Cole and Right-of-Way Rotary Parks. Improvements to both parks was promised to both neighborhoods by Council in exchange for allowing the bridge and access routes to impact theSite Acquisition parks and neighborhoods. Construction $10,000 $0 $0 $0 $925,000 Utility Costs $0 Landscaping $0 Testing/Staking/Inspection $5,000 Furnishings/Equipment $110,000 Other Project Costs 2003-04 Source of Funds Transit Tax GO Bonds 2004-05 Source of Funds Total $25,000 $1,075,000 $675,000 Project Number: $400,000 Estimated Start Date: 6000550 7/03 Estimated Completion Date: 12/03 New Appropriations by Fiscal Year Prior Funding: $0 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $1,075,000 $0 $0 $0 $0 $0 Total $1,075,000 Kiwanis Park Pump Station Replacement Project Description Estimated Project Costs Legal Administration This project provides fundign to adequately water the turf, trees and landscaping throughout Kiwanis Park. Architectural/Engineering $12,500 $25,000 Right-of-Way $0 Site Acquisition Construction $0 $250,000 Utility Costs $0 Landscaping $0 Testing/Staking/Inspection $10,000 Furnishings/Equipment $0 Other Project Costs 2003-04 Source of Funds GO Bonds $12,500 Total 2004-05 Source of Funds $310,000 Project Number: $310,000 6301290 Estimated Start Date: 7/03 Estimated Completion Date: 4/04 New Appropriations by Fiscal Year Prior Funding: $0 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $310,000 $0 $0 $0 $0 $0 Total $310,000 Neighborhood Park Improvements Project Description Estimated Project Costs This ongoing project provides for the replacement of playground equipment, Legal Administration picnic equipment, fencing, signage, concrete, sand, rubber playground surfacing Architectural/Engineering in various neighborhood parks. With an aging park system, new Consumer Right-of-Way Products Safety Commission (CPSC) guidelines on playground safety and Americans with Disabilities Act (ADA) accessibility guidelines, replacement andSite Acquisition accessibility of play equipment, play areas and other park amenities is an Construction important aspect of continued funding. Utility Costs $0 $120,000 $0 $0 $600,000 $0 Landscaping $150,000 Testing/Staking/Inspection $30,000 Furnishings/Equipment $600,000 Other Project Costs 2003-04 Source of Funds GO Bonds $250,000 2004-05 Source of Funds GO Bonds Total $0 $1,500,000 Project Number: $250,000 6399829 Estimated Start Date: Ongoing Estimated Completion Date: Ongoing New Appropriations by Fiscal Year Prior Funding: $250,000 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $250,000 $250,000 $250,000 $250,000 $250,000 $250,000 Total $1,500,000 Mitchell School Acquisition Project Description Estimated Project Costs This project provides for the annual payment for the acquisition of the Mitchell Legal Administration Park site. This contract will be completed in 2004. In the current contract with Architectural/Engineering the Tempe Elementary School District #3, the City has the option to purchase the Right-of-Way site prior to the conclusion of the contract. If the City wishes to exercise its option, the purchase price would be: Site Acquisition Construction June 2003 - $234,118 Utility Costs June 2004 - $121,154 2003-04 Source of Funds Transfer from Other Funds $130,000 $0 $0 $260,000 $0 $0 Landscaping $0 Testing/Staking/Inspection $0 Furnishings/Equipment $0 Other Project Costs $0 Total 2004-05 Source of Funds Transfer from Other Fund $0 $260,000 Project Number: $130,000 63-886251 Estimated Start Date: 7/03 Estimated Completion Date: 7/04 New Appropriations by Fiscal Year Prior Funding: $0 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $130,000 $130,000 $0 $0 $0 $0 Total $260,000 Sports Facility Relamping Project Description Estimated Project Costs This project provides for the continued funding of a maintenance program for our Legal Administration sports facilities' lighting needs. This project established a plan for a regular Architectural/Engineering cycle of relamping and cleaning of light fixtures at all softball/baseball fields, soccer fields, tennis/racquetball courts and park basketball/volleyball courts. Right-of-Way $0 $0 $0 Site Acquisition Construction 2003-04 Source of Funds GO Bonds $60,000 Utility Costs $0 Landscaping $0 Testing/Staking/Inspection $0 Furnishings/Equipment $0 Other Project Costs $0 2004-05 Source of Funds GO Bonds $0 $360,000 Total $360,000 Project Number: $60,000 63-996938 Estimated Start Date: Ongoing Estimated Completion Date: Ongoing New Appropriations by Fiscal Year Prior Funding: $60,000 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $60,000 $60,000 $60,000 $60,000 $60,000 $60,000 Total $360,000 Pyle Adult Recreation Center Project Description Estimated Project Costs The Pyle Adult Recreation Center is 20 years old and needs modifications and Legal Administration improvements to enhance services. Architectural/Engineering $0 $0 Right-of-Way $0 Site Acquisition Construction 2003-04 Source of Funds GO Bonds $0 $48,000 Utility Costs $0 Landscaping $0 Testing/Staking/Inspection $0 Furnishings/Equipment $0 Other Project Costs $0 Total 2004-05 Source of Funds $48,000 Project Number: $48,000 6300369 Estimated Start Date: 12/02 Estimated Completion Date: New Appropriations by Fiscal Year Prior Funding: 8/03 $212,000 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $48,000 $0 $0 $0 $0 $0 Total $48,000 North Side Multigenerational Center Project Description Estimated Project Costs This request provides funding for the construction of the North Tempe Legal Administration Multigenerational Center. The proposed facility would be similar to the West