CAPITAL IMPROVEMENT PROGRAM 2006-2016 July 01, 2006 RESOLUTION NO. R2006-50 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF YUMA, ARIZONA, ADOPTING THE TEN-YEAR CAPITAL IMPROVEMENT PROGRAM FOR FISCAL YEARS 2006-2016 , WHEREAS, pursuant to Article XIII, Section 10 of the City Charter of the City of Yuma (City), the City Council did compile a list of all Capital Improvements which are proposed to be undertaken during the next ten fiscal years, with appropriate supporting information as to the necessity for such improvements; and, WHEREAS, pursuant to Article Xm, Section 11 of said Charter, the City Council did publish a general summary of the Capital Improvement Program (CIP) and, following due Public Notice, Public Hearings were held on May 15,2006 and June 7,2006; and WHEREAS, the first year of the CIP is to be undertaken utilizing committed CIP funding, the second through the fifth years of the CIP are a fiscally constrained CIP and the sixth through the tenth years of the program are a projected CIP based on reasonably anticipated revenues. NOW THEREFORE, BE IT RESOLVED by the City Council of the City of Yuma, Arizona, as follows: SECTION 1: That the Capital Improvement Program for Fiscal Years 2006-2016 dated May 1, 2006, on file with the City Clerk, as increased, reduced or changed, is hereby adopted. SECTION 2: That the Capital Improvement Program Budget for Fiscal Year 20062007 be adopted as a part of the City of Yuma budget for Fiscal Year 2006-2007. 8 City of Yuma 2006-2016 Capital Improvement Program i INTRODUCTION The City of Yuma 2006-2016 Capital Improvement Program (CIP) is a 10-year schedule of public physical improvements to the City's infrastructure. The CIP sets forth proposed expenditures for systematically constructing, upgrading, expanding and replacing the community's physical plant. Projects are typically major expenditures. They can be either infrequent projects, such as the East Mesa Water Pollution Control Facility construc tion or systematic improvements, such as street surface replacement. Typical, regular maintenance of City facilities is not considered a Capital Improvement. Therefore, a project such as street slurry seals, which seals minor surface cracks, would not be found in this document and is funded, scheduled and completed within the Public Works Department’s Operations and Maintenance (O&M) budget. Because the CIP identifies where City facility improvements will be done, where City facilities will be expanded a nd where City dollars will be spent, it is more than a schedule of expenditures. It is a statement of budgetary policy and a planning document. Implementation of the Capital Improvement Program is a tool to accomplish the adopted goals and policies of the City Council and the City of Yuma General Plan. Those goals and policies are found in a number of programs and plans adopted and approved by the City Council. Projects in the 10-year program support the implementation of the City’s Growth and Development Policy, the Old Town Design Guidelines, the 2020 Vision Plan, the General Plan Parks and Recreation Element and Bicycle Element, the City Water Distribution Plan, the City Wastewater Facilities Plan (208), Major Roadways Plan - 2005 and the voter-approved Road Tax. Additionally, the 10-year Capital Improvement Program supports a number of the Goals and Objectives found in the City of Yuma General Plan. Projects are developed throughout the course of the fiscal year. The typical process involves council, citizens or staff proposing needed projects. Staff then coordinates the project with any related projects, reviews the project in order to determine how completing the project will accomplish the goals and policies of the City of Yuma, identifies a funding source and develops a project schedule. Projects are reviewed by the responsible department and placed within the department's ten-year schedule. During the annual review of the 10-year CIP completed projects are removed, new projects are proposed and scheduled projects moved forward through the schedule or moved to later years. The timing of a project is dependent upon the current condition of the facility and funding availability. The 10-year CIP is fine-tuned in the development process, with ove rsight of senior staff and the City Administrator. At this time, the specific dollar amounts available for each funding source are known or reliable projections can be made and projects may be added or dropped based on the amount of funds available in the next ten years. After review by staff the next step is referral to the Planning and Zoning Commission for comments and recommendations. The Planning and Zoning Commission’s role is to review the Capital Improvement Program for consistency with the goals and policies of the General Plan. 2006-2016 CAPITAL IMPROVEMENT PROGRAM This CIP anticipates the completion of a number of major projects over the next 10 years, including major rehabilitation to City facilities. The primary funding issues are the lack of funds to pursue timely implementation of the Parks and Recreation Element, development of the Riverfront and Downtown, and the lack of adequate funds for water and sanitary sewer projects. The Parks and Recreation Element of the City of Yuma details an extensive Implementation Plan that identifies the park and recreation needs of a growing community. Currently there are limited General Fund dollars available to fund regular operation and maintenance of city facilities and construction of new parks. Additionally, the City is striving to develop the Riverfront and Downtown. In order to promote private development, city funds will be needed to partner with private interests to provide needed infrastructure. ii The City is pursuing a variety of funding resources to meet the needs of the community and to have an economically viable city into the future. These funding sources include private investment, bond issues, and state and federal grant funding. The last two funding issues the City is facing ha ve to do with water and wastewater. There continues to be a growing need for an East Mesa Wastewater collection and treatment facility due to increasing residential development. Arizona Department of Environmental Quality is stressing the need to have developments where septic systems are failing find another solution - the City of Yuma - for wastewater disposal. Additionally, the City’s older existing wastewater system of pipes, force mains and trunk sewers is in need of major repairs and there is a lack of Sewer Utility Funds to accomplish these projects. There is also a need to establish Water treatment and distribution facilities in the East Mesa and to rezone the Water system based on the recommendations of the Water Distribution Master Plan. A voter-approved bond issue was approved to fund water and wastewater projects needs. This bond issue has permitted the City to the construction of the initial phase of the water and wastewater facilities needed in a more expeditious manner. All projects within the nine sections of the CIP focus on construction of major new projects and rehabilitation to existing facilities. The General Government Section identifies riverfront projects, which include the local match for specific grants the City has received, and two projects that were identified in the Heritage Area Plan. The Parks and Recreation Section focus is continuing to bring City parks to a specific public standard. The Public Safety Section lists major maintenance projects and a need to construct New Fire Station Facilities to better serve the neighboring population and to locate in a facility that best meets current spacing needs. The Transportation Section focuses on major upgrades to City facilities and the completion of a number of major road and bike facilities. Over the next ten years the City will be completing construction or reconstruction of the following facilities: The Water Utility and Sewer Utility Sections list of projects focuses on the replacement and upgrade of the water and sewer utility lines throughout the city. These sections include projects to address the needs of the growing population on the East Mesa with a study on the enlargement or rebuild of the existing water treatment facilities and a new waste water treatment facility on the East Mesa, as well as providing continued expansion to City utilities in the Yuma Valley. The Stormwater Control Section primarily identifies projects that will expand the City’s collection, conveyance and disposal facilities and supplement the existing systems of the Yuma County Flood Control District, including the development of a major stormwater retention basin in the Smucker Park area. BACKGROUND The first year of the CIP is called the Capital Budget. An extensive project, such as the installation of a major waterline, may typically be a multi-year project. The first year of the project is the design stage and the second year will involve actual construction. The Capital Budget is integrated with the operating budget of the City where funds are allotted to be spent in those fiscal years. The projects within the first year of the CIP are prioritized. Prioritization is developed within each section and is established by the responsible departments. The prioritization is based on the need for the project and the available resources needed to complete the project. The availability of funds is the key factor as to whether a project will be initiated and completed. There are a variety of funding sources available to the City of Yuma for Capital Improvement Projects iii but these funding sources are limited in both the amount available for CIP projects and in how these funds can be used. On page 7 is a table listing the different types of funding sources available for Capital Improvement Projects and a brief explanation of the source of those funds. Within this CIP document the funding sources are abbreviated for ease of use. The abbreviations are noted in the attached table. Projects can be funded by City, state or federal monies and by outside agencies and individuals. City funding sources typically are general taxes: sales and property, fees paid to the City for services and utilities, the Road tax and the Highway Users Revenue Fund, a state gasoline tax with specific amounts allotted to municipalities based on population. Funding revenues received by the City are used not only for building new infrastructure but maintaining and operating the existing infrastructure. Therefore, if maintenance and operation costs are high then there will be fewer funds available for Capital Improvements. Additionally, many of the funding revenues can only be spent on designated projects. For example, fees collected throughout the Water System Development Contract can only be used to construct or improve waterlines 10” in diameter or larger, not to construct a roadway facility. A fund source added this year is the Citywide Impact Fee, which can provide funding to several specific types of projects. This CIP is fiscally balanced and constrained in all funding sources within the first five years of the program and is based upon revenues that can reasonable be anticipated to be received within the next five years of the program. The projects in the ten-year program are funded based on the best revenue estimates available. There are a number of projects, which could not be scheduled into the ten-year program since funding is not available and their need is not immediate. These Potential Infrastructure Projects (P.I.P.) are listed below. As the program is annually reviewed and updated and revenues become available, these unfunded projects could move forward into the ten-year program. There is also the possibility that if another funding source becomes available for a project, such as a state grant, a project could move forward into the first year of the program, the capital budget. Potential Infrastructure Projects (P.I.P.) 1.0022 Community Amphitheater 1.0023 Performing Arts Center 2.9701 Black Hill Specialized Facility 2.0101 Kennedy/McGraw Multi-Sports Complex 3.9303 Protective Fence - Desert Hills Golf Course 5.9620 Avenue D - 16th Street to 24th Street 5.9703 Avenue A – 24th Street to 32nd Street 5.9743 Avenue D ROW Acquisition - 24th to 32nd Sts. 5.9809 Intersection I-8 - 4th Avenue & Winterhaven 5.9810 Right-of-Way Improvements - Target Area 1 5.9905 Meadowbrook Subdivision Reconstruction 5.0305 Avenue 3½E Canal Bridge 5.0531 56th Street Construction 5.0540 Avenue 9½E – 32nd St to 40th St 5.0541 Avenue 9E Construction 5.0543 Pacific Avenue – 12th St to 32nd St 5.0550 Avenue 6E – Gila Ridge Rd to 52nd St 5.0555 1st Street Widening 5.0556 12th Street Widening and Connection 5.0557 16th Street Corridor – Ave D to Ave 3E 5.0558 20th Street - West Widening 5.0559 24th Street – Avenue D to Avenue 3E 5.0560 28th Street – Ave B to Ave D 5.0561 5.0563 5.0567 5.0568 5.0569 5.0570 5.0571 5.0580 6.8701 6.9401 7.9202 7.9212 7.9306 7.9320 7.9407 7.9411 7.9413 7.9505 7.9701 7.0104 8.8722 8.0307 9.9305 iv 32nd Street – Ave A to Ave 2½E 48th Street Construction 72nd Street - US 95 Widening 72nd Street Construction Avenue A Construction Avenue B Construction Avenue C Construction Big Curve Improvements Refuse Station Feas. Study and Construct City Landfill Contingency 6" Waterline - Parklane Replace Waterline in Arizona Avenue 12" Waterline on 40th Street Waterline on Ave. A-40th St. to Airport Lp Road Waterlines - Palm, Crane and Frances 12" Waterline Ave. 3E - 12th to 15th St. 8" Waterline Engler Avenue - 16th St. 20th Dr. - 20th Street Connection 5th Street 10" Watermain - Ave. B to Ave. C Automated Meter Reading Lift Station - Hettema Sweetwater Lift Station Reconfiguration Storm Pump Station Telemetry All projects within the CIP have a unique number, such as 5.8301. The CIP number has three parts. The section number (5), the year (83) the project was proposed and the order (01) of the proposed projects within each section for that year. The projects within the Capital Improvement Program for the City of Yuma are divided into nine categories or sections, which correspond to the individual project numbers. These sections are based on the department that has primary jurisdiction over the projects. Section 1 is known as General Government. These projects are generally community redevelopment, environmental or visual improvements to City facilities and start with the number “1”. This section also acts as a catch all for unique projects. Sections 2 & 3, Parks and Recreation and Recreation Complexes, are the responsibility of the Parks and Recreation Department. Section 2 contains projects that are designed to expand or improve the City's park and recreation facilities, such as Smucker or Kennedy Parks and start with number “2”. Section 3 contains projects which are designed to expand or improve the City's Recreation Complexes, such as the Civic and Convention Center and the golf courses and start with the number “3”. Section 4 projects relate to Public Safety. These projects are proposed by the Fire Department or the Police Department. Projects usually involve improvements to existing facilities or construction of new facilities and start with the number “4”. Sections 5, 6, 7 , 8 and 9 are the joint responsibility of the City Engineer and Public Works services. Section 5 relates to transportation projects. These projects are designed to expand or improve the City transportation system and start with the number “5”. Typically these projects involve street reconstruction or intersection improvements. Section 6 is the responsibility of the Department of Public Works. Projects contained in this section relate to sanitation and solid waste and start with number “6”. Projects within Section 7 relate to Water Utilities. These projects are designed to expand or improve the City's water system. These projects typically include water line replacement, new water lines and expansion of treatment facilities, such as the water treatment plant and start with the number “7”. Projects within Section 8 relate to Sewer Utilities. These projects are designed to expand or improve the City sewer system. These projects typically involve sewer line construction or replacement and start with the number “8”. The last section is Section 9, Stormwater Control. The Engineering Division has primary responsibility for these projects. After project completion they are operated and maintained by the Department of Public Works or the Parks and Recreation Department, as may be appropriate. These projects involve the construction of storm drains and retention/detention basins and start with the number “9”. This 10 year CIP document is divided into four sections. The first two sections, the Capital Budget and 2006-2016, show the amount of funding proposed to be spent in the first year and ten-year program by category, project and fund source. The third section is the Project Listing of all the projects in the ten-year CIP. This listing contains a full description of each project and the project budget. The Project Listing is listed in order of the nine sections of the Capital Improvement Program and the CIP project number. The elements used to identify and describe a project attempt to cover all aspects of that project. At the top of the page is the project number and title. Following that is the identification of the Department who is responsible for the project and the year the project is targeted for work to start. The Department abbrevi ations are: DCD ENG P&R FD PD PW RIV - Department of Community Development - City Engineering Department - Parks and Recreation - Fire Department - Police Department - Public Works - Riverfront v The scope of the project is then described, a location is identified if necessary, and any related projects are listed. Examples of related projects are water and sewer line projects that need to occur in conjunction or prior to a street reconstruction project. The need or justification for the project is also identified. The final descriptive information is the planning context. This item identifies the City Council adopted plans and policies that this project is part of or supports. Budgeting information includes a ten-year schedule of project expenditures and the budget for the project. There are five elements to a project budget. The design of the project, the possible need for land or right-of-way, the actual construction of the facility, the inspection of the construction and the facility to determine if the project has been constructed to code and specifications and lastly any other items that may be needed for the project, such as prefabricated ramadas or equipment. A location map is also provided for the project where the scope of the project applies to a specific location. The last section is a number of maps, which identify the locations of the capital improvement projects. Projects which are located beyond this range or do not identify a specific location are not listed on the maps. The maps are primarily divided by sections of the CIP, but in the situation where there are a small number of projects in a number of sections then the section maps are combined. vi CAPITAL IMPROVEMENT PROGRAM FUNDING SOURCES FUND DESCRIPTION BOND This fund can be either the voter approved bond issue for specific projects or City dollars, which are developed through a Bond financing mechanism. CDBG Community Development Block Grants: Non-City dollars, federal funds for redevelopment projects. CIT Community Investment Trust: Funds generated by divestiture of City assets. DD Developer Deposits: Deposits paid by developers in place of completing construction on specific projects. DH Desert Hills Enterprise Fund: Collected from golf fees. GEN GRNT General Fund: Revenues from fees paid, sales tax, property tax, fines, etc. Grant: Non-City dollars - can be federal or state grants include ACTION and Heritage Grants. HURF Highway Users Fund/Lottery Funds: This fund has two sources, the Highway Users Gasoline Tax and the Lottery dollars. The City receives a percentage of these funds based on population. Funds are used for street improvements or street related projects. IMPCT Impact Fee: City dollars, collected at the time building permits are issued for specific improvements, i.e., parks, transportation, etc. Improvement District: Property owners form Improvement Districts after annexing to the City to fund specific public facility improvements, such as street surface replacement. The City will bond guarantee the work. IMPD OTHR Non-City dollars such as ADOT, APS funds or other agency funds. PBSF Public Safety Tax Fund: This fund source is the Public Safety tax. PRO This fund specifies ProRata financing that has been collected and is available for development of projects. RCX Recreation Complex funds: City dollars that are collected from fees paid at the civic center and baseball complex. Also can be 2% excise tax dollars, depending on the specific project. ROAD .5% City road tax: Collected from the general sales tax. Funds are used for specific road projects. SANI Sanitation funds: General Fund dollars, which are reserved for sanitation projects. SCF Sewer Capacity Fund: City dollars, collected from fees paid at time of sewer connection. SRF Sewer Replacement Fund: City dollars, set aside from revenues of sewer billings. SSIC STP Sanitary Sewer Interceptor Charge: City dollars, collected from fees paid at time of issuance of a sewer permit. Funds are used for improvements to Interceptor lines. Surface Transportation Program: Non-City dollars, federal highway funds for roads and bridges. SUF Sewer Utility Fund: City dollars, collected from fees paid for specific sewer utility items, such as a meter. TWO% 2% Tax financing: A special excise tax on hotel, motel, restaurant and bar sales, which finances the Yuma Civic and Convention Center facility, the Baseball Complex, the Arroyo Dunes and Desert Hills Golf Courses, the Yuma Crossing Park and surrounding area and convention/tourism related activities. WCF Water Capacity Fund: City dollars, collected from fees paid at time of water connection. WRF Water Replacement Fund: City dollars, set aside from revenues of water billings. WSDC Water System Development Charges: A separate fee paid at the time of issuance of a water permit. The fee is based on the acreage of the property. Water Utility Fund: City dollars, collected from fees paid for specific utility items, such as a meter. WUF vii Category Summary Fiscal Year 2006-2007 1 General Government $38,784,395 2 Parks and Recreation $5,930,800 3 Recreation Complexes $19,308,000 4 Public Safety $12,998,750 5 Transportation $68,537,700 7 Water Utility $117,340,100 8 Sewer Utility $33,272,431 9 Stormwater Control $5,582,000 Total A-1 $301,754,176 Project Summary Listing CIP # Title 1.9601 Target Year: Soil Remediation Site 2006-2007 Fund Fiscal Year 2006-2007 General Government 10-Year Project Cost: 1.9604 Target Year: $335,000 Annex./Economic Development Improvements 2006-2007 10-Year Project Cost: 1.9757 Target Year: $1,200,000 Budget Authority Reserve 2006-2007 10-Year Project Cost: 1.9802 Target Year: $30,600,000 Main Street Reconstruction 2006-2007 10-Year Project Cost: 1.9905 Target Year: $4,636,000 Drying Bed-Main Street WTP 2006-2007 10-Year Project Cost: 1.9908 Target Year: $2,300,000 Madison Avenue Reconstruction 2006-2007 10-Year Project Cost: 1.9916 Target Year: $278,895 Riverfront Infrastructure Improvements 2006-2007 10-Year Project Cost: 1.0000 Target Year: $1,500,000 Railroad Settling Tank 2006-2007 10-Year Project Cost: 1.0002 Target Year: $15,000 East Wetlands 2006-2007 HURF UNF Total $0 $135,000 $135,000 CIT Total $400,000 $400,000 BOND DD GRNT IMPCT OTHR Total $3,100,000 $1,500,000 $500,000 $3,000,000 $700,000 $8,800,000 GRNT ROAD SUF WUF Total $1,460,000 $1,815,000 $825,000 $536,000 $4,636,000 BOND Total $2,300,000 $2,300,000 ROAD SUF WUF Total $150,000 $60,000 $68,895 $278,895 BOND UNF WUF Total $1,119,000 $94,000 $287,000 $1,500,000 TWO% Total 10-Year Project Cost: 1.0003 Target Year: $3,970,000 Yuma Crossing Retail Compon./Canal Walk 2006-2007 10-Year Project Cost: 1.0011 $30,000 Riverfront Development Master Planning B-1 BOND GRNT Total TWO% Total $15,000 $15,000 $970,000 $3,000,000 $3,970,000 $30,000 $30,000 Project Summary Listing CIP # Title Target Year: 2006-2007 Fund 10-Year Project Cost: 1.0012 Target Year: $28,000 Gila Street Extension 2006-2007 10-Year Project Cost: 1.0014 Target Year: $825,000 Relocation of US Fish and Wildlife Svc. 2006-2007 10-Year Project Cost: 1.0015 Target Year: $550,000 Gateway Riverfront Park Project 2006-2007 10-Year Project Cost: 1.0017 Target Year: $2,526,000 Riverfront Development Grande Promenade 2006-2007 10-Year Project Cost: 1.0025 Target Year: $600,000 West Wetlands Road 2006-2007 10-Year Project Cost: 1.0106 Target Year: $50,000 Citywide Fiber Optic Cabling Installation 2006-2007 10-Year Project Cost: 1.0300 Target Year: 10-Year Project Cost: 1.0302 Target Year: $2,050,000 Multi-Modal Reconstruction 2006-2007 $3,142,000 800 MHZ New Radio Site 2006-2007 10-Year Project Cost: 1.0402 Target Year: $5,400,000 City Hall Modification 2006-2007 10-Year Project Cost: 1.0403 Target Year: $700,000 West Wetlands Mitigation 2006-2007 10-Year Project Cost: 1.0501 Target Year: $120,000 New Downtown Redevelopment Initiative 2006-2007 10-Year Project Cost: $78,000 B-2 Fiscal Year 2006-2007 TWO% Total $28,000 $28,000 HURF Total $825,000 $825,000 TWO% Total $550,000 $550,000 GRNT TWO% Total $1,900,000 $626,000 $2,526,000 GRNT OTHR ROAD Total $0 $60,000 $0 $60,000 HURF Total $50,000 $50,000 OTHR UNF Total $0 $50,000 $50,000 CDBG GEN GRNT Total $100,000 $42,000 $3,000,000 $3,142,000 GRNT OTHR PBSF Total $2,300,000 $750,000 $1,750,000 $4,800,000 BOND Total $700,000 $700,000 GEN Total $120,000 $120,000 GEN Total $50,000 $50,000 Project Summary Listing CIP # Title Fund 1.0503 Target Year: Yuma Crossing Exhibit Master Plan 2006-2007 10-Year Project Cost: 1.0504 Target Year: $25,000 Vehicle Acquisitions 2006-2007 10-Year Project Cost: 1.0568 Target Year: $2,542,500 Improvement District No. 68 - Castle Dome Ave. 2006-2007 10-Year Project Cost: 1.0601 Target Year: $3,300,000 Pivot Point 2006-2007 2.9602 Target Year: OTHR Total $25,000 $25,000 IMPCT Total $418,500 $418,500 IMPD Total 10-Year Project Cost: $2,325,000 General Government Section Total Fiscal Year 2006-2007 $3,300,000 $3,300,000 GRNT TWO% Total $0 $75,000 $75,000 $38,784,395 OTHR PRO Total $2,500,000 $370,000 $2,870,000 Parks and Recreation Yuma Valley Area Park 2006-2007 10-Year Project Cost: 2.9806 Target Year: $2,870,000 Park Facility Improvements 2006-2007 10-Year Project Cost: 2.0300 Target Year: $1,380,000 Lighting for Parks and Athletic Fields 2006-2007 10-Year Project Cost: 2.0301 Target Year: $750,000 Upgrading and Replacement of Restrooms 2006-2007 10-Year Project Cost: 2.0500 Target Year: $900,000 Kennedy Park Parking Lot Expansion 2006-2007 10-Year Project Cost: 2.0502 Target Year: $380,000 Carver Park Tennis, Handball & Basketball Court 2006-2007 GEN Total $270,000 $270,000 UNF Total $375,000 $375,000 GEN Total $390,000 $390,000 GEN Total $180,000 $180,000 CDBG GEN Total 10-Year Project Cost: 2.0504 Target Year: $85,800 Shade Structures 2006-2007 10-Year Project Cost: 2.0508 Target Year: $240,000 Desert Sun Stadium 2006-2007 10-Year Project Cost: 2.0509 Target Year: $250,000 Stewart Vincent Wolfe Memorial Playground 2006-2007 B-3 $81,000 $4,800 $85,800 UNF Total $120,000 $120,000 RCX Total $250,000 $250,000 Project Summary Listing CIP # Title Fund GEN OTHR Total 10-Year Project Cost: 2.0510 Target Year: $1,050,000 Yuma Art Center Museum 2006-2007 10-Year Project Cost: 2.0601 Target Year: $140,000 Cibola High School Community Swimming Pool 2006-2007 BOND Total 10-Year Project Cost: $2,466,914 Parks and Recreation Section Total 3.9707 Target Year: Recreation Complexes Variable Frequency Drive (VFD)Sys.(DHGC) 2006-2007 10-Year Project Cost: 3.9802 Target Year: $488,000 Parking Lot Maintenance Upgrades 2006-2007 10-Year Project Cost: 3.0202 Target Year: $2,350,000 Replacement of Air Conditioning Compres. 2006-2007 10-Year Project Cost: 3.0500 Target Year: $540,000 Deyo Complex Adapative Re-use 2006-2007 10-Year Project Cost: $17,880,000 Recreation Complexes Section Total 4.9401 Target Year: Public Safety Public Safety Training Facility 2006-2007 10-Year Project Cost: 4.9601 Target Year: $4,177,750 Fire Station 6 (B) - Avenue C and 32nd St. 2006-2007 10-Year Project Cost: 4.0300 Target Year: $2,900,000 Fire Station #1 Replacement 2006-2007 10-Year Project Cost: 4.0400 Target Year: $4,750,000 Police Department Facility Improvements 2006-2007 10-Year Project Cost: 4.0502 Target Year: UNF Total $2,871,000 Police Storage Facility 2006-2007 B-4 Fiscal Year 2006-2007 $50,000 $1,000,000 $1,050,000 $140,000 $140,000 $200,000 $200,000 $5,930,800 TWO% Total $488,000 $488,000 GEN RCX TWO% Total $100,000 $150,000 $150,000 $400,000 RCX Total $540,000 $540,000 BOND Total $17,880,000 $17,880,000 $19,308,000 BOND Total $4,177,750 $4,177,750 BOND PBSF Total $2,680,000 $220,000 $2,900,000 BOND Total $400,000 $400,000 BOND PBSF Total $2,431,000 $440,000 $2,871,000 BOND PBSF $0 $400,000 Project Summary Listing CIP # Title Fund 10-Year Project Cost: 4.0503 Target Year: $3,740,000 Land Acquisition for all current Fire Facility Projects 2006-2007 Total 10-Year Project Cost: $4,162,500 Public Safety Section Total 5.8308 Target Year: Transportation Arizona Ave - 16th Street to Palo Verde 2006-2007 10-Year Project Cost: 5.8325 Target Year: $250,000 24th Street - Avenue B to Avenue C 2006-2007 10-Year Project Cost: 5.8702 Target Year: $4,650,000 1st Street - Gila Street to Avenue C 2006-2007 10-Year Project Cost: 5.8903 Target Year: $6,857,000 23rd Avenue Widening 2006-2007 10-Year Project Cost: 5.9105 Target Year: $230,000 Magnolia Avenue, et al 2006-2007 10-Year Project Cost: 5.9205 Target Year: $1,090,000 12th to 16th Streets - 4th Ave to Ave "A" 2006-2007 10-Year Project Cost: 5.9207 Target Year: $1,350,000 Camino Alameda, et al (Casa Mañana) 2006-2007 10-Year Project Cost: 5.9208 Target Year: $1,500,000 Catalina Drive - 32nd St. to 4th Ave. 2006-2007 10-Year Project Cost: 5.9209 Target Year: $605,000 17th to 19th Streets - 5th Ave to Ave A 2006-2007 10-Year Project Cost: 5.9211 Target Year: $2,500,000 Airport Loop Road, et al 2006-2007 10-Year Project Cost: 5.9401 Target Year: $97,200 Villa Hermosa No. 2 2006-2007 B-5 Fiscal Year 2006-2007 $400,000 PBSF Total $2,250,000 $2,250,000 $12,998,750 ROAD Total $250,000 $250,000 BOND PRO ROAD Total $0 $0 $50,000 $50,000 BOND ROAD STP Total $1,000,000 $200,000 $0 $1,200,000 HURF Total $230,000 $230,000 BOND Total $1,090,000 $1,090,000 BOND HURF Total $0 $150,000 $150,000 BOND Total $500,000 $500,000 HURF Total $55,000 $55,000 BOND Total $2,500,000 $2,500,000 ROAD Total $97,200 $97,200 BOND $1,800,000 Project Summary Listing CIP # Title Fund 10-Year Project Cost: 5.9402 Target Year: $1,800,000 32nd Street - 4th Avenue to Avenue B 2006-2007 Total 10-Year Project Cost: 5.9408 Target Year: $7,976,393 Maiden Lane & Gila Street - 1st St to Giss Pkwy 2006-2007 10-Year Project Cost: 5.9507 Target Year: $525,000 20th Street - Avenue B to Avenue C 2006-2007 10-Year Project Cost: 5.9510 Target Year: $1,300,000 Driveway Replacements 2006-2007 10-Year Project Cost: 5.9511 Target Year: $200,000 Sidewalk Handicap Ramps 2006-2007 10-Year Project Cost: 5.9512 Target Year: $50,000 Right-of-Way Acquisition 2006-2007 10-Year Project Cost: 5.9602 Target Year: $15,425,000 1st Avenue - 16th Street to 12th Street 2006-2007 10-Year Project Cost: 5.9628 Target Year: $500,000 Intersection Sight Distance 2006-2007 10-Year Project Cost: 5.9700 Target Year: $700,000 Pacific Avenue Sidewalks 2006-2007 10-Year Project Cost: 5.9701 Target Year: $360,000 Avenue A - 16th St. to 24th St. 2006-2007 10-Year Project Cost: 5.9702 Target Year: 10-Year Project Cost: 5.9705 Target Year: 10-Year Project Cost: $4,179,000 Avenue A - 8th St. to 16th St. 2006-2007 $10,970,000 Avenue A - 32nd St. to 36th St. 2006-2007 $2,325,000 B-6 Fiscal Year 2006-2007 $1,800,000 BOND STP Total $3,800,000 $800,000 $4,600,000 BOND HURF Total $0 $50,000 $50,000 BOND Total $1,300,000 $1,300,000 HURF Total $40,000 $40,000 HURF Total $10,000 $10,000 BOND ROAD Total $14,300,000 $125,000 $14,425,000 HURF Total $100,000 $100,000 ROAD Total $200,000 $200,000 ROAD Total $360,000 $360,000 BOND OTHR Total $3,355,000 $699,000 $4,054,000 BOND ROAD Total $200,000 $650,000 $850,000 BOND ROAD Total $0 $75,000 $75,000 Project Summary Listing CIP # Title 5.9711 Target Year: Sahuaro Estates Reconstruction 2006-2007 10-Year Project Cost: 5.9714 Target Year: 10-Year Project Cost: 5.9715 Target Year: 10-Year Project Cost: 5.9718 Target Year: 10-Year Project Cost: 5.9728 Target Year: 10-Year Project Cost: 5.9753 Target Year: Fund $920,000 Engler Avenue - 24th St. & E. Palo Verde St. 2006-2007 $1,950,000 29th Street between 4th Ave. & 8th Ave. 2006-2007 $140,000 32nd Street Reconstruct. - Ave. B to Ave. C 2006-2007 $7,800,000 Avenue C Reconstruction - 32nd to 40th Street 2006-2007 $7,050,000 New Fleet Services Maintenance Shop 2006-2007 10-Year Project Cost: 5.9806 Target Year: $17,900,000 Traffic Signal Interconnection 2006-2007 10-Year Project Cost: 5.9807 Target Year: $315,000 11th Street - 3rd Avenue to 2nd Avenue 2006-2007 10-Year Project Cost: 5.9811 Target Year: $70,000 12th Street - Avenue A to Avenue B 2006-2007 10-Year Project Cost: 5.9812 Target Year: 10-Year Project Cost: 5.9904 Target Year: $10,930,000 24th Street - Avenue 6E to Avenue 9E 2006-2007 $19,420,000 Street Lights - Infill/Growth 2006-2007 BOND HURF Total $910,000 $10,000 $920,000 BOND HURF Total $0 $50,000 $50,000 HURF Total $140,000 $140,000 BOND IMPCT ROAD Total $0 $300,000 $300,000 $600,000 BOND IMPCT ROAD Total $0 $300,000 $300,000 $600,000 BOND HURF SUF WUF Total $0 $100,000 $100,000 $100,000 $300,000 ROAD Total $315,000 $315,000 HURF Total $70,000 $70,000 BOND ROAD Total $880,000 $0 $880,000 BOND IMPCT OTHR Total $8,050,000 $750,000 $0 $8,800,000 HURF B-7 Fiscal Year 2006-2007 $50,000 Project Summary Listing CIP # Title Fund 10-Year Project Cost: 5.9910 Target Year: $50,000 14th Street - 1st Ave to 4th Ave 2006-2007 Total 10-Year Project Cost: 5.9912 Target Year: $210,000 32nd Street - Avenue A to 8th Avenue 2006-2007 10-Year Project Cost: 5.9913 Target Year: $100,000 Arizona Avenue - 16th to Giss Pky 2006-2007 10-Year Project Cost: 5.9990 Target Year: $800,000 Traffic Signal Installation and Upgrades 2006-2007 10-Year Project Cost: 5.0104 Target Year: $3,500,000 Intersection Safety Upgrades 2006-2007 10-Year Project Cost: 5.0200 Target Year: $122,500 Araby Road - I-8 West to 24th Street 2006-2007 10-Year Project Cost: 5.0301 Target Year: $400,000 Traffic Signal System Implementation 2006-2007 10-Year Project Cost: 5.0401 Target Year: $930,000 Avenue 3E - Gila Ridge Rd. to 32nd St. 2006-2007 10-Year Project Cost: 5.0403 Target Year: $8,300,000 Pavement Replacement 2006-2007 10-Year Project Cost: 5.0404 Target Year: $1,700,000 16th Street Corridor Study 2006-2007 10-Year Project Cost: 5.0405 Target Year: $75,500 4th Avenue - 32nd Street Corridor Study 2006-2007 10-Year Project Cost: 5.0408 Target Year: $75,500 24th Street - Ave 2½E to Ave 3E 2006-2007 10-Year Project Cost: 5.0409 $835,000 8th Street - East Main Canal to Avenue B B-8 Fiscal Year 2006-2007 $50,000 HURF Total $210,000 $210,000 ROAD Total $100,000 $100,000 ROAD Total $400,000 $400,000 IMPCT ROAD UNF Total $400,000 $390,000 $0 $790,000 DD ROAD Total $22,500 $100,000 $122,500 ROAD Total $400,000 $400,000 BOND Total $130,000 $130,000 BOND OTHR ROAD Total $0 $4,300,000 $150,000 $4,450,000 BOND Total $500,000 $500,000 ROAD Total $75,500 $75,500 ROAD Total $75,500 $75,500 ROAD Total $60,000 $60,000 Project Summary Listing CIP # Title Target Year: 2006-2007 10-Year Project Cost: 5.0411 Target Year: 10-Year Project Cost: 5.0414 Target Year: Fund $875,000 Automated Traffic Counting Addition 2006-2007 $440,000 Avenue 7E Bridge Replacement 2006-2007 10-Year Project Cost: 5.0416 Target Year: $150,000 33rd Drive Extension 2006-2007 10-Year Project Cost: 5.0507 Target Year: $340,000 Ave. B & 24th St. Intersection 2006-2007 10-Year Project Cost: 5.0509 Target Year: $90,000 School Traffic Safety and Circulation Improvements 2006-2007 10-Year Project Cost: 5.0510 Target Year: $250,000 Bus Stops, Bus Bays and Bus Shelters 2006-2007 10-Year Project Cost: 5.0515 Target Year: $525,000 Roadways Plan Modeling Study 2006-2007 10-Year Project Cost: 5.0516 Target Year: $50,000 Roadways Plan Alignment Studies 2006-2007 10-Year Project Cost: 5.0517 Target Year: $260,000 24th St & Ave 3½E - Ave 3E to 56th St 2006-2007 10-Year Project Cost: 5.0518 Target Year: $30,975,000 Orange Avenue Improvements and Beautification 2006-2007 10-Year Project Cost: 5.0522 Target Year: $2,728,000 Expressways Access Studies 2006-2007 10-Year Project Cost: 5.0534 Target Year: $775,000 Avenue 8½E - 32nd St Expressway to 44th St 2006-2007 B-9 Fiscal Year 2006-2007 OTHR ROAD Total $170,000 $575,000 $745,000 HURF OTHR Total $10,000 $100,000 $110,000 ROAD STP Total $30,000 $120,000 $150,000 ROAD Total $340,000 $340,000 ROAD Total $90,000 $90,000 GRNT Total $50,000 $50,000 OTHR Total $225,000 $225,000 ROAD Total $50,000 $50,000 IMPCT Total $260,000 $260,000 BOND OTHR Total $1,000,000 $1,044,000 $2,044,000 BOND GRNT Total $260,000 $0 $260,000 ROAD Total $154,000 $154,000 BOND $0 Project Summary Listing CIP # Title 10-Year Project Cost: 5.0535 Target Year: $3,160,000 Avenue 8E - 32nd St Expressway to 56th St 2006-2007 10-Year Project Cost: 5.0552 Target Year: $14,402,000 East Yuma Freeway 2006-2007 10-Year Project Cost: 5.0564 Target Year: Fund $311,000,000 45th Avenue - 5th St to 28th St 2006-2007 10-Year Project Cost: 5.0574 Target Year: $17,690,000 16th St & 4th Ave Intersection Improvements 2006-2007 10-Year Project Cost: 5.0584 Target Year: $13,875,000 16th Street Widening 2006-2007 10-Year Project Cost: 5.0599 Target Year: $11,635,000 Traffic Impact Analysis Studies 2006-2007 10-Year Project Cost: $500,000 Transportation Section Total 7.8225 Target Year: Water Utility 1st Avenue Waterline - 8th St to 12th St 2006-2007 10-Year Project Cost: 7.8310 Target Year: $275,000 2nd Avenue Waterline - 12th St to 16th St 2006-2007 10-Year Project Cost: 7.8706 Target Year: $385,000 Highway 80 Waterline - Ave 6½E to Ave 8½E 2006-2007 10-Year Project Cost: 7.8722 Target Year: $700,000 Avenue 3E and Gila Ridge Road Watermains 2006-2007 10-Year Project Cost: 7.8802 Target Year: $350,000 5th Ave Watermain - 8th St to 16th St 2006-2007 10-Year Project Cost: 7.9294 Target Year: $470,000 Fire Hydrants 2006-2007 10-Year Project Cost: $300,000 B-10 ROAD Total Fiscal Year 2006-2007 $60,000 $60,000 BOND Total $3,100,000 $3,100,000 ROAD UNF Total $100,000 $0 $100,000 ROAD UNF Total $470,000 $0 $470,000 BOND Total $3,000,000 $3,000,000 BOND OTHR Total $2,170,000 $1,035,000 $3,205,000 DD Total $100,000 $100,000 $68,537,700 WUF Total $55,000 $55,000 WUF Total $130,000 $130,000 BOND Total $700,000 $700,000 WSDC Total $160,000 $160,000 WUF Total $470,000 $470,000 WUF Total $100,000 $100,000 Project Summary Listing CIP # Title Fund 7.9309 Target Year: Magnolia Ave Watermain - 1st St to 8th St 2006-2007 10-Year Project Cost: 7.9408 Target Year: $394,000 3rd & 4th Ave Waterlines - 3rd St. to 4th St. 2006-2007 10-Year Project Cost: 7.9490 Target Year: $190,000 New Water Services 2006-2007 10-Year Project Cost: 7.9602 Target Year: $675,000 Avenue A Waterline - 16th to 24th Streets 2006-2007 10-Year Project Cost: 7.9603 Target Year: $350,000 Gila Ridge Rd Watermains - Ave 4½E to Araby Rd 2006-2007 10-Year Project Cost: 7.9606 Target Year: $825,000 15th, 16th & 17th Ave Waterlines - 3rd St to 8th St 2006-2007 10-Year Project Cost: 7.9803 Target Year: $840,000 Orange Avenue Waterline - 4th St to 8th St 2006-2007 10-Year Project Cost: 7.9806 Target Year: $370,000 Agua Viva Water Treatment Plant 2006-2007 10-Year Project Cost: 7.9904 Target Year: $80,000,000 Carbon Feeder Improvements 2006-2007 WUF Total $394,000 $394,000 WUF Total $190,000 $190,000 WUF Total $125,000 $125,000 WUF Total $350,000 $350,000 WSDC Total $400,000 $400,000 WUF Total $420,000 $420,000 WUF Total $20,000 $20,000 BOND Total 10-Year Project Cost: 7.9996 Target Year: $200,000 Waterline Replacement/Improvements 2006-2007 10-Year Project Cost: 7.0102 Target Year: $4,000,000 Flocculation/Sedimentation Basin 2006-2007 10-Year Project Cost: 7.0107 Target Year: $450,000 Zone 2 to Zone 1 Pressure Reducing Valve 2006-2007 10-Year Project Cost: 7.0108 Target Year: $270,000 Potable Water Dedicated Sample Taps 2006-2007 10-Year Project Cost: 7.0111 Target Year: $180,000 8th St Water Transmission Ln - Ave A to Ave B 2006-2007 $80,000,000 $80,000,000 WUF Total $200,000 $200,000 WUF Total $800,000 $800,000 BOND Total $450,000 $450,000 WUF Total $270,000 $270,000 WUF Total $60,000 $60,000 BOND B-11 Fiscal Year 2006-2007 $2,200,000 Project Summary Listing CIP # Title Fund 10-Year Project Cost: 7.0113 Target Year: $2,200,000 Avenue B Water Transmission Line 2006-2007 Total 10-Year Project Cost: 7.0114 Target Year: $2,100,000 Ave 9E Water Transmission Ln - I-8 to 40th St 2006-2007 10-Year Project Cost: 7.0115 Target Year: $2,200,000 Ave 9E Water Transmission Ln - E. Mesa WTP to I-8 2006-2007 10-Year Project Cost: 7.0116 Target Year: $1,100,000 MSWTP Safe Drinking Water Act Upgrades 2006-2007 10-Year Project Cost: 7.0117 Target Year: $6,840,000 SCADA System Upgrades, Phase I 2006-2007 10-Year Project Cost: 7.0118 Target Year: $406,000 32nd St Water Trans. Ln - Ave B to Friendship Twr 2006-2007 10-Year Project Cost: 7.0203 Target Year: $760,000 Water Utility Security 2006-2007 10-Year Project Cost: 7.0300 Target Year: $584,000 1st Ave Water Transmission Ln - 5th St to 16th St 2006-2007 10-Year Project Cost: 7.0301 Target Year: $470,000 Ave 9E Water Trans. Ln - E. Mesa WTP to 24th St 2006-2007 10-Year Project Cost: 7.0302 Target Year: $2,700,000 40th St Water Transmission Ln - Ave 3E to Ave 9E 2006-2007 10-Year Project Cost: 7.0401 Target Year: $8,300,000 Main Street WTF Chlorine Scrubber Improvement 2006-2007 10-Year Project Cost: 7.0403 Target Year: $375,000 Main Street WTF Auxillary Power 2006-2007 10-Year Project Cost: 7.0500 Target Year: $2,013,000 Main Street WTF Filter System Upgrade 2006-2007 10-Year Project Cost: 7.0501 $1,940,100 Main Street WTF Mechanical De-watering System B-12 Fiscal Year 2006-2007 $2,200,000 BOND Total $2,100,000 $2,100,000 BOND Total $2,200,000 $2,200,000 BOND Total $1,100,000 $1,100,000 BOND Total $3,420,000 $3,420,000 WUF Total $406,000 $406,000 WSDC Total $760,000 $760,000 BOND Total $442,000 $442,000 WUF Total $20,000 $20,000 BOND Total $2,700,000 $2,700,000 BOND Total $8,300,000 $8,300,000 BOND Total $375,000 $375,000 BOND WUF Total $1,095,000 $18,000 $1,113,000 BOND Total $1,940,100 $1,940,100 Project Summary Listing CIP # Title Target Year: 2006-2007 Fund 10-Year Project Cost: 7.0505 Target Year: $1,000,000 Friendship Tower Improvements 2006-2007 10-Year Project Cost: 7.0506 Target Year: $2,000,000 Main Street WTF Sedimentation Basin Covers 2006-2007 10-Year Project Cost: 7.0507 Target Year: $1,500,000 Main Street WTF Yard Paving Improvements 2006-2007 10-Year Project Cost: 7.0508 Target Year: $220,000 Water System Master Plan Update 2006-2007 10-Year Project Cost: 7.0509 Target Year: $250,000 Main Street WTF AZPDES Permit 2006-2007 10-Year Project Cost: $1,000,000 Water Utility Section Total 8.8705 Target Year: Sewer Utility 12th Street Trunk Sewer, Phase I & II 2006-2007 10-Year Project Cost: 8.9404 Target Year: $1,700,000 Avenue B & 24th Street 12" Force Main 2006-2007 10-Year Project Cost: 8.9502 Target Year: $290,000 Manhole Rehabilitation/Reconstruction 2006-2007 10-Year Project Cost: $1,800,000 8.9593 Sewer Line Replacements/Improvements Target Year: 2006-2007 10-Year Project Cost: 8.9803 Target Year: $5,309,400 Desert Dunes Water Pollution Control Fac. 2006-2007 10-Year Project Cost: 8.0003 Target Year: $62,000,000 Administrative Building Expansion 2006-2007 10-Year Project Cost: 8.0004 Target Year: $770,000 Colorado River Interceptor Sanitary Sewer 2006-2007 B-13 Fiscal Year 2006-2007 BOND Total $1,000,000 $1,000,000 BOND Total $2,000,000 $2,000,000 BOND Total $750,000 $750,000 WUF Total $220,000 $220,000 WUF Total $250,000 $250,000 WCF Total $750,000 $750,000 $117,340,100 BOND Total SUF Total $1,700,000 $1,700,000 $290,000 $290,000 BOND SUF Total $1,000,000 $0 $1,000,000 BOND DD SUF Total $490,000 $500,000 $170,000 $1,160,000 BOND Total $13,000,000 $13,000,000 BOND Total $70,000 $70,000 BOND $400,000 Project Summary Listing CIP # Title Fund 10-Year Project Cost: 8.0006 Target Year: $400,000 Riverfront Park Manhole Replacement 2006-2007 Total Fiscal Year 2006-2007 $400,000 10-Year Project Cost: 8.0100 Target Year: $90,000 5th Avenue Sewerline Replacement 2006-2007 SUF Total $90,000 $90,000 10-Year Project Cost: 8.0103 Target Year: $29,500 Figueroa WPCF - Aerator Upgrade 2006-2007 SUF Total $29,500 $29,500 10-Year Project Cost: 8.0104 Target Year: $3,500,000 Figueroa WPCF SCADA Improvements 2006-2007 10-Year Project Cost: 8.0200 Target Year: $150,000 Figueroa WPCF Digester Electrical Upgrades 2006-2007 10-Year Project Cost: 8.0300 Target Year: $150,000 Wastewater Utility Security 2006-2007 10-Year Project Cost: 8.0301 Target Year: $150,000 Figueroa WPCF Gate Replacements 2006-2007 10-Year Project Cost: 8.0302 Target Year: $615,000 Upgrade Figueroa Service Area 2006-2007 10-Year Project Cost: 8.0303 Target Year: $10,000,000 Sanitary Sewer Collection System Model 2006-2007 10-Year Project Cost: 8.0304 Target Year: $155,000 Citrus View WPCF Reconfiguration 2006-2007 10-Year Project Cost: 8.0305 Target Year: $1,200,000 Jack Rabbit Mesa WPCF Upgrades Phase II 2006-2007 10-Year Project Cost: 8.0402 Target Year: $10,212,931 Figueroa Avenue WPCF Digester Improvements 2006-2007 10-Year Project Cost: 8.0403 Target Year: $1,700,000 Figueroa WPCF System Upgrades 2006-2007 10-Year Project Cost: 8.0404 $800,000 Figueroa WPCF Improvements B-14 BOND Total $2,500,000 $2,500,000 SUF Total $100,000 $100,000 SCF Total $150,000 $150,000 BOND Total $150,000 $150,000 SCF Total $115,000 $115,000 BOND SSIC Total SSIC Total $2,500,000 $700,000 $3,200,000 $65,000 $65,000 BOND Total $1,200,000 $1,200,000 BOND Total $1,812,931 $1,812,931 BOND Total $600,000 $600,000 SCF Total $800,000 $800,000 Project Summary Listing CIP # Title Target Year: 2006-2007 Fund 10-Year Project Cost: 8.0405 Target Year: $23,500,000 Figueroa WPCF NPDES Renewal 2006-2007 10-Year Project Cost: 8.0500 Target Year: $1,140,000 Update City's 208 Facilities Plan 2006-2007 10-Year Project Cost: 8.0501 Target Year: $350,000 Secondary Clarifier Upgrades & Improvements 2006-2007 10-Year Project Cost: 8.0503 Target Year: $3,650,000 Figueroa Avenue WPCF Primary Clarifier Imp. 2006-2007 10-Year Project Cost: 8.0510 Target Year: $3,500,000 Figueroa WPCF Auxiliary Power Improvements 2006-2007 $1,500,000 $1,500,000 SCF Total $840,000 $840,000 SCF Total $100,000 $100,000 SCF Total $150,000 $150,000 BOND Total UNF Total 10-Year Project Cost: $1,000,000 Sewer Utility Section Total 9.9301 Target Year: BOND Total Fiscal Year 2006-2007 $1,500,000 $1,500,000 $750,000 $750,000 $33,272,431 Stormwater Control 28th Street Storm Drainage 2006-2007 10-Year Project Cost: 9.9801 Target Year: $11,830,000 Fix Alley Drainage - 4th Avenue & Ave. A 2006-2007 10-Year Project Cost: 9.0100 Target Year: $100,000 Araby Road Drainage Improvements 2006-2007 10-Year Project Cost: 9.0101 Target Year: $42,000 Stormwater NPDES Permit 2006-2007 10-Year Project Cost: 9.0401 Target Year: $545,000 Cibola Heights Stormwater Basin Improvements 2006-2007 10-Year Project Cost: 9.0500 Target Year: $15,000 Storm Water Drainage 2006-2007 10-Year Project Cost: 9.0502 Target Year: $260,000 Dunes Drainage Basin 2006-2007 10-Year Project Cost: $105,000 B-15 BOND OTHR ROAD Total $3,700,000 $1,200,000 $130,000 $5,030,000 HURF Total $100,000 $100,000 ROAD Total $42,000 $42,000 ROAD Total $125,000 $125,000 HURF Total $15,000 $15,000 HURF Total $260,000 $260,000 HURF Total $10,000 $10,000 Project Summary Listing CIP # Title Fund Stormwater Control Section Total Total Fiscal Year 2006-2007 $5,582,000 $301,754,176 B-16 Fund Summary Listing CIP # Title Year Fund BOND 1.9757 1.9905 1.9916 1.0002 1.0402 2.0601 3.0500 4.9401 4.9601 4.0300 4.0400 5.8702 5.9105 5.9207 5.9209 5.9401 5.9402 5.9507 5.9512 5.9701 5.9702 5.9711 5.9811 5.9812 5.0301 5.0403 5.0517 5.0518 5.0535 5.0574 5.0584 7.8706 7.9806 7.0102 7.0111 7.0113 7.0114 7.0115 7.0116 7.0203 7.0301 7.0302 7.0401 7.0403 7.0500 7.0501 7.0505 7.0506 8.8705 Budget Authority Reserve Drying Bed-Main Street WTP Riverfront Infrastructure Improvements East Wetlands City Hall Modification Cibola High School Community Swimming Pool Deyo Complex Adapative Re-use Public Safety Training Facility Fire Station 6 (B) - Avenue C and 32nd St. Fire Station #1 Replacement Police Department Facility Improvements 1st Street - Gila Street to Avenue C Magnolia Avenue, et al Camino Alameda, et al (Casa Mañana) 17th to 19th Streets - 5th Ave to Ave A Villa Hermosa No. 2 32nd Street - 4th Avenue to Avenue B 20th Street - Avenue B to Avenue C Right-of-Way Acquisition Avenue A - 16th St. to 24th St. Avenue A - 8th Street to 16th Street Sahuaro Estates Reconstruction 12th Street - Avenue to Avenue B 24th Street - Avenue 6E to Avenue 9E Traffic Signal System Implementation Pavement Replacement 24th St & Ave 3½E - Ave 3E to 56th St Orange Avenue Improvements and Beautification Avenue 8E - 32nd St Expressway to 56th St 16th St & 4th Ave Intersection Improvements 16th Street Widening Highway 80 Waterline - Ave 6½E to Ave 8½E Agua Viva Water Treatment Plant Flocculation/Sedimentation Basin 8th St Water Transmission Ln - Ave A to Ave B Avenue B Water Transmission Line Ave 9E Water Transmission Ln - I-8 to 40th St Ave 9E Water Transmission Ln - E. Mesa WTP to I-8 MSWTP Safe Drinking Water Act Upgrades Water Utility Security Ave 9E Water Trans. Ln - E. Mesa WTP to 24th St 40th St Water Transmission Ln - Ave 3E to Ave 9E Main Street WTF Chlorine Scrubber Improvement Main Street WTF Auxillary Power Main Street WTF Filter System Upgrade Main Street WTF Mechanical De-watering System Friendship Tower Improvements Main Street WTF Sedimentation Basin Covers 12th Street Trunk Sewer, Phase I & II 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND C-1 2006-2007 $3,100,000 $2,300,000 $1,119,000 $970,000 $700,000 $200,000 $17,880,000 $4,177,750 $2,680,000 $400,000 $2,431,000 $1,000,000 $1,090,000 $500,000 $2,500,000 $1,800,000 $3,800,000 $1,300,000 $14,300,000 $3,355,000 $200,000 $910,000 $880,000 $8,050,000 $130,000 $500,000 $1,000,000 $260,000 $3,100,000 $3,000,000 $2,170,000 $700,000 $80,000,000 $450,000 $2,200,000 $2,100,000 $2,200,000 $1,100,000 $3,420,000 $442,000 $2,700,000 $8,300,000 $375,000 $1,095,000 $1,940,100 $1,000,000 $2,000,000 $750,000 $1,700,000 Fund Summary Listing CIP # Title Year 8.9502 8.9593 8.9803 8.0003 8.0004 8.0103 8.0300 8.0302 8.0304 8.0305 8.0402 8.0404 8.0503 9.9301 Manhole Rehabilitation/Reconstruction Sewer Line Replacements/Improvements Desert Dunes Water Pollution Control Fac. Administrative Building Expansion Colorado River Interceptor Sanitary Sewer Figueroa WPCF - Aerator Upgrade Wastewater Utility Security Upgrade Figueroa Service Area Citrus View WPCF Reconfiguration Jack Rabbit Mesa WPCF Upgrades Phase II Figueroa Avenue WPCF Digester Improvements Figueroa WPCF Improvements Figueroa Avenue WPCF Primary Clarifier Imp. 28th Street Storm Drainage 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 Total for BOND Fund BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND $1,000,000 $490,000 $13,000,000 $70,000 $400,000 $2,500,000 $150,000 $2,500,000 $1,200,000 $1,812,931 $600,000 $1,500,000 $1,500,000 $3,700,000 $228,697,781 CDBG 1.0300 2.0502 Multi-Modal Reconstruction Carver Park Tennis, Handball & Basketball Court 06-07 06-07 Total for CDBG Fund CDBG CDBG $100,000 $81,000 $181,000 CIT 1.9604 Annex./Economic Development Improvements 06-07 Total for CIT Fund CIT $400,000 $400,000 DD 1.9757 5.0104 5.0599 8.9593 Budget Authority Reserve Intersection Safety Upgrades Traffic Impact Analysis Studies Sewer Line Replacements/Improvements 06-07 06-07 06-07 06-07 Total for DD Fund DD DD DD DD $1,500,000 $22,500 $100,000 $500,000 $2,122,500 GEN 1.0300 1.0403 1.0501 2.9806 2.0301 2.0500 2.0502 2.0509 3.9802 Multi-Modal Reconstruction West Wetlands Mitigation New Downtown Redevelopment Initiative Park Facility Improvements Upgrading and Replacement of Restrooms Kennedy Park Parking Lot Expansion Carver Park Tennis, Handball & Basketball Court Stewart Vincent Wolfe Memorial Playground Parking Lot Maintenance Upgrades 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 Total for GEN Fund GEN GEN GEN GEN GEN GEN GEN GEN GEN $42,000 $120,000 $50,000 $270,000 $390,000 $180,000 $4,800 $50,000 $100,000 $1,206,800 GRNT 1.9757 1.9802 1.0002 1.0015 1.0300 Budget Authority Reserve Main Street Reconstruction East Wetlands Gateway Riverfront Park Project Multi-Modal Reconstruction GRNT GRNT GRNT GRNT GRNT $500,000 $1,460,000 $3,000,000 $1,900,000 $3,000,000 06-07 06-07 06-07 06-07 06-07 C-2 Fund 2006-2007 Fund Summary Listing CIP # Title Year 1.0302 5.0509 800 MHZ New Radio Site 06-07 School Traffic Safety and Circulation Improvements 06-07 Total for GRNT Fund GRNT GRNT $2,300,000 $50,000 $12,210,000 HURF 1.0012 1.0025 5.8903 5.9205 5.9208 5.9408 5.9510 5.9511 5.9602 5.9711 5.9714 5.9715 5.9753 5.9807 5.9904 5.9910 5.0411 9.9801 9.0401 9.0500 9.0502 Gila Street Extension West Wetlands Road 23rd Avenue Widening 12th to 16th Streets - 4th Ave to Ave "A" Catalina Drive - 32nd St. to 4th Ave. Maiden Lane & Gila Street - 1st St to Giss Pkwy Driveway Replacements Sidewalk Handicap Ramps 1st Avenue - 16th Street to 12th Street Sahuaro Estates Reconstruction Engler Avenue - 24th St. & E. Palo Verde St. 29th Street between 4th Ave. & 8th Ave. New Fleet Services Maintenance Shop 11th Street - 3rd Avenue to 2nd Avenue Street Lights - Infill/Growth 14th Street - 1st Ave to 4th Ave Automated Traffic Counting Addition Fix Alley Drainage - 4th Avenue & Ave. A Cibola Heights Stormwater Basin Improvements Storm Water Drainage Dunes Drainage Basin 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 Total for HURF Fund HURF HURF HURF HURF HURF HURF HURF HURF HURF HURF HURF HURF HURF HURF HURF HURF HURF HURF HURF HURF HURF $825,000 $50,000 $230,000 $150,000 $55,000 $50,000 $40,000 $10,000 $100,000 $10,000 $50,000 $140,000 $100,000 $70,000 $50,000 $210,000 $10,000 $100,000 $15,000 $260,000 $10,000 $2,535,000 IMPCT 1.9757 1.0504 5.9718 5.9728 5.9812 5.9990 5.0516 Budget Authority Reserve Vehicle Acquisitions 32nd Street Reconstruct. - Ave. B to Ave. C Avenue C Reconstruction - 32nd to 40th Street 24th Street - Avenue 6E to Avenue 9E Traffic Signal Installation and Upgrades Roadways Plan Alignment Studies 06-07 06-07 06-07 06-07 06-07 06-07 06-07 Total for IMPCT Fund IMPCT IMPCT IMPCT IMPCT IMPCT IMPCT IMPCT $3,000,000 $418,500 $300,000 $300,000 $750,000 $400,000 $260,000 $5,428,500 IMPD 1.0568 Improvement District No. 68 - Castle Dome Ave. 06-07 Total for IMPD Fund IMPD $3,300,000 $3,300,000 OTHR 1.9757 1.0017 1.0302 1.0503 2.9602 2.0509 5.9701 Budget Authority Reserve Riverfront Development Grande Promenade 800 MHZ New Radio Site Yuma Crossing Exhibit Master Plan Yuma Valley Area Park Stewart Vincent Wolfe Memorial Playground Avenue A - 16th St. to 24th St. OTHR OTHR OTHR OTHR OTHR OTHR OTHR $700,000 $60,000 $750,000 $25,000 $2,500,000 $1,000,000 $699,000 06-07 06-07 06-07 06-07 06-07 06-07 06-07 C-3 Fund 2006-2007 Fund Summary Listing CIP # Title 5.0401 5.0409 5.0411 5.0510 5.0517 5.0584 9.9301 Avenue 3E - Gila Ridge Rd. to 32nd St. 8th Street - East Main Canal to Avenue B Automated Traffic Counting Addition Bus Stops, Bus Bays and Bus Shelters 24th St & Ave 3½E - Ave 3E to 56th St MCAS Sign & Signal Improvements 28th Street Storm Drainage Year Fund 2006-2007 06-07 06-07 06-07 06-07 06-07 06-07 06-07 Total for OTHR Fund OTHR OTHR OTHR OTHR OTHR OTHR OTHR $4,300,000 $170,000 $100,000 $225,000 $1,044,000 $1,035,000 $1,200,000 $13,808,000 800 MHZ New Radio Site 06-07 Fire Station 6 (B) - Avenue C and 32nd St. 06-07 Police Department Facility Improvements 06-07 Police Storage Facility 06-07 Land Acquisition for all current Fire Facility Projects 06-07 Total for PBSF Fund PBSF PBSF PBSF PBSF PBSF $1,750,000 $220,000 $440,000 $400,000 $2,250,000 $5,060,000 PRO 2.9602 Yuma Valley Area Park 06-07 Total for PRO Fund PRO $370,000 $370,000 RCX 2.0508 3.9802 3.0202 Desert Sun Stadium Parking Lot Maintenance Upgrades Replacement of Air Conditioning Compres. 06-07 06-07 06-07 Total for RCX Fund RCX RCX RCX $250,000 $150,000 $540,000 $940,000 ROAD 1.9802 1.9908 5.8308 5.8325 5.8702 5.9211 5.9512 5.9628 5.9700 5.9702 5.9705 5.9718 5.9728 5.9806 5.9912 5.9913 5.9990 5.0104 5.0200 5.0401 5.0404 5.0405 Main Street Reconstruction Madison Avenue Reconstruction Arizona Ave - 16th Street to Palo Verde 24th Street - Avenue B to Avenue C 1st Street - Gila Street to Avenue C Airport Loop Road, et al Right-of-Way Acquisition Intersection Sight Distance Pacific Avenue Sidewalks Avenue A - 8th St. to 16th St. Avenue A - 32nd St. to 36th St. 32nd Street Reconstruct. - Ave. B to Ave. C Avenue C Reconstruction - 32nd to 40th Street Traffic Signal Interconnection 32nd Street - Avenue A to 8th Avenue Arizona Avenue - 16th to Giss Pky Traffic Signal Installation and Upgrades Intersection Safety Upgrades Araby Road - I-8 West to 24th Street Avenue 3E - Gila Ridge Rd. to 32nd St. 16th Street Corridor Study 4th Avenue - 32nd Street Corridor Study PBSF 1.0302 4.9601 4.0400 4.0502 4.0503 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 C-4 ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD $1,815,000 $150,000 $250,000 $50,000 $200,000 $97,200 $125,000 $200,000 $360,000 $650,000 $75,000 $300,000 $300,000 $315,000 $100,000 $400,000 $390,000 $100,000 $400,000 $150,000 $75,500 $75,500 Fund Summary Listing CIP # Title 5.0408 5.0409 5.0414 5.0416 5.0507 5.0515 5.0522 5.0534 5.0552 5.0564 9.9301 9.0100 9.0101 24th Street - Ave 2½E to Ave 3E 8th Street - East Main Canal to Avenue B Avenue 7E Bridge Replacement 33rd Drive Extension Ave. B & 24th St. Intersection Roadways Plan Modeling Study Expressways Access Studies Avenue 8½E - 32nd St Expressway to 44th St East Yuma Freeway 45th Avenue - 5th St to 28th St 28th Street Storm Drainage Araby Road Drainage Improvements Stormwater NPDES Permit SCF 8.0200 8.0301 8.0403 8.0405 8.0500 8.0501 Year Fund 2006-2007 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 Total for ROAD Fund ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD $60,000 $575,000 $30,000 $340,000 $90,000 $50,000 $154,000 $60,000 $100,000 $470,000 $130,000 $42,000 $125,000 $8,804,200 Figueroa WPCF Digester Electrical Upgrades Figueroa WPCF Gate Replacements Figueroa WPCF System Upgrades Figueroa WPCF NPDES Renewal Update City's 208 Facilities Plan Secondary Clarifier Upgrades & Improvements 06-07 06-07 06-07 06-07 06-07 06-07 Total for SCF Fund SCF SCF SCF SCF SCF SCF $150,000 $115,000 $800,000 $840,000 $100,000 $150,000 $2,155,000 SSIC 8.0302 8.0303 Upgrade Figueroa Service Area Sanitary Sewer Collection System Model 06-07 06-07 Total for SSIC Fund SSIC SSIC $700,000 $65,000 $765,000 STP 5.0414 5.9402 Avenue 7E Bridge Replacement 32nd Street - 4th Avenue to Avenue B 06-07 06-07 Total for STP Fund STP STP $120,000 $800,000 $920,000 SUF 1.9802 1.9908 5.9753 8.9404 8.9593 8.0006 8.0100 8.0104 Main Street Reconstruction Madison Avenue Reconstruction New Fleet Services Maintenance Shop Avenue B & 24th Street 12" Force Main Sewer Line Replacements/Improvements Riverfront Park Manhole Replacement 5th Avenue Sewerline Replacement Figueroa WPCF SCADA Improvements 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 Total for SUF Fund SUF SUF SUF SUF SUF SUF SUF SUF $825,000 $60,000 $100,000 $290,000 $170,000 $90,000 $29,500 $100,000 $1,664,500 TWO% 1.0000 1.0003 1.0011 1.0014 Railroad Settling Tank Yuma Crossing Retail Compon./Canal Walk Riverfront Development Master Planning Relocation of US Fish and Wildlife Svc. 06-07 06-07 06-07 06-07 C-5 TWO% TWO% TWO% TWO% $15,000 $30,000 $28,000 $550,000 Fund Summary Listing CIP # Title 1.0015 1.0601 3.9707 3.9802 Gateway Riverfront Park Project Pivot Point Variable Frequency Drive (VFD)Sys.