Architectural/Engineering Side Multigenerational Facility and the Escalante Facility. The facility would Right-of-Way provide neighborhood and community services to North Tempe residents. Services would range from early childhood programs to services for senior Site Acquisition citizens. The service matrix will be modeled after the Escalante and West Side Construction facilities. The proposed site adjacent to Laird Elementary School has been approved by the community and the Tempe Elementary School District. The Utility Costs project is estimated to be 32,000 square feet and would include exterior Landscaping playgrounds. Testing/Staking/Inspection $0 $0 $0 $0 $0 $0 $0 $0 Furnishings/Equipment Other Project Costs 2003-04 Source of Funds 2004-05 Source of Funds GO Bonds Total $0 $1,895,000 $1,895,000 Project Number: $1,895,000 6300291 Estimated Start Date: 07/01 Estimated Completion Date: 06/05 New Appropriations by Fiscal Year Prior Funding: $4,680,000 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $0 $1,895,000 $0 $0 $0 $0 Total $1,895,000 Park Improvements/Public Works Program Summary Project Description Recommended Various Parks Landscaping / Improvements Total Recommended Source of Funds General Obligation Bonds Total 2003-04 2004-05 Funded Funded Program Program Total 6-Year Additional Needs 2005-06 2006-07 2007-08 2008-09 Program 50,000 50,000 50,000 50,000 50,000 50,000 300,000 $50,000 $50,000 $50,000 $50,000 $50,000 $50,000 $300,000 2003-04 $50,000 $50,000 2004-05 $50,000 $50,000 Various Parks Landscaping/Improvements Project Description Estimated Project Costs This project provides funding to improve the softball, baseball, and multi-use Legal Administration sports field. This will be accomplished by improving the irrigation systems, Architectural/Engineering regrading, refurbishing skinned playing surfaces, and adding turf amendments. Right-of-Way Upgrades such as these have been implemented at Diablo Stadium and Kiwanis Park and have been well received by the public. Site Acquisition $0 $0 $0 Construction $0 $0 Utility Costs $0 Landscaping $0 Testing/Staking/Inspection $0 Furnishings/Equipment Other Project Costs 2003-04 Source of Funds GO Bonds $50,000 2004-05 Source of Funds GO Bonds Total $50,000 $0 $300,000 $300,000 Project Number: 6399839 Estimated Start Date: Ongoing Estimated Completion Date: Ongoing New Appropriations by Fiscal Year Prior Funding: 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $50,000 $50,000 $50,000 $50,000 $50,000 $50,000 $50,000 Total $300,000 General Governmental Program Summary Project Description Recommended Community Services Reservation/Registration System 2003-04 2004-05 Funded Funded Program Program Total 6-Year Additional Needs 2005-06 2006-07 2007-08 2008-09 Program 0 0 0 0 200,000 200,000 0 0 0 0 0 0 200,000 200,000 730,000 200,000 0 0 930,000 730,000 200,000 0 0 930,000 862,750 200,000 50,000 536,000 1,648,750 862,750 200,000 714,400 0 1,777,150 862,750 200,000 0 0 1,062,750 862,750 200,000 0 0 1,062,750 4,911,000 1,200,000 764,400 536,000 7,411,400 167,000 167,000 175,000 175,000 175,000 175,000 175,000 175,000 175,000 175,000 175,000 175,000 1,042,000 1,042,000 500,000 500,000 0 500,000 0 500,000 2,000,000 225,000 725,000 225,000 725,000 225,000 225,000 225,000 725,000 225,000 225,000 225,000 725,000 1,350,000 3,350,000 Municipal Arts Program 345,243 521,445 356,552 340,224 310,956 102,082 1,976,502 Neighborhood Improvement Program 225,000 225,000 225,000 225,000 225,000 225,000 1,350,000 300,000 65,000 50,000 32,000 0 447,000 300,000 35,000 35,000 32,000 0 402,000 300,000 35,000 35,000 32,000 305,000 707,000 300,000 35,000 35,000 32,000 0 402,000 300,000 35,000 35,000 32,000 0 402,000 300,000 35,000 35,000 32,000 0 402,000 1,800,000 240,000 225,000 192,000 305,000 2,762,000 Development Services AWA - 1st Street Redevelopment Downtown Public Parking City Hall Replacement Parking Railroad / State Land Purchase Financial Services Leased Office Space Information Technology City PC Software Environmental Upgrade Digital Infrastructure Public Works City Facilities Rehabilitation Historic Properties Preservation HVAC Equipment Replacement Energy Upgrade and Retrofit Carpet Replacement - Library Total Recommended Source of Funds Transfer from Other Funds Other Revenue Water/Wastewater Fund Capital Projects Fund Balance Total $2,839,243 $2,978,445 $3,537,302 $3,644,374 $2,400,706 $2,691,832 $18,091,902 2003-04 2004-05 $897,000 $1,352,000 1,097,000 1,105,000.00 345,243 521,445.00 500,000 0 $2,839,243 $2,978,445 America West Airlines - 1st Street Redevelopment Project Description Estimated Project Costs This project provides funding for the payments necessary under the Development Legal Administration Agreement between AWA and the City. Architectural/Engineering $0 $0 Right-of-Way $0 Site Acquisition Construction $0 $0 Utility Costs $0 Landscaping $0 Testing/Staking/Inspection $0 Furnishings/Equipment Other Project Costs 2003-04 Source of Funds Transfer from Other Funds $730,000 2004-05 Source of Funds Transfer from Other Fund Total $730,000 $0 $4,911,000 $4,911,000 Project Number: 67-996940 Estimated Start Date: 7/99 Estimated Completion Date: 4/19 New Appropriations by Fiscal Year Prior Funding: 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $730,000 $730,000 $862,750 $862,750 $862,750 $862,750 $730,000 Total $4,911,000 Downtown Public Parking Project Description Estimated Project Costs Legal Administration This project provides funding for operations and lease payments on private parking facilities which the City has leased or purchased parking rights for useArchitectural/Engineering as public parking in the downtown. These include: Right-of-Way LDS Church Lease Lots AWA Parking Structure and Lots Site Acquisition Brickyard Parking Structure Construction 5th & Farmer Leased Lot Utility Costs Hayden Flour Mill Parking Structure Transfer from Other Funds $200,000 Transfer from Other Fund $200,000 $0 $0 $0 $0 $0 Testing/Staking/Inspection $0 Furnishings/Equipment $0 Total 2004-05 Source of Funds $0 Landscaping Other Project Costs 2003-04 Source of Funds $0 $1,200,000 $1,200,000 Project Number: 67-00489 Estimated Start Date: 7/99 Estimated Completion Date: 7/09 New Appropriations by Fiscal Year Prior Funding: 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $280,000 Total $1,200,000 Leased Office Space Project Description Estimated Project Costs The purpose of this project is to provide funding for the office lease costs for theLegal Administration Code Enforcement Office and the Tax and License Office at Centerpoint Plaza. Architectural/Engineering $0 $0 Right-of-Way $0 Site Acquisition Construction $0 $0 Utility Costs $0 Landscaping $0 Testing/Staking/Inspection $0 Furnishings/Equipment Other Project Costs 2003-04 Source of Funds Transfer from Other Funds $167,000 2004-05 Source of Funds Transfer from Other Fund Total $1,042,000 Project Number: $175,000 $0 $1,042,000 67-996985 Estimated Start Date: Ongoing Estimated Completion Date: Ongoing New Appropriations by Fiscal Year Prior Funding: 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $167,000 $175,000 $175,000 $175,000 $175,000 $175,000 $160,000 Total $1,042,000 City PC Software Environmental Upgrade Project Description Estimated Project Costs Legal Administration Industry changes in software and hardware periodically obsolete computer operating environments. This shift by Microsoft to an NT style of operating Architectural/Engineering system for Personal Computers will be enforced in the market place by PC Right-of-Way manufacturers, who will deliver systems with only the new environment installed. The new Windows 2000 environment is not compatible with the Site Acquisition Windows 95/97 environment the City currently uses. The Gartner Group suggests Construction that by 2004 the City should have completed its conversion from Win 95/97 to Win 2000. This conversion will require the City to purchase upgrade software Utility Costs for all personal computers (desktop and laptop) and the 31 servers it uses. The Landscaping City's workforce will need to be trained in the differences of the new operating Testing/Staking/Inspection environment and the new office suite of work group software that will be used. Furnishings/Equipment Contract personnel will be needed to complete the conversion in as short a time as possible. Other Project Costs 2003-04 Source of Funds CIP Fund Balance $500,000 Total 2004-05 Source of Funds Other Revenue $500,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,000,000 $2,000,000 Project Number: 6700959 Estimated Start Date: Ongoing Estimated Completion Date: Ongoing New Appropriations by Fiscal Year Prior Funding: 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $500,000 $500,000 $0 $500,000 $0 $500,000 $0 Total $2,000,000 Digital Infrastructure Project Description Estimated Project Costs This project provides funding to upgrade and enhance the telecommunicationsLegal Administration network infrastructure providing increased bandwidth, reliability, and future Architectural/Engineering growth. The upgrade to the network infrastructure will ensure the ability of the Right-of-Way Information Technology Division to deliver current and future voice and data applications city-wide. It will cover conduit, fiber-optic cable, wireless, and otherSite Acquisition alternative telecommunication infrastucture enhancements. The bulk of the Construction funding is used to place conduit and fiber optic-cable into joint trenches during undergrounding projects. This conduit and cable will be used in the future to Utility Costs connect City facilities, as well as, providing a pre-buried network of ducts for use Landscaping by telecommunications companies wishing to establish service in Tempe. The preburied network of conduit will provide an alternative to future street cuts. Once Testing/Staking/Inspection Furnishings/Equipment this network is in place, the potential exists to lease conduit and/or fiber to telecommunication providers to recover the cost of installation as well as generate Other Project Costs revenue for the City. 2003-04 Source of Funds 2004-05 Source of Funds Total Other Revenue $225,000 Other Revenue $225,000 Project Number: $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,350,000 $1,350,000 67-946555 Estimated Start Date: Ongoing Estimated Completion Date: Ongoing New Appropriations by Fiscal Year Prior Funding: 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $225,000 $225,000 $225,000 $225,000 $225,000 $225,000 $225,000 Total $1,350,000 Municipal Arts Program Project Description Estimated Project Costs This project provides for various Municipal Arts projects as determined by the Legal Administration Municipal Arts Commission and the City Council. Architectural/Engineering Right-of-Way $0 Site Acquisition Construction $0 $0 Utility Costs $0 Landscaping $0 Testing/Staking/Inspection $0 Furnishings/Equipment $0 Other Project Costs 2003-04 Source of Funds W/WW Fund $345,243 Total 2004-05 Source of Funds W/WW Fund $521,445 ` $0 $0 $1,976,502 $1,976,502 Project Number: 6699790 Estimated Start Date: Ongoing Estimated Completion Date: Ongoing New Appropriations by Fiscal Year Prior Funding: 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $345,243 $521,445 $356,552 $340,224 $310,956 $102,082 $0 Total $1,976,502 Neighborhood Improvement Program Project Description Estimated Project Costs This is the annual Neighborhood Grant Program which provides funding for Legal Administration small projects (less than $12,000 per association requests) in Tempe Architectural/Engineering neighborhoods. The selection of recipients and the amounts awarded are determined by the Neighborhood Service Team (NST). Examples of projects Right-of-Way include landscape, security lighting, park improvements, etc. The 2002-2003 Site Acquisition applications totalled requests for $538,741 for the $225,000 in available funding. Construction $0 $0 $0 $0 $0 Utility Costs $0 Landscaping $0 Testing/Staking/Inspection $0 Furnishings/Equipment Other Project Costs 2003-04 Source of Funds Other Revenue $225,000 2004-05 Source of Funds Other Revenue Total $225,000 $0 $1,350,000 $1,350,000 Project Number: 67-946556 Estimated Start Date: Ongoing Estimated Completion Date: Ongoing New Appropriations by Fiscal Year Prior Funding: 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $225,000 $225,000 $225,000 $225,000 $225,000 $225,000 $225,000 Total $1,350,000 City Facilities Rehabilitation Project Description Estimated Project Costs This project provides for the rehabilitation and repair of City owned properties. Legal Administration As existing City facilities continue to age, it is necessary to rehabilitate them with Architectural/Engineering roofing repairs, structural repairs, exterior painting, electrical systems and other Right-of-Way interior infrastructure. It is necessary to continue funding this capital improvement project for the Site Acquisition following reasons: well maintained buildings last longer and reduce operating Construction costs, moisture infiltration not only damages or weakens the building's structural integrity, but also damages interior furnishings, and promotes the potential for Utility Costs developing harmful growth of molds. Landscaping Scheduled repairs will be as follows: Museum roof, Pyle Adult Center roof and Testing/Staking/Inspection exterior water proofing, Fire department facilities painting, Escalante Center structural modifications, Improve area lighting at Priest and Hardy yards, and Furnishings/Equipment Diablo stadium epoxy floor recoating. Other Project Costs 2003-04 Source of Funds Other Revenue $300,000 Total 2004-05 Source of Funds Other Revenue $300,000 $0 $150,000 $0 $0 $1,650,000 $0 $0 $0 $0 $0 $1,800,000 Project Number: 67-986867 Estimated Start Date: 7/02 Estimated Completion Date: 7/09 New Appropriations by Fiscal Year Prior Funding: 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $300,000 $300,000 $300,000 $300,000 $300,000 $300,000 $300,000 Total $1,800,000 Historic Properties Preservation Project Description Estimated Project Costs This project was orginally developed to provide funding to preserve the structural Legal Administration and aesthetic value of city owned historical properties. Our immediate needs are Architectural/Engineering as follows: The Hackett house requires two projects: 1) to remove, repair and replace the Right-of-Way existing wooden floor, which has been extensively damaged by termites, and 2)Site Acquisition to install a water drainage system surrounding the house which should stabilize Construction the existing degradation and eliminate moisture damage to the brick facade. Utility Costs A new roof at the Peterson house is needed to prevent further water damage toLandscaping the facia and to prevent any moisture damage to the interior walls. This location Testing/Staking/Inspection is now requiring paint and repairs to the exterior fence. Furnishings/Equipment $0 $20,000 $0 $0 $220,000 $0 $0 $0 $0 Other Project Costs 2003-04 Source of Funds Other Revenue $65,000 2004-05 Source of Funds Other Revenue $0 Total $35,000 $240,000 Project Number: 67-976809 Estimated Start Date: 7/02 Estimated Completion Date: 7/09 New Appropriations by Fiscal Year Prior Funding: 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $65,000 $35,000 $35,000 $35,000 $35,000 $35,000 $50,000 Total $240,000 HVAC Equipment Replacement Project Description Estimated Project Costs City owned A/C equipment located city wide has either been identified as beingLegal Administration ineffective, inefficient, or has exceeded its life span and now requires Architectural/Engineering replacement due to their increased down time. Staff has determined that repair Right-of-Way costs to existing equipment is not a prudent expenditure of City monies. Site Acquisition The benefits of purchasing new A/C Units would be increased reliability in Construction providing consistent heating/cooling, efficient use of energy, and eliminating work requests for repairs. This would allow Technicians to respond to other Utility Costs needed preventive maintenance activities. The first year activities would be the Landscaping replacement of heating, ventilation, and air conditioning (HVAC) units at Testing/Staking/Inspection theTraffic Operations facility, Hacket House, and Pyle Adult center. Furnishings/Equipment $0 $0 $0 $0 $0 $0 $0 $0 $225,000 Other Project Costs 2003-04 Source of Funds Other Revenue $50,000 Total 2004-05 Source of Funds Other Revenue $35,000 $0 $225,000 Project Number: Estimated Start Date: 67-986873 Ongoing Estimated Completion Date: Ongoing New Appropriations by Fiscal Year Prior Funding: 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $50,000 $35,000 $35,000 $35,000 $35,000 $35,000 $50,000 Total $225,000 Energy Upgrade and Retrofit Project Description