(DHGC) Parking Lot Maintenance Upgrades WCF 7.0509 Main Street WTF AZPDES Permit WSDC 7.8722 7.9603 7.0118 Year Fund 2006-2007 06-07 06-07 06-07 06-07 Total for TWO% Fund TWO% TWO% TWO% TWO% $626,000 $75,000 $488,000 $150,000 $1,962,000 06-07 Total for WCF Fund WCF $750,000 $750,000 Avenue 3E and Gila Ridge Road Watermains 06-07 Gila Ridge Rd Watermains - Ave 4½E to Araby Rd 06-07 32nd St Water Trans. Ln - Ave B to Friendship Twr 06-07 Total for WSDC Fund WSDC WSDC WSDC $160,000 $400,000 $760,000 $1,320,000 UNF 1.9601 1.9916 1.0106 2.0300 2.0504 2.0510 8.0510 Soil Remediation Site Riverfront Infrastructure Improvements Citywide Fiber Optic Cabling Installation Lighting for Parks and Athletic Fields Shade Structures Yuma Art Center Museum Figueroa WPCF Auxiliary Power Improvements UNF UNF UNF UNF UNF UNF UNF $135,000 $94,000 $50,000 $375,000 $120,000 $140,000 $750,000 $1,664,000 WUF 1.9802 1.9908 1.9916 5.9753 7.8225 7.8310 7.8802 7.9294 7.9309 7.9408 7.9490 7.9602 7.9606 7.9803 7.9904 7.9996 7.0107 7.0108 7.0117 7.0300 7.0403 7.0507 7.0508 Main Street Reconstruction Madison Avenue Reconstruction Riverfront Infrastructure Improvements New Fleet Services Maintenance Shop 1st Avenue Waterline - 8th St to 12th St 2nd Avenue Waterline - 12th St to 16th St 5th Ave Watermain - 8th St to 16th St Fire Hydrants Magnolia Ave Watermain - 1st St to 8th St 3rd & 4th Ave Waterlines - 3rd St. to 4th St. New Water Services Avenue A Waterline - 16th to 24th Streets 15th, 16th & 17th Ave Waterlines - 3rd St to 8th St Orange Avenue Waterline - 4th St to 8th St Carbon Feeder Improvements Waterline Replacement/Improvements Zone 2 to Zone 1 Pressure Reducing Valve Potable Water Dedicated Sample Taps SCADA System Upgrades, Phase I 1st Ave Water Transmission Ln - 5th St to 16th St Main Street WTF Auxillary Power Main Street WTF Yard Paving Improvements Water System Master Plan Update WUF WUF WUF WUF WUF WUF WUF WUF WUF WUF WUF WUF WUF WUF WUF WUF WUF WUF WUF WUF WUF WUF WUF $536,000 $68,895 $287,000 $100,000 $55,000 $130,000 $470,000 $100,000 $394,000 $190,000 $125,000 $350,000 $420,000 $20,000 $200,000 $800,000 $270,000 $60,000 $406,000 $20,000 $18,000 $220,000 $250,000 06-07 06-07 06-07 06-07 06-07 06-07 06-07 Total for UNF Fund C-6 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 Fund Summary Listing CIP # Title Year Total for WUF Fund Total C-7 Fund 2006-2007 $5,489,895 $301,754,176 Category Summary Fiscal Year 2006-2007 Fiscal Year 2007-2008 Fiscal Year 2008-2009 Fiscal Year 2009-2010 Fiscal Year 2010-2011 Fiscal Year 2011-2016 1 General Government $38,784,395 $13,091,500 $15,008,500 $5,098,500 $19,568,500 $6,000,000 2 Parks and Recreation $5,930,800 $3,621,914 $3,533,820 $1,670,000 $9,084,000 $4,756,000 3 Recreation Complexes $19,308,000 $600,000 $1,050,000 $350,000 $350,000 $0 4 Public Safety $12,998,750 $6,110,875 $5,475,250 $3,550,000 $319,600 $9,795,366 5 Transportation $68,537,700 $64,316,693 $47,163,500 $69,000,200 $388,554,400 $271,203,800 7 Water Utility $117,340,100 $11,279,000 $2,586,500 $1,725,000 $1,000,000 $5,556,000 8 Sewer Utility $33,272,431 $32,373,400 $14,050,000 $54,490,000 $1,500,000 $1,778,000 9 Stormwater Control $5,582,000 $3,166,000 $3,590,000 $229,000 $1,160,000 $2,745,000 $301,754,176 $134,559,382 $92,457,570 $136,112,700 $421,536,500 $301,834,166 Grand Total $1,388,254,494 Total AA-1 Title 1.9601 Target Year: Soil Remediation Site 2006-2007 HURF $0 UNF $135,000 $335,000 Total $135,000 Annex./Economic Development Improvements 2006-2007 CIT $400,000 $1,200,000 Total $400,000 Budget Authority Reserve 2006-2007 BOND $3,100,000 DD $1,500,000 GRNT $500,000 IMPCT $3,000,000 OTHR $700,000 $30,600,000 Total $8,800,000 Main Street Reconstruction 2006-2007 GRNT $1,460,000 ROAD $1,815,000 SUF $825,000 WUF $536,000 $4,636,000 Total $4,636,000 Yuma Theatre and Art Center Restoration 2009-2010 BOND $0 $7,020,000 Total $0 Drying Bed-Main Street WTP 2006-2007 BOND $2,300,000 $2,300,000 Total $2,300,000 Madison Avenue Reconstruction 2006-2007 ROAD $150,000 SUF $60,000 WUF $68,895 $278,895 Total $278,895 Downtown Parking Structure(s) 10-Year Project Cost: 1.9604 Target Year: 10-Year Project Cost: 1.9757 Target Year: 10-Year Project Cost: 1.9802 Target Year: 10-Year Project Cost: 1.9803 Target Year: 10-Year Project Cost: 1.9905 Target Year: 10-Year Project Cost: 1.9908 Target Year: 10-Year Project Cost: 1.9910 Fund Project Summary Listing Fiscal Year Fiscal Year Fiscal Year 2006-2007 2007-2008 2008-2009 General Government CIP # Fiscal Year 2009-2010 Fiscal Year 2010-2011 Fiscal Year 2011-2016 $0 $0 $0 $0 $0 $0 $0 $0 $0 $200,000 $0 $200,000 $0 $0 $0 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $0 $0 $2,000,000 $200,000 $500,000 $0 $800,000 $3,500,000 $2,000,000 $200,000 $500,000 $0 $800,000 $3,500,000 $2,000,000 $200,000 $500,000 $0 $600,000 $3,300,000 $5,000,000 $1,000,000 $2,500,000 $0 $3,000,000 $11,500,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,020,000 $1,020,000 $0 $0 $6,000,000 $6,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 BB-1 CIP # Title Target Year: 2008-2009 10-Year Project Cost: 1.9911 Target Year: 10-Year Project Cost: 1.9913 Target Year: 10-Year Project Cost: 1.9916 Target Year: 10-Year Project Cost: 1.0000 Target Year: 10-Year Project Cost: 1.0002 Target Year: 10-Year Project Cost: 1.0003 Target Year: 10-Year Project Cost: 1.0011 Target Year: 10-Year Project Cost: 1.0012 Target Year: 10-Year Project Cost: Fund Project Summary Listing Fiscal Year Fiscal Year Fiscal Year 2006-2007 2007-2008 2008-2009 BOND $0 $3,840,000 Total $0 Natural History Museum 2007-2008 GRNT $0 $3,650,000 Total $0 Multi-Agency Visitor Center 2007-2008 GEN $0 GRNT $0 OTHR $0 $5,550,000 Total $0 Riverfront Infrastructure Improvements 2006-2007 BOND $1,119,000 UNF $94,000 WUF $287,000 $1,500,000 Total $1,500,000 Railroad Settling Tank 2006-2007 TWO% $15,000 $15,000 Total $15,000 East Wetlands 2006-2007 BOND $970,000 GRNT $3,000,000 $3,970,000 Total $3,970,000 Yuma Crossing Retail Compon./Canal Walk 2006-2007 TWO% $30,000 $30,000 Total $30,000 Riverfront Development Master Planning 2006-2007 TWO% $28,000 $28,000 Total $28,000 Gila Street Extension 2006-2007 HURF $825,000 $825,000 Total $825,000 Fiscal Year 2009-2010 Fiscal Year 2010-2011 Fiscal Year 2011-2016 $0 $0 $3,840,000 $3,840,000 $0 $0 $0 $0 $0 $0 $3,650,000 $3,650,000 $0 $0 $0 $0 $0 $0 $0 $0 $550,000 $2,000,000 $0 $2,550,000 $0 $2,000,000 $1,000,000 $3,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 BB-2 CIP # 1.0014 Target Year: 10-Year Project Cost: 1.0015 Target Year: 10-Year Project Cost: 1.0017 Target Year: 10-Year Project Cost: 1.0019 Target Year: 10-Year Project Cost: 1.0025 Target Year: 10-Year Project Cost: 1.0106 Target Year: 10-Year Project Cost: 1.0300 Target Year: 10-Year Project Cost: 1.0302 Target Year: 10-Year Project Cost: Project Summary Listing Fiscal Year Fiscal Year Fiscal Year 2006-2007 2007-2008 2008-2009 Relocation of US Fish and Wildlife Svc. 2006-2007 TWO% $550,000 $0 $0 $550,000 Total $550,000 $0 $0 Gateway Riverfront Park Project 2006-2007 GRNT $1,900,000 $0 $0 TWO% $626,000 $0 $0 $2,526,000 Total $2,526,000 $0 $0 Riverfront Development Grande Promenade 2006-2007 GRNT $0 $480,000 $0 OTHR $60,000 $0 $0 ROAD $0 $60,000 $0 $600,000 Total $60,000 $540,000 $0 Miscellaneous Structure Demolition 2007-2008 TWO% $0 $100,000 $0 $100,000 Total $0 $100,000 $0 West Wetlands Road 2006-2007 HURF $50,000 $0 $0 $50,000 Total $50,000 $0 $0 Citywide Fiber Optic Cabling Installation 2006-2007 OTHR $0 $500,000 $500,000 UNF $50,000 $500,000 $500,000 $2,050,000 Total $50,000 $1,000,000 $1,000,000 Multi-Modal Reconstruction 2006-2007 CDBG $100,000 $0 $0 GEN $42,000 $0 $0 GRNT $3,000,000 $0 $0 $3,142,000 Total $3,142,000 $0 $0 800 MHZ New Radio Site 2006-2007 GRNT $2,300,000 $400,000 $0 OTHR $750,000 $0 $0 PBSF $1,750,000 $200,000 $0 $5,400,000 Total $4,800,000 $600,000 $0 Title Fund BB-3 Fiscal Year 2009-2010 Fiscal Year 2010-2011 Fiscal Year 2011-2016 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Title 1.0402 Target Year: City Hall Modification 2006-2007 BOND $700,000 $700,000 Total $700,000 West Wetlands Mitigation 2006-2007 GEN $120,000 $120,000 Total $120,000 Downtown / I-8 Trailblazing & City ID Imps. 2007-2008 OTHR $0 TWO% $0 $255,000 Total $0 New Downtown Redevelopment Initiative 2006-2007 GEN $50,000 $78,000 Total $50,000 Downtown Wayfinder Initiative 2008-2009 GEN $0 GRNT $0 $600,000 Total $0 Yuma Crossing Exhibit Master Plan 2006-2007 OTHR $25,000 $25,000 Total $25,000 Vehicle Acquisitions 2006-2007 IMPCT $418,500 $2,542,500 Total $418,500 East Mesa Facilities 2009-2010 BOND $0 GEN $0 HURF $0 SUF $0 WUF $0 $7,410,000 Total $0 Improvement District No. 68 - Castle Dome Ave. 2006-2007 10-Year Project Cost: 1.0403 Target Year: 10-Year Project Cost: 1.0500 Target Year: 10-Year Project Cost: 1.0501 Target Year: 10-Year Project Cost: 1.0502 Target Year: 10-Year Project Cost: 1.0503 Target Year: 10-Year Project Cost: 1.0504 Target Year: 10-Year Project Cost: 1.0508 Target Year: 10-Year Project Cost: 1.0568 Target Year: Fund Project Summary Listing Fiscal Year Fiscal Year Fiscal Year 2006-2007 2007-2008 2008-2009 CIP # Fiscal Year 2009-2010 Fiscal Year 2010-2011 Fiscal Year 2011-2016 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $155,000 $100,000 $255,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $28,000 $28,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $100,000 $500,000 $600,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $418,500 $418,500 $868,500 $868,500 $418,500 $418,500 $418,500 $418,500 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $40,000 $40,000 $40,000 $40,000 $160,000 $7,250,000 $0 $0 $0 $0 $7,250,000 $0 $0 $0 $0 $0 $0 BB-4 CIP # Title 10-Year Project Cost: 1.0601 Target Year: $3,300,000 Pivot Point 2006-2007 10-Year Project Cost: $2,325,000 General Government Section Total 2.9602 Target Year: 10-Year Project Cost: 2.9605 Target Year: 10-Year Project Cost: 2.9606 Target Year: 10-Year Project Cost: 2.9704 Target Year: 10-Year Project Cost: 2.9711 Target Year: 10-Year Project Cost: 2.9712 Target Year: 10-Year Project Cost: 2.9713 Target Year: Fund IMPD Total GRNT TWO% Total Project Summary Listing Fiscal Year Fiscal Year Fiscal Year 2006-2007 2007-2008 2008-2009 $3,300,000 $0 $0 $3,300,000 $0 $0 Fiscal Year 2010-2011 Fiscal Year 2011-2016 $0 $0 $0 $0 $0 $0 $1,100,000 $900,000 $2,000,000 $15,008,500 $0 $0 $0 $5,098,500 $0 $0 $0 $19,568,500 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $555,000 $405,000 $960,000 $0 $0 $0 $0 $0 $0 $49,000 $49,000 $426,000 $426,000 $0 $0 $0 $2,000,000 $0 $2,000,000 $0 $200,000 $200,000 $2,300,000 $0 $2,300,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $320,000 $320,000 $0 $0 $0 $0 $0 $0 $70,000 $70,000 $570,000 $570,000 $20,000 $0 $0 $570,000 $0 $0 $0 $0 $0 $0 $0 $0 $75,000 $250,000 $75,000 $250,000 $38,784,395 $13,091,500 Parks and Recreation Yuma Valley Area Park 2006-2007 OTHR $2,500,000 PRO $370,000 $2,870,000 Total $2,870,000 Central Drain Linear Park - Ave C to C¾ 2012-2013 GEN $0 HURF $0 $960,000 Total $0 Avenue C¾ Alignment Park - 16th St to 24th St 2010-2011 HURF $0 $475,000 Total $0 South Valley Area Park 2008-2009 BOND $0 GEN $0 $4,500,000 Total $0 Central Canal Park - Ave. B to E. Main Canal 2011-2012 GEN $0 $320,000 Total $0 Central Drain Linear Park - Ave B to Ave C 2010-2011 GEN $0 $640,000 Total $0 Central Canal Linear Park - Ave. C to Ave. D 2007-2008 GEN $0 UNF $0 Fiscal Year 2009-2010 BB-5 CIP # 10-Year Project Cost: 2.9714 Target Year: 10-Year Project Cost: 2.9715 Target Year: 10-Year Project Cost: 2.9716 Target Year: 10-Year Project Cost: 2.9806 Target Year: 10-Year Project Cost: 2.0001 Target Year: 10-Year Project Cost: 2.0300 Target Year: 10-Year Project Cost: 2.0301 Target Year: 10-Year Project Cost: 2.0500 Target Year: 10-Year Project Cost: 2.0502 Target Year: Project Summary Listing Fiscal Year Fiscal Year Fiscal Year 2006-2007 2007-2008 2008-2009 $590,000 Total $0 $20,000 $570,000 Thacker Lateral Park - 24th to 32nd St. 2011-2012 GEN $0 $0 $0 HURF $0 $0 $0 $820,000 Total $0 $0 $0 Avenue B½ Linear Park - 32nd to 36th St. 2010-2011 GEN $0 $0 $0 HURF $0 $0 $0 $415,000 Total $0 $0 $0 Avenue C½ & 28th Street Linear Park 2013-2014 GEN $0 $0 $0 HURF $0 $0 $0 $620,000 Total $0 $0 $0 Park Facility Improvements 2006-2007 GEN $270,000 $370,000 $370,000 $1,380,000 Total $270,000 $370,000 $370,000 Smucker Park Improvements 2008-2009 UNF $0 $0 $150,000 $650,000 Total $0 $0 $150,000 Lighting for Parks and Athletic Fields 2006-2007 UNF $375,000 $375,000 $0 $750,000 Total $375,000 $375,000 $0 Upgrading and Replacement of Restrooms 2006-2007 GEN $390,000 $250,000 $260,000 $900,000 Total $390,000 $250,000 $260,000 Kennedy Park Parking Lot Expansion 2006-2007 GEN $180,000 $200,000 $0 $380,000 Total $180,000 $200,000 $0 Carver Park Tennis, Handball & Basketball Court 2006-2007 CDBG $81,000 $0 $0 GEN $4,800 $0 $0 Title Fund BB-6 Fiscal Year 2009-2010 Fiscal Year 2010-2011 Fiscal Year 2011-2016 $0 $0 $0 $0 $0 $0 $0 $0 $0 $435,000 $385,000 $820,000 $0 $0 $0 $45,000 $0 $45,000 $170,000 $200,000 $370,000 $0 $0 $0 $0 $0 $0 $350,000 $270,000 $620,000 $370,000 $370,000 $0 $0 $0 $0 $500,000 $500,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 CIP # Title Fund 10-Year Project Cost: 2.0504 Target Year: $85,800 Shade Structures 2006-2007 Total Project Summary Listing Fiscal Year Fiscal Year Fiscal Year 2006-2007 2007-2008 2008-2009 $85,800 $0 $0 UNF $120,000 $240,000 Total $120,000 West Wetlands Amphitheater Improvements 2009-2010 UNF $0 10-Year Project Cost: $4,750,000 Total $0 2.0506 Beautification of Entry Way to the Readiness Ctr Target Year: 2007-2008 GEN $0 10-Year Project Cost: $203,820 Total $0 2.0507 Lighting of Foothills High School Fields Target Year: 2010-2011 GEN $0 10-Year Project Cost: $540,000 Total $0 2.0508 Desert Sun Stadium Target Year: 2006-2007 RCX $250,000 10-Year Project Cost: $250,000 Total $250,000 2.0509 Stewart Vincent Wolfe Memorial Playground Target Year: 2006-2007 GEN $50,000 OTHR $1,000,000 10-Year Project Cost: $1,050,000 Total $1,050,000 2.0510 Yuma Art Center Museum Target Year: 2006-2007 UNF $140,000 10-Year Project Cost: $140,000 Total $140,000 2.0511 New Area Park in the East I Target Year: 2009-2010 GEN $0 OTHR $0 10-Year Project Cost: $2,600,000 Total $0 2.0601 Cibola High School Community Swimming Pool Target Year: 2006-2007 BOND $200,000 10-Year Project Cost: $2,466,914 Total $200,000 Parks and Recreation Section Total $5,930,800 10-Year Project Cost: 2.0505 Target Year: Fiscal Year 2009-2010 Fiscal Year 2010-2011 Fiscal Year 2011-2016 $0 $0 $0 $120,000 $120,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $500,000 $500,000 $4,100,000 $4,100,000 $150,000 $150,000 $20,000 $20,000 $183,820 $183,820 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $20,000 $20,000 $520,000 $520,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $100,000 $0 $100,000 $500,000 $2,000,000 $2,500,000 $0 $0 $0 $0 $0 $0 $0 $2,266,914 $2,266,914 $3,621,914 $0 $0 $3,533,820 $0 $0 $1,670,000 $0 $0 $9,084,000 $0 $0 $2,315,000 BB-7 Project Summary Listing Fiscal Year Fiscal Year Fiscal Year 2006-2007 2007-2008 2008-2009 Recreation Complexes 3.9707 Variable Frequency Drive (VFD)Sys.(DHGC) Target Year: 2006-2007 TWO% $488,000 $0 $0 10-Year Project Cost: $488,000 Total $488,000 $0 $0 3.9802 Parking Lot Maintenance Upgrades Target Year: 2006-2007 GEN $100,000 $350,000 $350,000 RCX $150,000 $250,000 $300,000 TWO% $150,000 $0 $0 10-Year Project Cost: $2,350,000 Total $400,000 $600,000 $650,000 3.0200 Civic Center Roof Replacement Target Year: 2008-2009 RCX $0 $0 $400,000 10-Year Project Cost: $400,000 Total $0 $0 $400,000 3.0202 Replacement of Air Conditioning Compres. Target Year: 2006-2007 RCX $540,000 $0 $0 10-Year Project Cost: $540,000 Total $540,000 $0 $0 3.0500 Deyo Complex Adapative Re-use Target Year: 2006-2007 BOND $17,880,000 $0 $0 10-Year Project Cost: $17,880,000 Total $17,880,000 $0 $0 Recreation Complexes Section Total $19,308,000 $600,000 $1,050,000 Public Safety 4.9401 Public Safety Training Facility Target Year: 2006-2007 BOND $4,177,750 $0 $0 10-Year Project Cost: $4,177,750 Total $4,177,750 $0 $0 4.9601 Fire Station 6 (B) - Avenue C and 32nd St. Target Year: 2006-2007 BOND $2,680,000 $0 $0 PBSF $220,000 $0 $0 10-Year Project Cost: $2,900,000 Total $2,900,000 $0 $0 4.9602 Fire Station A - 32nd St. & Avenue 4E Target Year: 2007-2008 BOND $0 $212,500 $2,325,000 10-Year Project Cost: $2,537,500 Total $0 $212,500 $2,325,000 4.9605 Fire Station E - I-8 and Fortuna Road Target Year: 2010-2011 CIP # Title Fund BB-8 Fiscal Year 2009-2010 Fiscal Year 2010-2011 Fiscal Year 2011-2016 $0 $0 $0 $0 $0 $0 $350,000 $0 $0 $350,000 $350,000 $0 $0 $350,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $350,000 $0 $0 $350,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Project Summary Listing Fiscal Year Fiscal Year Fiscal Year 2006-2007 2007-2008 2008-2009 BOND $0 $0 $0 10-Year Project Cost: $3,196,650 Total $0 $0 $0 4.9607 Fire Station C - Avenue C and 8th Street Target Year: 2013-2014 BOND $0 $0 $0 10-Year Project Cost: $3,521,366 Total $0 $0 $0 4.9903 Fire Station D - 40th Street & Avenue 8E Target Year: 2007-2008 BOND $0 $244,375 $2,643,750 10-Year Project Cost: $2,888,125 Total $0 $244,375 $2,643,750 4.0300 Fire Station #1 Replacement Target Year: 2006-2007 BOND $400,000 $4,350,000 $0 10-Year Project Cost: $4,750,000 Total $400,000 $4,350,000 $0 4.0400 Police Department Facility Improvements Target Year: 2006-2007 BOND $2,431,000 $0 $0 PBSF $440,000 $0 $0 10-Year Project Cost: $2,871,000 Total $2,871,000 $0 $0 4.0402 Fire Station I Target Year: 2011-2012 BOND $0 $0 $0 10-Year Project Cost: $3,342,950 Total $0 $0 $0 4.0500 Emergency Vehicle Signal Pre-empt Target Year: 2007-2008 GEN $0 $54,000 $54,000 10-Year Project Cost: $162,000 Total $0 $54,000 $54,000 4.0502 Police Storage Facility Target Year: 2006-2007 BOND $0 $0 $0 PBSF $400,000 $0 $140,000 10-Year Project Cost: $3,740,000 Total $400,000 $0 $140,000 4.0503 Land Acquisition for all current Fire Facility Projects Target Year: 2006-2007 PBSF $2,250,000 $1,250,000 $312,500 10-Year Project Cost: $4,162,500 Total $2,250,000 $1,250,000 $312,500 Public Safety Section Total $12,998,750 $6,110,875 $5,475,250 Transportation 5.8308 Arizona Ave - 16th Street to Palo Verde Target Year: 2006-2007 CIP # Title Fund BB-9 Fiscal Year 2009-2010 $0 $0 Fiscal Year 2010-2011 $265,600 $265,600 Fiscal Year 2011-2016 $2,931,050 $2,931,050 $0 $0 $0 $0 $3,521,366 $3,521,366 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $3,342,950 $3,342,950 $0 $0 $54,000 $54,000 $0 $0 $3,200,000 $0 $3,200,000 $0 $0 $0 $0 $0 $0 $350,000 $350,000 $3,550,000 $0 $0 $319,600 $0 $0 $6,585,428 CIP # 10-Year Project Cost: 5.8312 Target Year: 10-Year Project Cost: 5.8322 Target Year: 10-Year Project Cost: 5.8323 Target Year: 10-Year Project Cost: 5.8325 Target Year: 10-Year Project Cost: 5.8326 Target Year: 10-Year Project Cost: 5.8330 Target Year: 10-Year Project Cost: 5.8702 Target Year: 10-Year Project Cost: 5.8703 Target Year: 10-Year Project Cost: Title Fund Project Summary Listing Fiscal Year Fiscal Year Fiscal Year 2006-2007 2007-2008 2008-2009 $250,000 $0 $0 $250,000 $0 $0 ROAD $250,000 Total 4th Avenue Reconstruction 2010-2011 BOND $0 ROAD $0 $5,980,000 Total $0 Arizona Avenue - 32nd to 40th Street 2007-2008 ROAD $0 $120,000 Total $0 40th Street - Arizona Avenue to Avenue A 2007-2008 BOND $0 ROAD $0 $5,800,000 Total $0 24th Street - Avenue B to Avenue C 2006-2007 BOND $0 PRO $0 ROAD $50,000 $4,650,000 Total $50,000 Ave A - 40th St to Airport Loop Road 2007-2008 ROAD $0 $50,000 Total $0 1st Avenue - Giss Pkwy to 12th Street 2007-2008 HURF $0 $800,000 Total $0 1st Street - Gila Street to Avenue C 2006-2007 BOND $1,000,000 ROAD $200,000 STP $0 $6,857,000 Total $1,200,000 Del Oro Reconstruction, et al 2007-2008 IMPD $0 $700,000 Total $0 Fiscal Year 2009-2010 Fiscal Year 2010-2011 Fiscal Year 2011-2016 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $500,000 $500,000 $4,500,000 $980,000 $5,480,000 $120,000 $120,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $500,000 $500,000 $800,000 $0 $800,000 $4,500,000 $0 $4,500,000 $0 $0 $0 $0 $0 $0 $0 $0 $100,000 $100,000 $1,080,000 $3,420,000 $0 $4,500,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $50,000 $50,000 $0 $0 $0 $0 $0 $0 $0 $0 $800,000 $800,000 $0 $0 $0 $0 $0 $0 $0 $0 $4,500,000 $0 $650,000 $5,150,000 $0 $0 $507,000 $507,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $150,000 $150,000 $550,000 $550,000 $0 $0 $0 $0 $0 $0 BB-10 Title 5.8903 Target Year: 23rd Avenue Widening 2006-2007 HURF $230,000 $230,000 Total $230,000 16th Street Right Turn Lane @ Avenue B 2010-2011 UNF $0 $325,000 Total $0 Magnolia Avenue, et al 2006-2007 BOND $1,090,000 $1,090,000 Total $1,090,000 28th St. - 4th Ave. to Alley West of Madison Ave. 2009-2010 ROAD $0 $300,000 Total $0 36th Street Const. - 4th Ave to 8th Ave 2011-2012 ROAD $0 $1,740,000 Total $0 12th to 16th Streets - 4th Ave to Ave "A" 2006-2007 BOND $0 HURF $150,000 $1,350,000 Total $150,000 Camino Alameda, et al (Casa Mañana) 2006-2007 BOND $500,000 $1,500,000 Total $500,000 Catalina Drive - 32nd St. to 4th Ave. 2006-2007 HURF $55,000 $605,000 Total $55,000 17th to 19th Streets - 5th Ave to Ave A 2006-2007 BOND $2,500,000 $2,500,000 Total $2,500,000 Airport Loop Road, et al 2006-2007 ROAD $97,200 10-Year Project Cost: 5.9102 Target Year: 10-Year Project Cost: 5.9105 Target Year: 10-Year Project Cost: 5.9108 Target Year: 10-Year Project Cost: 5.9203 Target Year: 10-Year Project Cost: 5.9205 Target Year: 10-Year Project Cost: 5.9207 Target Year: 10-Year Project Cost: 5.9208 Target Year: 10-Year Project Cost: 5.9209 Target Year: 10-Year Project Cost: 5.9211 Target Year: Fund Project Summary Listing Fiscal Year Fiscal Year Fiscal Year 2006-2007 2007-2008 2008-2009 CIP # Fiscal Year 2009-2010 Fiscal Year 2010-2011 Fiscal Year 2011-2016 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $325,000 $325,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $300,000 $300,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,740,000 $1,740,000 $700,000 $0 $700,000 $500,000 $0 $500,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,000,000 $1,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $550,000 $550,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 BB-11 Title 10-Year Project Cost: 5.9401 Target Year: $97,200 Total Villa Hermosa No. 2 2006-2007 BOND $1,800,000 $1,800,000 Total $1,800,000 32nd Street - 4th Avenue to Avenue B 2006-2007 BOND $3,800,000 STP $800,000 $7,976,393 Total $4,600,000 Major Intersection Improvements 2007-2008 ROAD $0 $180,000 Total $0 Maiden Lane & Gila Street - 1st St to Giss Pkwy 2006-2007 BOND $0 HURF $50,000 $525,000 Total $50,000 36th Street - Arizona Avenue to 4th Avenue 2011-2012 BOND $0 ROAD $0 $2,490,000 Total $0 Elks Lane - 24th Street to N. of Camino Real 2009-2010 HURF $0 $435,000 Total $0 20th Street - Avenue B to Avenue C 2006-2007 BOND $1,300,000 $1,300,000 Total $1,300,000 8th Avenue - 24th Street to 32nd Street 2008-2009 ROAD $0 $135,000 Total $0 Driveway Replacements 2006-2007 HURF $40,000 $200,000 Total $40,000 10-Year Project Cost: 5.9402 Target Year: 10-Year Project Cost: 5.9404 Target Year: 10-Year Project Cost: 5.9408 Target Year: 10-Year Project Cost: 5.9504 Target Year: 10-Year Project Cost: 5.9506 Target Year: 10-Year Project Cost: 5.9507 Target Year: 10-Year Project Cost: 5.9508 Target Year: 10-Year Project Cost: 5.9510 Target Year: 10-Year Project Cost: Fund Project Summary Listing Fiscal Year Fiscal Year Fiscal Year 2006-2007 2007-2008 2008-2009 $97,200 $0 $0 CIP # Fiscal Year 2009-2010 Fiscal Year 2010-2011 Fiscal Year 2011-2016 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,776,393 $600,000 $3,376,393 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $180,000 $180,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $475,000 $0 $475,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,830,000 $660,000 $2,490,000 $0 $0 $0 $0 $45,000 $45,000 $390,000 $390,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $135,000 $135,000 $0 $0 $0 $0 $0 $0 $40,000 $40,000 $40,000 $40,000 $40,000 $40,000 $40,000 $40,000 $0 $0 BB-12 Title 5.9511 Target Year: Sidewalk Handicap Ramps 2006-2007 HURF $10,000 $50,000 Total $10,000 Right-of-Way Acquisition 2006-2007 BOND $14,300,000 ROAD $125,000 $15,425,000 Total $14,425,000 1st Avenue - 16th Street to 12th Street 2006-2007 HURF $100,000 $500,000 Total $100,000 Thacker Lateral Multi-Use Path (North) 2012-2013 BOND $0 HURF $0 $3,335,000 Total $0 Thacker Lateral Multi-Use Path (South) 2008-2009 HURF $0 $580,000 Total $0 16th Street - 45th Ave to Ave D 2008-2009 ROAD $0 $2,900,000 Total $0 24th Street - Avenue C to Avenue D 2006-2007 ROAD $0 $200,000 Total $0 West Main Canal Multi-use Path 2008-2009 GRNT $0 ROAD $0 $680,000 Total $0 Intersection Sight Distance 2006-2007 ROAD $200,000 $700,000 Total $200,000 Pacific Avenue Sidewalks 10-Year Project Cost: 5.9512 Target Year: 10-Year Project Cost: 5.9602 Target Year: 10-Year Project Cost: 5.9609 Target Year: 10-Year Project Cost: 5.9610 Target Year: 10-Year Project Cost: 5.9618 Target Year: 10-Year Project Cost: 5.9619 Target Year: 10-Year Project Cost: 5.9622 Target Year: 10-Year Project Cost: 5.9628 Target Year: 10-Year Project Cost: 5.9700 Fund Project Summary Listing Fiscal Year Fiscal Year Fiscal Year 2006-2007 2007-2008 2008-2009 CIP # Fiscal Year 2009-2010 Fiscal Year 2010-2011 Fiscal Year 2011-2016 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $0 $0 $0 $250,000 $250,000 $0 $250,000 $250,000 $0 $250,000 $250,000 $0 $250,000 $250,000 $0 $0 $0 $400,000 $400,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $3,050,000 $285,000 $3,335,000 $0 $0 $580,000 $580,000 $0 $0 $0 $0 $0 $0 $0 $0 $2,900,000 $2,900,000 $0 $0 $0 $0 $0 $0 $0 $0 $200,000 $200,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $80,000 $80,000 $500,000 $100,000 $600,000 $0 $0 $0 $0 $0 $0 $200,000 $200,000 $100,000 $100,000 $100,000 $100,000 $100,000 $100,000 $0 $0 BB-13 CIP # Title Target Year: 2006-2007 10-Year Project Cost: 5.9701 Target Year: 10-Year Project Cost: 5.9702 Target Year: 10-Year Project Cost: 5.9705 Target Year: 10-Year Project Cost: 5.9707 Target Year: 10-Year Project Cost: 5.9710 Target Year: 10-Year Project Cost: 5.9711 Target Year: 10-Year Project Cost: 5.9713 Target Year: 10-Year Project Cost: 5.9714 Target Year: Fund Project Summary Listing Fiscal Year Fiscal Year Fiscal Year 2006-2007 2007-2008 2008-2009 ROAD $360,000 $360,000 Total $360,000 Avenue A - 16th St. to 24th St. 2006-2007 BOND $3,355,000 OTHR $699,000 $4,179,000 Total $4,054,000 Avenue A - 8th St. to 16th St. 2006-2007 BOND $200,000 ROAD $650,000 $10,970,000 Total $850,000 Avenue A - 32nd St. to 36th St. 2006-2007 BOND $0 ROAD $75,000 $2,325,000 Total $75,000 Giss Parkway Extension 2008-2009 BOND $0 ROAD $0 $13,450,000 Total $0 3rd Street - Magnolia Ave to Ave B 2007-2008 HURF $0 $420,000 Total $0 Sahuaro Estates Reconstruction 2006-2007 BOND $910,000 HURF $10,000 $920,000 Total $920,000 East Palo Verde St. - Pacific Ave to Ave 2½E 2008-2009 ROAD $0 $2,070,000 Total $0 Engler Avenue - 24th St. & E. Palo Verde St. 2006-2007 BOND $0 HURF $50,000 Fiscal Year 2009-2010 Fiscal Year 2010-2011 Fiscal Year 2011-2016 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $125,000 $0 $125,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $4,100,000 $0 $4,100,000 $4,500,000 $0 $4,500,000 $1,520,000 $0 $1,520,000 $0 $0 $0 $0 $0 $0 $2,250,000 $0 $2,250,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $800,000 $800,000 $0 $1,200,000 $1,200,000 $11,450,000 $0 $11,450,000 $0 $0 $0 $40,000 $40,000 $380,000 $380,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $495,000 $495,000 $1,575,000 $1,575,000 $0 $0 $0 $0 $0 $100,000 $1,800,000 $0 $0 $0 $0 $0 $0 $0 BB-14 CIP # 10-Year Project Cost: 5.9715 Target Year: 10-Year Project Cost: 5.9716 Target Year: 10-Year Project Cost: 5.9718 Target Year: 10-Year Project Cost: 5.9719 Target Year: 10-Year Project Cost: 5.9720 Target Year: 10-Year Project Cost: 5.9722 Target Year: 10-Year Project Cost: 5.9723 Target Year: 10-Year Project Cost: 5.9724 Target Year: 10-Year Project Cost: Project Summary Listing Fiscal Year Fiscal Year Fiscal Year 2006-2007 2007-2008 2008-2009 $1,950,000 Total $50,000 $100,000 $1,800,000 29th Street between 4th Ave. & 8th Ave. 2006-2007 HURF $140,000 $0 $0 $140,000 Total $140,000 $0 $0 8th Street and Main Street Paving 2014-2015 UNF $0 $0 $0 $330,000 Total $0 $0 $0 32nd Street Reconstruct. - Ave. B to Ave. C 2006-2007 BOND $0 $0 $0 IMPCT $300,000 $600,000 $0 ROAD $300,000 $600,000 $0 $7,800,000 Total $600,000 $1,200,000 $0 40th Street Reconst. - Ave. A to Ave. B 2009-2010 BOND $0 $0 $0 ROAD $0 $0 $0 $6,300,000 Total $0 $0 $0 32nd Street Reconstruct. - Ave. C to Ave. D 2007-2008 BOND $0 $0 $0 IMPCT $0 $400,000 $0 ROAD $0 $250,000 $200,000 $6,350,000 Total $0 $650,000 $200,000 Avenue B½ Construction - 28th St. to 32nd St. 2010-2011 IMPCT $0 $0 $0 ROAD $0 $0 $0 $3,060,000 Total $0 $0 $0 36th Street Construction - Ave. C to Ave. D 2011-2012 UNF $0 $0 $0 $2,190,000 Total $0 $0 $0 36th Street Construction - Ave. B to Ave. C 2009-2010 BOND $0 $0 $0 ROAD $0 $0 $0 $4,985,000 Total $0 $0 $0 Title Fund BB-15 Fiscal Year 2009-2010 Fiscal Year 2010-2011 Fiscal Year 2011-2016 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $330,000 $330,000 $6,000,000 $0 $0 $6,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $650,000 $650,000 $0 $800,000 $800,000 $4,850,000 $0 $4,850,000 $0 $0 $0 $0 $0 $0 $0 $0 $5,500,000 $0 $0 $5,500,000 $0 $0 $0 $0 $460,000 $460,000 $1,300,000 $1,300,000 $2,600,000 $0 $0 $0 $0 $2,190,000 $2,190,000 $0 $285,000 $285,000 $2,700,000 $400,000 $3,100,000 $1,600,000 $0 $1,600,000 CIP # 5.9725 Target Year: 10-Year Project Cost: 5.9726 Target Year: 10-Year Project Cost: 5.9728 Target Year: 10-Year Project Cost: 5.9729 Target Year: 10-Year Project Cost: 5.9731 Target Year: 10-Year Project Cost: 5.9732 Target Year: 10-Year Project Cost: 5.9733 Target Year: 10-Year Project Cost: 5.9734 Target Year: 10-Year Project Cost: 5.9736 Target Year: Project Summary Listing Fiscal Year Fiscal Year Fiscal Year 2006-2007 2007-2008 2008-2009 28th Street Construction - Ave. C to Ave. D 2011-2012 BOND $0 $0 $0 ROAD $0 $0 $0 $3,050,000 Total $0 $0 $0 28th Street Constr. - Ave. B to Ave. C 2007-2008 IMPCT $0 $0 $300,000 ROAD $0 $380,000 $900,000 $1,580,000 Total $0 $380,000 $1,200,000 Avenue C Reconstruction - 32nd to 40th Street 2006-2007 BOND $0 $0 $900,000 IMPCT $300,000 $0 $0 ROAD $300,000 $0 $0 $7,050,000 Total $600,000 $0 $900,000 Avenue C Reconst. - 24th St. to 32nd St. 2009-2010 BOND $0 $0 $0 ROAD $0 $0 $0 $7,685,000 Total $0 $0 $0 Avenue B Reconst. - 24th to 32nd Street 2012-2013 IMPCT $0 $0 $0 ROAD $0 $0 $0 $10,000,000 Total $0 $0 $0 40th St. ROW Acquisition - Ave. C to Ave. D 2011-2012 ROAD $0 $0 $0 $600,000 Total $0 $0 $0 40th St. ROW Acquisition - Ave. B to Ave. C 2010-2011 ROAD $0 $0 $0 $600,000 Total $0 $0 $0 Avenue D Bike Path 2013-2014 UNF $0 $0 $0 $83,000 Total $0 $0 $0 Avenue B½ Construction - 32nd St. to 40th St. 2011-2012 Title Fund BB-16 Fiscal Year 2009-2010 Fiscal Year 2010-2011 Fiscal Year 2011-2016 $0 $0 $0 $0 $0 $0 $2,250,000 $800,000 $3,050,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,550,000 $0 $0 $5,550,000 $0 $0 $0 $0 $5,585,000 $300,000 $5,885,000 $300,000 $700,000 $1,000,000 $0 $800,000 $800,000 $0 $0 $0 $0 $0 $0 $2,130,000 $7,870,000 $10,000,000 $0 $0 $0 $0 $600,000 $600,000 $0 $0 $600,000 $600,000 $0 $0 $0 $0 $0 $0 $83,000 $83,000 CIP # 10-Year Project Cost: 5.9737 Target Year: 10-Year Project Cost: 5.9739 Target Year: 10-Year Project Cost: 5.9740 Target Year: 10-Year Project Cost: 5.9741 Target Year: 10-Year Project Cost: 5.9742 Target Year: 10-Year Project Cost: 5.9744 Target Year: 10-Year Project Cost: 5.9745 Target Year: 10-Year Project Cost: 5.9753 Target Year: 10-Year Project Cost: 5.9804 Project Summary Listing Fiscal Year Fiscal Year Fiscal Year 2006-2007 2007-2008 2008-2009 BOND $0 $0 $0 ROAD $0 $0 $0 $6,030,000 Total $0 $0 $0 Avenue C½ Construction - 36th to 40th St. 2013-2014 BOND $0 $0 $0 ROAD $0 $0 $0 $2,860,000 Total $0 $0 $0 Traffic Signal Install - Avenue C & 28th Street 2010-2011 ROAD $0 $0 $0 $250,000 Total $0 $0 $0 Traffic Signal Install. - Ave. B½ & 24th St. 2008-2009 BOND $0 $0 $220,000 $220,000 Total $0 $0 $220,000 Traffic Signal - Ave B½ & 32nd Street 2009-2010 IMPCT $0 $0 $0 $240,000 Total $0 $0 $0 Traffic Signal Install. - Ave. B & 36th St. 2011-2012 IMPCT $0 $0 $0 $240,000 Total $0 $0 $0 Avenue D ROW Acquisition - 32nd St. to 40th St. 2012-2013 UNF $0 $0 $0 $800,000 Total $0 $0 $0 Avenue C½ Bike Path 2010-2011 UNF $0 $0 $0 $85,000 Total $0 $0 $0 New Fleet Services Maintenance Shop 2006-2007 BOND $0 $0 $9,000,000 HURF $100,000 $50,000 $0 SUF $100,000 $50,000 $0 WUF $100,000 $50,000 $0 $17,900,000 Total $300,000 $150,000 $9,000,000 El Paseo Real Construction Title Fund BB-17 Fiscal Year 2009-2010 Fiscal Year 2010-2011 $0 $0 $0 $0 $0 $0 Fiscal Year 2011-2016 $4,550,000 $1,480,000 $6,030,000 $0 $0 $0 $0 $0 $0 $1,850,000 $1,010,000 $2,860,000 $0 $0 $250,000 $250,000 $0 $0 $0 $0 $0 $0 $0 $0 $240,000 $240,000 $0 $0 $0 $0 $0 $0 $0 $0 $240,000 $240,000 $0 $0 $0 $0 $800,000 $800,000 $0 $0 $85,000 $85,000 $0 $0 $8,450,000 $0 $0 $0 $8,450,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 CIP # Title Target Year: 2010-2011 10-Year Project Cost: 5.9806 Target Year: 10-Year Project Cost: 5.9807 Target Year: 10-Year Project Cost: 5.9811 Target Year: 10-Year Project Cost: 5.9812 Target Year: 10-Year Project Cost: 5.9904 Target Year: 10-Year Project Cost: 5.9906 Target Year: 10-Year Project Cost: 5.9907 Target Year: 10-Year Project Cost: 5.9910 Target Year: 10-Year Project Cost: 5.9911 Target Year: Fund Project Summary Listing Fiscal Year Fiscal Year Fiscal Year 2006-2007 2007-2008 2008-2009 HURF $0 $202,000 Total $0 Traffic Signal Interconnection 2006-2007 ROAD $315,000 $315,000 Total $315,000 11th Street - 3rd Avenue to 2nd Avenue 2006-2007 HURF $70,000 $70,000 Total $70,000 12th Street - 14th Avenue to Avenue B 2006-2007 BOND $880,000 ROAD $0 $10,930,000 Total $880,000 24th Street - Avenue 6E to Avenue 9E 2006-2007 BOND $8,050,000 IMPCT $750,000 OTHR $0 $19,420,000 Total $8,800,000 Street Lights - Infill/Growth 2006-2007 HURF $50,000 $50,000 Total $50,000 Rancho Verde Subdivision Reconstruction 2010-2011 HURF $0 $435,000 Total $0 Upgrade Traffic Signals w/Illumin. Signs 2011-2012 ROAD $0 $178,200 Total $0 14th Street - 1st Ave to 4th Ave 2006-2007 HURF $210,000 $210,000 Total $210,000 Magnolia Village Units 1,2, and 3 2009-2010 Fiscal Year 2009-2010 Fiscal Year 2010-2011 Fiscal Year 2011-2016 $0 $0 $0 $0 $0 $0 $202,000 $202,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $3,800,000 $250,000 $4,050,000 $1,500,000 $0 $1,500,000 $4,500,000 $0 $4,500,000 $0 $0 $0 $0 $0 $0 $4,200,000 $0 $3,500,000 $7,700,000 $2,920,000 $0 $0 $2,920,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $30,000 $30,000 $405,000 $405,000 $0 $0 $0 $0 $0 $0 $0 $0 $178,200 $178,200 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 BB-18 CIP # 10-Year Project Cost: 5.9912 Target Year: 10-Year Project Cost: 5.9913 Target Year: 10-Year Project Cost: 5.9990 Target Year: 10-Year Project Cost: 5.0005 Target Year: 10-Year Project Cost: 5.0008 Target Year: 10-Year Project Cost: 5.0104 Target Year: 10-Year Project Cost: 5.0113 Target Year: 10-Year Project Cost: 5.0200 Target Year: 10-Year Project Cost: 5.0301 Project Summary Listing Fiscal Year Fiscal Year Fiscal Year 2006-2007 2007-2008 2008-2009 HURF $0 $0 $0 $50,000 Total $0 $0 $0 32nd Street - Avenue A to 8th Avenue 2006-2007 ROAD $100,000 $0 $0 $100,000 Total $100,000 $0 $0 Arizona Avenue - 16th to Giss Pky 2006-2007 ROAD $400,000 $400,000 $0 $800,000 Total $400,000 $400,000 $0 Traffic Signal Installation and Upgrades 2006-2007 IMPCT $400,000 $400,000 $0 ROAD $390,000 $460,000 $350,000 UNF $0 $0 $0 $3,500,000 Total $790,000 $860,000 $350,000 28th Street - 8th Ave to 4th Ave 2011-2012 BOND $0 $0 $0 ROAD $0 $0 $0 $1,600,000 Total $0 $0 $0 56th Street - ASH to Ave 13E 2012-2013 BOND $0 $0 $0 ROAD $0 $0 $0 $5,300,000 Total $0 $0 $0 Intersection Safety Upgrades 2006-2007 DD $22,500 $0 $0 ROAD $100,000 $0 $0 $122,500 Total $122,500 $0 $0 Avenue B Turn Lanes 2011-2012 ROAD $0 $0 $0 $400,000 Total $0 $0 $0 Araby Road - I-8 West to 24th Street 2006-2007 ROAD $400,000 $0 $0 $400,000 Total $400,000 $0 $0 Traffic Signal System Implementation Title Fund BB-19 Fiscal Year 2009-2010 $50,000 $50,000 Fiscal Year 2010-2011 Fiscal Year 2011-2016 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $400,000 $350,000 $750,000 $0 $400,000 $350,000 $750,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,290,000 $310,000 $1,600,000 $0 $0 $0 $0 $0 $0 $3,800,000 $1,500,000 $5,300,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $400,000 $400,000 $0 $0 $0 $0 $0 $0 CIP # Title Target Year: 2006-2007 10-Year Project Cost: 5.0302 Target Year: 10-Year Project Cost: 5.0401 Target Year: 10-Year Project Cost: 5.0403 Target Year: 10-Year Project Cost: 5.0404 Target Year: 10-Year Project Cost: 5.0405 Target Year: 10-Year Project Cost: 5.0406 Target Year: 10-Year Project Cost: 5.0408 Target Year: 10-Year Project Cost: 5.0409 Target Year: 10-Year Project Cost: 5.0411 Target Year: Fund Project Summary Listing Fiscal Year Fiscal Year Fiscal Year 2006-2007 2007-2008 2008-2009 BOND $130,000 $930,000 Total $130,000 Palo Verde Street Construction 2010-2011 UNF $0 $140,000 Total $0 Avenue 3E - Gila Ridge Rd. to 32nd St. 2006-2007 BOND $0 OTHR $4,300,000 ROAD $150,000 $8,300,000 Total $4,450,000 Pavement Replacement 2006-2007 BOND $500,000 $1,700,000 Total $500,000 16th Street Corridor Study 2006-2007 ROAD $75,500 $75,500 Total $75,500 4th Avenue - 32nd Street Corridor Study 2006-2007 ROAD $75,500 $75,500 Total $75,500 Pacific Avenue Access Study & Implementation 2008-2009 ROAD $0 $1,210,000 Total $0 24th Street - Ave 2½E to Ave 3E 2006-2007 ROAD $60,000 $835,000 Total $60,000 8th Street - East Main Canal to Avenue B 2006-2007 OTHR $170,000 ROAD $575,000 $875,000 Total $745,000 Automated Traffic Counting Addition 2006-2007 Fiscal Year 2009-2010 Fiscal Year 2010-2011 Fiscal Year 2011-2016 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $0 $0 $0 $0 $0 $0 $0 $0 $140,000 $140,000 $0 $0 $1,650,000 $2,200,000 $0 $3,850,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $300,000 $300,000 $600,000 $600,000 $0 $0 $300,000 $300,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $40,000 $40,000 $90,000 $90,000 $280,000 $280,000 $800,000 $800,000 $0 $0 $775,000 $775,000 $0 $0 $0 $0 $0 $0 $130,000 $0 $130,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 BB-20 CIP # 10-Year Project Cost: 5.0414 Target Year: 10-Year Project Cost: 5.0416 Target Year: 10-Year Project Cost: 5.0503 Target Year: 10-Year Project Cost: 5.0505 Target Year: 10-Year Project Cost: 5.0506 Target Year: 10-Year Project Cost: 5.0507 Target Year: 10-Year Project Cost: 5.0508 Target Year: 10-Year Project Cost: 5.0509 Target Year: 10-Year Project Cost: 5.0510 Target Year: Title Fund Project Summary Listing Fiscal Year Fiscal Year Fiscal Year 2006-2007 2007-2008 2008-2009 $10,000 $10,000 $10,000 $100,000 $100,000 $100,000 $110,000 $110,000 $110,000 HURF OTHR $440,000 Total Avenue 7E Bridge Replacement 2006-2007 ROAD $30,000 STP $120,000 $150,000 Total $150,000 33rd Drive Extension 2006-2007 ROAD $340,000 $340,000 Total $340,000 40th Street Bridge - Area Service Highway 2012-2013 IMPCT $0 ROAD $0 $9,450,000 Total $0 38th Ave. and U.S.B.R. Central Drain 2008-2009 HURF $0 $250,000 Total $0 34th Drive and U.S.B.R. Central Drain 2007-2008 BOND $0 $310,000 Total $0 Ave. B & 24th St. Intersection 2006-2007 ROAD $90,000 $90,000 Total $90,000 'A' Canal Crossings 2010-2011 IMPCT $0 ROAD $0 $4,200,000 Total $0 School Traffic Safety and Circulation Improvements 2006-2007 GRNT $50,000 $250,000 Total $50,000 Bus Stops, Bus Bays and Bus Shelters 2006-2007 Fiscal Year 2009-2010 $10,000 $100,000 $110,000 Fiscal Year 2010-2011 Fiscal Year 2011-2016 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $450,000 $9,000,000 $9,450,000 $0 $0 $50,000 $50,000 $200,000 $200,000 $0 $0 $0 $0 $70,000 $70,000 $240,000 $240,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $100,000 $100,000 $4,050,000 $50,000 $4,100,000 $50,000 $50,000 $50,000 $50,000 $50,000 $50,000 $50,000 $50,000 $0 $0 BB-21 CIP # 10-Year Project Cost: 5.0512 Target Year: 10-Year Project Cost: 5.0514 Target Year: 10-Year Project Cost: 5.0515 Target Year: 10-Year Project Cost: 5.0516 Target Year: 10-Year Project Cost: 5.0517 Target Year: 10-Year Project Cost: 5.0518 Target Year: 10-Year Project Cost: 5.0522 Target Year: 10-Year Project Cost: 5.0523 Target Year: 10-Year Project Cost: 5.0524 Target Year: Title Fund Project Summary Listing Fiscal Year Fiscal Year Fiscal Year 2006-2007 2007-2008 2008-2009 $225,000 $75,000 $75,000 $225,000 $75,000 $75,000 OTHR $525,000 Total Trap Lane Safety Improvements 2007-2008 HURF $0 $271,300 Total $0 Traffic Signal Upgrades 2011-2012 HURF $0 $1,260,000 Total $0 Roadways Plan Modeling Study 2006-2007 ROAD $50,000 $50,000 Total $50,000 Roadways Plan Alignment Studies 2006-2007 IMPCT $260,000 $260,000 Total $260,000 24th St & Ave 3½E - Ave 3E to 56th St 2006-2007 BOND $1,000,000 OTHR $1,044,000 $30,975,000 Total $2,044,000 Orange Avenue Improvements and Beautification 2006-2007 BOND $260,000 GRNT $0 $2,728,000 Total $260,000 Expressways Access Studies 2006-2007 ROAD $154,000 $775,000 Total $154,000 Avenue 6E Widening: 32nd Street to 40th Street 2010-2011 BOND $0 ROAD $0 $5,130,000 Total $0 32nd Street & Pacific Avenue Improvements 2008-2009 ROAD $0 Fiscal Year 2009-2010 $75,000 $75,000 Fiscal Year 2010-2011 $75,000 $75,000 Fiscal Year 2011-2016 $0 $0 $271,300 $271,300 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,260,000 $1,260,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $4,006,000 $0 $4,006,000 $0 $0 $0 $6,936,000 $2,000,000 $8,936,000 $13,989,000 $2,000,000 $15,989,000 $0 $0 $0 $1,968,000 $500,000 $2,468,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $255,000 $255,000 $223,000 $223,000 $143,000 $143,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $500,000 $500,000 $4,630,000 $0 $4,630,000 $0 $94,500 $372,600 $0 $0 BB-22 CIP # 10-Year Project Cost: 5.0525 Target Year: 10-Year Project Cost: 5.0527 Target Year: 10-Year Project Cost: 5.0528 Target Year: 10-Year Project Cost: 5.0529 Target Year: 10-Year Project Cost: 5.0530 Target Year: 10-Year Project Cost: 5.0532 Target Year: 10-Year Project Cost: 5.0533 Target Year: 10-Year Project Cost: 5.0534 Target Year: 10-Year Project Cost: 5.0535 Target Year: 10-Year Project Cost: 5.0536 Project Summary Listing Fiscal Year Fiscal Year Fiscal Year 2006-2007 2007-2008 2008-2009 $467,100 Total $0 $0 $94,500 32nd Street Widening - Avenue 3E to Avenue 5E 2007-2008 BOND $0 $0 $3,810,000 ROAD $0 $420,000 $0 $4,230,000 Total $0 $420,000 $3,810,000 44th Street - Ave 3½E to 4½E & Ave 7E to 8½E 2014-2015 BOND $0 $0 $0 $1,193,000 Total $0 $0 $0 24th Street - North Frontage Road Widening 2015-2016 BOND $0 $0 $0 $1,500,000 Total $0 $0 $0 32nd Street Expressway Construction 2015-2016 BOND $0 $0 $0 $4,200,000 Total $0 $0 $0 36th Street - Ave 3½E to 6E & Ave 7E to 10E 2015-2016 BOND $0 $0 $0 $2,640,000 Total $0 $0 $0 40th Street - Ave 3½E to Ave 10E 2015-2016 BOND $0 $0 $0 $4,500,000 Total $0 $0 $0 Frontage Road - Ave 9E to Ave 11E 2011-2012 BOND $0 $0 $0 $3,000,000 Total $0 $0 $0 Avenue 8½E - 32nd St Expressway to 44th St 2006-2007 BOND $0 $0 $0 ROAD $60,000 $0 $0 $3,160,000 Total $60,000 $0 $0 Avenue 8E - 32nd St Expressway to 56th St 2006-2007 BOND $3,100,000 $0 $0 $14,402,000 Total $3,100,000 $0 $0 16th Street Expressway - Ave 2E to Ave 10E Title Fund BB-23 Fiscal Year 2009-2010 $372,600 Fiscal Year 2010-2011 Fiscal Year 2011-2016 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,193,000 $1,193,000 $0 $0 $0 $0 $1,500,000 $1,500,000 $0 $0 $0 $0 $4,200,000 $4,200,000 $0 $0 $0 $0 $2,640,000 $2,640,000 $0 $0 $0 $0 $4,500,000 $4,500,000 $0 $0 $0 $0 $3,000,000 $3,000,000 $0 $300,000 $300,000 $2,400,000 $400,000 $2,800,000 $0 $0 $0 $11,302,000 $11,302,000 $0 $0 $0 $0 CIP # Title Target Year: 2015-2016 10-Year Project Cost: 5.0537 Target Year: 10-Year Project Cost: 5.0538 Target Year: 10-Year Project Cost: 5.0539 Target Year: 10-Year Project Cost: 5.0542 Target Year: 10-Year Project Cost: 5.0544 Target Year: 10-Year Project Cost: 5.0546 Target Year: 10-Year Project Cost: 5.0547 Target Year: 10-Year Project Cost: 5.0548 Target Year: 10-Year Project Cost: 5.0549 Target Year: Fund Fiscal Year 2009-2010 Fiscal Year 2010-2011 Fiscal Year 2011-2016 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,500,000 $5,500,000 BOND $0 $40,000 Total $0 Avenue 7E - North Construction 2015-2016 ROAD $0 $50,000 Total $0 Avenue 7E - 32nd St Expressway to 56th St 2015-2016 BOND $0 $1,590,000 Total $0 Avenue 10E Widening 2007-2008 BOND $0 UNF $0 $37,206,000 Total $0 4th Avenue Corridor Construction 2010-2011 BOND $0 $32,700,000 Total $0 Avenue 4½E - 32nd St Expressway to 44th St 2015-2016 UNF $0 $795,000 Total $0 Avenue 4E - Gila Ridge Rd to Yuma Expressway 2015-2016 UNF $0 $1,920,000 Total $0 Avenue 5½E Construction 2011-2012 ROAD $0 UNF $0 $4,800,000 Total $0 Avenue 5E - 16th St Exp. to Yuma Expressway 2015-2016 UNF $0 $0 $0 $0 $0 $0 $0 $0 $0 $40,000 $40,000 $0 $0 $0 $0 $0 $0 $0 $0 $50,000 $50,000 $0 $0 $0 $0 $0 $0 $0 $0 $1,590,000 $1,590,000 $4,000,000 $0 $4,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $33,206,000 $33,206,000 $0 $0 $0 $0 $0 $0 $10,900,000 $10,900,000 $21,800,000 $21,800,000 $0 $0 $0 $0 $0 $0 $0 $0 $795,000 $795,000 $0 $0 $0 $0 $0 $0 $0 $0 $1,920,000 $1,920,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $480,000 $4,320,000 $4,800,000 $0 $0 $0 $0 $4,200,000 $5,500,000 Yuma Expressway 2015-2016 BOND Total Project Summary Listing Fiscal Year Fiscal Year Fiscal Year 2006-2007 2007-2008 2008-2009 BB-24 CIP # 10-Year Project Cost: 5.0551 Target Year: 10-Year Project Cost: 5.0552 Target Year: 10-Year Project Cost: 5.0554 Target Year: 10-Year Project Cost: 5.0562 Target Year: 10-Year Project Cost: 5.0564 Target Year: 10-Year Project Cost: 5.0566 Target Year: 10-Year Project Cost: 5.0574 Target Year: 10-Year Project Cost: 5.0575 Target Year: 10-Year Project Cost: 5.0576 Target Year: Project Summary Listing Fiscal Year Fiscal Year Fiscal Year 2006-2007 2007-2008 2008-2009 $4,200,000 Total $0 $0 $0 Avenue 7½E - 32nd St Expressway to 56th St 2015-2016 UNF $0 $0 $0 $1,325,000 Total $0 $0 $0 East Yuma Freeway 2006-2007 ROAD $100,000 $0 $0 UNF $0 $0 $0 $311,000,000 Total $100,000 $0 $0 Giss Parkway - 4th Avenue to I-8 2007-2008 BOND $0 $0 $3,400,000 ROAD $0 $450,000 $0 $3,850,000 Total $0 $450,000 $3,400,000 40th Street - Avenue B to Avenue D 2015-2016 UNF $0 $0 $0 $994,000 Total $0 $0 $0 45th Avenue - 5th St to 28th St 2006-2007 ROAD $470,000 $0 $0 UNF $0 $0 $0 $17,690,000 Total $470,000 $0 $0 52nd Street Construction 2015-2016 ROAD $0 $0 $0 $840,000 Total $0 $0 $0 16th St & 4th Ave Intersection Improvements 2006-2007 BOND $3,000,000 $2,000,000 $0 $13,875,000 Total $3,000,000 $2,000,000 $0 16th Street Widening - 6th Avenue to 13th Avenue 2012-2013 BOND $0 $0 $0 ROAD $0 $0 $0 $11,698,000 Total $0 $0 $0 24th Street / Avenue B Corridor Studies 2011-2012 ROAD $0 $0 $0 Title Fund BB-25 Fiscal Year 2009-2010 Fiscal Year 2010-2011 $0 $0 Fiscal Year 2011-2016 $4,200,000 $0 $0 $1,325,000 $1,325,000 $0 $0 $0 $0 $0 $0 $310,900,000 $310,900,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $994,000 $994,000 $0 $0 $0 $0 $17,220,000 $17,220,000 $0 $0 $0 $0 $0 $0 $0 $840,000 $840,000 $8,875,000 $8,875,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $11,122,000 $576,000 $11,698,000 $0 $0 $750,000 Project Summary Listing Fiscal Year Fiscal Year Fiscal Year 2006-2007 2007-2008 2008-2009 10-Year Project Cost: $750,000 Total $0 $0 $0 5.0577 Major Intersection and Location Studies Target Year: 2007-2008 HURF $0 $100,000 $0 ROAD $0 $0 $100,000 10-Year Project Cost: $400,000 Total $0 $100,000 $100,000 5.0578 Roadway Safety Improvements Target Year: 2008-2009 HURF $0 $0 $0 ROAD $0 $0 $250,000 10-Year Project Cost: $500,000 Total $0 $0 $250,000 5.0579 Palo Verde Street Speed Control Improvements Target Year: 2009-2010 HURF $0 $0 $0 10-Year Project Cost: $141,600 Total $0 $0 $0 4th Avenue Integrated Corridor 5.0581 Target Year: 2010-2011 BOND $0 $0 $0 UNF $0 $0 $0 10-Year Project Cost: $84,604,000 Total $0 $0 $0 5.0582 Expressways Access Studies Target Year: 2008-2009 ROAD $0 $0 $154,000 10-Year Project Cost: $775,000 Total $0 $0 $154,000 5.0584 16th Street Widening Target Year: 2006-2007 BOND $2,170,000 $6,430,000 $0 OTHR $1,035,000 $1,000,000 $1,000,000 10-Year Project Cost: $11,635,000 Total $3,205,000 $7,430,000 $1,000,000 5.0599 Traffic Impact Analysis Studies Target Year: 2006-2007 DD $100,000 $100,000 $100,000 10-Year Project Cost: $500,000 Total $100,000 $100,000 $100,000 Transportation Section Total $68,537,700 $64,316,693 $47,163,500 Water Utility 7.8225 1st Avenue Waterline - 8th St to 12th St Target Year: 2006-2007 WUF $55,000 $220,000 $0 10-Year Project Cost: $275,000 Total $55,000 $220,000 $0 7.8310 2nd Avenue Waterline - 12th St to 16th St CIP # Title Fund BB-26 Fiscal Year 2009-2010 Fiscal Year 2010-2011 $0 $0 Fiscal Year 2011-2016 $750,000 $100,000 $0 $100,000 $0 $100,000 $100,000 $0 $0 $0 $250,000 $0 $250,000 $0 $0 $0 $0 $0 $0 $141,600 $141,600 $0 $0 $0 $0 $0 $0 $0 $0 $1,460,400 $1,460,400 $70,000,000 $13,143,600 $83,143,600 $255,000 $255,000 $223,000 $223,000 $143,000 $143,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $100,000 $100,000 $69,000,200 $100,000 $100,000 $421,536,500 $0 $0 $271,203,800 $0 $0 $0 $0 $0 $0 CIP # Title Target Year: 2006-2007 10-Year Project Cost: 7.8706 Target Year: 10-Year Project Cost: 7.8722 Target Year: 10-Year Project Cost: 7.8802 Target Year: 10-Year Project Cost: 7.9210 Target Year: 10-Year Project Cost: 7.9294 Target Year: 10-Year Project Cost: 7.9305 Target Year: 10-Year Project Cost: 7.9307 Target Year: 10-Year Project Cost: 7.9308 Target Year: 10-Year Project Cost: 7.9309 Target Year: 10-Year Project Cost: 7.9310 Fund Project Summary Listing Fiscal Year Fiscal Year Fiscal Year 2006-2007 2007-2008 2008-2009 WUF $130,000 $385,000 Total $130,000 Highway 80 Waterline - Ave 6½E to Ave 8½E 2006-2007 BOND $700,000 $700,000 Total $700,000 Avenue 3E and Gila Ridge Road Watermains 2006-2007 WSDC $160,000 $350,000 Total $160,000 5th Ave Watermain - 8th St to 16th St 2006-2007 WUF $470,000 $470,000 Total $470,000 3rd Street Watermain - Magnolia Ave. to Ave. B 2007-2008 WSDC $0 $447,000 Total $0 Fire Hydrants 2006-2007 WUF $100,000 $300,000 Total $100,000 12th Street Waterline - 14th Ave. to 21st Dr. 2007-2008 WSDC $0 $205,000 Total $0 28th Street Waterline - 8th Ave to Ave A 2007-2008 WUF $0 $100,000 Total $0 19th Street Waterline - 4th Ave. to Arizona Ave. 2008-2009 WUF $0 $194,000 Total $0 Magnolia Ave Watermain - 1st St to 8th St 2006-2007 WUF $394,000 $394,000 Total $394,000 10" Waterline at 28th St E. of 4th Avenue Fiscal Year 2009-2010 Fiscal Year 2010-2011 Fiscal Year 2011-2016 $255,000 $255,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $190,000 $190,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $37,000 $37,000 $410,000 $410,000 $0 $0 $0 $0 $0 $0 $50,000 $50,000 $50,000 $50,000 $50,000 $50,000 $50,000 $50,000 $0 $0 $15,000 $15,000 $190,000 $190,000 $0 $0 $0 $0 $0 $0 $100,000 $100,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $104,000 $104,000 $90,000 $90,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 BB-27 CIP # Title Target Year: 2012-2013 10-Year Project Cost: 7.9311 Target Year: 10-Year Project Cost: 7.9408 Target Year: 10-Year Project Cost: 7.9416 Target Year: 10-Year Project Cost: 7.9417 Target Year: 10-Year Project Cost: 7.9490 Target Year: 10-Year Project Cost: 7.9503 Target Year: 10-Year Project Cost: 7.9602 Target Year: 10-Year Project Cost: 7.9603 Target Year: 10-Year Project Cost: 7.9606 Target Year: 10-Year Project Cost: 7.9707 Fund Project Summary Listing Fiscal Year Fiscal Year Fiscal Year 2006-2007 2007-2008 2008-2009 UNF $0 $106,000 Total $0 36th Street Waterline - 4th Ave. to 8th Ave. 2011-2012 WSDC $0 $140,000 Total $0 3rd & 4th Ave Waterlines - 3rd St. to 4th St. 2006-2007 WUF $190,000 $190,000 Total $190,000 Pecan Grove Waterline Improvements 2007-2008 WUF $0 $25,000 Total $0 16th St. & Zone 2 Waterline - Arizona Ave. to Ave. A 2011-2012 WSDC $0 $1,110,000 Total $0 New Water Services 2006-2007 WUF $125,000 $675,000 Total $125,000 8th Avenue Waterline - 24th St to 32nd St 2008-2009 WUF $0 $47,500 Total $0 Avenue A Waterline - 16th to 24th Streets 2006-2007 WUF $350,000 $350,000 Total $350,000 Gila Ridge Rd Watermains - Ave 4½E to Araby Rd 2006-2007 WSDC $400,000 $825,000 Total $400,000 15th, 16th & 17th Ave Waterlines - 3rd St to 8th St 2006-2007 WUF $420,000 $840,000 Total $420,000 19th St. 10" Watermain - 4th Ave. to Ave. A Fiscal Year 2009-2010 Fiscal Year 2010-2011 Fiscal Year 2011-2016 $0 $0 $0 $0 $0 $0 $0 $0 $106,000 $106,000 $0 $0 $0 $0 $0 $0 $0 $0 $140,000 $140,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $25,000 $25,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,110,000 $1,110,000 $125,000 $125,000 $125,000 $125,000 $150,000 $150,000 $150,000 $150,000 $0 $0 $0 $0 $47,500 $47,500 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $425,000 $425,000 $0 $0 $0 $0 $0 $0 $0 $0 $420,000 $420,000 $0 $0 $0 $0 $0 $0 $0 $0 BB-28 CIP # Title Target Year: 2009-2010 10-Year Project Cost: 7.9800 Target Year: 10-Year Project Cost: 7.9803 Target Year: 10-Year Project Cost: 7.9806 Target Year: 10-Year Project Cost: 7.9904 Target Year: 10-Year Project Cost: 7.9996 Target Year: 10-Year Project Cost: 7.0102 Target Year: 10-Year Project Cost: 7.0103 Target Year: 10-Year Project Cost: 7.0107 Target Year: 10-Year Project Cost: 7.0108 Target Year: 10-Year Project Cost: Fund Project Summary Listing Fiscal Year Fiscal Year Fiscal Year 2006-2007 2007-2008 2008-2009 WUF $0 $285,000 Total $0 24th Street Ground Storage Tank 2013-2014 BOND $0 WSDC $0 $4,200,000 Total $0 Orange Avenue Waterline - 4th St to 8th St 2006-2007 WUF $20,000 $370,000 Total $20,000 Agua Viva Water Treatment Plant 2006-2007 BOND $80,000,000 $80,000,000 Total $80,000,000 Carbon Feeder Improvements 2006-2007 WUF $200,000 $200,000 Total $200,000 Waterline Replacement/Improvements 2006-2007 WUF $800,000 $4,000,000 Total $800,000 Flocculation/Sedimentation Basin 2006-2007 BOND $450,000 $450,000 Total $450,000 1st Avenue Waterline - 12th St to 16th St 2007-2008 WUF $0 $205,000 Total $0 Zone 2 to Zone 1 Pressure Reducing Valve 2006-2007 WUF $270,000 $270,000 Total $270,000 Potable Water Dedicated Sample Taps 2006-2007 WUF $60,000 $180,000 Total $60,000 Fiscal Year 2009-2010 Fiscal Year 2010-2011 Fiscal Year 2011-2016 $0 $0 $0 $0 $285,000 $285,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $4,000,000 $200,000 $4,200,000 $0 $0 $0 $0 $350,000 $350,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $800,000 $800,000 $800,000 $800,000 $800,000 $800,000 $800,000 $800,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $205,000 $205,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $60,000 $60,000 $60,000 $60,000 $0 $0 $0 $0 $0 $0 BB-29 CIP # 7.0110 Target Year: 10-Year Project Cost: 7.0111 Target Year: 10-Year Project Cost: 7.0113 Target Year: 10-Year Project Cost: 7.0114 Target Year: 10-Year Project Cost: 7.0115 Target Year: 10-Year Project Cost: 7.0116 Target Year: 10-Year Project Cost: 7.0117 Target Year: 10-Year Project Cost: 7.0118 Target Year: 10-Year Project Cost: 7.0122 Target Year: 10-Year Project Cost: 7.0203 Target Year: 10-Year Project Cost: Project Summary Listing Fiscal Year Fiscal Year Fiscal Year 2006-2007 2007-2008 2008-2009 24th Street 16" Waterline Replacement 2007-2008 WUF $0 $520,000 $0 $520,000 Total $0 $520,000 $0 8th St Water Transmission Ln - Ave A to Ave B 2006-2007 BOND $2,200,000 $0 $0 $2,200,000 Total $2,200,000 $0 $0 Avenue B Water Transmission Line 2006-2007 BOND $2,100,000 $0 $0 $2,100,000 Total $2,100,000 $0 $0 Ave 9E Water Transmission Ln - I-8 to 40th St 2006-2007 BOND $2,200,000 $0 $0 $2,200,000 Total $2,200,000 $0 $0 Ave 9E Water Transmission Ln - E. Mesa WTP to I-8 2006-2007 BOND $1,100,000 $0 $0 $1,100,000 Total $1,100,000 $0 $0 MSWTP Safe Drinking Water Act Upgrades 2006-2007 BOND $3,420,000 $3,420,000 $0 $6,840,000 Total $3,420,000 $3,420,000 $0 SCADA System Upgrades, Phase I 2006-2007 WUF $406,000 $0 $0 $406,000 Total $406,000 $0 $0 32nd St Water Trans. Ln - Ave B to Friendship Twr 2006-2007 WSDC $760,000 $0 $0 $760,000 Total $760,000 $0 $0 Environmental Laboratory Equipment 2007-2008 WUF $0 $420,000 $350,000 $770,000 Total $0 $420,000 $350,000 Water Utility Security 2006-2007 BOND $442,000 $142,000 $0 $584,000 Total $442,000 $142,000 $0 Title Fund BB-30 Fiscal Year 2009-2010 Fiscal Year 2010-2011 Fiscal Year 2011-2016 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 CIP # 7.0300 Target Year: 10-Year Project Cost: 7.0301 Target Year: 10-Year Project Cost: 7.0302 Target Year: 10-Year Project Cost: 7.0401 Target Year: 10-Year Project Cost: 7.0403 Target Year: 10-Year Project Cost: 7.0500 Target Year: 10-Year Project Cost: 7.0501 Target Year: 10-Year Project Cost: 7.0503 Target Year: 10-Year Project Cost: 7.0504 Target Year: 10-Year Project Cost: 7.0505 Target Year: Project Summary Listing Fiscal Year Fiscal Year Fiscal Year 2006-2007 2007-2008 2008-2009 1st Ave Water Transmission Ln - 5th St to 16th St 2006-2007 WUF $20,000 $450,000 $0 $470,000 Total $20,000 $450,000 $0 Ave 9E Water Trans. Ln - E. Mesa WTP to 24th St 2006-2007 BOND $2,700,000 $0 $0 $2,700,000 Total $2,700,000 $0 $0 40th St Water Transmission Ln - Ave 3E to Ave 9E 2006-2007 BOND $8,300,000 $0 $0 $8,300,000 Total $8,300,000 $0 $0 Main Street WTF Chlorine Scrubber Improvement 2006-2007 BOND $375,000 $0 $0 $375,000 Total $375,000 $0 $0 Main Street WTF Auxillary Power 2006-2007 BOND $1,095,000 $900,000 $0 WUF $18,000 $0 $0 $2,013,000 Total $1,113,000 $900,000 $0 Main Street WTF Filter System Upgrade 2006-2007 BOND $1,940,100 $0 $0 $1,940,100 Total $1,940,100 $0 $0 Main Street WTF Mechanical De-watering System 2006-2007 BOND $1,000,000 $0 $0 $1,000,000 Total $1,000,000 $0 $0 Main Street WTF Operator Control Center 2008-2009 WUF $0 $0 $450,000 $450,000 Total $0 $0 $450,000 Main Street WTF Maintenance Shop Building 2007-2008 BOND $0 $1,500,000 $0 $1,500,000 Total $0 $1,500,000 $0 Friendship Tower Improvements 2006-2007 BOND $2,000,000 $0 $0 Title Fund BB-31 Fiscal Year 2009-2010 Fiscal Year 2010-2011 Fiscal Year 2011-2016 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Project Summary Listing Fiscal Year Fiscal Year Fiscal Year 2006-2007 2007-2008 2008-2009 10-Year Project Cost: $2,000,000 Total $2,000,000 $0 $0 7.0506 Main Street WTF Sedimentation Basin Covers Target Year: 2006-2007 BOND $750,000 $750,000 $0 10-Year Project Cost: $1,500,000 Total $750,000 $750,000 $0 7.0507 Main Street WTF Yard Paving Improvements Target Year: 2006-2007 WUF $220,000 $0 $0 10-Year Project Cost: $220,000 Total $220,000 $0 $0 7.0508 Water System Master Plan Update Target Year: 2006-2007 WUF $250,000 $0 $0 10-Year Project Cost: $250,000 Total $250,000 $0 $0 7.0509 Main Street WTF AZPDES Permit Target Year: 2006-2007 WCF $750,000 $250,000 $0 10-Year Project Cost: $1,000,000 Total $750,000 $250,000 $0 Water Utility Section Total $117,340,100 $11,279,000 $2,586,500 Sewer Utility 8.8705 12th Street Trunk Sewer, Phase I & II Target Year: 2006-2007 BOND $1,700,000 $0 $0 10-Year Project Cost: $1,700,000 Total $1,700,000 $0 $0 8.9305 Sanitary Sewer Line Repairs/Replacement Target Year: 2010-2011 SUF $0 $0 $0 10-Year Project Cost: $1,642,000 Total $0 $0 $0 8.9404 Avenue B & 24th Street 12" Force Main Target Year: 2006-2007 SUF $290,000 $0 $0 10-Year Project Cost: $290,000 Total $290,000 $0 $0 8.9502 Manhole Rehabilitation/Reconstruction Target Year: 2006-2007 BOND $1,000,000 $0 $0 SUF $0 $200,000 $200,000 10-Year Project Cost: $1,800,000 Total $1,000,000 $200,000 $200,000 8.9593 Sewer Line Replacements/Improvements Target Year: 2006-2007 BOND $490,000 $0 $0 DD $500,000 $500,000 $500,000 CIP # Title Fund BB-32 Fiscal Year 2009-2010 Fiscal Year 2010-2011 Fiscal Year 2011-2016 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,725,000 $0 $0 $1,000,000 $0 $0 $4,436,000 $0 $0 $0 $0 $0 $0 $0 $0 $164,000 $164,000 $1,478,000 $1,478,000 $0 $0 $0 $0 $0 $0 $0 $200,000 $200,000 $0 $200,000 $200,000 $0 $0 $0 $0 $500,000 $0 $500,000 $0 $0 CIP # 10-Year Project Cost: 8.9800 Target Year: 10-Year Project Cost: 8.9803 Target Year: 10-Year Project Cost: 8.0003 Target Year: 10-Year Project Cost: 8.0004 Target Year: 10-Year Project Cost: 8.0005 Target Year: 10-Year Project Cost: 8.0006 Target Year: 10-Year Project Cost: 8.0100 Target Year: 10-Year Project Cost: 8.0103 Target Year: 10-Year Project Cost: 8.0104 Target Year: 10-Year Project Cost: 8.0200 Target Year: Project Summary Listing Fiscal Year Fiscal Year Fiscal Year 2006-2007 2007-2008 2008-2009 SUF $170,000 $353,400 $400,000 $5,309,400 Total $1,160,000 $853,400 $900,000 Cemetery/Main Street - 6th-7th Streets 2011-2012 IMPD $0 $0 $0 $300,000 Total $0 $0 $0 Desert Dunes Water Pollution Control Fac. 2006-2007 BOND $13,000,000 $0 $0 $62,000,000 Total $13,000,000 $0 $0 Administrative Building Expansion 2006-2007 BOND $70,000 $700,000 $0 $770,000 Total $70,000 $700,000 $0 Colorado River Interceptor Sanitary Sewer 2006-2007 BOND $400,000 $0 $0 $400,000 Total $400,000 $0 $0 1st Avenue Trunk Sewer Replacement 2007-2008 SUF $0 $450,000 $0 $450,000 Total $0 $450,000 $0 Riverfront Park Manhole Replacement 2006-2007 SUF $90,000 $0 $0 $90,000 Total $90,000 $0 $0 5th Avenue Sewerline Replacement 2006-2007 SUF $29,500 $0 $0 $29,500 Total $29,500 $0 $0 Figueroa WPCF - Aerator Upgrade 2006-2007 BOND $2,500,000 $1,000,000 $0 $3,500,000 Total $2,500,000 $1,000,000 $0 Figueroa WPCF SCADA Improvements 2006-2007 SUF $100,000 $50,000 $0 $150,000 Total $100,000 $50,000 $0 Figueroa WPCF Digester Electrical Upgrades 2006-2007 Title Fund BB-33 Fiscal Year 2009-2010 $760,000 $1,260,000 Fiscal Year 2010-2011 $636,000 $1,136,000 Fiscal Year 2011-2016 $0 $0 $0 $0 $300,000 $300,000 $49,000,000 $49,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 CIP # 10-Year Project Cost: 8.0300 Target Year: 10-Year Project Cost: 8.0301 Target Year: 10-Year Project Cost: 8.0302 Target Year: 10-Year Project Cost: 8.0303 Target Year: 10-Year Project Cost: 8.0304 Target Year: 10-Year Project Cost: 8.0305 Target Year: 10-Year Project Cost: 8.0400 Target Year: 10-Year Project Cost: 8.0401 Target Year: 10-Year Project Cost: 8.0402 Target Year: 10-Year Project Cost: 8.0403 Title Fund Project Summary Listing Fiscal Year Fiscal Year Fiscal Year 2006-2007 2007-2008 2008-2009 $150,000 $0 $0 $150,000 $0 $0 SCF $150,000 Total Wastewater Utility Security 2006-2007 BOND $150,000 $150,000 Total $150,000 Figueroa WPCF Gate Replacements 2006-2007 SCF $115,000 $615,000 Total $115,000 Upgrade Figueroa Service Area 2006-2007 BOND $2,500,000 SSIC $700,000 $10,000,000 Total $3,200,000 Sanitary Sewer Collection System Model 2006-2007 SSIC $65,000 $155,000 Total $65,000 Citrus View WPCF Reconfiguration 2006-2007 BOND $1,200,000 $1,200,000 Total $1,200,000 Jack Rabbit Mesa WPCF Upgrades Phase II 2006-2007 BOND $1,812,931 $10,212,931 Total $1,812,931 5th Street Sanitary Sewer Replacement 2007-2008 SUF $0 $280,000 Total $0 10th Ave/Ave A Alley Sanitary Sewer 2007-2008 SUF $0 $410,000 Total $0 Figueroa Avenue WPCF Digester Improvements 2006-2007 BOND $600,000 $1,700,000 Total $600,000 Figueroa WPCF System Upgrades Fiscal Year 2009-2010 Fiscal Year 2010-2011 Fiscal Year 2011-2016 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $500,000 $500,000 $0 $0 $0 $0 $0 $0 $0 $0 $2,500,000 $0 $2,500,000 $2,500,000 $0 $2,500,000 $1,800,000 $0 $1,800,000 $0 $0 $0 $0 $0 $0 $30,000 $30,000 $30,000 $30,000 $30,000 $30,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $8,400,000 $8,400,000 $0 $0 $0 $0 $0 $0 $0 $0 $280,000 $280,000 $0 $0 $0 $0 $0 $0 $0 $0 $10,000 $10,000 $400,000 $400,000 $0 $0 $0 $0 $0 $0 $1,100,000 $1,100,000 $0 $0 $0 $0 $0 $0 $0 $0 BB-34 CIP # Title Target Year: 2006-2007 Fund Project Summary Listing Fiscal Year Fiscal Year Fiscal Year 2006-2007 2007-2008 2008-2009 SCF $800,000 $0 10-Year Project Cost: $800,000 Total $800,000 $0 8.0404 Figueroa WPCF Improvements Target Year: 2006-2007 BOND $1,500,000 $12,000,000 10-Year Project Cost: $23,500,000 Total $1,500,000 $12,000,000 8.0405 Figueroa WPCF NPDES Renewal Target Year: 2006-2007 SCF $840,000 $300,000 10-Year Project Cost: $1,140,000 Total $840,000 $300,000 8.0500 Update City's 208 Facilities Plan Target Year: 2006-2007 SCF $100,000 $250,000 10-Year Project Cost: $350,000 Total $100,000 $250,000 8.0501 Secondary Clarifier Upgrades & Improvements Target Year: 2006-2007 SCF $150,000 $1,500,000 10-Year Project Cost: $3,650,000 Total $150,000 $1,500,000 8.0502 Figueroa WPCF Inventory Control Building Target Year: 