Estimated Project Costs This project was originally titled "Lighting upgrade and retrofit." This CIP Legal Administration provided better lighting of the book stacks for library patrons, which resulted in a Architectural/Engineering reduction of energy use and lower electrical bills. Site surveys of the city's Right-of-Way interior lighting were conducted and a priority list of lighting projects was developed. To date 19 city buildings have been retrofitted with improved energy Site Acquisition lighting, resulting in annual savings of $125,000. Construction This project can be expanded to improve energy efficiency throughout the city Utility Costs and reduce power utility bills. Landscaping $0 $8,000 $0 $0 $0 $0 $0 Testing/Staking/Inspection $0 Furnishings/Equipment $120,000 Other Project Costs 2003-04 Source of Funds Other Revenue $32,000 2004-05 Source of Funds Other Revenue $64,000 Total $32,000 $192,000 Project Number: 67-976688 Estimated Start Date: 7/03 Estimated Completion Date: 7/09 New Appropriations by Fiscal Year Prior Funding: 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $32,000 $32,000 $32,000 $32,000 $32,000 $32,000 Total $192,000 Transportation The Transportation element of the Capital Improvements Program comprises Transportation and Rightof-Way Improvements as well as Traffic Signals/Street Lighting programs for the City. Combined, they constitute 10% of the $117,968,707 Capital Improvements Program for 2003-04, and 4% of the $176,983,222 Capital Improvements Program for 2004-05. A total of $3.9 million and $6.3 million in General Obligation bonds will go to support these projects. The balance of funding will come from payas-you-go financing and improvement district bonds. The 2003-04 and 2004-05 Capital Improvements Program provides for: Transportation and R.O.W. Improvements - funding for road widening at the Playa del Norte Redevelopment Project, and continued funding for local and major street renovation and reconstruction, minor concrete improvements, and various street landscaping; and Traffic Signals-Street Lighting - continued funding for new signals/modular upgrades, utility undergrounding, streetlight upgrades/new installations, and installation of ADA pedestrian push buttons. CAPITAL PROGRAM PROGRAM Enterprise Special Purpose General Purpose Transportation TOTAL CAPITAL PROGRAM FY 2003-04 FY 2004-05 $34,919,292 $54,404,500 64,185,390 103,958,829 7,656,543 12,279,395 11,207,482 $117,968,707 6,340,498 $176,983,222 Transportation & R.O.W. Improvements Program Summary Project Description Recommended Playa del Norte / Miller Road Widening I.D. Playa del Norte / Rural Road Widening I.D. Minor Concrete Improvements Major Street Renovation Local and Major Street Reconstruction Local Street Renovation Rural Road / Western Canal Drainage Improvement Bridge Maintenance City Facilities Parking Lots Various Street Landscaping Minor Street and Alley Improvements Neighborhood Transportation Management Total Recommended Source of Funds General Obligation Bonds Improvement District Bonds Total 2003-04 2004-05 Funded Funded Program Program Total 6-Year Additional Needs 2005-06 2006-07 2007-08 2008-09 Program 7,182,900 0 0 0 0 0 7,182,900 1,640,300 0 0 0 0 0 1,640,300 325,000 265,821 200,000 325,000 1,577,230 1,768,547 325,000 1,541,954 2,051,316 325,000 1,384,614 2,258,311 325,000 648,530 2,118,311 325,000 384,559 1,792,936 1,950,000 5,802,708 10,189,421 200,000 145,000 1,094,161 0 1,255,063 0 1,107,896 0 1,210,090 0 797,637 0 5,664,847 145,000 100,000 88,461 75,000 40,000 100,000 215,560 75,000 40,000 100,000 182,728 75,000 40,000 100,000 52,057 75,000 40,000 100,000 120,873 75,000 40,000 100,000 60,266 75,000 40,000 600,000 719,945 450,000 240,000 0 200,000 200,000 200,000 200,000 200,000 1,000,000 $10,262,482 2003-04 $3,934,282 6,328,200 $10,262,482 $5,395,498 $5,771,061 $5,542,878 $4,837,804 $3,775,398 $35,585,121 2004-05 $5,395,498 0 $5,395,498 Playa del Norte / Miller Road Widening I.D. Project Description Estimated Project Costs This project provides funding for the acquisition of right-of-way and the Legal Administration construction of Miller Rural Road south of Curry Road and through the Playa del Architectural/Engineering Norte Redevelopment Project to connect to Rural Road. Playa del Norte is the Right-of-Way private development that will occur on the North Bank of Town Lake on both sides of Rural Road. Project would also include the development of a Site Acquisition park/retension area on the north of the lake at the south end of Miller Road. Construction $10,000 $300,000 $2,328,000 $0 $2,909,000 Utility Costs Funding is through an improvement district (I.D.), with the City being responsible for costs associated with the acquisition of right-of-way and Landscaping construction costs related to extending Miller Road south from Curry Road to just south of the 202 Freeway (est. at $1,560,000). Playa del Norte development Testing/Staking/Inspection Furnishings/Equipment group would be responsible for the remaining costs. $885,000 $460,000 $290,900 $0 Other Project Costs 2003-04 Source of Funds Improvement Dist. Bonds GO Bonds 2004-05 Source of Funds Total $0 $7,182,900 $5,622,900 Project Number: $1,560,000 Estimated Start Date: 5101240 7/03 Estimated Completion Date: 10/04 New Appropriations by Fiscal Year Prior Funding: $0 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $7,182,900 $0 $0 $0 $0 $0 Total $7,182,900 Playa del Norte / Rural Road Widening I.D. Project Description Estimated Project Costs Legal Administration The purpose is to provide funding for the widening of Rural Road and creation of a signalized