2008-2009 BOND $0 $0 10-Year Project Cost: $220,000 Total $0 $0 8.0503 Figueroa Avenue WPCF Primary Clarifier Imp. Target Year: 2006-2007 BOND $1,500,000 $2,000,000 10-Year Project Cost: $3,500,000 Total $1,500,000 $2,000,000 8.0510 Figueroa WPCF Auxiliary Power Improvements Target Year: 2006-2007 UNF $750,000 $250,000 10-Year Project Cost: $1,000,000 Total $750,000 $250,000 Sewer Utility Section Total $33,272,431 $32,373,400 Stormwater Control 9.9301 28th Street Storm Drainage Target Year: 2006-2007 BOND $3,700,000 $2,400,000 OTHR $1,200,000 $0 ROAD $130,000 $0 10-Year Project Cost: $11,830,000 Total $5,030,000 $2,400,000 9.9316 Storm Water Drainage - Del Oro Estates BB-35 Fiscal Year 2009-2010 Fiscal Year 2010-2011 Fiscal Year 2011-2016 $0 $0 $0 $0 $0 $0 $0 $0 $8,000,000 $8,000,000 $2,000,000 $2,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,000,000 $2,000,000 $0 $0 $0 $0 $0 $0 $20,000 $20,000 $200,000 $200,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $14,050,000 $0 $0 $54,490,000 $0 $0 $1,500,000 $0 $0 $748,000 $2,400,000 $1,000,000 $0 $3,400,000 $0 $0 $0 $0 $0 $1,000,000 $0 $1,000,000 $0 $0 $0 $0 CIP # Title Target Year: 2011-2012 10-Year Project Cost: 9.9319 Target Year: 10-Year Project Cost: 9.9400 Target Year: 10-Year Project Cost: 9.9401 Target Year: 10-Year Project Cost: 9.9402 Target Year: 10-Year Project Cost: 9.9801 Target Year: 10-Year Project Cost: 9.0100 Target Year: 10-Year Project Cost: 9.0101 Target Year: 10-Year Project Cost: 9.0401 Target Year: 10-Year Project Cost: 9.0500 Target Year: 10-Year Project Cost: 9.0501 Fund Project Summary Listing Fiscal Year Fiscal Year Fiscal Year 2006-2007 2007-2008 2008-2009 IMPD $0 $2,695,000 Total $0 Ext. Storm Sewer/Arena Dr/9th to 10th St 2007-2008 HURF $0 $100,000 Total $0 The Manors Storm Sewer System 2011-2012 ROAD $0 $50,000 Total $0 8th Avenue Storm Sewer Extension 2009-2010 ROAD $0 $40,000 Total $0 6th Place Storm Sewer 2006-2007 BOND $0 $530,000 Total $0 Fix Alley Drainage - 4th Avenue & Ave. A 2006-2007 HURF $100,000 $100,000 Total $100,000 Araby Road Drainage Improvements 2006-2007 ROAD $42,000 $42,000 Total $42,000 Stormwater NPDES Permit 2006-2007 ROAD $125,000 $545,000 Total $125,000 Cibola Heights Stormwater Basin Improvements 2006-2007 HURF $15,000 $15,000 Total $15,000 Storm Water Drainage 2006-2007 HURF $260,000 $260,000 Total $260,000 Storm Water Lift Station Conversion Fiscal Year 2009-2010 Fiscal Year 2010-2011 Fiscal Year 2011-2016 $0 $0 $0 $0 $0 $0 $0 $0 $2,695,000 $2,695,000 $100,000 $100,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $50,000 $50,000 $0 $0 $0 $0 $40,000 $40,000 $0 $0 $0 $0 $530,000 $530,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $136,000 $136,000 $100,000 $100,000 $184,000 $184,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 BB-36 CIP # Title Target Year: 2010-2011 Fund HURF 10-Year Project Cost: $160,000 Total 9.0502 Dunes Drainage Basin Target Year: 2006-2007 HURF 10-Year Project Cost: $105,000 Total Stormwater Control Section Total Total Project Summary Listing Fiscal Year Fiscal Year Fiscal Year 2006-2007 2007-2008 2008-2009 Fiscal Year 2009-2010 Fiscal Year 2010-2011 Fiscal Year 2011-2016 $0 $0 $0 $0 $0 $0 $0 $0 $160,000 $160,000 $0 $0 $10,000 $10,000 $5,582,000 $0 $0 $3,166,000 $90,000 $90,000 $3,590,000 $5,000 $5,000 $229,000 $0 $0 $1,160,000 $0 $0 $2,480,000 $301,754,176 $134,559,382 $92,457,570 $136,112,700 $421,536,500 $301,834,166 BB-37 Fund Summary Listing CIP # Title Year Fund BOND 1.9757 1.9803 1.9905 1.9910 1.9916 1.0002 1.0402 1.0508 2.9704 2.0601 3.0500 4.9401 4.9601 4.9602 4.9605 4.9607 4.9903 4.0300 4.0400 4.0402 4.0502 5.8312 5.8323 5.8325 5.8702 5.9105 5.9205 5.9207 5.9209 5.9401 5.9402 5.9408 5.9504 5.9507 5.9512 5.9609 Budget Authority Reserve Yuma Theatre and Art Center Restoration Drying Bed-Main Street WTP Downtown Parking Structure(s) Riverfront Infrastructure Improvements East Wetlands City Hall Modification East Mesa Facilities South Valley Area Park Cibola High School Community Swimming Pool Deyo Complex Adapative Re-use Public Safety Training Facility Fire Station 6 (B) - Avenue C and 32nd St. Fire Station A - 32nd St. & Avenue 4E Fire Station E - I-8 and Fortuna Road Fire Station C - Avenue C and 8th Street Fire Station D - 40th Street & Avenue 8E Fire Station #1 Replacement Police Department Facility Improvements Fire Station I Police Storage Facility 4th Avenue Reconstruction 40th Street - Arizona Avenue to Avenue A 24th Street - Avenue B to Avenue C 1st Street - Gila Street to Avenue C Magnolia Avenue, et al 12th to 16th Streets - 4th Ave to Ave "A" Camino Alameda, et al (Casa Mañana) 17th to 19th Streets - 5th Ave to Ave A Villa Hermosa No. 2 32nd Street - 4th Avenue to Avenue B Maiden Lane & Gila Street - 1st St to Giss Pkwy 36th Street - Arizona Avenue to 4th Avenue 20th Street - Avenue B to Avenue C Right-of-Way Acquisition Thacker Lateral Multi-Use Path (North) 06-07 09-10 06-07 08-09 06-07 06-07 06-07 09-10 08-09 06-07 06-07 06-07 06-07 07-08 10-11 13-14 07-08 06-07 06-07 11-12 06-07 10-11 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 06-07 11-12 06-07 06-07 12-13 BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 $3,100,000 0 $2,300,000 0 $1,119,000 $970,000 $700,000 0 0 $200,000 $17,880,000 $4,177,750 $2,680,000 0 0 0 0 $400,000 $2,431,000 0 0 0 0 0 $1,000,000 $1,090,000 0 $500,000 $2,500,000 $1,800,000 $3,800,000 0 0 $1,300,000 $14,300,000 0 $2,000,000 0 0 0 0 0 0 0 0 $2,266,914 0 0 0 $212,500 0 0 $244,375 $4,350,000 0 0 0 0 0 0 $4,500,000 0 $700,000 $1,000,000 0 0 $2,776,393 0 0 0 0 0 $2,000,000 0 0 $3,840,000 0 0 0 0 $2,000,000 0 0 0 0 $2,325,000 0 0 $2,643,750 0 0 0 0 0 $800,000 $1,080,000 0 0 $500,000 0 0 0 0 $475,000 0 0 0 0 $2,000,000 $1,020,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $3,200,000 0 $4,500,000 0 0 0 0 0 0 0 0 0 0 0 0 0 $5,000,000 0 0 0 0 0 0 $7,250,000 $2,300,000 0 0 0 0 0 $265,600 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $6,000,000 0 0 0 0 0 0 0 0 0 0 0 0 $2,931,050 $3,521,366 0 0 0 $3,342,950 0 $4,500,000 0 0 0 0 0 0 0 0 0 0 $1,830,000 0 0 $3,050,000 CC-1 Fund Summary Listing CIP # Title Year Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 5.9701 5.9702 5.9705 5.9707 5.9711 5.9714 5.9718 5.9719 5.9720 5.9724 5.9725 5.9728 5.9729 5.9736 5.9737 5.9740 5.9753 5.9811 5.9812 5.0005 5.0008 5.0301 5.0401 5.0403 5.0506 5.0517 5.0518 5.0523 5.0525 5.0527 5.0528 5.0529 5.0530 5.0532 5.0533 5.0534 5.0535 Avenue A - 16th St. to 24th St. Avenue A - 8th St. to 16th St. Avenue A - 32nd St. to 36th St. Giss Parkway Extension Sahuaro Estates Reconstruction Engler Avenue - 24th St. & E. Palo Verde St. 32nd Street Reconstruct. - Ave. B to Ave. C 40th Street Reconst. - Ave. A to Ave. B 32nd Street Reconstruct. - Ave. C to Ave. D 36th Street Construction - Ave. B to Ave. C 28th Street Construction - Ave. C to Ave. D Avenue C Reconstruction - 32nd to 40th Street Avenue C Reconst. - 24th St. to 32nd St. Avenue B½ Construction - 32nd St. to 40th St. Avenue C½ Construction - 36th to 40th St. Traffic Signal Install. - Ave. B½ & 24th St. New Fleet Services Maintenance Shop 12th Street - 14th Avenue to Avenue B 24th Street - Avenue 6E to Avenue 9E 28th Street - 8th Ave to 4th Ave 56th Street - ASH to Ave 13E Traffic Signal System Implementation Avenue 3E - Gila Ridge Rd. to 32nd St. Pavement Replacement 34th Drive and U.S.B.R. Central Drain 24th St & Ave 3½E - Ave 3E to 56th St Orange Avenue Improvements and Beautification Avenue 6E Widening: 32nd Street to 40th Street 32nd Street Widening - Avenue 3E to Avenue 5E 44th Street - Ave 3½E to 4½E & Ave 7E to 8½E 24th Street - North Frontage Road Widening 32nd Street Expressway Construction 36th Street - Ave 3½E to 6E & Ave 7E to 10E 40th Street - Ave 3½E to Ave 10E Frontage Road - Ave 9E to Ave 11E Avenue 8½E - 32nd St Expressway to 44th St Avenue 8E - 32nd St Expressway to 56th St 06-07 06-07 06-07 08-09 06-07 06-07 06-07 09-10 07-08 09-10 11-12 09-10 06-07 11-12 13-14 08-09 06-07 06-07 06-07 11-12 12-13 06-07 06-07 06-07 07-08 06-07 06-07 10-11 07-08 14-15 15-16 15-16 15-16 15-16 11-12 06-07 06-07 BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND $3,355,000 $200,000 0 0 $910,000 0 0 0 0 0 0 0 0 0 0 0 0 $880,000 $8,050,000 0 0 $130,000 0 $500,000 0 $1,000,000 $260,000 0 0 0 0 0 0 0 0 0 $3,100,000 $125,000 $4,100,000 $2,250,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $3,800,000 $4,200,000 0 0 $200,000 $1,650,000 $300,000 $70,000 $4,006,000 $1,968,000 0 0 0 0 0 0 0 0 0 0 0 $4,500,000 0 0 0 $1,800,000 0 0 0 0 0 0 $900,000 0 0 $220,000 $9,000,000 $1,500,000 $2,920,000 0 0 $200,000 0 $600,000 $240,000 0 0 0 $3,810,000 0 0 0 0 0 0 0 0 0 $1,520,000 0 0 0 0 $6,000,000 0 0 0 0 $5,585,000 0 0 0 0 $8,450,000 $4,500,000 0 0 0 $200,000 0 0 0 $6,936,000 0 0 0 0 0 0 0 0 0 0 $11,302,000 0 0 0 $11,450,000 0 0 0 0 0 $2,700,000 0 $300,000 $5,550,000 0 0 0 0 0 0 0 0 $200,000 0 $300,000 0 $13,989,000 0 0 0 0 0 0 0 0 0 $2,400,000 0 0 0 0 0 0 0 0 $4,850,000 $5,500,000 $1,600,000 $2,250,000 0 0 $4,550,000 $1,850,000 0 0 0 0 $1,290,000 $3,800,000 0 0 0 0 0 0 $4,630,000 0 $1,193,000 $1,500,000 $4,200,000 $2,640,000 $4,500,000 $3,000,000 0 0 CC-2 Fund Summary Listing CIP # Title Year 5.0536 5.0537 5.0539 5.0542 5.0544 5.0554 5.0574 5.0575 5.0581 5.0584 7.8706 7.9800 7.9806 7.0102 7.0111 7.0113 7.0114 7.0115 7.0116 7.0203 7.0301 7.0302 7.0401 7.0403 7.0500 7.0501 7.0504 7.0505 7.0506 8.8705 8.9502 8.9593 8.9803 8.0003 8.0004 8.0103 8.0300 16th Street Expressway - Ave 2E to Ave 10E 15-16 Yuma Expressway 15-16 Avenue 7E - 32nd St Expressway to 56th St 15-16 Avenue 10E Widening 07-08 4th Avenue Corridor Construction 10-11 Giss Parkway - 4th Avenue to I-8 07-08 16th St & 4th Ave Intersection Improvements 06-07 16th Street Widening - 6th Avenue to 13th Avenue 12-13 4th Avenue Integrated Corridor 10-11 16th Street Widening 06-07 Highway 80 Waterline - Ave 6½E to Ave 8½E 06-07 24th Street Ground Storage Tank 13-14 Agua Viva Water Treatment Plant 06-07 Flocculation/Sedimentation Basin 06-07 8th St Water Transmission Ln - Ave A to Ave B 06-07 Avenue B Water Transmission Line 06-07 Ave 9E Water Transmission Ln - I-8 to 40th St 06-07 Ave 9E Water Transmission Ln - E. Mesa WTP to I-806-07 MSWTP Safe Drinking Water Act Upgrades 06-07 Water Utility Security 06-07 Ave 9E Water Trans. Ln - E. Mesa WTP to 24th St 06-07 40th St Water Transmission Ln - Ave 3E to Ave 9E 06-07 Main Street WTF Chlorine Scrubber Improvement 06-07 Main Street WTF Auxillary Power 06-07 Main Street WTF Filter System Upgrade 06-07 Main Street WTF Mechanical De-watering System 06-07 Main Street WTF Maintenance Shop Building 07-08 Friendship Tower Improvements 06-07 Main Street WTF Sedimentation Basin Covers 06-07 12th Street Trunk Sewer, Phase I & II 06-07 Manhole Rehabilitation/Reconstruction 06-07 Sewer Line Replacements/Improvements 06-07 Desert Dunes Water Pollution Control Fac. 06-07 Administrative Building Expansion 06-07 Colorado River Interceptor Sanitary Sewer 06-07 Figueroa WPCF - Aerator Upgrade 06-07 Wastewater Utility Security 06-07 Fund BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND BOND 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 0 0 0 0 0 0 $3,000,000 0 0 $2,170,000 $700,000 0 $80,000,000 $450,000 $2,200,000 $2,100,000 $2,200,000 $1,100,000 $3,420,000 $442,000 $2,700,000 $8,300,000 $375,000 $1,095,000 $1,940,100 $1,000,000 0 $2,000,000 $750,000 $1,700,000 $1,000,000 $490,000 $13,000,000 $70,000 $400,000 $2,500,000 $150,000 0 0 0 $4,000,000 0 0 $2,000,000 0 0 $6,430,000 0 0 0 0 0 0 0 0 $3,420,000 $142,000 0 0 0 $900,000 0 0 $1,500,000 0 $750,000 0 0 0 0 $700,000 0 $1,000,000 0 0 0 0 0 0 $3,400,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $8,875,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $49,000,000 0 0 0 0 0 0 0 0 $10,900,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $5,500,000 $40,000 $1,590,000 0 $21,800,000 0 0 $11,122,000 $70,000,000 0 0 $4,000,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CC-3 Fund Summary Listing CIP # Title 8.0302 8.0304 8.0305 8.0402 8.0404 8.0502 8.0503 9.9301 9.9402 CDBG 1.0300 2.0502 CIT 1.9604 2006-2007 2007-2008 Upgrade Figueroa Service Area 06-07 BOND Citrus View WPCF Reconfiguration 06-07 BOND Jack Rabbit Mesa WPCF Upgrades Phase II 06-07 BOND Figueroa Avenue WPCF Digester Improvements 06-07 BOND Figueroa WPCF Improvements 06-07 BOND Figueroa WPCF Inventory Control Building 08-09 BOND Figueroa Avenue WPCF Primary Clarifier Imp. 06-07 BOND 28th Street Storm Drainage 06-07 BOND 6th Place Storm Sewer 06-07 BOND Total for BOND Fund $2,500,000 $1,200,000 $1,812,931 $600,000 $1,500,000 0 $1,500,000 $3,700,000 0 $228,697,781 $2,500,000 0 $8,400,000 $1,100,000 $12,000,000 0 $2,000,000 $2,400,000 $530,000 $90,491,182 Multi-Modal Reconstruction 06-07 CDBG Carver Park Tennis, Handball & Basketball Court 06-07 CDBG Total for CDBG Fund $100,000 $81,000 $181,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Annex./Economic Development Improvements 06-07 CIT Total for CIT Fund $400,000 $400,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 0 0 $1,500,000 $22,500 $100,000 $500,000 $2,122,500 $200,000 0 $100,000 $500,000 $800,000 $200,000 0 $100,000 $500,000 $800,000 $200,000 0 $100,000 $500,000 $800,000 $1,000,000 0 $100,000 $500,000 $1,600,000 0 0 0 0 0 0 $42,000 $120,000 $50,000 0 0 0 0 0 $550,000 0 0 $28,000 0 0 0 0 0 0 0 0 0 $100,000 0 0 0 0 0 0 0 0 0 $40,000 0 0 $200,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $555,000 0 0 DD 1.9757 5.0104 5.0599 8.9593 Budget Authority Reserve Intersection Safety Upgrades Traffic Impact Analysis Studies Sewer Line Replacements/Improvements GEN 1.9913 1.0300 1.0403 1.0501 1.0502 1.0508 2.9605 2.9607 2.9704 Multi-Agency Visitor Center Multi-Modal Reconstruction West Wetlands Mitigation New Downtown Redevelopment Initiative Downtown Wayfinder Initiative East Mesa Facilities Central Drain Linear Park - Ave C to C¾ 45th Avenue & Central Stub 1 Linear Parks South Valley Area Park Year Fund 06-07 DD 06-07 DD 06-07 DD 06-07 DD Total for DD Fund 07-08 06-07 06-07 06-07 08-09 09-10 12-13 10-11 08-09 GEN GEN GEN GEN GEN GEN GEN GEN GEN CC-4 2008-2009 2009-2010 $2,500,000 $1,800,000 0 0 0 0 0 0 $8,000,000 $2,000,000 $20,000 $200,000 0 0 $2,400,000 0 0 0 $57,673,750 $117,088,000 2010-2011 2011-2016 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $62,604,600 $186,580,366 Fund Summary Listing CIP # Title Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 2.9711 2.9712 2.9713 2.9714 2.9715 2.9716 2.9806 2.0301 2.0500 2.0502 2.0506 2.0507 2.0509 2.0511 3.9802 4.0500 Central Canal Park - Ave. B to E. Main Canal 11-12 GEN Central Drain Linear Park - Ave B to Ave C 10-11 GEN Central Canal Linear Park - Ave. C to Ave. D 07-08 GEN Thacker Lateral Park - 24th to 32nd St. 11-12 GEN Avenue B½ Linear Park - 32nd to 36th St. 10-11 GEN Avenue C½ & 28th Street Linear Park 13-14 GEN Park Facility Improvements 06-07 GEN Upgrading and Replacement of Restrooms 06-07 GEN Kennedy Park Parking Lot Expansion 06-07 GEN Carver Park Tennis, Handball & Basketball Court 06-07 GEN Beautification of Entry Way to the Readiness Ctr 07-08 GEN Lighting of Foothills High School Fields 10-11 GEN Stewart Vincent Wolfe Memorial Playground 06-07 GEN New Area Park in the East I 09-10 GEN Parking Lot Maintenance Upgrades 06-07 GEN Emergency Vehicle Signal Pre-empt 07-08 GEN Total for GEN Fund 0 0 0 0 0 0 $270,000 $390,000 $180,000 $4,800 0 0 $50,000 0 $100,000 0 $1,206,800 0 0 $20,000 0 0 0 $370,000 $250,000 $200,000 0 $20,000 0 0 0 $350,000 $54,000 $1,842,000 0 0 0 0 0 0 $370,000 $260,000 0 0 $183,820 0 0 0 $350,000 $54,000 $1,317,820 0 0 0 0 0 0 $370,000 0 0 0 0 0 0 $100,000 $350,000 0 $1,060,000 0 $70,000 0 0 $45,000 0 0 0 0 0 0 $20,000 0 $500,000 $350,000 $54,000 $1,039,000 $320,000 $570,000 0 $435,000 $170,000 $350,000 0 0 0 0 0 $520,000 0 0 0 0 $2,920,000 $500,000 $1,460,000 0 0 $3,000,000 $1,900,000 0 $3,000,000 $2,300,000 0 0 0 $50,000 0 $12,210,000 $500,000 0 $3,650,000 $2,000,000 0 0 $480,000 0 $400,000 0 0 0 $50,000 $500,000 $7,580,000 $500,000 0 0 $2,000,000 0 0 0 0 0 $500,000 $1,100,000 0 $50,000 0 $4,150,000 $500,000 0 0 0 0 0 0 0 0 0 0 $500,000 $50,000 0 $1,050,000 $2,500,000 0 0 0 0 0 0 0 0 0 0 0 $50,000 0 $2,550,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $200,000 0 GRNT 1.9757 1.9802 1.9911 1.9913 1.0002 1.0015 1.0017 1.0300 1.0302 1.0502 1.0601 5.9622 5.0509 5.0518 HURF 1.9601 Year Budget Authority Reserve 06-07 GRNT Main Street Reconstruction 06-07 GRNT Natural History Museum 07-08 GRNT Multi-Agency Visitor Center 07-08 GRNT East Wetlands 06-07 GRNT Gateway Riverfront Park Project 06-07 GRNT Riverfront Development Grande Promenade 06-07 GRNT Multi-Modal Reconstruction 06-07 GRNT 800 MHZ New Radio Site 06-07 GRNT Downtown Wayfinder Initiative 08-09 GRNT Pivot Point 06-07 GRNT West Main Canal Multi-use Path 08-09 GRNT School Traffic Safety and Circulation Improvements 06-07 GRNT Orange Avenue Improvements and Beautification 06-07 GRNT Total for GRNT Fund Soil Remediation Site 06-07 HURF CC-5 Fund Summary Listing CIP # Title Year Fund 1.0012 1.0025 1.0508 2.9605 2.9606 2.9714 2.9715 2.9716 5.8330 5.8903 5.9205 5.9208 5.9408 5.9506 5.9510 5.9511 5.9602 5.9609 5.9610 5.9710 5.9711 5.9714 5.9715 5.9753 5.9804 5.9807 5.9904 5.9906 5.9910 5.9911 5.0411 5.0505 5.0512 5.0514 5.0577 5.0578 5.0579 Gila Street Extension West Wetlands Road East Mesa Facilities Central Drain Linear Park - Ave C to C¾ Avenue C¾ Alignment Park - 16th St to 24th St Thacker Lateral Park - 24th to 32nd St. Avenue B½ Linear Park - 32nd to 36th St. Avenue C½ & 28th Street Linear Park 1st Avenue - Giss Pkwy to 12th Street 23rd Avenue Widening 12th to 16th Streets - 4th Ave to Ave "A" Catalina Drive - 32nd St. to 4th Ave. Maiden Lane & Gila Street - 1st St to Giss Pkwy Elks Lane - 24th Street to N. of Camino Real Driveway Replacements Sidewalk Handicap Ramps 1st Avenue - 16th Street to 12th Street Thacker Lateral Multi-Use Path (North) Thacker Lateral Multi-Use Path (South) 3rd Street - Magnolia Ave to Ave B Sahuaro Estates Reconstruction Engler Avenue - 24th St. & E. Palo Verde St. 29th Street between 4th Ave. & 8th Ave. New Fleet Services Maintenance Shop El Paseo Real Construction 11th Street - 3rd Avenue to 2nd Avenue Street Lights - Infill/Growth Rancho Verde Subdivision Reconstruction 14th Street - 1st Ave to 4th Ave Magnolia Village Units 1,2, and 3 Automated Traffic Counting Addition 38th Ave. and U.S.B.R. Central Drain Trap Lane Safety Improvements Traffic Signal Upgrades Major Intersection and Location Studies Roadway Safety Improvements Palo Verde Street Speed Control Improvements 06-07 06-07 09-10 12-13 10-11 11-12 10-11 13-14 07-08 06-07 06-07 06-07 06-07 09-10 06-07 06-07 06-07 12-13 08-09 07-08 06-07 06-07 06-07 06-07 10-11 06-07 06-07 10-11 06-07 09-10 06-07 08-09 07-08 11-12 07-08 08-09 09-10 HURF HURF HURF HURF HURF HURF HURF HURF HURF HURF HURF HURF HURF HURF HURF HURF HURF HURF HURF HURF HURF HURF HURF HURF HURF HURF HURF HURF HURF HURF HURF HURF HURF HURF HURF HURF HURF 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 $825,000 $50,000 0 0 0 0 0 0 0 $230,000 $150,000 $55,000 $50,000 0 $40,000 $10,000 $100,000 0 0 0 $10,000 $50,000 $140,000 $100,000 0 $70,000 $50,000 0 $210,000 0 $10,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $800,000 0 0 0 0 0 $40,000 $10,000 $400,000 0 0 $40,000 0 $100,000 0 $50,000 0 0 0 0 0 0 $10,000 0 $271,300 0 $100,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $40,000 $10,000 0 0 $580,000 $380,000 0 0 0 0 0 0 0 0 0 0 $10,000 $50,000 0 0 0 0 0 0 0 $40,000 0 0 0 0 0 0 0 0 $550,000 0 $45,000 $40,000 $10,000 0 0 0 0 0 0 0 0 0 0 0 0 0 $50,000 $10,000 $200,000 0 0 $100,000 $250,000 $141,600 0 0 0 0 $49,000 0 0 0 0 0 0 0 0 $390,000 $40,000 $10,000 0 0 0 0 0 0 0 0 $202,000 0 0 $30,000 0 0 0 0 0 0 0 0 0 0 0 0 $405,000 $426,000 $385,000 $200,000 $270,000 0 0 0 0 0 0 0 0 0 $285,000 0 0 0 0 0 0 0 0 0 $405,000 0 0 0 0 0 $1,260,000 0 0 0 CC-6 Fund Summary Listing CIP # Title 9.9801 9.0401 9.0500 9.0501 9.0502 9.9319 IMPCT 1.9757 1.0504 5.9718 5.9720 5.9722 5.9726 5.9728 5.9731 5.9741 5.9742 5.9812 5.9990 5.0503 5.0508 5.0516 IMPD 1.0568 5.8703 8.9800 9.9316 OTHR 1.9757 1.9913 1.0017 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Fix Alley Drainage - 4th Avenue & Ave. A 06-07 HURF Cibola Heights Stormwater Basin Improvements 06-07 HURF Storm Water Drainage 06-07 HURF Storm Water Lift Station Conversion 10-11 HURF Dunes Drainage Basin 06-07 HURF Ext. Storm Sewer/Arena Dr/9th to 10th St 07-08 HURF Total for HURF Fund $100,000 $15,000 $260,000 0 $10,000 0 $2,535,000 0 0 0 0 0 $100,000 $1,921,300 0 0 0 0 $90,000 0 $1,160,000 0 0 0 0 $5,000 0 $1,441,600 0 0 0 $160,000 0 0 $1,081,000 0 0 0 0 0 0 $3,636,000 Budget Authority Reserve 06-07 IMPCT Vehicle Acquisitions 06-07 IMPCT 32nd Street Reconstruct. - Ave. B to Ave. C 06-07 IMPCT 32nd Street Reconstruct. - Ave. C to Ave. D 07-08 IMPCT Avenue B½ Construction - 28th St. to 32nd St. 10-11 IMPCT 28th Street Constr. - Ave. B to Ave. C 06-07 IMPCT Avenue C Reconstruction - 32nd to 40th Street 06-07 IMPCT Avenue B Reconst. - 24th to 32nd Street 12-13 IMPCT Traffic Signal - Ave B½ & 32nd Street 09-10 IMPCT Traffic Signal Install. - Ave. B & 36th St. 11-12 IMPCT 24th Street - Avenue 6E to Avenue 9E 06-07 IMPCT Traffic Signal Installation and Upgrades 06-07 IMPCT 40th Street Bridge - Area Service Highway 12-13 IMPCT 'A' Canal Crossings 10-11 IMPCT Roadways Plan Alignment Studies 06-07 IMPCT Total for IMPCT Fund $3,000,000 $418,500 $300,000 0 0 0 $300,000 0 0 0 $750,000 $400,000 0 0 $260,000 $5,428,500 0 $418,500 $600,000 $400,000 0 0 0 0 0 0 0 $400,000 0 0 0 $1,818,500 0 $868,500 0 0 0 $300,000 0 0 0 0 0 0 0 0 0 $1,168,500 0 $418,500 0 0 0 0 0 0 $240,000 0 0 0 0 0 0 $658,500 0 $418,500 0 0 0 0 0 0 0 0 0 0 0 0 0 $418,500 0 0 0 0 $1,300,000 0 0 $2,130,000 0 $240,000 0 0 $450,000 $4,050,000 0 $8,170,000 Improvement District No. 68 - Castle Dome Ave. 06-07 IMPD Del Oro Reconstruction, et al 07-08 IMPD Cemetery/Main Street - 6th-7th Streets 11-12 IMPD Storm Water Drainage - Del Oro Estates 11-12 IMPD Total for IMPD Fund $3,300,000 0 0 0 $3,300,000 0 $150,000 0 0 $150,000 0 $550,000 0 0 $550,000 0 0 0 0 0 0 0 0 0 0 0 0 $300,000 $2,695,000 $2,995,000 $700,000 0 $60,000 $800,000 0 0 $800,000 $1,000,000 0 $600,000 0 0 $3,000,000 0 0 0 0 0 Budget Authority Reserve Multi-Agency Visitor Center Riverfront Development Grande Promenade Year Fund 06-07 OTHR 07-08 OTHR 06-07 OTHR CC-7 Fund Summary Listing CIP # Title 1.0106 1.0302 1.0500 1.0503 2.9602 2.0509 2.0511 5.9701 5.9812 5.0401 5.0409 5.0411 5.0510 5.0517 5.0584 9.9301 PBSF 1.0302 4.9601 4.0400 4.0502 4.0503 Year Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Citywide Fiber Optic Cabling Installation 06-07 OTHR 800 MHZ New Radio Site 06-07 OTHR Downtown / I-8 Trailblazing & City ID Imps. 07-08 OTHR Yuma Crossing Exhibit Master Plan 06-07 OTHR Yuma Valley Area Park 06-07 OTHR Stewart Vincent Wolfe Memorial Playground 06-07 OTHR New Area Park in the East I 09-10 OTHR Avenue A - 16th St. to 24th St. 06-07 OTHR 24th Street - Avenue 6E to Avenue 9E 06-07 OTHR Avenue 3E - Gila Ridge Rd. to 32nd St. 06-07 OTHR 8th Street - East Main Canal to Avenue B 06-07 OTHR Automated Traffic Counting Addition 06-07 OTHR Bus Stops, Bus Bays and Bus Shelters 06-07 OTHR 24th St & Ave 3½E - Ave 3E to 56th St 06-07 OTHR MCAS Sign & Signal Improvements 06-07 OTHR 28th Street Storm Drainage 06-07 OTHR Total for OTHR Fund 0 $750,000 0 $25,000 $2,500,000 $1,000,000 0 $699,000 0 $4,300,000 $170,000 $100,000 $225,000 $1,044,000 $1,035,000 $1,200,000 $13,808,000 $500,000 0 $155,000 0 0 0 0 0 $3,500,000 $2,200,000 $130,000 $100,000 $75,000 0 $1,000,000 0 $8,460,000 $500,000 0 0 0 0 0 0 0 0 0 0 $100,000 $75,000 0 $1,000,000 $1,000,000 $4,475,000 0 0 0 0 0 0 0 0 0 0 0 $100,000 $75,000 $2,000,000 0 0 $2,775,000 0 0 0 0 0 0 $2,000,000 0 0 0 0 0 $75,000 $2,000,000 0 $1,000,000 $8,075,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 800 MHZ New Radio Site 06-07 PBSF Fire Station 6 (B) - Avenue C and 32nd St. 06-07 PBSF Police Department Facility Improvements 06-07 PBSF Police Storage Facility 06-07 PBSF Land Acquisition for all current Fire Facility Projects 06-07 PBSF Total for PBSF Fund $1,750,000 $220,000 $440,000 $400,000 $2,250,000 $5,060,000 $200,000 0 0 0 $1,250,000 $1,450,000 0 0 0 $140,000 $312,500 $452,500 0 0 0 0 $350,000 $350,000 0 0 0 0 0 0 0 0 0 0 0 0 PRO 2.9602 5.8325 Yuma Valley Area Park 24th Street - Avenue B to Avenue C 06-07 PRO 06-07 PRO Total for PRO Fund $370,000 0 $370,000 0 0 0 0 $3,420,000 $3,420,000 0 0 0 0 0 0 0 0 0 RCX 2.0508 3.9802 3.0200 3.0202 Desert Sun Stadium Parking Lot Maintenance Upgrades Civic Center Roof Replacement Replacement of Air Conditioning Compres. 06-07 RCX 06-07 RCX 08-09 RCX 06-07 RCX Total for RCX Fund $250,000 $150,000 0 $540,000 $940,000 0 $250,000 0 0 $250,000 0 $300,000 $400,000 0 $700,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CC-8 Fund Summary Listing CIP # Title Year Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 ROAD 1.9802 1.9908 1.0017 5.8308 5.8312 5.8322 5.8323 5.8325 5.8326 5.8702 5.9108 5.9203 5.9211 5.9404 5.9504 5.9508 5.9512 5.9618 5.9619 5.9622 5.9628 5.9700 5.9702 5.9705 5.9707 5.9713 5.9718 5.9719 5.9720 5.9722 5.9724 5.9725 5.9726 5.9728 5.9729 Main Street Reconstruction Madison Avenue Reconstruction Riverfront Development Grande Promenade Arizona Ave - 16th Street to Palo Verde 4th Avenue Reconstruction Arizona Avenue - 32nd to 40th Street 40th Street - Arizona Avenue to Avenue A 24th Street - Avenue B to Avenue C Ave A - 40th St to Airport Loop Road 1st Street - Gila Street to Avenue C 28th St. - 4th Ave. to Alley West of Madison Ave. 36th Street Const. - 4th Ave to 8th Ave Airport Loop Road, et al Major Intersection Improvements 36th Street - Arizona Avenue to 4th Avenue 8th Avenue - 24th Street to 32nd Street Right-of-Way Acquisition 16th Street - 45th Ave to Ave D 24th Street - Avenue C to Avenue D West Main Canal Multi-use Path Intersection Sight Distance Pacific Avenue Sidewalks Avenue A - 8th St. to 16th St. Avenue A - 32nd St. to 36th St. Giss Parkway Extension East Palo Verde St. - Pacific Ave to Ave 2½E 32nd Street Reconstruct. - Ave. B to Ave. C 40th Street Reconst. - Ave. A to Ave. B 32nd Street Reconstruct. - Ave. C to Ave. D Avenue B½ Construction - 28th St. to 32nd St. 36th Street Construction - Ave. B to Ave. C 28th Street Construction - Ave. C to Ave. D 28th Street Constr. - Ave. B to Ave. C Avenue C Reconstruction - 32nd to 40th Street Avenue C Reconst. - 24th St. to 32nd St. 06-07 06-07 06-07 06-07 10-11 07-08 07-08 06-07 07-08 06-07 09-10 11-12 06-07 07-08 11-12 08-09 06-07 08-09 06-07 08-09 06-07 06-07 06-07 06-07 08-09 08-09 06-07 09-10 07-08 10-11 09-10 11-12 07-08 09-10 06-07 ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD $1,815,000 $150,000 0 $250,000 0 0 0 $50,000 0 $200,000 0 0 $97,200 0 0 0 $125,000 0 0 0 $200,000 $360,000 $650,000 $75,000 0 0 $300,000 0 0 0 0 0 0 0 $300,000 0 0 $60,000 0 0 $120,000 $500,000 $100,000 $50,000 0 0 0 0 $180,000 0 0 $250,000 0 0 0 $200,000 0 0 0 0 0 $600,000 0 $250,000 0 0 0 $380,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $135,000 $250,000 $2,900,000 $200,000 $80,000 $100,000 0 0 0 $800,000 $495,000 0 0 $200,000 0 0 0 $900,000 0 0 0 0 0 0 0 0 0 0 0 0 $300,000 0 0 0 0 0 $250,000 0 0 $100,000 $100,000 0 0 0 $1,200,000 $1,575,000 0 $650,000 0 0 $285,000 0 0 $300,000 0 0 0 0 0 $500,000 0 0 0 0 0 0 0 0 0 0 0 $250,000 0 0 0 $100,000 0 0 0 0 0 0 $800,000 0 $460,000 $400,000 0 0 $700,000 0 0 0 0 0 $980,000 0 0 0 0 0 0 $1,740,000 0 0 $660,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $1,300,000 0 $800,000 0 $800,000 0 CC-9 Fund Summary Listing CIP # Title Year Fund 5.9731 5.9732 5.9733 5.9736 5.9737 5.9739 5.9806 5.9811 5.9907 5.9912 5.9913 5.9990 5.0005 5.0008 5.0104 5.0113 5.0200 5.0401 5.0404 5.0405 5.0406 5.0408 5.0409 5.0414 5.0416 5.0503 5.0507 5.0508 5.0515 5.0522 5.0523 5.0524 5.0525 5.0534 5.0538 5.0548 5.0552 Avenue B Reconst. - 24th to 32nd Street 40th St. ROW Acquisition - Ave. C to Ave. D 40th St. ROW Acquisition - Ave. B to Ave. C Avenue B½ Construction - 32nd St. to 40th St. Avenue C½ Construction - 36th to 40th St. Traffic Signal Install - Avenue C & 28th Street Traffic Signal Interconnection 12th Street - 14th Avenue to Avenue B Upgrade Traffic Signals w/Illumin. Signs 32nd Street - Avenue A to 8th Avenue Arizona Avenue - 16th to Giss Pky Traffic Signal Installation and Upgrades 28th Street - 8th Ave to 4th Ave 56th Street - ASH to Ave 13E Intersection Safety Upgrades Avenue B Turn Lanes Araby Road - I-8 West to 24th Street Avenue 3E - Gila Ridge Rd. to 32nd St. 16th Street Corridor Study 4th Avenue - 32nd Street Corridor Study Pacific Avenue Access Study & Implementation 24th Street - Ave 2½E to Ave 3E 8th Street - East Main Canal to Avenue B Avenue 7E Bridge Replacement 33rd Drive Extension 40th Street Bridge - Area Service Highway Ave. B & 24th St. Intersection 'A' Canal Crossings Roadways Plan Modeling Study Expressways Access Studies Avenue 6E Widening: 32nd Street to 40th Street 32nd Street & Pacific Avenue Improvements 32nd Street Widening - Avenue 3E to Avenue 5E Avenue 8½E - 32nd St Expressway to 44th St Avenue 7E - North Construction Avenue 5½E Construction East Yuma Freeway 12-13 11-12 10-11 11-12 13-14 10-11 06-07 06-07 11-12 06-07 06-07 06-07 11-12 12-13 06-07 11-12 06-07 06-07 06-07 06-07 08-09 06-07 06-07 06-07 06-07 12-13 06-07 10-11 06-07 06-07 10-11 08-09 07-08 06-07 15-16 11-12 06-07 ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD ROAD 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 0 0 0 0 0 0 $315,000 0 0 $100,000 $400,000 $390,000 0 0 $100,000 0 $400,000 $150,000 $75,500 $75,500 0 $60,000 $575,000 $30,000 $340,000 0 $90,000 0 $50,000 $154,000 0 0 0 $60,000 0 0 $100,000 0 0 0 0 0 0 0 $250,000 0 0 $400,000 $460,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $255,000 0 0 $420,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $350,000 0 0 0 0 0 0 0 0 $40,000 $775,000 0 0 0 0 0 0 0 $223,000 0 $94,500 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $400,000 0 0 0 0 0 0 0 0 $90,000 0 0 0 0 0 0 0 0 $143,000 0 $372,600 0 $300,000 0 0 0 0 0 $600,000 0 0 $250,000 0 0 0 0 0 $400,000 0 0 0 0 0 0 0 0 $280,000 0 0 0 0 0 0 $100,000 0 0 $500,000 0 0 $400,000 0 0 0 $7,870,000 $600,000 0 $1,480,000 $1,010,000 0 0 0 $178,200 0 0 0 $310,000 $1,500,000 0 $400,000 0 0 0 0 $800,000 0 0 0 0 $9,000,000 0 $50,000 0 0 0 0 0 0 $50,000 $480,000 0 CC-10 Fund Summary Listing CIP # Title 5.0554 5.0564 5.0566 5.0575 5.0576 5.0577 5.0578 5.0582 9.9301 9.9400 9.9401 9.0100 9.0101 SCF 8.0200 8.0301 8.0403 8.0405 8.0500 8.0501 Year Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Giss Parkway - 4th Avenue to I-8 07-08 ROAD 45th Avenue - 5th St to 28th St 06-07 ROAD 52nd Street Construction 15-16 ROAD 16th Street Widening - 6th Avenue to 13th Avenue 12-13 ROAD 24th Street / Avenue B Corridor Studies 11-12 ROAD Major Intersection and Location Studies 07-08 ROAD Roadway Safety Improvements 08-09 ROAD Expressways Access Studies 08-09 ROAD 28th Street Storm Drainage 06-07 ROAD The Manors Storm Sewer System 11-12 ROAD 8th Avenue Storm Sewer Extension 09-10 ROAD Araby Road Drainage Improvements 06-07 ROAD Stormwater NPDES Permit 06-07 ROAD Total for ROAD Fund 0 $470,000 0 0 0 0 0 0 $130,000 0 0 $42,000 $125,000 $8,804,200 $450,000 0 0 0 0 0 0 0 0 0 0 0 $136,000 $5,061,000 0 0 0 0 0 $100,000 $250,000 $154,000 0 0 0 0 $100,000 $8,146,500 0 0 0 0 0 0 0 $255,000 0 0 $40,000 0 $184,000 $6,544,600 0 0 0 0 0 $100,000 0 $223,000 0 0 0 0 0 $6,063,000 0 0 $840,000 $576,000 $750,000 0 0 $143,000 0 $50,000 0 0 0 $32,367,200 Figueroa WPCF Digester Electrical Upgrades 06-07 SCF Figueroa WPCF Gate Replacements 06-07 SCF Figueroa WPCF System Upgrades 06-07 SCF Figueroa WPCF NPDES Renewal 06-07 SCF Update City's 208 Facilities Plan 06-07 SCF Secondary Clarifier Upgrades & Improvements 06-07 SCF Total for SCF Fund $150,000 $115,000 $800,000 $840,000 $100,000 $150,000 $2,155,000 0 $500,000 0 $300,000 $250,000 $1,500,000 $2,550,000 0 0 0 0 0 $2,000,000 $2,000,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SSIC 8.0302 8.0303 Upgrade Figueroa Service Area Sanitary Sewer Collection System Model 06-07 SSIC 06-07 SSIC Total for SSIC Fund $700,000 $65,000 $765,000 0 $30,000 $30,000 0 $30,000 $30,000 0 $30,000 $30,000 0 0 0 0 0 0 STP 5.0414 5.8702 5.9402 Avenue 7E Bridge Replacement 1st Street - Gila Street to Avenue C 32nd Street - 4th Avenue to Avenue B 06-07 STP 06-07 STP 06-07 STP Total for STP Fund $120,000 0 $800,000 $920,000 0 $650,000 $600,000 $1,250,000 0 $507,000 0 $507,000 0 0 0 0 0 0 0 0 0 0 0 0 SUF 1.9802 Main Street Reconstruction 06-07 SUF $825,000 0 0 0 0 0 CC-11 Fund Summary Listing CIP # Title 1.9908 1.0508 5.9753 8.9305 8.9404 8.9502 8.9593 8.0005 8.0006 8.0100 8.0104 8.0400 8.0401 Madison Avenue Reconstruction East Mesa Facilities New Fleet Services Maintenance Shop Sanitary Sewer Line Repairs/Replacement Avenue B & 24th Street 12" Force Main Manhole Rehabilitation/Reconstruction Sewer Line Replacements/Improvements 1st Avenue Trunk Sewer Replacement Riverfront Park Manhole Replacement 5th Avenue Sewerline Replacement Figueroa WPCF SCADA Improvements 5th Street Sanitary Sewer Replacement 10th Ave/Ave A Alley Sanitary Sewer TWO% 1.0000 1.0003 1.0011 1.0014 1.0015 1.0019 1.0500 1.0601 3.9707 3.9802 Year Fund 06-07 SUF 09-10 SUF 06-07 SUF 10-11 SUF 06-07 SUF 06-07 SUF 06-07 SUF 07-08 SUF 06-07 SUF 06-07 SUF 06-07 SUF 07-08 SUF 07-08 SUF Total for SUF Fund Railroad Settling Tank 06-07 TWO% Yuma Crossing Retail Compon./Canal Walk 06-07 TWO% Riverfront Development Master Planning 06-07 TWO% Relocation of US Fish and Wildlife Svc. 07-08 TWO% Gateway Riverfront Park Project 06-07 TWO% Miscellaneous Structure Demolition 07-08 TWO% Downtown / I-8 Trailblazing & City ID Imps. 07-08 TWO% Pivot Point 06-07 TWO% Variable Frequency Drive (VFD)Sys.(DHGC) 06-07 TWO% Parking Lot Maintenance Upgrades 06-07 TWO% Total for TWO% Fund WCF 7.0509 Main Street WTF AZPDES Permit WSDC 7.8722 7.9210 7.9305 7.9311 Avenue 3E and Gila Ridge Road Watermains 3rd Street Watermain - Magnolia Ave. to Ave. B 12th Street Waterline - 14th Ave. to 21st Dr. 36th Street Waterline - 4th Ave. to 8th Ave. 06-07 WCF Total for WCF Fund 06-07 07-08 07-08 11-12 WSDC WSDC WSDC WSDC 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 $60,000 0 $100,000 0 $290,000 0 $170,000 0 $90,000 $29,500 $100,000 0 0 $1,664,500 0 0 $50,000 0 0 $200,000 $353,400 $450,000 0 0 $50,000 $280,000 $10,000 $1,393,400 0 0 0 0 0 $200,000 $400,000 0 0 0 0 0 $400,000 $1,000,000 0 $40,000 0 0 0 $200,000 $760,000 0 0 0 0 0 0 $1,000,000 0 0 0 $164,000 0 $200,000 $636,000 0 0 0 0 0 0 $1,000,000 0 0 0 $1,478,000 0 0 0 0 0 0 0 0 0 $1,478,000 $15,000 $30,000 $28,000 $550,000 $626,000 0 0 $75,000 $488,000 $150,000 $1,962,000 0 0 0 0 0 $100,000 $100,000 $250,000 0 0 $450,000 0 0 0 0 0 0 0 $900,000 0 0 $900,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $750,000 $750,000 $250,000 $250,000 0 0 0 0 0 0 0 0 $160,000 0 0 0 $190,000 $37,000 $15,000 0 0 $410,000 $190,000 0 0 0 0 0 0 0 0 0 0 0 0 $140,000 CC-12 Fund Summary Listing CIP # Title 7.9417 7.9603 7.9800 7.0118 UNF 1.9601 1.9916 1.0106 2.9713 2.0001 2.0300 2.0504 2.0505 2.0510 5.9102 5.9716 5.9723 5.9734 5.9744 5.9745 5.9990 5.0302 5.0542 5.0546 5.0547 5.0548 5.0549 5.0551 5.0552 5.0562 5.0564 5.0581 7.9310 8.0510 Year Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 16th St. & Zone 2 Waterline - Arizona Ave. to Ave. A 11-12 WSDC Gila Ridge Rd Watermains - Ave 4½E to Araby Rd 06-07 WSDC 24th Street Ground Storage Tank 13-14 WSDC 32nd St Water Trans. Ln - Ave B to Friendship Twr 06-07 WSDC Total for WSDC Fund 0 $400,000 0 $760,000 $1,320,000 0 $425,000 0 0 $667,000 0 0 0 0 $600,000 0 0 0 0 0 0 0 0 0 0 $1,110,000 0 $200,000 0 $1,450,000 Soil Remediation Site 06-07 UNF Riverfront Infrastructure Improvements 06-07 UNF Citywide Fiber Optic Cabling Installation 06-07 UNF Central Canal Linear Park - Ave. C to Ave. D 07-08 UNF Smucker Park Improvements 08-09 UNF Lighting for Parks and Athletic Fields 06-07 UNF Shade Structures 06-07 UNF West Wetlands Amphitheater Improvements 09-10 UNF Yuma Art Center Museum 06-07 UNF 16th Street Right Turn Lane @ Avenue B 10-11 UNF 8th Street and Main Street Paving 14-15 UNF 36th Street Construction - Ave. C to Ave. D 11-12 UNF Avenue D Bike Path 13-14 UNF Avenue D ROW Acquisition - 32nd St. to 40th St. 12-13 UNF Avenue C½ Bike Path 10-11 UNF Traffic Signal Installation and Upgrades 06-07 UNF Palo Verde Street Construction 10-11 UNF Avenue 10E Widening 07-08 UNF Avenue 4½E - 32nd St Expressway to 44th St 15-16 UNF Avenue 4E - Gila Ridge Rd to Yuma Expressway 15-16 UNF Avenue 5½E Construction 11-12 UNF Avenue 5E - 16th St Exp. to Yuma Expressway 15-16 UNF Avenue 7½E - 32nd St Expressway to 56th St 15-16 UNF East Yuma Freeway 06-07 UNF 40th Street - Avenue B to Avenue D 15-16 UNF 45th Avenue - 5th St to 28th St 06-07 UNF 4th Avenue Integrated Corridor 10-11 UNF 10" Waterline at 28th St E. of 4th Avenue 12-13 UNF Figueroa WPCF Auxiliary Power Improvements 06-07 UNF Total for UNF Fund $135,000 $94,000 $50,000 0 0 $375,000 $120,000 0 $140,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $750,000 $1,664,000 0 0 $500,000 0 0 $375,000 $120,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $250,000 $1,245,000 0 0 $500,000 $570,000 $150,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $1,220,000 0 0 0 0 0 0 0 0 $500,000 0 0 0 0 0 $500,000 $4,100,000 0 0 0 $325,000 0 0 0 0 0 0 0 0 0 $85,000 $350,000 $350,000 0 $140,000 0 0 0 0 0 0 0 0 0 0 0 $1,325,000 0 $310,900,000 0 0 0 $17,220,000 0 $1,460,400 0 0 0 0 $1,350,000 $335,905,400 0 0 0 0 0 0 0 $150,000 0 0 $330,000 $2,190,000 $83,000 $800,000 0 0 0 $33,206,000 $795,000 $1,920,000 $4,320,000 $4,200,000 0 0 $994,000 0 $13,143,600 $106,000 0 $62,237,600 CC-13 Fund Summary Listing CIP # WUF 1.9802 1.9908 1.9916 1.0508 5.9753 7.8225 7.8310 7.8802 7.9294 7.9307 7.9308 7.9309 7.9408 7.9416 7.9490 7.9503 7.9602 7.9606 7.9707 7.9803 7.9904 7.9996 7.0103 7.0107 7.0108 7.0110 7.0117 7.0122 7.0300 7.0403 7.0503 7.0507 7.0508 Title Year Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Main Street Reconstruction 06-07 WUF Madison Avenue Reconstruction 06-07 WUF Riverfront Infrastructure Improvements 06-07 WUF East Mesa Facilities 09-10 WUF New Fleet Services Maintenance Shop 06-07 WUF 1st Avenue Waterline - 8th St to 12th St 06-07 WUF 2nd Avenue Waterline - 12th St to 16th St 06-07 WUF 5th Ave Watermain - 8th St to 16th St 06-07 WUF Fire Hydrants 06-07 WUF 28th Street Waterline - 8th Ave to Ave A 07-08 WUF 19th Street Waterline - 4th Ave. to Arizona Ave. 08-09 WUF Magnolia Ave Watermain - 1st St to 8th St 06-07 WUF 3rd & 4th Ave Waterlines - 3rd St. to 4th St. 06-07 WUF Pecan Grove Waterline Improvements 07-08 WUF New Water Services 06-07 WUF 8th Avenue Waterline - 24th St to 32nd St 08-09 WUF Avenue A Waterline - 16th to 24th Streets 06-07 WUF 15th, 16th & 17th Ave Waterlines - 3rd St to 8th St 06-07 WUF 19th St. 10" Watermain - 4th Ave. to Ave. A 09-10 WUF Orange Avenue Waterline - 4th St to 8th St 06-07 WUF Carbon Feeder Improvements 06-07 WUF Waterline Replacement/Improvements 06-07 WUF 1st Avenue Waterline - 12th St to 16th St 07-08 WUF Zone 2 to Zone 1 Pressure Reducing Valve 06-07 WUF Potable Water Dedicated Sample Taps 06-07 WUF 24th Street 16" Waterline Replacement 07-08 WUF SCADA System Upgrades, Phase I 06-07 WUF Environmental Laboratory Equipment 07-08 WUF 1st Ave Water Transmission Ln - 5th St to 16th St 06-07 WUF Main Street WTF Auxillary Power 06-07 WUF Main Street WTF Operator Control Center 08-09 WUF Main Street WTF Yard Paving Improvements 06-07 WUF Water System Master Plan Update 06-07 WUF Total for WUF Fund $536,000 $68,895 $287,000 0 $100,000 $55,000 $130,000 $470,000 $100,000 0 0 $394,000 $190,000 0 $125,000 0 $350,000 $420,000 0 $20,000 $200,000 $800,000 0 $270,000 $60,000 0 $406,000 0 $20,000 $18,000 0 $220,000 $250,000 $5,489,895 0 0 0 0 $50,000 $220,000 $255,000 0 $50,000 $100,000 0 0 0 $25,000 $125,000 0 0 $420,000 0 0 0 $800,000 $205,000 0 $60,000 $520,000 0 $420,000 $450,000 0 0 0 0 $3,700,000 0 0 0 0 0 0 0 0 $50,000 0 $104,000 0 0 0 $125,000 $47,500 0 0 0 0 0 $800,000 0 0 $60,000 0 0 $350,000 0 0 $450,000 0 0 $1,986,500 0 0 0 $40,000 0 0 0 0 $50,000 0 $90,000 0 0 0 $150,000 0 0 0 $285,000 $350,000 0 $800,000 0 0 0 0 0 0 0 0 0 0 0 $1,765,000 0 0 0 0 0 0 0 0 $50,000 0 0 0 0 0 $150,000 0 0 0 0 0 0 $800,000 0 0 0 0 0 0 0 0 0 0 0 $1,000,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CC-14 Fund Summary Listing CIP # Title Year Total Fund 2006-2007 2007-2008 $301,754,176 $134,559,382 2008-2009 2009-2010 2011-2016 $92,457,570 $136,112,700 $421,536,500 $301,834,166 Grand Total CC-15 2010-2011 $1,388,254,494 Soil Remediation Site Status: 06 1.9601 Department: DCD Target Year: 06-07 Description: Find a location and construct a 75' by 75' bermed concrete slab with 6 compartmentalized sections to be used for the purposes of bioremediating spill absorbent produced in the course of removing petroleum product spills by street crews, the hazardous materials team and others, in the City. Containment of the material shall also require either a cover or tie down attachments for the material. The site selected will require a conditional use permit. Location: Yet to be determined Related Projects: Justification: Current procedures require collecting spill absorbent in 55 gallon drums at the public works yard and disposing of the material at a special landfill at quarterly intervals. These costs will exceed $10,000 annually. Planning Context: Project Schedule Fund HURF UNF Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $0 $0 $0 $0 $ 200,000 $0 $ 200,000 $ 135,000 $0 $0 $0 $0 $0 $ 135,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 135,000 $0 $0 $0 $ 200,000 $0 $ 335,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 1-1 $ 20,000 $ 50,000 $ 200,000 $ 15,000 $ 50,000 $ 335,000 Annex./Economic Development Improvements Status: 05 1.9604 Department: PW Target Year: 06-07 Description: Contingency fund for capital improvements to areas recently annexed to the City and a funding source for promoting and supporting economic development projects. Work may include: street lights, solid waste containers, signage, landscaping or other needed visual and physical improvements. FY '00-'01 included 32nd Street ROW improvements between Fisher Chrysler & Arizona Avenue ($108,000) and Development agreement for Variety Outlet improvements ($80,000). FY '01-'02 - 32nd Street ROW improvements @ DQ and Plaza Auto. Also includes Avenue 10E improvements, Water Main Extension on Stetson Street, and 40th Street construction. FY '05-'06 Plaza Auto at 32nd Street and Fortuna Avenue. Location: Recently annexed areas Related Projects: Justification: 1. Areas recently annexed to the City typically need capital improvements to bring the areas up to City standards. 2. This is a contingency project in order to have funding for these capital improvements. 3. Development Agreements with commercial enterprise. Planning Context: Core Project - annexation policy. Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total CIT $ 400,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $0 $ 1,200,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 400,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $0 $ 1,200,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 1-2 $0 $0 $ 1,200,000 $0 $0 $ 1,200,000 Budget Authority Reserve Status: 06 1.9757 Department: PW Target Year: 06-07 Description: Provide a reserve pool of budget authority for projects that acquire funding for the designated sources after the adoption of the project-specific annual C.I.P. budget. Location: Citywide Related Projects: Justification: As the City continues to grow and be more aggressive in its pursuit of alternate sources of funding it is necessary to create a vehicle to underwrite the budget authority necessary for funding sources that have not been verified or identified prior to the Annual C.I.P. Budget Adoption. Planning Context: Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total BOND $ 3,100,000 $ 2,000,000 $ 2,000,000 $ 2,000,000 $ 5,000,000 $0 $ 14,100,000 DD $ 1,500,000 $ 200,000 $ 200,000 $ 200,000 $ 1,000,000 $0 $ 3,100,000 GRNT $ 500,000 $ 500,000 $ 500,000 $ 500,000 $ 2,500,000 $0 $ 4,500,000 IMPCT $ 3,000,000 $0 $0 $0 $0 $0 $ 3,000,000 OTHR $ 700,000 $ 800,000 $ 800,000 $ 600,000 $ 3,000,000 $0 $ 5,900,000 $ 8,800,000 $ 3,500,000 $ 3,500,000 $ 3,300,000 $ 11,500,000 $0 $ 30,600,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 1-3 $ 30,600,000 $0 $0 $0 $0 $ 30,600,000 Main Street Reconstruction Status: 05 1.9802 Department: DCD Target Year: 06-07 Description: Main Street to be enhanced and re-opened for transportation. Work is to include enhanced street lighting, stormwater drainage improvements, sidewalk rehabilitation, curb & gutter, and water & sewer line improvements. Phase I: Design and removal of existing safety problems (i.e. flag ramp and street tile). Phase II: Reconstruction of Main Street to include: lighting, benches, signage, and signature art that will give Riverfront Development and Downtown Redevelopment cohesion and unity. Location: Main Street - Giss Parkway to 1st Street Related Projects: Justification: In order to continue the City's commitment to revitalizing the Downtown, it is necessary to provide a more pedestrian friendly and updated downtown area and remove any safety obstacles, while allowing motorists the opportunity to travel Main Street, as they did 40 years ago, while also providing the option for street closures for street fairs and special events. Planning Context: Historic Design Guidelines will apply. Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total GRNT $ 1,460,000 $0 $0 $0 $0 $0 $ 1,460,000 ROAD $ 1,815,000 $0 $0 $0 $0 $0 $ 1,815,000 SUF $ 825,000 $0 $0 $0 $0 $0 $ 825,000 WUF $ 536,000 $0 $0 $0 $0 $0 $ 536,000 $0 $0 $0 $0 $0 $0 $0 $ 4,636,000 $0 $0 $0 $0 $0 $ 4,636,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 1-4 $0 $0 $ 4,336,000 $ 300,000 $0 $ 4,636,000 Yuma Theatre and Art Center Restoration Status: 06 1.9803 Department: P&R Target Year: 09-10 Description: Phase 2 proposed scope of work to include: Creating a basement below the Yuma Theatre stage area for Theatre support space, enlarging the stage, creation of a flyloft, creation of a loading dock, organ lift for stage and installation of state-of-the-art sound, lighting, and rigging. Phase 2 renovation would be phased with year one being detailed schematics with cost information. Year 2 - Design project Year 3 - Construction Location: Yuma Theatre and Art Center - 254 Main Street Related Projects: Justification: The Yuma Art Center serves as the center piece for cultural activities in Yuma. The facility contributes to the revitalization of Yuma's Downtown and as an "arts incubator", it is key in developing other art resources in the community. Planning Context: 2020 Vision Plan Arts and Culture Work Plan Art Center Business Plan Historic Design Guidelines Project Schedule Fund BOND Total 2009-2010 2010-2011 2011-2012 2012-2013 2013-2014 2014-2019 Total $ 1,020,000 $0 $ 6,000,000 $0 $0 $0 $ 7,020,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 1,020,000 $0 $ 6,000,000 $0 $0 $0 $ 7,020,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 1-5 $ 620,000 $0 $ 6,000,000 $ 400,000 $0 $ 7,020,000 Drying Bed-Main Street WTP Status: 06 1.9905 Department: PW Target Year: 06-07 Description: This project is to construct a new backwash equalization basin, relocate the sludge drying beds and pump station at Main Street WTP, install 6" force main, and sludge drying beds/decant pump station and piping. This is a high priority project for commercial development of the Riverfront. Location: North of Main Canal between 9th and 10th Avenues Related Projects: Justification: Riverfront development projects necessitate the removal of the existing sludge drying beds from their location near the Yuma Main Canal. Planning Context: Project identified in Waterfront Center Plan of 2/98, and the recent Riverfront Redevelopment Master Plan. Project Schedule Fund BOND Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 2,300,000 $0 $0 $0 $0 $0 $ 2,300,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 2,300,000 $0 $0 $0 $0 $0 $ 2,300,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 1-6 $ 80,000 $0 $ 2,110,000 $ 110,000 $0 $ 2,300,000 Madison Avenue Reconstruction Status: 05 1.9908 Department: DCD Target Year: 06-07 Description: This project is to design and reconstruct Madison Avenue from 3rd Street to 1st Street. Year One (FY '04-'05): Preliminary design Year Two: (FY '05-'06) Final Design and reconstruct Madison Avenue from 1st Street North to the Colorado River. this will be the primary permanent access to the new hotel on the riverfront and will assure primary public access to the riverfront. North block reconstruction in FY '05-06'. South block scheduled for reconstruction in FY '06-'07. Location: Madison Avenue - 1st Street to 3rd Street Related Projects: 1.0601 Justification: Madison Avenue will be the primary North-South linkage for the Rivertown redevelopment area. Planning Context: Project identified in Waterfront Center plan of 2/98. Heritage Area Project. Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 150,000 $0 $0 $0 $0 $0 $ 150,000 SUF $ 60,000 $0 $0 $0 $0 $0 $ 60,000 WUF $ 68,895 $0 $0 $0 $0 $0 $ 68,895 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 278,895 $0 $0 $0 $0 $0 $ 278,895 ROAD Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 1-7 $ 40,000 $0 $ 218,895 $ 20,000 $0 $ 278,895 Downtown Parking Structure(s) Status: 05 1.9910 Department: DCD Target Year: 08-09 Description: Phase I: Interim parking constructed in FY '03-'04 in order to provide a smooth transition during Downtown and Riverfront construction. Phase II: Analysis of emerging trends in commercial activity and traffic is needed to determine feasibility and suitability of parking alternatives. Phase III: Design and construct parking structures. Location: Riverfront Project area - site not selected Related Projects: Justification: Re-development of the Rivertown area will put additional strain on parking availability that is already overtaxed during the winter months and during events. Planning Context: Project Schedule Fund BOND Total 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013 2013-2018 Total $ 3,840,000 $0 $0 $0 $0 $0 $ 3,840,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 3,840,000 $0 $0 $0 $0 $0 $ 3,840,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 1-8 $ 500,000 $0 $ 3,200,000 $ 140,000 $0 $ 3,840,000 Natural History Museum Status: 06 1.9911 Department: DCD Target Year: 07-08 Description: The Natural History Museum would enable Yuma to provide educational programs interpreting the unique natural environment of our region for residents and visitors. Major features would include the ecological adaptations of the animals and plants of the region, the geological forces shaping the landscape and the role of the natural environment in shaping human cultures in the region. Location: To be located within the West Wetlands Park. Related Projects: Justification: TheNatural History Museum is one of the 13 projects identified in the Yuma Crossing Heritage Area Executive Summary. This project has the support of Arizona Western College/Northern Arizona University, Bureau of Reclamation, Bureau of Land Management, Arizona State Parks, Yuma Convention and Visitors Bureau, Yuma Board of Realtors, as well as several departments within the City of Yuma. Planning Context: To be developed as part of the West Wetlands master plan, suggested site is 18th Avenue North of the Levee. Heritage Area project. Project Schedule Fund GRNT Total 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2017 Total $ 3,650,000 $0 $0 $0 $0 $0 $ 3,650,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 3,650,000 $0 $0 $0 $0 $0 $ 3,650,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 1-9 $ 300,000 $0 $ 3,000,000 $ 350,000 $0 $ 3,650,000 Multi-Agency Visitor Center Status: 06 1.9913 Department: RIV Target Year: 07-08 Description: The Visitors Center will provide an all en-compassing "one stop shop" to provide information to the thousands of visitors who make Yuma their first stop when entering Arizona from California. The overlying theme of the Center will be the public's opportunity to discover and explore the natural and cultural resources of the Yuma area. Programs will include such areas as waterways, desert terrain, and geological features. Location: NWC of 1st Street and 4th Avenue Related Projects: Justification: This Multi-Agency Visitors Center is one of the 13 projects identified in the Yuma Crossing Heritage Area Executive Summary. This facility will be a joint venture between the City of Yuma, Yuma Convention & Visitors Bureau, Bureau of Land Management, Bureau of Reclamation, Department of Fish & Wildlife, Arizona Game and Fish, and California Fish and Game. This facility must be built adjacent to Historic Downtown Yuma. Planning Context: To be developed as part of the Riverfront master plan, suggested site is along 1st Street Corridor. Funding sources include COY, YCVB, BOR, BLM, Fish & Wildlife, Arizona Game & Fish, and California Fish & Game. Heritage Area Project. Project Schedule Fund 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2017 Total GEN $ 550,000 $0 $0 $0 $0 $0 $ 550,000 GRNT $ 2,000,000 $ 2,000,000 $0 $0 $0 $0 $ 4,000,000 OTHR $0 $ 1,000,000 $0 $0 $0 $0 $ 1,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 2,550,000 $ 3,000,000 $0 $0 $0 $0 $ 5,550,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 1-10 $ 400,000 $0 $ 4,750,000 $ 400,000 $0 $ 5,550,000 Riverfront Infrastructure Improvements Status: 05 1.9916 Department: DCD Target Year: 06-07 Description: Year One: Design and permitting. 12" waterline from 4th Avenue to Madison Avenue, approximately one block North of 1st Street. Waterline will be looped to 1st Street waterline via Second Avenue and Madison Avenue. Madison Avenue sanitary sewer is to be extended north of the USBR Railroad right-of-way. Location: 4th Avenue to Madison Avenue Related Projects: Justification: Provides access to adequate water supply and sanitary sewer for Riverfront re-development properties and street landscaping in Riverfront area. Planning Context: Riverfront Development Master Plan Roll over Project Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 1,119,000 $0 $0 $0 $0 $0 $ 1,119,000 UNF $ 94,000 $0 $0 $0 $0 $0 $ 94,000 WUF $ 287,000 $0 $0 $0 $0 $0 $ 287,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 1,500,000 $0 $0 $0 $0 $0 $ 1,500,000 BOND Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 1-11 $ 200,000 $0 $ 1,200,000 $ 100,000 $0 $ 1,500,000 Railroad Settling Tank Status: 06 1.0000 Department: RIV Target Year: 06-07 Description: The Railroad settling tanks were located in the middle of the riverfront development area. Tanks and Hillside removed in 2001. Hydrocarbon remediation is ongoing. Location: Madison Avenue, North of Jones Street Related Projects: Justification: The area where the settling tanks sit has been identified as the primary site for the hotel. In order to begin the redevelopment of the riverfront area, the site must be cleared and prepared for development. Resolving the settling tank issue is one of the key projects necessary to begin development of the conference hotel. Planning Context: Project Schedule Fund TWO% Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 15,000 $0 $0 $0 $0 $0 $ 15,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 15,000 $0 $0 $0 $0 $0 $ 15,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 1-12 $ 15,000 $0 $0 $0 $0 $ 15,000 East Wetlands Status: 06 1.0002 Department: RIV Target Year: 06-07 Description: Design of passive public uses containing a recreational lake, backwater areas and restored habitat. Public use to include fishing, beaches, walking and hiking trails and wildlife observation areas. Future construction to be funded by Federal and State Grants with participation and cooperation of Quechan Tribe, City, Yuma County, Corp of Engineers, BLM, ADEQ, Game and Fish, BOR. Funds have already been awarded to the City by the EPA for implementation of this project for $230,000. This first phase will design the conveyance of backwash "filter water" from the water plant to the East Wetlands to recharge the Wetlands and secure return flow credits to the City. Design to include an EPA approved "Quality Assurance Project Plan" and Environmental Measurement. Planning and permitting for this 1418 acre Riparian area has been completed. the area will be cleared of non-native vegetation. Back channels will be dredged, and native trees will be planted. In total the project has amassed almost $4 million in State and Federal Grant funding of which $2.1 million will be spend in FY '05-'00. The design for the "Decant" system to convey filter backwash water from the Water Plant to the East Wetlands has been designed and expected to be build in FY '05-'06. The Decant project will help recharge the Wetlands, secure return flow credits to the City, and provide local match for the Grant Funding. Location: East of Ocean to Ocean Bridge, adjacent to Quechan Lands, encompassing the confluence of the Gila and Colorado Rivers, between existing river levees Related Projects: Justification: The East Wetland is one of the 13 projects identified in the Yuma Crossing Heritage Area Executive Summary. It will provide a large Wetland restoration and passive recreation area in proximity to the population center of Yuma. Planning Context: National Heritage Area. Potential limited funding by Heritage Area grant. Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total BOND $ 970,000 $0 $0 $0 $0 $0 $ 970,000 GRNT $ 3,000,000 $0 $0 $0 $0 $0 $ 3,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 3,970,000 $0 $0 $0 $0 $0 $ 3,970,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 1-13 $ 200,000 $0 $ 3,620,000 $ 150,000 $0 $ 3,970,000 Yuma Crossing Retail Compon./Canal Walk Status: 06 1.0003 Department: RIV Target Year: 06-07 Description: Creation of infrastructure and walkway along the Yuma Main Canal to support development of Yuma Crossing retail village, public amenities and unifying design elements. Location: 4th Avenue at the Crossing Park and terminating at the Yuma Siphon Related Projects: Justification: Site must be enhanced for new commercial development. Planning Context: Historic Design Guidelines will apply. Project Schedule Fund TWO% Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 30,000 $0 $0 $0 $0 $0 $ 30,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 30,000 $0 $0 $0 $0 $0 $ 30,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 1-14 $ 30,000 $0 $0 $0 $0 $ 30,000 Riverfront Development Master Planning Status: 06 1.0011 Department: RIV Target Year: 06-07 Description: This project requires 404 permitting. Any construction or development activity within the delineated jurisdiction of the U.S. Army Corps of Engineers (along the Colorado River) requires permitting by the US Army Corps of Engineers. The designated funds will also be used to move into design development. Location: Riverfront area north of 1st Street Related Projects: Justification: The Joint Riverfront Master Plan is the basis for facilitating $40-$50 million in private investment in hotel, retail and restaurant development, and 404 permitting is necessary for development. Planning Context: Riverfront Master Plan. Project Schedule Fund TWO% Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 28,000 $0 $0 $0 $0 $0 $ 28,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 28,000 $0 $0 $0 $0 $0 $ 28,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 1-15 $ 28,000 $0 $0 $0 $0 $ 28,000 Gila Street Extension Status: 06 1.0012 Department: PW Target Year: 06-07 Description: Construct a Gila Street Extension Loop Road to the Gateway Riverfront Park that assures secondary public access to this park. Project will incorporate unifying design features, including lighting and signage, which will give Riverfront Development and Downtown Redevelopment cohesion and unity. This body of design features will enhance aesthetics and appeal while at the same time directing traffic flow and way finding. Construction of this project is critical to commercial/hotel development on riverfront. The funds will be used as a match Grants for the Park. Location: NWC of 1st Street and Gila Street. Also located northeast of Water Treatment Plant from 1st Street to Hotel Site Related Projects: Justification: This project is part of the public access improvements that the City is required to do through a memorandum of understanding with the City's Development Partner, in order to maintain public access to the Colorado River. Planning Context: Heritage Area Historic Design Guidelines will apply Project Schedule Fund HURF Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 825,000 $0 $0 $0 $0 $0 $ 825,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 825,000 $0 $0 $0 $0 $0 $ 825,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 1-16 $0 $0 $ 820,000 $ 5,000 $0 $ 825,000 Relocation of US Fish and Wildlife Svc. Status: 05 1.0014 Department: RIV Target Year: 06-07 Description: U.S. Fish and Wildlife Services current offices are in the area along 1st Street that are to be cleared for redevelopment as a retail village. A partnership of Federal and local government funding is needed to relocate and clear the site. This is a high priority project to implement commercial development on the riverfront. U.S. Fish and Wildlife has Federal construction funds for its relocation in October 2005. City will enter into exchange for 1st Street property in early January 2006. City funding will be needed earlier then anticipated due to expedited Federal schedule. Location: Riverfront Area north of 1st Street Related Projects: Justification: Redevelopment plan requires relocation of the agency and clearance of the site. Planning Context: International Waterfront Group concept plan and Joint Riverfront Master Plan. Historic Design Guidelines will apply. Project Schedule Fund TWO% Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 550,000 $0 $0 $0 $0 $0 $ 550,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 550,000 $0 $0 $0 $0 $0 $ 550,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 1-17 $0 $ 530,000 $0 $ 20,000 $0 $ 550,000 Gateway Riverfront Park Project Status: 05 1.0015 Department: PR Target Year: 06-07 Description: This project involves the design and construction of a regional park along the Colorado Riverfront. This project will assure public improved public access and use of the riverfront when the Hotel/Conference Center and Commercial Development is completed at North Madison Avenue funding sources primarily State and Federal Grants. Integration of the downtown riverfront with the Territorial Prison is a component of this effort. The Madison beach park will integrate with the Territorial Prison so as to assure public access. This project will have funding from a developer contribution, a LRSP grant, and a SLIF Grant. Location: North of 1st Street between Ocean to Ocean Bridge and 1st Avenue Related Projects: 1.0002, 1.0012 Justification: Public development of this riverside park will provide better public access to the riverfront and East Wetlands. This facility will enhance and promote private development plans. Planning Context: Land use Plan and Riverfront development plans. Historic Design Guidelines will apply. Project Schedule Fund GRNT TWO% Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 1,900,000 $0 $0 $0 $0 $0 $ 1,900,000 $ 626,000 $0 $0 $0 $0 $0 $ 626,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 2,526,000 $0 $0 $0 $0 $0 $ 2,526,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 1-18 $0 $0 $ 2,300,000 $ 226,000 $0 $ 2,526,000 Riverfront Development Grande Promenade Status: 05 1.0017 Department: DCD Target Year: 06-07 Description: This main walkway through the riverfront area will be a pedestrian corridor along which private developments will be built. The walkway will serve emergency and utility vehicles for the entire riverfront area as well. Interpretive exhibits and a historical theme will be a part of the walkway. Grants for this project include: EPA and T-21. Location: Riverfront Area north of 1st Street Related Projects: Justification: The public-private partnership on the riverfront intends to inter-relate private developments with public amenities. Design and construction of the Grande Promenade is an essential part of the context and integration of public and private developments. Planning Context: Joint Riverfront Master Plan. Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total GRNT $0 $ 480,000 $0 $0 $0 $0 $ 480,000 OTHR $ 60,000 $0 $0 $0 $0 $0 $ 60,000 ROAD $0 $ 60,000 $0 $0 $0 $0 $ 60,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 60,000 $ 540,000 $0 $0 $0 $0 $ 600,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 1-19 $ 60,000 $0 $ 480,000 $ 60,000 $0 $ 600,000 Miscellaneous Structure Demolition Status: 05 1.0019 Department: RIV Target Year: 07-08 Description: The Riverfront area contains a number of structures which currently house numerous Federal, State and local agencies (National Guard Armory, City Annex, Border Patrol, Riverfront Development Office, Fish and Wildlife, Rear portion of City Hall and old truck inspection station). Once the agencies are relocated, the land will be cleared for redevelopment in accordance with the Riverfront Joint Master Plan. Location: Riverfront Area north of 1st Street from 4th Avenue to Madison Avenue Related Projects: Justification: The development and disposition agreement with Clark-Lankford LLC. requires that the City demolish structures to make land available for redevelopment. Planning Context: North End Redevelopment Plan and Joint Riverfront Master Plan. Historic Design Guidelines will apply. Project Schedule Fund TWO% Total 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2017 Total $ 100,000 $0 $0 $0 $0 $0 $ 100,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 100,000 $0 $0 $0 $0 $0 $ 100,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 1-20 $0 $ 100,000 $0 $0 $0 $ 100,000 West Wetlands Road Status: 06 1.0025 Department: RIV Target Year: 06-07 Description: This is the main park road that will bring the utilities through the park and add a landscape buffer on both sides of the road. This public roadway will have a 24 foot pavement width and will provide both public and emergency access through the West Wetlands Park. It is necessary to complete design of this project in order to move forward with Phase 2 of development of the West Wetlands. Location: West Wetlands Park Related Projects: Justification: This road will link the east and west sections of Phase I development of the park. This will be the base and backbone for all future development phases. Planning Context: This has been identified as Phase 2 of the West Wetlands Master Plan. Project Schedule Fund HURF Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 50,000 $0 $0 $0 $0 $0 $ 50,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 50,000 $0 $0 $0 $0 $0 $ 50,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 1-21 $ 3,000 $0 $ 45,000 $ 2,000 $0 $ 50,000 Citywide Fiber Optic Cabling Installation Status: 05 1.0106 Department: ITS Target Year: 06-07 Description: City wide fiber project will combine the needs for fiber for the traffic signal interconnect project and interbuilding connectivity for the city's business systems. Plans are for the city to be implementing the project in a cooperative manner with other agencies who have indicated of also having a need for fiber connectivity. Location: 4th Avenue - 1st Street to 32nd Street & 32nd Street - Avenue B to Araby Road Related Projects: Justification: This project takes advantage of money being spent for other CIP projects for fiber and will capitalize of forming a cooperative venture between several entities to share costs. With the passage of new legislation which puts limits on our current cable franchise agreement this project is now crucial to keeping the city's business system functioning. This will enable the city to have its own fiber backbone for voice and data without being dependat on other private companies to conduct routine daily business. Planning Context: City of Yuma General Plan - Public Services and Facilities Element. Project Schedule Fund OTHR UNF Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $0 $ 500,000 $ 500,000 $0 $0 $0 $ 1,000,000 $ 50,000 $ 500,000 $ 500,000 $0 $0 $0 $ 1,050,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 50,000 $ 1,000,000 $ 1,000,000 $0 $0 $0 $ 2,050,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 1-22 $ 50,000 $0 $ 2,000,000 $0 $0 $ 2,050,000 Multi-Modal Reconstruction Status: 05 1.0300 Department: RIV Target Year: 06-07 Description: This project is based on studies done by the Yuma Metropolitan Planning Organization in 1999-2000 concerning the need and best location for a Multi-Modal Transportation Center in Yuma. The Hotel Del Sol, vacant for 25 years was selected due to its location, historic significance and integration into the Downtown Redevelopment Plan. The City has received a $500,000 TEA21 Grant to purchase the property and begin design through another CIP project. Further Grant funding of $2.5 million is available through the Federal Transit Administration. City funding involves some CDBG funding and local match for the Federal funding while the entire building is intended for transit purpose in the long-run, interim uses can be proposed, and private investment can be solicited for those interim uses. Location: 3rd Street between Gila Street and Maiden Lane Related Projects: Justification: Restoring this facility will make a dramatic difference in the appearance of the downtown. A 20% local commitment would potentially allow the City to access $1.6 million in federal funding. The YMPO is in support of the project in concept, but does not have the local funds to match the federal funding. Planning Context: Yuma Crossing National Heritage Area Plan and YMPO Public Transportation Planning. Historic Design Guidelines will apply. Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total CDBG $ 100,000 $0 $0 $0 $0 $0 $ 100,000 GEN $ 42,000 $0 $0 $0 $0 $0 $ 42,000 $ 3,000,000 $0 $0 $0 $0 $0 $ 3,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 3,142,000 $0 $0 $0 $0 $0 $ 3,142,000 GRNT Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 1-23 $ 500,000 $0 $ 2,300,000 $ 42,000 $ 300,000 $ 3,142,000 800 MHZ New Radio Site Status: 05 1.0302 Department: ITS Target Year: 06-07 Description: New radio system will be installed as part of a joint project with city and county. System will be a digital P25 multiside trunked radio system. Various grants along with city and county funding will be used to fund this project. Location: Citywide Related Projects: Justification: The current city radio system is past its life expectancy and utilizes an older analog technology. Mobile and portable radios are obsolete and can no longer be purchased. Due to the age of the portable radios they are breaking down on a frequent basis. Some repair parts are not available. The current EF Johnson radio system purchased in 1997 is no longer supportable. Planning Context: Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total GRNT $ 2,300,000 $ 400,000 $0 $0 $0 $0 $ 2,700,000 OTHR $ 750,000 $0 $0 $0 $0 $0 $ 750,000 PBSF $ 1,750,000 $ 200,000 $0 $0 $0 $0 $ 1,950,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 4,800,000 $ 600,000 $0 $0 $0 $0 $ 5,400,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 1-24 $0 $0 $ 5,400,000 $0 $0 $ 5,400,000 City Hall Modification Status: 06 1.0402 Department: PW Target Year: 06-07 Description: Modify third floor of City Hall to accommodate Neighborhood Services Division and City Engineering Department personnel. Location: One City Plaza Related Projects: Justification: Relocation of City staff to one centralized location to perform work duties more efficiently. Planning Context: Project Schedule Fund BOND Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 700,000 $0 $0 $0 $0 $0 $ 700,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 700,000 $0 $0 $0 $0 $0 $ 700,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 1-25 $ 50,000 $0 $ 620,000 $ 30,000 $0 $ 700,000 West Wetlands Mitigation Status: 06 1.0403 Department: RIV Target Year: 06-07 Description: To establish a mitigation plan and site for 13 acres of upland re-vegetation to mitigate for impacts to delineated wetlands adjacent to the Colorado River as part of the Yuma West Wetlands Park and Wetland Re-vegetation projects. The project will also provide the necessary reporting as a requirement of our 404 permit and associated project management to complete mitigation and reporting. Phase I is complete. Phase II, acquisition of property and mitigation of that area is underway. Location: West Wetlands Park 12th Avenue and Water Street Related Projects: Justification: This project is consistent with the West Wetlands Park Master Plan and is a requirement of the US Army Corps of Engineers in order to comply with the City of Yuma's 404 permit for the West Wetlands Re-vegetation project. Planning Context: Consistent with the West Wetlands Park Master Plan and the Yuma Crossing National Heritage Area Plan and is required by the US Army Corps of Engineers. Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total GEN $ 120,000 $0 $0 $0 $0 $0 $ 120,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 120,000 $0 $0 $0 $0 $0 $ 120,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 1-26 $0 $0 $ 120,000 $0 $0 $ 120,000 Downtown / I-8 Trailblazing & City ID Imps. Status: 05 1.0500 Department: RIV Target Year: 07-08 Description: This project will accomplish 3 objectives (1) Improve identification of Yuma destinations at all applicable exits from I-8. (2) Provide adequate directional signing to Historic Downtown and historic sites in the vicinity of Downtown. (3) Guide traffic in the central area to I-8 by means of Redondo Center Drive, Giss Parkway and 4th Avenue to improve travel times and minimize congestion on 16th Street. Implementation of signing changes on I-8 would be implemented by the Arizona Department of Transportation (A.D.O.T.) and California Department of Transportation (CalTrans). Location: Interstate 8 through and approaching Yuma and Central Area of Yuma Related Projects: Justification: Signing on I-8 directing motorists to Yuma destinations and identifying Yuma is inadequate and misleading. There are several locations where existing signing is confusing. In addition, congestion on 16th Street can be reduced by directing motorists in the central area of the City to I-8 via the interchanges at Redondo Center Drive, Giss Parkway and 4th Avenue. This will also reduce travel time for these motorists. Finally, existing signing directing visitors to various central area historic attractions, City Hall and the Yuma Convention and Visitors Bureau (YCVB) is confusing and does not "reach out" far enough. A coordinated approach to all of these issues is needed. The YCVB has been requesting this project for several years. Planning Context: Project Schedule Fund 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2017 Total OTHR $ 155,000 $0 $0 $0 $0 $0 $ 155,000 TWO% $ 100,000 $0 $0 $0 $0 $0 $ 100,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 255,000 $0 $0 $0 $0 $0 $ 255,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 1-27 $ 60,000 $0 $ 185,000 $ 10,000 $0 $ 255,000 New Downtown Redevelopment Initiative Status: 05 1.0501 Department: RIV Target Year: 06-07 Description: This project will access under-utilized city owned property and establish a plan for redevelopment. An early action implementation program will be initiated. Location: Downtown/Yuma Crossing National Heritage Area Related Projects: Justification: While the Riverfront area will see major new investment. The downtown continues to lose vitality in the retail sector. This program will promote new residential, office and entertainment development to compensate. Planning Context: Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total GEN $ 50,000 $ 28,000 $0 $0 $0 $0 $ 78,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 50,000 $ 28,000 $0 $0 $0 $0 $ 78,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 1-28 $ 78,000 $0 $0 $0 $0 $ 78,000 Downtown Wayfinder Initiative Status: 06 1.0502 Department: RIV Target Year: 08-09 Description: The project will provide unified directional projection in the downtown and will be done in conjunction with I-8 Trail Blazing project being initiated by Riverfront. Location: Downtown/Yuma Crossing National Heritage Area Related Projects: 1.0500 Justification: City has recently entered into a Development Agreement intended to promote $80 Million in private investment in the downtown area. Providing good directional signage to the downtown is needed in conjunction with this private investment. Planning Context: Northend Redevelopment Plan, the Plan for Yuma Crossing National Heritage Area, Master Development Agreement with Clark-Lankford LLC. Project Schedule Fund 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013 2013-2018 Total GEN $ 100,000 $0 $0 $0 $0 $0 $ 100,000 GRNT $ 500,000 $0 $0 $0 $0 $0 $ 500,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 600,000 $0 $0 $0 $0 $0 $ 600,000 Total Project Budget Location Map Design Right-of-way $ 100,000 Construction Inspection Other (i.e. Materials) $ 500,000 Total 1-29 $0 $0 $0 $ 600,000 Yuma Crossing Exhibit Master Plan Status: 05 1.0503 Department: PW Target Year: 06-07 Description: To develop an Exhibit Master Plan for the State Historic Park under the city's IGA No. PR05-083-001 with Arizona State Parks Board. Funding has been provided by Arizona State Parks. Location: Yuma Crossing State Historic Park - 201 N. 4th Avenue Related Projects: Justification: To further the Yuma Crossing National Heritage Area Master Plan in partnership with Arizona State Parks. Planning Context: Yuma Crossing National Heritage Area Master Plan and Riverfront Development Master Plan. Project Schedule Fund OTHR Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 25,000 $0 $0 $0 $0 $0 $ 25,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 25,000 $0 $0 $0 $0 $0 $ 25,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 1-30 $ 25,000 $0 $0 $0 $0 $ 25,000 Vehicle Acquisitions Status: 06 1.0504 Department: PW Target Year: 06-07 Description: Acquisition of vehicles necessary to provide an expanded level of service to developing areas of the City. Location: City of Yuma Related Projects: Justification: As new areas of the City develop, additional vehicles are added to the current fleet, so that the levels of service currently provided to existing developed areas of the City are maintained within new develops. The funding shown below is to acquire five police patrol vehicles annually, one automated side-load refuse truck annually and one 3,500 gallon Fire tanker/pumper truck triennially, or equivalent equipment to those listed. Planning Context: Impact fee elegible project. Project Schedule Fund IMPCT Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 418,500 $ 418,500 $ 868,500 $ 418,500 $ 418,500 $0 $ 2,542,500 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 418,500 $ 418,500 $ 868,500 $ 418,500 $ 418,500 $0 $ 2,542,500 Project Budget Location Map Design Right-of-way $0 Construction Inspection Other (i.e. Materials) $0 Total 1-31 $0 $0 $ 2,542,500 $ 2,542,500 East Mesa Facilities Status: 06 1.0508 Department: PW Target Year: 09-10 Description: Provide satellite facilities for Public Works, Police and Parks and Recreation departments. Location: East Mesa, between Avenue 10E and Araby Road Related Projects: Justification: Annexations on the East Mesa are stretching the resources of City departments becouse of the time necessary to get to and from the main offices and shops and the East Mesa work sites. The proposed facility would include offices, maintenance buildings and shops, material and vehicle storage areas and fueling islands. Planning Context: Impact fee elegible facility. Project Schedule Fund 2009-2010 2010-2011 2011-2012 2012-2013 2013-2014 2014-2019 Total $0 $ 7,250,000 $0 $0 $0 $0 $ 7,250,000 GEN $ 40,000 $0 $0 $0 $0 $0 $ 40,000 BOND HURF $ 40,000 $0 $0 $0 $0 $0 $ 40,000 SUF $ 40,000 $0 $0 $0 $0 $0 $ 40,000 WUF $ 40,000 $0 $0 $0 $0 $0 $ 40,000 Total $ 160,000 $ 7,250,000 $0 $0 $0 $0 $ 7,410,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 1-32 $ 160,000 $ 2,500,000 $ 4,400,000 $ 350,000 $0 $ 7,410,000 Improvement District No. 68 - Castle Dome Ave. Status: 05 1.0568 Department: PW Target Year: 06-07 Description: Construct Castle Dome Avenue to a 5-lane minor arterial from 12th Street to 8th Street, including the extension of 12-inch sewer line 12 inch watermain, storm water lift station and storm water infrastructure and the signalization of the Castle Dome Avenue / 8th Street intersection. Location: Castle Dome Avenue - 12th Street to 8th Street Related Projects: 5.9707 Justification: Improvement District No. 68 formed at the request of WCC properties, LLC. Per City Council approved Development Agreement, Resolution R2006-05. Planning Context: Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total IMPD $ 3,300,000 $0 $0 $0 $0 $0 $ 3,300,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 3,300,000 $0 $0 $0 $0 $0 $ 3,300,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 1-33 $0 $0 $ 3,100,000 $ 200,000 $0 $ 3,300,000 Pivot Point Status: 06 1.0601 Department: RIV Target Year: 06-07 Description: Pivot Point is a riverfront overlook at the north end of Madison Avenue, which has two purposes: to connect Gateway Park with the hotel/conference center/riverfront development area and to interpret the historical importance of the Yuma Crossing. Location: Riverfront Development - North Madison Avenue Related Projects: 1.0011, 1.0015, 1.0017, 1.0020, 1.9908 Justification: The Riverfront Development represents a significant investment by the public and private sectors. In its first phase, $4 million dollars in public funds is being invested in Gateway Park and $25 million of private investment in the hotel/conference center. Pivot Point will link these two investments in a way that benefits the entire project. Planning Context: Riverfront Development Master Plan Riverfront Master Development and Disposition Agreement The Plan for the Yuma Crossing National Heritage Area Project Schedule Fund GRNT TWO% Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $0 $0 $ 1,100,000 $0 $0 $0 $ 1,100,000 $ 75,000 $ 250,000 $ 900,000 $0 $0 $0 $ 1,225,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 75,000 $ 250,000 $ 2,000,000 $0 $0 $0 $ 2,325,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 1-34 $ 325,000 $0 $ 1,700,000 $ 300,000 $0 $ 2,325,000 Yuma Valley Area Park Status: 05 2.9602 Department: P&R Target Year: 06-07 Description: This area park is a 15-acre area facility with large areas for passive recreation. Along with the other recreation facilities that are found in an area park, this facility could include a 4 field softball complex. The project will be constructed when there is available funding. May be able to use future retention basins for area park ameties. Location: West Valley Related Projects: Justification: Park development to be located in the Valley. Population centers and new housing development in the Valley warrant the development of an area park. Currently under discussion is the development and use of a softball facility to host tournaments. Planning Context: This park is part of the Parks Element adopted by Council in 1994 and part of the 20th Street Corridor Specific Facility Plan. Other Plans that identified a need for this facility include: a Consultant's Study FY '85/'86, Strategic Planning 1990 and a Public Forum 1993. Project Schedule Fund OTHR PRO Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 2,500,000 $0 $0 $0 $0 $0 $ 2,500,000 $ 370,000 $0 $0 $0 $0 $0 $ 370,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 2,870,000 $0 $0 $0 $0 $0 $ 2,870,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 2-1 $ 300,000 $ 2,570,000 $0 $0 $0 $ 2,870,000 Central Drain Linear Park - Ave C to C¾ Status: 06 2.9605 Department: P&R Target Year: 12-13 Description: Linear Park along the Central Drain at Avenue C¾. It will be a tree-lined pathway three quarter mile long. The project includes security lighting along the pathway. The project will be constructed when funding is available. Location: Central Drain - Avenue C to Avenue C¾ Related Projects: Justification: This is part of the linear park plan to link the City together. It ties the Valley Parks together and will provide a buffer zone to neighborhoods. Planning Context: This is part of the parks location plan and the bike plan adopted by City Council in 1994. Project Schedule Fund 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2022 Total GEN $0 $ 555,000 $0 $0 $0 $0 $ 555,000 $ 105,000 $ 300,000 $0 $0 $0 $0 $ 405,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 105,000 $ 855,000 $0 $0 $0 $0 $ 960,000 HURF Total Project Budget Location Map Design Right-of-way $ 105,000 Construction Inspection Other (i.e. Materials) $ 810,000 Total 2-2 $0 $ 45,000 $0 $ 960,000 Avenue C¾ Alignment Park - 16th St to 24th St Status: 06 2.9606 Department: PR Target Year: 10-11 Description: This project is a linear park with a bike path. It runs along the Central Drain Stub #2 from 16th to 24th Streets. The project will include a tree-lined pathway and bike path three-quarter mile long. The project is to include security lighting along the pathway. The project will be constructed when funding is available. Location: Central Drain (Ave C¾ Alignment) - 16th Street to 24th Street Related Projects: Justification: This project is part of the linear park plan and bike plan adopted by City Council in 1994. Planning Context: The bike plan and the park plan both show this project. There has been public meetings and public hearings on the project. Project Schedule Fund HURF Total 2010-2011 2011-2012 2012-2013 2013-2014 2014-2015 2015-2020 Total $ 49,000 $ 426,000 $0 $0 $0 $0 $ 475,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 49,000 $ 426,000 $0 $0 $0 $0 $ 475,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 2-3 $ 49,000 $0 $ 406,000 $ 20,000 $0 $ 475,000 45th Avenue & Central Stub 1 Linear Parks Status: 06 2.9607 Department: P&R Target Year: 10-11 Description: Two quarter-mile linear parkways - Central Stub #1 and 45th Avenue. Both parkways will be tree lined and include grass walkways and security lighting along the pathways. Location: 45th Avenue - Central Drain to 24th Street and Central Stub No. 1 - 20th Street to Central Drain Related Projects: Justification: This project is a linear park to link the open spaces together and to provide a safe area in which to walk. Planning Context: This is part of the linear park plan adopted in 1993 by City Council. Project Schedule Fund 2010-2011 2011-2012 2012-2013 2013-2014 2014-2015 2015-2020 Total GEN $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total Project Budget Location Map Design Right-of-way $0 Construction Inspection Other (i.e. Materials) $0 Total 2-4 $0 $0 $0 $0 South Valley Area Park Status: 06 2.9704 Department: P&R Target Year: 08-09 Description: The exact location of this facility is approximate at this time. This project involves the construction of an area park in the South Yuma Valley. This facility could include an athletic center, ball fields, a gymnasium, volleyball courts, etc. Land for this facility will be pursued via shared uses or donations. Location: South Yuma Valley Related Projects: Justification: Full development of this area will require an area park facility. Planning Context: Parks & Recreation Element Project Schedule Fund BOND GEN Total 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013 2013-2018 Total $ 2,000,000 $0 $ 2,300,000 $0 $0 $0 $ 4,300,000 $0 $ 200,000 $0 $0 $0 $0 $ 200,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 2,000,000 $ 200,000 $ 2,300,000 $0 $0 $0 $ 4,500,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 2-5 $ 200,000 $ 2,000,000 $ 2,200,000 $ 100,000 $0 $ 4,500,000 Central Canal Park - Ave. B to E. Main Canal Status: 06 2.9711 Department: P&R Target Year: 11-12 Description: This project involves the construction of a one-half mile length of the Central Canal Linear Park. It will contain a recreation path but not a fully developed Bike Path. This facility will tie into the East Main Canal linear park. Location: Central Canal Park - Avenue B to East Main Canal Related Projects: Justification: The facility will serve a local recreation/transportation use. Planning Context: Parks & Recreation Element Project Schedule Fund 2011-2012 2012-2013 2013-2014 2014-2015 2015-2016 2016-2021 Total GEN $ 320,000 $0 $0 $0 $0 $0 $ 320,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 320,000 $0 $0 $0 $0 $0 $ 320,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 2-6 $ 35,000 $0 $ 270,000 $ 15,000 $0 $ 320,000 Central Drain Linear Park - Ave B to Ave C Status: 06 2.9712 Department: P&R Target Year: 10-11 Description: This project involves the construction of a 1 mile length of the Central Drain (36th Street Alignment) linear park. It will contain a recreation path but not a fully developed Bike Path. This facility will tie into the planned Thacker Lateral linear park. Location: Central Drain Linear Park - Avenue B to Avenue C Related Projects: Justification: The facility will serve a local recreation/transportation use. Planning Context: Recreation Element Project Schedule Fund 2010-2011 2011-2012 2012-2013 2013-2014 2014-2015 2015-2020 Total GEN $ 70,000 $ 570,000 $0 $0 $0 $0 $ 640,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 70,000 $ 570,000 $0 $0 $0 $0 $ 640,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 2-7 $ 70,000 $0 $ 540,000 $ 30,000 $0 $ 640,000 Central Canal Linear Park - Ave. C to Ave. D Status: 06 2.9713 Department: P&R Target Year: 07-08 Description: This project involves the construction of a one mile length of the Central Canal Linear Park. It will contain a recreation path but not a fully developed Bike Path. This facility will tie into the planned Central Drain linear park to the east. Location: Central Canal Linear Park - Avenue C to Avenue D Related Projects: Justification: The facility will serve a local recreation/transportation use. Planning Context: Parks & Recreation Element Project Schedule Fund 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2017 Total GEN $ 20,000 $0 $0 $0 $0 $0 $ 20,000 UNF $0 $ 570,000 $0 $0 $0 $0 $ 570,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 20,000 $ 570,000 $0 $0 $0 $0 $ 590,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 2-8 $ 20,000 $0 $ 540,000 $ 30,000 $0 $ 590,000 Thacker Lateral Park - 24th to 32nd St Status: 06 2.9714 Department: P&R Target Year: 11-12 Description: This project involves the construction of a one mile length of the Thacker Lateral Linear Park along the Simon and Thacker Laterals. This facility will serve a local non-vehicular transportation need and will include a fully developed Bike Path. City needs an agreement with YCWUA for use of right-of-way. Location: Thacker Lateral Linear Park - 24th Street to 32nd Street Related Projects: Justification: The facility will serve a local recreation/transportation use. Planning Context: Parks & Recreation Element and Bicycle Element Project Schedule Fund 2011-2012 2012-2013 2013-2014 2014-2015 2015-2016 2016-2021 Total GEN $0 $ 435,000 $0 $0 $0 $0 $ 435,000 $ 85,000 $ 300,000 $0 $0 $0 $0 $ 385,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 85,000 $ 735,000 $0 $0 $0 $0 $ 820,000 HURF Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 2-9 $ 85,000 $0 $ 695,000 $ 40,000 $0 $ 820,000 Avenue B½ Linear Park - 32nd to 36th St. Status: 06 2.9715 Department: P&R Target Year: 10-11 Description: This project involves the construction of a half-mile length of the Avenue B½ Linear Park. This facility will serve a non-vehicular transportation need and will include a fully developed Bike Path. This facility will tie into the planned 36th Street/Central Drain linear park and connect to the Thacker Lateral Linear Park to the north. Location: Avenue B½ Linear Park - 32nd Street to 36th Street Related Projects: Justification: The facility will serve a local recreation/transportation use. Planning Context: Parks & Recreation Element and Bicycle Element Project Schedule Fund 2010-2011 2011-2012 2012-2013 2013-2014 2014-2015 2015-2020 Total GEN $ 45,000 $ 170,000 $0 $0 $0 $0 $ 215,000 $0 $ 200,000 $0 $0 $0 $0 $ 200,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 45,000 $ 370,000 $0 $0 $0 $0 $ 415,000 HURF Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 2-10 $ 45,000 $0 $ 350,000 $ 20,000 $0 $ 415,000 Avenue C½ & 28th Street Linear Park Status: 06 2.9716 Department: P&R Target Year: 13-14 Description: This project involves the construction of a three-quarter mile length of the Avenue C½ Linear Park. This facility will serve a local recreation need. It will contain a recreation path but not a fully developed Bike Path. This facility will tie into the planned bike path to the school to the south and the linear park along 28th Street to the west. Location: Avenue C½ - 24th Street to 28th Street & 28th Street - Avenue C½ to Avenue C¾ (Alignment) Related Projects: Justification: The facility will serve a local recreation/transportation use. Planning Context: Parks & Recreation Element and Bicycle Element Project Schedule Fund 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018 2018-2023 Total GEN $ 65,000 $ 285,000 $0 $0 $0 $0 $ 350,000 $0 $ 270,000 $0 $0 $0 $0 $ 270,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 65,000 $ 555,000 $0 $0 $0 $0 $ 620,000 HURF Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 2-11 $ 65,000 $0 $ 525,000 $ 30,000 $0 $ 620,000 Park Facility Improvements Status: 05 2.9806 Department: P&R Target Year: 06-07 Description: This project was established to make necessary improvements to the City of Yuma's existing parks. Pool Facility Improvements: These improvements include, but are not limited to, deck upgrades, pool pump and chlorine injectors, pump upgrades, pool heaters, shade structures and permanent bleachers. Park Facility Improvements: These improvements include, ramadas, irrigation, resurfacing and replacement of tennis, basketball, handball and racquetball courts and security lighting at various parks and athletic fields and multi-use pathways. Athletic Field Improvements: These improvements include fencing, irrigation, crows nest and concession sands, restroom upgrades, permanent bleachers, resurfacing of track areas and security lighting. Building Recreation Center Improvements: This includes flooring upgrades, climate controls upgrades, sound and lighting upgrades, carpet, interior upgrades. Other improvements: Skate park upgrades, gym flooring upgrades, fishing dock and viewing platforms, kiosk and information centers. Location: Kennedy, Joe Henry, Carver, Colorado River, Smucker, Kennedy Athletic, Woodard, Sunrise Optimist, Winsor Rotary, Friendship, Carver Track, Kiwanis, Sanguinetti, Marcus, Cibola, and JHOC (inside and outside). Related Projects: Justification: The City of Yuma's Parks are in need of modernization and need to have safety issues addressed. Planning Context: City of Yuma General Plan - Parks and Recreation Element. Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total GEN $ 270,000 $ 370,000 $ 370,000 $ 370,000 $0 $0 $ 1,380,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 270,000 $ 370,000 $ 370,000 $ 370,000 $0 $0 $ 1,380,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 2-12 $ 20,000 $0 $ 1,290,000 $ 70,000 $0 $ 1,380,000 Smucker Park Improvements Status: 05 2.0001 Department: P&R Target Year: 08-09 Description: To build the additional 25 acres of park. Including walkways, playgrounds, lighting, irrigation and pumping station upgrade, roads, parking areas and lake facility, fishing dock and viewing platforms, relocate maintenance compound, connect pathways to East Main Canal path. Location: Smucker Park Related Projects: Justification: This project is part of the 1988 Master Plan for the expansion and improvement of Ray Smucker Park. Basin needs to be constructed (to be joint venture between City and YCFCD). Will have more accurate cost figures during desing phase. Planning Context: 1988 Ray Smucker Park Expansion and Improvement Master Plan. Project Schedule Fund 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013 2013-2018 Total UNF $ 150,000 $ 500,000 $0 $0 $0 $0 $ 650,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 150,000 $ 500,000 $0 $0 $0 $0 $ 650,000 Total Project Budget Location Map Design Right-of-way $ 150,000 Construction Inspection Other (i.e. Materials) $ 500,000 Total 2-13 $0 $0 $0 $ 650,000 Lighting for Parks and Athletic Fields Status: 06 2.0300 Department: P&R Target Year: 06-07 Description: New and upgraded lighting for various parks and athletic facilities including replacement lighting for Woodard Athletic Field and security lighting for Joe Henry Park. The first upgrades will include new poles and upgrades to electrical systems. Other parks and athletic fields will be evaluated yearly to determine lighting needs and safety needs for the public. Location: Various locations Related Projects: Justification: Inadequate lighting throughout the parks system, security and safety for the public. Planning Context: Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total UNF $ 375,000 $ 375,000 $0 $0 $0 $0 $ 750,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 375,000 $ 375,000 $0 $0 $0 $0 $ 750,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 2-14 $ 50,000 $0 $ 680,000 $ 20,000 $0 $ 750,000 Upgrading and Replacement of Restrooms Status: 05 2.0301 Department: P&R Target Year: 06-07 Description: The Parks and Recreation Department has completed the restroom design that includes four different restroom plans to be placed at various parks and athletic fields throughout the City. These plans will provide the most efficient restroom design and produce the most cost effective product. The first restrooms that will be constructed will be at Kennedy, Joe Henry and Smucker Parks. Additional restrooms will be identified as funding becomes available. Location: Various locations Related Projects: Justification: Most of the restrooms within the system are 20 years of age or older. The City has provided face lifts on most of the facilities, but the structures are still deteriorating. Some of our existing parks and athletic fields have no restrooms at all. Planning Context: Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total GEN $ 390,000 $ 250,000 $ 260,000 $0 $0 $0 $ 900,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 390,000 $ 250,000 $ 260,000 $0 $0 $0 $ 900,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 2-15 $ 20,000 $0 $ 800,000 $ 80,000 $0 $ 900,000 Kennedy Park Parking Lot Expansion Status: 05 2.0500 Department: P&R Target Year: 06-07 Description: The parking lot expansion at Kennedy Park starts at the west end of the existing parking area in front of the pool and expands across the horseshoe courts and into the parks's open space area. This parking will provide additional facilities for the pool and in-line hockey facilities. This expansion was part of the original Phase Location: 24th Street and Kennedy Lane Related Projects: 2.0301, 2.9806 Justification: With the development of the Kennedy Park complex and the addition of the in-line hockey facility, the additional parking is needed to accommodate the higher participant usage. Planning Context: Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total GEN $ 180,000 $ 200,000 $0 $0 $0 $0 $ 380,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 180,000 $ 200,000 $0 $0 $0 $0 $ 380,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 2-16 $0 $0 $ 360,000 $ 20,000 $0 $ 380,000 Carver Park Tennis, Handball & Basketball Court Status: 06 2.0502 Department: P&R Target Year: 06-07 Description: The Parks and Recreation Department wishes to demolish and remove the existing 2 tennis courts at Carver Park, replacing them with one tennis court and one basketball court. The handball courts floor will be demolished and replaced with new concrete. The side walls will be repaired and painted. The existing basketball court, East of the John Morris Cottage, will also be replaced with a new concrete court and new basketball standards. Location: Carver Park - 385 S. 13th Avenue Related Projects: Justification: The facilities mentioned in the request are in need of replacement. Currently the tennis courts are closed to the area residents because of major deterioration. They have become a safety issue and funds at this time are unavailable to replace them. Replacing the existing tennis courts with one tennis cort and one basketball court will provide the residents of the Carver Park area and Yuma High neighborhoods "new" recreation facilities that will improve their quality of life. The handball and east basketball courts are also in need of replacement. Park maintenance, but cracks appear constantly due to the age of the existing concrete. Planning Context: Architectural designs have been completed and are at Public Works. This was a prior project in '03-'04, but there was not enough CDBG funding to complete the renovations. Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total CDBG $ 81,000 $0 $0 $0 $0 $0 $ 81,000 GEN $ 4,800 $0 $0 $0 $0 $0 $ 4,800 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 85,800 $0 $0 $0 $0 $0 $ 85,800 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 2-17 $0 $0 $ 85,800 $0 $0 $ 85,800 Shade Structures Status: 06 2.0504 Department: P&R Target Year: 06-07 Description: Purchase and construct shade structures over the 21 existing current playground units. The cost to cover one unit is approximately $12,000. Location: Various Parks Related Projects: Justification: These shade structures will provide shade to the citizens that use the playgrounds. They also provide rellief from the elements, which may extend the life of the equipment and lessen the maintenance required. Planning Context: Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total UNF $ 120,000 $ 120,000 $0 $0 $0 $0 $ 240,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 120,000 $ 120,000 $0 $0 $0 $0 $ 240,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 2-18 $ 5,000 $0 $ 230,000 $ 5,000 $0 $ 240,000 West Wetlands Amphitheater Improvements Status: 06 2.0505 Department: P&R Target Year: 09-10 Description: Design and construction of a finished road (i.e. city street standards, extend irrigation, parking lot at equestrian trailhead, amphitheater, water feature, creative playground. Location: West Wetlands Park Related Projects: Justification: This project is consistent with the West Wetlands Park Master Plan. This is the next phase of the park to be completed. Planning Context: Project Schedule Fund 2009-2010 2010-2011 2011-2012 2012-2013 2013-2014 2014-2019 Total UNF $ 500,000 $ 4,100,000 $ 150,000 $0 $0 $0 $ 4,750,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 500,000 $ 4,100,000 $ 150,000 $0 $0 $0 $ 4,750,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 2-19 $ 500,000 $0 $ 4,100,000 $ 150,000 $0 $ 4,750,000 Beautification of Entry Way to the Readiness Ctr Status: 06 2.0506 Department: P&R Target Year: 07-08 Description: Bautify the area surrounding the Yuma Readiness & Community Center. Install block wall and fencing from each entrance to the corner of Araby and 24th Street and a safety buffer for users and their children. Install irrigation. Landscape area with trees, desert plants and grass. Park benches, picnic table and a small ramada. Lighted signage for both entry ways into facility. Location: Readiness Center - 6550 E. 24th Street Related Projects: Justification: The masterplan regarding the Yuma Readiness Center included completion of the landscaping of the remaining property southeast and southwest of the facility. Currently it is untouched desert and needs improvement. It would serve as a small park and play area that residents in the college park community and Yuma Readiness Center can enjoy. Planning Context: Project Schedule Fund 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2017 Total GEN $ 20,000 $ 183,820 $0 $0 $0 $0 $ 203,820 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 20,000 $ 183,820 $0 $0 $0 $0 $ 203,820 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 2-20 $ 20,000 $0 $ 178,820 $ 5,000 $0 $ 203,820 Lighting of Foothills High School Fields Status: 06 2.0507 Department: P&R Target Year: 10-11 Description: Install lighting for softball and/or soccer fields at the Foothills High School. Location: East 24th Street Related Projects: Justification: If the YUHSD #70 constructs athletic facilities that include a minimum of two regulation soccer fields or two 300 foot softball fields together, the city would be interested in a joint partnership for usage of fields, through an intergovernmental agreement. By lighting the fields, it would enable the Parks & Recreation Department to schedule and provide recreational opportunities in the East Mesa, benefiting, area residents. Planning Context: Project Schedule Fund 2010-2011 2011-2012 2012-2013 2013-2014 2014-2015 2015-2020 Total GEN $ 20,000 $ 520,000 $0 $0 $0 $0 $ 540,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 20,000 $ 520,000 $0 $0 $0 $0 $ 540,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 2-21 $ 20,000 $0 $ 500,000 $ 20,000 $0 $ 540,000 Desert Sun Stadium Status: 06 2.0508 Department: P&R Target Year: 06-07 Description: Demolition and replacements of concrete below the concourse seating areas and public concourses at Desert Sun Stadium. Replacement of seating and railings in that same area. Location: Ray Kroc Baseball Complex Related Projects: Justification: Concrete in those areas are failing and the patching that has occurred is no longer effective. The aluminum frames on the seats are breaking down and replacement parts cannot be found for existing seats. Both these issues represent a public safety issue. Planning Context: James P. Deyo Adaptive Re-Use Plan Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total RCX $ 250,000 $0 $0 $0 $0 $0 $ 250,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 250,000 $0 $0 $0 $0 $0 $ 250,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 2-22 $ 10,000 $0 $ 235,000 $ 5,000 $0 $ 250,000 Stewart Vincent Wolfe Memorial Playground Status: 06 2.0509 Department: P&R Target Year: 06-07 Description: The playground will be designed entirely from the ideas of school aged children and built by community volunteers. Playground consultant will plan, design and oversee the organization of the project from start to finish. The city will pay for the consultant fees. All other funding for the playground will come from the community. Yuma Crossing National Heritage Area will handle community donations and expenditures for playground materials and supplies. BetterYuma.org has commited to be the lead volunteer organization for the project. Location: Yuma West Wetlands Park Related Projects: Justification: This "creative" playground will be a one-of-a-kind playground, unique to Yuma. It is expected to be a major draw to the West Wetlands Park. Planning Context: The playground will be added to the Yuma West Wetlands plan and conceptual design, currently being updated. Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total GEN $ 50,000 $0 $0 $0 $0 $0 $ 50,000 $ 1,000,000 $0 $0 $0 $0 $0 $ 1,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 1,050,000 $0 $0 $0 $0 $0 $ 1,050,000 OTHR Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 2-23 $ 50,000 $0 $ 1,000,000 $0 $0 $ 1,050,000 Yuma Art Center Museum Status: 06 2.0510 Department: P&R Target Year: 06-07 Description: Acoustic and lighting improvements for the Yuma Art Center Museum. Location: Yuma Art Center Related Projects: Justification: Artists and community groups using the museum have complained about the inadequate lighting and poor acoustics. The new facilities have now been operational for two years and have additional operating experience to make effective and lasting improvements for our facility users. Planning Context: The Arts & Culture Comission Workplan. Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total UNF $ 140,000 $0 $0 $0 $0 $0 $ 140,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 140,000 $0 $0 $0 $0 $0 $ 140,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 2-24 $ 15,000 $0 $ 120,000 $ 5,000 $0 $ 140,000 New Area Park in the East Status: 06 2.0511 Department: P&R Target Year: 09-10 Description: Design and construction of an Area Park in the College Park Subdivision Area. The project would include: irrigation system with pumping plant, playground units with shade covers (2), ramadas (2), walking pathways with security lighting, benches, picnic tables, BBQ grills, drinking fountains, restrooms, maintenance compound for equipment, water feature, fencing. Location: Near Foothills High School and East of Fire Station 5 Related Projects: Justification: Parks and Recreation Element plan, calls for an area park in this location. In the last Parks and Recreation survey, public demanded parks in the eastern city limits. Planning Context: Project Schedule Fund 2009-2010 2010-2011 2011-2012 2012-2013 2013-2014 2014-2019 Total GEN $ 100,000 $ 500,000 $0 $0 $0 $0 $ 600,000 $0 $ 2,000,000 $0 $0 $0 $0 $ 2,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 100,000 $ 2,500,000 $0 $0 $0 $0 $ 2,600,000 OTHR Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 2-25 $ 75,000 $0 $ 2,500,000 $ 25,000 $0 $ 2,600,000 Cibola High School Community Swimming Pool Status: 06 2.0601 Department: P&R Target Year: 06-07 Description: The Parks and Recreation Department will partner with Yuma Union High School District (YUHSD) #70 to construct a joint-use community swimming pool. The pool complex would feature an eight to ten lane competitive swimming pool, separate diving well with two one meter boards that YUHSD would pay for. The City would pay for the zero depth swim area, slide, three water play areas, and open grass area. Both, the City and YUHSD, would share the costs of a bathhouse with pool observation area, guardroom, training classroom, concession, and men's/women's bathrooms, showers and lockers. Location: SWC of 18th Street & 45th Avenue - West of Cibola High School Varsity Baseball Field Related Projects: Justification: Voters approved YUHSD #70 bond in November of 2005 and part of the funding is for the construction of a competitive pool and separate diving well. This is a perfect opportunity to share the costs of construction of a complete pool facility that will meet both our needs. The city would share the costs of the aquatic complex that offers amenities such as listed above and the high school would pay for the competitive pool and diving area to accommodate their swim program. Currently three high schools share pool time at Marcus Pool and with the future addition of the Foothills High School a fourth school will come on-line needing the same aquatic opportunities. The 1999 P&R Element of the General Plan identifies deficiency of one community pool. Planning Context: Project Schedule Fund BOND Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 200,000 $ 2,266,914 $0 $0 $0 $0 $ 2,466,914 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 200,000 $ 2,266,914 $0 $0 $0 $0 $ 2,466,914 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 2-26 $ 200,000 $0 $ 2,266,914 $0 $0 $ 2,466,914 Variable Frequency Drive (VFD)Sys.(DHGC) Status: 05 3.9707 Department: P&R Target Year: 06-07 Description: Multi-phase project including variable frequency Drive (VFD) system; wet well for VFD pumping plant irrigation filter system; building to house system and installation of injector system. Location: D.H.G.C. - 1245 Desert Hills Drive Related Projects: Justification: VFD system will save an average of 30% on power consumption ($29,000/year), reduce wear on irrigation system, and increase longevity of piping. Wet well required as new VFD consists of five pumps, existing wet well will only house three pumps. This project is needed to complete the upgrade to the Jim Deyo Complex. Planning Context: Project Schedule Fund TWO% Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 488,000 $0 $0 $0 $0 $0 $ 488,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 488,000 $0 $0 $0 $0 $0 $ 488,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 3-1 $0 $0 $ 458,000 $ 30,000 $0 $ 488,000 Parking Lot Maintenance Upgrades Status: 06 3.9802 Department: P&R Target Year: 06-07 Description: Work on this project was to slurry seal and patch parking lot to extend usable life. Future work will involve reconstruction of existing asphalt in parking lot including regrading and repaving so water flows away from center of parking lot and restriping parking spaces. The existing flat surface tends to keep water in for longer periods of time. Yuma Civc and Convention Center, Desert Hills Golf Course, Friendship Park, Kennedy Park, Carver Pool & Park, Marcus Pool, Sanguinetti Memorial Park, Sanguinetti Athletic Complex, Joe Henry Park & Athletic Complex, Cibola Athletic Complex, Kennedy Athletic Complex, Keagan Athletic Complex, Smucker Park, Parks Shop, and all City of Yuma Parks & Recreation parking lots. Location: Park facilities, Athletic facilities, all City of Yuma Parks & Recreation parking lots Related Projects: Justification: Parking lot needs to be re-paved because there are many pot holes that continue to enlarge as each year goes on. The City of Yuma street department has patched them, but now have recommended that the lot be repaved and restriped. The parking lot is used by the baseball complex, convention center and overflow for the golf course. It is a great asset for the complex and Parks and Recreation. Also a site for various vehicular testing and training courses. Coordinate with street construction projects where possible. Planning Context: Implementation of the HOK/Sports Committee report may modify the scope and scheduling of this project. Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total GEN $ 100,000 $ 350,000 $ 350,000 $ 350,000 $ 350,000 $0 $ 1,500,000 RCX $ 150,000 $ 250,000 $ 300,000 $0 $0 $0 $ 700,000 TWO% $ 150,000 $0 $0 $0 $0 $0 $ 150,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 400,000 $ 600,000 $ 650,000 $ 350,000 $ 350,000 $0 $ 2,350,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 3-2 $ 50,000 $0 $ 2,250,000 $ 50,000 $0 $ 2,350,000 Civic Center Roof Replacement Status: 06 3.0200 Department: P&R Target Year: 08-09 Description: Replace entire Yuma Civic and Convention Center roof. Location: Yuma Civic and Convention Center Related Projects: Justification: Present roof is over 25 years old. It was just patched and contractor recommended replacement. Planning Context: Project Schedule Fund 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013 2013-2018 Total RCX $ 400,000 $0 $0 $0 $0 $0 $ 400,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 400,000 $0 $0 $0 $0 $0 $ 400,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 3-3 $ 40,000 $0 $ 330,000 $ 30,000 $0 $ 400,000 Replacement of Air Conditioning Compres. Status: 05 3.0202 Department: P&R Target Year: 06-07 Description: Replacement of two (2) banks of chiller compressor Location: Yuma Civic and Convention Center Related Projects: Justification: Due to age and build up of contaminants, reliability is reduced and operating costs are maximized. The refrigerant in this machine is slated for phase out due to ozone depleting characteristics. Planning Context: Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total RCX $ 540,000 $0 $0 $0 $0 $0 $ 540,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 540,000 $0 $0 $0 $0 $0 $ 540,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 3-4 $ 24,000 $0 $ 500,000 $ 16,000 $0 $ 540,000 Deyo Complex Adapative Re-use Status: 05 3.0500 Department: P&R Target Year: 06-07 Description: This project is an adaptive re-use of the current complex changing it from baseball and 18 hole golf to a softball/soccer complex and a 9 hole golf course. This includes planning, design, grading, vehicle access and parking, lighting, fencing irrigation and landscaping. Location: Jim Deyo Complex Related Projects: Justification: The recreation trends in the community have determined the need for the complex change. The Parks and Recreation Department brought the project to the community through a number of public meetings and events in order to determine the level of community support. The community has been involved in the planning process of this project and has participated in several meetings. At the Parks & Recreation Commission Public Hearing on October 4, 2004, the Commission voted 4-0 to approve the James P. Deyo Adaptive Reuse Plan with the re-design of the golf course to include a 9-hole course. Planning Context: Project Schedule Fund BOND Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 17,880,000 $0 $0 $0 $0 $0 $ 17,880,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 17,880,000 $0 $0 $0 $0 $0 $ 17,880,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 3-5 $ 2,091,000 $0 $ 15,339,000 $ 450,000 $0 $ 17,880,000 Public Safety Training Facility Status: 05 4.9401 Department: FD Target Year: 06-07 Description: Provide offices, classrooms with communications enhancements (CATV broadcasts, interactive teaching with Arizona Western College; satellite feed) driving pad, burn building, drill tower, trench and confined space rescue props, roof ventilation props (both pitched and flat roofs), traffic collision extrication training area, liquefied petroleum gas and natural gas training props. Location: TBD Related Projects: Justification: To provide adequate facilities to deal with the complex and ever increasing training needs of the Fire Departments and other community agencies. Planning Context: Project Schedule Fund BOND Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 4,177,750 $0 $0 $0 $0 $0 $ 4,177,750 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 4,177,750 $0 $0 $0 $0 $0 $ 4,177,750 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 4-1 $ 365,250 $0 $ 3,562,500 $ 250,000 $0 $ 4,177,750 Fire Station 6 (B) - Avenue C and 32nd St. Status: 05 4.9601 Department: FD Target Year: 06-07 Description: 2-bay Fire Station proposed in the general area of Avenue C and 32nd Street to provide Fire Department services to newly annexed or developed areas. Phase I: Site Identification. Phase II: Design, land acquisition, site improvement and preparation (to include utilities). A traffic impact study, re-plot of land and Public Overlay Zoning designation of acquired land may be necessary for this project. Financing for this project is Public Safety Bond. Location: In the general area of 32nd Street and Avenue C Related Projects: Justification: This fire station is necessary to provide essential services in a timely manner to all citizens, driven by annexation and infill growth of the City of Yuma. Planning Context: Growth and Development Policy Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total BOND $ 2,680,000 $0 $0 $0 $0 $0 $ 2,680,000 PBSF $ 220,000 $0 $0 $0 $0 $0 $ 220,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 2,900,000 $0 $0 $0 $0 $0 $ 2,900,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 4-2 $ 80,000 $ 160,000 $ 2,440,000 $ 220,000 $0 $ 2,900,000 Fire Station A - 32nd St. & Avenue 4E Status: 05 4.9602 Department: FD Target Year: 07-08 Description: 2 bay Fire Station proposed in the general area of 32nd Street and Avenue 4E to provide Fire Department services to newly annexed or developed areas. Phase I: Site identification. Phase II: Design, land acquisition, site improvement and preparation (to include utilities). A Traffic Impact Study, re-plot of land and Public Overlay Zoning designation of acquired land may be necessary for this project. Financing for this project is planned as build/leaseback over five (5) years, pro-rata, Public Safety Bond and/or some combination of funding source, upon project initiation. Location: In the general area of 32nd Street and Avenue 4E Related Projects: Justification: This fire Station is necessary to provide essential services in a timely manner to all citizens, driven by annexation and infill growth of the City of Yuma. Planning Context: Growth and Development Policy. Project Schedule Fund BOND Total 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2017 Total $ 212,500 $ 2,325,000 $0 $0 $0 $0 $ 2,537,500 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 212,500 $ 2,325,000 $0 $0 $0 $0 $ 2,537,500 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 4-3 $ 212,500 $0 $ 2,125,000 $ 200,000 $0 $ 2,537,500 Fire Station E - I-8 and Fortuna Road Status: 06 4.9605 Department: FD Target Year: 10-11 Description: 2 bay Fire Station proposed in the general area of Interstate 8 and Fortuna Road to provide Fire Department services to newly annexed or developed areas. Phase I: Site identification. Phase II: Design, land acquisition, construction, site improvement and preparation to include utilities). A Traffic Impact Study, re-plot of land and Public Overlay Zoning designation of acquired land may be necessary for this project. Financing for this project is planned as build/leaseback over five (5) years, pro-rata, Public Safety bond and/or some combination of funding source, upon project initiation. Location: In the general area of Interstate-8 and Fortuna Road Related Projects: Justification: This fire station is necessary to provide essential services in a timely manner to all citizens, driven by annexation and infill growth of the City of Yuma. Planning Context: Growth and Development Policy. Project Schedule Fund BOND Total 2010-2011 2011-2012 2012-2013 2013-2014 2014-2015 2015-2020 Total $ 265,600 $ 2,931,050 $0 $0 $0 $0 $ 3,196,650 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 265,600 $ 2,931,050 $0 $0 $0 $0 $ 3,196,650 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 4-4 $ 265,600 $0 $ 2,656,050 $ 275,000 $0 $ 3,196,650 Fire Station C - Avenue C and 8th Street Status: 06 4.9607 Department: FD Target Year: 13-14 Description: 2 bay Fire Station proposed in the general area of Avenue C and 8th Street to provide Fire Department services to newly annexed or developed areas. Phase I: Site identification. Phase II: Design, land acquisition, construction, site improvement and preparation (to include utilities). A Traffic Impact Study, re-plot of land Public Overlay Zoning designation of acquired land may be necessary for this project. Financing for this project is planned as build/leaseback over five (5) years, pro-rata, Public Safety Bond and/or some combination of funding source, upon project initiation. Location: In the general area of 8th Street and Avenue C Related Projects: Justification: This fire station is necessary to provide essential services in a timely manner to all citizens, driven by annexation and infill growth of the City of Yuma. Planning Context: Growth and Annexation Policy. Project Schedule Fund BOND Total 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018 2018-2023 Total $ 3,521,366 $0 $0 $0 $0 $0 $ 3,521,366 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 3,521,366 $0 $0 $0 $0 $0 $ 3,521,366 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 4-5 $ 292,851 $0 $ 2,928,515 $ 300,000 $0 $ 3,521,366 Fire Station D - 40th Street & Avenue 8E Status: 06 4.9903 Department: FD Target Year: 07-08 Description: 2 bay Fire Station proposed in the general area of 40th Street and Avenue 8E to provide Fire Department services to newly annexed or developed areas. Phase I: Site identification. Phase II: Design, land acquisition, construction, site improvement and preparation (to include utilities). A Traffic Impact Study, re-plot of land and Public Overlay Zoning designation of acquired land may be necessary for this project. Financing for this project is planned as build/leaseback over five (5) years, Public Safety Bond and/or some combination of funding sources, upon project initiation. Location: In the general area of 40th Street and Avenue 8E Related Projects: Justification: This fire station is necessary to provide essential services in a timely manner to all citizens, driven by annexation and infill growth of the City of Yuma. Planning Context: Project Schedule Fund BOND Total 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2017 Total $ 244,375 $ 2,643,750 $0 $0 $0 $0 $ 2,888,125 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 244,375 $ 2,643,750 $0 $0 $0 $0 $ 2,888,125 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 4-6 $ 244,375 $0 $ 2,443,750 $ 200,000 $0 $ 2,888,125 Fire Station #1 Replacement Status: 05 4.0300 Department: FD Target Year: 06-07 Description: A 3 Bay Station proposed on the present lot location of Station #1. Preference would be to locate the new station on the north end of the property with emergency exit onto Giss Parkway. The station would be built to house up to 10 firefighters and a Battalion Chief. Location: Third Avenue and Giss Parkway Related Projects: Justification: Yuma CIP project # 4.0000 was developed and initiated in 2000-2001 to address a number of issues related to the current station #1 structure. The plan was to remodel the building to address some of the building deficiencies. It has been determined that it would be more fiscally responsible to construct a new building rather than invest further into the existing structure. The need for a fire station in this area remains a key to providing emergency services to the community. Planning Context: Project Schedule Fund BOND Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 400,000 $ 4,350,000 $0 $0 $0 $0 $ 4,750,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 400,000 $ 4,350,000 $0 $0 $0 $0 $ 4,750,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 4-7 $ 400,000 $0 $ 4,010,000 $ 340,000 $0 $ 4,750,000 Police Department Facility Improvements Status: 05 4.0400 Department: PD Target Year: 06-07 Description: The Police Department building was designed to allow future growth and expansion when needed. This project would allow for growth and expansion to occur in a timely fashion. Location: 1500 S. 1st Avenue Related Projects: Justification: Currently, all available office space at the Police Department has been utilized and several areas are experiencing overcrowding. This project would provide additional working space for the Patrol Division by moving the Traffic Enforcement Unit, the Community Oriented Policing Unit, and the Gang Unit up to the main level (enclosing the existing courtyard). It would allow for the Public Safety Communications to expand by creating additional space over the courtyard area, and additional office space would be created on the main level for administrative offices. Also, there is a critical need to expand the Police Department's computer room, telephone demarkation room, and radio room in order to accommodate new technology (mobile data computers). The project also includes a K-9 kennel with proper security and ventilation, and several needed building repairs. Planning Context: Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total BOND $ 2,431,000 $0 $0 $0 $0 $0 $ 2,431,000 PBSF $ 440,000 $0 $0 $0 $0 $0 $ 440,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 2,871,000 $0 $0 $0 $0 $0 $ 2,871,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 4-8 $ 90,000 $0 $ 2,431,000 $ 100,000 $ 250,000 $ 2,871,000 Fire Station I Status: 06 4.0402 Department: FD Target Year: 11-12 Description: 3 Bay Fire Station proposed in the general area of Avenue 6E & 40th Street intersection to provide Fire Department services to newly developing commercial areas. Phase I: side identification. Phase II: design, land acquisition, site improvement and site preparation (to include utilities). A Traffic Impact Study, and Public Overlay Zoning designation of acquired land may be necessary for this project. Location: General Area of Avenue 6E & 40th Street Intersection Related Projects: Justification: This fire station will be necessary to provide essential services in a timely manner to all citizens, driven by commercial development, infill growth of the City of Yuma and annexation. Planning Context: Project Schedule Fund BOND Total 2011-2012 2012-2013 2013-2014 2014-2015 2015-2016 2016-2021 Total $ 278,888 $ 3,064,062 $0 $0 $0 $0 $ 3,342,950 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 278,888 $ 3,064,062 $0 $0 $0 $0 $ 3,342,950 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 4-9 $ 278,888 $0 $ 2,789,062 $ 275,000 $0 $ 3,342,950 Emergency Vehicle Signal Pre-empt Status: 05 4.0500 Department: PW Target Year: 07-08 Description: The Arizona Department of Transportation (state) and Yuma County (county) occasionally install traffic signals adjacent to or near the city limits at intersections that are routinely used by City emergency services (police and fire) in responding to incidents. Because of this routine use, it is necessary to provide traffic signal pre-emption for city use is done do at all signalized intersections within the City. Location: Various locations Related Projects: Justification: Installation of pre-emption will facilitate responses to city fire and police emergencies and minimize the potential for traffic accidents involving city emergency equipment. Planning Context: Project Schedule Fund 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2017 Total GEN $ 54,000 $ 54,000 $0 $ 54,000 $0 $0 $ 162,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 54,000 $ 54,000 $0 $ 54,000 $0 $0 $ 162,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 4-10 $ 9,000 $0 $ 144,000 $ 9,000 $0 $ 162,000 Police Storage Facility Status: 06 4.0502 Department: PD Target Year: 06-07 Description: Need to acquire/build a facility to store police impound/evidence vehicles for extended periods of time. Currently utilizing the Figueroa WPCF parking area for storage of these vehicles/equipment and have been experiencing theft of property due to the lack of security. Future use of the property may include a police department evidence sotrage warehouse. A feasibility study will determine needs and space requirement. Location: To be determined Related Projects: Justification: Security issues with current evidence storage facility necessitates new facility with additional security. Also, a need to increase storage capacity is needed. Planning Context: 1. 