intersection in conjunction with the Playa del Norte RedevelopmentArchitectural/Engineering Project. Playa del Norte is the private development that will occur on the North Right-of-Way Bank of Town Lake on both sides of Rural Road. Site Acquisition Funding for this project will be through an improvement district (I.D), with the Construction City being responsible for costs associated with the widening of the approach to Utility Costs Rural Road Bridge (est. at $935,000). Playa del Norte development group would be responsible for all other costs. Landscaping $10,000 $200,000 $0 $0 $1,273,000 $30,000 $0 Testing/Staking/Inspection 2003-04 Source of Funds $127,300 Furnishings/Equipment $0 Other Project Costs $0 Total 2004-05 Source of Funds $1,640,300 GO Bonds $935,000 Project Number: Improvement Dist. Bonds $705,300 Estimated Start Date: 5101250 7/03 Estimated Completion Date: 10/04 New Appropriations by Fiscal Year Prior Funding: $0 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $1,640,300 $0 $0 $0 $0 $0 Total $1,640,300 Minor Concrete Improvements Project Description Estimated Project Costs This project will provide for the replacement of broken curbs, gutters, and sidewalks throughout the City and for the construction of curbs, gutters, and sidewalks to close small gaps at various locations. Legal Administration $0 Architectural/Engineering $0 Right-of-Way $0 Site Acquisition Construction Utility Costs $0 Landscaping $0 Testing/Staking/Inspection 2003-04 Source of Funds GO Bonds $325,000 2004-05 Source of Funds GO Bonds $135,000 Furnishings/Equipment $0 Other Project Costs $0 Total $325,000 $0 $1,815,000 $1,950,000 Project Number: 54-997001 Estimated Start Date: Ongoing Estimated Completion Date: Ongoing New Appropriations by Fiscal Year Prior Funding: 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $325,000 $325,000 $325,000 $325,000 $325,000 $325,000 Total $1,950,000 Major Street Renovation Project Description Estimated Project Costs This project provides ongoing preventive maintenance (micro-seal) of major arterial and collector streets throughout the city in accordance with the city's pavement management program. Legal Administration $0 Architectural/Engineering $0 Right-of-Way $0 Site Acquisition Construction Utility Costs $0 Landscaping $0 Testing/Staking/Inspection 2003-04 Source of Funds GO Bonds $265,821 GO Bonds $1,577,230 $310,136 Furnishings/Equipment $0 Other Project Costs $0 Total 2004-05 Source of Funds $0 $5,492,572 $5,802,708 Project Number: 5499931 Estimated Start Date: Ongoing Estimated Completion Date: Ongoing New Appropriations by Fiscal Year Prior Funding: 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $265,821 $1,577,230 $1,541,954 $1,384,614 $648,530 $384,559 Total $5,802,708 Local & Major Street Reconstruction Project Description Estimated Project Costs This project provides for the reconstruction or resurfacing of local and major Legal Administration streets throughout the city in accordance with the city's pavement management Architectural/Engineering program. Right-of-Way Site Acquisition Construction GO Bonds $200,000 2004-05 Source of Funds GO Bonds $0 $0 $9,440,213 $0 Landscaping $0 $499,472 Furnishings/Equipment $0 Other Project Costs $0 Total $1,768,547 $249,736 Utility Costs Testing/Staking/Inspection 2003-04 Source of Funds $0 $10,189,421 Project Number: 5499941 Estimated Start Date: Ongoing Estimated Completion Date: Ongoing New Appropriations by Fiscal Year Prior Funding: 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $200,000 $1,768,547 $2,051,316 $2,258,311 $2,118,311 $1,792,936 Total $10,189,421 Local Street Renovation Project Description Estimated Project Costs This project provides for the ongoing preventive maintenance (slurry seal) of Legal Administration local/residential streets throughout the city in accordance with the city's pavement Architectural/Engineering management program. Right-of-Way Site Acquisition Construction GO Bonds $200,000 GO Bonds $1,094,161 $0 $5,420,112 $0 Landscaping $0 $244,735 Furnishings/Equipment $0 Other Project Costs $0 Total 2004-05 Source of Funds $0 Utility Costs Testing/Staking/Inspection 2003-04 Source of Funds $0 $0 $5,664,847 Project Number: 5499951 Estimated Start Date: Ongoing Estimated Completion Date: Ongoing New Appropriations by Fiscal Year Prior Funding: 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $200,000 $1,094,161 $1,255,063 $1,107,896 $1,210,090 $797,637 Total $5,664,847 Rural Road/Western Canal Drainage Improvement Project Description Estimated Project Costs This project provides funds to modify drainage, landscape, and replace the Legal Administration masonry wall on the west side of Rural Road north of the Western Canal. The Architectural/Engineering existing wall has been damaged by storm water runoff from the street right-ofway. A taller wall is necessary due to the height of the Rural Road sidewalk to Right-of-Way create a safety barrier for pedestrians. Site Acquisition 2003-04 Source of Funds GO Bonds $0 $10,000 $0 Construction $0 $100,000 Utility Costs $10,000 Landscaping $15,000 Testing/Staking/Inspection $10,000 Furnishings/Equipment $0 Other Project Costs $0 2004-05 Source of Funds Total $145,000 Project Number: $145,000 5401260 Estimated Start Date: 9/03 Estimated Completion Date: 12/04 New Appropriations by Fiscal Year Prior Funding: $0 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $145,000 $0 $0 $0 $0 $0 Total $145,000 Bridge Maintenance Project Description Estimated Project Costs Legal Administration This project will provide for the maintenance and rehabilitation of bridges located throughout