2. 3. 4. 5. Obtain property. Modify and secure for immediate vehicle storage use. Conduct on evidence space needs study. Design Build Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total BOND $0 $0 $0 $ 3,200,000 $0 $0 $ 3,200,000 PBSF $ 400,000 $0 $ 140,000 $0 $0 $0 $ 540,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 400,000 $0 $ 140,000 $ 3,200,000 $0 $0 $ 3,740,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 4-11 $ 140,000 $ 400,000 $ 3,100,000 $ 100,000 $0 $ 3,740,000 Land Acquisition for all current Fire Facility Projects Status: 06 4.0503 Department: PW Target Year: 06-07 Description: A multiple year, multiple project CIP project for the purchase of property for identified fire facilities. This plan does not include the purchase of property for Fire Station #6 (B) (CIP #4.9601) and Fire Station D (40th Street & Avenue 8E CIP #4.9903). Those land acquisitions will continue to be shown in their respective CIP document. Location: Various Locations Related Projects: Justification: The future locations of fire facilities have been identified in the City General Plan. With this strategic planning it only makes sense to purchase the needed propertties up-front in order to save tax payer dollars and to prevent delays. Purchasing the land earlier rather than later will enable the city to save time and money. Planning Context: Project Schedule Fund PBSF Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 2,250,000 $ 1,250,000 $ 312,500 $ 350,000 $0 $0 $ 4,162,500 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 2,250,000 $ 1,250,000 $ 312,500 $ 350,000 $0 $0 $ 4,162,500 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 4-12 $0 $ 4,162,500 $0 $0 $0 $ 4,162,500 Arizona Ave - 16th Street to Palo Verde Status: 06 5.8308 Department: PW Target Year: 06-07 Description: Construct, reconstruct and/or widen Arizona Avenue to Constrained Minor Arterial Standard between 16th Street and Palo Verde. Project will include sidewalks, curb and gutter and drainage improvements. 16th Street to Palo Verde pavement replacement completed FY '00-'01. Bike lanes are to be included from 16th Street to 24th Street. Phase I: 16th Street intersection upgrades and reconstruction. Proposed budget is for right-of-way acquisition only. Location: Arizona Avenue - 16th Street to East Palo Verde Related Projects: 5.9913 Justification: The street functions as a major arterial north of 24th Street. Intersection of 16th Street to be upgraded in coordination with City of Yuma/Arizona Department of Transportation (A.D.O.T.) improvement project between Arizona Avenue and I-8. Planning Context: Road Tax - Core Project Bikeway Element, Phase I identified bike lanes, Giss to 24th Street. Rollover Project Major Roadways Plan - 2005 Project Schedule Fund ROAD Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 250,000 $0 $0 $0 $0 $0 $ 250,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 250,000 $0 $0 $0 $0 $0 $ 250,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-1 $0 $ 250,000 $0 $0 $0 $ 250,000 4th Avenue Reconstruction Status: 06 5.8312 Department: PW Target Year: 10-11 Description: Minor arterial street construction and widening of 4th Avenue - 32nd Street to 40th Street, with curb and gutter and sidewalks. Location: 4th Avenue - 32nd to 40th Streets Related Projects: Justification: The Police Department and private citizens have expressed concern about the lack of left turn lanes and sidewalks. Planning Context: Road Tax - Potential Project. Airport Area Specific Plan - Potential Cargo Facility - not adopted by Council. Major Roadways Plan 2005. Project Schedule Fund 2010-2011 2011-2012 2012-2013 2013-2014 2014-2015 2015-2020 Total BOND $0 $0 $ 2,500,000 $ 2,000,000 $0 $0 $ 4,500,000 ROAD $ 500,000 $ 980,000 $0 $0 $0 $0 $ 1,480,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 500,000 $ 980,000 $ 2,500,000 $ 2,000,000 $0 $0 $ 5,980,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-2 $ 500,000 $ 980,000 $ 4,100,000 $ 400,000 $0 $ 5,980,000 Arizona Avenue - 32nd to 40th Street Status: 06 5.8322 Department: PW Target Year: 07-08 Description: Reconstruct Arizona Avenue to minor arterial standard - 32nd Street to 40th Street. Intersection at 32nd with Arizona Avenue to the north aligned in FY 2001-2002. Location: Arizona Avenue - 32nd Street to 40th Street Related Projects: 5.8323, 5.9404 Justification: Will improve access to airport industrial areas. Planning Context: Road Tax - Potential Project Major Roadways Plan - 2005 Project Schedule Fund ROAD Total 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2017 Total $ 120,000 $0 $0 $0 $0 $0 $ 120,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 120,000 $0 $0 $0 $0 $0 $ 120,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-3 $ 120,000 $0 $0 $0 $0 $ 120,000 40th Street - Arizona Avenue to Avenue A Status: 06 5.8323 Department: PW Target Year: 07-08 Description: Reconstruct 40th Street to minor arterial standard with center turn lane as necessary, plus curb and gutter, sidewalk and drainage. Location: 40th Street - Arizona Avenue to Avenue A Related Projects: 5.8213, 5.8322 Justification: Access to new industrial area near airport. Planning Context: Road Tax - Potential Project. Major Roadways Plan - 2005. Project Schedule Fund 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2017 Total BOND $0 $ 800,000 $ 4,500,000 $0 $0 $0 $ 5,300,000 ROAD $ 500,000 $0 $0 $0 $0 $0 $ 500,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 500,000 $ 800,000 $ 4,500,000 $0 $0 $0 $ 5,800,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-4 $ 500,000 $ 800,000 $ 4,150,000 $ 350,000 $0 $ 5,800,000 24th Street - Avenue B to Avenue C Status: 06 5.8325 Department: PW Target Year: 06-07 Description: Reconstruct to minor arterial standard with curb and gutter, sidewalk, setbacks and parkways and storm drainage facilities. This street is to include bike lanes as identified in the Bicycle Element. Project design will include right turn lanes, landscaped medians, under grounding utilities, and landscaped setbacks where appropriate. Phase I (FY '04-'05) - relocation of Edenwood Subdivision walls Phase II (FY '06-'09) - Remainder of project Location: 24th Street - Avenue B to Avenue C Related Projects: Justification: Existing development makes widening of arterial necessary. Existing street is built to County standards and is not adequate for urban development. Planning Context: Bicycle Element - Phase 1 Major Roadways Plan - 2005 Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total BOND $0 $0 $ 1,080,000 $0 $0 $0 $ 1,080,000 PRO $0 $0 $ 3,420,000 $0 $0 $0 $ 3,420,000 $ 50,000 $ 100,000 $0 $0 $0 $0 $ 150,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 50,000 $ 100,000 $ 4,500,000 $0 $0 $0 $ 4,650,000 ROAD Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-5 $ 75,000 $ 75,000 $ 4,150,000 $ 350,000 $0 $ 4,650,000 Ave A - 40th St to Airport Loop Road Status: 06 5.8326 Department: PW Target Year: 07-08 Description: Reconstruct to collector standard. Avenue A - 40th Street to Airport Loop Road Location: Avenue A-40th Street to Airport Loop Road Related Projects: Justification: Existing surface consists of cold mix material with only 3 to 4-year life. Need reconstruction to collector standards. Planning Context: Airport Area Specific Plan - not adopted by Council. Major Roadways Plan - 2005. Project Schedule Fund ROAD Total 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2017 Total $ 50,000 $0 $0 $0 $0 $0 $ 50,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 50,000 $0 $0 $0 $0 $0 $ 50,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-6 $ 50,000 $0 $0 $0 $0 $ 50,000 1st Avenue - Giss Pkwy to 12th Street Status: 05 5.8330 Department: PW Target Year: 07-08 Description: Pavement replacement and minor upgrades in conjunction with water transmission & distribution line construction. Location: 1st Avenue - Giss Parkway to 12th Street Related Projects: Justification: Planning Context: Bicycle Element - Phase 1 identified bike lanes. Project Schedule Fund HURF Total 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2017 Total $ 800,000 $0 $0 $0 $0 $0 $ 800,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 800,000 $0 $0 $0 $0 $0 $ 800,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-7 $ 50,000 $0 $ 640,000 $ 110,000 $0 $ 800,000 1st Street - Gila Street to Avenue C Status: 06 5.8702 Department: PW Target Year: 06-07 Description: This project is to design and reconstruct 1st Street. Phase 1 (4th Avenue to Avenue A ) complete FY 98-99. Phase II (4th Avenue to Madison Ave.) Complete FY 99-00 and preliminary design of Phase III - Madison Avenue to Ocean to Ocean Bridge. FY '00/'01: Phase III final design. Construction - FY '05-'06 (complete). Phase IV (FY 05-06): - design and reconstruct Avenue A to Avenue B (complete). Phase V (FY 06-07) 1st Street - Avenue B to Avenue C (joint City/County Project) design in '00-'01. Widen and reconstruct from Avenue B to Avenue C - with curb, gutter, sidewalk, landscaped median and storm drainage, as necessary. Location: 1st Street - 4th Avenue to Gila Street; 1st Street - Avenue A to Avenue B; 1st Street - Avenue B to Avenue C Related Projects: Justification: Phase II and III are part of the planned riverfront development. Phase III includes substantial street scape improvements. Surface conditions will be rough requiring rehabilitation and considerable additional maintenance. Much of the Phase III surface is failing. Traffic volume is increasing. Serves an area of potential industrial expansion. Seismic study and canal scour study include recommendations for bridge replacement at Main Canal. Planning Context: Multi-year Project. Bicycle Element. Downtown Design Policy adopted by Resolution. Major Roadways Plan - 2005. Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total BOND $ 1,000,000 $ 4,500,000 $0 $0 $0 $0 $ 5,500,000 ROAD $ 200,000 $0 $0 $0 $0 $0 $ 200,000 $0 $ 650,000 $ 507,000 $0 $0 $0 $ 1,157,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 1,200,000 $ 5,150,000 $ 507,000 $0 $0 $0 $ 6,857,000 STP Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-8 $ 100,000 $ 1,100,000 $ 5,307,000 $ 350,000 $0 $ 6,857,000 Del Oro Reconstruction, et al Status: 05 5.8703 Department: PW Target Year: 07-08 Description: Reconstruction of subdivision streets - Ave B to Whitewing Lane. Quail Avenue, Sidewinder, Cottontail, Roadrunner, Javelina, Coyote, Whitewing - Del Sol to Del Oro. Del Sol, Del Plata, Dos Pesos, Del Oro - Quail to Whitewing. Storm Drainage needed by YCFCD. Construct access from Del Oro Lane to 20th Street and close north subdivision access to Avenue B to improve safety. Location: Del Oro Subdivision Related Projects: Justification: Streets were skin patched and/or slurry sealed in 1994. This was a short term fix. The streets are in need of replacement due to age and cracking. Planning Context: Project Schedule Fund 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2017 Total IMPD $ 150,000 $ 550,000 $0 $0 $0 $0 $ 700,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 150,000 $ 550,000 $0 $0 $0 $0 $ 700,000 Total Project Budget Location Map Design Right-of-way $ 100,000 Construction Inspection Other (i.e. Materials) $ 480,000 Total 5-9 $ 100,000 $ 20,000 $0 $ 700,000 23rd Avenue Widening Status: 05 5.8903 Department: PW Target Year: 06-07 Description: Widening 23rd Avenue - 1st Street to Joe Henry Park. Relocate irrigation ditch. Possible options are to designate 23rd Avenue as exit only and the 22nd Avenue as the entrance to the park. Location: 23rd Avenue - 1st Street to Joe Henry Park Related Projects: 3.9802 Justification: 23rd Avenue may become the main entrance to Joe Henry Park and may need to be widened. Planning Context: Project Schedule Fund HURF Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 230,000 $0 $0 $0 $0 $0 $ 230,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 230,000 $0 $0 $0 $0 $0 $ 230,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-10 $0 $ 65,000 $ 150,000 $ 15,000 $0 $ 230,000 16th Street Right Turn Lane @ Avenue B Status: 06 5.9102 Department: PW Target Year: 10-11 Description: 16th Street right turn lane at Avenue B Eastbound direction 200 feet +/- to South side. Require ROW acquisition, relocation signal pole, remove and replace curb & gutter and sidewalk installation. Bike lanes planned in Phase 2 of Bicycle Element Implementation Plan. Location: 16th Street and Avenue B Related Projects: Justification: Traffic increasing on 16th Street Eastbound. Need full two lanes Eastbound. Right turning traffic blocks one through lane. Planning Context: Bicycle Element - Phase 2 Major Roadways Plan - 2005 Project Schedule Fund 2010-2011 2011-2012 2012-2013 2013-2014 2014-2015 2015-2020 Total UNF $ 325,000 $0 $0 $0 $0 $0 $ 325,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 325,000 $0 $0 $0 $0 $0 $ 325,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-11 $ 25,000 $ 125,000 $ 160,000 $ 15,000 $0 $ 325,000 Magnolia Avenue, et al Status: 05 5.9105 Department: PW Target Year: 06-07 Description: Project work to include milling and overlay, milling and rubberized overlay, or street reconstruction depending on the status of the street. Segment 1: Magnolia Avenue - 1st Street to 8th Street Segment 2: 14th Avenue - 3rd Street to 5th Street Segment 3: 13th Avenue - East Main Canal to 5th Street Segment 4: 15th Avenue - West Main Canal to 8th Street Segment 5: 17th Avenue - West Main Canal to 3rd Street Segment 6: 4th Street - 17th Avenue to Magnolia Avenue Phase I: East of 16th Avenue Phase II: West of 16th Avenue Location: West Main Canal (WMC), Magnolia Avenue, 8th Street, and East Main Canal (EMC) Related Projects: 7.9309, 7.9606 Justification: Streets have reflective cracking. Street maintenance included cold patching and slurry sealing in 1994. Planning Context: Bicycle Element - Bike route signs have been installed on Magnolia and 14th Avenues. Project Schedule Fund BOND Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 1,090,000 $0 $0 $0 $0 $0 $ 1,090,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 1,090,000 $0 $0 $0 $0 $0 $ 1,090,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-12 $0 $0 $ 1,000,000 $ 90,000 $0 $ 1,090,000 28th St. - 4th Ave. to Alley West of Madison Ave. Status: 06 5.9108 Department: PW Target Year: 09-10 Description: Reconstruction of 28th Street - 4th Avenue to alley immediately West of Madison Avenue. Location: 28th Street - 4th Avenue to Alley West of Madison Avenue Related Projects: Justification: Street surface and base beginning to crack badly. Therefore a slurry seal was installed in 1995. Will need replacement in 1999-2000. Planning Context: Project Schedule Fund ROAD Total 2009-2010 2010-2011 2011-2012 2012-2013 2013-2014 2014-2019 Total $ 300,000 $0 $0 $0 $0 $0 $ 300,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 300,000 $0 $0 $0 $0 $0 $ 300,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-13 $0 $0 $ 275,000 $ 25,000 $0 $ 300,000 36th Street Const. - 4th Ave to 8th Ave Status: 06 5.9203 Department: PW Target Year: 11-12 Description: Construct 36th Street from 4th Avenue to 8th Avenue to collector standard with curb, gutter, sidewalk, drainage; underground irrigation canal; 64' between curbs. Pipelining of existing canal is required. Location: 36th Street - 4th Avenue to 8th Avenue Related Projects: Justification: In FY '91-'92, 36th Street was constructed from Avenue A to 8th Avenue. This project's construction will extend 36th Street to 4th Avenue. Create an alternate for traffic exiting Civic Center. Traffic signals may be required in the future at 36th Street and Avenue A and 36th Street and 4th Avenue. Provide secondary access to 4th Avenue for new Fire Station No. 2. Planning Context: Road Tax - Potential Project. Major Roadways Plan - 2005. Collector Street. Project Schedule Fund ROAD Total 2011-2012 2012-2013 2013-2014 2014-2015 2015-2016 2016-2021 Total $ 120,000 $ 330,000 $ 1,290,000 $0 $0 $0 $ 1,740,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 120,000 $ 330,000 $ 1,290,000 $0 $0 $0 $ 1,740,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-14 $ 120,000 $ 330,000 $ 1,200,000 $ 90,000 $0 $ 1,740,000 12th to 16th Streets - 4th Ave to Ave "A" Status: 05 5.9205 Department: PW Target Year: 06-07 Description: Reconstruction or milling and rubber overlay of the residential streets bounded by 12th Street, Avenue A, 16th Street and 4th Avenue. Specific work will depend on Engineering evaluation of fabric with 1.5" overlay versus a 1" rubber overlay and milling edges versus pavement replacement. Phase I: West of 8th Avenue. Phase II: East of 8th Avenue. Location: 12th to 16th Streets - 4th Ave to Ave "A". Related Projects: Justification: Last surface reconstruction done in late 1970's. Planning Context: Bicycle Element - Phase 1 - identified bike routes (12th Street, 14th Street and 11th Avenue). Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total BOND $0 $ 700,000 $ 500,000 $0 $0 $0 $ 1,200,000 HURF $ 150,000 $0 $0 $0 $0 $0 $ 150,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 150,000 $ 700,000 $ 500,000 $0 $0 $0 $ 1,350,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-15 $ 100,000 $0 $ 1,150,000 $ 100,000 $0 $ 1,350,000 Camino Alameda, et al (Casa Mañana) Status: 06 5.9207 Department: PW Target Year: 06-07 Description: Reconstruction of street and base 1. Camino Barranca - 24th St to Camino Pradera 2. Camino Harina - Camino Barranca to Camino Alameda 3. Camino Soledad - Camino Barranca to Camino Alameda 4. Camino Otero - Camino Barranca to Camino Alameda 5. Camino Granada - Camino Barranca to Alameda 6. Camino Cerro - Camino Barranca to Camino Alameda 7. Camino Pradera - Camino Barranca to Camino Alameda 8. Camino Alameda - 24th Street to Camino Pradera 9. Camino Barranca - Camino Cerro to Camino Pradera. Install Casa Mañana drainage and connect Tierro Kino storm drain system to Yuma County Flood Control District - Developed Victoria Meadows basin. Location: Casa Mañana Subdivision - 24th Street Related Projects: 8.9593, 9.9313 Justification: Base failure and surface irregularities require reconstruction. Done in conjunction with water service replacement and storm sewer installation. Skin patch and slurry seal to extend street life in Camino Pradera was applied in FY '95/'96. Planning Context: Bicycle Element - Phase 1 - identified bike routes on Camino Alameda. Project Schedule Fund BOND Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 500,000 $ 1,000,000 $0 $0 $0 $0 $ 1,500,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 500,000 $ 1,000,000 $0 $0 $0 $0 $ 1,500,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-16 $0 $0 $ 1,370,000 $ 130,000 $0 $ 1,500,000 Catalina Drive - 32nd St. to 4th Ave. Status: 06 5.9208 Department: PW Target Year: 06-07 Description: Catalina Drive from 32nd Street to 4th Avenue. Replace roll curb and gutter at all driveways. Reconstruction or milling and overlay as per Engineering evaluation. Location: Catalina Drive - 32nd Street to 4th Avenue Related Projects: Justification: Street resurfaced in early 1980. Reflection cracking increasing to extent replacement is necessary. Crack sealing and slurry seal were completed in November 1994 to extend life. Planning Context: Bicycle Element - Phase 1 identified bike routes at Catalina Drive. Project Schedule Fund HURF Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 55,000 $0 $0 $ 550,000 $0 $0 $ 605,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 55,000 $0 $0 $ 550,000 $0 $0 $ 605,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-17 $ 55,000 $0 $ 500,000 $ 50,000 $0 $ 605,000 17th to 19th Streets - 5th Ave to Ave A Status: 05 5.9209 Department: PW Target Year: 06-07 Description: Milling and Repavement 1. 6th Avenue - 16th to 19th Street 2. 7th Avenue - 16th to 18th Street 3. 9th Avenue - 17th to 19th Street 4. 10th Avenue - 16th to 19th Street 5. 11th Avenue - 16th to 19th Street 6. 19th Street - 5th Avenue to Avenue A 7. 18th Street - 5th Avenue to Avenue A 8. 17th Street - 4th Avenue to Avenue A 9. 5th Avenue - 16th to 19th Street Phase I: West of 8th Avenue. Phase II: East of 8th Avenue. Location: Residential streets bounded by 16th Street, Avenue A, 19th Street and 4th Avenue Related Projects: Justification: These residential streets overlaid (1") in FY '81-'82. Existing pavement condition plus utility replacements and upgrades within this area makes pavement replacement the most viable paving option. Planning Context: Bicycle Element: Phase 1 identified bike routes 11th Avenue and 19th Street. Phase 2 identified bike lane 19th Street. Project Schedule Fund BOND Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 2,500,000 $0 $0 $0 $0 $0 $ 2,500,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 2,500,000 $0 $0 $0 $0 $0 $ 2,500,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-18 $0 $0 $ 2,400,000 $ 100,000 $0 $ 2,500,000 Airport Loop Road, et al Status: 05 5.9211 Department: PW Target Year: 06-07 Description: Resurface and reconstruction: 1. Airport Loop Road - 4th Avenue to Southwest City limit 24' wide. 2. 4th Avenue - 40th Street to Airport Loop Road Reconstruction of the existing 24' wide asphalt road and widened to 48'(4 lanes). Construct curb and gutter as necessary. Phase I: Installation of a left turn lane for northbound Airport Loop Road Traffic at Avenue A (FY '06-'07). Avenue A intersection modifications will be the first activity undertaken. Location: Airport Loop Road - 4th Avenue to Avenue A and County 14th intersection Related Projects: Justification: Increasing traffic on Airport Loop and Avenue A has increased the number of traffic accidents and conflicts occurring at this intersection. Increased development in area necessitates arterial construction. Planning Context: Major Roadways Plan - 2005. Project Schedule Fund ROAD Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 97,200 $0 $0 $0 $0 $0 $ 97,200 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 97,200 $0 $0 $0 $0 $0 $ 97,200 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-19 $0 $0 $ 90,000 $ 7,200 $0 $ 97,200 Villa Hermosa No. 2 Status: 05 5.9401 Department: PW Target Year: 06-07 Description: Reconstruct existing residential streets of Villa Hermosa Subdivision including replacement of roll curb and gutter with vertical curb and gutter storm drainage, except 22nd Street. 1. 21st Lane 2. 21st Place 3. 21st Street 4. 20th Place 5. 27th Way 6. 28th Avenue 7. 29th Avenue 8. 25th Drive 9. 27th Avenue Location: Villa Hermosa No. 2 Subdivision. Residential streets between 20th and 22nd Streets - Avenue B and Thacker Lateral Related Projects: 5.9507, 7.9996 Justification: Skin patch and slurry 22nd Street in FY '95/'96 and maintain streets till FY '98/'99. Planning Context: Project Schedule Fund BOND Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 1,800,000 $0 $0 $0 $0 $0 $ 1,800,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 1,800,000 $0 $0 $0 $0 $0 $ 1,800,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-20 $0 $0 $ 1,675,000 $ 125,000 $0 $ 1,800,000 32nd Street - 4th Avenue to Avenue B Status: 06 5.9402 Department: PW Target Year: 06-07 Description: Construction of curb and gutter, sidewalk and drainage improvements. Resurface existing street. 32nd Street - 4th Avenue to Avenue B. Widen to four or six lanes. Pavement replacement Avenue A to Big Curve (Spragues) completed FY '99-'00. Design concept report in FY '94/'95. Location: 32nd Street - Big Curve to Avenue B Related Projects: 7.0118 Justification: The surface is beginning to fail in several locations. Rehabilitation is needed. Traffic volume increasing and left turn movement has become difficult. Planning Context: Rollover Project. Road Tax - Core Project, South Yuma Valley Facility Plan. Bicycle Element - Phase 1 identified bike lane. Major Roadways Plan - 2005. Project Schedule Fund BOND STP Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 3,800,000 $ 2,776,393 $0 $0 $0 $0 $ 6,576,393 $ 800,000 $ 600,000 $0 $0 $0 $0 $ 1,400,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 4,600,000 $ 3,376,393 $0 $0 $0 $0 $ 7,976,393 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-21 $ 150,000 $ 1,000,000 $ 6,426,393 $ 400,000 $0 $ 7,976,393 Major Intersection Improvements Status: 06 5.9404 Department: PW Target Year: 07-08 Description: Compile data, study conditions and recommend actions to be taken to improve traffic flow, safety and physical conditions at the following street intersections: Phase II: Develop, design and construct an I-8/Giss Parkway/Redondo Drive interchange to allow ingress/egress from the north end of the Jose Maria Redondo Commerce Center to include traffic signals (complete), Phase III: East Palo Verde Street and Arizona Avenue, Phase IV: 32nd Street and Arizona Avenue (complete), Phase V: Giss Parkway, Madison Avenue and Orange Avenue intersection (complete), Phase VI: 8th Avenue and 20th Street. Bikeways are to be considered in the design stage, where applicable. Location: Various major intersections throughout the city Related Projects: Justification: These intersections do not meet on Section Lines/Half Section Lines, do not align with each other or are intersections of more than two streets. As a result, traffic control is difficult. Since each intersection involves a major traffic conduit in Yuma, for which solutions need to be devised. Future development is also expected to put additional pressures on these locations. Assistance/cooperation from A.D.O.T. will be required for at least two locations. Any resulting projects recommended should be treated as separate Capital Improvement Projects. Planning Context: Multi-year Project. Project Schedule Fund ROAD Total 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2017 Total $ 180,000 $0 $0 $0 $0 $0 $ 180,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 180,000 $0 $0 $0 $0 $0 $ 180,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-22 $0 $0 $ 170,000 $ 10,000 $0 $ 180,000 Maiden Lane & Gila Street - 1st St to Giss Pkwy Status: 05 5.9408 Department: PW Target Year: 06-07 Description: Reconstruction of asphaltic concrete (A.C.) Pavement in accordance with Downtown Guidelines and Plan. Reconstruct pavement and base course; curbing and sidewalk as needed; address drainage problems; address right-of-way for Maiden Lane, (1st Street to 2nd Street, (established)); underground and/or overhead utilities. FY '98/'99: Design Maiden Lane FY '99/'00: Completed construction on Maiden Lane FY '06/'07: Final design of Gila Street FY '06/'07: Reconstruct Gila Street FY '08-'09. Location: Maiden Lane - 1st Street to Giss Parkway and Gila Street - 1st Street to Giss Parkway Related Projects: Justification: Surface is breaking up in some areas, due to pockets of standing water. Reconstruction will include streetscaping, lighting, improvements and artistic opportunities. Planning Context: Downtown Revitalization, Vision 2020 Plan. Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total BOND $0 $0 $ 475,000 $0 $0 $0 $ 475,000 HURF $ 50,000 $0 $0 $0 $0 $0 $ 50,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 50,000 $0 $ 475,000 $0 $0 $0 $ 525,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-23 $ 50,000 $0 $ 450,000 $ 25,000 $0 $ 525,000 36th Street - Arizona Avenue to 4th Avenue Status: 06 5.9504 Department: PW Target Year: 11-12 Description: Construct mid-section commercial/industrial arterial. Location: 36th Street - Arizona Avenue to 4th Avenue Related Projects: Justification: A East/West midsection industrial arterial is needed in this area. Planning Context: Airport Master Plan Cargo Access - not adopted by Council. Major Roadways Plan - 2005. Collector Street. Project Schedule Fund 2011-2012 2012-2013 2013-2014 2014-2015 2015-2016 2016-2021 Total BOND $0 $ 750,000 $ 1,080,000 $0 $0 $0 $ 1,830,000 ROAD $ 210,000 $ 450,000 $0 $0 $0 $0 $ 660,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 210,000 $ 1,200,000 $ 1,080,000 $0 $0 $0 $ 2,490,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-24 $ 210,000 $ 450,000 $ 1,700,000 $ 130,000 $0 $ 2,490,000 Elks Lane - 24th Street to N. of Camino Real Status: 06 5.9506 Department: PW Target Year: 09-10 Description: Reconstruct Elks Lane from 24th Street to 970' N. of Camino Real, residential collector. Location: Elks Lane - 24th Street to 970' North of Camino Real Related Projects: Justification: Planning Context: Bicycle Element - Phase 1 identified bike route Elks Lane - 14th Avenue to 24th Street Project Schedule Fund HURF Total 2009-2010 2010-2011 2011-2012 2012-2013 2013-2014 2014-2019 Total $ 45,000 $ 390,000 $0 $0 $0 $0 $ 435,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 45,000 $ 390,000 $0 $0 $0 $0 $ 435,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-25 $ 45,000 $0 $ 360,000 $ 30,000 $0 $ 435,000 20th Street - Avenue B to Avenue C Status: 06 5.9507 Department: PW Target Year: 06-07 Description: Reconstruct, upgrade and construct 20th Street to three-lane collector standards between Avenue B and Avenue C. Project should include necessary signalization and stormwater facilities. The right-of-way target is 98 feet. Project design will include the review of possible design options, such as right turn lanes, landscaped medians and landscaped setbacks. This street will contain a bike path as noted in the Bicycle Element. The 20th Street Bike Path is a separate CIP. This project is to be coordinated with development plans for water and sewer projects. Location: 20th Street - Avenue B to Avenue C Related Projects: 5.9401 Justification: Portions of the street have been built over the years. With the new residential development west of Ave. C as well as Cibola High School and the elementary schools, an upgraded East-West access between Avenue B and Avenue C is needed. Planning Context: Major Roadways Plan - 2005 Project Schedule Fund BOND Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 1,300,000 $0 $0 $0 $0 $0 $ 1,300,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 1,300,000 $0 $0 $0 $0 $0 $ 1,300,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-26 $0 $0 $ 1,200,000 $ 100,000 $0 $ 1,300,000 8th Avenue - 24th Street to 32nd Street Status: 06 5.9508 Department: PW Target Year: 08-09 Description: Reconstruction of 8th Avenue between 24th Street and 32nd Street with drainage. Includes improvements to geometry at Catalina Drive, signalization of Catalina Drive and signal system interconnect of all signals. Phase I: 8th Avenue, Palmcroft Drive to South of 32nd Street, widening and signalization. Phase II: Remainder of project. Location: 8th Avenue - 24th Street to 32nd Street Related Projects: 7.9503, 9.9301 Justification: Slurry sealed in 2003. Planning Context: Bicycle Element - Phase 1 identified bike routes. Project Schedule Fund ROAD Total 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013 2013-2018 Total $ 135,000 $0 $0 $0 $0 $0 $ 135,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 135,000 $0 $0 $0 $0 $0 $ 135,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-27 $ 135,000 $0 $0 $0 $0 $ 135,000 Driveway Replacements Status: 05 5.9510 Department: PW Target Year: 06-07 Description: Reconstruct roll curbs at driveway locations where overlays have caused problems citywide. Each street project shall address driveway replacement if existing roll curb is causing customer complains. Replace driveways: 1. Avenue A to 13th Avenue & 16th Street to 19th Street. 2. Area bounded by 3rd Street to 8th Street and Magnolia to Avenue B. 3. Area bounded by 24th Street to Palo Verde and Arizona Avenue to Mary Avenue. 4. 8th Avenue to Avenue A & 28th Street to 32nd Street. 5. Subdivision - Mountain View, San Carlos, ATMAR, Thomas White, La Verne Terrace, and Clarence Trigg. Location: Various locations Related Projects: Justification: City overlays have increased depression of roll curb and gutters causing vehicle damage. City residents have filled in roll curb, causing standing water damage to adjacent pavement. Planning Context: Cascade Project Project Schedule Fund HURF Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 40,000 $ 40,000 $ 40,000 $ 40,000 $ 40,000 $0 $ 200,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 40,000 $ 40,000 $ 40,000 $ 40,000 $ 40,000 $0 $ 200,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-28 $0 $0 $ 200,000 $0 $0 $ 200,000 Sidewalk Handicap Ramps Status: 06 5.9511 Department: PW Target Year: 06-07 Description: Installation of handicap ramps at intersections Location: As selected Related Projects: Justification: Federal regulation required compliance with the Americans with Disabilities Act. Planning Context: Cascade Project Project Schedule Fund HURF Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000 $0 $ 50,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000 $0 $ 50,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-29 $0 $0 $ 50,000 $0 $0 $ 50,000 Right-of-Way Acquisition Status: 06 5.9512 Department: PW Target Year: 06-07 Description: Conversion of existing easements for streets to City-owned right-of-way. Purchase of additional right-of-way at intersections. Environmental assessments for right-of-way acquisition and right-of-way for planned bike facilities. Location: Various sites Related Projects: Justification: Obtain full City control and ownership of rights-of-way transferred to the City by the State or Yuma County as easements. Obtain additional right-of-way as required for sidewalks and at intersections having insufficient right-of-way for areas that are not related to a CIP Project. Planning Context: Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total BOND $ 14,300,000 $0 $0 $0 $0 $0 $ 14,300,000 ROAD $ 125,000 $ 250,000 $ 250,000 $ 250,000 $ 250,000 $0 $ 1,125,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 14,425,000 $ 250,000 $ 250,000 $ 250,000 $ 250,000 $0 $ 15,425,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-30 $0 $ 15,425,000 $0 $0 $0 $ 15,425,000 1st Avenue - 16th Street to 12th Street Status: 06 5.9602 Department: PW Target Year: 06-07 Description: Reconstruct 1st Avenue - 12th Street to 16th Street. Design should evaluate reconfiguration for northbound left turns/median to Police Municipal Court facilities. Project to include bike route signs. Location: 1st Avenue - 16th Street to 12th Street Related Projects: 4.0400, 7.0103, 7.0300, 7.8225, 8.0005 Justification: Portions of the street have failed and need to be reconstructed. Construction traffic during Police Department construction has accelerated the streets rate of failure. Based on the Traffic Impact Analysis for Interstate 8, Giss Parkway and Redondo Drive, the 16th Street intersection was identified as dropping below acceptable standards due to the additional traffic being generated by the Redondo Center. As a result, it is the City's responsibility to bring the intersection back to an acceptable level of service. The Arizona Department of Transportation (A.D.O.T.) does not intend to participate in this project. Planning Context: Bicycle Element - Bike Route. Project Schedule Fund HURF Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 100,000 $ 400,000 $0 $0 $0 $0 $ 500,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 100,000 $ 400,000 $0 $0 $0 $0 $ 500,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-31 $0 $ 100,000 $ 350,000 $ 50,000 $0 $ 500,000 Thacker Lateral Multi-Use Path (North) Status: 06 5.9609 Department: PW Target Year: 12-13 Description: This pathway will run along the Thacker Lateral and serve bicycling traffic heading north/south between Avenues B and C. The path should be at least 10 feet wide. If the City receives Grant funding for this project it could move forward in the CIP budget. Location: Thacker Lateral - Colorado River Levee at Joe Henry Park to 16th Street Related Projects: Justification: This corridor is identified as a pathway area in the approved City Bicycle Element and as a linear park in the City Parks and Recreation Element. There is a growing need to provide bikeway facilities in this area. Planning Context: Bicycle Element Phase 1 Project Schedule Fund 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2022 Total BOND $0 $ 3,050,000 $0 $0 $0 $0 $ 3,050,000 HURF $ 285,000 $0 $0 $0 $0 $0 $ 285,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 285,000 $ 3,050,000 $0 $0 $0 $0 $ 3,335,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-32 $ 285,000 $0 $ 2,850,000 $ 200,000 $0 $ 3,335,000 Thacker Lateral Multi-Use Path (South) Status: 06 5.9610 Department: PW Target Year: 08-09 Description: This pathway will run along the Thacker Lateral and serve bicycle traffic between Avenues B and C. The path should be at least 20 feet wide. Construction: $530,000 and inspection: $10,000. Location: Thacker Lateral - 16th Street to 24th Street Related Projects: Justification: This corridor is identified as a pathway location in the approved Bicycle Element and a linear park corridor in the City Parks & Recreation Element. There is a growing need to provide a bikeway facility in this area. Planning Context: City of Yuma General Plan Parks Element and Bicycle Element. Project Schedule Fund HURF Total 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013 2013-2018 Total $ 580,000 $0 $0 $0 $0 $0 $ 580,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 580,000 $0 $0 $0 $0 $0 $ 580,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-33 $ 55,000 $0 $ 475,000 $ 50,000 $0 $ 580,000 16th Street - 45th Ave to Ave D Status: 06 5.9618 Department: PW Target Year: 08-09 Description: Reconstruct to arterial standard with curb and gutter, sidewalk and storm drainage facilities. A drain crossing for Central Stub No. 2 will be required. The estimated cost for the drain crossing is $80,000. The right-of-way target is a 100-foot width. A 10 foot right turn lane flair at Avenue D is desirable 100 feet back from the intersection. The specific layout of this street is still undetermined pending a design study and a study of the effects on the adjoining streets. It is recommended that the street contain landscaped medians, setbacks and parkways. Additionally, this street has been identified as a bike route, in the Bicycle Element. Location: 16th Street - 45th Avenue to Avenue D Related Projects: Justification: To meet the needs of the community by improving the traffic network. Planning Context: Bicycle Element Project Schedule Fund ROAD Total 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013 2013-2018 Total $ 2,900,000 $0 $0 $0 $0 $0 $ 2,900,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 2,900,000 $0 $0 $0 $0 $0 $ 2,900,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-34 $ 280,000 $ 400,000 $ 2,100,000 $ 120,000 $0 $ 2,900,000 24th Street - Avenue C to Avenue D Status: 06 5.9619 Department: PW Target Year: 08-09 Description: Reconstruct to arterial standard including curb and gutter, sidewalk and storm drain facilities. This would also involve a landscaped median with turn lanes at appropriate collector street locations. Collector streets should be kept to a minimum number (e.g. 3 in number) and limited driveway encroachments are recommended. Right-of-way target is a 100 foot width with right-turn lane flairs at intersections with other arterials (i.e. Avenue D, Avenue C) for 100 feet from each intersection. Location: 24th Street - Avenue C to Avenue D Related Projects: Justification: To meet the needs of the community by improving the traffic network. Planning Context: Project Schedule Fund ROAD Total 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013 2013-2018 Total $ 200,000 $0 $0 $0 $0 $0 $ 200,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 200,000 $0 $0 $0 $0 $0 $ 200,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-35 $ 200,000 $0 $0 $0 $0 $ 200,000 West Main Canal Multi-use Path Status: 05 5.9622 Department: PW Target Year: 08-09 Description: This project will design and construct a pathway along the West Main Canal to include security lights. The path will be at least 10 feet wide. Grant funding will be sought for this project. Location: West Main Canal between Main Canal (Avenue A) and Thacker Canal (Avenue B). Related Projects: Justification: This portion of the West Main Canal is shown as being improved with a path in the approved City Bicycle Element, and as a linear park in the City Parks & Recreation Element. There is a growing need to provide bikeway facilities in this area. Planning Context: Bicycle Element. Parks Element. Project Schedule Fund 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013 2013-2018 Total GRNT $0 $ 500,000 $0 $0 $0 $0 $ 500,000 ROAD $ 80,000 $ 100,000 $0 $0 $0 $0 $ 180,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 80,000 $ 600,000 $0 $0 $0 $0 $ 680,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-36 $ 80,000 $0 $ 510,000 $ 90,000 $0 $ 680,000 Intersection Sight Distance Status: 05 5.9628 Department: PW Target Year: 06-07 Description: Improve sight distance at problem intersections throughout the city. Purchase ROW and reconstruct fences at selected locations. Locations currently awaiting improvements: 8th St. and 7th Ave., 3rd St. and Magnolia Ave., 3rd St. and 13th Ave., 8th Ave. and 25th St., and 8th St. and 8th Ave. Location: City wide Related Projects: Justification: Improve safety at intersections by eliminating encroachments within the sight visibility triangles. Planning Context: Project Schedule Fund ROAD Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 200,000 $ 200,000 $ 100,000 $ 100,000 $ 100,000 $0 $ 700,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 200,000 $ 200,000 $ 100,000 $ 100,000 $ 100,000 $0 $ 700,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-37 $ 50,000 $ 250,000 $ 375,000 $ 25,000 $0 $ 700,000 Pacific Avenue Sidewalks Status: 06 5.9700 Department: PW Target Year: 06-07 Description: Construct sidewalk infill and/or multi-use paths along Pacific Avenue. Location: Pacific Avenue - 24th to 32nd Street Related Projects: Justification: In most cases, sidewalk construction was not required as a part of subdivision or commercial development. A multi-use path could be integrated into the eastern sidewalk, in lieu of putting bicyclists on Pacific Avenue. Planning Context: Bicycle Element - Pathway Project Schedule Fund ROAD Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 360,000 $0 $0 $0 $0 $0 $ 360,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 360,000 $0 $0 $0 $0 $0 $ 360,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-38 $ 35,000 $0 $ 300,000 $ 25,000 $0 $ 360,000 Avenue A - 16th St. to 24th St. Status: 06 5.9701 Department: PW Target Year: 06-07 Description: Widen and reconstruct Avenue A to accommodate two lanes of traffic in each direction. Facilities will include drainage. Because of severe right-of-way constraints, the planned bike lanes for this segment of Avenue A may not be included in the design of this project. ADOT will be contributing for 16th Street intersection. Location: Avenue A - 16th St. to 24th St. Related Projects: 7.9707 Justification: This segment of arterial roadway is in need of expansion. Traffic counts = 16,360 Average ADT (1994). Planning Context: Bicycle Element - bike lanes Major Roadways Plan - 2005 Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total BOND $ 3,355,000 $ 125,000 $0 $0 $0 $0 $ 3,480,000 OTHR $ 699,000 $0 $0 $0 $0 $0 $ 699,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 4,054,000 $ 125,000 $0 $0 $0 $0 $ 4,179,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-39 $ 30,000 $0 $ 4,024,000 $ 125,000 $0 $ 4,179,000 Avenue A - 8th Street to 16th Street Status: 05 5.9702 Department: PW Target Year: 06-07 Description: Widen and reconstruct Avenue A; facilities will include drainage and two lanes of traffic in each direction are anticipated. Location: Avenue A - 8th Street to 16th Street Related Projects: Justification: This arterial roadway is in need of reconstruction/replacement. Traffic counts= 11,530 Average ADT (1994). Planning Context: Bicycle Element - bike lanes Major Roadways Plan - 2005 Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total BOND $ 200,000 $ 4,100,000 $ 4,500,000 $ 1,520,000 $0 $0 $ 10,320,000 ROAD $ 650,000 $0 $0 $0 $0 $0 $ 650,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 850,000 $ 4,100,000 $ 4,500,000 $ 1,520,000 $0 $0 $ 10,970,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-40 $ 850,000 $ 4,100,000 $ 5,650,000 $ 370,000 $0 $ 10,970,000 Avenue A - 32nd St. to 36th St. Status: 05 5.9705 Department: PW Target Year: 06-07 Description: Expansion of Avenue A to a five-lane configuration, to match the cross-section constructed south of 36th Street, through CIP No. 5.8213. Location: Avenue A - 32nd St. to 36th St. Related Projects: Justification: Coordination of this segment of Avenue A to match the adjacent reconstruction to the North and South. Traffic counts = 6,140 Average ADT (1994). Planning Context: Bicycle Element - pathway. Major Roadways Plan - 2005. Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total BOND $0 $ 2,250,000 $0 $0 $0 $0 $ 2,250,000 ROAD $ 75,000 $0 $0 $0 $0 $0 $ 75,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 75,000 $ 2,250,000 $0 $0 $0 $0 $ 2,325,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-41 $ 75,000 $0 $ 2,100,000 $ 150,000 $0 $ 2,325,000 Giss Parkway Extension Status: 05 5.9707 Department: PW Target Year: 08-09 Description: Extend the full construction of Giss Parkway from the I-8 off ramp to Avenue 2E and south to 16th Street. Construct four lanes, bike lanes, curb, gutter, and landscaped median. Shoulders for agricultural traffic should be considered. (12th Street to 16th Street completed in FY '04-'05) Location: Giss Parkway - I-8 to Pacific Avenue to 16th Street Related Projects: Justification: The County has completed the expansion of Pacific Avenue to four lanes south of 16th Street. With growth and annexation to the east, this will provide another high quality facility to move traffic. Planning Context: Bicycle Element - bike lanes. Major Roadways Plan - 2005. Principal Arterial. Project Schedule Fund 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013 2013-2018 Total BOND $0 $0 $ 11,450,000 $0 $0 $0 $ 11,450,000 ROAD $ 800,000 $ 1,200,000 $0 $0 $0 $0 $ 2,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 800,000 $ 1,200,000 $ 11,450,000 $0 $0 $0 $ 13,450,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-42 $ 1,200,000 $ 800,000 $ 10,600,000 $ 850,000 $0 $ 13,450,000 3rd Street - Magnolia Ave to Ave B Status: 06 5.9710 Department: PW Target Year: 07-08 Description: The replacement of the 3rd Street waterline will result in approximately 22 transverse pavement cuts over a distance of 2,100 feet, plus a 2,200 foot long longitudinal pavement cut. Following such disruption, pavement replacement will be necessary. Location: 3rd Street - Magnolia Avenue to Avenue B Related Projects: 7.9210 Justification: The combining of this project with 7.9210 will result in a significant economic savings to the City, when compared to constructing the projects individually. The street surface is 20-30 years old and begining to show evidence of stress, which will be accelerated and exacerbated by the waterline construction. Planning Context: Bicycle Element - bike route. Project Schedule Fund HURF Total 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2017 Total $ 40,000 $ 380,000 $0 $0 $0 $0 $ 420,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 40,000 $ 380,000 $0 $0 $0 $0 $ 420,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-43 $ 40,000 $0 $ 345,000 $ 35,000 $0 $ 420,000 Sahuaro Estates Reconstruction Status: 06 5.9711 Department: PW Target Year: 06-07 Description: Reconstruct the residential streets in Sahuaro Estates. Upgrade Water and sewer services if necessary. Location: Residential streets in Sahuaro Estates Related Projects: Justification: Maintenance of these streets is no longer cost effective and the streets should be reconstructed. Planning Context: Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total BOND $ 910,000 $0 $0 $0 $0 $0 $ 910,000 HURF $ 10,000 $0 $0 $0 $0 $0 $ 10,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 920,000 $0 $0 $0 $0 $0 $ 920,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-44 $ 10,000 $0 $ 890,000 $ 20,000 $0 $ 920,000 East Palo Verde St. - Pacific Ave to Ave 2½E Status: 06 5.9713 Department: PW Target Year: 08-09 Description: Construct East Palo Verde Street, between Pacific Avenue and Avenue 2½E to Collector Standard. Location: East Palo Verde Street - Pacific Avenue to Avenue 2½E Related Projects: Justification: Street was annexed in 1995, and has no curb, gutter or sidewalk on the south side of the street. There is a stretch on the north side of the street adjacent to Rolle School which has no curb lane, gutter or sidewalk. Planning Context: Bicycle Element - Bike Route. Project Schedule Fund ROAD Total 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013 2013-2018 Total $ 495,000 $ 1,575,000 $0 $0 $0 $0 $ 2,070,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 495,000 $ 1,575,000 $0 $0 $0 $0 $ 2,070,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-45 $ 200,000 $ 150,000 $ 1,575,000 $ 145,000 $0 $ 2,070,000 Engler Avenue - 24th St. & E. Palo Verde St. Status: 06 5.9714 Department: PW Target Year: 06-07 Description: Construct Engler Avenue to residential collector street standard between 24th Street and East Palo Verde Street. Phase I: Drainage analysis of entire area and final design for 24th Street to San Marcos Drive. Phase II: Construct drainage and complete street. Phase III: San Marcos Drive to Palo Verde Street - Design and construction in out-year. Location: Engler Avenue - 24th Street to East Palo Verde Street Related Projects: Justification: Engler Avenue which was annexed to the City in September 1995, was not built to City standards. Need curb, gutter and sidewalk to the east side and sufficient width to move residential traffic and school traffic. Stormwater disposal facilities are also necessary. Planning Context: Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total BOND $0 $0 $ 1,800,000 $0 $0 $0 $ 1,800,000 HURF $ 50,000 $ 100,000 $0 $0 $0 $0 $ 150,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 50,000 $ 100,000 $ 1,800,000 $0 $0 $0 $ 1,950,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-46 $ 50,000 $ 100,000 $ 1,600,000 $ 200,000 $0 $ 1,950,000 29th Street between 4th Ave. & 8th Ave. Status: 06 5.9715 Department: PW Target Year: 06-07 Description: Reconstruct 29th Street between 4th Avenue and 8th Avenue using a commercial or industrial structural section. Location: 29th Street, 4th Avenue to 8th Avenue. Related Projects: Justification: The street has severe localized deterioration and will not be maintainable through conventional methods by FY 1999-2000. Planning Context: Project Schedule Fund HURF Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 140,000 $0 $0 $0 $0 $0 $ 140,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 140,000 $0 $0 $0 $0 $0 $ 140,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-47 $0 $0 $ 130,000 $ 10,000 $0 $ 140,000 8th Street and Main Street Paving Status: 06 5.9716 Department: PW Target Year: 14-15 Description: Construction of the extension of 8th Street and Main Street. Construction will include grading, base, pavement, vertical curb and Gutter, and sidewalks. The project will also include landscaping within the 10' setback of the Parks Maintenance Facility property including the parkway. Location: 8th Street - Arizona Avenue Alignment to Cemetery Avenue Alignment and Main Street - 7th Street to 8th Street Related Projects: Justification: The City constructed the Parks Maintenance Facility and needs access from the proposed Arizona Avenue alignment. Planning Context: Annexation of South half of 8th Street necessary. Project Schedule Fund 2014-2015 2015-2016 2016-2017 2017-2018 2018-2019 2019-2024 Total UNF $ 330,000 $0 $0 $0 $0 $0 $ 330,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 330,000 $0 $0 $0 $0 $0 $ 330,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-48 $ 20,000 $0 $ 290,000 $ 20,000 $0 $ 330,000 32nd Street Reconstruct. - Ave. B to Ave. C Status: 06 5.9718 Department: PW Target Year: 06-07 Description: This project involves the widening and reconstruction of 32nd Street from Avenue B to Avenue C to a Principal Arterial Street Standard. The ultimate right-of-way for this facility should be 124 feet to accommodate six (6) lanes of travel should they be needed in the future. Location: 32nd Street - Avenue B to Avenue C Related Projects: Justification: This major arterial, per the YMPO 1995-2015 Countywide Transportation Plan, will carry cross town and locally generated traffic. The YMPO projected 2015 average daily traffic count on this roadway is 9,000 vehicles a day. Planning Context: Major Roadways Plan - 2005 Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total BOND $0 $0 $0 $ 6,000,000 $0 $0 $ 6,000,000 IMPCT $ 300,000 $ 600,000 $0 $0 $0 $0 $ 900,000 ROAD $ 300,000 $ 600,000 $0 $0 $0 $0 $ 900,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 600,000 $ 1,200,000 $0 $ 6,000,000 $0 $0 $ 7,800,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-49 $ 600,000 $ 1,200,000 $ 5,600,000 $ 400,000 $0 $ 7,800,000 40th Street Reconst. - Ave. A to Ave. B Status: 05 5.9719 Department: PW Target Year: 09-10 Description: This project involves the reconstruction of 40th Street to an Minor Arterial Standard. This street will require a canal crossing at the East Main Canal. Location: 40th Street - Avenue A to Avenue B Related Projects: Justification: This street will serve locally generated traffic and the growing industrial traffic generated by facilities at the Yuma International Airport when the East Main Canal Crossing is constructed. The YMPO projected 2015 average daily traffic count on this roadway is 9,000 vehicles a day. Planning Context: Major Roadways Plan - 2005 Project Schedule Fund 2009-2010 2010-2011 2011-2012 2012-2013 2013-2014 2014-2019 Total BOND $0 $0 $ 4,850,000 $0 $0 $0 $ 4,850,000 ROAD $ 650,000 $ 800,000 $0 $0 $0 $0 $ 1,450,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 650,000 $ 800,000 $ 4,850,000 $0 $0 $0 $ 6,300,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-50 $ 650,000 $ 800,000 $ 4,500,000 $ 350,000 $0 $ 6,300,000 32nd Street Reconstruct. - Ave. C to Ave. D Status: 05 5.9720 Department: PW Target Year: 07-08 Description: This project involves the widening and/or reconstruction of 32nd Street from Avenue C to Avenue D to a Principal Arterial Street Standard. The north half of 32nd Street, Avenue C½ to Avenue C¾, was constructed as part of the Barkley Ranch Subdivisions and is not included in the cost estimate. The ultimate right-of-way for this facility should be 124 feet to accommodate six (6) lanes of travel should they be needed in the future. Location: 32nd Street - Avenue C to Avenue D Related Projects: Justification: Principal Arterial Street per Major Roadways Plan - 2005 Planning Context: Project Schedule Fund 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2017 Total BOND $0 $0 $0 $0 $ 5,500,000 $0 $ 5,500,000 IMPCT $ 400,000 $0 $0 $0 $0 $0 $ 400,000 ROAD $ 250,000 $ 200,000 $0 $0 $0 $0 $ 450,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 650,000 $ 200,000 $0 $0 $ 5,500,000 $0 $ 6,350,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-51 $ 650,000 $ 200,000 $ 5,100,000 $ 400,000 $0 $ 6,350,000 Avenue B½ Construction - 28th St. to 32nd St. Status: 06 5.9722 Department: PW Target Year: 10-11 Description: The project involves the construction of Avenue B½ from 28th Street to 32nd Street to a minor arterial standard. This facility will be located on the west side of the Thacker Canal. Location: Avenue B½ - 28th Street to 32nd Street Related Projects: Justification: This section of Avenue B½ will carry locally generated traffic. Planning Context: Major Roadways Plan - 2005 Project Schedule Fund 2010-2011 2011-2012 2012-2013 2013-2014 2014-2015 2015-2020 Total IMPCT $0 $ 300,000 $ 1,000,000 $0 $0 $0 $ 1,300,000 ROAD $ 460,000 $ 300,000 $ 1,000,000 $0 $0 $0 $ 1,760,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 460,000 $ 600,000 $ 2,000,000 $0 $0 $0 $ 3,060,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-52 $ 300,000 $ 450,000 $ 2,100,000 $ 210,000 $0 $ 3,060,000 36th Street Construction - Ave. C to Ave. D Status: 06 5.9723 Department: PW Target Year: 11-12 Description: The project involves the constuction of this portion of 36th Street to a Collector Standard. Local traffic on this street, being on the edge of the urban area, will reduce as it approaches Avenue D. In order to maintain an urban boundary at Avenue D, traffic from this collector will be restricted and a linear part put in its place. However, the City will reserve right-of-way should the connection be needed in the future. A linear park is also to be constructed adjacent to the Central Drain, but that is a separate project. The exact alignment of this faciity will be determined as this area develops. Location: 36th Street - Avenue C to Avenue D Related Projects: Justification: This collector road will carry locally generated traffic. Planning Context: Project Schedule Fund 2011-2012 2012-2013 2013-2014 2014-2015 2015-2016 2016-2021 Total UNF $ 2,190,000 $0 $0 $0 $0 $0 $ 2,190,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 2,190,000 $0 $0 $0 $0 $0 $ 2,190,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-53 $ 200,000 $ 200,000 $ 1,650,000 $ 140,000 $0 $ 2,190,000 36th Street Construction - Ave. B to Ave. C Status: 06 5.9724 Department: PW Target Year: 09-10 Description: The project involves the construction of 36th Street from Avenue B to Avenue C to a Collector Standard along south side of Central Canal. A linear park is also to be constructed adjacent to the Central Drain, through a separate project. Location: 36th Street - Avenue B to Avenue C Related Projects: Justification: This collector road will carry locally generated traffic. Planning Context: Major Roadways Plan - 2005 Project Schedule Fund 2009-2010 2010-2011 2011-2012 2012-2013 2013-2014 2014-2019 Total BOND $0 $ 2,700,000 $ 1,600,000 $0 $0 $0 $ 4,300,000 ROAD $ 285,000 $ 400,000 $0 $0 $0 $0 $ 685,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 285,000 $ 3,100,000 $ 1,600,000 $0 $0 $0 $ 4,985,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-54 $ 420,000 $ 865,000 $ 3,365,000 $ 335,000 $0 $ 4,985,000 28th Street Construction - Ave. C to Ave. D Status: 06 5.9725 Department: PW Target Year: 11-12 Description: This project involves the constuction of 28th Street to minor arterial street standard. A portion of 28th Street, Avenue C½ to Avenue D, will be constructed as part of the Barkley Subdivision and is not included in the cost estimate. Local traffic on this street being on the edge of the urban area, will reduce as it approaches Avenue D. Location: 28th Street - Avenue C to Avenue D Related Projects: Justification: This minor arterial road will carry locally generated traffic. Planning Context: Major Roadways Plan - 2005 Project Schedule Fund 2011-2012 2012-2013 2013-2014 2014-2015 2015-2016 2016-2021 Total BOND $0 $0 $ 2,250,000 $0 $0 $0 $ 2,250,000 ROAD $ 500,000 $ 300,000 $0 $0 $0 $0 $ 800,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 500,000 $ 300,000 $ 2,250,000 $0 $0 $0 $ 3,050,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-55 $ 300,000 $ 500,000 $ 2,100,000 $ 150,000 $0 $ 3,050,000 28th Street Constr. - Ave. B to Ave. C Status: 05 5.9726 Department: PW Target Year: 07-08 Description: This project involves the construction of 28th Street from Avenue B to Avenue C to a Minor Arterial Standard. This project will also include a crossing at Thacker Lateral. Eastern three-quarters of street was constructed by developer and City of Yuma in FY '05-'06. Location: 28th Street - Avenue B to Avenue C Related Projects: Justification: This minor arterial road will carry traffic between Avenue B and Avenue C as an alternate route to 32nd Street. Planning Context: Major Roadways Plan - 2005 Project Schedule Fund 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2017 Total IMPCT $0 $ 300,000 $0 $0 $0 $0 $ 300,000 ROAD $ 380,000 $ 900,000 $0 $0 $0 $0 $ 1,280,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 380,000 $ 1,200,000 $0 $0 $0 $0 $ 1,580,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-56 $ 80,000 $ 300,000 $ 1,100,000 $ 100,000 $0 $ 1,580,000 Avenue C Reconstruction - 32nd to 40th Street Status: 06 5.9728 Department: PW Target Year: 06-07 Description: The project involves the reconstruction of Avenue C from 32nd Street to 40th Street to a standard. Four lanes of travel from 32nd Street to 36th Street and two lanes of travel from 36th Street to 40th Street. The ultimate right-of-way for this facility should be 124 feet to accommodate six (6) lanes of travel should it be needed in the future. Funding sources are impact fees and half Cent Road Tax. Location: Avenue C - 32nd Street to 40th Street Related Projects: Justification: This facility will function as an arterial road, per YMPO 1995-2015 Countywide Transportation Plan, carrying local and cross town traffic. The YMPO projected 2015 average daily traffic count on this roadway is 5,000 vehicles a day. Planning Context: Major Roadways Plan - 2005 Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total BOND $ 900,000 $0 $0 $0 $ 5,550,000 $0 $ 6,450,000 IMPCT $ 300,000 $0 $0 $0 $0 $0 $ 300,000 ROAD $ 300,000 $0 $0 $0 $0 $0 $ 300,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 1,500,000 $0 $0 $0 $ 5,550,000 $0 $ 7,050,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-57 $ 600,000 $ 900,000 $ 5,100,000 $ 450,000 $0 $ 7,050,000 Avenue C Reconst. - 24th St. to 32nd St. Status: 06 5.9729 Department: PW Target Year: 09-10 Description: This project involves the reconstruction of Avenue C from 24th Street to 32nd Street to a Principal Arterial Standard. The ultimate right-of-way for this facility should be 124 feet to accommodate six (6) lanes of travel should it be needed in the future. Location: Avenue C - 24th Street to 32nd Street Related Projects: Justification: This street will function as an aterial road, per YMPO 1995-2015 Countywide Transportation Plan, for cross town traffic and carry local traffic. The YMPO projected 2015 average daily traffic count on this roadway is 8,000 vehicles a day. Planning Context: Major Roadways Plan - 2005 Project Schedule Fund 2009-2010 2010-2011 2011-2012 2012-2013 2013-2014 2014-2019 Total BOND $ 5,585,000 $ 300,000 $0 $0 $0 $0 $ 5,885,000 ROAD $ 300,000 $ 700,000 $ 800,000 $0 $0 $0 $ 1,800,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 5,885,000 $ 1,000,000 $ 800,000 $0 $0 $0 $ 7,685,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-58 $ 700,000 $ 1,400,000 $ 5,077,000 $ 508,000 $0 $ 7,685,000 Avenue B Reconst. - 24th to 32nd Street Status: 06 5.9731 Department: PW Target Year: 12-13 Description: This project involves the acquisition of right-of-way and the addition of two (2) lanes of travel to make Avenue B from 24th Street to 32nd Street a Principal Arterial as identified in the Major Roadways Plan - 2005. Location: Avenue B - 24th Street to 32nd Street Related Projects: Justification: The existing four (4) lanes of travel will serve the regional traffic needs and the two new lanes will meet the needs of local traffic. The YMPO projected 2015 average daily traffic count on this roadway is 35,000 vehicles a day. Planning Context: Bicycle Element - Bike Lanes Project Schedule Fund 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2022 Total IMPCT $0 $0 $ 1,300,000 $ 830,000 $0 $0 $ 2,130,000 ROAD $ 800,000 $ 2,100,000 $ 3,500,000 $ 1,470,000 $0 $0 $ 7,870,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 800,000 $ 2,100,000 $ 4,800,000 $ 2,300,000 $0 $0 $ 10,000,000 Total Project Budget Location Map Design Right-of-way $ 1,100,000 Construction Inspection Other (i.e. Materials) $ 6,500,000 Total 5-59 $ 1,800,000 $ 600,000 $0 $ 10,000,000 40th St. ROW Acquisition - Ave. C to Ave. D Status: 06 5.9732 Department: PW Target Year: 11-12 Description: This project is to pursue right-of-way only to obtain a half width of 50 feet on 40th Street. This project does not involve any reconstruction of 40th Street. Location: 40th Street - Avenue C to Avenue D Related Projects: Justification: In the future this facility may serve as a regional transportation corridor. Planning Context: Major Roadways Plan - 2005 Project Schedule Fund ROAD Total 2011-2012 2012-2013 2013-2014 2014-2015 2015-2016 2016-2021 Total $ 600,000 $0 $0 $0 $0 $0 $ 600,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 600,000 $0 $0 $0 $0 $0 $ 600,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-60 $0 $ 600,000 $0 $0 $0 $ 600,000 40th St. ROW Acquisition - Ave. B to Ave. C Status: 06 5.9733 Department: PW Target Year: 10-11 Description: This project is to pursue right-of-way only to obtain a half width of 50 feet on 40th Street. This project does not involve any reconstruction of 40th Street. Location: 40th Street - Avenue B to Avenue C Related Projects: Justification: In the future this facility may serve as a regional transportation corridor. Planning Context: Major Roadways Plan - 2005 Project Schedule Fund ROAD Total 2010-2011 2011-2012 2012-2013 2013-2014 2014-2015 2015-2020 Total $ 600,000 $0 $0 $0 $0 $0 $ 600,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 600,000 $0 $0 $0 $0 $0 $ 600,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-61 $0 $ 600,000 $0 $0 $0 $ 600,000 Avenue D Bike Path Status: 06 5.9734 Department: PW Target Year: 13-14 Description: This project involves the construction of a half-mile bike path facility, which will connect the 28th Street linear park to the Avenue D bike path north of 24th Street. Location: Avenue D - 24th Street to 28th Street Related Projects: Justification: The facility will serve local recreation/transportation use. Planning Context: Bicycle Element Project Schedule Fund 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018 2018-2023 Total UNF $ 83,000 $0 $0 $0 $0 $0 $ 83,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 83,000 $0 $0 $0 $0 $0 $ 83,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-62 $ 5,000 $0 $ 75,000 $ 3,000 $0 $ 83,000 Avenue B½ Construction - 32nd St. to 40th St. Status: 06 5.9736 Department: PW Target Year: 11-12 Description: This project involves the construction of Avenue B½ to a minor arterial street standard. Location: Avenue B½ - 32nd Street to 40th Street Related Projects: Justification: Half-mile Street Planning Context: Major Roadways Plan - 2005 Project Schedule Fund 2011-2012 2012-2013 2013-2014 2014-2015 2015-2016 2016-2021 Total BOND $0 $ 1,400,000 $ 3,150,000 $0 $0 $0 $ 4,550,000 ROAD $ 700,000 $ 780,000 $0 $0 $0 $0 $ 1,480,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 700,000 $ 2,180,000 $ 3,150,000 $0 $0 $0 $ 6,030,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-63 $ 500,000 $ 980,000 $ 4,140,000 $ 410,000 $0 $ 6,030,000 Avenue C½ Construction - 36th to 40th St. Status: 06 5.9737 Department: PW Target Year: 13-14 Description: This project involves the construction of Avenue C½ to a collector street standard between 36th Street and 40th Street. Local traffic on this street will reduce as it approaches 40th Street. Location: Avenue C½ - 36th Street to 40th Street Related Projects: Justification: This mid-section line collector will carry locally generated traffic. Planning Context: Project Schedule Fund 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018 2018-2023 Total BOND $0 $ 1,200,000 $ 650,000 $0 $0 $0 $ 1,850,000 ROAD $ 650,000 $ 360,000 $0 $0 $0 $0 $ 1,010,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 650,000 $ 1,560,000 $ 650,000 $0 $0 $0 $ 2,860,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-64 $ 210,000 $ 800,000 $ 1,690,000 $ 160,000 $0 $ 2,860,000 Traffic Signal Install - Avenue C & 28th Street Status: 06 5.9739 Department: PW Target Year: 10-11 Description: This project involves the installation of a traffic signal at the intersection of Avenue C and 28th Street. Location: Avenue C & 28th Street Related Projects: Justification: Full development of this area will warrant a signalized intersection. Planning Context: Project Schedule Fund ROAD Total 2010-2011 2011-2012 2012-2013 2013-2014 2014-2015 2015-2020 Total $ 250,000 $0 $0 $0 $0 $0 $ 250,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 250,000 $0 $0 $0 $0 $0 $ 250,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-65 $ 30,000 $ 40,000 $ 170,000 $ 10,000 $0 $ 250,000 Traffic Signal Install. - Ave. B½ & 24th St. Status: 06 5.9740 Department: PW Target Year: 08-09 Description: This project involves the installation of a traffic signal at the intersection of Avenue B½ and 24th Street. Location: Avenue B½ and 24th Street Intersection Related Projects: Justification: Full development of this area will warrant a signalized intersection. Planning Context: Project Schedule Fund BOND Total 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013 2013-2018 Total $ 220,000 $0 $0 $0 $0 $0 $ 220,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 220,000 $0 $0 $0 $0 $0 $ 220,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-66 $ 30,000 $0 $ 180,000 $ 10,000 $0 $ 220,000 Traffic Signal - Ave B½ & 32nd Street Status: 06 5.9741 Department: PW Target Year: 09-10 Description: This project involves the installation of a traffic signal at the intersection of Avenue B½ and 32nd Street. Location: Avenue B½ and 32nd Street Intersection Related Projects: Justification: Planning Context: Project Schedule Fund IMPCT Total 2009-2010 2010-2011 2011-2012 2012-2013 2013-2014 2014-2019 Total $ 240,000 $0 $0 $0 $0 $0 $ 240,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 240,000 $0 $0 $0 $0 $0 $ 240,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-67 $ 30,000 $0 $ 200,000 $ 10,000 $0 $ 240,000 Traffic Signal Install. - Ave. B & 36th St. Status: 06 5.9742 Department: PW Target Year: 11-12 Description: This project involves the installation of a traffic signal at the intersection of Avenue B and 36th Street. Location: Avenue B and 36th Street Intersection Related Projects: Justification: Full development of this area will warrant a signalized intersection. Planning Context: Project Schedule Fund IMPCT Total 2011-2012 2012-2013 2013-2014 2014-2015 2015-2016 2016-2021 Total $ 240,000 $0 $0 $0 $0 $0 $ 240,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 240,000 $0 $0 $0 $0 $0 $ 240,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-68 $ 30,000 $ 30,000 $ 170,000 $ 10,000 $0 $ 240,000 Avenue D ROW Acquisition - 32nd St. to 40th St. Status: 06 5.9744 Department: PW Target Year: 12-13 Description: This project does not involve any reconstruction of Avenue D. This is to pursue right-of-way only to obtain a half width of 65 feet. Location: Avenue D - 32nd Streeet to 40th Street Related Projects: Justification: The YMPO projected 2015 average daily traffic count on this roadway is 3,000 vehicles a day. The current facilities will serve this projected need. In the future this facility may serve as a regional transportation corridor. This project is on the edge of the urban area. The land to the west is planned to stay agricultural. Planning Context: Project Schedule Fund 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2022 Total UNF $ 800,000 $0 $0 $0 $0 $0 $ 800,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 800,000 $0 $0 $0 $0 $0 $ 800,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-69 $0 $ 800,000 $0 $0 $0 $ 800,000 Avenue C½ Bike Path Status: 06 5.9745 Department: PW Target Year: 10-11 Description: This project involves the construction of a 3/8 mile bike path facility, which will connect the linear park on Avenue C½ to the linear park in the Barkley Ranch Subdivision, which then connects to the school to the south. Location: Avenue C½ - 28th Street to 29th Lane Related Projects: Justification: The facility will serve a local recreation/transportation use. Planning Context: Bicycle Element Project Schedule Fund 2010-2011 2011-2012 2012-2013 2013-2014 2014-2015 2015-2020 Total UNF $ 85,000 $0 $0 $0 $0 $0 $ 85,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 85,000 $0 $0 $0 $0 $0 $ 85,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-70 $ 6,000 $0 $ 75,000 $ 4,000 $0 $ 85,000 New Fleet Services Maintenance Shop Status: 06 5.9753 Department: PW Target Year: 06-07 Description: Construction of a new complex for the relocation of the Maintenance and Operation facilities for the equipment maintenance shop with storage for streets, solid waste, fire, parks, police and utilities vehicles, equipment and materials. Design completed in 2003. Phase I: Underground existing powerline north of substation (FY '06-'07). Phase II: Update phases to current building code (FY '07-'08). Phase III: Facility construction. Location: NWC of 14th Street and 1st Avenue Related Projects: Justification: Existing 40-year maintenance facility is too small for operations equipment and does not have the adquate floor space to accommodate the number of vehicles requiring service. Planning Context: Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total BOND $0 $0 $ 9,000,000 $ 8,450,000 $0 $0 $ 17,450,000 HURF $ 100,000 $ 50,000 $0 $0 $0 $0 $ 150,000 SUF $ 100,000 $ 50,000 $0 $0 $0 $0 $ 150,000 WUF $ 100,000 $ 50,000 $0 $0 $0 $0 $ 150,000 $0 $0 $0 $0 $0 $0 $0 $ 300,000 $ 150,000 $ 9,000,000 $ 8,450,000 $0 $0 $ 17,900,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-71 $ 150,000 $0 $ 17,000,000 $ 750,000 $0 $ 17,900,000 El Paseo Real Construction Status: 06 5.9804 Department: PW Target Year: 10-11 Description: Reconstruct street to include a cul-de-sac at the its western terminus. Location: El Paseo Real - dead end north of 16th Street Related Projects: Justification: Construction work done previously by the Arizona Department of Transporation (A.D.O.T.) left this facility with a below standard configuration. Planning Context: Project Schedule Fund HURF Total 2010-2011 2011-2012 2012-2013 2013-2014 2014-2015 2015-2020 Total $ 202,000 $0 $0 $0 $0 $0 $ 202,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 202,000 $0 $0 $0 $0 $0 $ 202,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-72 $ 10,000 $ 100,000 $ 85,000 $ 7,000 $0 $ 202,000 Traffic Signal Interconnection Status: 05 5.9806 Department: PW Target Year: 06-07 Description: Develop and implement a plan to interconnect traffic signals on a city-wide basis. This will be a multi-year project and a joint project with ADOT and Yuma County. If additional funding sources can be established, this system could also be utilized to increase fiber optic count of cabling being installed for City dedicated fiber at current and future facilities. Location: City wide Related Projects: Justification: Interconnected signals will allow for safer and more efficient intersection traffic flow. The interconnection will allow for remote monitoring of signals to provide quicker and more efficient response to maintenance needs. Increasing fiber count will enable the City to have its own fiber backbone for voice and data without being dependent on other private companies to conduct routine daily business. Planning Context: Project Schedule Fund ROAD Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 315,000 $0 $0 $0 $0 $0 $ 315,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 315,000 $0 $0 $0 $0 $0 $ 315,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-73 $ 10,000 $0 $ 280,000 $ 25,000 $0 $ 315,000 11th Street - 3rd Avenue to 2nd Avenue Status: 05 5.9807 Department: PW Target Year: 06-07 Description: Construct curb, gutter, sidewalks, and handicap ramps on 11th Street. Location: 11th Street - 3rd Avenue to 2nd Avenue Related Projects: Justification: Requested by neighbors at neighborhood meetings. Neighborhood street requires pedestrian access. Project located within target area 1. Planning Context: Project Schedule Fund HURF Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 70,000 $0 $0 $0 $0 $0 $ 70,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 70,000 $0 $0 $0 $0 $0 $ 70,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-74 $ 5,000 $0 $ 60,000 $ 5,000 $0 $ 70,000 12th Street - Avenue A to Avenue B Status: 05 5.9811 Department: PW Target Year: 06-07 Description: New construction of a Minor Arterial Standard street, plus curb, gutter and sidewalks and drainage from Avenue A to Avenue B. Bike lanes to be included in this project. Major right-of-way acquisitions will be required. Location: 12th Street - Avenue A to Avenue B Related Projects: 5.9702, 8.8705 Justification: Construction of this minor arterial street will better meet the East/West transportation needs of the community. Access across canals is limited, and mid-section line roadways should cross canals to allow for optimum circulation. Planning Context: Major Roadways Plan - 2005 Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total BOND $ 880,000 $ 3,800,000 $ 1,500,000 $ 4,500,000 $0 $0 $ 10,680,000 ROAD $0 $ 250,000 $0 $0 $0 $0 $ 250,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 880,000 $ 4,050,000 $ 1,500,000 $ 4,500,000 $0 $0 $ 10,930,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-75 $ 600,000 $ 4,830,000 $ 5,250,000 $ 250,000 $0 $ 10,930,000 24th Street - Avenue 6E to Avenue 9E Status: 05 5.9812 Department: PW Target Year: 06-07 Description: Widen 24th Street to Major Arterial standards. Phase I: Avenue 6E to Avenue 7½E. Phase II: constuct balance - 2008. This road should be improved to include bike lanes between Araby Road and Avenue 9E. Location: 24th Street - Avenue 6E to Avenue 9E Related Projects: Justification: Development in this area is putting greater demands on 24th Street. Educational facilities expansions are planned or in progress for Arizona Western College (AWC) and Yuma Union High School District (YUHSD), respectively, which will create a greater need for roadway capacity. Planning Context: 1995 City Bicycle Element - Bike Lanes. Major Roadways Plan - 2005. Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total BOND $ 8,050,000 $ 4,200,000 $ 2,920,000 $0 $0 $0 $ 15,170,000 IMPCT $ 750,000 $0 $0 $0 $0 $0 $ 750,000 OTHR $0 $ 3,500,000 $0 $0 $0 $0 $ 3,500,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 8,800,000 $ 7,700,000 $ 2,920,000 $0 $0 $0 $ 19,420,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-76 $ 1,500,000 $ 1,100,000 $ 15,520,000 $ 1,300,000 $0 $ 19,420,000 Street Lights - Infill/Growth Status: 05 5.9904 Department: PW Target Year: 06-07 Description: Since the City purchased the street light system from APS, we must now pay investment costs (purchase) replacements, and infill in existing developed areas. Contracts have been established with both APS and 3rd parties for construction work. Newly annexed areas often need new lights or added lights. Phase 1 : Cresta Gila #1 & #2 streetlight infill installation. Phase 2 : 13th Place & 40th Drive streetlight installation. Phase 3 : Annexation streetlight purchases at- Cresta Gila, Tamarack Nos. 1-3, College Park Nos. 1-4 & Desert Grove Subdivisions. Location: Throughout the City Related Projects: Justification: Frequent requests are made to place street lights in locations previously missed or to enhance security and safety in key locations. Occasionally, lights are damaged from accidents without identification of a liable party. Planning Context: Project Schedule Fund HURF Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 50,000 $0 $0 $0 $0 $0 $ 50,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 50,000 $0 $0 $0 $0 $0 $ 50,000 Project Budget Location Map Design Right-of-way $0 Construction Inspection Other (i.e. Materials) $0 Total 5-77 $0 $0 $ 50,000 $ 50,000 Rancho Verde Subdivision Reconstruction Status: 05 5.9906 Department: PW Target Year: 10-11 Description: Reconstruct the residential streets in Rancho Verde Subdivision: Rancho Way from the North end to the South end, Charro Lane from the West end to the East end, and Vaquero Lane from the West end to the East end. Location: Rancho Verde Subdivision Related Projects: Justification: Recent slurry surface treatment will hold the subdivision's original pavement until 2010. Planning Context: Project Schedule Fund HURF Total 2010-2011 2011-2012 2012-2013 2013-2014 2014-2015 2015-2020 Total $ 30,000 $ 405,000 $0 $0 $0 $0 $ 435,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 30,000 $ 405,000 $0 $0 $0 $0 $ 435,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-78 $ 30,000 $0 $ 380,000 $ 25,000 $0 $ 435,000 Upgrade Traffic Signals w/Illumin. Signs Status: 06 5.9907 Department: PW Target Year: 11-12 Description: Upgrade existing traffic signals with illuminated street name signs. Project to include 24-Arizona Department of Transportation (ADOT) intersections, 20-City of Yuma intersections and 1-Yuma County intersection. Some intersections may require a signal pole upgrade to accommodate the illuminated signs. 2011-2012 - finish 4th Avenue at 16th Street and 32nd Street. 2012-2013 - 24th Street and portions of Avenue A and Avenue B. 2013-2014 - remainder of City. Location: Throughout the City Related Projects: Justification: Larger and better lit street signage provides better visibility and direction to drivers day and night. The public response has been overwhelmingly positive. Planning Context: Project Schedule Fund ROAD Total 2011-2012 2012-2013 2013-2014 2014-2015 2015-2016 2016-2021 Total $ 68,000 $ 60,200 $ 50,000 $0 $0 $0 $ 178,200 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 68,000 $ 60,200 $ 50,000 $0 $0 $0 $ 178,200 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-79 $ 11,000 $0 $ 159,000 $ 8,200 $0 $ 178,200 14th Street - 1st Ave to 4th Ave Status: 05 5.9910 Department: PW Target Year: 06-07 Description: Pavement replacement of road on 14th Street from 1st Avenue to 4th Avenue. Location: 14th Street - 1st Avenue to 4th Avenue Related Projects: 7.8310 Justification: Due to the amount of block and fatigue cracking; rain water has infiltrated the base causing pavement surface failure. Planning Context: Project Schedule Fund HURF Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 210,000 $0 $0 $0 $0 $0 $ 210,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 210,000 $0 $0 $0 $0 $0 $ 210,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-80 $ 20,000 $0 $ 170,000 $ 20,000 $0 $ 210,000 Magnolia Village Units 1,2, and 3 Status: 06 5.9911 Department: PW Target Year: 09-10 Description: Reconstruct streets in the entire Magnolia Village Subdivision Area. Location: NWC of Magnolia Avenue and 12th Street Related Projects: 5.9811 Justification: Reconstruction will be needed in the future so a survey of the streets for right-of-way monument establishment and stormwater drainage flow determination is necessary. Planning Context: Project Schedule Fund HURF Total 2009-2010 2010-2011 2011-2012 2012-2013 2013-2014 2014-2019 Total $ 50,000 $0 $0 $0 $0 $0 $ 50,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 50,000 $0 $0 $0 $0 $0 $ 50,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-81 $ 50,000 $0 $0 $0 $0 $ 50,000 32nd Street - Avenue A to 8th Avenue Status: 05 5.9912 Department: PW Target Year: 06-07 Description: This project consists of right-of-way acquisition in anticipation of construction of curb and gutter, sidewalk and drainage improvements. Resurface existing street. Recommend installation of landscaped medians and right turn lanes where possible. Location: 32nd Street - Avenue A to 8th Avenue Related Projects: 5.9402, 5.9703 Justification: The surface is beginning to fail in several locations. Rehabilitation is needed. Traffic volume increasing and left turn movement has become necessary. Planning Context: Project Schedule Fund ROAD Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 100,000 $0 $0 $0 $0 $0 $ 100,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 100,000 $0 $0 $0 $0 $0 $ 100,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-82 $0 $ 100,000 $0 $0 $0 $ 100,000 Arizona Avenue - 16th to Giss Pky Status: 05 5.9913 Department: PW Target Year: 06-07 Description: Construct, reconstruct and/or widen Arizona Avenue to Major Arterial Standard between 16th Street to Giss Parkway. To include sidewalks, curb and gutter and drainage improvements. Bike lanes to be included from Giss Parkway to 16th Street. First phase to address signalization of the 16th Street and Giss Parkway intersections. Location: Arizona Avenue - 16th Street to Giss Parkway Related Projects: 5.8308 Justification: Surface conditions require reconstruction to improve drainage and driving conditions. The street functions as a major arterial north of 24th Street. Planning Context: Project Schedule Fund ROAD Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 400,000 $ 400,000 $0 $0 $0 $0 $ 800,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 400,000 $ 400,000 $0 $0 $0 $0 $ 800,000 Project Budget Location Map Design Right-of-way $ 150,000 Construction Inspection Other (i.e. Materials) $ 350,000 Total 5-83 $ 250,000 $ 50,000 $0 $ 800,000 Traffic Signal Installation and Upgrades Status: 06 5.9990 Department: PW Target Year: 06-07 Description: Install or upgrade traffic signals at all locations as warranted. Potential intersections: 8th Avenue and Catalina Drive to Park Lane, Giss Parkway and 1st Avenue, 32nd Street and Avenue 5½E, Avenue A and Palmcroft Drive, Avenue B and 3rd Street, 1st Street and Avenue A, 1st Street and Avenue B, and 24th Street and 22nd Drive. Location: All warranted signalized intersections Related Projects: Justification: As traffic volume warrants, signals need to be installed or upgraded. Interconnecting signals will allow them to operate more efficiently together, reducing delay and congestion. Signal operation and maintenance needs can be monitored from remote locations, saving personnel time and costs. Planning Context: Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total IMPCT $ 400,000 $ 400,000 $0 $0 $0 $0 $ 800,000 ROAD $ 390,000 $ 460,000 $ 350,000 $ 400,000 $ 400,000 $0 $ 2,000,000 $0 $0 $0 $ 350,000 $ 350,000 $0 $ 700,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 790,000 $ 860,000 $ 350,000 $ 750,000 $ 750,000 $0 $ 3,500,000 UNF Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-84 $ 190,000 $0 $ 2,360,000 $ 220,000 $ 730,000 $ 3,500,000 28th Street - 8th Ave to 4th Ave Status: 06 5.0005 Department: PW Target Year: 11-12 Description: Improve 28th Street to commercial collector standards including drainage, with right-turn bays as appropriate. Funding includes $25,000 in Developer Deposits. Location: 28th Street - 8th Avenue to 4th Avenue Related Projects: Justification: Major Roadways Plan identifies this street as a collector. Current configuration can sustain only one lane of traffic in each direction and provides no adequate turn bays. Planning Context: Major Roadways Plan - 2005 Project Schedule Fund 2011-2012 2012-2013 2013-2014 2014-2015 2015-2016 2016-2021 Total BOND $ 1,290,000 $0 $0 $0 $0 $0 $ 1,290,000 ROAD $ 310,000 $0 $0 $0 $0 $0 $ 310,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 1,600,000 $0 $0 $0 $0 $0 $ 1,600,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-85 $ 110,000 $ 200,000 $ 1,200,000 $ 90,000 $0 $ 1,600,000 56th Street - ASH to Ave 13E Status: 06 5.0008 Department: PW Target Year: 12-13 Description: Development of 56th Street, through a joint City/County project to mitigate air quality degradation caused by increased motor vehicle traffic on a roadway that is currently unpaved. Funding includes $50,000 from County. Initial activities to be directed toward right-of-way acquisiton. Location: 56th Street - Area Service Highway (ASH) to Avenue 13E Related Projects: Justification: The City and County are in EPA PM10 non-attainment areas. Increased traffic on unpaved streets will result in further air quality degradation. Planning Context: Potential $1,200,000 Federal Aid Grant contribution to Yuma County. Project Schedule Fund 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2022 Total BOND $0 $0 $0 $ 3,800,000 $ 32,000,000 $0 $ 35,800,000 ROAD $ 500,000 $ 500,000 $ 500,000 $0 $0 $0 $ 1,500,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 500,000 $ 500,000 $ 500,000 $ 3,800,000 $ 32,000,000 $0 $ 37,300,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-86 $ 3,800,000 $ 1,500,000 $ 29,000,000 $ 3,000,000 $0 $ 37,300,000 Intersection Safety Upgrades Status: 05 5.0104 Department: PW Target Year: 06-07 Description: Remove temporary turn restrictions and make them permanent using raised medians. Channel, realign intersections, add turn lanes, and etc. Location: Orange Avenue at 1st Avenue, 2nd Avenue and 3rd Avenue intersections; 9th Street and 4th Avenue intersection; Avenue 3E and 24th Street Extension intersection; 16th Street and 3rd Avenue and 5th Avenue Intersections. Related Projects: Justification: Safety studies performed for the YMPO showed these to be effective safety improvements to reduce the number of crashes occurring at these intersections and crash potential. Planning Context: Project Schedule Fund DD ROAD Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 22,500 $0 $0 $0 $0 $0 $ 22,500 $ 100,000 $0 $0 $0 $0 $0 $ 100,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 122,500 $0 $0 $0 $0 $0 $ 122,500 Project Budget Location Map Design Right-of-way $ 10,000 Construction Inspection Other (i.e. Materials) $ 90,000 Total 5-87 $ 12,500 $ 10,000 $0 $ 122,500 Avenue B Turn Lanes Status: 06 5.0113 Department: PW Target Year: 11-12 Description: Creation/Installation of right and left turn lanes from Avenue B. Location: Avenue B - 36th Street to 16th Street Related Projects: Justification: Traffic Impact Analyses performed for property development along the Avenue B corridor will determine the necessity of turn lanes from Avenue B to City streets or to development main entrances. Planning Context: Project Schedule Fund ROAD Total 2011-2012 2012-2013 2013-2014 2014-2015 2015-2016 2016-2021 Total $ 400,000 $0 $0 $0 $0 $0 $ 400,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 400,000 $0 $0 $0 $0 $0 $ 400,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-88 $ 30,000 $ 30,000 $ 320,000 $ 20,000 $0 $ 400,000 Araby Road - I-8 West to 24th Street Status: 05 5.0200 Department: PW Target Year: 06-07 Description: Replace existing pavement, modify median, incidental concrete replacement and traffic signal installation conduit at 26th Street. Paralleling the length of the project, between 24th Street and I-8. Location: Araby Road - Interstate 8 Westbound ramps to 24th Street Related Projects: Justification: Pavement has reached the end of its useful life and maintenance costs will become inflated. Planning Context: Project Schedule Fund ROAD Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 400,000 $0 $0 $0 $0 $0 $ 400,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 400,000 $0 $0 $0 $0 $0 $ 400,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-89 $0 $0 $ 380,000 $ 20,000 $0 $ 400,000 Traffic Signal System Implementation Status: 05 5.0301 Department: PW Target Year: 06-07 Description: Install fiber optic cable (some in conduit, some aerially) from the Public Works Building at 155 West 14th Street to virtually every traffic signal in the City to provide monitoring of the operation of each signal to improve safety and reduce down-time due to signal malfunctions. Installation of a computer to be located at the Public Works Building will provide for control and monitoring of the system. Timing all traffic signals with appropriate applications software. Location: Citywide Related Projects: Justification: At present, no two signals in Yuma are connected to provide coordinated traffic flow. Effective interconnection of traffic signals to provide for coordinated movement of traffic is the most cost-effective improvement that can be made for roadways. Systems such as the one planned generally pay for themselves in user economic savings in less than two years of implementation -- often within one year. The system will also enable the collection of better traffic count data cost-effectively on a City wide scope. Planning Context: Major Roadways Plan - 2005. Project Schedule Fund BOND Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 130,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $0 $ 930,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 130,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $0 $ 930,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-90 $0 $0 $ 900,000 $ 30,000 $0 $ 930,000 Palo Verde Street Construction Status: 06 5.0302 Department: PW Target Year: 10-11 Description: Remove the wall that is across Palo Verde Street just west of Pacific Avenue, install street connection, and make miscellaneous adjustments, from Pacific Avenue to Arizona Avenue, to allow it to function as a collector street. Location: Palo Verde Street between Olivia and Pacific Avenue Related Projects: Justification: Palo Verde Street, between Arizona Avenue and Pacific Avenue is shown to be a Collector Street in the Major Roadways Plan - 2005. The justification for the wall construction (to halt blown sand) no longer exists, with adjacent commercial developments. Planning Context: Project Schedule Fund 2010-2011 2011-2012 2012-2013 2013-2014 2014-2015 2015-2020 Total UNF $ 140,000 $0 $0 $0 $0 $0 $ 140,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 140,000 $0 $0 $0 $0 $0 $ 140,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-91 $ 10,000 $0 $ 120,000 $ 10,000 $0 $ 140,000 Avenue 3E - Gila Ridge Rd. to 32nd St. Status: 05 5.0401 Department: PW Target Year: 06-07 Description: Widen and improve Avenue 3E to a 5-lane facility, with median, drainage, sidewalks and street lighting between 24th Street Extension and 32nd Street. The Gila Ridge Road to 24th Street segment will be widened to 7 lanes, including bridge improvements spaning the railroad. Location: Avenue 3E - Gila Ridge Road to 32nd Street Related Projects: 7.8722 Justification: Existing 3-lane roadway cannot accommodate current traffic load. Arizona Department of Transportation (A.D.O.T.) is preparing design and will contribute to construction funding. Planning Context: Major Roadways Plan - 2005 and YMPO 2026 Regional Transportation Plan. Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total BOND $0 $ 1,650,000 $0 $0 $0 $0 $ 1,650,000 OTHR $ 4,300,000 $ 2,200,000 $0 $0 $0 $0 $ 6,500,000 ROAD $ 150,000 $0 $0 $0 $0 $0 $ 150,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 4,450,000 $ 3,850,000 $0 $0 $0 $0 $ 8,300,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-92 $0 $ 1,000,000 $ 6,500,000 $ 800,000 $0 $ 8,300,000 Pavement Replacement Status: 05 5.0403 Department: PW Target Year: 06-07 Description: Provide full-width pavement replacement for streets in which City utility projects are being constructed, to augment and complement the trenchline pavement replacement installed for the utility project. Location: Citywide Related Projects: Justification: Utility projects encounter elevated costs (the cost per square yard of pavement) for trenchline pavement replacement, because pavement quantities are relatively small and, quite often, involve a substantial amount of hand work. This project would provide additional funding to projects in areas in which the streets are not scheduled for major reconstruction or rehabilitation, reducing the unit cost of pavement replacement and providing a street surface that will not require extraordinary maintenance activities. Planning Context: Project Schedule Fund BOND Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 500,000 $ 300,000 $ 600,000 $0 $ 300,000 $0 $ 1,700,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 500,000 $ 300,000 $ 600,000 $0 $ 300,000 $0 $ 1,700,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-93 $0 $0 $ 1,700,000 $0 $0 $ 1,700,000 16th Street Corridor Study Status: 05 5.0404 Department: PW Target Year: 06-07 Description: Prepare a transportation corridor study to identify roadway improvements needed to satisfy current and anticipated traffic demand along 16th Street in the core of Yuma. Location: 16th Street corridor from Avenue B to Avenue 3E Related Projects: Justification: This corridor is currently over capacity and providing a poor level of service with significant traffic accidents. With increasing development in Yuma, it is expected to get significantly worse. This study will provide the basis for developing a plan to address this situation. This segment of U.S. Highway #95 is also designated for turnback from the State to the City upon substantial completion of the Area Service Highway. The City will have full responsibility of street ownership, operation and maintenance at this time. Planning Context: Major Roadways Plan - 2005 Project Schedule Fund ROAD Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 75,500 $0 $0 $0 $0 $0 $ 75,500 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 75,500 $0 $0 $0 $0 $0 $ 75,500 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-94 $ 75,500 $0 $0 $0 $0 $ 75,500 4th Avenue - 32nd Street Corridor Study Status: 05 5.0405 Department: PW Target Year: 06-07 Description: Prepare a transportation corridor study to identify roadway improvements needed to satisfy current and anticipated traffic demand along 4th Avenue-32nd Street in the core of Yuma. Location: 4th Avenue - 32nd Street corridor from California line to 32nd Street and Pacific Avenue. Related Projects: Justification: This corridor is currently over capacity and providing a poor level of service with significant traffic accidents. With increasing development in Yuma, it is expected to get significantly worse. This study will provide the basis for developing a plan to address this situation. This segment of B-8, is also designated for turn back from the State to the City upon substantial completion of the Area Service Highway. The City will have full responsibility of street ownership, operation and maintenance at that time. Planning Context: Major Roadways Plan - 2005. Project Schedule Fund ROAD Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 75,500 $0 $0 $0 $0 $0 $ 75,500 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 75,500 $0 $0 $0 $0 $0 $ 75,500 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-95 $ 75,500 $0 $0 $0 $0 $ 75,500 Pacific Avenue Access Study & Implementation Status: 05 5.0406 Department: PW Target Year: 08-09 Description: This study would investigate the traffic operations and accident experience on Pacific Avenue from I-8 to Yuma International Airport, identify problems and anticipated problems and recommend remedial measures, design and construct improvements. Location: Pacific Avenue - Interstate 8 (I-8) to Yuma International Airport Related Projects: Justification: The median in the vicinity of Wal-Mart was removed in 2003. This project will review the site as well as other access and safety concerns along this section of Pacific Avenue. Planning Context: Major Roadways Plan - 2005, Avenue 3E corridor study. Project Schedule Fund ROAD Total 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013 2013-2018 Total $ 40,000 $ 90,000 $ 280,000 $ 800,000 $0 $0 $ 1,210,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 40,000 $ 90,000 $ 280,000 $ 800,000 $0 $0 $ 1,210,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-96 $ 40,000 $ 90,000 $ 1,000,000 $ 80,000 $0 $ 1,210,000 24th Street - Ave 2½E to Ave 3E Status: 05 5.0408 Department: PW Target Year: 06-07 Description: Reconstruct asphalt pavement from 2½E to Avenue 3E. Location: 24th Street - Avenue 2½E to Avenue 3E Related Projects: Justification: Existing pavement consists of severe alligator cracking and surface conditions that contain abrasive block cracking which require reconstruction of this 1984 vintage street. Planning Context: Project Schedule Fund ROAD Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 60,000 $0 $ 775,000 $0 $0 $0 $ 835,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 60,000 $0 $ 775,000 $0 $0 $0 $ 835,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-97 $ 60,000 $0 $ 730,000 $ 45,000 $0 $ 835,000 8th Street - East Main Canal to Avenue B Status: 05 5.0409 Department: PW Target Year: 06-07 Description: Reconstruct or replace asphalt pavement on 8th Street, from East Main Canal to Avenue B. Coordination with Yuma County necessary due to ROW jurisdiction being shared between Yuma County and City of Yuma. Widened and improved in 1983. Location: 8th Street - East Main Canal to Avenue B Related Projects: Justification: Existing pavement exhibits severe alligator cracking, abrasive block cracking, and weathering which require total asphalt reconstruction or replacement. Planning Context: Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total OTHR $ 170,000 $ 130,000 $0 $0 $0 $0 $ 300,000 ROAD $ 575,000 $0 $0 $0 $0 $0 $ 575,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 745,000 $ 130,000 $0 $0 $0 $0 $ 875,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-98 $ 75,000 $ 100,000 $ 640,000 $ 60,000 $0 $ 875,000 Automated Traffic Counting Addition Status: 05 5.0411 Department: PW Target Year: 06-07 Description: The new traffic signal system will have the ability to take and process traffic counts throughout the City. Under this project, the necessary detectors and pavement loops will be installed to enable this feature at appropriate locations. Appropriate software will also be added to signal system computer. Location: Citywide Related Projects: 5.0301, 5.9806 Justification: This project will benefit both the City and YMPO by automating many of the routine traffic counts and by automatically processing them into useful formats. Planning Context: Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total HURF $ 10,000 $ 10,000 $ 10,000 $ 10,000 $0 $0 $ 40,000 OTHR $ 100,000 $ 100,000 $ 100,000 $ 100,000 $0 $0 $ 400,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 110,000 $ 110,000 $ 110,000 $ 110,000 $0 $0 $ 440,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-99 $ 40,000 $0 $ 360,000 $ 40,000 $0 $ 440,000 Avenue 7E Bridge Replacement Status: 05 5.0414 Department: PW Target Year: 06-07 Description: Replace bridge spanning the canal with one capable of carrying vehicular traffic. Location: South Gila Canal Related Projects: Justification: County of Yuma had closed the bridge to vehicular traffic, due to structural concerns. Cresta Gila Estates and Araby Estates currently have access only from Araby Road. Secondary access to these subdivisions is necessary for residents and emergency services. Planning Context: Project Schedule Fund ROAD STP Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 30,000 $0 $0 $0 $0 $0 $ 30,000 $ 120,000 $0 $0 $0 $0 $0 $ 120,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 150,000 $0 $0 $0 $0 $0 $ 150,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-100 $ 30,000 $0 $ 120,000 $0 $0 $ 150,000 33rd Drive Extension Status: 05 5.0416 Department: PW Target Year: 06-07 Description: Acquisition of right-of-way, design, construction and inspection of 33rd Drive from Parkway Place Subdivision to 24th Street, as a residential collector street. Project to include right-of-way acquisition, design, construction and inspection. Includes right turn lane from 24th Street to 33rd Drive. Location: 33rd Drive - 24th Street and 24th Lane Related Projects: Justification: City Council Directive. Planning Context: Project Schedule Fund ROAD Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 340,000 $0 $0 $0 $0 $0 $ 340,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 340,000 $0 $0 $0 $0 $0 $ 340,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-101 $0 $ 100,000 $ 200,000 $ 40,000 $0 $ 340,000 40th Street Bridge - Area Service Highway Status: 06 5.0503 Department: PW Target Year: 12-13 Description: Design and construct a bridge across the Area Service Highway to accommodate a principal arterial street. Location: 40th Street and Avenue 6½E Related Projects: Justification: Element identified in the Major Roadways Plan - 2005 Planning Context: Major Roadways Plan - 2005. Project Schedule Fund 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2022 Total IMPCT $ 450,000 $0 $0 $0 $0 $0 $ 450,000 ROAD $ 450,000 $ 300,000 $ 8,250,000 $0 $0 $0 $ 9,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 900,000 $ 300,000 $ 8,250,000 $0 $0 $0 $ 9,450,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-102 $ 900,000 $ 300,000 $ 7,500,000 $ 750,000 $0 $ 9,450,000 38th Ave. and U.S.B.R. Central Drain Status: 06 5.0505 Department: PW Target Year: 08-09 Description: Construction of a culvert crossing of the U.S. Bureau of Reclamation Central Drain, looping the existing water mains together and street construction for continuance of 38th Avenue to 21st Lane. Location: South half of 21st Lane at 38th Avenue Related Projects: Justification: Planning Context: Project Schedule Fund HURF Total 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013 2013-2018 Total $ 50,000 $ 200,000 $0 $0 $0 $0 $ 250,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 50,000 $ 200,000 $0 $0 $0 $0 $ 250,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-103 $ 50,000 $0 $ 180,000 $ 20,000 $0 $ 250,000 34th Drive and U.S.B.R. Central Drain Status: 06 5.0506 Department: PW Target Year: 07-08 Description: Construction of a culvert crossing of the U.S. Bureau of Reclamation Central Drain, looping the existing watermains together and street construction for continuance of 38th Avenue from 22nd Lane to 21st Lane. Location: South of 21st Lane at 34th Drive Related Projects: Justification: Pioneer Park Subdivision Units 3 and 4 don't have a secondary remote street entrance away from 20th Street. This street crossing of the central drain would allow for secondary access to the subdivision by the residents and emergency vehicles. Planning Context: Project Schedule Fund BOND Total 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2017 Total $ 70,000 $ 240,000 $0 $0 $0 $0 $ 310,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 70,000 $ 240,000 $0 $0 $0 $0 $ 310,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-104 $ 70,000 $0 $ 220,000 $ 20,000 $0 $ 310,000 Ave. B & 24th St. Intersection Status: 05 5.0507 Department: PW Target Year: 06-07 Description: Interim intersection improvements will include extending the westbound left-turn lane, changing the lane use configuration on the east leg, modifying the west leg to accommodate the changes on the east leg, changing the traffic signal operation and installation, installing overhead lane use signs on the east leg, and acquiring right-of-way needed for these changes. Location: Avenue B & 24th Street Intersection Related Projects: Justification: Normal traffic growth has greatly increased westbound traffic turning left. This growth is expected to continue. This has been furhter exacerbated by the construction of the new Wal-Mart. Left-turn traffic actually exceed through traffic on the westbound approach and must wait through several long signal cycles to get through the intersection. Some motorists are making unsafe movements to bypass the situation. This interim improvement is needed now and will improve the operation of the entire intersection, but additional major improvements will be needed to fully alleviate over-capacity conditions into the future. Planning Context: Major Roadways Plan - 2005. Project Schedule Fund ROAD Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 90,000 $0 $0 $0 $0 $0 $ 90,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 90,000 $0 $0 $0 $0 $0 $ 90,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-105 $0 $0 $ 90,000 $0 $0 $ 90,000 'A' Canal Crossings Status: 06 5.0508 Department: PW Target Year: 10-11 Description: Construction of bridge or box culvert crossings of the United States Bureau of Reclamation/Yuma Mesa Irrigation & Drainage District 'A' Canal, at the intersection of 40th Street and Avenue 7E and at Avenue 7½E and at 48th Street. Location: Arterial Street Crossings of the U.S.B.R. / Y.M.I.D.D. 'A' Canal Related Projects: Justification: Development of the Yuma Mesa lands lying east of Avenue 3E is going to require the construction of "A" Canal crossings, to provide continuity of travel for the Public and for emergency services, between City 32nd Street and Yuma County 14th Street, with the cost being borne between the development community and the City. Planning Context: Project Schedule Fund 2010-2011 2011-2012 2012-2013 2013-2014 2014-2015 2015-2020 Total IMPCT $0 $ 2,200,000 $0 $0 $ 1,850,000 $0 $ 4,050,000 ROAD $ 100,000 $0 $0 $ 50,000 $0 $0 $ 150,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 100,000 $ 2,200,000 $0 $ 50,000 $ 1,850,000 $0 $ 4,200,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-106 $ 200,000 $0 $ 3,650,000 $ 350,000 $0 $ 4,200,000 School Traffic Safety and Circulation Improvements Status: 05 5.0509 Department: PW Target Year: 06-07 Description: Under this project, the City will develop recommended improvements for pedestrian and traffic safety and circulation problems at and around the various schools in the City. Where these improvements can be implemented using signs, pavement markings, and minor physical construction, the City will perform the implementation under this project. Where the improvements require major improvements, they will be made under other CIP projects as those projects come forward. Location: Various schools in the City Related Projects: Justification: Remediate pedestrian and traffic safety and circulation problems at and around the various schools in the City. Planning Context: Project Schedule Fund GRNT Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000 $0 $ 250,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000 $0 $ 250,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-107 $ 50,000 $0 $ 175,000 $ 25,000 $0 $ 250,000 Bus Stops, Bus Bays and Bus Shelters Status: 05 5.0510 Department: PW Target Year: 06-07 Description: This project will include the construction of new bus bays at bus stops to permit passenger loading and unloading outside the traffic stream. It may also include installation of bus stop shelters. Installation of bus stop signs will also be performed under this project. Location: Various locations throughout Yuma Related Projects: Justification: The YMPO operates several bus routes in and around Yuma. It is planning on adding more. History has shown that bus stop locations must be added and relocated from time to time to best serve potential riders. This work will be totally funded by the YMPO. No City funds will be used. Planning Context: YMPO 2000-2023 Regional Transportation Plan. Project Schedule Fund OTHR Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 225,000 $ 75,000 $ 75,000 $ 75,000 $ 75,000 $0 $ 525,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 225,000 $ 75,000 $ 75,000 $ 75,000 $ 75,000 $0 $ 525,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-108 $ 42,000 $ 105,000 $ 350,000 $ 28,000 $0 $ 525,000 Trap Lane Safety Improvements Status: 05 5.0512 Department: PW Target Year: 07-08 Description: There are 10 locations around the City where through-traffic lanes become mandatory turn lanes without adequate warning. These locations require the use of overhead lane use signs to correct this problem and changes in pavement markings. Location: Various locations throughout Yuma Related Projects: Justification: These improvements will reduce the potential for accidents caused by lack of adequate advance warning of the changes in lane use. They will also facilitate smoother traffic flow. Planning Context: Intersection Leg Lane 1st Avenue & 16th Street 1st Street & 4th Avenue 1st Street & Avenue B 1st Street & Avenue B 16th Street & Pacific Avenue 24th Street & Avenue 3E 32nd Street & Avenue 3E 32nd Street & Avenue A 32nd Street & Avenue D 8th Street & 4th Avenue north north east south west west west south east west left all right right right all right all right right Intersection Leg Avenue 3E & MCAS Main Entrance Giss Parkway & 4th Avenue Giss Parkway & 4th Avenue Giss Parkway & Main Street Giss Parkway & Redondo Ctr. Dr. Pacific Avenue & 32nd Street north east east east west north Lane all all right right right right Project Schedule Fund HURF Total 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2017 Total $ 271,300 $0 $0 $0 $0 $0 $ 271,300 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 271,300 $0 $0 $0 $0 $0 $ 271,300 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-109 $ 25,000 $0 $ 228,000 $ 18,300 $0 $ 271,300 Traffic Signal Upgrades Status: 05 5.0514 Department: PW Target Year: 11-12 Description: This project provides for the replacement of obsolete traffic signal equipment and also for making changes to signalization at intersections, such as the addition of left-turn arrows, to better serve traffic. This work has been moved from CIP 5.9990 (Traffic Signal Installation and Upgrades) because the upgrade work is increasing significantly. Location: Various intersections throughout the City Related Projects: Justification: The following intersections need their obsolete controllers, poles, mast arms and signal heads, etc. replaced now: Ave A & 3rd St, 8th St & Ave A, 8th St & Orange Ave, 24th St & 1st Ave, 24th St & Arizona Ave, and 8th Ave & 28th St. In addition, signals need to be upgraded from time to time to accommodate changes in operation resulting from traffic growth and changing traffic patterns. Costs shown do not include related radius improvements or roadway widenings but do include estimated costs or right-of-way acquisitions so poles can be placed at their ultimate locations. Planning Context: Project Schedule Fund HURF Total 2011-2012 2012-2013 2013-2014 2014-2015 2015-2016 2016-2021 Total $ 320,000 $ 540,000 $ 400,000 $0 $0 $0 $ 1,260,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 320,000 $ 540,000 $ 400,000 $0 $0 $0 $ 1,260,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-110 $ 100,000 $ 60,000 $ 1,000,000 $ 100,000 $0 $ 1,260,000 Roadways Plan Modeling Study Status: 06 5.0515 Department: PW Target Year: 06-07 Description: This study will be established as a baseline for key components of the City's road system. This study can be used for planning purposes when the City has projected new developments, the City can populate the model with estimates and best determine how to ensure effective operation of the road system. The study will also provide an overall cost estimate for the improvements that are needed. Location: Citywide Related Projects: Justification: This study is recommended in the Major Roadways Plan - 2005. Planning Context: Major Roadways Plan - 2005. Project Schedule Fund ROAD Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 50,000 $0 $0 $0 $0 $0 $ 50,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 50,000 $0 $0 $0 $0 $0 $ 50,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-111 $ 50,000 $0 $0 $0 $0 $ 50,000 Roadways Plan Alignment Studies Status: 05 5.0516 Department: PW Target Year: 06-07 Description: Unlike the 1997 Major Roadways Plan, a number of the roadways recommended in the Major Roadways Plan - 2005 are curvilinear or do not follow section and mid-section lines. These studies would establish centerline alignments for these associated roadways so that rights-of-way can be effectively acquired and protected. Roadway portions to be included: 12th St., 26th St., 8th St. at Pacific Avenue, 5th St. at 45th Avenue/Avenue C½. Location: Multiple locations Citywide Related Projects: Justification: These studies will enable needed rights-of-way for irregular roadway segments to be obtained as part of the development process. The studies will save the City money by eliminating the need for emergency designs when developers want to build on or adjacent to these irregular sections. They will also aid the development community by providing developers and land owners clear information on the City's plans. Planning Context: Major Roadways Plan - 2005. Project Schedule Fund IMPCT Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 260,000 $0 $0 $0 $0 $0 $ 260,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 260,000 $0 $0 $0 $0 $0 $ 260,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-112 $ 260,000 $0 $0 $0 $0 $ 260,000 24th St & Ave 3½E - Ave 3E to 56th St Status: 05 5.0517 Department: PW Target Year: 06-07 Description: Construct a Principal Arterial along the B Canal transitioning into Avenue 3½E as recommended in the Avenue 3E Corridor Study as part of the overall plan to emphasize Avenue 3½E and de-emphasize Avenue 3E for through traffic. Location: 24th St. Extension & Avenue 3½E - Avenue 3E to 56th Street Related Projects: Justification: This recommendation is based on the recently completed Avenue 3E Corridor Study. That study included Avenue 3E, Avenue 3½E and 32nd Street. A major recommendation of the study was the diversion of traffic, especially large trucks, from Avenue 3E to Avenue 3½E for improved traffic operation and safety and for improved security at MCAS - Yuma. Building of this connection is essential to accomplishing that recommendation, which has been very favorably received by the public in general, the business owners in the area, and MCAS. Providing this roadway will reduce congestion on Avenue 3E and 32nd Street and at the intersection. It will enable that intersection to function acceptably and reduce traffic accidents. Planning Context: Major Roadways Plan - 2005. Avenue 3E Corridor Study. Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total BOND $ 1,000,000 $ 4,006,000 $0 $ 6,936,000 $ 13,989,000 $0 $ 25,931,000 OTHR $ 1,044,000 $0 $0 $ 2,000,000 $ 2,000,000 $0 $ 5,044,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 2,044,000 $ 4,006,000 $0 $ 8,936,000 $ 15,989,000 $0 $ 30,975,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-113 $ 3,050,000 $ 3,000,000 $ 22,385,000 $ 2,540,000 $0 $ 30,975,000 Orange Avenue Improvements and Beautification Status: 06 5.0518 Department: PW Target Year: 06-07 Description: The project would have 2 aspects: traffic improvements from 1st Avenue to 3rd Avenue and from 3rd Avenue to 4th Avenue, and reconstruction and beautification of Orange Avenue from 1st Avenue to 4th Avenue, including installation of a median, in general conformance with the Orange Avenue Concensus Master Plan. Location: Orange Avenue - 1st Avenue to 4th Avenue Related Projects: Justification: The Orange Avenue Concensus Master Plan adopted by City Council and the Yuma Crossing National Heritage Area in 2002 recommended rehabilitation and beautification of Orange Avenue from 1st Avenue to 4th Avenue. Furthermore, there are traffic problems at and in the vicinity of the intersections with 1st Avenue, 3rd Avenue (north), 3rd Avenue (south), and 4th Avenue that should be rectified to reduce the potential for traffic accidents. This project will address these issues. Planning Context: Orange Avenue Consensus Master Plan. Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total BOND $ 260,000 $ 1,968,000 $0 $0 $0 $0 $ 2,228,000 GRNT $0 $ 500,000 $0 $0 $0 $0 $ 500,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 260,000 $ 2,468,000 $0 $0 $0 $0 $ 2,728,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-114 $ 252,000 $ 8,000 $ 2,300,000 $ 168,000 $0 $ 2,728,000 Expressways Access Studies Status: 06 5.0522 Department: PW Target Year: 06-07 Description: This study will develop property-specific recommendations for providing access when these roadways (total of 42.5 miles) are constructed/converted to expressways as shown in the Major Roadways Plan. The city has identified eight distinct expressway segments that will enable the city to conduct the study in phases. 