Tempe as identified in the City's Bridge Inspection Report. Fiscal Architectural/Engineering year 2003-05 funding will be used to replace bridge joints at various locations and perform further studies and potential design of canal bridge replacement atRight-of-Way Baseline Road near Kyrene Road. Site Acquisition Construction 2003-04 Source of Funds GO Bonds $100,000 GO Bonds $100,000 $0 $0 $520,000 Utility Costs $0 Landscaping $0 Testing/Staking/Inspection $0 Furnishings/Equipment $0 Other Project Costs $0 Total 2004-05 Source of Funds $0 $80,000 $600,000 Project Number: 54-99890 Estimated Start Date: Ongoing Estimated Completion Date: Ongoing New Appropriations by Fiscal Year Prior Funding: 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $100,000 $100,000 $100,000 $100,000 $100,000 $100,000 Total $600,000 City Facilities Parking Lots Project Description Estimated Project Costs This project will provide for the sealing, resurfacing, and reconstruction of City Legal Administration parking lots in accordance with the City's Pavement Program. Architectural/Engineering $0 $0 Right-of-Way Site Acquisition Construction GO Bonds $88,461 2004-05 Source of Funds GO Bonds $0 Landscaping $0 $39,602 Furnishings/Equipment $0 Other Project Costs $0 Total $215,560 $0 $680,343 Utility Costs Testing/Staking/Inspection 2003-04 Source of Funds $0 $719,945 Project Number: 5499901 Estimated Start Date: Ongoing Estimated Completion Date: Ongoing New Appropriations by Fiscal Year Prior Funding: 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $88,461 $215,560 $182,728 $52,057 $120,873 $60,266 Total $719,945 Various Street Landscaping Project Description Estimated Project Costs Legal Administration This project will provide funding to continue improvement of various street rightsof-way and public properties by installation of upgraded landscaping. Architectural/Engineering $0 $0 Right-of-Way $0 Site Acquisition Construction $0 $0 Utility Costs $0 Landscaping 2003-04 Source of Funds GO Bonds $75,000 GO Bonds Testing/Staking/Inspection $0 Furnishings/Equipment $0 Other Project Costs $0 Total 2004-05 Source of Funds $75,000 $450,000 $450,000 Project Number: 54-99911 Estimated Start Date: Ongoing Estimated Completion Date: Ongoing New Appropriations by Fiscal Year Prior Funding: 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $75,000 $75,000 $75,000 $75,000 $75,000 $75,000 Total $450,000 Minor Street and Alley Improvements Project Description Estimated Project Costs This project will provide for the improvement or dust control of minor streets and Legal Administration alleys throughout the City, including paving unpaved streets or upgrading of Architectural/Engineering substandard minor streets to City standards. The paving of these streets and dust Right-of-Way control in the alleys will assist the City in meeting its air quality standard requirements. Site Acquisition Construction 2003-04 Source of Funds GO Bonds $40,000 2004-05 Source of Funds GO Bonds $0 $0 $0 $240,000 Utility Costs $0 Landscaping $0 Testing/Staking/Inspection $0 Furnishings/Equipment $0 Other Project Costs $0 Total $40,000 $0 $240,000 Project Number: 5499780 Estimated Start Date: Ongoing Estimated Completion Date: Ongoing New Appropriations by Fiscal Year Prior Funding: 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $40,000 $40,000 $40,000 $40,000 $40,000 $40,000 Total $240,000 Neighborhood Transportation Management Project Description Estimated Project Costs Legal Administration This project will provide the Transportation Division with resources to strengthen its ability to address neighborhood traffic concerns. Traffic Engineering staff Architectural/Engineering will work with neighborhoods to plan and identify the most effective Right-of-Way neighborhood-specific traffic calming measures, including speed humps. Site Acquisition Construction GO Bonds $200,000 $0 $900,000 $0 Landscaping $0 $25,000 Furnishings/Equipment $0 Other Project Costs $0 Total 2004-05 Source of Funds $0 Utility Costs Testing/Staking/Inspection 2003-04 Source of Funds $0 $75,000 $1,000,000 Project Number: Estimated Start Date: 54-99920 7/99 Estimated Completion Date: Ongoing New Appropriations by Fiscal Year Prior Funding: 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $0 $200,000 $200,000 $200,000 $200,000 $200,000 $800,000 Total $1,000,000 Traffic Signals/Street Lighting Program Summary Project Description Recommended New Signals/Modular Upgrades Utility Undergrounding Streetlight Upgrades/New Installations Installation of ADA Pedestrian Push Buttons Total Recommended Source of Funds General Obligation Bonds HURF Fund Balance Total 2003-04 2004-05 Funded Funded Program Program Total 6-Year Additional Needs 2005-06 2006-07 2007-08 2008-09 Program 320,000 300,000 300,000 320,000 300,000 300,000 320,000 300,000 300,000 320,000 350,000 300,000 320,000 350,000 300,000 320,000 350,000 300,000 1,920,000 1,950,000 1,800,000 25,000 25,000 25,000 25,000 25,000 25,000 150,000 $945,000 $945,000 $945,000 $995,000 $995,000 $995,000 $5,820,000 2003-04 $0 945,000 $945,000 2004-05 $945,000 0 $945,000 New Signals/Modular Upgrades Project Description Estimated Project Costs This project provides for the installation of new traffic signals as warranted or for Legal Administration the conversion of existing signals to modular standards. The projected schedule is Architectural/Engineering as follows: Right-of-Way FY2003/2004 Baseline & College Site Acquisition Country Club & Guadalupe Construction Signals as warranted per Traffic Engineering studies Utility Costs FY2004/2005 Landscaping As part of the Comprehensive