32nd Street will be the first phase. Scheduling of other phases will depend somewhat on area development projects. Location: 16th Street, 32nd Street, Avenue 9E and Yuma Expressway Related Projects: Justification: The Major Roadways Plan classifies these roadways as expressways and restricts access to them; however, the city does not have any play to show how adequate access to the properties will be provided. Planning Context: Major Roadways Plan - 2005. Project Schedule Fund ROAD Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 154,000 $ 255,000 $ 223,000 $ 143,000 $0 $0 $ 775,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 154,000 $ 255,000 $ 223,000 $ 143,000 $0 $0 $ 775,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-115 $ 775,000 $0 $0 $0 $0 $ 775,000 Avenue 6E Widening: 32nd Street to 40th Street Status: 06 5.0523 Department: PW Target Year: 10-11 Description: This project will widen Avenue 6E, an arterial, in this fast growing part of the City to 5 lanes. Location: Avenue 6E from 32nd to 40th Streets Related Projects: Justification: Over 4,000 dwelling units are planned for the near future to the east of Avenue 6E. Several hundred are either under construction or imminent. Unless the roadway is widened, the city will begin experiencing traffic congestion and accidents. The city has an opportunity to preempt this if the city acts now. Planning Context: Major Roadways Plan - 2005 Project Schedule Fund 2010-2011 2011-2012 2012-2013 2013-2014 2014-2015 2015-2020 Total BOND $0 $ 2,500,000 $ 2,130,000 $0 $0 $0 $ 4,630,000 ROAD $ 500,000 $0 $0 $0 $0 $0 $ 500,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 500,000 $ 2,500,000 $ 2,130,000 $0 $0 $0 $ 5,130,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-116 $ 500,000 $ 200,000 $ 4,100,000 $ 330,000 $0 $ 5,130,000 32nd Street & Pacific Avenue Improvements Status: 06 5.0524 Department: PW Target Year: 08-09 Description: Add second dedicated eastbound left-turn lane, convert existing left-through lane to through lane, upgrade traffic signal, extend median on north leg further north, revise access to properties on west side of north leg. The project will also include installation of conduit and fiber optic cable (via CIP No. 5.9806) to coordinate the signal with other signals to provide smooth traffic flow. Location: 32nd Street & Pacific Avenue Related Projects: Justification: This recommendation is based on the Avenue 3E Corridor Study made in 2003-2004. That study included 32nd Street from Pacific Avenue to Avenue 5E. The widening is needed to eliminate current congestion and to adequately provide for traffic growth and to alleviate traffic accidents. The median extension and access revisions are needed to reduce the number of traffic accidents and permit the intersection to function at full capacity. Planning Context: Major Roadways Plan - 2005. Avenue 3E Corridor Study. Project Schedule Fund ROAD Total 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013 2013-2018 Total $ 94,500 $ 372,600 $0 $0 $0 $0 $ 467,100 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 94,500 $ 372,600 $0 $0 $0 $0 $ 467,100 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-117 $ 31,500 $ 63,000 $ 345,000 $ 27,600 $0 $ 467,100 32nd Street Widening - Avenue 3E to Avenue 5E Status: 06 5.0525 Department: PW Target Year: 07-08 Description: Widen 32nd Street to 6 through lanes between Avenue 3E and Avenue 5E with median and needed turn lanes. Side street intersection legs will also be widened as needed to provide needed overall intersection capacities. Widening of the north leg of 32nd Street & Avenue 2½E is also included. Location: 32nd Street - Avenue 3E to Avenue 5E Related Projects: Justification: This recommendation is based on the recently completed Avenue 3E Corridor Study. That study included 32nd Street from Pacific Avenue to Avenue 5E. The widening is needed to adequately provide for traffic growth. Planning Context: Major Roadways Plan - 2005. Avenue 3E Corridor Study. Project Schedule Fund 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2017 Total BOND $ 3,810,000 $0 $0 $0 $0 $0 $ 3,810,000 ROAD $ 420,000 $0 $0 $0 $0 $0 $ 420,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 4,230,000 $0 $0 $0 $0 $0 $ 4,230,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-118 $ 420,000 $0 $ 3,600,000 $ 210,000 $0 $ 4,230,000 44th Street - Ave 3½E to 4½E & Ave 7E to 8½E Status: 06 5.0527 Department: PW Target Year: 14-15 Description: Design and construction of two segments of 44th Street to minor arterial standards as recommended in the Major Roadways Plan 2005. Location: 44th Street from Avenue 3½E to Avenue 4½E & Avenue 7E to Avenue 8½E Related Projects: Justification: Provide a minor arterial to serve the fast-growing area south of I-8 on the East Mesa. Planning Context: Major Roadways Plan - 2005. Project Schedule Fund BOND Total 2014-2015 2015-2016 2016-2017 2017-2018 2018-2019 2019-2024 Total $ 1,193,000 $0 $0 $0 $0 $0 $ 1,193,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 1,193,000 $0 $0 $0 $0 $0 $ 1,193,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-119 $ 1,193,000 $0 $0 $0 $0 $ 1,193,000 24th Street - North Frontage Road Widening Status: 06 5.0528 Department: PW Target Year: 15-16 Description: Design and construction of the widening of 24th Street - North Frontage Road from Avenue 3E to Avenue 9E to minor arterial standards, including purchase of needed right-of-way, as recommended in the Major Roadways Plan - 2005. Location: 24th Street - North Frontage Road from Avenue 3E to Avenue 6E Related Projects: Justification: Provide a minor arterial to serve the fast-growing area north of I-8 on the East Mesa. Planning Context: Major Roadways Plan - 2005. Project Schedule Fund BOND Total 2015-2016 2016-2017 2017-2018 2018-2019 2019-2020 2020-2025 Total $ 1,500,000 $0 $0 $0 $0 $0 $ 1,500,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 1,500,000 $0 $0 $0 $0 $0 $ 1,500,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-120 $ 1,500,000 $0 $0 $0 $0 $ 1,500,000 32nd Street Expressway Construction Status: 06 5.0529 Department: PW Target Year: 15-16 Description: Design and construction of the widening of 32nd Street to expressway standards and purchase control of access as recommended in the Major Roadways Plan - 2005. Location: 32nd Street - Pacific Avenue to Avenue 9E Related Projects: Justification: Provide a high volume expressway to provide increased mobility among the Foothills, the East Mesa and the central portion of the City. Planning Context: Major Roadways Plan - 2005. Project Schedule Fund BOND Total 2015-2016 2016-2017 2017-2018 2018-2019 2019-2020 2020-2025 Total $ 4,200,000 $0 $0 $0 $0 $0 $ 4,200,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 4,200,000 $0 $0 $0 $0 $0 $ 4,200,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-121 $ 4,200,000 $0 $0 $0 $0 $ 4,200,000 36th Street - Ave 3½E to 6E & Ave 7E to 10E Status: 06 5.0530 Department: PW Target Year: 15-16 Description: Design and construction of two segments of 36th Street to minor arterial standards as recommended by the Major Roadways Plan 2005. Location: 36th Street - Avenue 3½E to Avenue 6E and Avenue 7E to Avenue 10E Related Projects: Justification: Provide a minor arterial to serve the fast growing area south of I-8 on the East Mesa. Planning Context: Major Roadways Plan - 2005. Project Schedule Fund BOND Total 2015-2016 2016-2017 2017-2018 2018-2019 2019-2020 2020-2025 Total $ 2,640,000 $0 $0 $0 $0 $0 $ 2,640,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 2,640,000 $0 $0 $0 $0 $0 $ 2,640,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-122 $ 2,640,000 $0 $0 $0 $0 $ 2,640,000 40th Street - Ave 3½E to Ave 10E Status: 06 5.0532 Department: PW Target Year: 15-16 Description: Design and construction of the widening of 40th Street from Avenue 3½E to Avenue 10E to principal arterial standard as recommended in the Major Roadways Plan - 2005. Location: 40th Street - Avenue 3½E to Avenue 10E Related Projects: Justification: Provide a principal arterial on section line to serve the area south of I-8 on the East Mesa. Planning Context: Major Roadways Plan - 2005. Project Schedule Fund BOND Total 2015-2016 2016-2017 2017-2018 2018-2019 2019-2020 2020-2025 Total $ 4,500,000 $0 $0 $0 $0 $0 $ 4,500,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 4,500,000 $0 $0 $0 $0 $0 $ 4,500,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-123 $ 4,500,000 $0 $0 $0 $0 $ 4,500,000 Frontage Roads - Ave 9E to Ave 11E Status: 05 5.0533 Department: PW Target Year: 11-12 Description: Design and construction of the widening of North and South Frontage Roads from Avenue 9E to Avenue 11E to collector/arterial standards. Location: North & South Frontage Roads - Avenue 9E to Avenue 11E Related Projects: Justification: Provide a minor arterial to serve the area north of I-8 on the East Mesa. Planning Context: Major Roadways Plan - 2005, Yuma County Initial Design Concept Report - 2005. Design and construct as an intergovernmental project with Yuma County. South Frontage in 2006-2007 and 2007-2008, with North Frontage Road in 2008-2009 and 2009-2010, with Yuma County responsible for Avenue 11E to Avenue 13E in the same South-North sequencing. Project Schedule Fund BOND Total 2011-2012 2012-2013 2013-2014 2014-2015 2015-2016 2016-2021 Total $ 3,000,000 $0 $0 $0 $0 $0 $ 3,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 3,000,000 $0 $0 $0 $0 $0 $ 3,000,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-124 $ 400,000 $ 300,000 $ 2,200,000 $ 100,000 $0 $ 3,000,000 Avenue 8½E - 32nd St Expressway to 44th St Status: 06 5.0534 Department: PW Target Year: 06-07 Description: Design, widening and construction of Avenue 8½E from 32nd Street Expressway to 44th Street to minor arterial standards as recommended in the Major Roadways Plan - 2005. Location: Avenue 8½E - 32nd Street Expressway to 44th Street Related Projects: Justification: Provide a minor arterial on mid-section line to serve the east side of the City. Planning Context: Major Roadways Plan - 2005. Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total BOND $0 $0 $0 $0 $ 2,400,000 $0 $ 2,400,000 ROAD $ 60,000 $0 $0 $ 300,000 $ 400,000 $0 $ 760,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 60,000 $0 $0 $ 300,000 $ 2,800,000 $0 $ 3,160,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-125 $ 300,000 $ 400,000 $ 2,160,000 $ 300,000 $0 $ 3,160,000 Avenue 8E - 32nd St Expressway to 56th St Status: 06 5.0535 Department: PW Target Year: 06-07 Description: Design, widening and construction of Avenue 8E from 32nd Street Expressway to 56th Street to minor arterial standard as recommended in the Major Roadways Plan - 2005. Location: Avenue 8E - 32nd Street Expressway to 56th Street Related Projects: Justification: Provide a minor arterial on section line to serve the east side of the City. Planning Context: Major Roadways Plan - 2005. Project Schedule Fund BOND Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 3,100,000 $0 $0 $ 11,302,000 $0 $0 $ 14,402,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 3,100,000 $0 $0 $ 11,302,000 $0 $0 $ 14,402,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-126 $ 700,000 $ 1,802,000 $ 11,000,000 $ 900,000 $0 $ 14,402,000 16th Street Expressway - Ave 2E to Ave 10E Status: 06 5.0536 Department: PW Target Year: 15-16 Description: Design and construction of the widening of 16th Street to expressway standards and purchase control of access as recommended in the Major Roadways Plan - 2005. Location: 16th Street - Avenue 2E to Avenue 10E Related Projects: Justification: Provide a high volume expressway to provide increased mobility between U.S. 95 to the north and the central portion of the City. Planning Context: Major Roadways Plan - 2005. Project Schedule Fund BOND Total 2015-2016 2016-2017 2017-2018 2018-2019 2019-2020 2020-2025 Total $ 5,500,000 $0 $0 $0 $0 $0 $ 5,500,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 5,500,000 $0 $0 $0 $0 $0 $ 5,500,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-127 $ 5,500,000 $0 $0 $0 $0 $ 5,500,000 Yuma Expressway Status: 06 5.0537 Department: PW Target Year: 15-16 Description: Design and construction of the Yuma Expressway as recommended in the Major Roadways Plan - 2005. Location: Yuma Expressway - Area Service Highway (ASH) to Interstate Highway 8 (I-8) Related Projects: Justification: Increased mobility. Provide an expressway bypass around the south and west sides of the City. Planning Context: Major Roadways Plan - 2005. Project Schedule Fund BOND Total 2015-2016 2016-2017 2017-2018 2018-2019 2019-2020 2020-2025 Total $ 40,000 $0 $0 $0 $0 $0 $ 40,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 40,000 $0 $0 $0 $0 $0 $ 40,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-128 $ 40,000 $0 $0 $0 $0 $ 40,000 Avenue 7E - North Construction Status: 06 5.0538 Department: PW Target Year: 15-16 Description: Design and widening of Avenue 7E from 24th Street to 16th Street Expressway to minor arterial standards as recommended in the Major Roadways Plan - 2005. Location: Avenue 7E - 24th Street to 16th Street Expressway Related Projects: 5.0414 Justification: Provide a minor arterial on section line. Planning Context: Major Roadways Plan - 2005. Project Schedule Fund ROAD Total 2015-2016 2016-2017 2017-2018 2018-2019 2019-2020 2020-2025 Total $ 50,000 $0 $0 $0 $0 $0 $ 50,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 50,000 $0 $0 $0 $0 $0 $ 50,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-129 $ 50,000 $0 $0 $0 $0 $ 50,000 Avenue 7E - 32nd St Expressway to 56th St Status: 06 5.0539 Department: PW Target Year: 15-16 Description: Design, widening and construction of Avenue 7E from 32nd Street Expressway to 56th Street to minor arterial standards as recommended in the Major Roadways Plan - 2005. Location: Avenue 7E - 32nd Street Expressway to 56th Street Related Projects: Justification: Provide a minor arterial on section line to serve the east side of the City. Planning Context: Major Roadways Plan - 2005. Project Schedule Fund BOND Total 2015-2016 2016-2017 2017-2018 2018-2019 2019-2020 2020-2025 Total $ 1,590,000 $0 $0 $0 $0 $0 $ 1,590,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 1,590,000 $0 $0 $0 $0 $0 $ 1,590,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-130 $ 1,590,000 $0 $0 $0 $0 $ 1,590,000 Avenue 10E Widening Status: 06 5.0542 Department: PW Target Year: 07-08 Description: Design, widen and construction of Avenue 10E from 32nd Street to 56th Street to minor arterial standards as recommended in the Major Roadways Plan - 2005. Location: Avenue 10E from 16th Street Expressway to North Frontage Road & from 32nd Street Expressway to 56th St. Related Projects: Justification: Provide a minor arterial on section line to serve the east side of the City. Planning Context: Major Roadways Plan - 2005. Project Schedule Fund BOND UNF Total 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2017 Total $ 4,000,000 $0 $0 $0 $0 $0 $ 4,000,000 $0 $0 $0 $0 $ 33,206,000 $0 $ 33,206,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 4,000,000 $0 $0 $0 $ 33,206,000 $0 $ 37,206,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-131 $ 3,180,000 $ 5,406,000 $ 26,500,000 $ 2,120,000 $0 $ 37,206,000 4th Avenue Corridor Construction Status: 06 5.0544 Department: PW Target Year: 10-11 Description: Design, construction and widening of 4th Avenue - 4th Avenue Extension from 14th Street to 32nd Street to principal arterial standards and from 32nd Street to 40th Street to minor arterial standards as recommended in the Major Roadways Plan - 2005. The project will include major intersection improvements at 16th Street and at 24th Street. The project may also include improvements to 3rd Avenue - Orange Avenue and connecting streets depending on the recommendations of the 4th Avenue and 16th Street Corridors Study. Location: 4th Avenue - 4th Avenue Extension from 14th Street to 40th Street. Related Projects: 5.8312 Justification: Reduce congestion and improve safety. Planning Context: Major Roadways Plan - 2005. Project Schedule Fund BOND Total 2010-2011 2011-2012 2012-2013 2013-2014 2014-2015 2015-2020 Total $ 10,900,000 $ 10,900,000 $ 10,900,000 $0 $0 $0 $ 32,700,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 10,900,000 $ 10,900,000 $ 10,900,000 $0 $0 $0 $ 32,700,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-132 $ 3,030,000 $ 2,400,000 $ 25,250,000 $ 2,020,000 $0 $ 32,700,000 Avenue 4½E - 32nd St Expressway to 44th St Status: 06 5.0546 Department: PW Target Year: 15-16 Description: Design and widening of Avenue 4½E from 32nd Street Expressway to 44th Street to minor arterial standards as recommended in the Major Roadways Plan - 2005. Location: Avenue 4½E - 32nd Street Expressway to 44th Street Related Projects: Justification: Provide a minor arterial on mid-section line to serve the east side of the City. Planning Context: Major Roadways Plan - 2005 Project Schedule Fund 2015-2016 2016-2017 2017-2018 2018-2019 2019-2020 2020-2025 Total UNF $ 795,000 $0 $0 $0 $0 $0 $ 795,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 795,000 $0 $0 $0 $0 $0 $ 795,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-133 $ 795,000 $0 $0 $0 $0 $ 795,000 Avenue 4E - Gila Ridge Rd to Yuma Expressway Status: 06 5.0547 Department: PW Target Year: 15-16 Description: Design and widening of Avenue 4E from Gila Ridge Road to Yuma Expressway to minor arterial standards as recommended in the Major Roadways Plan - 2005. Location: Avenue 4E - Gila Ridge Road to Yuma Expressway (56th Street) Related Projects: Justification: Provide a minor arterial on section line to serve the east side of the City. Planning Context: Major Roadways Plan - 2005 Project Schedule Fund 2015-2016 2016-2017 2017-2018 2018-2019 2019-2020 2020-2025 Total UNF $ 1,920,000 $0 $0 $0 $0 $0 $ 1,920,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 1,920,000 $0 $0 $0 $0 $0 $ 1,920,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-134 $ 1,920,000 $0 $0 $0 $0 $ 1,920,000 Avenue 5½E Construction Status: 06 5.0548 Department: PW Target Year: 11-12 Description: Design, widening and construction of Avenue 5½E from 32nd Street Expressway to 40th Street to minor arterial standards as recommended in the Major Roadways Plan - 2005. Location: Avenue 5½E - 32nd Street Expressway to 40th Street Related Projects: Justification: Provide a principal arterial on mid-section line to serve the east side of the City. Planning Context: Major Roadways Plan - 2005 Project Schedule Fund ROAD UNF Total 2011-2012 2012-2013 2013-2014 2014-2015 2015-2016 2016-2021 Total $ 480,000 $0 $0 $0 $0 $0 $ 480,000 $0 $0 $ 4,320,000 $0 $0 $0 $ 4,320,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 480,000 $0 $ 4,320,000 $0 $0 $0 $ 4,800,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-135 $ 480,000 $0 $ 4,000,000 $ 320,000 $0 $ 4,800,000 Avenue 5E - 16th St Exp. to Yuma Expressway Status: 06 5.0549 Department: PW Target Year: 15-16 Description: Design, widening and construction of Avenue 5E from 16th Street Expressway to Yuma Expressway to principal arterial standards as recommended in the Major Roadways Plan - 2005, including I-8 and U.P.R.R. underpasses. Location: Avenue 5E - 16th Street Expressway to Yuma Expressway (56th Street) Related Projects: Justification: Provide a principal arterial on section line to serve the east side of the City. The project will include an interchange with Interstate 8. The project will include major improvements, possibly including interchanges, at the intersections of 16th Street Expressway, 32nd Street Expressway and Yuma Expressway. Planning Context: Major Roadways Plan - 2005 Project Schedule Fund 2015-2016 2016-2017 2017-2018 2018-2019 2019-2020 2020-2025 Total UNF $ 4,200,000 $0 $0 $0 $0 $0 $ 4,200,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 4,200,000 $0 $0 $0 $0 $0 $ 4,200,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-136 $ 4,200,000 $0 $0 $0 $0 $ 4,200,000 Avenue 7½E - 32nd St Expressway to 56th St Status: 06 5.0551 Department: PW Target Year: 15-16 Description: Design, widening and construction of Avenue 7½E from 32nd Street Expressway to 56th Street to minor arterial and collector street standards as recommended in the Major Roadways Plan - 2005. Location: Avenue 7½E - 32nd Street Expressway to 56th Street Related Projects: Justification: Provide a minor arterial or collector street on mid-section line to serve the east side of the City. Planning Context: Major Roadways Plan - 2005 Project Schedule Fund 2015-2016 2016-2017 2017-2018 2018-2019 2019-2020 2020-2025 Total UNF $ 1,325,000 $0 $0 $0 $0 $0 $ 1,325,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 1,325,000 $0 $0 $0 $0 $0 $ 1,325,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-137 $ 1,325,000 $0 $0 $0 $0 $ 1,325,000 East Yuma Freeway Status: 06 5.0552 Department: PW Target Year: 06-07 Description: Design and construction of East Yuma Freeway basically adjacent to the A Canal alignment to freeway standards as recommended in the Major Roadways Plan - 2005. Location: East Yuma Freeway from Area Service Highway to Highway 95 at Blaidsdell Road Related Projects: Justification: Provide a freeway bypass to service traffic between south Yuma and US 95 in the vicinity of Fortuna Road. Planning Context: Major Roadways Plan - 2005 Project Schedule Fund ROAD UNF Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 100,000 $0 $0 $0 $0 $0 $ 100,000 $0 $0 $0 $0 $ 310,900,000 $0 $ 310,900,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 100,000 $0 $0 $0 $ 310,900,000 $0 $ 311,000,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-138 $ 19,000,000 $ 26,000,000 $ 237,500,000 $ 28,500,000 $0 $ 311,000,000 Giss Parkway - 4th Avenue to I-8 Status: 06 5.0554 Department: PW Target Year: 07-08 Description: Design and construction of the widening of Giss Parkway from 4th Avenue to Interstate 8 to minor arterial standards as recommended in the Major Roadways Plan - 2005. Location: Giss Parkway from 4th Avenue to I-8 Related Projects: Justification: Improve Giss Parkway to minor arterial standards to mitigate congestion and improve access to the developing commercial area on the east side of the City. Planning Context: Major Roadways Plan - 2005. Project Schedule Fund 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2017 Total BOND $0 $ 3,400,000 $0 $0 $0 $0 $ 3,400,000 ROAD $ 450,000 $0 $0 $0 $0 $0 $ 450,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 450,000 $ 3,400,000 $0 $0 $0 $0 $ 3,850,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-139 $ 250,000 $ 200,000 $ 3,200,000 $ 200,000 $0 $ 3,850,000 40th Street - Avenue B to Avenue D Status: 06 5.0562 Department: PW Target Year: 15-16 Description: Design and construction of the widening of 40th Street from Avenue B to Avenue D to minor arterial standards as recommended in the Major Roadways Plan - 2005. Location: 40th Street - Avenue B to Avenue D Related Projects: Justification: Provide a minor arterial on section-line to serve the southwest area of the City. Planning Context: Major Roadways Plan - 2005 Project Schedule Fund 2015-2016 2016-2017 2017-2018 2018-2019 2019-2020 2020-2025 Total UNF $ 994,000 $0 $0 $0 $0 $0 $ 994,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 994,000 $0 $0 $0 $0 $0 $ 994,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-140 $ 994,000 $0 $0 $0 $0 $ 994,000 45th Avenue - 5th St to 28th St Status: 06 5.0564 Department: PW Target Year: 06-07 Description: Design and construction of the widening of 45th Avenue from 5th Street to 28th Street to minor arterial standard as recommended in the Major Roadways Plan - 2005. Location: 45th Avenue - 5th Street to 28th Street Related Projects: Justification: Provide a minor arterial on mid-section line to serve the western area of the City. Planning Context: Major Roadways Plan - 2005 Project Schedule Fund ROAD UNF Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 470,000 $0 $0 $0 $0 $0 $ 470,000 $0 $0 $0 $0 $ 17,220,000 $0 $ 17,220,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 470,000 $0 $0 $0 $ 17,220,000 $0 $ 17,690,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-141 $ 1,600,000 $ 2,470,000 $ 12,420,000 $ 1,200,000 $0 $ 17,690,000 52nd Street Construction Status: 06 5.0566 Department: PW Target Year: 15-16 Description: Design and construction of two segments 52nd Street to minor arterial standards as recommended in the Major Roadways Plan 2005. Location: 52nd Street - Avenue 3½E to Avenue 4E & from Avenue 5E to Avenue 6E Related Projects: 5.0517 Justification: Provide a half-section line minor arterial to serve the fast-growing area south of I-8 on the East Mesa. Planning Context: Major Roadways Plan - 2005 Project Schedule Fund ROAD Total 2015-2016 2016-2017 2017-2018 2018-2019 2019-2020 2020-2025 Total $ 840,000 $0 $0 $0 $0 $0 $ 840,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 840,000 $0 $0 $0 $0 $0 $ 840,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-142 $ 840,000 $0 $0 $0 $0 $ 840,000 16th St & 4th Ave Intersection Improvements Status: 06 5.0574 Department: PW Target Year: 06-07 Description: Widen both streets to 6 through lanes, dual left-turn lanes, right-turn lanes and 1/8-mile of median on each leg. This is a major phase of the needed improvements to both 4th Avenue and 16th Street corridors. Widen 16th Street between 6th Avenue and Arizona Avenue. Location: Vicinity of 16th Street & 4th Avenue Related Projects: 5.0404, 5.0525, 5.0584 Justification: Minimize congestion, mitigate accidents at the city's most congested intersection, foster economic development. Planning Context: Major Roadways Plan - 2005, 4th Avenue and 16th Street corridor studies, economic development. Project Schedule Fund BOND Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 3,000,000 $ 2,000,000 $0 $ 8,875,000 $0 $0 $ 13,875,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 3,000,000 $ 2,000,000 $0 $ 8,875,000 $0 $0 $ 13,875,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-143 $ 354,000 $ 6,000,000 $ 6,785,000 $ 236,000 $ 500,000 $ 13,875,000 16th Street Widening - 6th Avenue to 13th Avenue Status: 06 5.0575 Department: PW Target Year: 12-13 Description: Widen 16th Street to 7-lane cross-section with auxiliary lanes, realign 7th and 8th Avenues to form a single intersection, provide for restricted access from minor side streets. Location: 16th Street - 6th Avenue to 13th Avenue and selected cross streets Related Projects: 5.0574, 7.9417 Justification: Major Roadways Plan - 2005, 4th Avenue & 16th Street corridor studies, improved traffic flow, minimize potential for accidents, foster economic development. Planning Context: Major Roadways Plan - 2005, 4th Avenue and 16th Street corridor studies, economic development Project Schedule Fund 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2022 Total BOND $0 $ 5,692,000 $ 5,430,000 $0 $0 $0 $ 11,122,000 ROAD $ 576,000 $0 $0 $0 $0 $0 $ 576,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 576,000 $ 5,692,000 $ 5,430,000 $0 $0 $0 $ 11,698,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-144 $ 576,000 $ 6,700,000 $ 3,400,000 $ 272,000 $ 750,000 $ 11,698,000 24th Street / Avenue B Corridor Studies Status: 06 5.0576 Department: PW Target Year: 11-12 Description: Perform a traffic operations and safety planning study to determine the current and future needs. Location: 24th Street - Avenue C to Avenue 3E & Avenue B from 7th to 40th Street Related Projects: Justification: 24th Street is experiencing congestion from 1st Avenue to Avenue B and does not provide adequately for u-turns. Avenue B is very congested at both 16th Street and 24th Street. Congestion is starting to build at other intersections as well. Planning Context: Major Roadways Plan - 2005, 4th Avenue & 16th Street corridor studies, economic development. Project Schedule Fund ROAD Total 2011-2012 2012-2013 2013-2014 2014-2015 2015-2016 2016-2021 Total $ 250,000 $ 500,000 $0 $0 $0 $0 $ 750,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 250,000 $ 500,000 $0 $0 $0 $0 $ 750,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-145 $ 750,000 $0 $0 $0 $0 $ 750,000 Major Intersection and Location Studies Status: 06 5.0577 Department: PW Target Year: 07-08 Description: Study intersections and other locations to define problems and functionality design mitigating improvements to improve traffic flow and reduce traffic hazards and accidents as needed. Design and construction will be separate CIP projects. Location: Various locations citywide Related Projects: Justification: Mitigate traffic flow and safety problems at major intersections and other locations on major roadways. Planning Context: Major Roadways Plan - 2005. Traffic operations and safety improvements. Ongoing multi-year project. Project Schedule Fund 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2017 Total HURF $ 100,000 $0 $ 100,000 $0 $0 $0 $ 200,000 ROAD $0 $ 100,000 $0 $ 100,000 $0 $0 $ 200,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $0 $0 $ 400,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-146 $ 400,000 $0 $0 $0 $0 $ 400,000 Roadway Safety Improvements Status: 06 5.0578 Department: PW Target Year: 08-09 Description: Installation of medians, islands, special signals, corner radius improvements, turn lanes, and etc. to reduce accident experience or potential at various locations as needs develop. Budget is based on 4 locations per year. Location: Citywide - based on citizen requests and traffic investigations Related Projects: Justification: These types of improvements have been proven effective in the reduction of accidents and injuries by YMPO, ADOT, and many other agencies that are applicable to many locations in Yuma to mitigate accident experience. Planning Context: Accident mitigation program Project Schedule Fund 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013 2013-2018 Total HURF $0 $ 250,000 $0 $0 $0 $0 $ 250,000 ROAD $ 250,000 $0 $0 $0 $0 $0 $ 250,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 250,000 $ 250,000 $0 $0 $0 $0 $ 500,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-147 $ 48,000 $ 16,000 $ 400,000 $ 32,000 $ 4,000 $ 500,000 Palo Verde Street Speed Control Improvements Status: 06 5.0579 Department: PW Target Year: 09-10 Description: Under this project, speed tables will be constructed along Palo Verde Street to physically limit operating speeds to 25 mph and the ALL-WAY STOP control will be removed from the minor intersections. 9 to 12 speed tables are planned. Location: Palo Verde - Olivia Avenue to Catalina Drive Related Projects: 5.9208 Justification: Palo Verde Street has numerous ALL-WAY STOP intersections that have been installed to control vehicular speeds. These frustrate motorists and cause an unnecessary increase in pollutants and user costs. The speed tables will be effective in controlling speeds and will eliminate the frustation, added pollution and increased operating costs. Planning Context: Major Roadways Plan - 2005. Improvement of intersection of Palo Verde Street & Arizona Avenue intersection. Project Schedule Fund HURF Total 2009-2010 2010-2011 2011-2012 2012-2013 2013-2014 2014-2019 Total $ 141,600 $0 $0 $0 $0 $0 $ 141,600 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 141,600 $0 $0 $0 $0 $0 $ 141,600 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-148 $ 12,000 $0 $ 120,000 $ 9,600 $0 $ 141,600 4th Avenue Integrated Corridor Status: 05 5.0581 Department: PW Target Year: 10-11 Description: Widen 3rd Avenue, eliminate discontinuities to provide a 3 lane cross-section with auxiliary turn lanes, improve 24th Street & 4th Avenue (Phase I). 3rd Avenue & 16th Street, 24th Street & 3rd Avenue, connect 3rd & 4th Avenue intersections. Location: 3rd Avenue and 4th Avenue - 13th Street to 26th Street Related Projects: 5.0405 Justification: Provide an alternate route to relive congestion on 4th Avenue, reduce accidents, foster economic development. Planning Context: Major Roadways Plan - 2005, 4th Avenue and 16th Street Corridor Studies, economic development. Project Schedule Fund BOND UNF Total 2010-2011 2011-2012 2012-2013 2013-2014 2014-2015 2015-2020 Total $0 $ 35,000,000 $ 35,000,000 $0 $0 $0 $ 70,000,000 $ 1,460,400 $0 $0 $ 6,571,500 $ 6,572,100 $0 $ 14,604,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 1,460,400 $ 35,000,000 $ 35,000,000 $ 6,571,500 $ 6,572,100 $0 $ 84,604,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-149 $ 1,460,400 $ 70,000,000 $ 12,170,000 $ 973,600 $0 $ 84,604,000 Expressways Access Studies Status: 06 5.0582 Department: PW Target Year: 08-09 Description: This study will develop property-specific recommendations for providing access when these roadways (total of 42.5 miles) are constructed/converted to expressways as shown in the Major Roadways Plan - 2005. The city has identified 8 distinct expressway segments that will enable it to conduct the study in phases. Scheduling of phases will depend somewhat on area development project. Location: 16th Street, 32nd Street, Avenue 9E and Yuma Expressway Related Projects: Justification: The Major Roadways Plan classifies these roadways as expressways and restricts access to them; however, the city does not have any plan that shows how adequate access to the properties will be provided. Until such a plan is in place, the city cannot realistically begin to implement the expressway requirements or to obtain the needed right-of-way through the development process. Planning Context: Major Roadways Plan Project Schedule Fund ROAD Total 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013 2013-2018 Total $ 154,000 $ 255,000 $ 223,000 $ 143,000 $0 $0 $ 775,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 154,000 $ 255,000 $ 223,000 $ 143,000 $0 $0 $ 775,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-150 $ 775,000 $0 $0 $0 $0 $ 775,000 16th Street Widening Status: 05 5.0584 Department: PW Target Year: 06-07 Description: Widen 16th Street to 6 lanes with median and turn lanes at major intersections, streetlights and sidewalks, rebuild I-8 interchange/bridge, replace or widen railroad bridge, and replace, interconnect and coordinate all existing traffic signals. Location: 16th Street - I-8 to Arizona Avenue Related Projects: Justification: 16th Street has become heavily traveled all year. This project will provide greater roadway capacity and reduce the frequency and severity of accidents. Joint project with State. Planning Context: Major Roadways Plan - 2005, 4th Avenue and 16th Street corridor studies, economic development. ADOT to provide $3,000,000 to provide over 3 years. Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total BOND $ 2,170,000 $ 6,430,000 $0 $0 $0 $0 $ 8,600,000 OTHR $ 1,035,000 $ 1,000,000 $ 1,000,000 $0 $0 $0 $ 3,035,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 3,205,000 $ 7,430,000 $ 1,000,000 $0 $0 $0 $ 11,635,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-151 $ 670,000 $ 1,500,000 $ 8,618,000 $ 447,000 $ 400,000 $ 11,635,000 Traffic Impact Analysis Studies Status: 05 5.0599 Department: PW Target Year: 06-07 Description: This project is to be comprised of multiple phases. Each phase will be a traffic impact study for a new development to determine the effects the development will have on the roadways system and what mitigation measures will be needed. Both capacity analysis and traffic signal warrant analysis will be included. Each study will be paid for by the associated developer. Location: Various locations Citywide Related Projects: Justification: City of Yuma requires traffic impact analysis studies for new developments that will generate 100 vehicles per hour or more. In the past, developers have had these studies conducted, but they have lacked thoroughness and consistency and have not served its purpose. City of Yuma has been performing these studies for developers at their expense to rectify this situation. This CIP project is needed as a vehicle to receive the developers' funds and pass them on to City of Yuma consultants. Planning Context: Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total DD $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $0 $ 500,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $0 $ 500,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 5-152 $ 500,000 $0 $0 $0 $0 $ 500,000 1st Avenue Waterline - 8th St to 12th St Status: 06 7.8225 Department: PW Target Year: 06-07 Description: Phase I (Giss Parkway to 9th Street) - Install 8" distribution main and services, etc. to replace the existing 2" & 4" mains, between Giss and 8th Street. Replace existing 12" main and services between 8th and 9th Street. Phase II (9th Street to 12th Street) - Replace existing 12" watermain and services. Location: 1st Avenue between 8th Street and 12th Street Related Projects: Justification: Increase distribution between Giss Parkway and 12th Street. Consistent with requirements of the Water Distribution Master Plan. Phase I is to be coordinated with C.I.P. Nos. 5.8330. Planning Context: Water Distribution Master Plan. Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total WUF $ 55,000 $ 220,000 $0 $0 $0 $0 $ 275,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 55,000 $ 220,000 $0 $0 $0 $0 $ 275,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 7-1 $ 55,000 $0 $ 200,000 $ 20,000 $0 $ 275,000 2nd Avenue Waterline - 12th St to 16th St Status: 05 7.8310 Department: PW Target Year: 06-07 Description: Installation of new 12" water main on 2nd Avenue from 12th Street to 16th Street. Tie to 10" PVC on 12th between 3rd and 4th Avenues. Add 330 L.F. - 6" & appurt. on 14th Street (3rd - 4th Avenues) per 7.8891A design. Detour around APS Yard - 13th Street, 3rd Avenue, 14th Street. Location: 2nd Avenue - 12th Street to 16th Street Related Projects: 5.9910 Justification: Increase distribution capacity to 16th Street area and add distribution westward on 16th Street to insure adequate water volume to the west. Consistent with requirements of the Water Distribution Master Plan. Planning Context: Water Master Plan. Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total WUF $ 130,000 $ 255,000 $0 $0 $0 $0 $ 385,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 130,000 $ 255,000 $0 $0 $0 $0 $ 385,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 7-2 $ 30,000 $0 $ 325,000 $ 30,000 $0 $ 385,000 Highway 80 Waterline - Ave 6½E to Ave 8½E Status: 05 7.8706 Department: PW Target Year: 06-07 Description: Install 20" waterline from Avenue 6½E to Avenue 8½E along Highway 80 with crossings bored or trenched under Highway 80 at half-mile and mile lines. Location: Highway 80 - Avenue 6½E to Avenue 8½E Related Projects: Justification: To increase water service from 6½E east to 8½E along Highway 80. Conforms with requirement of water master plan. Needed to properly serve the area for growth and to loop system. Planning Context: Water Distribution Master Plan. Project Schedule Fund BOND Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 700,000 $0 $0 $0 $0 $0 $ 700,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 700,000 $0 $0 $0 $0 $0 $ 700,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 7-3 $0 $0 $ 650,000 $ 50,000 $0 $ 700,000 Avenue 3E and Gila Ridge Road Watermains Status: 06 7.8722 Department: PW Target Year: 06-07 Description: Phase I (12" watermain) - Gila Ridge Road (BLM to Avenue 3E) and Avenue 3E (Gila Ridge Road to Dairy Queen) completed FY '04-'05. Phase II - Avenue 3E (12"/16") (Gila Ridge Road to 24th Street Extension). Phase III (10"/12")- Gila Ridge Road (Avenue 3E to Avenue 4E). Location: Phase I - Gila Ridge Road (BLM to Avenue 3E) and Avenue 3E (Gila Ridge Road to Dairy Queen). Phase II - Avenue 3E (Gila Ridge Road to 24th Street Extension). Phase III - Gila Ridge Road (Avenue 3E to Avenue 4E) Related Projects: Justification: Significant development on Gila Ridge Road at 3E and east of that point. Presently served by inadequate 2" water line. Project will begin looping to 16" line near 4E on Gila Ridge Road. Planning Context: Project Schedule Fund WSDC Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 160,000 $ 190,000 $0 $0 $0 $0 $ 350,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 160,000 $ 190,000 $0 $0 $0 $0 $ 350,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 7-4 $0 $0 $ 325,000 $ 25,000 $0 $ 350,000 5th Ave Watermain - 8th St to 16th St Status: 06 7.8802 Department: PW Target Year: 06-07 Description: Install 12" main on 5th Avenue from 8th Street to 16th Street. Location: 5th Avenue - 8th Street to 16th Street Related Projects: 8.0100 Justification: Master plan shows need for future major transmission main between 8th and 16th Street to better distribute major flows to west portion of the City. Planning Context: Water Distribution Master Plan. Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total WUF $ 470,000 $0 $0 $0 $0 $0 $ 470,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 470,000 $0 $0 $0 $0 $0 $ 470,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 7-5 $ 10,000 $0 $ 430,000 $ 30,000 $0 $ 470,000 3rd Street Watermain - Magnolia Ave. to Ave. B Status: 06 7.9210 Department: PW Target Year: 07-08 Description: Replace 12" watermain in 3rd Street from Magnolia Avenue to Avenue B; abandon existing line in place, salvage valves and reconnect services. Include waterline extensions into side streets to avoid pavement disturbance for future extensions. Location: 3rd Street - Magnolia Avenue to Avenue B Related Projects: Justification: The existing 1954 cement lined steel pipe needs to be replaced. The inside coating is failing causing rusting through the pipe. Planning Context: Project Schedule Fund WSDC Total 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2017 Total $ 37,000 $ 410,000 $0 $0 $0 $0 $ 447,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 37,000 $ 410,000 $0 $0 $0 $0 $ 447,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 7-6 $ 37,000 $0 $ 370,000 $ 40,000 $0 $ 447,000 Fire Hydrants Status: 06 7.9294 Department: PW Target Year: 06-07 Description: Install hydrants as needed in newly annexed areas. '96/'97 - Engler Estates (completed). '97-'98 - Desert Grove Fire Hydrants (completed), Donovan Estates, Magnolia Village - 6 hydrants and 2,450 LF of 6" line '98-'99: Arcadia Meadows - 3 hydrants (completed). Location: As annexed Related Projects: Justification: Newly annexed areas frequently have City waterlines but few or no fire hydrants. The hydrants are planned in expectation of annexation requiring additional hydrants. Planning Context: Growth and Development policy. Multi-year Project. Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total WUF $ 100,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000 $0 $ 300,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 100,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000 $0 $ 300,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 7-7 $0 $0 $ 260,000 $ 40,000 $0 $ 300,000 12th Street Waterline - 14th Ave. to 21st Dr. Status: 06 7.9305 Department: PW Target Year: 07-08 Description: Install approximately 2,250 LF of 10" waterline on 12th Street between 21st Drive & 14th Avenue. Location: 12th Street - 14th Avenue to 21st Drive Related Projects: Justification: Provide for system looping. Conforms with water distribution master plan. Planning Context: Water Distribution Master Plan Project Schedule Fund WSDC Total 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2017 Total $ 15,000 $ 190,000 $0 $0 $0 $0 $ 205,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 15,000 $ 190,000 $0 $0 $0 $0 $ 205,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 7-8 $ 15,000 $0 $ 180,000 $ 10,000 $0 $ 205,000 28th Street Waterline - 8th Ave to Ave A Status: 06 7.9307 Department: PW Target Year: 07-08 Description: Install approximately 1,320 LF of 10" Water Line on 28th Street, between 8th Avenue and Avenue A. Location: 28th Street - 8th Avenue to Avenue A Related Projects: 5.0005 Justification: Provide for system looping. Conforms with water distribution master plan. Planning Context: Water Distribution Master Plan. Project Schedule Fund 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2017 Total WUF $ 100,000 $0 $0 $0 $0 $0 $ 100,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 100,000 $0 $0 $0 $0 $0 $ 100,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 7-9 $0 $0 $ 95,000 $ 5,000 $0 $ 100,000 19th Street Waterline - 4th Ave. to Arizona Ave. Status: 06 7.9308 Department: PW Target Year: 08-09 Description: Install approximately 2,640 LF of 10" Waterline between 4th Avenue and Arizona Avenue. East 660 L.F. installed FY '01-'02 with 7.9412. Location: 19th Street - 4th Avenue to Arizona Avenue Related Projects: Justification: To provide for system looping. Conforms with typical midsection line minimum waterline sizing and reinforcement of 4th Avenue waterlines. Midsection line to 19th Street because of street alignments between Arizona Avenue and Avenue A Main has been installed under 4th Avenue. Planning Context: Water Distribution Master Plan. Project Schedule Fund 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013 2013-2018 Total WUF $ 104,000 $ 90,000 $0 $0 $0 $0 $ 194,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 104,000 $ 90,000 $0 $0 $0 $0 $ 194,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 7-10 $ 14,000 $0 $ 170,000 $ 10,000 $0 $ 194,000 Magnolia Ave Watermain - 1st St to 8th St Status: 06 7.9309 Department: PW Target Year: 06-07 Description: Install 10" Waterline on Magnolia Avenue between 1st Street and 8th Street. Approximately 4,600 L.F. This includes hanging main on Bridge over West Main Canal. Location: Magnolia Avenue - 1st Street to 8th Street Related Projects: Justification: To provide for system looping. Conforms with Water Distribution Master Plan. Planning Context: Water Distribution Master Plan. Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total WUF $ 394,000 $0 $0 $0 $0 $0 $ 394,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 394,000 $0 $0 $0 $0 $0 $ 394,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 7-11 $ 58,000 $0 $ 306,000 $ 30,000 $0 $ 394,000 10" Waterline at 28th St E. of 4th Avenue Status: 06 7.9310 Department: PW Target Year: 12-13 Description: Install approximately 1,280 L.F. of 10" Waterline on 28th Street between 4th Avenue and the Alley west of Madison. Should be constructed inconjunction with 5.9108 - Street project. Location: 28th Street - 4th Avenue to Madison Avenue Related Projects: Justification: Provide for system looping. Conforms with Public Works Utility Regulations for minimum Waterline sizing. Planning Context: Water Distribution Master Plan Project Schedule Fund 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2022 Total UNF $ 106,000 $0 $0 $0 $0 $0 $ 106,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 106,000 $0 $0 $0 $0 $0 $ 106,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 7-12 $ 5,000 $0 $ 96,000 $ 5,000 $0 $ 106,000 36th Street Waterline - 4th Ave. to 8th Ave. Status: 06 7.9311 Department: PW Target Year: 11-12 Description: Install approximately 1,320 L.F. of 10" waterline on 36th Street between 4th Avenue and 8th Avenue. Location: 36th Street - 4th Avenue to 8th Avenue Related Projects: Justification: Provide for system looping. Planning Context: Water Distribution Master Plan. Project Schedule Fund WSDC Total 2011-2012 2012-2013 2013-2014 2014-2015 2015-2016 2016-2021 Total $ 10,000 $0 $ 130,000 $0 $0 $0 $ 140,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 10,000 $0 $ 130,000 $0 $0 $0 $ 140,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 7-13 $ 10,000 $0 $ 120,000 $ 10,000 $0 $ 140,000 3rd & 4th Ave Waterlines - 3rd St. to 4th St. Status: 06 7.9408 Department: PW Target Year: 06-07 Description: Replace existing line with (1) 700 L.F. 10" waterline 3rd Avenue: 3rd Street to 4th Street, (2) 400 L.F. 6" waterline 4th Street: 3rd Avenue to east side of 4th Avenue. Install new services. Recover several lengths of existing pipe dating from 1910 for analysis and museum display. Location: 3rd Avenue between 3rd Street and 4th Street; 4th Street - 3rd Avenue to 4th Avenue. Related Projects: Justification: This project will eliminate 4" Asbestos Cement Pipe (ACP), 4" Cast Iron Pipe (CIP), 6" Asbestos Cement Pipe (ACP), 6" Cast Iron Pipe (CIP) dated from 1910. 4th Avenue alternate main. Planning Context: Rollover project Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total WUF $ 190,000 $0 $0 $0 $0 $0 $ 190,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 190,000 $0 $0 $0 $0 $0 $ 190,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 7-14 $ 10,000 $0 $ 170,000 $ 10,000 $0 $ 190,000 Pecan Grove Waterline Improvements Status: 06 7.9416 Department: PW Target Year: 07-08 Description: Replace existing waterlines with 2,320 L.F. of 6" waterline (580 L.F. on each side of 3rd Pl., 4th St., 4th Pl., 5th Street). Install new services. This project is to include street, sidewalk, and driveway patching. As part of the Avenue B street project, 2nd Street to 8th Street, the County installed 6" stubs into intersecting streets from Avenue B. Construction: $340,000 and inspection: $15,000. Location: 3rd Place - 24th Avenue to Avenue B, 4th Street - 24th Avenue to Avenue B, 4th Place - 24th Avenue to Avenue B, and 5th Street 24th Avenue to Avenue B Related Projects: Justification: Present lines in alley to be abandoned when cost of increased maintenance justifies cost. Planning Context: Project Schedule Fund 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2017 Total WUF $ 25,000 $0 $0 $0 $0 $0 $ 25,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 25,000 $0 $0 $0 $0 $0 $ 25,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 7-15 $ 25,000 $0 $0 $0 $0 $ 25,000 16th St. & Zone 2 Waterline - Arizona Ave. to Ave. A Status: 06 7.9417 Department: PW Target Year: 11-12 Description: Replace 24" cement lined concrete (CLC) waterline in 16th Street between Arizona Avenue and Avenue A with a 36" PVC watermain, as per new system requirements. Location: 16th Street - Arizona Avenue to Avenue A Related Projects: Justification: Replace existing CLC line prior to/in conjunction with street reconstruction. Install local distribution line in 16th Street and alternate section line main stub-outs to the north or south of 16th Street as determined necessary. Planning Context: Water Distribution Master Plan Project Schedule Fund WSDC Total 2011-2012 2012-2013 2013-2014 2014-2015 2015-2016 2016-2021 Total $ 1,110,000 $0 $0 $0 $0 $0 $ 1,110,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 1,110,000 $0 $0 $0 $0 $0 $ 1,110,000 Project Budget Location Map Design Right-of-way $ 111,000 Construction Inspection Other (i.e. Materials) $ 924,000 Total 7-16 $0 $ 75,000 $0 $ 1,110,000 New Water Services Status: 06 7.9490 Department: PW Target Year: 06-07 Description: New service installations including water meter boxes, polyvinylchloride (PVC) pipe and brass fittings. Location: Citywide Related Projects: Justification: This project provides a funding account in order to finance water service line capital improvements to the water system in the course of the fiscal year. Planning Context: Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total WUF $ 125,000 $ 125,000 $ 125,000 $ 150,000 $ 150,000 $0 $ 675,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 125,000 $ 125,000 $ 125,000 $ 150,000 $ 150,000 $0 $ 675,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 7-17 $0 $0 $ 675,000 $0 $0 $ 675,000 8th Avenue Waterline - 24th St to 32nd St Status: 06 7.9503 Department: PW Target Year: 08-09 Description: Replace existing 10 inch waterline in conjunction with street reconstruction. Location: 8th Avenue - 24th Street to 32nd Street Related Projects: Justification: Existing line is of obsolete Simplex pipe and replacement is difficult. Breaks are frequent. Planning Context: Project Schedule Fund 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013 2013-2018 Total WUF $ 47,500 $0 $0 $0 $0 $0 $ 47,500 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 47,500 $0 $0 $0 $0 $0 $ 47,500 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 7-18 $ 47,500 $0 $0 $0 $0 $ 47,500 Avenue A Waterline - 16th to 24th Streets Status: 05 7.9602 Department: PW Target Year: 06-07 Description: Replace existing 12" Simplex water line with new 12" water line prior to street construction. Location: Avenue A - 16th Street to 24th Street Related Projects: Justification: 12" AC (Simplex) main has reached end of life. Water model shall be run to define additional water requirements in Avenue A. Planning Context: Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total WUF $ 350,000 $0 $0 $0 $0 $0 $ 350,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 350,000 $0 $0 $0 $0 $0 $ 350,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 7-19 $0 $0 $ 335,000 $ 15,000 $0 $ 350,000 Gila Ridge Rd Watermains - Ave 4½E to Araby Rd Status: 06 7.9603 Department: PW Target Year: 06-07 Description: Install watermains. Phase I: Avenue 4E(U.P.R.R. to Gila Ridge Road) 16" watermain (complete). Phase II: Gila Ridge Road (Avenue 4E - Avenue 5E) 16" watermain (complete). Phase III: Avenue 5E (U.P.R.R. to Gila Ridge Road) 12" watermain (complete). Phase IV: Work transferred to CIP 7.8722. Phase V: Gila Ridge Road (Avenue 5E to Avenue 6½E) 16" watermain. Location: Various locations Related Projects: Justification: Water system looping. This project will provide City water to the industrial area. Once connected in at East Palo Verde Street and Avenue 3E, there will be redundancy to Highway 80 waterline. Planning Context: Project Schedule Fund WSDC Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 400,000 $ 425,000 $0 $0 $0 $0 $ 825,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 400,000 $ 425,000 $0 $0 $0 $0 $ 825,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 7-20 $ 75,000 $0 $ 700,000 $ 50,000 $0 $ 825,000 15th, 16th & 17th Ave Waterlines - 3rd St to 8th St Status: 06 7.9606 Department: PW Target Year: 06-07 Description: Replace existing 4" Asbestos Cement Pipe (ACP) main in 17th Avenue (1,900 feet) and 16th Avenue (2,000 feet) from 3rd Street to Yuma Housing Authority at 6th Place, with 6" Polyvinylchloride Pipe (PVC). Replace 2760 feet of existing 4" waterline on 15th Avenue, 3rd Street to 7th Street with 8" and 12" PVC pipe. Location: 17th Avenue - 3rd Street to 6th Place; 16th Avenue - 3rd Street to 6th Place; 15th Avenue - 3rd Street to 8th Street. Related Projects: 5.9105, 9.9402 Justification: Undersized lines. Planning Context: Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total WUF $ 420,000 $ 420,000 $0 $0 $0 $0 $ 840,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 420,000 $ 420,000 $0 $0 $0 $0 $ 840,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 7-21 $0 $0 $ 800,000 $ 40,000 $0 $ 840,000 19th St. 10" Watermain - 4th Ave. to Ave. A Status: 05 7.9707 Department: PW Target Year: 09-10 Description: Install a 10" water main in 19th Street from 4th Avenue to Avenue A. Phase I (4th Avenue to 6th Avenue) constructed in FY '01-'02. Location: 19th Street from 4th Avenue to Avenue A Related Projects: 5.9209 Justification: This project will provide system looping along a mid-section alignment. Planning Context: Project Schedule Fund 2009-2010 2010-2011 2011-2012 2012-2013 2013-2014 2014-2019 Total WUF $ 285,000 $0 $0 $0 $0 $0 $ 285,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 285,000 $0 $0 $0 $0 $0 $ 285,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 7-22 $ 25,000 $0 $ 240,000 $ 20,000 $0 $ 285,000 24th Street Ground Storage Tank Status: 05 7.9800 Department: PW Target Year: 13-14 Description: Phase 1: Acquire property and construct a fill and discharge pipeline system, booster pump station and a four (4) million gallon storage tank (property acquisition is complete). Phase 2: includes construction of a 16" feed line from Avenue B to Tank and a discharge line from tank site to Avenue D. Phase 3: Construction of a second four (4) million gallon tank with property acquisition. Location: North of 24th Street at Thacker Lateral (Avenue B½ Alignment) Related Projects: Justification: The water system analysis phase of C.I.P. No. 7.9610 (Water Pressure Zones) indicate that with the existing transmission and distribution pipeline network and planned expansion to same, additional storage capacity in this vicinity is needed due to anticipated demand growth. Planning Context: Project Schedule Fund 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018 2018-2023 Total BOND $ 4,000,000 $0 $0 $0 $0 $0 $ 4,000,000 WSDC $ 200,000 $0 $0 $0 $0 $0 $ 200,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 4,200,000 $0 $0 $0 $0 $0 $ 4,200,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 7-23 $ 300,000 $0 $ 3,580,000 $ 320,000 $0 $ 4,200,000 Orange Avenue Waterline - 4th St to 8th St Status: 05 7.9803 Department: PW Target Year: 06-07 Description: Install 2400 L.F. of 10" waterline in Orange Avenue from end of 7.9408 project near 4th Street to 8th Street. Install when Orange Avenue needs to be reconstructed. Location: Orange Avenue - 4th St. to 8th St. Related Projects: 5.0518 Justification: 4th Avenue (mid-section) alternate main to replace 4" and 6" Asbestos Cement Pipe (ACP). Planning Context: Water Distribution Master Plan. Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total WUF $ 20,000 $0 $0 $ 350,000 $0 $0 $ 370,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 20,000 $0 $0 $ 350,000 $0 $0 $ 370,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 7-24 $ 20,000 $0 $ 320,000 $ 30,000 $0 $ 370,000 Agua Viva Water Treatment Plant Status: 05 7.9806 Department: PW Target Year: 06-07 Description: Feasibility study, design and construction of a larger water treatment plant with expansion capacity to 40 MGD to replace existing 1 MGD plant. Current phase will construct 20 MGD of treatment capacity. Location: SWC of Avenue 9E and Araby - Blaisdale Road (City owned property) Related Projects: 7.0301 Justification: City of Yuma growth to the East warrants construction of a new treatment plant. Existing City capability supplies water volume and pressure necessary to meet the needs east of Avenue 3E and will be limited by the year 2008. Planning Context: Project Schedule Fund BOND Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 80,000,000 $0 $0 $0 $0 $0 $ 80,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 80,000,000 $0 $0 $0 $0 $0 $ 80,000,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 7-25 $0 $0 $ 75,000,000 $ 5,000,000 $0 $ 80,000,000 Carbon Feeder Improvements Status: 05 7.9904 Department: PW Target Year: 06-07 Description: Replace existing carbon feeder with new super-sack carbon injection feeder to assist in complying with new Disinfection/Disinfection By-products Rule (EPA/ADEQ) with monitoring capabilities through the SCADA system. Location: Main Street Water Treatment Facility Related Projects: Justification: Activated carbon is critical in controlling the generation of Trihalomethanes which result from the chlorination of the City's drinking water. The current carbon feeder is inoperable more than 50% of its run time. The feeder manufacturer is no longer in business and replacement parts are very difficult to acquire or must be manufactured. In addition, the loading of the existing feeder causes excessive dust which poses a significant health risk to personnel, and man-hours to clean related equipment and building area where it is housed. Planning Context: Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total WUF $ 200,000 $0 $0 $0 $0 $0 $ 200,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 200,000 $0 $0 $0 $0 $0 $ 200,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 7-26 $ 20,000 $0 $ 170,000 $ 10,000 $0 $ 200,000 Waterline Replacement/Improvements Status: 06 7.9996 Department: PW Target Year: 06-07 Description: Replacement of miscellaneous cast iron and cement asbestos waterline extensions found to be needed at time of construction of various street projects. Location: Various Street Projects Related Projects: Justification: System looping or extensions and water main replacement in conjunction with Street Projects. Provide water service to every lot prior to construction of street improvements. Planning Context: Multi-year Project. Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total WUF $ 800,000 $ 800,000 $ 800,000 $ 800,000 $ 800,000 $0 $ 4,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 800,000 $ 800,000 $ 800,000 $ 800,000 $ 800,000 $0 $ 4,000,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 7-27 $ 200,000 $0 $ 3,600,000 $ 200,000 $0 $ 4,000,000 Mechanical Shop Expansion Status: 06 7.0000 Department: PW Target Year: 12-13 Description: Construct 1000 square foot building adjacent to current shop with overhead awning between both buildings for additional work area. Location: Main Street Treatment Facility Related Projects: Justification: The current mechanical space is limited due to the addition of personnel and necessary equipment to maintain plant systems. Planning Context: Project Schedule Fund Total 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2022 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Project Budget Location Map Design Right-of-way $0 Construction Inspection Other (i.e. Materials) $0 Total 7-28 $0 $0 $0 $0 Flocculation/Sedimentation Basin Status: 05 7.0102 Department: PW Target Year: 06-07 Description: Replace flocculation section. Repair or replace weir sections and cathodic anodes. Repair or replace influent and effluent gates, upgrade electrical wiring. Replace 42" effluent butterfly valve. Location: Main Street Water Treatment Plant Related Projects: Justification: Existing basins need to be upgraded and refurbished. Design is of early 70's era. Improvements would eliminate costly maintenance costs. Current design is not cost effective. Concrete top would eliminate foreign material. Planning Context: Project Schedule Fund BOND Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 450,000 $0 $0 $0 $0 $0 $ 450,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 450,000 $0 $0 $0 $0 $0 $ 450,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 7-29 $ 10,000 $0 $ 420,000 $ 20,000 $0 $ 450,000 1st Avenue Waterline - 12th St to 16th St Status: 05 7.0103 Department: PW Target Year: 07-08 Description: Replacement of fifty (50) year-old Asbestos Cement Pipe (ACP)(Simplex) waterline, in conjunction with street improvement project. Location: 1st Avenue - 12th Street to 16th Street Related Projects: Justification: The existing pipe was not manufactured to uniform tolerances, making it difficult to acquire adapters, when tying into or repairing the pipe. Planning Context: Project Schedule Fund 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2017 Total WUF $ 205,000 $0 $0 $0 $0 $0 $ 205,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 205,000 $0 $0 $0 $0 $0 $ 205,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 7-30 $ 10,000 $0 $ 180,000 $ 15,000 $0 $ 205,000 Zone 2 to Zone 1 Pressure Reducing Valve Status: 05 7.0107 Department: PW Target Year: 06-07 Description: Design and construction of two pressure reducing valves. First valve at 8th Street and 11th Avenue installed FY '04-'05. Second valve at Avenue A and 16th Street to be constructed FY '06-'07. Location: Avenue A at 16th Street and 8th Street at 11th Avenue Related Projects: 5.9701, 7.9602 Justification: Recommended by Water Distribution Master Plan. Planning Context: Water Distribution Master Plan. Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total WUF $ 270,000 $0 $0 $0 $0 $0 $ 270,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 270,000 $0 $0 $0 $0 $0 $ 270,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 7-31 $0 $0 $ 263,000 $ 7,000 $0 $ 270,000 Potable Water Dedicated Sample Taps Status: 05 7.0108 Department: PW Target Year: 06-07 Description: Purchase and install 100 meter boxes, shut off valves and dedicated sample taps throughout the distribution system for potable water sampling for the City of Yuma. Location: Throughout the City of Yuma and other areas served by the City of Yuma public water system Related Projects: Justification: Samples for microbiological and residual disinfectant analysis are collected at 93 sites each month. The population served by a public water system determines the number of samples collected each month. EPA and ADEQ require 90 samples per month for the City of Yuma water system based on the current population. 100 samples must be collected when the population served reaches 96,001. Currently, samples are collected at various locations within the city and sometimes require staff to change sites due to unforeseen problems (pets, homes empty, broken taps, etc.). The dedicated sample taps will allow flushing and collection of samples that reflect the quality of the water in the distribution system, rather than water under the influence of private plumbing. Planning Context: Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total WUF $ 60,000 $ 60,000 $ 60,000 $0 $0 $0 $ 180,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 60,000 $ 60,000 $ 60,000 $0 $0 $0 $ 180,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 7-32 $0 $0 $ 180,000 $0 $0 $ 180,000 24th Street 16" Waterline Replacement Status: 05 7.0110 Department: PW Target Year: 07-08 Description: Design and construction to replace existing 16" waterline in 24th Street. Location: 24th Street - 8th Avenue to Arizona Avenue Related Projects: Justification: Per recommendation of Water Distribution Master Plan. Planning Context: Water Distribution Master Plan. Project Schedule Fund 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2017 Total WUF $ 520,000 $0 $0 $0 $0 $0 $ 520,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 520,000 $0 $0 $0 $0 $0 $ 520,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 7-33 $0 $0 $ 480,000 $ 40,000 $0 $ 520,000 8th St Water Transmission Ln - Ave A to Ave B Status: 05 7.0111 Department: PW Target Year: 06-07 Description: Design and construction of a 30" Zone 1 Water Transmission Line at 8th Street from Avenue A to Avenue B. Location: 8th Street from Avenue A to Avenue B Related Projects: 5.0409, 7.9102 Justification: Per recommendation of Water Distribution Master Plan. Planning Context: Water Distribution Master Plan. Project Schedule Fund BOND Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 2,200,000 $0 $0 $0 $0 $0 $ 2,200,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 2,200,000 $0 $0 $0 $0 $0 $ 2,200,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 7-34 $0 $0 $ 2,100,000 $ 100,000 $0 $ 2,200,000 Avenue B Water Transmission Line Status: 06 7.0113 Department: PW Target Year: 06-07 Description: Design and construction of a Zone 1 Water Transmission Line. Phase I (16th St. to 32nd Street) constructed in FY '01-'02. Phase II (16th Street to 8th Street) in FY '06-'07. Location: 32nd St. to 24th St. (16" line), 24th St. to 16th St. (24" line) and 16th St. to 8th St. (24" line). Related Projects: 7.0111 Justification: Per recommendation of Water Distribution Master Plan. Planning Context: Water Distribution Master Plan. Project Schedule Fund BOND Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 2,100,000 $0 $0 $0 $0 $0 $ 2,100,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 2,100,000 $0 $0 $0 $0 $0 $ 2,100,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 7-35 $0 $0 $ 2,000,000 $ 100,000 $0 $ 2,100,000 Ave 9E Water Transmission Ln - I-8 to 40th St Status: 05 7.0114 Department: PW Target Year: 06-07 Description: Design and construction of Zone 2 42" Water Transmission Line. Location: Avenue 9E from Southside I-8 to 40th Street Related Projects: Justification: Per recommendation of Water Distribution Master Plan. Planning Context: Water Distribution Master Plan. Project Schedule Fund BOND Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 2,200,000 $0 $0 $0 $0 $0 $ 2,200,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 2,200,000 $0 $0 $0 $0 $0 $ 2,200,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 7-36 $0 $0 $ 2,100,000 $ 100,000 $0 $ 2,200,000 Ave 9E Water Transmission Ln - E. Mesa WTP to I-8 Status: 05 7.0115 Department: PW Target Year: 06-07 Description: Design and construction of a 42" Water Transmission Line from the East Mesa Water Treatment Plant to the southside of Interstate 8. Project to include a casing on 1-8 portion. Location: Avenue 9E from East Mesa Water Treatment Plant to southside of I-8 Related Projects: 7.0115, 7.0302 Justification: Per recommendation of Water Distribution Master Plan. Planning Context: Water Distribution Master Plan. Project Schedule Fund BOND Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 1,100,000 $0 $0 $0 $0 $0 $ 1,100,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 1,100,000 $0 $0 $0 $0 $0 $ 1,100,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 7-37 $ 56,000 $0 $ 1,004,000 $ 40,000 $0 $ 1,100,000 MSWTP Safe Drinking Water Act Upgrades Status: 05 7.0116 Department: PW Target Year: 06-07 Description: Contingency project to provide construction to meet EPA enhanced coagulation rule. These are preliminary estimates and contingent upon denial of request for waiver. Location: Main Street Water Treatment Facility. Related Projects: Justification: EPA/ADEQ regulatory requirement. Planning Context: Project Schedule Fund BOND Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 3,420,000 $ 3,420,000 $0 $0 $0 $0 $ 6,840,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 3,420,000 $ 3,420,000 $0 $0 $0 $0 $ 6,840,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 7-38 $ 570,000 $0 $ 5,700,000 $ 570,000 $0 $ 6,840,000 SCADA System Upgrades, Phase I Status: 06 7.0117 Department: PW Target Year: 06-07 Description: Upgrade Water Treatment Facilities SCADA system to allow continued monitoring and control; expand present system to include new facilities and modifications; add additional RTV and PLC's at all facilities. Location: Water Treatment Facilities Related Projects: Justification: Present system hardware is obsolete, software is not supported; new sites which require monitoring can not be added to the system due to compatibility. System upgrade is imperative if the system is to continue to function. Planning Context: Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total WUF $ 406,000 $0 $0 $0 $0 $0 $ 406,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 406,000 $0 $0 $0 $0 $0 $ 406,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 7-39 $0 $0 $ 376,000 $ 30,000 $0 $ 406,000 32nd St Water Trans. Ln - Ave B to Friendship Twr Status: 06 7.0118 Department: PW Target Year: 06-07 Description: Design and construction of a 20" Zone 1 Water Transmission Line. Location: 32nd Street - Avenue B to Friendship Tower Related Projects: 7.0113 Justification: Per recommendation of Water Distribution Master Plan. Planning Context: Water Distribution Master Plan. Project Schedule Fund WSDC Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 760,000 $0 $0 $0 $0 $0 $ 760,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 760,000 $0 $0 $0 $0 $0 $ 760,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 7-40 $ 30,000 $0 $ 685,000 $ 45,000 $0 $ 760,000 Environmental Laboratory Equipment Status: 05 7.0122 Department: PW Target Year: 07-08 Description: Laboratory equipment to allow metals and organics analysis for compliance with regulatory requirements. Includes: Inductively Coupled Plasma/Mass Spectrometer, Ion Chromatograph, Hot Block - metals digestion, Auto analyzers, Radiometer and Gas Chromatograph/Mass Spectrometer analyzers, etc. Location: Utility Division Laboratory (Figueroa Avenue WPCF) Related Projects: Justification: The requested equipment will allow the division laboratory to perform most if not all of the monitoring and testing currently required by the EPA and ADEQ and eliminate most if not all of the testing costs associated with our having to use commercial laboratories to perform this function. Planning Context: Project Schedule Fund 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2017 Total WUF $ 420,000 $ 350,000 $0 $0 $0 $0 $ 770,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 420,000 $ 350,000 $0 $0 $0 $0 $ 770,000 Total Project Budget Location Map Design Right-of-way $0 Construction Inspection Other (i.e. Materials) $0 Total 7-41 $0 $0 $ 770,000 $ 770,000 Water Utility Security Status: 05 7.0203 Department: PW Target Year: 06-07 Description: Upgrade present security systems to provide adequate protection for public drinking water. Phase 1: Install CCTV surveillance components. Phase 2: Install Card Access System Components(Conduit Interconnect). Phase 3: Install Object Video for Perimeter Security. Location: Main Street Water Treatment Facility, Yuma Mesa East Water Treatment Facilty, Booster Pump Stations, and Storage Facilities Related Projects: Justification: Water Treatment Plants and related facilities have been identified as high risk for attacks by terrorists. Regular upgrade to current security systems will ensure adequate protection for City water system. Planning Context: Project Schedule Fund BOND Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 442,000 $ 142,000 $0 $0 $0 $0 $ 584,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 442,000 $ 142,000 $0 $0 $0 $0 $ 584,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 7-42 $ 40,000 $0 $ 444,000 $ 80,000 $ 20,000 $ 584,000 1st Ave Water Transmission Ln - 5th St to 16th St Status: 05 7.0300 Department: PW Target Year: 06-07 Description: Install 20" transmission line to transmit water to Zone 2 from the Main Street Water Treatment Plant. Location: 1st Avenue - 5th Street to 16th Street Related Projects: 5.8330 Justification: Recommended by 2001 Water Master Plan. Planning Context: Water Master Plan. Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total WUF $ 20,000 $ 450,000 $0 $0 $0 $0 $ 470,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 20,000 $ 450,000 $0 $0 $0 $0 $ 470,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 7-43 $ 20,000 $0 $ 430,000 $ 20,000 $0 $ 470,000 Ave 9E Water Trans. Ln - E. Mesa WTP to 24th St Status: 05 7.0301 Department: PW Target Year: 06-07 Description: Design and construction of a 16-inch or 20-inch water transmission line. Location: Avenue 9E - E. Mesa Water Treatment Plant to 24th Street Related Projects: 5.9812 Justification: Provide additional transmission capacity to the northern portion of the East Mesa. Planning Context: Project Schedule Fund BOND Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 2,700,000 $0 $0 $0 $0 $0 $ 2,700,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 2,700,000 $0 $0 $0 $0 $0 $ 2,700,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 7-44 $ 30,000 $0 $ 2,500,000 $ 170,000 $0 $ 2,700,000 40th St Water Transmission Ln - Ave 3E to Ave 9E Status: 05 7.0302 Department: PW Target Year: 06-07 Description: Design and construction of a 30-inch water transmission line. Location: 40th Street - Avenue 3E to Avenue 9E Related Projects: 7.0114 Justification: Provide additional transmission capacity to East Mesa. Planning Context: Area Service Highway Crossing must be coordinated with ASH construction. Project Schedule Fund BOND Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 8,300,000 $0 $0 $0 $0 $0 $ 8,300,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 8,300,000 $0 $0 $0 $0 $0 $ 8,300,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 7-45 $0 $0 $ 7,600,000 $ 700,000 $0 $ 8,300,000 Main Street WTF Chlorine Scrubber Improvement Status: 05 7.0401 Department: PW Target Year: 06-07 Description: Replace existing chlorine scrubber with dry media scrubber and modify existing piping and controls. Location: Main Street Water Treatment Facility Related Projects: Justification: Current scrubber uses sodium hydroxide which generates hazardous waste that must be disposed every 3-5 years at considerable cost. Dry media scrubber will provide equal protection from chlorine leaks without producing a hazardous waste and will result in significant cost savings and greater level of safety for plant personnel. Planning Context: Project Schedule Fund BOND Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 375,000 $0 $0 $0 $0 $0 $ 375,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 375,000 $0 $0 $0 $0 $0 $ 375,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 7-46 $ 40,000 $0 $ 305,000 $ 30,000 $0 $ 375,000 Main Street WTF Auxillary Power Status: 05 7.0403 Department: PW Target Year: 06-07 Description: Evaluate critical auxillary power requirements at the Main Street Water Plant; replace existing natural gas generator with diesel powered generator. Augment/expand existing generating capacity to meet plant power needs. Location: Main Street Water Treatment Facility Related Projects: Justification: Existing generator will not power all facilities needed to ensure uninterrupted water production during prolonged power outages. Additionally, a stand alone auxillary generator will ensure uninterrupted water production. Planning Context: Project Schedule Fund BOND WUF Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 1,095,000 $ 900,000 $0 $0 $0 $0 $ 1,995,000 $ 18,000 $0 $0 $0 $0 $0 $ 18,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 1,113,000 $ 900,000 $0 $0 $0 $0 $ 2,013,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 7-47 $ 113,000 $0 $ 1,750,000 $ 150,000 $0 $ 2,013,000 Main Street WTF Filter System Upgrade Status: 05 7.0500 Department: PW Target Year: 06-07 Description: Upgrade existing backwash recovery system. Design and install emergency de-watering system in filter gallery; Upgrade filter control buildings and controls; Upgrade backwash recovery pump (combines CIP's 7.0202, 7.0204 and 7.0402). Location: Main Street Water Plant Related Projects: Justification: Existing filter and backwash system is over 20 years old. Failure will occur if system is not upgraded resulting in lengthy service interruption for the majority of water customers. Planning Context: Project Schedule Fund BOND Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 1,940,100 $0 $0 $0 $0 $0 $ 1,940,100 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 1,940,100 $0 $0 $0 $0 $0 $ 1,940,100 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 7-48 $ 250,000 $0 $ 1,540,100 $ 150,000 $0 $ 1,940,100 Main Street WTF Mechanical De-watering System Status: 05 7.0501 Department: PW Target Year: 06-07 Description: Design and install mechanical de-watering system for residuals generated at the Main Street Water Plant. Location: Main Street Water Plant Related Projects: Justification: With the construction of the hotel on Main Street, the treatment plant will have no way to dispose of residuals generated via the treatment process. Mechanical de-watering allows handling on site and disposal off site. Planning Context: Project Schedule Fund BOND Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 1,000,000 $0 $0 $0 $0 $0 $ 1,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 1,000,000 $0 $0 $0 $0 $0 $ 1,000,000 Project Budget Location Map Design Right-of-way $ 200,000 Construction Inspection Other (i.e. Materials) $ 650,000 Total 7-49 $0 $ 150,000 $0 $ 1,000,000 Main Street WTF Operator Control Center Status: 05 7.0503 Department: PW Target Year: 08-09 Description: New building to house operations staff. Location: Main Street Water Plant Related Projects: Justification: New construction obstructs view of treatment facility. New building located south of existing sedimentation basin would allow unobstructed view of 80%-90% of the facility. Additionally, existing building is over 70 years old, wiring and new control system needs are not always adaptable to such an old building. Planning Context: Project Schedule Fund 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013 2013-2018 Total WUF $ 450,000 $0 $0 $0 $0 $0 $ 450,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 450,000 $0 $0 $0 $0 $0 $ 450,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 7-50 $ 50,000 $0 $ 340,000 $ 60,000 $0 $ 450,000 Main Street WTF Maintenance Shop Building Status: 06 7.0504 Department: PW Target Year: 07-08 Description: Maintenance building to house treatment plant mechanic shop and equipment. Location: Main Street Water Plant Related Projects: Justification: Existing shop is 25 years old and not big enough to accommodate increase in staff and equipment needed to maintain twice as much equipment as existed in 1980. Overcrowding is a safety issue; existing shop must be relocated as part of Riverfront Development Plans. Planning Context: Project Schedule Fund BOND Total 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2017 Total $ 1,500,000 $0 $0 $0 $0 $0 $ 1,500,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 1,500,000 $0 $0 $0 $0 $0 $ 1,500,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 7-51 $ 200,000 $0 $ 1,100,000 $ 200,000 $0 $ 1,500,000 Friendship Tower Improvements Status: 05 7.0505 Department: PW Target Year: 06-07 Description: Coat interior of storage tank; replace cathodic protection system; bring electrical system to current standards; repair tank interior as needed; and enhance product mixing. Location: Friendship Tower - 1440 W. Desert Hills Drive Related Projects: Justification: Interior coating has deteriorated allowing corrosion inside the tank. Existing interior cathodic protection system is obsolete and no longer provides adequate protection; electrical system does not meet code; mixing within the tank must be upgraded to allow stored water to meet current and future regulations. Planning Context: Project Schedule Fund BOND Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 2,000,000 $0 $0 $0 $0 $0 $ 2,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 2,000,000 $0 $0 $0 $0 $0 $ 2,000,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 7-52 $ 250,000 $0 $ 1,550,000 $ 200,000 $0 $ 2,000,000 Main Street WTF Sedimentation Basin Covers Status: 05 7.0506 Department: PW Target Year: 06-07 Description: Install covers on sedimentation basins at Main Street Water Plant. Location: Main Street Water Plant Related Projects: Justification: Proximity of open basins to plant perimeter makes them accessible to contamination caused by objects and materials being thrown and blown from outside the plant. With increased public presence and activity in the area, this danger is greatly elevated. Covering the basins protects against contamination and is consistent with the EPA Mandated Vulnerability Assessment. Planning Context: Project Schedule Fund BOND Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 750,000 $ 750,000 $0 $0 $0 $0 $ 1,500,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 750,000 $ 750,000 $0 $0 $0 $0 $ 1,500,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 7-53 $ 75,000 $0 $ 1,340,000 $ 85,000 $0 $ 1,500,000 Main Street WTF Yard Paving Improvements Status: 05 7.0507 Department: PW Target Year: 06-07 Description: Pave unimproved areas within the treatment plant. Location: Main Street Water Plant Related Projects: Justification: Blowing dust from unpaved areas damages electrical system and electronic equipment and interferes with control system. Planning Context: Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total WUF $ 220,000 $0 $0 $0 $0 $0 $ 220,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 220,000 $0 $0 $0 $0 $0 $ 220,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 7-54 $ 20,000 $0 $ 195,000 $ 5,000 $0 $ 220,000 Water System Master Plan Update Status: 06 7.0508 Department: PW Target Year: 06-07 Description: Update the 2001 Water System Master Plan. Location: Citywide Related Projects: Justification: The Water System Master Plan was completed in 2001. As the third fastest growing community in the nation, Yuma needs a current master plan to adequately meet the needs of its water customers. A current master plan will allow Division to plan for future treatment facilities and infrastucture, system and facility expansions, and retrofit of existing facilities including location, capacity, and construction scheduling. Planning Context: Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total WUF $ 250,000 $0 $0 $0 $0 $0 $ 250,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 250,000 $0 $0 $0 $0 $0 $ 250,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 7-55 $ 250,000 $0 $0 $0 $0 $ 250,000 Main Street WTF AZPDES Permit Status: 06 7.0509 Department: PW Target Year: 06-07 Description: Testing, modeling and document submittal for AZPDES Permit Renewal/Modification. Location: Main Street Water Treatment Facility Related Projects: Justification: Without a discharge permit, the Main Street treatment plant cannot discharge water from sedimentation basins to the Colorado River in the event of an emergency nor can it discharge to the East Wetlands project. The major impact is no means to dispose of water in the event of an emergency and the East Wetlands project will not go forward. Planning Context: Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total WCF $ 750,000 $ 250,000 $0 $0 $0 $0 $ 1,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 750,000 $ 250,000 $0 $0 $0 $0 $ 1,000,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 7-56 $ 1,000,000 $0 $0 $0 $0 $ 1,000,000 12th Street Trunk Sewer, Phase I & II Status: 05 8.8705 Department: PW Target Year: 06-07 Description: Phase I - Pipeline YCWUA Kent Lateral to prepare for Phase II (complete). Phase II - 15" trunk sewer installation on 12th Street from 21st Drive, east 1,200 feet to and across East Main Canal and 12" trunk sewer east 1000 feet from East Main Canal to tie into Sunset Mesa Hillside Place facilities. Location: 12th Street - 21st Drive to East Main Canal. 12th Street - East Main Canal to Sunset Mesa/Hillside Place Gravity Collection System Related Projects: Justification: Development in area will require construction of sewer in conjunction with street improvements. Development of a portion of the area served by this sewer occurred in 1987 and serves the Country Meadows Subdivision. Extension to the Hillside Place Gravity Collection System will allow City to retire and remove an existing lift station. Planning Context: Project Schedule Fund BOND Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 1,700,000 $0 $0 $0 $0 $0 $ 1,700,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 1,700,000 $0 $0 $0 $0 $0 $ 1,700,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 8-1 $0 $0 $ 1,600,000 $ 100,000 $0 $ 1,700,000 Sanitary Sewer Line Repairs/Replacement Status: 06 8.9305 Department: PW Target Year: 10-11 Description: Replacement or parallel construction of selected sewer lines. TV inspection of lines would determine priority of replacement. Installation of 4th Ave parallel sewer in three phases: (1) 12" sewer in 26th St, 8th Ave to 4th Ave. (2) 12" sewer in 4th Ave, 22nd to 26th St. (3) 12" and 10" sewers in 4th Ave, 20th to 22nd St; and in 20th St, 4th Ave to 1st Ave. Location: 26th Street: 8th Avenue to 4th Avenue. 4th Avenue: 22nd Street to 26th Street. 4th Avenue: 20th to 22nd Streets and in 20th Street: 4th Avenue to 1st Avenue. Related Projects: Justification: Sewer Master plan report indicated need to parallel or upsizing line along 4th Avenue to relieve projected overloading. Will be confirmed by flow measurement and computer modeling. Planning Context: Project Schedule Fund 2010-2011 2011-2012 2012-2013 2013-2014 2014-2015 2015-2020 Total SUF $ 164,000 $ 1,000,000 $ 478,000 $0 $0 $0 $ 1,642,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 164,000 $ 1,000,000 $ 478,000 $0 $0 $0 $ 1,642,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 8-2 $ 164,000 $0 $ 1,368,000 $ 110,000 $0 $ 1,642,000 Avenue B & 24th Street 12" Force Main Status: 06 8.9404 Department: PW Target Year: 06-07 Description: Replace existing 12" Asbestos Cement (ACP) Force Main. Location: From Avenue B and 24th Street Lift Station to 20th Street and Avenue B Interceptor/Trunk Sewer. Related Projects: Justification: An A.C. Force Main cannot resist Hydrogen Sulfide damage if left exposed, because the Hydrogen Sulfide attacks concrete and cementateous materials. The existing line has deteriorated to a point where replacement is required. Planning Context: Wastewater Facilities Plan, Public Services Element of General Plan. Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total SUF $ 290,000 $0 $0 $0 $0 $0 $ 290,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 290,000 $0 $0 $0 $0 $0 $ 290,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 8-3 $0 $0 $ 275,000 $ 15,000 $0 $ 290,000 Manhole Rehabilitation/Reconstruction Status: 06 8.9502 Department: PW Target Year: 06-07 Description: 1. Replace Yuma Industrial interceptor from Giss Parkway at Gila Street to 16th Street (20 manholes) severe corrosion beneath urethane coat (complete). 2. Install MCAS Interceptor MCAS Gate, manhole #137 to 8th Avenue and 32nd Street, manhole #88 - all manholes suffering from severe corrosion beneath coating unable to assess structural condition. Additionally T-lock pipe ends are corroded severely restricting flow and causing severe base and channel erosion. a. remove lining, b. clean barrel and pipe ends, c. appraise need of repair, d. repair, e. recoat base, and d. recoat barrel or Magnesium Hydroxide slurry application. Location: Avenue A east to MCAS and Yuma Industrial Lateral. Various locations as necessary. Related Projects: Justification: Hydrogen sulfide has damaged manholes. Present coating needs to be reapplied every five years. May need total reconstruction where coating will not suffice. Planning Context: Wastewater Facilities Plan, Public Services Element of General Plan, Cascading Project. Project Schedule Fund BOND SUF Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 1,000,000 $0 $0 $0 $0 $0 $ 1,000,000 $0 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $0 $ 800,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 1,000,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $0 $ 1,800,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 8-4 $0 $0 $ 1,660,000 $ 140,000 $0 $ 1,800,000 Sewer Line Replacements/Improvements Status: 06 8.9593 Department: PW Target Year: 06-07 Description: Provide minor sanitary sewer extensions and modifications so that sewer service is available to all lots along street reconstruction projects. Location: All street, storm and water projects where funds will be needed Related Projects: Justification: Coordination of utility work with street, storm and water projects will provide the maximum benefit per dollar spent and reduce future street pavement cuts. Planning Context: Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total BOND $ 490,000 $0 $0 $0 $0 $0 $ 490,000 DD $ 500,000 $ 500,000 $ 500,000 $ 500,000 $ 500,000 $0 $ 2,500,000 SUF $ 170,000 $ 353,400 $ 400,000 $ 760,000 $ 636,000 $0 $ 2,319,400 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 1,160,000 $ 853,400 $ 900,000 $ 1,260,000 $ 1,136,000 $0 $ 5,309,400 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 8-5 $ 130,000 $0 $ 5,079,400 $ 100,000 $0 $ 5,309,400 Cemetery/Main Street - 6th-7th Streets Status: 06 8.9800 Department: PW Target Year: 11-12 Description: Install sewer main(s) for Cemetery Avenue and Main Street. Need to establish a special rate for these residences to provide City with a 10 year payback. Location: Cemetery Avenue & Main Street from 6th St. to 7th St. and 7th St. from Cemetery Ave. to Gila St. Related Projects: Justification: Residences are on Septic tanks. Parks Maintenance Building is on mound system. Planning Context: Project Schedule Fund IMPD Total 2011-2012 2012-2013 2013-2014 2014-2015 2015-2016 2016-2021 Total $ 30,000 $ 270,000 $0 $0 $0 $0 $ 300,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 30,000 $ 270,000 $0 $0 $0 $0 $ 300,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 8-6 $ 25,000 $ 5,000 $ 250,000 $ 20,000 $0 $ 300,000 Desert Dunes Water Pollution Control Fac. Status: 05 8.9803 Department: PW Target Year: 06-07 Description: Project for design, permitting, and construction of a new water pollution control facility and collection pipes to serve the East Yuma Mesa between Avenues 3E and 10E. Phase I: Plant design and construction to accommodate 3.0 MGD. Phase 1 completed in FY '04-'05. Phase II: Expansion of plant capacity from 3 MGD to 7 MGD design in FY '06-'07. Location: East Yuma Mesa Related Projects: Justification: Development on the East Mesa is occurring at a rapid rate. As there is no regional facility to treat wastewater, developers must rely on package treatment facilities or septic tanks. Additionally, there may be several developments between Avenues 3E and 10E which will be required to connect to a regional facility or construct a package plant. Construction of a regional plant to serve the East Mesa reduces the duplication of facilities and provides a long term solution for the residents of the East Mesa. Planning Context: Wastewater Facilities Plan, Public Services Element of General Plan, at an ultimate capacity of 10-12 MGD. Project Schedule Fund BOND Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 13,000,000 $0 $0 $ 49,000,000 $0 $0 $ 62,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 13,000,000 $0 $0 $ 49,000,000 $0 $0 $ 62,000,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 8-7 $ 4,000,000 $ 8,500,000 $ 44,500,000 $ 5,000,000 $0 $ 62,000,000 Administrative Building Expansion Status: 05 8.0003 Department: PW Target Year: 06-07 Description: Building expansion to house additional personnel, automatic samplers, pretreatment equipment, equipment washdown area, sinks and drying racks. Location: Figueroa Avenue - Water Pollution Control Facility Related Projects: Justification: Presently this critical equipment is being washed and stored outside because no other facilities are available. The existing method does not allow for proper equipment maintenance and is unacceptable as part of an adequate sampling program as mandated by USEPA. Figueroa plant staff has doubled since 1970 with no additional facilities. Planning Context: Project Schedule Fund BOND Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 70,000 $ 700,000 $0 $0 $0 $0 $ 770,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 70,000 $ 700,000 $0 $0 $0 $0 $ 770,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 8-8 $ 70,000 $0 $ 630,000 $ 70,000 $0 $ 770,000 Colorado River Interceptor Sanitary Sewer Status: 05 8.0004 Department: PW Target Year: 06-07 Description: Junction Box #4 (19th Avenue) and #5 (Avenue B) should be replaced with lined Manholes. Location: Colorado River Interceptor Related Projects: Justification: Unlined concrete Junction Boxes are being eroded by sulfide gases. Failure is certain, unless they are replaced. Planning Context: Project Schedule Fund BOND Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 400,000 $0 $0 $0 $0 $0 $ 400,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 400,000 $0 $0 $0 $0 $0 $ 400,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 8-9 $0 $0 $ 370,000 $ 30,000 $0 $ 400,000 1st Avenue Trunk Sewer Replacement Status: 05 8.0005 Department: PW Target Year: 07-08 Description: Replace overloaded 8" Vitrified Clay Pipe (VCP) sewer line in 1st Avenue from 1st Avenue to 16th Street to 10th Street, east to MH #2218, between Madison Avenue and Maple Avenue. Location: 1st Avenue - 16th Street to the Industrial Trunk Sewer Related Projects: 5.9602 Justification: The existing 8" pipe sewer system is overloaded. The sewer system needs to be increased to a 12" pipe just to handle existing flows. Any change in land use (or increase in intensity) could result in surcharged conditions. Planning Context: Project Schedule Fund 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2017 Total SUF $ 450,000 $0 $0 $0 $0 $0 $ 450,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 450,000 $0 $0 $0 $0 $0 $ 450,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 8-10 $ 10,000 $0 $ 400,000 $ 40,000 $0 $ 450,000 Riverfront Park Manhole Replacement Status: 05 8.0006 Department: PW Target Year: 06-07 Description: Replace completely 2 Beehive manholes on the Colorado River Interceptor manholes 2793 and 2679. Location: Colorado River Interceptor Manholes #2793 & 2679 Related Projects: 8.9502 Justification: Both manholes are original and above grade. Presence of sulfide gas has destroyed mortar and bases. Manholes subject to vandalism in park, further damage will result in failure if river floods (inside levee). Planning Context: Replace both manholes in conjunction with development of the riverfront. Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total SUF $ 90,000 $0 $0 $0 $0 $0 $ 90,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 90,000 $0 $0 $0 $0 $0 $ 90,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 8-11 $0 $0 $ 85,000 $ 5,000 $0 $ 90,000 5th Avenue Sewerline Replacement Status: 05 8.0100 Department: PW Target Year: 06-07 Description: Replace approximately 160' cast iron sewer from manhole 2241 east to manhole 2238. Include new manhole at approximately station 93+00. Location: 800 block of South 5th Avenue Sanitary Sewer Distribution Atlas page 1223. Related Projects: 7.8802 Justification: 8" cast iron sewer is in various states of failure. 6" sewer is of substandard size, but appears to be working fine. Inclusion of the manhole will allow for cleaning and inspection of the 6" sewer. Planning Context: Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total SUF $ 29,500 $0 $0 $0 $0 $0 $ 29,500 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 29,500 $0 $0 $0 $0 $0 $ 29,500 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 8-12 $ 29,500 $0 $0 $0 $0 $ 29,500 Figueroa WPCF - Aerator Upgrade Status: 05 8.0103 Department: PW Target Year: 06-07 Description: Rehabilitation and upgrade of aerator process to be constructed in accordance with Malcomb Pirnie Study, ADEQ construction approval, AZPDES permit negotiations, use Attainability Analysis to change, river designated in conjunction with Figueroa AZPDES permit. Location: Figueroa WPCF Related Projects: Justification: Existing improvements have reached end of useful life. New permit may require process change. Planning Context: Project Schedule Fund BOND Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 2,500,000 $ 1,000,000 $0 $0 $0 $0 $ 3,500,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 2,500,000 $ 1,000,000 $0 $0 $0 $0 $ 3,500,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 8-13 $ 195,000 $0 $ 3,105,000 $ 200,000 $0 $ 3,500,000 Figueroa WPCF SCADA Improvements Status: 05 8.0104 Department: PW Target Year: 06-07 Description: Design and construction of SCADA improvements at the Figueroa WPCF. Location: Figueroa WPCF Related Projects: Justification: Update monitoring and control of plant processes including central site software and hardware. Planning Context: Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total SUF $ 100,000 $ 50,000 $0 $0 $0 $0 $ 150,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 100,000 $ 50,000 $0 $0 $0 $0 $ 150,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 8-14 $0 $0 $ 150,000 $0 $0 $ 150,000 Figueroa WPCF Digester Electrical Upgrades Status: 05 8.0200 Department: PW Target Year: 06-07 Description: Relocate, upgrade and replace existing Motor Control Centers into new environmentally sound facility. Location: Figueroa Avenue WPCF Related Projects: Justification: Existing electrical equipment is in excess of 20 years of age and located in a highly corrosive environment. Replacement and relocation of this equipment is necessary if digester function is to continue. Planning Context: Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total SCF $ 150,000 $0 $0 $0 $0 $0 $ 150,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 150,000 $0 $0 $0 $0 $0 $ 150,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 8-15 $0 $0 $ 140,000 $ 10,000 $0 $ 150,000 Wastewater Utility Security Status: 05 8.0300 Department: PW Target Year: 06-07 Description: Vulnerability Assessment and upgrade present security systems to provide adequate protection for wastewater systems. Location: Figueroa Avenue WPCF, Jack Rabbit Mesa WPCF, East Mesa WPCF, Lift Stations, and Ferrous Chloride Station. Related Projects: Justification: Wastewater treatment plants and related facilities have been identified as targets of terrorists attack. Regular upgrade to current security systems will ensure adequate protection for the City wastewater system. Planning Context: Project Schedule Fund BOND Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 150,000 $0 $0 $0 $0 $0 $ 150,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 150,000 $0 $0 $0 $0 $0 $ 150,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 8-16 $0 $0 $ 140,000 $ 10,000 $0 $ 150,000 Figueroa WPCF Gate Replacements Status: 05 8.0301 Department: PW Target Year: 06-07 Description: Replace existing Gates and Primary gates. Location: Figueroa WPCF Related Projects: Justification: Existing gates and trough are 30 years old and cannot provide necessary security. Planning Context: Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total SCF $ 115,000 $ 500,000 $0 $0 $0 $0 $ 615,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 115,000 $ 500,000 $0 $0 $0 $0 $ 615,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 8-17 $0 $0 $ 605,000 $ 10,000 $0 $ 615,000 Upgrade Figueroa Service Area Status: 05 8.0302 Department: PW Target Year: 06-07 Description: Rehabilitate, replace, expand, and install new sanitary sewer interceptor in Figueroa Service Area. Location: Figueroa Sanitary Sewer Service Area Related Projects: Justification: Provide additional conveyance capacity. Planning Context: Project Schedule Fund BOND SSIC Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 2,500,000 $ 2,500,000 $ 2,500,000 $ 1,800,000 $0 $0 $ 9,300,000 $ 700,000 $0 $0 $0 $0 $0 $ 700,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 3,200,000 $ 2,500,000 $ 2,500,000 $ 1,800,000 $0 $0 $ 10,000,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 8-18 $ 200,000 $ 700,000 $ 8,390,000 $ 710,000 $0 $ 10,000,000 Sanitary Sewer Collection System Model Status: 05 8.0303 Department: PW Target Year: 06-07 Description: Conduct wastewater flow monitoring studies, to include the construction of permanent flow metering installations at various points on the City wastewater collection system. Collect field data on the existing system. Perform wastewater flow model and collection plan updates. Evaluate alternatives and perform other engineering studies, including training for City staff, as necessary, to monitor, model and assess the capacity of the City's wastewater collection system. Location: Citywide Related Projects: Justification: Provide information to the Department of Community Development regarding the collection capacity of the existing collection system relative to proposed developments and to initiate specific capital improvement projects to provide additional collection system capacity on an as needed basis. Planning Context: Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total SSIC $ 65,000 $ 30,000 $ 30,000 $ 30,000 $0 $0 $ 155,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 65,000 $ 30,000 $ 30,000 $ 30,000 $0 $0 $ 155,000 Total Project Budget Location Map Design Right-of-way $ 65,000 Construction Inspection Other (i.e. Materials) $ 84,000 Total 8-19 $0 $ 6,000 $0 $ 155,000 Citrus View WPCF Reconfiguration Status: 05 8.0304 Department: PW Target Year: 06-07 Description: Reconfigure Citrus View discharge to convey wastewater to the East Mesa collection system. Location: Citrus View WPCF Related Projects: Justification: Growth in the sanitary sewer service area and elimination of temporary package plant. Planning Context: Project Schedule Fund BOND Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 1,200,000 $0 $0 $0 $0 $0 $ 1,200,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 1,200,000 $0 $0 $0 $0 $0 $ 1,200,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 8-20 $0 $ 150,000 $ 1,000,000 $ 50,000 $0 $ 1,200,000 Jack Rabbit Mesa WPCF Upgrades Phase II Status: 05 8.0305 Department: PW Target Year: 06-07 Description: Upgrade treatment facilities in accordance with Jack Rabbit Mesa Treatment Master Plan, and negotiation with ADEQ and APP, to raise plant capacity from 260,000 GPD to 1,000,000 GPD (IMGD). Location: Jack Rabbit Mesa WPCF Related Projects: Justification: Growth in Jack Rabbit Mesa sanitary service area. Planning Context: Project Schedule Fund BOND Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 1,812,931 $ 8,400,000 $0 $0 $0 $0 $ 10,212,931 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 1,812,931 $ 8,400,000 $0 $0 $0 $0 $ 10,212,931 Project Budget Location Map Design Right-of-way $ 1,400,000 Construction Inspection Other (i.e. Materials) $ 7,312,931 Total 8-21 $0 $ 1,500,000 $0 $ 10,212,931 5th Street Sanitary Sewer Replacement Status: 05 8.0400 Department: PW Target Year: 07-08 Description: Replace 1,600 l.f. of 8" and 10" sanitary sewer mainline and manholes. Reconnect existing service lines. Location: 5th Street at 6/7 alley (MH 2431) to Ave. A (MH 2423) Related Projects: Justification: Pipe joints compromised by roots, resulting in failures, stoppages, overflows. Planning Context: Project Schedule Fund 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2017 Total SUF $ 280,000 $0 $0 $0 $0 $0 $ 280,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 280,000 $0 $0 $0 $0 $0 $ 280,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 8-22 $0 $0 $ 260,000 $ 20,000 $0 $ 280,000 10th Ave / Ave A Alley Sanitary Sewer Status: 05 8.0401 Department: PW Target Year: 07-08 Description: Replace 1,900 l.f. of 8" Vitrified Clay Pipe (VCP) with 8" Polyvinyl Chloride pipe (PVC). Reconnect service laterals. Location: 10th Avenue / Avenue A, alley 5th Street to 8th Street Related Projects: Justification: Tar sealed vitrified clay pipe is not gas tight, and is allowing root penetration creating stoppages. Planning Context: Project Schedule Fund 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2017 Total SUF $ 10,000 $ 400,000 $0 $0 $0 $0 $ 410,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 10,000 $ 400,000 $0 $0 $0 $0 $ 410,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 8-23 $ 10,000 $0 $ 370,000 $ 30,000 $0 $ 410,000 Figueroa Avenue WPCF Digester Improvements Status: 05 8.0402 Department: PW Target Year: 06-07 Description: Upgrade heat exchangers in digesters 1 and 2. Upgrade lids on digesters 1 and 2. Upgrade and coat interiors of digesters 1 and 2. Location: Figueroa Avenue WPCF Related Projects: Justification: Heat exchangers in digesters 1 and 2 are over twenty years old and over due for upgrade. The lid on digester 1 is over 30 years old and needs to be upgraded. The lid on digester 2 is over 12 years and leaks significantly, creating safety and environmental non-compliance issues. Planning Context: Project Schedule Fund BOND Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 600,000 $ 1,100,000 $0 $0 $0 $0 $ 1,700,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 600,000 $ 1,100,000 $0 $0 $0 $0 $ 1,700,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 8-24 $ 70,000 $0 $ 1,550,000 $ 80,000 $0 $ 1,700,000 Figueroa WPCF System Upgrades Status: 05 8.0403 Department: PW Target Year: 06-07 Description: Design, construct and inspect dechlorination improvements at the Figueroa treatment plant. Modify existing chlorination system to meet current requirements and accommodate dechlorination processes. Location: Figueroa Water Pollution Control Facility Related Projects: Justification: Addition is necessary to meet new AZPDES permit requirements for discharge to the Colorado River. Planning Context: Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total SCF $ 800,000 $0 $0 $0 $0 $0 $ 800,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 800,000 $0 $0 $0 $0 $0 $ 800,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 8-25 $0 $0 $ 750,000 $ 50,000 $0 $ 800,000 Figueroa WPCF Improvements Status: 05 8.0404 Department: PW Target Year: 06-07 Description: Add 3 million gallon capacity and upgrade existing structures to include Biological Nutrient Removal. Location: Figueroa Water Pollution Control Facility Related Projects: Justification: Upgrade and increase capacity is necessary to meet new AZPDES discharge permit requirements for discharge to the Colorado River. Planning Context: Project Schedule Fund BOND Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 1,500,000 $ 12,000,000 $ 8,000,000 $ 2,000,000 $0 $0 $ 23,500,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 1,500,000 $ 12,000,000 $ 8,000,000 $ 2,000,000 $0 $0 $ 23,500,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 8-26 $ 2,500,000 $0 $ 19,000,000 $ 2,000,000 $0 $ 23,500,000 Figueroa WPCF NPDES Renewal Status: 05 8.0405 Department: PW Target Year: 06-07 Description: Testing, modeling and document submittal for NPDES permit renewal. Location: Figueroa WPCF Related Projects: Justification: Without a permit renewal the Figueroa WPCF is not able to discharge its treated effluent to the Colorado River. Planning Context: Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total SCF $ 840,000 $ 300,000 $0 $0 $0 $0 $ 1,140,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 840,000 $ 300,000 $0 $0 $0 $0 $ 1,140,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 8-27 $ 1,140,000 $0 $0 $0 $0 $ 1,140,000 Update City's 208 Facilities Plan Status: 05 8.0500 Department: PW Target Year: 06-07 Description: The 208 Facilities Plan is the planning document for addressing growth within the City's sewer service area; setting minimum standards for treatment facilities; determining number of facilities and the infrastructure needed to meet future demands. Location: Citywide Related Projects: Justification: The Facilities Plan was last updated in 1999. Current and anticipated growth in the City's service area necessitates an updated 208 Facilities Plan. Planning Context: Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total SCF $ 100,000 $ 250,000 $0 $0 $0 $0 $ 350,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 100,000 $ 250,000 $0 $0 $0 $0 $ 350,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 8-28 $ 350,000 $0 $0 $0 $0 $ 350,000 Secondary Clarifier Upgrades & Improvements Status: 05 8.0501 Department: PW Target Year: 06-07 Description: Rehabilitate secondary clarifiers to include replacing catwalks, drive mechanisms, and piping; reconfigure troughs; coat interior and exterior; install covers and odor control equipment as needed. Location: Figueroa WPCF Related Projects: 8.0503 Justification: Existing clarifiers are 44 years old. Last major improvements were made 25 years ago. Improvements needed to address corrosion, safety, and odor problems. Planning Context: Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total SCF $ 150,000 $ 1,500,000 $ 2,000,000 $0 $0 $0 $ 3,650,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 150,000 $ 1,500,000 $ 2,000,000 $0 $0 $0 $ 3,650,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 8-29 $ 150,000 $0 $ 3,400,000 $ 100,000 $0 $ 3,650,000 Figueroa WPCF Inventory Control Building Status: 05 8.0502 Department: PW Target Year: 08-09 Description: Warehouse building for storage of equipment, piping and parts need to maintain the City's four treatment plants and 21 lift stations. Location: Figueroa WPCF Related Projects: Justification: Existing building was designed to accommodate needs of one treatment plant and five lift stations. Planning Context: Project Schedule Fund BOND Total 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013 2013-2018 Total $ 20,000 $ 200,000 $0 $0 $0 $0 $ 220,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 20,000 $ 200,000 $0 $0 $0 $0 $ 220,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 8-30 $ 20,000 $0 $ 180,000 $ 20,000 $0 $ 220,000 Figueroa Avenue WPCF Primary Clarifier Imp. Status: 05 8.0503 Department: PW Target Year: 06-07 Description: Rehabilitate primary clarifiers and gravity thickener to include upgrade of existing odor control equipment; upgrade catwalks, drive mechanisms, piping, re-configure troughs; upgrade coating; upgrade existing covers. Location: Figueroa Avenue WPCF Related Projects: 8.0501 Justification: Existing clarifiers are 44 years old. Last major improvements occurred 25 years ago. Improvements needed to address corrosion, safety, confined space and odor problems. Planning Context: Project Schedule Fund BOND Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 1,500,000 $ 2,000,000 $0 $0 $0 $0 $ 3,500,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 1,500,000 $ 2,000,000 $0 $0 $0 $0 $ 3,500,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 8-31 $ 15,000 $0 $ 3,185,000 $ 300,000 $0 $ 3,500,000 Figueroa WPCF Auxiliary Power Improvements Status: 06 8.0510 Department: PW Target Year: 06-07 Description: Evaluate critical auxiliary power requirements at the Figueroa WPCF. Augment/expand existing auxiliary power capacity to meet plant power needs. Location: Figueroa Water Pollution Control Facility Related Projects: Justification: One of the two generators is over 20 years old and no longer functions. The plant cannot maintain uninterrupted service with only one generator. State and Federal environmental regulations require auxiliary power. The generators, whether singly or combined, cannot supply adequiate power to facilities added since 1991 which includes motor control centers for critical plant functions. Planning Context: Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total UNF $ 750,000 $ 250,000 $0 $0 $0 $0 $ 1,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 750,000 $ 250,000 $0 $0 $0 $0 $ 1,000,000 Total Project Budget Location Map Design Right-of-way $ 125,000 Construction Inspection Other (i.e. Materials) $ 725,000 Total 8-32 $0 $ 150,000 $0 $ 1,000,000 28th Street Storm Drainage Status: 06 9.9301 Department: PW Target Year: 06-07 Description: Storm sewer installation in 28th Street from 8th Avenue to Kofa Retention Basin. 72" diameter pipe to 96" diameter pipe and basin. Basin construction costs to be shared by Yuma County Flood Control District and will be used as the local match for CIP No. 2.0001 grant application. Phase I: Smucker Basin Phase II: 28th Street (Smucker Basin to 8th Avenue) Phase III: Westridge Drive (Smucker Basin to 8th Avenue) Location: Area bounded by East Main Canal, 26th Place/Barbara, 32nd Street, 20th Street. Related Projects: Justification: Improve storm water drainage in area from Avenue A to Barbara Avenue and 26th Place. Planning Context: Rollover Project. YCFCD Master Plan. Project Schedule Fund 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total BOND $ 3,700,000 $ 2,400,000 $ 2,400,000 $0 $0 $0 $ 8,500,000 OTHR $ 1,200,000 $0 $ 1,000,000 $0 $ 1,000,000 $0 $ 3,200,000 ROAD $ 130,000 $0 $0 $0 $0 $0 $ 130,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 5,030,000 $ 2,400,000 $ 3,400,000 $0 $ 1,000,000 $0 $ 11,830,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 9-1 $ 30,000 $0 $ 11,300,000 $ 500,000 $0 $ 11,830,000 Storm Water Drainage - Del Oro Estates Status: 06 9.9316 Department: PW Target Year: 11-12 Description: Construct underground storm drainage collection system with surface inlets for Del Oro Estates. Construct outfall drain from Del Oro to Victoria Meadows Detention Basin. Location: Del Oro Estates Related Projects: Justification: Del Oro Estates has no provisions for storm water removal and is virtually flat having been designed for on-site stormwater disposal. This project will afford flooding protection for residents and remove storm water from City Streets. Planning Context: Improvement District project as conditioned upon annexation of the subdivision. Project Schedule Fund 2011-2012 2012-2013 2013-2014 2014-2015 2015-2016 2016-2021 Total IMPD $ 215,000 $ 1,500,000 $ 980,000 $0 $0 $0 $ 2,695,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 215,000 $ 1,500,000 $ 980,000 $0 $0 $0 $ 2,695,000 Total Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 9-2 $ 200,000 $ 15,000 $ 2,300,000 $ 180,000 $0 $ 2,695,000 Ext. Storm Sewer/Arena Dr/9th to 10th St Status: 05 9.9319 Department: PW Target Year: 07-08 Description: Extend existing storm sewer from Arena Drive and 9th Street south along Arena Drive to 10th Street then east to the intersection of 10th Street and 13th Avenue. Include inlet structures. Location: Arena Drive, 9th Street, 10th Street. 10th Street: Arena Drive to 13th Avenue. Related Projects: Justification: Water from 13th Avenue is supposed to be channeled in 10th Street, 9th Place and Arena Drive then conveyed by surface to the existing inlets at 9th Street and Arena Drive. However, such is not the case. Even moderately small storms create overland flow that quickly jumps curbs and creates erosion problems across private property. Planning Context: Project Schedule Fund HURF Total 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2017 Total $ 100,000 $0 $0 $0 $0 $0 $ 100,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 100,000 $0 $0 $0 $0 $0 $ 100,000 Project Budget Location Map Design Right-of-way $ 10,000 Construction Inspection Other (i.e. Materials) $ 80,000 Total 9-3 $0 $ 10,000 $0 $ 100,000 The Manors Storm Sewer System Status: 06 9.9400 Department: PW Target Year: 11-12 Description: Design, construct and inspect storm sewer to drain La Mesa Manor #1 and #2, Desert View, and La Mesa Park subdivisions. Will drain to YCFCD East Mesa Outfall - Phase V. Construction: $762,000, and Inspection: $20,000. Yuma County Flood Control District completed outfall line north of 26th Place in FY '03-'04. City will construct east-west tie-ins to the outfall line, from adjacent subdivisions. Location: La Mesa Manor #1 & #2, Desert View and La Mesa Park Subdivisions Related Projects: Justification: Conform to YCFCD East Mesa Storm Sewer Outfall plan and relief of overland flows to 26th Place, with resultant downstream flooding. Planning Context: Project Schedule Fund ROAD Total 2011-2012 2012-2013 2013-2014 2014-2015 2015-2016 2016-2021 Total $ 50,000 $0 $0 $0 $0 $0 $ 50,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 50,000 $0 $0 $0 $0 $0 $ 50,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 9-4 $ 50,000 $0 $0 $0 $0 $ 50,000 8th Avenue Storm Sewer Extension Status: 06 9.9401 Department: PW Target Year: 09-10 Description: Install 3000 L.F. - 48" storm drain sewer and appurtenances. Location: 8th Avenue - Catalina Drive to 28th Street. 28th Street - 24th Street east to 6th Avenue connect to existing. Related Projects: 5.9508 Justification: Capture overland flows from the area south and east of Catalina Drive and 8th Avenue. Planning Context: YCFCD West Yuma Mesa Master Plan. Project Schedule Fund ROAD Total 2009-2010 2010-2011 2011-2012 2012-2013 2013-2014 2014-2019 Total $ 40,000 $0 $0 $0 $0 $0 $ 40,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 40,000 $0 $0 $0 $0 $0 $ 40,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 9-5 $ 40,000 $0 $0 $0 $0 $ 40,000 6th Place Storm Sewer Status: 06 9.9402 Department: PW Target Year: 06-07 Description: Construct 1750 L.F. of 24" - 36" storm drain and appurtenances in accordance with the B&N Master Plan. Location: 6th Place - 21st - Magnolia Avenue and Magnolia Avenue - 6th to 8th Streets Related Projects: Justification: 1. Relieve overloading of existing downstream 17th Avenue storm sewer. 2. Conform to YCFCD's B&N Master Plan. Planning Context: YCFCD Master Plan Project Schedule Fund BOND Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $0 $ 530,000 $0 $0 $0 $0 $ 530,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 530,000 $0 $0 $0 $0 $ 530,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 9-6 $0 $ 50,000 $ 450,000 $ 30,000 $0 $ 530,000 Fix Alley Drainage - 4th Avenue & Ave. A Status: 05 9.9801 Department: PW Target Year: 06-07 Description: Phase I: Design concept report to identify drainage solutions in these alleys for storm and nuisance water and develop cost estimates. Phase II: Construction. Location: 1. East 4th Avenue Alley between 12th and 13th Streets. 2. West 4th Avenue Alley between 17th and 22nd Streets. 3. West Avenue A Alley between 6th and 7th Streets. Related Projects: 8.9503 Justification: These alleys need improved drainage facilities. Planning Context: Project Schedule Fund HURF Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 100,000 $0 $0 $0 $0 $0 $ 100,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 100,000 $0 $0 $0 $0 $0 $ 100,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 9-7 $0 $0 $ 100,000 $0 $0 $ 100,000 Araby Road Drainage Improvements Status: 05 9.0100 Department: PW Target Year: 06-07 Description: Replace drainage spillways with curb inlets and piping to stormwater basins, along the West side of Araby Road. Location: Araby Road at the Bluffs Subdivision Related Projects: Justification: Due to the street grade and the existing spillway configuration, stormwater flows skip over the spillways and are deposited in a property lying downhill from the Bluffs Subdivision. Planning Context: Project Schedule Fund ROAD Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 42,000 $0 $0 $0 $0 $0 $ 42,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 42,000 $0 $0 $0 $0 $0 $ 42,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 9-8 $ 5,000 $0 $ 35,000 $ 2,000 $0 $ 42,000 Stormwater NPDES Permit Status: 05 9.0101 Department: PW Target Year: 06-07 Description: Phase I: Prepare and submit all documentation necessary to secure a NPDES permit from ADEQ by 3/10/03 (completed). Permit addresses action plan for stormwater flows that will reach the Colorado and Gila Rivers. Phase II: Implement action plan and provide documentation to ADEQ. Location: Citywide Related Projects: Justification: USEPA/ADEQ-mandated permit requirement to assure that the waters of the US are not polluted by runoff waters generated from point and non-point sources. Planning Context: Joint effort with the Yuma County Flood Control District is recommended. Project Schedule Fund ROAD Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 125,000 $ 136,000 $ 100,000 $ 184,000 $0 $0 $ 545,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 125,000 $ 136,000 $ 100,000 $ 184,000 $0 $0 $ 545,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 9-9 $ 461,000 $0 $0 $0 $ 84,000 $ 545,000 Cibola Heights Stormwater Basin Improvements Status: 05 9.0401 Department: PW Target Year: 06-07 Description: Design, construct and inspect improvements to subdivision basin drainage and landscaping. Location: Cibola Heights Subdivision Related Projects: Justification: Developer of Cibola Heights did not complete basin improvements, to provide the City with a fully operational and aesthetically acceptable site. Planning Context: Project Schedule Fund HURF Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 15,000 $0 $0 $0 $0 $0 $ 15,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 15,000 $0 $0 $0 $0 $0 $ 15,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 9-10 $ 15,000 $0 $0 $0 $0 $ 15,000 Storm Water Drainage Status: 05 9.0500 Department: PW Target Year: 06-07 Description: To provide Storm Water drainage evacuation from retention basin. Location: 15th St. and 44th Ave. Basin #113-47-087 Related Projects: Justification: At present the Street Department evacuates stormwater from this location by bringing pumps and stringing hoses. Installation of an automated lift station and forcemain will provide more effective removal of stormwater. Planning Context: Project Schedule Fund HURF Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 260,000 $0 $0 $0 $0 $0 $ 260,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 260,000 $0 $0 $0 $0 $0 $ 260,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 9-11 $ 25,000 $0 $ 220,000 $ 15,000 $0 $ 260,000 Storm Water Lift Station Conversion Status: 05 9.0501 Department: PW Target Year: 10-11 Description: To install submersible pump with discharge at existing pumping structure at said retention basin. Location: YCFCD Central Storm Drainage detention area at 4th St. and Avenue A Related Projects: Justification: As it is set up at present time, the Street Division has to set a portable three inch pump at the south end of the basin, and pump into the Storm Drain at 4th Street and Avenue A to evaluate stormwater from the basin. With the conversion to an automated lift station and discharge the Street Division would not have to set up a smaller pump, and basin evacuation would be more effective. Planning Context: Project Schedule Fund HURF Total 2010-2011 2011-2012 2012-2013 2013-2014 2014-2015 2015-2020 Total $ 160,000 $0 $0 $0 $0 $0 $ 160,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 160,000 $0 $0 $0 $0 $0 $ 160,000 Project Budget Location Map Design Right-of-way Construction Inspection Other (i.e. Materials) Total 9-12 $ 30,000 $0 $ 120,000 $ 10,000 $0 $ 160,000 Dunes Drainage Basin Status: 05 9.0502 Department: PW Target Year: 06-07 Description: Landscape existing stormwater basin in accordance with City of Yuma criteria. Location: Tract "C" of Dunes Subdivision at 34th Street and 18th Avenue Related Projects: Justification: While functional as a stormwater facility, the basin site is not landscaped, leading to potential erosion from wind and water and creating the possibility for the generation of wind-blown dust. Planning Context: Project Schedule Fund HURF Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 Total $ 10,000 $0 $ 90,000 $ 5,000 $0 $0 $ 105,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 10,000 $0 $ 90,000 $ 5,000 $0 $0 $ 105,000 Project Budget Location Map Design Right-of-way $ 10,000 Construction Inspection Other (i.e. Materials) $ 70,000 Total 9-13 $0 $ 5,000 $ 20,000 $ 105,000 Prepared by the City of Yuma Department of Public Works 155 W. 14th Street Yuma, Arizona 85364 (928) 373-4520