Transportation Plan, a tentative schedule has been Testing/Staking/Inspection set for: Furnishings/Equipment University & Roosevelt University & Beck Other Project Costs Signals as warranted per Traffic Engineering studies 2003-04 Source of Funds 2004-05 Source of Funds Total HURF Fund Balance $320,000 GO Bonds $320,000 Project Number: $0 $0 $0 $0 $1,920,000 $0 $0 $0 $0 $0 $1,920,000 6999879 Estimated Start Date: Ongoing Estimated Completion Date: Ongoing New Appropriations by Fiscal Year Prior Funding: 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $320,000 $320,000 $320,000 $320,000 $320,000 $320,000 $400,000 Total $1,920,000 Utility Undergrounding Project Description Estimated Project Costs Legal Administration This project will provide for the undergrounding of overhead utility lines. We will use the 2003-04 budget to complete the underground conversion of overhead Architectural/Engineering lines on Farmer Avenue from First St. to University Drive. We have already completed the underground conduit installation using fundings from prior year Right-of-Way and contributions from Project Impact. We will need another $300,000 to Site Acquisition complete the conversion. The 2004-05, 2005-06 and 2006-07 budget will be used Construction to complete the power line undergrounding for the remaining of Farmer Avenue Utility Costs from University Drive to 13th Street. $0 $75,000 $0 $0 $1,775,000 $0 Landscaping The goal for completing overhead line conversion on Farmer Avenue is to provide a more reliable power source to St. Luke Hospital from the APS Substation at First Street. This segment is located mainly in an established residential area, the possibility of undergrounding being done by others (or developers) is slim unless that area is being redeveloped. 2003-04 Source of Funds 2004-05 Source of Funds HURF Fund Balance $300,000 GO Bonds $300,000 Testing/Staking/Inspection $0 $100,000 Furnishings/Equipment $0 Other Project Costs $0 Total $1,950,000 Project Number: Estimated Start Date: 69-999859 Ongoing Estimated Completion Date: Ongoing New Appropriations by Fiscal Year Prior Funding: 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $300,000 $300,000 $300,000 $350,000 $350,000 $350,000 $0 Total $1,950,000 Streetlight Upgrades/New Installs Project Description Estimated Project Costs This project provides for the installations of new street lights at various locations Legal Administration as well as the upgrading of streetlights from mercury vapor luminaires to high Architectural/Engineering pressure luminaires. A typical year's program would include installation of 200 new arterial street lights, 50 mid-block residential lights, and five (5) alley lightsRight-of-Way in high crime areas. Site Acquisition Construction 2003-04 Source of Funds HURF Fund Balance $300,000 2004-05 Source of Funds GO Bonds $0 $0 $0 $1,800,000 Utility Costs $0 Landscaping $0 Testing/Staking/Inspection $0 Furnishings/Equipment $0 Other Project Costs $0 Total $300,000 $0 $1,800,000 Project Number: 6999869 Estimated Start Date: Ongoing Estimated Completion Date: Ongoing New Appropriations by Fiscal Year Prior Funding: 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $300,000 $300,000 $300,000 $300,000 $300,000 $300,000 $320,000 Total $1,800,000 Installation of ADA Pedestrian Push Buttons Project Description Estimated Project Costs Legal Administration The purpose of this project is to convert existing or install new accessible pedestrian push buttons at traffic signal controlled intersections. This project isArchitectural/Engineering a step toward complying with the Americans with Disabilities Act (ADA) and provides an essential public service for Tempe citizens. These devices provideRight-of-Way audible and vibro-tactile information for pedestrians who have limited or no Site Acquisition sight, improving their personal safety as they navigate Tempe streets. These Construction devices reduce the City's liability exposure and facilitate and enhance public service. It is planned that 10 intersections will be converted to ADA pedestrian Utility Costs push buttons per year. Landscaping 2003-04 Source of Funds HURF Fund Balance $25,000 GO Bonds $25,000 $0 $0 $150,000 $0 $0 Testing/Staking/Inspection $0 Furnishings/Equipment $0 Other Project Costs $0 Total 2004-05 Source of Funds $0 $0 $150,000 Project Number: Estimated Start Date: 6901270 7/03 Estimated Completion Date: Ongoing New Appropriations by Fiscal Year Prior Funding: 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $0 Total $150,000 Office of Management and Budget Staff Even though the budget is heard by the Mayor and Council in March and April, its preparation begins several months prior, with projections of City funding sources, remaining bond authorization, reserves, revenues, and expenditures. It continues through numerous phases and culminates with adoption in June. We recognize and appreciate that budgeting is an ongoing process of planning, monitoring, problem solving, and customer service throughout the fiscal year. Each year, every effort is made to improve both the budget process and the usefulness of the budget documents. Cecilia Velasco-Robles Deputy Financial Services Manager Debbie Bair Budget & Research Analyst Michelle Caruso Budget & Research Analyst Travis Clark Budget & Research Analyst Anita Erspamer Executive Assistant Natalie Winger Accountant Please see City of Tempe budget documents on the World Wide Web. We’re at: www.tempe.gov/budget If you have questions, call us at 480-3508350 Our mailing address is: City of Tempe Financial Services/Budget P.O. Box 5002 Tempe, Arizona 85280